Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRES 4448CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4448
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, ADOPTING BY
REFERENCE THE CURRENT CAPITAL FACILITIES PLANS FOR KENT, ISSAQUAH, AND
RENTON SCHOOL DISTRICTS, AND ADOPTING UPDATED SCHOOL IMPACT FEES
FOR EACH SCHOOL DISTRICT.
WHEREAS, under Renton Municipal Code Section 4-1-190 of Chapter 1, Administration
and Enforcement, of Title IV (Development Regulations), the City of Renton has heretofore
collected school impact fees on behalf of the Kent, Issaquah, and Renton School Districts; and
WHEREAS, the Kent, Issaquah, and Renton School Districts each have requested that the
City of Renton adopt their District's current Capital Facilities Plans; and
WHEREAS, as established in the current Kent School District Capital Facilities Plan, the
school impact fee rates for the Kent School District have been calculated at $5,818.09 per single
family dwelling unit, and $2,457.53 per new multi -family dwelling unit, an increase from the prior
single family dwelling unit rate of $5,692.85 and an increase from the prior multi -family dwelling
unit rate of $2,404.63; and
WHEREAS, as established in the current Issaquah School District Capital Facilities plan,
the school impact fee rates for the Issaquah School District have been calculated at $20,291 per
single family dwelling unit, and $8,353 per new multi -family dwelling unit, an increase from the
prior single family dwelling unit rate of $18,213 and an increase from the prior multi -family
dwelling rate of $12,043; and
WHEREAS, as established in the current Renton School District Capital Facilities Plan, the
school impact fee rates for the Renton School District have been calculated at $2,659 per single
family dwelling unit, and $4,737 per new multi -family dwelling unit, a decrease from the prior
1
RESOLUTION N0. 4448
single family dwelling unit rate of $7,681 and a decrease from the prior multi -family dwelling unit
rate of $4,989; and
WHEREAS, the City of Renton Fee Schedule lists the school impact fee rate charged on
behalf of each District,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The City Council of the City of Renton hereby adopts by reference as if fully
set forth herein the following Capital Facilities Plans:
A. The Kent School District Six -Year Capital Facilities Plan 2020-21 - 2026-27, dated
June 2021;
B. The 2021 Capital Facilities Plan of Issaquah School District No. 411, dated May 27,
2021; and
C. The 2021 Capital Facilities Plan of Renton School District No. 403, dated July 14,
2021.
SECTION II. The City Council hereby adopts the following school impact fees, to be
effective January 1, 2022, which will be listed in an updated City of Renton Fee Schedule:
A. Kent School District:
1. $5,818.09 per single family dwelling unit; and
2. $2,457.53 per new multi -family dwelling unit.
B. Issaquah School District:
1. $20,291 per single family dwelling unit; and
2. $8,353 per new multi -family dwelling unit.
PA
RESOLUTION NO. 4448
C. Renton School District:
1. $2,659 per single family dwelling unit; and
2. $4,737 per new multi -family dwelling unit.
SECTION III. Copies of each Capital Facilities Plan, attached hereto and adopted by
reference will be on file with the City Clerk.
PASSED BY THE CITY COUNCIL this 11th day of October
APPROVED BY THE MAYOR this 11th day of
Approved as to form:
'.44�
Shane Moloney, City Attorney
RES:1889:9/17/21
3
"'0%%111111111"
SEAL _ *"
ORA 'ED1S�e`�.�`.
2021.
Kent School District Six -Year Capital
Facilities Plan 2020-21- 2026-27
Dated June 2021
4' KENT SCHOOL DISTRICT
Im EQUITY EXCELLENCE COMMUNITY
Six -Year Capital Facilities Plan
2020-2021 through 2026-2027
June 2021
Kent School District No. 415
12033 SE 256`h Street
Kent, Washington 98030-6643
(253) 373-7295
BOARD of DIRECTORS
Ms. Denise Daniels, President
Ms. Michele Bettinger, Vice President
Ms. Maya Vengadasalam, Legislative Representative
Ms. Leslie Hamada, Director
Mr. Joe Bento, Director
ADMINISTRATION
Dr. Calvin J. Watts
Superintendent of Schools
Israel Vela, Chief School Operations and Academic Support Officer
Dr. Jewelle Harmon, Chief Accountability Officer
Mr. Benjamin Rarick, Executive Director of Fiscal Services Mr.
Dave Bussard, Director of Capital Planning & Facilities
2
Six -Year Capital Facilities Plan
Table of Contents
- Executive Summary.................................................................................................3
II - Six - Year Enrollment Projection.............................................................................4
III - Current Kent School District "Standard of Service".................................................6
Current Standards of Service for Elementary Students ................................................... 7
Current District Standards of Service for Secondary Students ........................................ 7
IV - Inventory and Capacity of Existing Schools............................................................8
V - Six -Year Planning and Construction Plan................................................................9
VI- Portable Classrooms...........................................................................................10
VII - Projected Six -Year Classroom Capacity...............................................................11
VIII- Finance Plan.....................................................................................................12
IX - Summary of Changes to June 2020 Capital Facilities Plan.....................................14
X- Appendices..........................................................................................................15
2
3
I - Executive Summary
This Six -Year Capital Facilities Plan has been prepared by the Kent School District as the
organization's capital facilities planning document, in compliance with the requirements of
Washington's Growth Management Act, King County Code K.C.C. 21A.43 and Cities of Kent,
Covington, Renton, Auburn, Black Diamond, Maple Valley, and SeaTac. This annual Plan
update was prepared using data available in the spring of 2021 for the 2021-2022 school year.
This annual update of the Plan reflects no new major capital projects, and an inflation -based
adjustment to prior year impact fee rates.
This Plan is consistent with prior long-term capital facilities plans adopted by the Kent School
District. This Plan is not intended to be the sole planning document for all of the District's
needs. The District may prepare interim and periodic Long -Range Capital Facilities Plans
consistentwith Board Policies, taking into account a longer or shorter time period, otherfactors
and trends in the use of facilities, and other needs of the District as may be required.
Prior Capital Facilities Plans of the Kent School District have been adopted by Metropolitan
King County Council and Cities of Kent, Covington, Auburn and Renton and included in the
Capital Facilities Plan element of the Comprehensive Plans of each jurisdiction. This Plan has
also been submitted to cities of Black Diamond, Maple Valley, and SeaTac for their information
and inclusion in their Comprehensive Plans.
In order for impact fees to be collected in the unincorporated areas of Kent School District,
the Metropolitan King County Council must adopt this Plan and a fee- implementing ordinance
for the District. For impact fees to be collected in the incorporated portions of the District, the
cities of Kent, Covington, Renton and Auburn must also adopt this Plan and their own school
impact fee ordinances.
This Capital Facilities Plan establishes a standard of service in order to ascertain current and
future capacity. While the State Superintendent of Public Instruction establishes square
footage guidelines for capacity, those guidelines do not account for local program needs in the
District. The Growth Management Act, King County and City codes and ordinances authorize
the District to make adjustments to the standard of service based on specific needs for
students of the District.
This Plan includes the standard of service as established by Kent School District. Program
capacity is based on an average capacity and updated to reflect changes to special programs
served in each building. Portables in the capacity calculation use the same standard of service
as the permanent facilities.
The capacity of each school in the District is calculated based on the District's standard of
service and the existing inventory of permanent facilities. The District's program capacity
3
4
of permanent facilities reflects program changes and the state's mandated reduction of class
size to meet the standard of service for Kent School District. Portables provide additional
transitional capacity.
Kent School District is the fifth largest (FTE basis) district in the state. Enrollment is
electronically reported monthly to the Office of the Superintendent of Public Instruction
("OSPI") on Form P-223. Although funding apportionment is based on Annual Average Full Time
Equivalent (AAFTE), enrollment on October 1 is a widely recognized "snapshot in time" that is
used to report the District's enrollment for the year as reported to OSPI.
The District's standard of service, enrollment history and projections, and use of transitional
facilities are reviewed in detail in various sections of this Plan. The District plans to continue
to satisfy concurrency requirements through the transitional use of portables.
This Plan currently represents projects in process funded primarily by the Kent School District's
2016 Bond, as well as the 2018 Capital Construction Levy. Additional information about these
projects can be found on the district's capital projects homepage (link . Additionally, project
updates sent to our community of stakeholders can be accessed on the KSD website link .
Based on revised student generation rates, and district enrollment projects, the district has
updated the proposed student impact fee rate for the coming year. For a short overview, see
Section IX (Summary of Changes to the June 2020 Capital Facilities Plan).
a
II - Six - Year Enrollment Projection
For capital facilities planning, enrollment growth projections are based on cohort survival and
student yield from documented residential construction projected over the next six years (See
Table2). For this Plan, the district relied substantially on the results from Dr. Les Kendrick's study
of long-range enrollment forecasts for the Kent School District in the Fall of 2020.
King County live births and the District's relational percentage average were used to determine
the number of kindergartners entering the system (See Table 1). 6.88% of 26,011 King County live
births in 2016 is projected for 1,789 students expected in Kindergarten for October 1, 2021. This
is an increase of 524 live births in King County over the previous year (See Table 2).
Early Childhood Education students (also identified as "ECE"), "Early Childhood Special Education
("ECSE") students are forecast and reported to OSPI separately on Form P-223H for Special
Education Enrollment. Capacity is reserved to serve students in the ECE programs at elementary
schools.
In addition to live birth data, enrollment projections for October 1, 2021 going forward rely upon
the results of the enrollment study by Dr. Kendrick, utilizing the "medium growth" methodology.
Within practical limits, the District has kept abreast of proposed developments. The District will
continue to track new development activity to determine impact to schools. Information on new
residential developments and the completion of these proposed developments in all jurisdictions
will be considered in the District's future analysis of growth projections.
The Kent School District serves eight permitting jurisdictions: unincorporated King County, the
cities of Kent, Covington, Renton, and Auburn and smaller portions of the cities of SeaTac, Black
Diamond, and Maple Valley.
STUDENT GENERATION FACTOR
"Student Factor" is defined by King County code as "the number derived by a school district to describe how
many students of each grade span are expected to be generated by a dwelling unit" based on district records
of average actual student generated rates for developments completed within the last ten years.
Following these guidelines, the student generation rate for Kent School District is as follows:
Single Family Elementary .277
Middle School .071
Senior High .086
Total .435
Multi -Family Elementary .258
Middle School .058
Senior High .100
Total .416
The student generation factor is based on a survey of 1,399 single-family dwelling units and 1,020 multi-
family dwelling units with no adjustment for occupancy rates.
In preparing the 2021-2022 to 2026-2027 Capital Facilities Plan the District contracted with Dr. Les Kendrick
of Educational Data Solutions LLC, a noted expert in demographic studies for school districts, to analyze and
prepare the student generation factor. EDC included both "garden" and "urban style" apartments in the
calculation for multi -family residences.
Within the district's borders there are several low-income and multi -family housing projects coming
on-line in 2021.Once developed with occupancy occurring the District does recognize that the student
generation for multi -family housing may impact future Capital Facilities Plan updates.
KENT SCHOOL DISTRICT No.415
OCTOBER REPORT 1251 H (HEADCOUNT) ENROLLMENT HISTORY
For 2021 UP - Headcount Enrollment History
LB = Live Births
LB in 2007 LB in 2008
LB in 2009
LB in 2010
LB in 2011
LB in 2012
LB in 2013
LB in 2014
LB in 2015
October HC Enrollment
2012
2013
2014
2015
2016
2017
2018
2019
2020
King County Live Births'
24,899
25,222
25,057
24,514
24,630
25,032
24,910
25,348
25,487
Increase / Decrease
655
323
-165
-543
116
402
280
316
139
Kindergarten / Birth %'
8.57%
8.40%
8.34%
8.34%
8.17%
8.14%
7.98%
7.93%
6.68%
Kindergarten
2,134
2,119
2,090
2,045
2,013
2,037
1,989
2,010
1,703
Grade 1
2,017
2,186
2,127
2,131
2,067
2,056
2,061
2,036
1,882
Grade 2
1,905
2,055
2,190
2,163
2,163
2,077
2,008
2,091
1,980
Grade 3
2,082
1,922
2,070
2,176
2,195
2,143
2,043
1,995
2,001
Grade 4
2,000
2,087
1,956
2,089
2,195
2,218
2,118
2,038
1,912
Grade 5
2,044
2,008
2,116
1,958
2,103
2,189
2,169
2,120
1,937
Grade 6
2,026
2,079
2,023
2,058
1,952
2,120
2,184
2,164
2,024
Grade 7 Middle School
2,139
2,046
2,104
1,974
2,021
1,922
2,044
2,166
2,010
Grade 8 "
2,139
2,121
2,091
2,100
2,021
2,043
1,882
2,073
2,086
Grade 9 Senior High
2,455
2,483
2,428
2,093
2,105
2,006
2,004
1,888
2,006
Grade 10 "
2,092
2,046
2,151
2,165
2,099
2,080
1,946
2,035
1,813
Grade 11 "
1,933
1,873
1,802
1,818
1,865
1,823
1,732
1,663
1,744
Grade 12 "
1,646
1,539
1,576
1,742
1,730
1,810
1,654
1,634
1,484
Total Enrollment 2
26,612
26,564
26,724
26,512
26,529
26,524
25,834
25,913
24,582
Yearly Headcount
Increase / Decrease
-3
-48
160
-212
17
-5
-690
79
-1,331
Cumulative Increase
-219
-267
-107
-319
-302
-307
1 -997
1 -918
1 -2,249
Change to Full Day Kindergarten for all schools
This number indicates actual births in King County 5 years prior to enrollment year as updated by Washington State Department of
Health, Center for Health Statistics. Kent School District percentage based on actual Kindergarten enrollment 5 years later.
2 Enrollment reported to OSPI on Form P-223 generates basic education funding and excludes Early Childhood Special Education
("ECSE" & "132" or Birth to 2 Preschool Inclusive Education) and excludes College -only Running Start students.
Kent School District Six -Year Capital Facilities Plan Table 1 May 2021
KENT SCHOOL DISTRICT No. 415
SIX -YEAR ENROLLMENT PROJECTION
2020 - 2026 Enrollment Projections
Full Day Kindergarten at all Elem
LB in 2015
LB in 2016
1 LB in 2017
1 LB in 2018
1 LB in 2019
1 LB in 2020
Est LB in 2021
ACTUAL
ENROLLMENT
PROJECTED ENROLLMENT
October
2020
2021
2022
2023
2024
2025
2026
King County Live Births
25,487
26,011
25,274
24,337
24,090
23,849
23,611
Increase / Decrease
139
524
-737
-937
-1,184
-1,425
-726
Kindergarten / Birth %
6.68%
6.88%
6.88%
6.94%
6.80%
6.65%
6.51%
FD Kindergarten
1,703
1,789
1,739
1,688
1,637
1,587
1,536
Grade 1
1,882
1,787
1,945
1,950
1,951
1,944
1,937
Grade 2
1,980
1,968
1,845
2,000
2,002
1,998
1,992
Grade 3
2,001
2,052
2,014
1,880
2,035
2,033
2,027
Grade 4
1,912
2,083
2,110
2,062
1,922
2,076
2,074
Grade 5
1,937
1,979
2,130
2,148
2,097
1,949
2,105
Grade 6
2,024
2,013
2,032
2,177
2,193
2,135
1,985
Grade 7 Middle School
2,010
2,060
2,024
2,033
2,176
2,188
2,130
Grade 8 "
2,086
2,105
2,130
2,085
2,091
2,233
2,245
Grade 9 Senior High
2,006
2,163
2,157
2,173
2,125
2,126
2,270
Grade 10 "
1,813
2,078
2,213
2,197
2,210
2,157
2,157
Grade 11 "
1,744
1,625
1,841
1,951
1,934
1,942
1,894
Grade 12 "
1,484
1,707
1,571
1,772
1,877
1,855
1,863
Total Enrollment Projection
24,582
j 25,410
1 25,751
1 26,117
1 26,250
1 26,224
1 26,215
Yearly Increase/Decrease
-1,331
828
341
366
133
-26
-9
Yearly Increase/Decrease %
-5.14%
3.37%
1.34%
1.42%
0.51%
-0.10%
-0.03%
Total Enrollment Projection
24,582 25,410 25,751 26,117 26,250 26,224 26,215
Live births for King County are estimates for year 2021
Projection Source: Les Kendrick Demographic Study, 2021 ("Medium Growth Model")
Kent School District Six -Year Capital Facilities Plan Table 2 May 2021
9
III- Current Kent School District "Standard of Service"
In order to determine the capacity of facilities in a school district, King County Code 21A.06
references a "standard of service" that each school district must establish in order to ascertain
its overall capacity. The standard of service identifies the program year, the class size, the
number of classrooms, students and programs of special need, and other factors determined
by the district which would best serve the student population.
This Plan includes the standard of service as established by Kent School District. The District
has identified schools with significant special needs programs as "impact" schools and the
standard of service targets a lower-class size at those facilities. Portables included in the
capacity calculation use the same standard of service as the permanentfacilities.
The standard of service defined herein will continue to evolve in the future. Kent School
District is continuing a long-term strategic planning process combined with review of changes
to capacity and standard of service. This process will affect various aspects of the District's
standard of service and future changes will be reflected in future capital facilities plans.
M
Current Standards of Service for Elementary Students
• Class size ratio for grades K - 3 is planned for an average of 23 students per class, not
to exceed 26.
• Class size ratio for grades 4 - 6 is planned for an average of 27 students per class, not
to exceed 29.
Some special programs require specialized classroom space and the program capacity of some
of the buildings housing these programs is reduced. Some students, for example, leave their
regular classroom for a short period of time to receive instruction in special programs and
space must be allocated to serve these programs.
Students may also be provided music instruction and physical education in a separate
classroom or facility.
Some identified students will also be provided educational opportunities in classrooms for
special programs such as those designated as follows:
English Learners (EL)
Education for Disadvantaged Students (Title 1) — Federal Program
Learning Assisted Programs (LAP) — State Program
Highly Capable Students— State Program
Reading, math or science Labs
Dual Language Programs in four elementary schools
Inclusive Education Service for Elementary and Secondary students with disabilities may be
provided in a separate or self-contained classroom sometimes with a capacity of 10- 15
depending on the program.
Current District Standards of Service for Secondary Students
The standards of service outlined below reflect only those programs and educational
opportunities provided to secondary students which directly affect the capacity of the school
buildings per the negotiated collective bargaining agreement with KEA.
• The average class size ratio for grades 7-8 is 30 students per class and 143 students
per day, with a maximum daily class load/enrollment of 150 based on five class periods
per day.
S
RE
• The average class size ratio for grades 9-12 is 32 students per class and 153 students
per day, with a maximum daily class load/enrollment of 160 based on five class periods
per day.
Like Inclusive Education Programs listed above, many other secondary programs require
specialized classroom space which can reduce the program capacity of the permanent school
buildings, such as technology labs, performing arts activities, a variety of career and technical
education programs, and other specialized programs.
Space or Classroom Utilization
As a result of scheduling conflicts for student programs, the need for specialized rooms for
certain programs, and the need forteachersto have a workspace duringtheir planning periods,
it is not possible to achieve 100% utilization of regular teaching stations at secondary schools.
Based on the analysis of actual utilization of classrooms, the Kent School District has
determined that the standard utilization rate is 95% for secondary schools. Program capacity
at elementary schools reflects 100% utilization at the elementary level.
10
12
IV - Inventory and Capacity of Existing Schools
Currently, the District has permanent program capacity to house 28,564 students and
transitional (portable) capacity to house 2,085. This capacity is based on the District's Standard
of Service as set forth in Section III. Included in this Plan is an inventory of the District's schools
by type, address and current capacity (See Table 3). The ratio between permanent capacity and
portable capacity is 94.9%-5.1%.
The program capacity is periodically updated for changes in programs, additional classrooms
and new schools. Program capacity has been updated in this Plan to reflect program changes
implemented in the Fall of 2020.
Calculation of Elementary, Middle School and Senior High School capacities are set forth in
Appendices A, B, and C. Maps of existing schools are included.
For clarification, the following is a brief description of some of the non-traditional programs
for students in Kent School District:
The 2021-2022 school year will have two academy programs within the district housed at our
new Kent Laboratory Academy. The project was approved by the Kent Board of Directors in
2019 by utilizing funding from the 2016 Bond Project "20 Classrooms". The new facility has
24 classrooms and will now be utilized for many types of Academy related programs. The
previous facility of these two programs (Kent Phoenix Academy Campus) will have the voter
approved 2018 Levy Projects completed and will be available for additional capacity for our
District at the secondary level.
iGrad - Kent School District has developed the Individualized Graduation and Degree Program
or "iGrad". iGrad offers a second chance to students aged 16-21 who have dropped out of high
school and want to earn a high school diploma. iGrad is not included in this Capital Facilities
Plan because it is served in leased space at the Kent Hill Plaza Shopping Center. Over the past
three years, enrollment in the iGrad program has averaged over 300 students.
