Loading...
HomeMy WebLinkAboutS-41160103co r T v 0 0 w H Ld ry a c� 0 Q W U T 7 n N a k: 30 A POINT OF INTERSECTION STA 11+00.00 BRONSON WAY NORTH= STA 25+76.54 GARDEN AVE N HLENGINEERING P.O. Box 81211 Seattle, WA 98108 patrick@hl.engineenng (858) 581-0754 P K41V. 48 01 •$ Firs-ry AL6 FA G Q� C) I RIGHT-OF-WAY OF -WAY /2 �/ : I NG DEDICATED I ot / RIGHT-OF-WAY DEDICATED j I (1) 2" ELEC (SCL, L RIGHT-OF-WAY ST LIGHT) too i" I -- �31336d� , p3A 36d / 03133gd� -- / Ems, C3t336d SEE �,� / P lEC i�EE�EC / _PSEREC \ � _ I i 13+00 NO N 0 N m REVISION I _ 14+00 CENTERLINE (RIGHT-OF-WAY) BRONSON wA l' N .. �. n o Q POINT OF INTERSECTION -. STA 14+16.65 BRONSON WAY N= _ STA 44+62.12 MEADOW AVE N BY I DATE I APPR 1. COORDINATE UTILITY POLE REMOVAL WITH PURVEYOR. SEQUENCE WORK WITH STREET IMPROVEMENTS AS NEEDED TO PROVIDE CONTINUOUS STREET LIGHTING. 2. UNLESS NOTED OTHERWISE, CONDUIT BEND RADII SHALL BE 4' MINIMUM. DEPTH OF COVER OVER STREET LIGHT CONDUIT OUTSIDE OF JOINT TRENCHING CONDITION SHALL BE 18" MIN, DEPTH OF COVER OVER PRIMARY CONDUIT OUTSIDE OF JOINT TRENCHING CONDITION SHALL BE 36" MIN, 3. PROVIDE REPLACEMENT SURFACING (SIDEWALK OR VEHICLE PAVEMENT) MATCHING EXISTING OR PROPOSED NEW CONDITION OVER UTILITY TRENCH ROUTES. 603 IN COMPLIANCE WITH CITY OF RENTON STANDARDS 20 10 0 20 40 scale 1" = 20' feet � .- —As-NOTED Im CITY OF CITC HEADQUARTERS , axeDPAH --- RENTON1300 BRONSON WAY N, RENTON WA 98 BWR DATUM UTILITY CONVERSION PLAN °1tM1FO' � •*NLL� � Plonning/Building/Public Works Dept. wo . NMY BRONSON WAY N 10.11 CA-2.0 3 9