HomeMy WebLinkAboutR-41160156J I II I II I II I II I II EXISTING BUILDING i TO BE PARTIALLY I DEMOLISHED I I II w I J El I I II Q II I li ii I I CATCH BASIN INSERT PER i C.O.R. STANDARD DETAIL 216.30, TYP I I I I / i N II I SILT FENCE PER C.O.R. STANDARD DETAIL 214.00, TYP - � I / PROPERTY LINE, TYP MATCHLINE SEE SHEET CC-5.11 __------gRONSON WAY N TE$C NOTES: 1. APPROVAL OF THIS EROSIONISEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATIONILANDSCAPING IS ESTABLISHED. 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANTICONTRACTOR FORTHE DURATION OF CONSTRUCTION. 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER A$ TO INSURE THAT SEDIMENTAND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAY$, OR VIOLATE APPLICABLE WATER STANDARDS. 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE E$C FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. 6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN ATRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. 10 5 0 10 20 scale 1"=10' feet HLENGINEERING P.O. Box 81211 Seattle, WA 98108 (858}581-0754 Patrick Hansen -Lund, P.E. / Project Manager p Y �W (y aF w!pF�VS4 C L A _ pA g4,�4Ni(yfiPCe Y S'F40NpL6HG� I�—II—WtY/ 0 DATE ISSUE A 2019.09.16 LAND USE PERMIT APPLICATION B 2020.02.24 LAND USE MODIFICATION 1 2020.02.05 90% SITE PRICING SET 2 2020.03.13 50%CONSTRUCTION DOCUMENTS(VE) C 2020.05.04 CITY OF RENTON BUILDING PERMIT SET 3 2020.06.26 100%CD SET 4 2020.08.05 CITC REVISIONS 5 2020.08.05 VE REVISIONS D 2020.08.05 CITY OF RENTON BUILDING PERMIT CORRECTIONS E 2020.09.08 CITY OF RENTON CIVIL CONST PERMIT CORRECTIONS BUILDING PERMIT Drawn By: BR Checked By: PHL Directory. Sheet all 30" x 42' Project Name: CITC HEADQUARTERS Project Address: 1300 Bronson Way N. Renton,WA 98057 Sheet Title TESC PLAN SHEET 47 of 58 Sheet Number: CC- 5F 01 Pmject Number: 2401 Date: W20.10.11