12
13
KENT SCHOOL DISTRICT No.415
INVENTORY and CAPACITY of EXISTING SCHOOLS
SCHOOL Year ABR ADDRESS
Opened
2021 - 2022
Program
Capacity
Carriage Crest Elementary
1990
CC
18235 - 140th Avenue SE, Renton 98058
428
Cedar Valley Elementary
1971
CV
26500 Timberlane Way SE, Covington 98042
360
Covington Elementary
2018
CO
25811 156th Avenue SE, Covington 98042
630
Crestwood Elementary
1980
CW
25225 - 180th Avenue SE, Covington 98042
408
East Hill Elementary
1953
EH
9825 S 240th Street, Kent 98031
464
Emerald Park
1999
EP
11800 SE 216th Street, Kent 98031
477
Fairwood Elementary
1969
FW
16600 - 148th Avenue SE, Renton 98058
386
George T. Daniel Elementary
1992
DE
11310 SE 248th Street, Kent 98030
432
Glenridge Elementary
1996
GR
19405 - 120th Avenue SE, Renton 98058
431
Grass Lake Elementary
1971
GL
28700 - 191 st Place SE, Kent 98042
428
Horizon Elementary
1990
HE
27641 - 144th Avenue SE, Kent 98042
477
Jenkins Creek Elementary
1987
JC
26915 - 186th Avenue SE, Covington 98042
384
Kent Elementary
1999
KE
24700 - 64th Avenue South, Kent 98032
454
Kent Valley Early Learning Center
2014
KV
317 ---4th Ave S, Kent, WA 98032
318
Lake Youngs Elementary
1965
LY
19660 - 142nd Avenue SE, Kent 98042
497
Martin Sortun Elementary
1987
MS
12711 SE 248th Street, Kent 98030
455
Meadow Ridge Elementary
1994
MR
27710 - 108th Avenue SE, Kent 98030
454
Meridian Elementary
1939
ME
25621 - 140th Avenue SE, Kent 98042
497
Millennium Elementary
2000
ML
11919 SE 270th Street, Kent 98030
478
Neely -O'Brien Elementary
1990
NO
6300 South 236th Street, Kent 98032
454
Panther Lake Elementary
2009
PL
12022 SE 216th Street, Kent, 98031
552
Park Orchard Elementary
1963
PO
11010 SE 232nd Street, Kent 98031
463
Pine Tree Elementary
1967
PT
27825 - 118th Avenue SE, Kent 98030
487
Ridgewood Elementary
1987
RW
18030 - 162nd Place SE, Renton 98058
477
River Ridge Elementary
2021
RR
00000 - 22420 Military Rd S SeaTac, WA
758
Sawyer Woods Elementary
1994
SW
31135 - 228th Ave SE, Black Diamond 98010
477
Scenic Hill Elementary
1960
SH
26025 Woodland Way South, Kent 98030
454
Soos Creek Elementary
1971
SC
12651 SE 218th Place, Kent 98031
360
Springbrook Elementary
1969
SB
20035 - 100th Avenue SE, Kent 98031
396
Sunrise Elementary
1992
SR
22300 - 132nd Avenue SE, Kent 98042
477
Elementary TOTAL
13,813
Cedar Heights Middle School
1993
CH
19640 SE 272 Street, Covington 98042
895
Mattson Middle School
1981
MA
16400 SE 251st Street, Covington 98042
787
Meeker Middle School
1970
MK
12600 SE 192nd Street, Renton 98058
832
Meridian Middle School
1958
MM
23480 - 120th Avenue SE, Kent 98031
792
Mill Creek Middle School
2005
MC
620 North Central Avenue, Kent 98032
916
Northwood Middle School
1996
NW
17007 SE 184th Street, Renton 98058
926
Middle School TOTAL
5,148
Kent -Meridian High School
1951
KM
10020 SE 256th Street, Kent 98030
1,904
Kentlake Senior High School
1997
KL
21401 SE 300th Street, Kent 98042
1,957
Kentridge Senior High School
1968
KR
12430 SE 208th Street, Kent 98031
2,277
Kentwood Senior High School
1981
KW
25800 - 164th Avenue SE, Covington 98042
2,159
Senior High TOTAL 8,297
Kent Laboratory Academy 2021 KLA 00000 - 208th St Kent, WA 98030 456
Kent Phoenix Academy 2007 PH 11000 SE 264th Street, Kent 98030 850
DISTRICT TOTAL 28,564
Kent School District Six -Year Capital Facilities Plan Ta4!p 3 May 2021
14
......... m e w wrainyRa R
o: o
� w y me
O I rn dat & o
G
s 180th 5t G OOD ES
KENT
SCHOOL Tac �a
DISTRICT `''`'' GLENR!^GE S
r SPRINGBR00 ES G oL
a
> w
THE'R y
.yc sF a CP�
- - !.' � t
' E S CR r
PAR NR S
S 224th st o .
ORC AR S
? w SE232ndSt 1apleValley
m /
EAS:
L >
v
cc , t • r c RTU S ,i�fs
o 1KEKT ft 6EORGE T� OOD"ES
ar 9 �
1.,�°° !IE ES -0 "1
z fNERIDIi,' r G R�
LEYES
n
it
pW f. MILLE U 5 �S� ._ o
T2ndSt t�51 Hen
RIDGE 8 I w Eli. Run �J Rid
dIL
dfClut Open;
PINE £ a' a
`.GRASS LAKE ESCL
2861h S t > y! c,��� 88th St Qp
a
`v
".5.
z SAWYER
r SE 304th St J'
WOODS ES
Lea Hill o q
' SE 312th St
> asF
3 1a \�"r7'mp^d Rd tan
Main StAuburnQ
1s
15 Kent School District
Puget Sound
a
;
;
�•1r,,,, i. Mfrrormont
AaP10VAllrykd �A
as
<
H
p
7
W
F
_eMile Taroma
i
0
W
Int'IA,ryx,rt
s
in
<
�e
Normandy
W
r
'fie
Park
i*
Y
W M r'
m S 1761h S t
= ,ate
Oa
,ad
: G•d
y ;s
lean, St
�C
s '
?THWOOD MSs
Taylor
SlaethStS
brat
MEEK:
a ��
WFounwlal in
IL
S 20Ott% S 1
W
i
Hobart
/'
If0f17pMr.
V)
1 R_
;E 208
W
L
Des 4216thSt
S
5
Mal nes
a
o
LLA
0
MERIDIAN MS6
alley
SE 2.32ndSt
J,Koniw
Y
v
b 240th S i
o-laury Island
MATTSON Ma
Marine
Park
•
p » •i
9d
`
��
u<
-
SE 2561h Si
{ Y
= �
O
'"
i
m
CEDAR HEIGHTS MS d
i"ovtn
�
S
2nd Si
Be 234I91
SE Kent-Kangl•y ay
W III f.:un
Henrys
Rdye
Ravemdal e.
n :nit .lub
Own ��
5ugarloid
Mountain
F ore st
28M St
a
ct atntitcwt tia.. 81h 31
,NW
a
s
-Rea.
Ir
Z
r
t,'
ak i
a t[4a
S 30401St
V)
r
SE 3041h St
E
Lea Hill
•�%
Pdrner �c
�S112thSI
y1
StPVW
SE3121hSi
V90
Jellum
<
<
s
F
JeAum Connection
\Dash Point
320thSt
r S 320ihS1
OAT Uramor,d R a
4
y
Srta
State Park
�c
o
\
w t,„St
Auburn
O
P
�r
: Black
<
T
�
Federal
W vl.,-.hm tr�n
Diamond
o
\
tr�
Way
ki -
_
_
g tdrtlr,nrlo
lut
ow of fJ rrh
4s0
y
tin
Ism SISw
W
r
May 22, 2017 1:144,448
0 1.75 3.5 7 mi
0 2.75 5.5 11 km
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P,
NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri
(Thailand), Mapmylndia, NGCC, © OpenStreetMap contributors,
and the GIS User Community
16 Map by: SchoolSite Locator
Davis Demographics & Planning
16 Kent School District
w
hurler►- - -- - ; o 8i,
\
$E
Puget Sound
rn
-
`fit== `
Tl/fwila 3
3
R•"bn spl•Vall•yRd
a Mlrrormont
Rid
to
s
F
S�agb-Ttottu
I
>
<
Q
:
w
InflAltport
a
Normandy
$
_ o
w
a.
Park
v
>a
W
r 0
m S 17eM S t
;
�� O
%d
•
w
;S 1801h St
S16- Ca%
<
Q�
°j
is
Taylor
e S 18ith S IS
dt
f
Mountain
•�•
Forest
4
m
�
s 20•
•
KEN'TRIDGE HS
w
p
Hobart
SE 2144
•
a
w
rt'
L
•
Des 3216thSt
-
SE216thSt
a
<
s
MoinesPO�
o
N
apl e
SE 232nd St alley
8 240th S t
I,aury Island
0
Mw*w
Kent
Park
•�
, 5
;
S
S 2nd i r
—
SE Kent-Kantil•y t?y
!�
Finrys
I n ,- , R
Ravers dale
,t Open Space
Sugarlo
s
Food
289h S i
r"
�i
1"W
}S'i
FR•a•
LAKE HS
•� �a
,�.1,•�
S IOdthSt d'
^
3
SE
3046 St
n
=
;
Lea H11
4'v as
Palmer
9 312thSt ^
'1 sIt
�
SE 312h St
Pd o
_
Jefum
<
;
<
d'
`°
301trn Connecton
,Dash Font �20th S 1
.+. S 12011t S
0�•� �amo++d as
a
b
..+
Sdo
5101e Pak
g
,�„ S t Auburn
v�
�
Black
o
� p
Federal
to
g rl,a„-,..,,
•
Diamond
d,
Way S 33e `
�r,r
May 22, 2017 1:144,448
0 1.75 3.5 7 mi
0 2.75 5.5 11 km
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P,
NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri
(Thailand), Mapmylndia, NGCC, © OpenStreetMap contributors,
and the GIS User Community
16 Map by: SchoolSite Locator
Davis Demographics & Planning
17
V - Six -Year Planning and Construction Plan
In November 201C, the voters of the Kent School District approved a bond measure for
$252 million. This new bonding authority provided for the replacement for Covington
Elementary school, which opened in August of 2018, a new elementary school in the Kent Valley
(Currently being built at the former location of Kent Mountain View Academy — River Ridge
Elementary), and the twenty additional classrooms project redirected by the Kent School
Board to build a 20 classroom Kent Academy Facility housing multiple academy programs in
our district, which is currently underway at the site of the Old Panther Lake Elementary School
(The Laboratory Academy).
At the time of preparation of this Plan in spring 2021, the following projects to increase
capacity will be a part of our student capacity in the Kent School District.
• 'Construction is more than 80% completed for the New Valley Elementary School (River
Ridge) on West Hill within the City Limits of SeaTac, WA. The 89,000 square foot K-6
school project is being funded with bond funds and impact fees from King County. It will
open for the 2021-2022 school year.
• Construction is more than 95% complete for our new Kent Laboratory Academy at the
Old Panther Lake Elementary Site in Kent in order to free up space at the current Kent
Phoenix Academy location (formerly Sequoia Junior High) for additional classroom
space if needed and/or to open another middle school soon. The new 59,000 square
foot facility will accommodate a variety of Academy Programs within the Kent School
District.
• Some funding for lease or purchase of additional portables may be provided by
impact fees as needed. Sites are based on need for additional capacity.
As a critical component of capital facilities planning, county and city planners and decision -
makers are encouraged to consider safe walking conditions for all students when reviewing
applications and design plans for new roads and developments. This should include sidewalks
for pedestrian safety to and from school and bus stops as well as bus pull-outs and turn-
arounds.
Included in this Plan is an inventory of potential projects and sites identified by the District which
are potentially acceptable site alternatives in the future (See Table 4 & Sitemap).
19
F.
Voter approved bond issues have included funding for the purchase of sites for some of these
and future schools, and the sites acquired to date are included in this Plan. Some funding is
secured for purchase of additional sites, but some may be funded with impact fees as needed.
Not all undeveloped properties meet current school construction requirements, and some
property may be traded or sold to meet future facility needs. The Board of Directors has started
the process to sell surplus property over the last school year.
The Board will continue an annual review of standards of service and those decisions will be
reflected in each update of the Capital Facilities Plan.
18
19
KENT SCHOOL DISTRICT No.415
Site Acquisitions and Projects Planned to Provide Additional Capacity
Projected Projected % for
SCHOOL / FACILITY / SITE LOCATION Type Status Completion Program new
Date Capacity Growth
#on I Map ELEMENTARY
6 New Valley Elementary School (River Ridge) Old Kent Mountain View Academy Site Elementary Under 2021-2022 758 100%
Addition Construction
MIDDLE SCHOOL & SENIOR HIGH
3 New Academy Site (Kent Laboratory Academy) Old Panther Lake Elementary Site Academy Under 2021-2022 456 100%
Construction
TEMPORARY FACILITIES
Portables' TBD - For placement as needed
,on
Map
I 2
OTHER SITES ACQUIRED
1
164th SE (Across from Mattson)
25230-25050 164th SE, Covington 98042
2
Ham Lake area (Pollard)
16820 SE 240, Kent 98042
4
Shady Lk area (Sowers, Blaine, Drahota, Paroline)
17426 SE 192 Street, Renton 98058
5
SE of Lake Morton area (West property)
SE 332 & 204 SE, Kent 98042
10
South Central Site (Yeh)
SE 286th St & 124th Ave SE, Auburn 98092
12
256th - Covington (Halleson)
25435 SE 256th, Covington 98042
12a
156th - Covington (Wikstrom)
25847 156th Ave. SE, Covington 98042
Additional
Capacity
New Planning 2020+ 24-31 each 100%
Land Use
Designation
Type
Land Use
Jurisdiction
Rural
TBD
King County
Rural
Elementary
King County
Urban
Elementary
King County
Rural
Secondary
King County
Urban
TBD
King County
Rural
To be sold
King County
Rural
To be sold
King County
Notes:
TBD - To be determined - Some sites are identified but placement, timing and/or configuration of portables has not been determined.
2 Numbers correspond to sites on Site Bank Map on Page 19. Other Map site locations are parcels identified in Table 7 on Page 29.
Kent School District Six -Year Capital Facilities Plan Table 4 May 2021
19
Qen=rlol_ �qj Fairwood _ v, A-M
3LVaL C \ t ;� 'f{y ■Eleme ry Map/eYa;y
S < /J¢> Pork SL I$$ Sl Fairwood \ \;�-JC �e� Ne,gb/I Pmk `o \ Cedv Crave Arrporl C
MIMIC ENNTSSIT2�FL a �enlon rWDO� CDl Lake '� ar eun 1l4
�� Pork !%a COUn I f y Cl Ub o�y t _ j` 'G�p�E,
/ }
S_ 176 ST P o? I ¢ "� 2 \ IiSK`^ r" _ s =� + to
n' $[ 176 ST j,_ 0 ________ +
y < +'I - P Pf Pefroirrsp}y Rid J dod�r SE _ e
SEA: r r,5 ,�'_��-I Or Ilia G triage Porn gam' ;re _ �E�R
SW 43 c- RR RD SEII8U sl n ■ I: nt r c,
j G 1 ■ E ementary ryC
n B0W a r "y "uye �` ,-c I " : , �. / rl <'p F'�P,% 1
,10ke �,`fk , I _ 'I Luke Yuungs'Tr uil--_-- 5E '94.1s F �' L,ry o �=_- EI184 ST
`--�----, o J' >' 'Dula✓ord ST F,
89 a I oe al anePa eeker °` weo Cedar Grove
�' " ■ Middle Sc ool1+ dlelScho I 5C Id85 `�
1 t S_ -1192 ST SC 92 T SC 192 �T 6 , \ F
An
+ I 1) 31 Pork } + -- I -+-J '-- -I- �- \I �i� '+-- \ r--------- 1 \. +
--� —� PANT I rl�il�Ig L k1e Youn §JL oke , o U '
> L. O UU U iS1✓S- A O U ^ U - ^J qi� • l y U -.. Uc> oP
t's� , r_ cv % '-'-' SC 96 ST nllrbry,. R, o ■ Etentary co d- c� 1ci
a
S s zoc s \ x, ' S 1200 S 0 Icnthcr `"_ L oka t> ~ _ icy
\ J c lo!4Fnf! �ST Lokc K `4(entridgd- Ir�sr znr, sr c= in
TAC °
N v t^. .. e L A Youngs 1 \ Luke
i'� I ,
Irnl + f �y +x T;fi ST/I . a �> '' ■ High School ST � J v + 2U9+
o I\v rt ...i �, C17Y SCl TliC IAK/ DUNG :S' WA.!b)YSHf1)
- N K boratory I,C"r�
S 212 Si S i I71 S> aden Emerald Park o �/l ,--------
U ' i N n ■Elementary I'.I - --- - ---- 1 �i
2 $ i \\�`/I�ST Q �BrienlI ] 'a a q zlssr ■2165- c'onncnci r - r FJ� 1� -�1�s
1I I I ---lb
-
u' r r'is ny <�• ,I S 211 ST Trn llT_r
> p
`c�rrl:o•, SoosCreejc\, \� llal�GW a
a T --CSFkPPP ST ■ Elem ntari \�� �; �',P \ \ (Oka MAP E IV
r' ondr�'' rK E'' iNlii' s�;2sr , - •Eu u� SL(+_ 22L-- ST — -+- - G�� ���JJJ nI +;SF y
�k"�th tfJ�y-.�
■ Efemen�,, 22E Ij Sid slzasr=errrtro, ���s�
4 ( -T!n
�C ��, Pork.'--Par_k rch�rd Pork 1. v t i > orrnrrGEleii� nta v SC_ L57 ST :: za
y Neel "Etr z sr ry WesiCon on (((/ 322ST
Pk Y a
■ Ele ary 1 Q ,ru r - Meridian O I „� Hom `
T� Af cr,u: �I =
9le C r
SF r a' rrre ` ■MiddleSrh of r� r�oke
�F ''•� / 210 ST �o vP o e
r � V I'� N' J ^ + a l NLIhiF.6eek _ - +�i + - . + +
ST+ r �i 4� IIMiddle S h of ■ E#Q entary ;,,1 - °I °ko- l,9er r d orl a < - aC < ' , �i I i s PK �9,0
rl^m SVITTI ST -
'o. i cF t ��K� R ST cy .I Dahle - rrK /. r° - moo- v' o�
e o 'jrk +, z I r Mattson v' a
- c815 ■[EIQmBH�.aigli r - ti 2' b c l r,
I mnortun` ,,o, n!ry ■Middle Scho21-
Per: ,<� ■ Ele entart > r eKP ✓ ld. oe ��.
Q c Kent Meridian �� Q Cr twood
.l I/i
Hi School I -- - ■ ementary
o I rl I r_
z r ■East Hill Is- 6 ST Meridian �° ""�ArW-ilderngss
900 ent Sch �t
/� - KAF E ST o T - rAllenaian'I. + / + +
S m 7 ✓rrrs / +. 0 T ]District a \� [UK I CCr
g l F L I entwoo F „QKz Center ■ a'Elm Yeights
` �' \ • FE 1 l4dmmisf tioa, Hi h Scho y sE 4 �a �� ^kL
KP e rink / t \ ■ Scenic H111 f enter �� i�
l cI �ti� _ �a3 I srrh _ ��✓IlJ<
Elementary o ri x 5
' cnW " r " p ■ .. \ F .a � Cedar Valley -
A r ..UN, C� l r q a 'YGr SC ffi6 ST _ A
�crx 1 \`\ { JI + z _ r \ eek ■ Elementary `
� sr S > --'a MI le ium „.,,o „ e Ins C4�k�■ 'i �-
I' - �: `F• Gef9.ftt�lelils
Ir p Elements
r7 / iml JTA R ST �1 - I} `` �N P,/� / -,p + cE :72 SI `� sC� + e T OKE + SE F + rIPr7 �j Middle Schoo+ o SF
-L P/4 S - - Sr K-NT = =
LAKE�s X. �Pr, �n , . ,
�-, rP t' F GIs ST
2 s CC Co ton
i� LtKL �`� c 7 I 1I S ow ■ FirPit�T orizon
TAR nD i Thomas emente Z
y
f E_T6in
r R; YP a e men Ele t
S I> , S: 761 S nt ry cu le tar �FE �^^ti
SIG L Dkc I — �� ovington co l
Pork,. 'ifi p, 7t�r �� > f F, Grass Lake
> ` Ulsor nfon SEA Ele�t�@n�ta "
a� \�T'nrK s —-_ Berrydale�Q + ■ FiN/i�"Kry lD + SI4
S 2$8 ST +- jj -- ` + H COVI II,
Comcloi Pork `� Meredith �{-37 sT NWT-�✓//Itiubu/nMurlcip�( Y, �$OOS� Crest ;l
s �Zsz;I '2 r i _ B IU� �0/( "'< rt = 797 S- Airaork wl / \ k s„w,�•�,�-"
s i !
�1 .--� •� s r• --- 1 ¢ { r N SST �\PIc°J
c- , cn�S 796 IST C, i. - iT J -
t hristopher
i Grass L a re s- 9
tO P9. ST RAI NF
> :z N /mil �Q Br tii,riunl� ,G'aanlyJSF 3,1q ST O �y Kentlake■ 1i
T a 0 r :T Prrk Fork + + l_+ \m! + + HighSchool r�n
j + zs nv vi _ o� 9C, \I K ✓ � L GKe
Lokc _ b ;r �� ¢. 1
a 1IT mcT c�,r----� `1 c. _ lee Hill Seoitie !rl •1 } �q., 51 h Sawyer Woods ■ -=
J " s a,�"'��' Roce✓✓o Elementar
y
ark NV, 2 9r-Aoburrdalc
copyright KROLL MAP COMPANY, INC. This map has been modified by KSD 08/01
21
I - Portable Classrooms
The Plan references use of portables as interim or transitional capacity and facilities.
Currently, the District utilizes portables to house students in excess of permanent capacity and
for program purposes at some school locations (Please see Appendices A, B, Q.
Based on enrollment projections, implementation of full day kindergarten programs, lower
state mandated class sizes, program capacity, and the need for additional permanent capacity,
the District anticipates the need to purchase or lease additional portables during the next six -
year period to ensure capacity (Noted in section V. Six Yr. Planning Construction).
During the time period covered by this Plan, the District does not anticipate that all of the
District's portables will be replaced by permanent facilities. During the useful life of some of
the portables, the school -age population may decline in some communities and increase in
others, and these portables provide the flexibility to accommodate the immediate needs of
the community.
Portables may be used as interim or transitional facilities:
1. To prevent overbuilding or overcrowding of permanent school facilities.
2. To cover the gap between the times of demand for increased capacity and
completion of permanent school facilities to meet that demand.
3. To meet unique program requirements.
Portables currently in the District's inventory are continually evaluated resulting in some being
improved and some replaced.
The Plan projects that the District will use portables to accommodate interim housing needs
for the next six years and beyond. The use of portables, their impacts on permanent facilities,
life cycle and operational costs, and the interrelationship between portables, emerging
technologies, and educational restructuring will continue to beexamined.
20
22
VII - Projected Six -Year Classroom Capacity
As stated in Section IV, the program capacity study is periodically updated for changes in
special programs and reflects class size requirements, class size fluctuations etc. As shown in
the Inventory and Capacity chart in Table 3, the program capacity is also reflected in the
capacity and enrollment comparison charts (See Tables 5 & 5a-b-c).
Enrollment is electronically reported to OSPI on Form P-223 on a monthly basis and funding
apportionment is based on Annual Average FTE (AAFTE). The first school day of October is
widely recognized as the enrollment "snapshot in time" to report enrollment for the year.
Kent School District continues to be the fifth largest district (both FTE and headcount basis) in
the state of Washington. The P-223 Headcount for October 2020 was 24,587 with kindergarten
students counted at 1.0 and excluding ECSE and college -only Running Start students.
In October 2020, there were an additional 1,102 students in 11th and 12th grade participating
in the Running Start program at different colleges and receiving creditstoward both high school
and college graduation. Of these students, 686 attended classes only at the college ("college -
only") and are excluded from FTE and headcount for capacity and enrollment comparisons.
Kent School District has one of the highest Running Start program participation rates in the
state.
Based on the enrollment forecasts, permanent facility inventory and capacity, current
standard of service, portable capacity, and future additional classroom space, the District plans
to continue to satisfy concurrency requirements through the transitional use of portables (See
Table 5 and Tables 5 a-b-c).
This does not mean that some schools will not experience overcrowding. There may be a need
for additional portables and/or new schools to accommodate growth and additional programs
within the District. New schools may be designed to accommodate placement of future
portables. School attendance area changes, limited and costly movement of portables, zoning
changes, market conditions, and educational restructuring will all play a major role in
addressing overcrowding and underutilization as well as possible overcrowding of facilities in
different parts of the District.
22
23
KENT SCHOOL DISTRICT No. 415
PROJECTED ENROLLMENT and CAPACITY
TOTAL DISTRICT
SCHOOL YEAR
2020-21
2021-22
1 2022-23
1 2023-24
1 2024-25
1 2025-26
1 2026-27
Actual
P R O J E C T E D
27,255
0
28,564
0
28,564
0
28,564
0
28,564
0
28,564
0
28564
0
Permanent Program Capacity'
Changes to Permanent Capacity '
Capacity Increase (F)
Additional Permanent Classrooms
Permanent Program Capacity Subtotal
27,255
28,564
28,564
28,564
28,564
28,564
28,564
Interim Portable Capacity
Elementary Portable Capacity Required
1,248
0
0
0
0
0
0
Middle School Portable Capacity Required
0
0
0
0
0
0
0
Senior High School Portable Capacity Required
0
0
0
0
0
0
0
Interim Portable Capacity Total
1,248
0
0
0
0
0
0
TOTAL CAPACITY 28,503 1 28,564 1 28,564 1 28,564 1 28,564 1 28,564 1 28,564
TOTAL ENROLLMENT/ PROJECTION 2 1 24,582 1 24,410 1 25,751 1 26,117 1 26,250 1 26,224 1 26,215
DISTRICT AVAILABLE CAPACITY 3,921 4,154 2,813 2,447 2,314 2,340 2,349
1 Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes.
2 Projection Source: Les Kendrick Demographic Study, 2021 ("Medium Growth Model")
Kent School District Six -Year Capital Facilities Plan Table 5 May 2021
22
24 KENT SCHOOL DISTRICT No. 415
PROJECTED ENROLLMENT and CAPACITY
ELEMENTARY - Grades K - 6
SCHOOL YEAR 1 2020-21 1 2021-22 1 2022-23 1 2023-24 1 2024-25 1 2025-26 1 2026-27
Actual I P R O J E C T E D
Elementary Permanent Capacity' 1 13,000 13,000 13,758 13,758
New Elementary School - Kent Valley
758
Additional Permanent Classrooms 2
0
0
0
0
Subtotal
13,000
13,758
13,758
13,758
13,758 13,758 13,758
0 0 0
13,758 13,758 13,758
Portable Capacity Required' 1248 456 336 336 336 336 336
TOTAL CAPACITY 1 12 14,248 14,214 14,094 14,094 14,094 14,094 14,094
ENROLLMENT / PROJECTION 3 13,439 13,671 13,815 1 13,905 1 13,837 1 13,723 13,657
SURPLUS DEFICIT CAPACITY 809 543 279 189 257 371 437
Number of Portables Required
52 19 14 14 14 14 14
1 Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes
2 Additional classrooms will be placed at schools with the greatest need for aleve overcrowding
3 Projection Source: Les Kendrick Demographic Study, 2021 ("Medium Growth Model")
Enrollment & Projections reflect FULL Day Kindergarten at ALL Elementary schools @ 1.0 & exclude ECSE Preschoolers.
Kent School District Six -Year Capital Facilities Plan Table 5 A May 2021
24
25
KENT SCHOOL DISTRICT No. 415
PROJECTED ENROLLMENT and CAPACITY
MIDDLE SCHOOL - Grades 7 - 8
SCHOOL YEAR
2020-21
2021-22 1 2022-23
1 2023-24
1 2024-25
1 2025-26 2026-2027
Actual
I P R
O J
E C
T E D
Middle School Permanent Capacity' 5,148
Changes to Middle School C= 0
5,148 5,148 5,148 5,148 5,148 5,148
0 0 0 0 0 0
Subtotal 5,148 5,148 5,148 5,148 5,148 5,148 5,148
Portable Capacity Required' 0 0 0 0 0 0 0
TOTAL CAPACITY 1 & s 5,148 5,148 5,148 1 5,148 1 5,148 1 5,148 1 5,148
ENROLLMENT/PROJECTION 2 4,096 4,164 4,154 1 4,118 1 4,267 1 4,421 1 4,374
SURPLUS (DEFICIT) CAPACITY 1 1,052 984 994 1,030 881 727 774
Number of Portables Required 0 0 0 0 0 0 0
No Classroom Portables required at middle schools at this time. Some Portables used for classroom and program purposes.
1 Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes.
2 Projection Source: Les Kendrick Demographic Study, 2021 ("Medium Growth Model")
3 Surplus capacity due to grade level reconfiguration - All 9th grade students moved to the high schools in Fall 2004.
Kent School District Six -Year Capital Facilities Plan Table 5 B May 2021
25
26
KENT SCHOOL DISTRICT No. 415
PROJECTED ENROLLMENT and CAPACITY
SENIOR HIGH - Grades 9 - 12
SCHOOL YEAR
2020-21
2021-22
1 2022-23 1
2023-24
1 2024-2025 1
2025-26 1
2026-27
Actual
P
R O
J
E C
T E
D
Senior High Permanent Capacity 8,297 8,297 8,297 8,297 8,297 8,297 8,297
Changes to High School Capacity 0 0 0 0 0 0 0
Subtotal t3,29f t3,29/ 6,29t t3,29/ 6,29f t3,29/ 6,29t
Portables Capacity Required 1 0 0 0 0 0 0 0
TOTAL CAPACITY ' 1 8,297 8,297 8,297 8,297 1 8,297 1 8,297 1 8,297
ENROLLMENT/PROJECTION 3
7,047
7,574
7,782
8,094 1
8,146
1 8,080 1
8,184
SURPLUS (DEFICIT) CAPACITY
1,250
723
515
203
151
217
113
Number of Portables Required
0
0
0
0
0
0
0
No Classroom Portables required at this time. Some Portables used for classroom and program purposes.
Capacity is based on standard of service for programs provided and is updated periodically to reflect program changes
3 Projection Source: Les Kendrick Demographic Study, 2021 ("Medium Growth Model")
Kent School District Six -Year Capital Facilities Plan Table 5 C May 2021
26
27
VIII - Finance Plan
The finance plan shown on Table 6 demonstrates how the Kent School District plans to finance
improvements for the years 2021-2022 through 2026-2027. The financing components include
secured and unsecured funding and impact fees. The plan is based on future bond issues, state
school construction assistance, collection of impact fees under the State Growth Management
Act and voluntary mitigation fees paid pursuant to State Environmental Policy Act.
With River Ridge Elementary School (New Valley School Project) and Kent Laboratory Academy
(New Academy Project) coming on-line for school year 2021-2022, this will help support the
capacity issue that has been an issue for our district. The building rate within the City of Kent
and surrounding areas within our boundary continue to be robust. The district is likely to see
growth in enrollment due to these conditions.
In November 2016, the District held a special election to approve the authorization of
$252,000,000 in bonding authority. The projects described above are part of this
authorization. The first series of bonds ($80 million) were issued in February 2017, which
funded the Covington Elementary Replacement School, as well as other infrastructure
projects. Impact fees will be used at both the New Valley and Academy projects due to
escalation in construction pricing across the Pacific Northwest.
According to RCW 82.02.090, the definition of an impact fee is "... a payment of money
imposed upon development as a condition of development approval to pay for public facilities
needed to serve new growth and development, and that is reasonably related to the new
development that creates additional demand and need for public facilities, that is a
proportionate share of the cost of the public facilities, and that is used for facilities that
reasonably benefit the new development. Impact fee' does not include a reasonable permit
or application fee." Mitigation or impact fees can be calculated on the basis of "unhoused
student need" or "the maintenance of a district's level of service" as related to new residential
development.
A mitigation/impact fee may be imposed based upon a determination of insufficient existing
permanent and/or portable school space or to pay for permanent and/or portable school
space previously constructed as a result of growth in the district. A district's School Board must
first approve the application of the mitigation or impact fees and, in turn, approval must then
be granted by the other general government jurisdictions having responsibility within the
district, counties, cities and towns. (Kent, Covington, Renton, Auburn, Black Diamond, Maple Valley,
and SeaTac)
Though the current enrollment projections increase for both elementary and secondary
schools are relatively flat, the ongoing need to provide permanent instructional facilities to
house students is a driving need as the shifts in our family populations continue, due to
ongoing development. Impact fees will be used to support and address the challenges related
to the number of temporary instructional facilities currently in use, the replacement of some
of these aged facilities, the maintenance of the district's level of services, and the potential
expansions to existing facilities in future years.
20
28
The Kent School District 2021 UP update includes continued execution of the 2016 Capital Bond
Projects and anticipation of the data collection and review of our Facility Assessment Reports within
the coming months. With the opening of our River Ridge Elementary School and the Kent Laboratory
Academy, we are advancing opportunity to add capacity for our programs and student -based needs.
The District Facilities and Capital Planning Teams have been preparing to complete an initial plan
(Fall 2021) as we move the next steps of creating a Capital Bond Planning Task Force (CBPTF) — which
will include District personnel, design professionals, teaching staff, student voice as well as
community members to being well collaborated discussions to this platform. Our initial plan has
revealed priorities including school replacement due to age, and the need for added permanent
facilities to (1) reduce and eliminate our need for portables and (2) accommodate future growth as
housing in the Kent region continues to expand. Once the CBPTF has it will be brought before the
District's Board of Directors for comments, discussion, and approval. A Capital Bond Measure would
follow soon after approval. Portable purchases may be required before the Bond Measure passes as
it takes approximately three years from design to open for most large-scale projects such as schools
or added permanent capacity. Future updates to this Capital Facilities Plan will include detail of any
adopted planning.
For the Six -Year Finance Plan, costs of future schools are based on estimates from Kent School
District Capital Planning Team. Please see pages 13-14 for a summary of the cost basis.
Cost Basis Summary
For impact fee calculations, construction costs are based on cost of the last elementary school,
adjusted for inflation, and projected cost of the future elementary schools and additional
classrooms.
Project
Projected Cost
New Elementary School
$55,000,000
Kent Valley (To open Fall 2021) - Board Approved Name
— River Ridge Elementary
New Academy Facility (To open Fall 2021) - Board
$36,000,000
Approved Name — Kent Laboratory Academy
Site Acquisition Cost
The site acquisition cost is based on an average cost of sites purchased or built on within the
last ten years. Please see Table 7 for a list of site acquisition costs and averages.
District Adjustment
The impact fee calculations on Appendix B & C include a "District Adjustment" which is equal
to the amount of increase that the impact fee formulas total for this year and adjusted for the
decrease in the 2022 CY Consumer Price Index (2.2%) for the Seattle metropolitan area
(Previously 2.5% for the 2021 CY).
29
29
KENT SCHOOL DISTRICT No.415
SIX -YEAR FINANCE PLAN
Secured
Unsecured
Impact
SCHOOL FACILITIES * 2021 2022 2023 2024 2025 2026 2027 TOTAL
Local & State
State 2 or Local 3
Fees 5
Estimated Estimated
PERMANENT FACILITIES
$0
$0
No School Projects at this time.
TEMPORARY FACILITIES
Additional portables 3-4
OTHER
N/A
Totals
$0 $0 $0 $0 $0 $0 $0
$0
$0 $0 $0
F = Funded U = Unfunded
NOTES:
2 The District anticipates receiving some State Funding Construction Assistance for some projects.
3 Facility needs are pending review. Some of these projects may be funded with impact fees.
4 Cost of portables based on current cost and adjusted for inflation for future years.
5 Fees in this column are based on amount of fees collected to date and estimated fees on future units.
Kent School District Six -Year Capital Facilities Plan Table 6 May 2021
28
30
Type &
# on Map
Elementary
School / Site
KENT SCHOOL DISTRICT No.415
Site Acquisitions & Costs
Average of Sites Purchased, Sold or Built on within last 10 Years
Year Open /
Purchased
Sold
Location
12 / Urban
Property Sale-29.7 acres of Plemons-Yeh site
2016
SSE 124th Ave and 284th ST SE
29.70
7 / Rural
Property Sale - Scarsella site
2015
2900 Kent Black Diamond RD SE
13.25
3 / Rural
Property Sale - Old Covington Parcel A, #362206-9081
2019
17070 SE Wax Rd, Covington
8.00
3 / Rural
Property Sale - Old Covington Parcel , #362206-9081
2021
17070 SE Wax Rd, Covington
8.00
6 / Rural
Property purchased for new elementary
2019
5 lots purchased Military Road South SeaTac WA
10.00
Middle School
Senior High
No Acquisitions for Middle School
No Acquisitions for Senior Highs
Note: All rural sites were purchased prior to adoption of Urban Growth Area.
Numbers correspond to locations on Site Bank & Acquisitions Map on Page 17.
Properties purchased prior to 2010
1 / Urban
Site - Covington area North (So of Mattson MS)
2 / Rural
Site - Ham Lake east (Pollard)
4 / Urban
Site - Shady Lake (Sowers-Blaine-Drahota-Paroline)
5 / Rural
Site - SE of Lake Morton area (West property)
10 / Urban
Site - Yeh-Williams (W of 132 Ave SE at SE 288)
12 / Urban
Site - SE 256th Covington (Halleson)
12a / Urban
Site - 156th Ave. SE Covington (Wikstrom)
1984
1992
1995
1993
1999
2000
2004
Elementary Site Subtotal 68.95
Cost/Price
$947,536
$330,000
$3,869,697
0,000,000
$1,770,355
$6,917,588
0.00 $0
Middle School Site Subtotal 0.00 $0
0.00
Senior High Site Subtotal 0.00
Total Averaqe Cost / Acre
$31,904
$24,906
$483, 712
$0
$177,036
$100,328
Elem site average
$0
Middle Schl Site Avg.
$0 $0
$0 $0
Sr Hi Site Average
Total Acreage & Cost
Total Average Cost / Acre
68.95 $6,917,588
$100,328
Kent School District Six -Year Capital Facilities Plan Table 7 May 2021
20
31
KENT SCHOOL DISTRICT
FACTORS
FOR ESTIMATED
IMPACT FEE CALCULATIONS
Student Generation
Factors - Single Family
Student Generation Factors - Multi
-Family
Elementary
(Grades K - 6)
0.277
Elementary
0.258
Middle School
(Grades 7 - 8)
0.071
Middle School
0.058
Senior High
(Grades 9 - 12)
0.086
Senior High
0.100
Total
0.435
Total
0.416
Projected Increased Student Capacity
Elementary 758
Middle School 0
Senior High (Academy) 456
Required Site Acreage per Facility
Elementary (required) 12
Middle School (required) 25
Senior High (required) 38
New Facility Construction Cost
Elementary * $55,000,000
Middle School $0
Senior High * (Academy) $36,000,000
Temporary Facility Square Footage
Elementary
125,204
Middle School
10,256
Senior High
21,296
Total 4.3%
156,756
Permanent Facility Square Footage
Elementary 1,621,688
Middle School 660,904
Senior High/Other 1,223,349
Total 95.7% 3,505,941
Total Facilities Square Footage
Elementary
1,746,892
Middle School
671,160
Senior High/Other
1,244,645
Total
3,662,697
Developer Provided Sites / Facilities
Value 0
Dwelling Units 0
OSPI - Square Footage per Student
Elementary
115
Middle School
148
Senior High
173
Special Education
??
Average Site Cost / Acre
Elementary
$100,328
Middle School
$0
Senior High
$0
Temporary Facility Capacity & Cost
Elementary @ 24
$0
Middle School @ 29
$0
Senior High @ 31
$0
State Funding Assistance Credit
District Funding Assistance Percentage 53.79%
Construction Cost Allocation
CCA - Cost/Sq, Ft. $238.22
District Average Assessed Value
Single Family Residence $268,271
District Average Assessed Value
Multi -Family Residence $226,726
Bond Levy Tax Rate/$1,000 1.41
Current Rate / 1,000 Tax Rate 0.0014
General Obligation Bond Interest Rate
Current Bond Interest Rate 2.44%
CPI Inflation Factor 2.20%
Per OSPI Website
Kent School District Six -Year Capital Facilities Plan (APPENDIX A) May 2021
30
32
KENT SCHOOL DISTRICT
IMPACT FEE CALCULATION for SINGLE FAMILY RESIDENCE
Site Acquisition Cost per Single Family Residence
Formula: ((Acres x Cost per Acre) / Facility Capacity) x Student Generation Factor
Required Site Acreage Average Site Cost/Acre I
Facility Capacity I
Student Factor
A 1 (Elementary) 12 $100,328
758
0.27734 $440.50
A 2 (Middle School) 25 $0
0
0.07076 $0.00
A 3 (Senior Hiqh) 38 $0
456
0.08649 $0.00
Total 75 $100,328 1,214 0.435
A -:> $440.50
Permanent Facility Construction Cost per Single Family Residence
Formula: ((Facility Cost / Facility Capacity) x Student Factor) x (Permanent/Total Square Footage Ratio)
Construction Cost
Facility Capacity
Student Factor I
Footage Ratio
B 1 (Elementary) $55,000,000
758
0.27734
0.903 $18,171.62
B 2 (Middle School) $0
0
0.07076
0.984
B 3 (Senior High) $36,000,000
456
0.08649
0.998 $6,814.50
Total $91,000,000
1,214
0.435
$24,986.13
Temporary Facility Cost per Single Family Residence (Portables)
Formula: ((Facility Cost / Facility Capacity) x Student Factor) x (Temporary / Total Square Footage Ratio)
Facility Cost
I Facility Capacity
I Student Factor I
Footage Ratio
C 1 (Elementary)
$0
24
0.27734
0.097
C 2 (Middle School)
$0
29
0.07076
0.016
C 3 (Senior Hiqh)
$0
31
0.08649
0.02
Total
$0 84 0.435
State Funding Assistance Credit per Single Family Residence (formerly "State Match")
$0.00
$0.00
$0.00
$0.00
Formula: Area Cost Allowance x SPI Square Feet per student x Funding Assistance % x Student Factor
Construction Cost Allocation SPI Sq. Ft. / Student I
Assistance % I
Student Factor
D 1 (Elementary) $238.22 115
0.5379
0.27734
$4,086.86
D 2 (Middle School) $238.22 148
0.5379
0.07076
$1,342
D 3 (Senior High) $238.22 173
0.5379
0.08649
$1,917
$7,346.10
Tax Credit per Single Family Residence
Average SF Residential Assessed Value (AAV)
$268,271
Net Present Value (per EQ) (NPV)
8.90
Current Debt Service Rate / 1,000 ( r)
0.14%
TC b
$3,366.53
(Below used to calculate NPV)
Current Bond Interest Rate
2.44%
Years Amortized (10 Years)- Used in NPV Calculation
10
Developer Provided Facility Credit Facility / Site Value
Dwelling Units
0
0
FC 0
Fee Recap*
A = Site Acquisition per SF Residence $440.50
B = Permanent Facility Cost per Residence $24,986.13
C = Temporary Facility Cost per Residence $0.00
Subtotal
$25,426.63
D = State Match Credit per Residence $7,346.10
TC = Tax Credit per Residence $3,366.53
Subtotal
$10,712.63
Total Unfunded Need
$14,713.99
50% Developer Fee Obligation
$7,357
FC = Facility Credit (if applicable)
$0
District Adjustment
(1538.90)
Net Fee Obligation per Residence - Single Family
$5,818.09
Kent School District Six -Year Capital Facilities Plan (APPENDIX B) June 2020
32
33
KENT SCHOOL DISTRICT
IMPACT FEE CALCULATION for MULTI -FAMILY RESIDENCE
Site Acquisition Cost per Multi -Family Residence Unit
Formula: ((Acres x Cost per Acre) / Facility Capacity) x Student Generation Factor
Required Site Acreage I Average Site Cost/Acre
I Facility Capacity I
Student Factor I
A 1 (Elementary) 12 $100,328
758
0.25784
$409.53
A 2 (Middle School) 25 $0
0
0.05784
A 3 (Senior High) 38 $0
456
0.100
$0.00
Total $75 100,328
1,214
0.416
A
$409.63
Permanent Facility Construction Cost per Multi -Family Residence Unit
Formula: ((Facility Cost / Facility Capacity) x Student Factor) x (Permanent / Total Square Footage Ratio
Construction Cost Facility Capacity
Student Factor
Footage Ratio
B 1 (Elementary) $55,000,000 758
0.25784
0.903
$16,893.96
B 2 (Middle School) $0 0
0.05784
0.984
B 3 (Senior High) $36,000,000 456
0.100
0.998
$7,878.95
Total $91,000,000 1,214
0.416
$24,772.91
Temporary Facility Cost per Multi -Family Residence Unit
Formula: ((Facility Cost / Facility Capacity) x Student Factor) x (Temporary / Total Square Footage Ratio)
Facility Cost Facility Capacity
Student Factor I
Footage Ratio
C 1 (Elementary) $0 24
0.25784
0.097
$0.00
C 2 (Middle School) $0 29
0.05784
0.016
$0
C 3 (Senior High) $0 31
0.100
0.02
$0
Total $0 84
$0.00
State Funding Assistance Credit per Multi -Family Residence (formerly "State Match")
Formula: Area Cost Allowance x SPI Square Feet per student x Funding Assistance % x Student Factor
Area Cost Allowance SPI Sq. Ft. / Student
Equalization %
Student Factor
D 1 (Elementary) $238.22 115
0.5379
0.25784
$3,799.51
D 2 (Middle School) $238.22 148
0.5379
0.05784
$1,097
D 3 (Senior High) $238.22 173
0.5379
0.1
$2,217
$7,113.22
Tax Credit per Multi Family Residence
erage MF Residential Assessed Value (AAV)
$226,726
t Present Value (per EQ) (NPV)
rCu
8.90
Current Debt Service Rate / 1,000 ( r)
0.14%
TC
$2,845.18
(Below used to calculate NPV)
Current Bond Interest Rate
2.44%
Years Amortized (10 Years)- Used in NPV Calculation
10
Developer Provided Facility Credit Facility / Site Value
Dwelling Units
0
0
FC b
0
Fee Recap **
A = Site Acquisition per Multi -Family Unit
B = Permanent Facility Cost per MF Unit
C = Temporary Facility Cost per MF Unit
D = State Match Credit per MF Unit
TC = Tax Credit per MF Unit
Subtotal
Subtotal
Total Unfunded Need
50% Developer Fee Obligation
FC = Facility Credit (if applicable)
District Adjustment
Net Fee Obligation per Residential Unit - Multi -family
$409.53
$24,772.91
$0.00
$25,182.44
$7,113.22
$2,845.18
- $9,958.40
$15,224.04
$7,612
0
($5,154)
$2,457.53
Kent School District Six -Year Capital Facilities Plan (APPENDIX C)
33
June 2020
34
IX - Summary of Changes to June 2020 Capital Facilities Plan
The Capital Facilities Plan (the "Plan") is updated annually based on previous Plans in effect
since 1993. The primary changes from the June 2020 Plan are summarized here.
Changes to capacity continue to reflect fluctuations in class size ratio as well as program
changes. Changes in portables or transitional capacity reflect use, lease or purchase, sale,
surplus and/or movement between facilities.
The district worked with contractor Educational Data Solutions, LLC out of Seattle Washington
to update student generation factors. The updated rates are included in the body of the Plan.
The student headcount enrollment forecast is updated annually. All Elementary schools now
have Full Day Kindergarten so six -year Kindergarten projections were previously modified to
meet the requirements for Full Day Kindergarten programs at all elementary schools.
The district expects to receive some State Funding Assistance (formerly called "state matching
funds") for projects in this Plan and tax credit factors are updated annually. Unfunded site and
facility needs will be reviewed in the future.
The impact fees for 2022 calendar year will change based on the percentage increase of the
consumer price index for the Seattle metropolitan area. The increase for 2022 calendar year
is 2.2% (Based on the OSPI Applied to LEA & Levy per pupil inflators CPI as of March 2021).
For single-family residences, the fee will increase by $125.24 to $5818.06. The impact fee
for multi -family units will increase by $52.90 to $2,457.53.
34
35
X - Appendices
Changes to Impact Fee Calculation Factors Include:
ITEM
Grade/
FROM
TO
Increase/
Comments
Type
Decrease
Student Generation Factor
Elem
0.334
0.277
Single Family (SF)
MS
0.078
0.071
SH
0.117
0.086
Total
0.529
0.435
-0.094 Decrease
Student Generation Factor
Elem
0.187
0.258
Multi -Family (MF)
MS
0.043
0.058
SH
0.070
0.100
Total
0.300
0.416
0.116 Increase
State Funding Assistance Ratios ("State
Match")
Area Cost Allowance
Average Assessed Valuation (AV)
AV - Average of Condominiums &
Apts.
Debt Service Capital Levy Rate / $1000
General Obligation Bond Interest Rate
Impact Fee - Single Family
Impact Fee - Multi -Family
56.96%
53.79%
-3.17%
Per OSPI Website
$225.97
$238.22
12.250
Per OSPI Website
SF $423,247
$268,271
(154,976)
Puget Sound ESD
MF $164,546
$226,726
62,180
Puget Sound ESD
$1.41
$1.41
0.0
Per King Co. Assessor Report
2.16%
2.44%
0.28%
Bond Buyers 20 year GO Index
SF $5,692.85
$5,818.09
$125.24
2.20%
MF $2,403.63
$2,457.53
$53.90
2.20%
35
2021 Capital Facilities Plan of
Issaquah School District No. 411
Dated May 27, 2021
2021 CAPITAL FACILITIES PLAN
Issaquah School District No. 411
Issaquah, Washington
Adopted May 27, 2021
Resolution No. 1165
The Issaquah School District No. 411 hereby provides this Capital Facilities Plan
documenting present and future school facility requirements of the District. The plan
contains all elements required by the Growth Management Act and King County Council
Ordinance 21-A.
TABLE OF CONTENTS
EXECUTIVE SUMMARY...................................................................................................
3
STANDARD OF SERVICE.................................................................................................
4
TRIGGER OF CONSTRUCTION.........................................................................................
5
DEVELOPMENT TRACKING.............................................................................................
5
NEED FOR IMPACT FEES AND GROWTH -RELATED CAPACITY NEEDS .................................
6-7
ENROLLMENT METHODOLOGY.......................................................................................
8
TABLE ONE: ACTUAL STUDENT COUNTS 2012-13 through 2020-21
ENROLLMENT PROJECTIONS 2021-22 through 2035-36............................................
9
TABLE TWO: STUDENT FACTORS — SINGLE FAMILY..........................................................10
TABLE THREE: STUDENT GACTORS — MULTI -FAMILY .......................................................
11
INVENTORY AND EVALUATION OF CURRENT FACILITIES...................................................12
SITE LOCATION MAP.......................................................................................................13
URBAN GROWTH BOUNDARY MAP..................................................................................
14
THE ISSAQUAH SCHOOL DISTRICT'S SIX -YEAR FINANCE PLAN..........................................15
TABLE FOUR: PROJECTED CAPACITY TO HOUSE STUDENTS............................................15
SCHOOL IMPACT FEE CALCULATIONS..............................................................................16
BASIS FOR DATA USED IN SCHOOL IMPACT FEE CALCULATIONS ......................................
17
APPENDIXA...................................................................................................................
18
APPENDIXB...................................................................................................................
19
APPENDIXC...................................................................................................................
20
APPENDIXD...................................................................................................................
21
APPENDIXE...................................................................................................................
22
EXECUTIVE SUMMARY
This Six -Year Capital Facilities Plan (the "Plan") has been prepared by the Issaquah School District (the
"District") as the District's primary facility planning document, in compliance with the requirements of
Washington's Growth Management Act and King County Council Code Title 21A. This Plan was
prepared using data available in April 2021.
This Plan is an update of prior long-term Capital Facilities Plans adopted by the Issaquah School
District. However, this Plan is not intended to be the sole Plan for all of the District's needs. The District
may prepare interim and periodic Long Range Capital Facilities Plans consistent with board policies,
taking into account a longer or a shorter time period, other factors and trends in the use of facilities, and
other needs of the District as may be required. Any such plan or plans will be consistent with this Six -
Year Capital Facilities Plan.
In June 1992, the District first submitted a request to King County to impose and to collect school impact
fees on new developments in unincorporated King County. On November 16, 1992, the King County
Council first adopted the District's Plan and a fee implementing ordinance. This Plan is the annual
update of the Six -Year Plan.
King County and the cities of Issaquah, Renton, Bellevue, Newcastle and Sammamish collect impact
fees on behalf of the District. Most of these jurisdictions provide exemptions from impact fees for senior
housing and certain low-income housing.
Pursuant to the requirements of the Growth Management Act, this Plan will be updated on an annual
basis, and any charges in the fee schedule(s) adjusted accordingly.
STANDARD OF SERVICE
School facility and student capacity needs are dictated by the types and amounts of space required to
accommodate the District's adopted educational program. The educational program standards which
typically drive facility space needs include grade configuration, optimal facility size, class size,
educational program offerings, as well as classroom utilization and scheduling requirements and use of
re -locatable classroom facilities (portables).
Different class sizes are used depending on the grade level or programs offered such as special
education or the gifted program. With the passage of Initiative 728 in November 2000, the Issaquah
School Board established new class size standards for elementary grades K-5. The Board and District
Administration will continue to keep class sizes near the levels provided by 1-728; this will be done via
local levy funds. There is also legislation that requires the State to fund Full -Day Kindergarten by 2018.
The District provided Full -Day Kindergarten beginning in the 2016-2017 school year. A class size
average of 20 for grades K-5 is now being used to calculate building capacities. A class size of 26 is
used for grades 6-8 and 28 for grades 9-12. Special Education class size is based on 12 students per
class. For the purpose of this analysis, rooms designated for special use, consistent with the provisions
of King County Council Code Title 21A, are not considered classrooms.
Invariably, some classrooms will have student loads greater in number than this average level of service
and some will be smaller. Program demands, state and federal requirements, collective bargaining
agreements, and available funding may also affect this level of service in the years to come. Due to
these variables, a utilization factor of 95% is used to adjust design capacities to what a building may
actually accommodate.
Portables used as classrooms are used to accommodate enrollment increases for interim purposes
until permanent classrooms are available. When permanent facilities become available, the portable(s)
is either moved to another school as an interim classroom or removed.
The King County decision to no longer allow schools to be built outside the Urban Growth Boundary
Line (UGBL) means District owned property planned for a new elementary school and middle school
could not be used for its long planned purpose. The District sold this planned site to a third party. The
District has acquired one high school site, two elementary school sites and one middle school site inside
the UGBL. The State does not provide funding for property purchases.
Approved Bond funding provides for a new high school, new middle school, two new elementary
schools, a rebuild/expansion of an existing middle school and additions to six existing elementary
schools.
TRIGGER OF CONSTRUCTION
The Issaquah School District Capital Facilities Plan proposes construction of a new high school, a new
elementary school, and the expansion of an existing elementary school to meet the needs of
elementary, middle school and high school capacity needs. The need for new schools and school
additions is triggered by comparing our enrollment forecasts with our permanent capacity figures.
These forecasts are by grade level and, to the extent possible, by geography. The analysis provides a
list of new construction needed by school year.
The decision on when to construct a new facility involves factors other than verified need. Funding is
the most serious consideration. Factors including the potential tax rate for our citizens, the availability
of state funds and impact fees, the ability to acquire land, and the ability to pass bond issues determine
when any new facility can be constructed. The planned facilities will be funded by a bond passed on
April 26, 2016, school impact fees and reserve funds held by the District. New school facilities are a
response to new housing which the county or cities have approved for construction.
The District's Six -Year Finance Plan is shown in Appendix E.
DEVELOPMENT TRACKING
In order to increase the accuracy and validity of enrollment projections, a major emphasis has been
placed on the collection and tracking data of known new housing developments. This data provides
two useful pieces of planning information. First, it is used to determine the actual number of students
that are generated from a single family or multi -family residence. It also provides important information
on the impact new housing developments will have on existing facilities and/or the need for additional
facilities.
Developments that have been completed or are still selling houses are used to forecast the number of
students who will attend our schools from future developments. Generation rates for elementary school,
middle school and high school student per new single-family residence and new multi -family housing is
shown on page 10 and page 11.
NEED FOR IMPACT FEES AND GROWTH -RELATED CAPACITY NEEDS
The District relies on school impact fee revenue to help fund growth -related capacity needs. However,
by law, impact fees can only be used to fund a portion of a capacity project. State funding and impact
fees are also not reliable sources of revenue. As a result, the District must also rely on local funding to
fund school construction. On April 26, 2016 voters approved bond funding for the construction of a new
high school, a new middle school and two new elementary schools, the rebuild/expansion of an existing
middle school and additions to six existing elementary schools.
As demonstrated in Appendix A, (page 18) the District currently has a permanent capacity (at 95%) to
serve 8,280 students at the elementary level. This leaves the District's elementary enrollment under
permanent capacity by 327 students (current enrollment is identified on page 9).
As demonstrated in Appendix B, (page 19) the District currently has a permanent capacity (at 95%) to
serve 4,193 students at the middle school level. This leaves the District's middle school enrollment
under permanent capacity by 128 students (current enrollment is identified on page 9).
As demonstrated in Appendix C, (page 20) the District currently has a permanent capacity (at 95%) to
serve 4,932 students at the high school level. This leaves the District's high school enrollment over
permanent capacity by 610 students (current enrollment is identified on page 9).
Based on the District's student generation rates, the District expects that 0.791 students will be
generated from each new single family home and 0.341 students will be generated from each new multi-
family dwelling unit.
Applying the enrollment projections contained on page 9 to the District's existing permanent capacity
(Appendices A, B, and C) and if no capacity improvements are made by the year 2026-27, and
permanent capacity is adjusted to 95%, the District elementary population will be over its permanent
capacity by 1,228 students, over permanent capacity at the middle school level by 178 students, and
over by 734 students at the high school level. The District's enrollment projections are developed using
two methods: first, the cohort survival — historical enrollment method is used to forecast enrollment
growth based upon the progression of existing students in the District; then, the enrollment projections
are modified to include students anticipated from new developments in the District.
NEED FOR IMPACT FEES AND GROWTH -RELATED CAPACITY NEEDS
(continued)
To address existing and future capacity needs, the District's six -year construction plan includes the
following capacity projects:
Facility Projected / Final Location Additional
Expansions Completion Date Capacity
New High School #4
2023
Issaquah
1600
New Elementary #17
2023
Issaquah
560
New Middle School #6
2021
Issaquah
850
Maple Hills Elementary - Expansion
2021
King County
120
New Elementary #16
2021
Sammamish
560
Based upon the District's capacity data and enrollment projections, as well as the student generation
data, the District has determined that a majority of its capacity improvements are necessary to serve
students generated by new development.
The school impact fee formula ensures that new development only pays for the cost of the facilities
necessitated by new development. The fee calculations examine the costs of housing the students
generated by each new single family dwelling unit or each new multi -family dwelling unit and then
reduces that amount by credits for the anticipated state match and future tax payments. The resulting
impact fee is then discounted as required by local ordinances. Thus, by applying the student generation
factor to the school project costs, the fee formula only calculates the costs of providing capacity to serve
each new dwelling unit. The formula does not require new development to contribute the costs of
providing capacity to address existing needs.
The King County Council and the City Councils of the Cities of Bellevue, Issaquah, Newcastle, Renton
and Sammamish have created a framework for collecting school impact fees and the District can
demonstrate that new developments will have an impact on the District. The impact fees will be used
in a manner consistent with RCW 82.02.050 - .110 and the adopted local ordinances. Engrossed
Senate Bill 5923, enacted in the 2015 Legislative Session, requires that developers be provided an
option to defer payment of impact fees to final inspection, certificate of occupancy, or closing, with no
fees deferred longer than 18 months from building permit issuance. The District adopts the positions
that: (1) no school impact fee should be collected later than the earlier of final inspection or 18 months
from the time of building permit issuance; and (2) no developer applicant should be permitted to defer
payment of school impact fees for more than 20 dwelling units in a single year. The District's recent
and ongoing student growth, coupled with the need for the timely funding and construction of new
facilities to serve this growth, requires strict adherence to this position.
ENROLLMENT METHODOLOGY
Two basic techniques are used, with the results compared, to establish the most likely range of
anticipated student enrollment:
1. The student 3-2-1 cohort survival method. Examine Issaquah School District enrollments for
the last 5 years and determine the average cohort survival for the consecutive five-year period.
Because cohort survival does not consider students generated from new development it is a
conservative projection of actual enrollment. For the same reason, these projections are also
slow to react to actual growth.
2. Based on information from King County, realtors, developers, etc., seek to establish the number
of new dwelling units that will be sold each year. The new dwelling units are converted to new
students based on the following:
a) The number of actual new students as a percentage of actual new dwellings for the past
several years.
b) Determine the actual distribution of new students by grade level for the past several years,
i.e., 5% to kindergarten, 10% to first grade, 2% to 11th grade, etc.
c) Based on an examination of the history shown by (a) and (b) above, establish the most
likely factor to apply to the projected new dwellings.
After determining the expected new students, the current actual student enrollments are moved forward
from year to year with the arrived at additions.
One of the challenges associated with all projection techniques is that they tend to always show growth
because the number of houses and the general population always increases. Enrollments, however,
can and do decrease even as the population increases. The reason is as the population matures, the
number of kindergartners will go down as the number of 10th graders is still increasing. To adjust for
this factor, the number of school age children per dwelling is examined. When this number exceeds
expectations, it is probably because the District is still assuming kindergarten growth, while the main
growth is actually moving into middle school. When this happens, a reduction factor is added to
kindergarten to force it to decrease even though the general population continues to grow. A precise
statistical formula has not been developed to make this adjustment.
After all of the projections have been made and examined, the most likely range is selected. An
examination of past projections compared with actual enrollment indicates the cohorts tend to be more
accurate over a ten-year time span while dwelling units tend to be more accurate over a shorter period.
The probable reason is that over a ten-year period, the projections tend to average out even though
there are major shifts both up and down within the period.
Enrollment projections for the years 2021-2022 through 2035-2036 are shown in Table One. Student
generation factors are shown in Table Two and Table Three.
TABLE ONE: ACTUAL STUDENT COUNTS 2012-13 through 2020-21
ENROLLMENT PROJECTIONS 2021-22 through 2035-36
ISSAQUAH SCHOOL DISTRICT
actual Student Cowils 2012.13 Through 2020 11
Enrollment Pro)echons 2021-22 Through 2035-36
I It. l.urallnrent
��,�
A
ICI
?Vr
!KU
1111
illl
�IH
'lll
r1ll
III
hill
nTll
I?I11
lnlil
�-�
♦>t
� i�
i.,�
'�I•' 17
eel
I*1
ten'
1r4,
IW
I1i1
IW,
141-
1114'
111'
1W,
1','4'
i11�
IL
11-
2t1i 14
eb
1My
I411
1520
Ilan
I1"
IIp2
IN
I103
0"
144
1211
1'.40
131e
W?1
2*141.-
NI
104
1552
in
INS
1555
I51:
1.01
10!
1495
13S:
129!
I.
1&0"
AW
10t
cx 1
11,611tL
211116
661
I%r
11%
1611
lilt
lit:
lom
0"
IJ':
141110
Ilo'
11
IR,u!
Off
1611
tRb15
1e1� 1^
IIDt
I�kA
too)
IoON
IoSO
le0t
16:0
1020
lira
I %i
I-'S
12y9
I.e+
19 e10
�3'�
Mtl'
-4 ,
I�f116
261' IA
IW
V%I
1335
1091
1641
IM
le_-
1055
Io51
NAN
I-W
1243
Itos
D1.6'2
il;-%
1031
5%3
301!
wil,1•
1W
190
1"1
1SA%
II"
1615
1':'1
I611
16.0
le-
1%%
I101
1061
11!71
'1%,
1'N:
%1'
t1,r?1
211t y
141"
1•16'
IN)
Ie51
11*1
113
low
I'31
1e11
1051
1020
1163
lilt
M,?4$
'1i11
SOW
ib'
's.215
2t12t21
1113
IMI
I"I
IAV
I91110
ICE
106,
loth
16-8
le:a
1105
1221
1"1'
K142
Ao;1
Mb
-..
11,111
210I•11
I)"
Im
IQI
13-1
1103
I41
ISIa
1610
1"1
164
li"
12%
1•
1><W
cm
r%
;u'
111444)
M22-11
I.W
14N
1215
14M
13'S
IM
1446
1510
1Q4
14M
1!43
IbI
I
1> -0
Yi12
ari5
sv,l
Itnl
M212+
INS
ON
105
102
IWO
I51e
103
113
1e'2
1124
1'25
140
I :
Ilk"
'►O1'
iWo
Nkr)4
M 12'
110
JW
II."
Ih:
1/10
I5'1
It01
Ih3J
IJ03
1$&4
1"M
1%1
1:
11,90
+0'll
W219
MW
M3-16
Is"
1100
1"1
1-W
Iwo
I"
Ii0
1M
1605
left
)1*
14*
1
19,111
1V4
IQ,!
Li'
19'"1
M26.2-
It"
IVII
1r4
114,
W
Irt
IM
lim
11N
IW.
1016
1M
I'
11.6'4.c
tmt
13'1
i*
t�yc
W-:A
IM
for
IIrA
It-1
1513
1"'
1366
13v
IS0'
I/51
1i30
12?s
I'
IIA29
I
1i1!
SW
lilto
202t-r
IW
1%6
I'll
I
INI
ila
1*3
11"
1204
134
1235
W."
1"-1
3 oe
IV,
tR12'
M11 jo
1145
IM
Iii2
14W
1552
15:1
14-0
101
13 I
I312
141
2022
9031
I:I1
"
?6.022
ftmit
14W
I9C
108t
It"I
10TI
ISY
1515
1116
Isl
1315
1211
1LXI
2n.Wc
ii3
111:
till
4y15
M l 12
1e12
2010
INI
I"
I050
100
ON
11011
1 Ct
1115
12.17
026
0
m,'w
-oc
11:
..')
`6.7'SY
M I.sl
1016
2015
:oat
m
mi
Id:s
I"
I-W
In
11:0
147
II1#1
'11
111"
,�1
M6
`t.IM
MW31
ir23
l016
'011
:OM
10'3
1")
1416
IQ06
165
1*4
1112
10_%
-UI
21.'2'
4it
$31"
4.*
1.-?-
�-lc
I:•
,�
,
v�,
PK•.
t�t.'
t•=:1
1'rr:
Iktl
r,
��
u:
,.
'2�?/
<;�
S:1
2W 4
.04-t1 E,r0M+Rrr4ari M IOVAP;f $00 FPffe ral De► Kn"*w
TABLE TWO:
STUDENT FACTORS
- SINGLE FAMILY
2020-21 Single Family
STUDENTS
AVERAGE PER UNIT
Single Family Development
# Planned
# Sold
K-5
6-8
9-12
Total
K-6
6-8
9-12
Total
Avery Pointe
40
40
15
9
5
29
0.375
0.225
0.125
0.725
Belvedere
94
93
36
21
23
80
0.387
0.226
0.247
0.860
Cedarcroft
27
27
15
4
7
26
0.556
0.148
0.259
0.963
Chestnut Estates
38
38
13
4
10
27
0.342
0.105
0.263
0.711
Dalton Park
39
39
12
4
2
18
0.308
0.103
0.051
0.462
Forest Heights
24
20
0
0
2
2
0.000
0.000
0.100
0.100
Glencoe, Preswick & Kinlock @ Trossachs
211
210
94
63
75
232
0.448
0.300
0.357
1.105
Highcroft @ Sammamish
121
121
59
31
27
117
0.488
0.256
0.223
0.967
Issaquah Highlands - Ichijo Sun Ridge
35
35
11
7
3
21
0.314
0.200
0.086
0.600
Issaquah Highlands - Westridge South
72
71
39
10
32
81
0.549
0.141
0.451
1.141
Lawson Park
31
31
20
10
7
37
0.645
0.323
0.226
1.194
Meadowteaf
115
92
19
8
4
31
0.207
0.087
0.043
0.337
Overlook @ Brookshire
38
38
17
3
7
27
0.447
0.079
0.184
0.711
Providence Ridge
38
36
14
5
2
21
0.389
0.139
0.056
0.583
Summit Pickeringllnneswood Estates
30
30
10
5
11
26
0.333
0.167
0.367
0.867
Reserve at Newcastle
163
156
25
17
11
53
0.160
0.109
0.071
0.340
Rivenwood
52
52
40
18
14
72
0.769
0.346
0.269
1.385
Shorelane Vistas
38
38
6
5
9
20
0.158
0.132
0.237
0.526
Symphony Ridge
57
57
22
7
8
37
0.386
0.123
0.140
0.649
Westridge North at Issaquah Highlands
72
26
6
4
11
21
0.231
0.154
0.423
0.808
Windsor Grove
30
29
3
0
2
5
0.103
0.000
0.069
0.172
Windstone 1-5
82
78
37
30
24
91
0.474
0.385
0.308
1.167
TOTALS
1447
1367
613
266
296
1074
0.378
0.196
0.218
0.791
Single Family
Elementary School K-5
0.378
Middle School 6-8
0.195
High School 9-12
0.218
TOTAL
0.791
These developments are currently under construction or have been completed within the past five years.
10
TABLE THREE:
STUDENT FACTORS
- MULTI -FAMILY
2019-20 Multi Family
STUDENTS
AVERAGE PER UNIT
Multi Family Development #
Planned
# Sold K-5 6-8
9-12
Total
K-5
6-8
9-12
Total
Aldea at Newcastle Commons
129
129 2 0
0
2
0.016
0.000
0.000
0.016
Issaquah Highlands - View Ridge
38
38 6 6
9
21
0.158
0.158
0.237
0.553
Issaquah Highlands - The Brownstones
176
176 15 9
13
37
0.085
0.051
0.074
0.210
Lake Boren Townhomes
56
56 2 0
0
2
0.036
0.000
0.000
0.036
Lakehouse
41
41 3 1
1
5
0.073
0.024
0.024
0.122
Overlook @ Brookshire
42
42 17 3
7
27
0.405
0.071
0.167
0.643
Towns at Westridge
122
122 54 19
39
112
0.443
0.156
0.320
0.918
TOTALS
604
604 99 38
69
206
0.164
0.063
0.114
0.341
Multi -Family
Elementary School K-5
0.164
Middle School 6-8
0.063
High School 9-12
0.114
TOTAL
0.341
These developments are currently under construction or have been completed within
the past
five years.
11
INVENTORY AND EVALUATION OF CURRENT FACILITIES
Currently, using the 95% utilization factor, the District has the capacity to house 17,406 students in
permanent facilities and 4,290 students in portables. The projected student enrollment for the 2021
2022 school year is expected to be 18,583 including K-5 FTE which leaves a permanent capacity
overage of 1,177. Adding portable classrooms into the capacity calculations gives us a capacity of
21,696 with a surplus capacity of 3,113 for the K-12 student population.
Calculations of elementary, middle school and high school capacities are shown in Appendices A, B
and C. Totals are shown in Appendix D.
Below is a list of current facilities. These facility locations and sites are shown on the District Site
Location Map.
EXISTING FACILITIES LOCATION
GRADE SPAN K-5:
Apollo Elementary
15025 S.E. 117th Street, Renton
Briarwood Elementary
17020 S.E. 134th Street, Renton
Cascade Ridge Elementary
2020 Trossachs Blvd. S.E., Sammamish
Challenger Elementary
25200 S.E. Klahanie Blvd., Issaquah
Clark Elementary
335 First Ave. S.E., Issaquah
Cougar Ridge Elementary
4630 16711 Ave. S.E., Bellevue
Creekside Elementary
20777 SE 1611 Street, Sammamish
Discovery Elementary
2300 228th Ave. S.E., Sammamish
Endeavour Elementary
26205 S.E. Issaquah -Fall City Rd., Issaquah
Grand Ridge Elementary
1739 NE Park Drive, Issaquah
Issaquah Valley Elementary
555 N.W. Holly Street, Issaquah
Maple Hills Elementary
15644 204' Ave. S.E., Issaquah
Newcastle Elementary
8440 136' Ave S.E., Newcastle
Sunny Hills Elementary
3200 Issaquah -Pine Lake Rd. S.E., Sammamish
Sunset Elementary
4229 W. Lk. Sammamish Pkwy. S.E., Issaquah
Elementary School #16
4399 Issaquah -Pine Lake Rd SE, Sammamish
GRADE SPAN 6-8:
Beaver Lake Middle School
25025 S.E. 32nd Street, Issaquah
Issaquah Middle School
600 2nd Ave. Ave. S.E., Issaquah
Maywood Middle School
14490 168' Ave. S.E., Renton
Pacific Cascade Middle School
24635 SE Issaquah -Fall City Rd, Issaquah
Pine Lake Middle School
3095 Issaquah -Pine Lake Rd., Sammamish
Middle School #6
1929 NW Talus Dr, Issaquah
GRADE SPAN 9-12:
Issaquah High School
700 Second Ave. S.E., Issaquah
Liberty High School
16655 S.E. 136th Street, Renton
Skyline High School
1122 228' Ave. S.E., Sammamish
Gibson Ek High School
379 First Ave. S.E., Issaquah
SUPPORT SERVICES:
Administration Building 5150 22011 Ave S.E., Issaquah
Holly Street Campus 565 N.W. Holly Street, Issaquah
May Valley Service Center 16404 S.E. May Valley Road, Renton
Transportation Center 805 Second Avenue S.E., Issaquah
Transportation Satellite 3402 228' Ave. S.E., Sammamish
12
SITE LOCATION MAP
13
URBAN GROWTH BOUNDARY MAP
14
THE ISSAQUAH SCHOOL DISTRICT'S
SIX -YEAR CONSTRUCTION PLAN
The District's Six -Year Finance Plan is shown in Appendix E. Shown in Table Four is the District's
projected capacity to house students, which reflects the additional facilities as noted. Voters passed a
$533 million bond in April 2016 to fund the purchase of land for and construction of a new high school,
a new middle school, two new elementary schools, the rebuild/expansion of an existing middle school
and additions to six existing elementary schools. The District does anticipate receiving State matching
funds for High School #4 project that would reduce future bond sale amounts or be applied to new K-
12 construction projects included in this Plan.
The District also anticipates that it will receive $500,000 in impact fees and mitigation payments that
will be applied to capital projects.
The District projects 18,583 FTE students for the 2021-2022 school year and 19,545 FTE students in
the 2026-2027 school year. Growth will be accommodated by the planned facilities. Per the formula in
the adopted school impact fee ordinance, half of the unfunded growth -related need is assigned to impact
fees and half is the local share.
TABLE FOUR: PROJECTED CAPACITY TO HOUSE STUDENTS
Projected Capacity to House Students
Years
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
Permanent Capacity
18,322
19,852
19,852
22,012
22,012
22,012
High School
1,600
Middle School
850
Elementary School
680
560
Gross Totals
19,852
19,852
22,012
22,012
22,012
22,012
`Subtotal (Sum at 95% Utilization
Rate)
18,859
18,859
20,911
20,911
20,911
20,911
Portables @ 95%
4,290
4,290
4,290
4,290
4,290
4,290
Total Capacity
23,149
23,149
25,201
25,201
25,201
25,201
Projected FTE Enrollment-
18,583
18,770
20,294
19,945
19,441
19,545
Permanent Capacity @ 95%
(surplus/deficit
276
89
617
966
1,470
1,366
*Permanent Capacity and New Construction calculations are based on the 95% utilization factors (See Appendix D)
The number of portables may be reduced as permanent capacity projects come on line and are open for instruction
15
SCHOOL IMPACT FEE CALCULATIONS
SCHOOL IMPACT FEE CALCULATIONS
DISTRICT Issaquah SD 4411
YEAR 2021
School Site Acquisition Cost:
((Acres x Cost per Acre)/Facility Capacity) x Student Generation Factor
Student
Student
Facility
Cost/
Facility
Factor
Factor
Cost/
Cost/
Acreage
Acre
Capacity
SFR
MFR
SFR
MFR
Elementary
7.00
$0
560
0.378'
0.164
$0
$0
Middle/Jr High
10.00
$0
850
0.195'
0.063
$0
$0
High
30.00
$0
1,600
0.218'
0.114
$0
$0
TOTAL
$0
$0
School Construction Cost:
((Facility Cost/Facility Capacity) x Student Generation Factor) x (Permanent/Total Sq Ft)
Student
Student
%Perm/
Facility
Facility
Factor
Factor
Total Sq.Ft.
Cost
Capacity
SFR
MFR
Elementary
92.37%
$38,000,000
560
0.378
0.164
Middle/Jr High
92.37%
$75,000,000
850
0.195
0.063
High
92.37%
$135,000,000
1,600
0.218
0.114
TOTAL
Temporary Facility Cost:
((Facility Cost/Facility Capacity)
x Student Generation Factor) x (Temporary/Total
Square
Feet)
Student
Student
%Temp/
Facility
Facility
Factor
Factor
Total Sq.Ft.
Cost
Size
SFR
MFR
Elementary
7.63%
$0
80
0.378
0.164
Middle/Jr High
7.63%
$0
56
0.195
0.063
High
7.63%
$0
224
0.218
0.114
TOTAL
State Matching Credit:
Area Cost Allowance
x SPI Square Footage x District Match % x Student Factor
Student
Student
Current Area
SPI
District
Factor
Factor
Cost Allowance
Footage
Match %
SFR
MFR
Elementary
$238.22
90
0.00%
0.378
0.164
Middle/Jr High
$238.22
108
0.00%
0.195
0.063
High School
$238.22
130
38.66%
0.218
0.114
TOTAL
Tax Payment Credit:
Average Assessed Value
Capital Bond Interest Rate
Net Present Value of Average Dwelling
Years Amortized
Property Tax Levy Rate
Present Value of Revenue Stream
Fee Summary:
Site Acquistion Costs
Permanent Facility Cost
Temporary Facility Cost
State Match Credit
Tax Payment Credit
FEE (AS CALCULATED)
Local Share
FINAL FEE
Single Multi -
Family Family
$0.00 $0.00
$56,611.90 $24,304.74
$0.00 $0.00
($2,611.53) ($1,367.71)
($13,417.46) ($6,231.69)
$40,582.91 $16,705.34
$20,291.45 $8,352.67
$20,291 $8,353
Cost/
SFR
$23,695
$15,916
$17,000
$56,612
Cost/
SFR
$0
$0
$0
$0
Cost/
SFR
$0
$0
$2,612
$2,612
SFR
$888,554
2.44%
$7,800,848
10
$1.72
$13,417
Each city or county sets and adopts the amount of the school impact fee.
For the applicable fee schedule, please consult with the permitting jurisdiction for the development project.
16
Cost/
MFR
$10,274
$5,128
$8,903
$24,305
Cost/
MFR
$0
$0
$0
$0
Cost/
MFR
$0
$0
$1,368
$1,368
MFR
$412,686
2.44%
$3,623,074
10
$1.72
$6,232
BASIS FOR DATA USED IN SCHOOL IMPACT FEE CALCULATIONS
SCHOOL SITE ACQUISITION COST:
• The District previously purchased sites for the new elementary schools, middle school and
high school.
SCHOOL CONSTRUCTION COST:
• Elementary $38,000,000 is the estimated construction cost of the project providing
additional elementary capacity
• Middle School $75,000,000 is the estimated construction cost of the project providing
additional middle school capacity
• High School $135,000,000 is the estimated construction cost of the project providing
additional high school capacity
PERCENTAGE OF PERMANENT AND TEMPORARY SQUARE FOOTAGE TO TOTAL SQUARE
FOOTAGE:
Total Square Footage
Permanent Square Footage (OSPI)
Temporary Square Footage
STATE MATCH CREDIT:
Current Area Cost Allowance
Percentage of State Match
17
2,709,045
2,518,228
190,817
$238.22
38.66%
I
02
0
w
Q
W
p
a.
Q
Q
U
J
O
2
I
Q
Z
LU
W
J
W
r
N
N
N
oss
OD
OS��B l&Od JOyS`yo
H/� 0) M
S/ W a1 O M O Lo M V O r` r r`
N N N N N N M N
�b /M
0 bOblb%S W N OD N M 0 co h r` O O O M O r`
(17 V M O O u'1 V V (n O N
NpO l4ho�ppaN/��2lCl)
ASS papa/ v M (No (o o awi (ten v (No n rwi r- (iOc v rn
owa -Ito m w o v (c in M (n LO (n v M
Sb, Ody0#
,Q/O bdb0 >O WnWikbW
SOS
(0ll W n4gkb "Q/O bdb0 W
S400�,&.
O
O (0 O 00 co 00 O 00 (D O - O co N -q O O
M r N O M a O V m N a h M W (n
h O fb h (0 r` n 00 00 0 w 01 r- M
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
nSS@ �liOd
��Oy
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
dbO,OONO
o
00` @i( S"ry%
47
M
N
M
47
N
O
O
M
7
00
'
O
N
1/ObdbO'OOyOs �jJO
T
r.
w
I-
r-
1�
r-
r�
rr
w
v
w
w
r�
00
O
�/�
`•�oz� �
1,
f`
O
f`
CO
n
00
n
r`
co00
(n
(D
0)
1-
M
/ObdbO�>Sb��
/OO�SSb�O
V
m
0
00
OD
W
CD
0
0
O d
�)Bb��Od
C)
0
N
O
N
O
(00
N
o0
0
��i•(s/�.
-964b �yo
I�
00
V
o
00
O
00
00
N
o
7
00
N
V
O
'T
M
'c(/�ydb0
000l@
N
LO
V
-It
(0
N
N
(n
(n
(n
O
V
V
(0
O
O
00
N
d
00
m
°n
co
n
ObdbOW �d
v
a
u00
m
(M
(00
�
v
u
(n
��
M
co
co
V
co
V
(0
V
M
(0
N
coM
r-
00
O
m
7
75
S
WOO
0
�O�,b/��
Cl)Cl)Cl)V
Cl)V
(n
V
M
m
N
Cl)co(O
r.-
O
00
<
ds�O
LO
7
%z,
�1/ObdbOWOOc(J
SWOO�SSb>
(Nn
v
v
C)
'T
(0
N
(No
v
M-IT
(No
(No
0
0
M m<
O O
°o
o � i
cc
CL
yO
co
N
(0M
N
N
N
N
O
M
r�
N
r
N
f�
N
co
N
O
N
M
O
N
V
N
M
M
O
O
N p
(6 Y .N r
N c
o rn (
S)
;
ID x
'{dl
W
Ur
W
}
W
0
U Y
m m .8
a m
of
cDCL
J
�d
0
Of
W
p
Q
c7
W
W}
0
y
�'
�
>
0
0
J
J
=
J
(!�
Q=~
J
Z
a
3 p C {
X c
'.
J
� Jf
Y(D
W
o
W
Z
J
()
Z�
W
J
(a
i
aQ
Q
m
U
U
U()
W
0
0
W
Q
U`
Q
Qgqg
Z
>
Z
Z
0
Z
(n
w
W
H
�
C >
� a
-3�10b�,0
Ss�
S�'ob,yS�°
., ° (S/
p fob,! y�/M
J-7
I
F71
4�p �iyb
Pay/z0�
�d
/voo&s
SyIO�IBb�� IPoAa/Pa/oJd
O�y
yo
/NOS/�bW
�!/obdbo
I O
''^^
cn
O
r9�Jdy� 5�
W
yW
=
S!v �Igb1
N
9y
oss��
a
�Od�'
J
U
°y°S
`-
o
m
O
�Op
ypS
�h
X
0
=
sOo
WOo�S �/J ydb
a
o
'�^^
SbI°�I8b��0 O Ieb�yod
�
LU
V/
W
d
O
/1
L.L
`�
U a
Q
dbp
a w
°oo, �w, ,ybk'�1Li
c% JOr
0
-O y
Q
�hbw
db° 4,�d
0OO�o
�
N
C L
N
h'O°�O
�'03
U
dS
yo
(Be)
o o � a`�i
O U
,5
m m
U
N .T.
=
s�oO`Yss dyo00
C
a�
b
°tib
` U U
m M
U U p
C
5 �.@ a�z
U N N C Ell
Sloo
o
O o O U C
or m N c
yos�
N
x x
a # T
U m
�
-38 0 a
n U E
K N C
o x
N
M
M
M
t0
W
Ot
t0
t0
O
c0
N
M
OD
r
N
I�
r�
�
M
o
N
fD
r
�
w
O
OO
m
In
y
O
W
tD
o�
N
O
M
O
O
N
O
�
O
o
�
N
O
O
O
O
O
O
O
0
0
0
0
0
0
0
00
W
01
M
O
O
01
f0
01
fD
01
N
W
OD
O
M
O
O
�M
voi
ucOi
M
N
a
m
o
rn
�
�
N
o
N
vCOi
o
N
�
o
�
N
O
W
CO
of
N
O
M
N
r
t0
O
o0
O
N
o
r
r
t0
O
o0
O
M
O1
v
n
oao
o
m
o°o
M
N
ID
�
�
O
�
M
M
O
Ln
n
r
O
M
�
N
�
N
O
O
coM
V
N
N
co
N
M
O
N
W
W
�
pa
J
�
V
0
YW
J
�
O
�
yWy
W
0
J
Q
W
�
Q
Z
�
0
40S�'�
**
O S
dOh,�s
0
r�
cypy��1
Ion db,
d
Woo�SS yleo2
I
�J�>8b��0 �pal�a/pJtl
dyo
�iObdbo
I yIN
OyOSGG
r8�/
W/Jbdy�/�
yw
S blob,
1�Oa>�OOb
U
Q
5k,
kss gb1
�1i,bdbJ, yOd�'b
Qo
yy
�ol OOyJs�N��'8,
U
X
J
bdb
J �J
0
°o
0
ti
Js
o
z
w
���� J
S� (g�J�I
00&SSb Ob°bJ�
@
U
a
2
_
O
y
db,
m
N
b
�4N�'Nb
a o
U
Nr�`J0
g
bdbJ
W
4
" " a X
N
Oo
�O�c
U
SG�
CD
rn 0
00� ds
O
X -p
.
- y
a m
O U
C j
bJ`v00
N C
p 2 O
N
S
VSSb�J
N
dog
N o_ Y m
N � N C
U
S?
00yjS
U
Na 2 o 5
U
) u5 m -M
]
/
/v
u5 a
� C j U
O
of
X. - c X
N � N
_ = N
F
0o
v
m
v
o
o
o
u�
m
N
0o
m
c0
o
O
v�
N
V
o
O
O
7
c0
N
N
O
O
r
7
N
�
o
m
o
cp
v
M
(O
N
O
(D
V
�
Cl)
00
f�
V
M
N
V
N
O
N
CU
0
0
0
0
0
0
0
0
0
0
00
O
f0
N
h
M
N
N
t0
�
f0
N
r
O
M
O
N
�
M
a0
f�
�
M
�
N
O
N
N
t0
O
V
O
CO
N
OD
N
V
�
N
N
V
O)
O
W
O
c0
7
Cl)M
n
v
�
v
rNi
T
N
N
01
fD
OD
O
00
+s� �
4f<b�t,
�
° °4-1
0
�a
e
� &
�a �z
co
�,
co
~ ®
>¥,
a
\
a�
co
\
0
���a `��7
E
W
°
,
/
v�
°
°
\
00
V,'o,
\°z
-
Xco+
a
Q
°�
s
a
x _
W
F-
°
aco
p
CN
¥
w
��a
\
N
+�
=
e
-
k
p
o
s �
o %
g
cm
�� & «
+�¥E
@
/
°
\
-
<� _
c
\
�a «
/
�
J
a
�
{
s
CD
e
§
/
0&
»&
-
\
S
-
���¥
co
-
�0
¥
\
a)+,
1,1010
/
cu
/
E
LO
In
cD
Q_
C
3
0
`o_
0
m
`o
U
w U
C
v O
� �
U
wE N
w
oo
N E V�
X
=
E 'o
N O
45 a
0
L O N
Z
z J N
w^
rn U N
c o
I L
a
c
`o m
c
Ai
o o
W
T _
U
i N
oC
N
_I
v '
9
z w
o
o
Q O 0
N m T t
m U
J N E
N O 1
O C d
75
o
w x m a
_
o v o
w a,
c
U
a o_
o T E
_ C C -
J
o
O O O
°1 U
n v w
a a)
N 00 '.1E EO
N p E U
N a E
a o t
❑ �'
E U a
O
N N a
U ri J ❑ 9
iq U
U O
� L m 2 O a
O" N L
O J v
U m E d
N o w L o
N N O m
n J
Z
L n R LL
z E N
O
o
❑
w
o
0
o
0
� J
O
O
wU
�
�
U O
z
p
0
o
o
0
o
c
� �
o
0
O
w
� O
z
*
�'
o
o
❑ F
W Q
o
0
0
0
0
0
0
't"+
o
coN
0
0
0
0
�
U J
O
N
a
N
G
� U
W
V
u>
N
ui
N
cFr
64
�
M
yr
O
0
0
0
0
0
0�
0
�
0
�
o
0
0
0
0
0
Q�
o
vi
o
0
0
0
�
D_
o
N
ao
M
0
N
0
m
0
O
o
O
m
O �
U O
W
O
V
N
N
t»
�
N
va
N
69
�
_
O
''�
0
0
0
0
0
0
0
0
,n
N
o
0
O
O
N
O
�
ER
O
N
�
O
O
O
O
O
O
O
N
O
N
N
�
O
coaO
0
0
0
0
0
0
0
0
0
0
0
0
0
N
N
o
N
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
�
0
O
N
�
O
�
fA
O
O
69
N
O
69
N
�
M
0
0
0
0
0
0
0
0
0
0
Cl
0
0
0
0
0
0
o
0
0
0
0
0
0
0
_
N
O
N
0
O
N
M
fA
0
O
O
69
0
O
N
�
69
0
m
a
N
V3
0
O
N
fl3
0
O
ER
�
�
r
bq
�
Z
Z
Z
Z
�c
Z
Z
Z
�
Z
n_
�
W
❑
_
O
T
L
m
U
O_
in
N
N
N
�q
�
ai
a�ia�i
c
a�i
a
y
J
z
z
z
z
w
a°
�
Capital Facilities Plan of
Renton School District No. 403
Dated July 14, 2021
2021 Capital Facilities Plan Renton School District No. 403
2021 CAPITAL FACILITIES PLAN
Renton School District No. 403
Board of Directors
Alisa Louie, President
Gloria Hodge, Vice President
Avanti Bergquist, MD
Stefanie Mclrvin, Ed. D
Shelby Scovel
Dr. Damien Pattenaude, Superintendent
�c
it I� II 1 ■� � ■ t � �
July 2021 — adopted July 14, 2021
�/�
nton ke�n
SCHOOL DISTRICT
SERVICE I EXCELLENCE I EQUITY
2021 Capital Facilities Plan Renton School District No. 403
2021
6-YEAR CAPITAL FACILITIES PLAN
Renton School District No. 403
TABLE OF CONTENTS
I. INTRODUCTION
II. ENROLLMENT TRENDS
III. STANDARD OF SERVICE & CAPACITY
IV. ENROLLMENT PROJECTIONS
V. GROWTH RELATED PROJECTS
VI. SIX -YEAR FINANCE PLAN
VII. IMPACT FEES
VIII. APPENDICES
2021 Capital Facilities Plan Renton School District No. 403
I. INTRO TION DUC
Purpose of the Capital Facilities Plan:
This Six -Year Capital Facilities Plan (the "Plan") was prepared by Renton School District (the
"District") in compliance with the requirements of the Washington State Growth Management
Act (GMA, the Act), King County Code Title 21A.43, and applicable ordinances of the cities of
Bellevue, Newcastle and Renton. It is the District's intent that the Plan be adopted by King
County and the cities of Bellevue, Newcastle and Renton as a sub -element of their respective
Capital Facilities Plans, and that that those jurisdictions assess and collect school impact fees on
behalf of the District, as empowered by the GMA. This Plan, however, is not intended to be the
sole planning instrument developed by the District to determine its capital facility needs.
The GMA was adopted by the State legislature in 1990 in response to rapidly increasing
development; most notably in King County and the surrounding central Puget Sound area. The
Act requires state and local governments to manage Washington's growth by developing and
implementing comprehensive land -use and transportation plans, by designating Urban Growth
Areas, and by protecting natural resources and environmentally critical areas.
The Capital Facilities Plan is one element of a County or City's Comprehensive Plan that
addresses existing public facility capacities, forecasts future public facility needs, presents a plan
for expanding existing facilities or constructing new facilities to meet those needs, and indicates
how those public facility improvements are to be financed. The GMA empowers jurisdictions to
assess and collect impact fees as one means of financing new public facilities necessitated by
private development.
This Capital Facilities Plan addresses the impact of growth on public school facilities by
examining:
1. anticipated growth of the District's student population over the next six years;
2. the ability of existing and proposed classroom facilities to adequately house those
students based on the District's current Standard of Service;
3. the need for additional enrollment or growth driven capital facilities;
4. the method of financing those capital improvements; and
5. calculation of school impact fees based on, among other variables, the number of students
generated by recent residential development (student generation factors).
This plan is updated annually and submitted to local governments for inclusion as a sub -element
in their Capital Facilities Plans. Past Plans have been adopted by King County and the Cities of
Bellevue, Newcastle and Renton. The District continues to dialogue with the cities of Tukwila
and SeaTac regarding implementation of impact fees within their jurisdictions.
2021 Capital Facilities Plan Renton School District No. 403
Overview of the Renton School District:
The District is located on the south end of Lake Washington, 11 miles south of Seattle to the
west and south of Bellevue to the east. Home to nearly 100,000 people who value working,
living, and playing in the Pacific Northwest, Renton has a strong economic base and a favorable
business climate. The District spans approximately 32 square miles and serves a diverse
population of approximately 15,000 students in pre-K through 12th grade at 4 high schools, 4
middle schools, 15 elementary schools, and an early childhood learning center.
District programs also address the special needs of disabled, academically gifted, and artistically
talented students. Four schools (Renton Park Elementary, Hazelwood Elementary, McKnight
Middle, and Lindbergh High) are U.S. Department of Education -recognized Blue Ribbon
Schools of Excellence. Community support for Renton schools is strong. School levies, which
make up 25% of the district's budget, have been consistently approved by the community for
more than 20 years. Voter -approved bond measures or capital facilities levies from 1992 through
2019 have brought exciting improvements in school buildings and support facilities, including
the rebuilding of all elementary schools, the remodeling of all middle and high schools, and the
recent additional construction of a new elementary school (Sartori) and middle school (Risdon).
Voter support has also provided state-of-the-art technology - a must to prepare students for living
and working in this leading high-tech region. Every classroom has high-speed Internet
connections and ample computer devices for all students.
Creating life-long learners is at the heart of Renton School District's instructional goals. Students
are encouraged to reach for excellence through a variety of programs that focus on basic
academic skills, problem solving, creative and critical thinking, and social and emotional growth.
Each year, Renton School District students qualify as National Merit Finalists while the total
value of college scholarships earned is in the hundreds of thousands of dollars. Elementary level
students are well-grounded in science through participation in the Hands-on Science Kit
Program, lauded by the National Science Teachers' Association. At the high school level, the
district's challenging chemistry program, which provides options for advanced placement college
credit, has been recognized by the National Science Association, as well as the National Science
Foundation. The focus in math is on intensive instruction in the basic skills, supplemented by
opportunities to apply developing knowledge to real world problems. The K-12 math program
increases student achievement through problem solving, integration of technology, and a
rigorous assessment component. Students from elementary to high school levels regularly excel
in regional and national mathematics contests. Across all levels and subjects, reading with
accuracy and understanding is a primary goal. Elementary students receive a rich exposure to
fine literature. Middle and high school students work extensively on reading in the content areas
and exploring classic and modern literature works. Reading activities are integrated with a
topnotch writing program beginning in kindergarten that provides students with intensive and
focused practice for the mastery of a wide range of language arts skills from creative to business
and technical writing.
2021 Capital Facilities Plan Renton School District No. 403
A variety of classes, clubs, and programs give students opportunities to expand their educational
horizons and pursue special interests. Choices range from instrumental and music, performing
and visual arts, intramurals and athletics, academic -focused and career clubs, and community
service opportunities to leadership development programs, business internships, job shadowing,
and participation in the annual robotics competition. Special needs students with physical,
emotional, and academic disabilities receive individualized attention from skilled teachers.
Special education and remedial support are also available and children who are just learning
English receive intensive, small -group ESL instruction to supplement their regular classroom
learning. Guidance and counseling services are available for primary, middle, and high school
students. Intellectually gifted children have many opportunities for extended learning. Operating
at two magnet elementary schools and the three middle schools, the Discovery Program offers a
challenging curriculum with a special focus on higher level thinking skills. High school students
can take advantage of a full range of honors and advanced placement classes.
Renton School District staff consistently show a commitment to their most important task -
preparing their students for success in work and life. More than 80 percent of certificated staff
have five or more years of higher education and two of every three teachers have advanced
degrees in their fields. Several of the district's certificated and classified staff have received the
Washington Award for Educational Excellence. Individual teachers have received special honors
such as the Christa McAuliffe Award for Excellence in Education, the Outstanding Secondary
Science Award, the Washington State High School Social Studies Teacher of the Year Award,
and Outstanding College Alumni recognition. Teachers are encouraged to take an active role in
promoting their own professional growth through creating and refining curriculum, sharing
successful strategies, and looking for new ways to assess student progress. This focus on
continuous staff development enables teachers to consistently improve the quality of instruction
and prepares them to help students meet rigorous state academic standards. Hundreds of training
opportunities are offered to teachers and other staff members each year, ranging from CPR and
first aid, technology education, diversity, and crisis intervention to math, science, and reading
instruction strategies, assessment techniques, and arts education.
H. ENROLLMENT TRENDS
Over the past six years, District enrollment has dropped by 3%, or 340 students. The elementary
grade span experienced a loss of 659 students and the high school grade span dropped by 105
students. Middle school however increased by 105 students. Growth in the immigrant
population had been a significant factor fueling enrollment gains over the past two decades.
However, more recently - between 2016 and 2019 - the ELL (immigrant) population in the
District grew only by an annual average of 1.6%. This is much lower than the 5% annual growth
2021 Capital Facilities Plan Renton School District No. 403
rate experienced by the District between 2012 and 2016. This lower growth rate is consistent
across South King County and could be an early indicator of slowing growth in this part of King
County. The District should continue its observation of the region's immigrant growth trends in
the near term.
Recent increases in the price of housing and declining birth rates are also potential reasons for
declining enrollment. Additionally, the recent impact of the COVID-19 pandemic has caused
numerous adjustments to school district's teaching and learning protocols throughout the last half
of the 2019-2020 school year and certainly throughout the 2020-2021 school year. Many school
districts, including Renton, have experienced notable drops in enrollment in varied grades.
There has been much discussion on whether enrollment will return to pre -pandemic levels, and
that discussion will likely continue over the next couple of years with future CFP's. The learning
model in most cases has been through remote delivery methods and have only recently returned
to partial in -person learning. While the District anticipates and is planning for a full return to in -
person learning, families will also have an option for a virtual program this fall. The District
won't fully understand the impact of these options until well into the fall, and potentially into the
2022-2023 school year.
While overall District enrollment has been trending down in recent years, the district is still
responding to existing capacity deficiencies from growth in earlier years. However, there are
specific service areas within the District that are experiencing growth and continued pressures on
capacity. Elementary schools within the Hazen High School service areas continue to experience
over -enrollment and higher student generation rates than other areas within the district. There is
more planned community new development in the pipeline in these neighborhoods, putting
increased pressure on the nearby elementary schools' capacity. Single-family student generation
rates within Renton trend closer to 40-45 new students per 100 over the past 5 years as compared
to district -wide rates of 24 new students per 100. This is evident is the six neighboring
elementary schools further discussed in the enrollment analysis in the appendix as well. Out of
the 212 new students generated from new single-family development, over half were generated
from development within the City of Renton. Another 109 students were generated from multi-
family development within the City of Renton.
Approval by the community of a 2019 bond measure allowed the District to construct a new
elementary school (#16) to accommodate over -enrollment in the K-5 grade span and to provide
some elementary capacity relief. Sartori, another new elementary was opened in 2019 as a choice
school in the downtown area. This new school has helped with drawing some students from their
neighborhood school, but the affect of growth in this service area continue to put pressure on
elementary grade -span school capacity.
When the pandemic appeared to cause another slight decline in enrollment for the District, the
District chose to supplement the 2020 CFP by further evaluating the enrollment and capacity of
the elementary schools located within or near the service areas the new elementary school #16
(attached as exhibit). The District also chose to more closely evaluate actual student generation
rates within the District, rather than rely on neighboring district averages, as it has in the past, to
more closely evaluate enrollment, growth, and new development student growth rates. The
conclusion of that analysis reaffirmed the District need for the new elementary school. #16. The
new elementary school is scheduled to open in fall of 2023 and is discussed later in this Plan.
2021 Capital Facilities Plan Renton School District No. 403
III. STANDARD OF SERVICE & CAPACITY
The Renton School District Standard of Service is the standard adopted by the District that
identifies the program year, school organizational structure, student/teacher ratios by grade level
(taking into account the requirements of students with special needs), daily class schedule, types
of facilities and other factors identified by the District to be beneficial in supporting its
educational programs and objectives. The Standard of Service is the major determining factor,
together with the number of classrooms (teaching stations), in calculating facility capacity.
The District has adopted a traditional elementary/middle/high school organizational structure that
houses kindergarten through Grade 5 in elementary schools, Grades 6 through 8 in middle
schools, and Grades 9 through 12 in high schools. The school -year calendar adopted by the
District is also traditional; typically beginning in late August and ending in mid -June. Similarly,
the District maintains a common daily schedule, with classes beginning between 7:20 and 9:30
a.m. and ending between 2:03 and 3:10 p.m., depending on grade level.
The District, and the Renton Education Association, recognize that reasonable class size is
necessary for optimum learning, and have established the following targets in student/teacher
ratios:
Grade Levels K-1
21:1
Grade Level 2
22:1
Grade Level 3
24:1
Grade Levels 4-12
29:1
The 29:1 ratio at the secondary level applies to all Language Arts, Social Studies, Science, Math,
World Languages, World Language Exploratory and Health classes. Other ratios apply as
follows:
Band/Orchestra
40:1
Choir
50:1
Middle School PE
35:1
High School PE
40:1
All other classes
31:1
2021 Capital Facilities Plan Renton School District No. 403
For the purposes of this report, student /teacher ratio for special education classes held in self-
contained classrooms within comprehensive elementary and secondary facilities is assumed to be
12:1. Educational facilities dedicated solely to special education or other specialized programs
are excluded from capacity calculations, as are associated student headcounts.
In response to new State and District high school graduation requirements, beginning with the
2018-2019 school year, all District high schools changed from a semester system to a trimester
system, resulting in the following:
• Three 12-week terms instead of two 18-week terms,
• Five 72-minute periods per day instead of six 57-minute periods, and
• Reduction of classroom efficiency from 83% to 80%, reducing facility capacity.
Beginning with the graduating class of 2020-2021, high school graduation requirements require
one additional credit of science (three instead of two), and a total of 24 credits; three more than
the previously required 21. This will impact high school capacity, especially regarding science
classrooms, where additional classroom space suitable for the various sciences, or the
renovation/upgrade of existing classrooms to accommodate the same, will be necessary. The
construction of new science classroom addition at Lindbergh High is one such project included
in last year's update, although it is not addressed in the calculation of this year's impact fees or
previous year's impact fees.
Student/teacher ratios, referenced earlier, are applicable to both permanent and relocatable
classrooms. However, inasmuch as relocatable facilities do not generally allow for the full range
of educational activities promoted by the District, they are generally viewed as temporary or
interim housing, necessary to accommodate enrollment fluctuations and development driven
enrollment increases, but only until such time as permanent facilities can be financed and
constructed. For those reasons, relocatable classrooms capacities are calculated, but not used in
the analysis of future facility needs.
Practical Capacity Model:
The Practical Capacity Model calculates building capacity based on limitations that existing
facilities place on enrollment as a result of current educational program needs, operating policy
and contractual restrictions.
The calculation is made by reviewing the use of each classroom/teaching station in each facility.
For every room housing students, a calculation is made, assigning a maximum number of
students per room. Sometimes the capacity of core facilities, such as the cafeteria or gym, or the
quantity of restroom fixtures, may limit facility capacity to a level below that calculated by
collective classroom capacity levels.
2021 Capital Facilities Plan Renton School District No. 403
Capacity at the secondary school level is further limited by class scheduling restrictions and
student distribution among elective classes. Based on a typical middle school six -period day,
where one period is designated for teacher planning, capacity is reduced by one -sixth, or 17
percent, of theoretical capacity. Similarly, at high schools, with the newly established five -
period day, capacity is reduced by one -fifth, or 20 percent. Elective classes, many of which
require specialized classrooms, also figure into the equation for determining a school's capacity,
which together with required classes, require a well thought out Master Schedule if the facility's
capacity is to be maximized.
Current Capacity:
Student capacity of existing, permanent K-12 facilities, excluding special education facilities and
facilities housing alternative learning environments, is 14,788. Based on current enrollment
(October 2020 headcount), the District is showing a permanent facility deficit of 162 at the
elementary level, further reduced from last year's deficit of 498 and 755 the year prior. This is
deficit reduction is due to the new Elementary School, Sartori, opening in 2019, but could also
be due in some manner, to the effects of the pandemic. The current and future capacity at the
elementary level, as documented in this report, is based on the District's current Standard of
Service and does not necessarily reflect aspirational K-3 student/teacher ratios of 17 students to
one teacher. The District continues to make progress towards these requirements, by utilizing
available classroom space, added staffing and plans to utilize the new elementary school
classrooms to work towards this ratio. Most recently, the District was at 17.3:1, and continues
making successful progress towards the mandate.
As a result of increased enrollment at middle schools, the current number of students now
exceeds facility capacity by 213, while a decrease in recent high school enrollment results in a
surplus capacity of 252, down from last year's surplus of 349.
Elementary school capacity remains the District's greatest challenge. Relying heavily on the use
of relocatable classrooms (portables) to accommodate the fluctuating student population,
portables at elementary schools account for over 15% of the District's total
K — 5 facility capacity. Portables are, however, not considered permanent structures, and are
therefore not included in the inventory of permanent facilities. They are viewed as a short-term
solution for managing enrollment fluctuation, housing students on a temporary or interim basis
until permanent facilities can be constructed.
Renton School District's capital facilities include both permanent structures and relocatable
(interim or portable) classrooms. Permanent facilities are further categorized as either K-12
(traditional elementary, middle and high school configurations), Special Instructional Use, or
Non -instructional Support Facilities. The District maintains a total of 32 permanent and 55
relocatable facilities serving a total student population of 14,918 (October 2020 headcount).
The District's permanent K-12 facilities include 15 elementary schools, 4 middle schools, and 4
high schools. Two Special Instructional Use facilities house the District's early childhood,
special education and alternative learning programs. Support facilities include the Kohlwes
2021 Capital Facilities Plan Renton School District No. 403
Education Center (admin.), Transportation Center, Facilities Operations and Maintenance
Center, Nutrition Services/Warehouse, Renton Memorial Stadium and the Lindbergh Swimming
Pool. Total permanent facilities encompass 2,595,263 square feet, with 2,417,847 square feet
(93%) devoted to K-12 and instructional special use. See Appendix A for District Maps.
The District's relocatable K-12 facilities are used primarily to address enrollment fluctuations
and to house students on an interim or temporary basis until permanent facilities can be
constructed. For those reasons they are not considered a long-term solution for housing students
and are not acknowledged in the calculation of the capacity of K-12 facilities. Of the 55
relocatable facilities in the District's inventory, 44 are "double portables" containing two
classrooms, and 11 are singles. Combined, they provide the District with a total of 99
relocatable classrooms, encompassing 88,704 square feet of additional space available for
instruction.
The tables below summarize existing K-12 facility capacity. Table 1 below includes all
facilities. Table 2 indicates capacities in term of high school Service Areas. A complete
inventory of District facilities, including undeveloped property, follows in Tables 3,4, & 5.
Facility capacity worksheets may be found in Appendix B.
EXISTING FACILITY CAPACITY
Facility
Type
Elementary
Schools
Middle
Schools
High
Schools
Total
Permanent
6,895
84.6%
3,435
88.3%
4,458
98.0%
14,788
89.1%
Relocatable
1,252
15.4%
457
11.7%
92
2.0%
1,801
10.9%
Total
8,147
100%
3,892
100%
4,550
100%
16,589
100%
TABLE 1
CAPACITY BY SERVICE AREA
Facility Type
Lindbergh
Hazen
Renton High
Total
Elementary
Permanent
1843
2423
2075
6341
Relocatable
183
618
451
1252
Total Elem
2026
3041
2526
7593
Middle
Permanent
896
1745
794
3435
Relocatable
183
183
91
457
Total Elem
1079
1928
885
3892
High
Permanent
1211
1462
1389
4062
Relocatable
92
0
0
92
Total Elem
1303
1462
1389
4154
Grand Total
4408
6431
4800
15639
TABLE 2
1. Does not include Sartori Elementary and Talley High, as they are not associated with a particular service
area.
2021 Capital Facilities Plan Renton School District No. 403
INVENTORY AND CAPACITY OF RELOCATEABLE CLASSROOMS
Building ID
Location
Number of
Classrooms
School ID
Numbers
Area
(sq. ft.)
Student
Capacity
53
McKnight Middle
2
7/8
1,792
46
54
Nelsen Middle
2
7/8
1,792
46
55
Nelsen Middle
2
5/6
1,792
46
56
Nelsen Middle
2
3/4
1,792
46
57
Nelsen Middle
2
1/2
1,792
46
59
Lindbergh High
1
2
896
21
60
Lindbergh High
1
3
896
21
61
Lindbergh High
1
4
896
21
62
Talbot Hill Elementary
1
2
896
29
64
Talbot Hill Elementary
1
1
896
29
65
Dimmitt Middle
1
3
896
23
66
Dimmitt Middle
1
4
896
23
69
Honey Dew Elementary
2
3A/3B
1,792
58
70
Talbot Hill Elementary
1
3
896
29
72
McKnight Middle
2
3/4
1,792
46
73
Lakeridge Elementary
2
5/6
1,792
58
74
Sierra Heights Elementary
2
5/6
1,792
58
77
McKnight Middle
2
5/6
1,792
46
78
McKnight Middle
2
1/2
1,792
46
79
Dimmitt Middle
2
1/2
1,792
46
80
Honey Dew Elementary
2
2A/2B
1,792
58
81
Cascade Elementary
2
1/2
1,792
58
82
Sierra Heights Elementary
2
1/2
1,792
58
83
Lindbergh High
2
5/6
1,792
42
84
Maplewood Heights Elementary
2
5/6
1,792
58
85
Dimmitt Middle
1
5
896
23
86
Dimmitt Middle
1
6
896
23
87
Dimmitt Middle
1
7
896
23
88
Bryn Mawr Elementary
2
1/2
1,792
58
89
Bryn Mawr Elementary
2
3/4
1,792
58
90
Honey Dew Elementary
2
4A/4B
1,792
58
91
Honey Dew Elementary
2
lA/lB
1,792
58
92
Tiffany Park Elementary
2
1/2
1,792
58
93
Spring Glen
2
1/3
1,792
46
94
Spring Glen
2
2/4
1,792
46
95
Campbell Hill Elementary
2
2A/2B
1,792
58
96
Campbell Hill Elementary
2
lA/lB
1,792
58
97
Cascade Elementary
2
3/4
1,792
58
98
Cascade Elementary
2
5/6
1,792
58
99
Lakeridge Elementary
2
7/8
1,792
58
100
Lakeridge Elementary
2
3/4
1,792
58
101
Campbell Hill Elementary
2
3A/3B
1,792
58
102
Campbell Hill Elementary
2
4A/4B
1,792
58
103
Maplewood Heights Elementary
2
1/2
1,792
58
2021 Capital Facilities Plan Renton School District No. 403
104
Maplewood Heights Elementary
2
3/4
1,792
58
105
Maplewood Heights Elementary
2
7/8
1,792
58
106
Sierra Heights Elementary
2
3/4
1,792
58
107
Sierra Heights Elementary
2
7/8
1,792
58
108
Tiffany Park Elementary
2
3/4
1,792
58
109
Bryn Mawr Elementary
2
5/6
1,792
58
110
Hazelwood Elementary
2
lA/1B
1,792
58
111
Maplewood Heights Elementary
2
9/10
1,792
58
112
Maplewood Heights Elementary
2
11/12
1,792
58
113
Talbot Hill Elementary
2
lA/1B
1,792
58
114
Talbot Hill Elementary
2
2A/2B
1,792
58
Total
99
88,704
2,669
TABLE 3
*Capacity based on Standard of Service and not actual use
2021 Capital Facilities Plan Renton School District No. 403
INVENTORY AND CAPACITY OF PERMANENT FACILITIES
J
0
0
x
U
N
a
Z
W
5
W
J
W
JCn
J
0 0
00
__
M U
Cn
W
J
0
0
U
N
x
CD
x
W
_U
W
N
0
a
a
D
V)
NAME
LOCATION
AREA (ft)
CAPACITY
Benson Hill
18665 - 116th Ave. SE, Renton, 98058
67,533
520
Bryn Mawr
8212 S 118th St., Seattle, 98178
49,157
338
Campbell Hill
6418 S 124th St., Seattle, 98178
57,072
332
Cascade
16022 - 116th Ave. SE, Renton, 98058
59,164
467
Hazelwood
7100 - 116th Ave. SE, Newcastle, 98056
66,161
591
Highlands
2727 NE 7th St., Renton, 98056
60,000
547
Honey Dew
800 Union Ave. NE, Renton, 98059
54,620
336
Kennydale
1700 NE 28th St., Renton, 98056
65,169
622
Lakeridge
7400 S 115th St., Seattle, 98178
52,958
398
Maplewood Hgts.
130 Jericho Ave., Renton, 98059
56,220
402
Renton Park
16828 - 128th Ave. SE, Renton, 98058
65,955
476
Sartori
332 Park Ave. N, Srenton, 98057
76,797
554
Sierra Heights
2501 Union Ave. NE, Renton, 98058
53,992
472
Talbot Hill
2300 Talbot Rd., Renton, 98055
57,844
460
Tiffany Park
1601 Lake Youngs Way, Renton, 98058
58,758
380
Total Grades K-5 Capacity
901,400
6,895
Dimmitt
12320 - 80th Ave. S, Seattle, 98178
109,070
794
McKnight
2600 NE 12th St., Renton, 98056
126,706
847
Nelsen
2304 Jones Ave. S, Renton, 98055
124,234
896
Risdon
6928 - 116th Ave. SE, Newcastle 98056
136,582
898
Total Grades 6-8 Capacity
496,592
3,435
Hazen
1101 Hoquiam Ave. NE, Renton, 98059
327,395
1,462
Lindbergh
16426 - 128th Ave. SE, Renton, 98058
242,662
1,211
Renton
400 S 2nd St., Renton, 98057
278,373
1,389
Talley
7800 S 132nd St., Renton, 98178
70,831
397
Total Grades 9-11 Capacity
919,261
4,458
TOTAL GRADE LEVELS K-12
2,317,253
14,788
Meadow Crest EEC
1800 Index Ave. NE, Renton, 98056
68,752
464
HOME Program - Spring Glen
2607 Jones Ave. S, Renton, 98055
7,005
84
Renton Academy - Spring Glen
2607 Jones Ave. S, Renton, 98055
24,837
48
Total Instructional Special Use
100,594
596
Total Instructional Facilities
2,417,847
15,384
Facilities Operations Center
7812 S 124th St., Seattle, 98178
21,894
Kohlwes Educational Center
300 SW 7th St., Renton, 98057
57,000
Lindbergh Pool
16740 - 128th Ave. SE, Renton, 98058
13,600
Nutrition Services / Warehouse
409 S Tobin St., Renton 98057
27,466
Renton Memorial Stadium
405 Logan Ave. N, Renton, 98057
37,213
Transportation Center
420 Park Ave. N, Renton, 98057
20,243
Total Support Services
177,416
Total All Permanent Facilities
2,595,263
TABLE 4
2021 Capital Facilities Plan Renton School District No. 403
RELOCATABLE FACILITY CAPACITY BY SCHOOL*
ELEMENTARY SCHOOLS
Location
Address
Building ID
Area
(sq. ft.)
Capacity
Bryn Mawr
8212 S I I8th St., Seattle, 98178
88, 89, 109
5,376
174
Campbell Hill
6418 S 124th St., Seattle, 98178
95, 96, 101, 102
7,168
232
Cascade
16022 - 116th Ave. SE, Renton, 98058
81, 97, 98
5,376
174
Hazelwood
7100 - 116th Ave. SE, Newcastle, 98056
110
1,792
58
Honey Dew
800 Union Ave. NE, Renton, 98059
69.80.90.91
7,168
232
Lakeridge
7400 S 115th St., Seattle, 98178
73, 99, 100
5,376
174
Maplewood Heights
130 Jericho Ave., Renton, 98059
84, 103, 104, 105,
111,112
10,752
348
Sierra Heights
2501 Union Ave. NE, Renton, 98058
74, 82, 106, 107
7,168
232
Talbot Hill
2300 Talbot Rd., Renton, 98055
62, 64, 70, 113,
114
6,272
203
Tiffany Park
1601 Lake Youngs Way, Renton, 98058
92,108
3,584
116
Elementary School
Total Capacity
60,032
1943
MIDDLE SCHOOLS
Location
Address
Building ID
Area
(sq. ft.)
Capacity
Dimmitt
12320 - 80th Ave. S, Seattle, 98178
65, 66, 79, 85, 86,
87
6,272
161
McKnight
2600 NE 12th St., Renton, 98056
53, 72, 77, 78
7,168
184
Nelsen
2304 Jones Ave. S, Renton, 98055
54, 55, 56, 57
7,168
184
Middle School
Total
20,608
529
HIGH SCHOOLS
Location
Address
Building ID
Area
(sq. ft.)
Capacity
Lindbergh
16426 - 128th Ave. SE, Renton, 98058
59, 60, 61, 83
4,480
105
High School Total
4,480
105
INSTRUCTIONAL SPECIAL USE
Area
Location
Address
Building ID
(sq. ft.)
Capacity
Spring Glen
2607 Jones Ave. S, Renton, 98055
93,94
3,584
92
Special Education
Total
3,584
92
TOTAL ALL
RELOCATABLE
88,704
2669
CLASSROOMS
TABLE 5
*Capacity based on Standard of Service and not actual use
2021 Capital Facilities Plan Renton School District No. 403
UNDEVELOPED PROPERTY
Skyway Site
S Langston Rd. & 76th Ave. S, Seattle
4.18 Acres
Chelan Ave. Site
Chelan Ave. NE & NE 12th St., Renton
10.80 Acres
Park Ave. N Site
Park Ave. N & N 3rd St., Renton
0.31 Acres
Park Ave. N Site
Park Ave. N & N 5th Ave., Renton
0.45 Acres
IV. ENROLLMENT PROJECTIONS
Projection Methodology
Numerous methodologies are available for projecting long-term enrollments. The most common
method is known as cohort survival which tracks groups of students through the system and
adjusts the populations to account for the average year -to- year growth. For example, this year's
fourth grade is adjusted based on the average enrollment trend of the past in order to estimate
next year's fifth grade enrollment. This calculation method considers the past five years' trends
to determine the average adjustment factor for each grade, or cohort. The method works well for
all grades except kindergarten, where there is no previous year data. For kindergarten, two
methodologies are generally used: A linear extrapolation from the previous five years of
kindergarten enrollment, assuming that there is a trend; or, alternatively, a comparison of the
kindergarten enrollment to births from five years prior can be used to calculate a "birth-to-k"
ratio. For example, kindergarten enrollment in 2019 is divided by the total births in King County
in 2014 to produce a birth-to-k ratio. The average ratio for the last five years can then be applied
to births in subsequent years to estimate kindergarten enrollment.
The cohort survival method has been used by OSPI to predict enrollment for all Districts in the
state. In past years, OSPI has used a 6-year cohort average for grades 1-12 and a linear
extrapolation method at kindergarten. In 2008, OSPI commissioned a study to evaluate the
effectiveness of this method for predicting enrollment. The report recommended the use of the
"birth-to-k" method for predicting kindergarten enrollment and the use of a housing adjustment
factor for Districts that are likely to be impacted by large numbers of new housing developments.
The cohort survival method generally works well for Districts that have a consistent trend of
gradual increases or declines in enrollment. It is less reliable in Districts where spikes in
demographic trends (especially a marked increase or decrease in new housing) can lead to
dramatic swings in enrollment from one year to the next. In addition, the use of the linear
extrapolation method at the kindergarten level can result in a distorted trend since it does not
2021 Capital Facilities Plan Renton School District No. 403
consider changes in birth rate trends. Combining cohort survival with other information about
births, housing, regional population trends, and even trends in service area and private school
enrollment can sometimes provide for a more accurate forecast. For this Plan, the average rollup
at existing grades was combined with estimates of growth that might be expected from new
housing, and assumptions about market share gains or losses that the District is likely to see at
certain grade levels. Estimates of housing growth for this model were obtained from building
permit information provided by the respective jurisdictions. Overall enrollment is predicted to
increase between 2021 and 2026. Elementary and High School enrollment are projected to grow
by about 1% over the six -year forecasted period, while the middle school is projected to lose
about 1 % enrollment over this same period.
Projections and Future Capacity:
Enrollment projections provided by Educational Data Solutions, LLC indicate some growth in
the elementary and high school grade span over the next six years, with a minor decrease in
middle school enrollment. Overall enrollment is projected to grow by 497 students, or 15,415
students - returning enrollment to pre -pandemic levels. The elementary grade span is projected
to increase by 373 students, middle school is projected to drop enrollment by 171 students and
the high school grade span projects a growth of 303 students. While this enrollment projection
begins to return the District to pre -pandemic levels, it still reflects a less than 0.5% annual
growth, which is relatively consistent with actual enrollment growth over the past decade.
For the purposes of this Plan, the District is using a `medium' enrollment projection but will
continue to monitor both a `low' and a `high' enrollment projection as well. As the District
moves past the pandemic and related impacts, there is potential for development growth in the
real estate market and for a resurgence of immigrant population with recent political
administration changes at the national level.
Acknowledging the opening of the new Sartori Elementary School in 2018 and factoring in the
projections in elementary school enrollment over the next six years, current capacity will still be
insufficient to accommodate all K-5 students. With the passage of the 2019 RSD bond measure,
the District is moving forward with design and construction of an additional elementary school,
which, upon completion, will allow permanent capacity to surpass enrollment for the first time in
nearly two decades. The District's sixteenth elementary school is scheduled to open in the fall
of 2023.
Middle schools are currently showing a deficit capacity of 213. Projections show a slight drop in
enrollment over the next six years and there are currently no plans to increase middle school
capacity. At the high school level, projected enrollment over the next six years will add an
additional 303 students. With a current surplus capacity of 252, this enrollment increase will
result in a deficit of 84 by the school year 2023 — 2024. That deficit will be mitigated by the
construction of new science classrooms, and the renovation of existing science classrooms, at
Lindbergh High School, increasing capacity by 84. This increase, however, will still result in a
deficit of 47 by the school year 2025 — 2026. There are no additional plans currently to increase
high school capacity.
2021 Capital Facilities Plan Renton School District No. 403
PROJECTED ENROLLMENT GROWTH
ACTUAL
OCT. 2019
HEADCOUNT
ACTUAL
OCT. 2020
HEADCOUNT
OCT.2026
PROJECTED
HEADCOUNT
ACTUAL
CHANGE
2019 - 2020
ACTUAL
CHANGE (%)
2019 - 2020
PROJECTED
CHANGE
2020 - 2026
PERCENTAGE
CHANGE
2020 - 2026
ELEMENTARY
7,485
7,057
7,429
(428)
-5.72%
372
5.27%
MIDDLE
3,546
3,648
3,477
102
2.88%
-171
-4.69%
HIGH
4,142
4,206
4,509
64
1.55%
303
7.20%
TOTAL
15,173
14,911
1 15,415
(262)
-1.73%
504
3.38%
TABLE 6
•------------------------------------------------------------------------
RENTON SCHOOL DISTRICT NO. 403
ENROLLMENT PROJECTIONS BY COHORT SURVIVAL*
(KK Linear Projection)
--ACTUAL
HEADCOUNT- -
AVE. %
- - - - - - PROJECTED
ENROLLMENT ------
Oct. 2019
Oct.2020
SURVIVAL
2021
2022
2023
2024
2025
2026
Kindergarten
1,263
1,095
1,296
1,297
1,231
1,230
1,221
1,247
Grade 1
1,248
1,214
100.91%
1,256
1,295
1,290
1,218
1,230
1,212
Grade 2
1,207
1,215
97.94%
1,181
1,251
1,289
1,284
1,212
1,220
Grade 3
1,225
1,142
98.37%
1,166
1,180
1,250
1,289
1,284
1,209
Grade 4
1,256
1,186
98.34%
1,143
1,158
1,172
1,241
1,279
1,270
Grade 5
1,286
1,205
98.48%
1,173
1,139
1,154
1,168
1,237
1,271
TOTAL K - 5
7,485
7,057
7,215
7,320
7,386
7,430
7,463
7,429
Grade 6
1,246
1,234
96.39%
1,152
1,143
1,110
1,124
1,138
1,202
Grade 7
1,175
1,251
99.51%
1,201
1,160
1,151
1,118
1,132
1,143
Grade 8
1,125
1,163
99.14%
1,200
1,205
1,163
1,154
1,121
1,132
TOTAL 6 - 8
3,546
3,648
3,553
3,508
3,424
3,396
3,391
3,477
Grade 9
1,118
1,123
101.12%
1,158
1,215
1,222
1,180
1,169
1,137
Grade 10
1,133
1,110
101.36%
1,140
1,183
1,228
1,236
1,193
1,183
Grade 11
960
992
90.76%
1,037
1,057
1,099
1,141
1,152
1,108
Grade 12
931
981
101.26%
965
972
993
1,032
1,075
1,081
TOTAL 9 - 12
4,142
4,206
4,300
4,427
4,542
4,589
4,589
4,509
TOTAL K - 12
15,173
14,911
15,068
15,255
15,352
15,415
15,443
15,415
YEARLY CHANGE
157
187
97
63
28
-28
YEARLY CHANGE %
1.05%
1.24%
0.64%
0.41%
0.18%
0.18%
CUMULATIVE CHANGE
157
344
441
504
532
504
CUMULATIVE CHANGE %
1.05%
2.31%
2.96%
3.38%
3.57%
3.38%
TABLE 7
2021 Capital Facilities Plan Renton School District No. 403
V. ENROLLMENT DRIVEN FACILITY NEEDS
With the opening of the new Sartori Elementary School in August 2018, the 2017 elementary
deficit capacity of 1,244 was dramatically reduced by nearly 40% to 755. Currently, as a result of
recent enrollment declines, that deficit has been further reduced to 498. However, even with the
K-5 enrollment decreases projected through the 2025 -26 school year, existing facilities will still
be inadequate to house all K-5 students. Aside from these growth -related deficits, the future
implementation of reduced K-3 student/teacher ratios, as prescribed by the McCleary Act, will
further necessitate the need for additional elementary school capacity. With the passage of the
2019 Bond Measure, approved by the voters in November, 2019, the District is proceeding with
the design and construction of its sixteenth elementary school, located in the Hazen High School
service area, where the District has experienced the most growth in the past. The new school is
scheduled to be completed and opened for the 2023-24 school year.
To get a better understanding of enrollment driven facility needs at the K-5 level, it is helpful to
view existing conditions in terms of high school Service Areas, the vast majority of the District's
elementary facility deficit has occurred within the Hazen High School Service Area, representing
approximately 95% of the total shortfall. Although growth in this area has slowed down over the
past decade, it has not recovered from the construction boom of the early 2000's. The need for
additional permanent facilities in the Hazen Service Area, to replace the multitude of relocatable
facilities that have overtaken student play areas, has been a District goal for several years. With
the passage of the 2019 Bond, the District is now able to proceed with construction of a new
elementary school, bringing equity, in the way of permanent classroom facilities, to the East Hill
of Renton.
At the middle school level, enrollment projections indicate that, due to decreased enrollment, the
current deficit of 39 unhoused students will become a surplus of 106 by the 2025-26 school year.
There are currently no enrollment driven capital facilities projects in the planning stages for
middle schools.
At the high school level, the District continues showing a decreasing surplus capacity until 2023,
when enrollment overtakes capacity, resulting in a deficit of 84. The deficit returns to a slight
surplus by 2026. Although the need for additional facilities based on enrollment growth is not a
priority at this time, recent changes in graduation requirements have created the need for
additional science classrooms and laboratories. Changed requirements include an increase from
21 to 24 credits, and one addition credit of Science. As part of the recently passed 2019 Bond
Measure, the District will be constructing additional science classrooms at Lindbergh High
School and renovating/upgrading existing science classrooms at all three comprehensive high
schools.
In addition to these current and/or future projected permanent facility deficits at the elementary
and high school levels, it should be noted that the District is also reaching its maximum limit in
2021 Capital Facilities Plan Renton School District No. 403
providing portable classrooms at its existing sites, due to current land use and building code
requirements. Although not included in the calculation of Impact Fees, the implementation of
new relocatable classrooms and/or the relocation of existing ones, remains a viable method of
addressing both growth and the shifting of student population, for the short term.
Similarly, science classroom additions proposed for Lindbergh High School, as well as other
potential high school renovations, additions, or relocations responding to enrollment growth
and/or changes in capacity methodology, are not included in the calculation of these fees.
Table 8 compares the current permanent capacity of Renton School District facilities to current
and projected enrollment for the next six years.
SURPLUS / DEFICIT CAPACITY PROJECTIONS' 2019 - 2025
2019 1 2020 1 2021 1 2022 1 2023 1 2024 2025
PERMANENT CAPACITY
6,895
6,895
6,895
6,895
7,545
7,545
7,545
ELEM.
K-5
STUDENT ENROLLMENT
7,393
7,288
7,221
7,198
7,187
7,153
7,085
SURPLUS / DEFICIT CAPACITY
498
393
326
303
358
392
460
PERMANENT CAPACITY
3,435
3,435
3,435
3,435
3,435
3,435
3,435
MIDDLE
6-8
STUDENT ENROLLMENT
3,484
3,584
3,599
3,495
3,376
3,314
3,329
SURPLUS / DEFICIT CAPACITY
49
149
164
60
59
121
106
PERMANENT CAPACITY
4,458
4,458
4,458
4,458
4,542
4,542
4,542
HIGH
9.12
STUDENT ENROLLMENT
4,109
4,224
4,336
4,457
4,562
4,608
4,567
SURPLUS / DEFICIT CAPACITY
349
234
122
1
20
66
25
TABLE 8
1. Does not include relocatable facilities (portables)
2021 Capital Facilities Plan Renton School District No. 403
Capital Construction Plan:
For the next six -year period, the District's highest priorities will be addressing existing and
projected facility capacity deficits, both growth and program related. This includes:
• Construction of a new elementary school within the Hazen High School service area,
where most of the growth has and continues to occur, and relief is needed at the
elementary grade -span. (see enrollment analysis appendix)
• High school additions and/or renovations to create additional science
classroom/laboratory space to address changes in State graduation requirements
• Acquisition of land for future development.
• Addition and or relocation of relocatable classrooms (interim classroom space known as
portables)
Other high priority capital improvements will fall into one or more of the following major
categories; Safety and Security, Energy Conservation, Site Improvements, and Building
Upgrades. Improvements will occur district -wide, affecting nearly all District facilities,
achieving and maintaining the level of service necessary to provide safe, healthy, and nurturing
learning environments for all students. These improvements are not necessarily enrollment
related. Many of these projects will be funded by the 2019 Bond Measure passed in November
2019.
2021 Capital Facilities Plan Renton School District No. 403
VI. SIX -YEAR FINANCE PLAN
Finance Plan:
The primary funding sources for all capital construction projects scheduled over the next six
years include 2019 Bond funds, remaining funds from the 2016 capital levy; and school impact
fees currently being collected by King County and the cities of Bellevue, Newcastle and Renton.
Expenditures for enrollment driven projects over the next six years are estimated at $77,362,000,
of which 100% is secured by the 2019 Bond Measure approved by the voters in November 2019,
and previously collected impact fees.
Impact Fees:
Impact fees were calculated in conformance with King County Council Ordinance 11621,
Attachment A, resulting in a decrease of $5,022 per unit for single-family fees, and a decrease in
multi -family fees of $252 per unit. The primary variables contributing to these decreases are due
to a notable decrease in the Student Generation Factors for single-family residential construction,
as well as the continued low Bond rates.
A comparison of current and last year's fees is shown below.
IMPACT FEES
2019
2020
CHANGE
SINGLE-
FAMILY
$6,862
$7,681
$819
MULTI -FAMILY
$3,582
$4,989
$1,407
TABLE 1
Enrollment driven capital improvements projects identified in this Plan will be funded by the
2019 Capital Bond funds, and school impact fees assessed and collected by King County and the
cities of Bellevue, Newcastle and Renton. The District does not appear to be eligible for any
funding through the OSPI School Construction Assistance Program (SCAP) at this point in time,
based on the construction projects included in this update.
The District's intent in structuring its capital improvement programs is to maintain a constant
level of construction throughout the program period in order to optimize the utilization of its
management capabilities. The District utilizes a combination of in-house project management
(Capital Projects Office) and outside management consultants to accomplish this.
Enrollment driven projects represent only a portion of the Districts total capital improvement
plan. Estimated expenditures for enrollment driven projects over the duration of this six -year
plan are indicated in Table 10 below.
2021 Capital Facilities Plan Renton School District No. 403
SIX -YEAR FINANCE PLAN - GROWTH
DRIVEN PROJECTS
Project
Estimated Expenditures' $1,000's
Fundin $1,OOOs
2020-
21
2021-
22
2022-
23
2023-
24
2024-
25
2025-
26
Total
Secured
Unsecured'
New Elem. School
1,120
16,800
30,880
10,080
1,120
60,000
60,000
Science Classrooms
& Portables (if
needed)
817
2,088
4,406
9,423
766
17,500
17,500
Land Acquisition
I
1
1 2,431
1 2,431
1
1
1 4,862
1 4,862
Total
1 1,937
1 18,888
1 37,717
1 21,934
1 1,886
1 0
1 82,362
1 82,362
TABLE 10
1. Estimated expenditures based on total project cost, including hard and soft costs.
2. Secured funding includes 2019 bond monies, and school impact fees.
3. Unsecured funds include future levy and bond initiatives.
2021 Capital Facilities Plan Renton School District No. 403
VII. IMPACT FEES
The GMA empowers jurisdictions to assess and collect impact fees as a means of
supplementing the funding of additional public facilities necessitated by enrollment growth
from new development. In the case of public schools, impact fees are assessed only on
residential new development. To determine an equitable school impact fee throughout
unincorporated King County, King County Code 2 1 A was adopted, establishing an impact
fee formula that has in turn been adopted by the cities of Bellevue, Newcastle and Renton,
in their respective enabling ordinances. The formula requires that school districts establish
"Student Generation Factors" that estimate the number of students generated by each new
single or multi -family residential unit constructed and establish district -specific
construction costs that are unique to that district. Refer to Appendix D for substantiating
documentation on Student Generation Factors.
Other factors influencing impact fees include:
Site Acquisition Costs - the estimated cost per acre to purchase property.
Building Acquisition Cost - the estimated cost to construct facilities unique to the
district.
Temporary Facility Cost - the estimated cost per classroom to purchase and install a
relocatable classroom, including site work and utilities.
State Funding Assistance Credit - the amount of funding provided by the State, subject
to District eligibility, based on a construction cost allocation and funding assistance
percentage established by the State.
Tax Credit — Driven by assessed property values, taxation rate, and Bond interest rates.
Based on the Growth Management Act and King County Code 21A, impact fees for the
plan year 2021 are:
Single -Family Units $ 2,659
Multi -Family Units $ 4,737
Single -Family and Multi -Family Fee Calculation spreadsheet follows.
2021 Capital Facilities Plan Renton School District No. 403
SCHOOL IMPACT FEE CALCULATION
SITE ACQUISITION COST
Facility
Site Area
(Acres)
Cost per Acre
Facility
Capacity
SINGLE FAMILY
MULTI -FAMILY
SGF
COST
SGF
COST
Elementary
10
650,000
650
0.154
$1,540
0.137
$1,370.00
Middle
0
650
850
0.065
$0
0.042
$0.00
Hi h
0
650
1250
0.062
$0
0.060
$0.00
TOTALS $1,540 1 TOTALS $1,370
SCHOOL CONSTRUCTION COST
Facility
Perm. % of
Tot. Facilities
Facility Cost
(2020 $)
Facility
Capacity
SINGLE FAMILY
MULTI -FAMILY
SGF
COST
SGF
COST
Elementary
84.63%
482434,125
650
0.154
$9,712
0.176
$11,123
Middle
88.25%
0
850
0.065
$0
$0.077
$0
High
97.97%
0
1,250
0.062
$0
$0.078
$0
TOTAL $9,7121 TOTAL $11,123
TEMPORARY FACILITY COST
Facility
Perm. % of
Tot. Facilities
Facility Cost
(2019 $)
Facility
Capacity
SINGLE FAMILY
MULTI -FAMILY
SGF
COST
SGF
COST
Elementary
15.37%
0
29
0.154
$0
0.176
$0
Middle
11.75%
0
26
0.065
$0
0.077
$0
High
2.03%
0
26
0.062
$0
0.078
$0
TOTAL $0 1 TOTAL $0 j
OSPISCAP
Facility
Cost Alloc.
per Sq. Ft.
Sq. Ft. per
Student
Assistance
Percentage
SINGLE FAMILY
MULTI -FAMILY
SGF
COST
SGF
COST
Elementary
238.22
90
0.3133
0.154
$1,034
0.176
$1,185
Middle
238.22
117
0.3133
0.065
$0
0.077
$0-
High
238.22
130
0.3133
0.062
$0
0.078
$0
TAX CREDIT (TC)
Average Assessed Value (AAV)
Interest Rate for Bonds ( i )
Term (t = maximum 10 yrs.)
Tax Rate ( r )
TC TOTAL
FACILITY CREDIT
TOTALFEE
50% DEVELOPER FEE OBLIGATION
TABLE11
TOTAL $1,034 TOTAL ($1,185)�
SINGLE-FAMILY MULTI -FAMILY
$509,159 $190,741
2.44% 2.44%
10 10
0.001096 0.00109602
TC TOTAL $4,899 $1,835
$0 $0
$5,318 $9,473
2,659 4,737
IMPACT FEE 2,659 4,737
TAX CREDIT (TC) = NPV (net present value) x AAV x r where NPV = ((1+i)t - 1)
i (1 +i)t
AAV = Average assessed Value
r = Tax Rate
i = Bond Interest Rate as of 03/2019
t = Bond Term
2021 Capital Facilities Plan Renton School District No. 403
XIII. APPENDICES
APPENDIX A: DISTRICT MAPS ....................................... 23
APPENDIX B: CAPACITY WORKSHEETS ............................... 25
APPENDIX C: HEADCOUNT & PROJECTIONS ...........................27
APPENDIX D: STUDENT GENERATION FACTORS ....................... 29
APPENDIX E: CHANGES FROM PREVIOUS PLAN ....................... 31
2021 Capital Facilities Plan Renton School District No. 403
RSD BOUNDARY MAP - MUNICIPALITY OVERLAY
Renton School Dist
Bellevue
Kent
King County
Newcastle
Renton
Seatac
Tukwila
City Limits
of Renton
KC U G
Boundary
Abbreviations
Elwnandry R Pro-K Schools:
decondery 3ohooic
BHE
Benson HII Elementary
oMS Olnmtt Middle 3dno1
BME
Bryn Mawr Ekwrw ary
HHS Hazen High School
CES
Cascade Elarnentary
LHS Uxlbsrgh Hlg h School
CHE
Campbel Hil Elementary
MMS Mdcreght Meddle Sdoo1
HIDE
Honeydew Elementary
NMIS Nelsen Middle School
HES
Hszlewood EJamentary
MIS Ren6on High Sdwal
HLE
Highlands Eknvwtery
RMS Medon M ck School
ME
Kennydale Elementary
THIS Talley High Stool
LRE
Lelewidoe Element"
MEC
Moedowcro t Eerty Learning
MHE
Maplewood Heights Elementary
RAS
Renlonlcademy
RPE
Ranlon Park Elemsrttsry
SAE
Sartori Elernetlary
SHE
Slows Hel" Elemonbry
THE
Talbot Hill Elementsry
2021 Capital Facilities Plan Renton School District No. 403
2021 Capital Facilities Plan Renton School District No. 403
APPENDIX B
ELEMENTARY SCHOOL CAPACITY
FACTORS: Student/Teacher Ratios:
Grades K-1 21:1
Grade 2
22:1
Grade 3
24:1
Grades 4-5
29:1
Scheduling Efficiency
1.00
Program Efficiency
1.00
Permanent Teaching Stations
SCHOOL
Total
K-1
2
3
4-5
Sped
Other
Ca
BENSON HILL
32
8
3
3
6
4
8
520
BRYN MAWR
25
7
3
5
0
1
9
338
CAMPBELL HILL
25
6
2
6
0
2
9
332
CASCADE
31
7
4
0
7
3
10
467
HAZELWOOD
32
9
4
4
7
2
6
591
HIGHLANDS
32
8
4
3
7
2
8
547
HONEY DEW
22
7
4
4
0
1
6
336
KENNYDALE
33
9
3
5
8
2
6
622
LAKERIDGE
26
6
3
3
4
2
8
398
MAPLEWOOD HGTS.
26
11
5
2
0
2
6
402
RENTON PARK
32
7
3
3
6
2
11
476
SARTORI
32
8
4
4
6
3
7
554
SIERRA HGTS.
29
8
4
3
4
3
7
472
TALBOT HILL
26
8
3
2
6
1
6
460
TIFFANY PARK
27
8
3
3
2
2
9
380
TOTAL
430
109
52
50
63
32
116
6,895
Relocatable Classrooms
SCHOOL
Total
K-1
2
3
4-5
Sped
Other
Cap
Total
Ca
BENSON HILL
0
0
0
0
0
0
0
0
520
BRYN MAWR
6
0
0
0
5
0
1
145
483
CAMPBELL HILL
8
0
0
3
5
0
0
217
549
CASCADE
6
0
0
4
0
0
2
96
563
HAZELWOOD
2
0
0
0
0
0
2
0
591
HIGHLANDS
0
0
0
0
0
0
0
0
547
HONEY DEW
8
0
0
0
6
0
2
174
510
KENNYDALE
0
0
0
0
0
0
0
0
622
LAKERIDGE
6
0
0
0
1
0
5
29
427
MAPLEWOOD HGTS.
12
0
0
3
9
0
0
333
735
RENTON PARK
0
0
0
0
0
0
0
0
476
SARTORI
0
0
0
0
0
0
0
0
554
SIERRA HGTS.
8
0
0
1
3
0
4
111
583
TALBOT HILL
5
0
0
2
0
1
2
60
520
TIFFANY PARK
4
0
0
0
3
0
1
87
467
TOTAL
65
0
0
13
32
1
19
1,252
8,147
TABLE 11
2021 Capital Facilities Plan Renton School District No. 403
APPENDIX B
Permanent Teaching Stations
LINDBERGH SERVICE
AREA
Total
K-1
2
3
4-5
Sped
Other
Cap
BENSON HILL
32
8
3
3
6
4
8
520
CASCADE
31
7
4
0
7
3
10
467
RENTON PARK
32
7
3
3
6
2
11
476
TIFFANY PARK
27
8
3
3
2
2
9
380
TOTAL
122
30
1 13
9
1 21
11
38
1,843
Relocatable Classrooms
LINDBERGH SERVICE
AREA
Total
K-1
2
3
4-5
Sped
Other
Cap
Total
Ca
BENSON HILL
0
0
0
0
0
0
0
0
520
CASCADE
6
0
0
4
0
0
2
96
563
RENTON PARK
0
0
0
0
0
0
0
0
476
TIFFANY PARK
4
0
0
0
3
0
1
87
467
TOTAL
110
0
1 0
1 4
1 3
1 0
1 3
1 183
1 2,026
Permanent Teaching Stations
HAZEN SERVICE AREA
Total
K-1
2
3
4-5
Sped
Other
Ca
HAZELWOOD
32
9
4
4
7
2
6
591
HONEY DEW
22
7
4
4
0
1
6
336
KENNYDALE
33
9
3
5
8
2
6
622
MAPLEWOOD HGTS.
26
11
5
2
0
2
6
402
SIERRA HGTS.
29
8
4
3
4
3
7
472
TOTAL
110
27
16
14
12
8
25
1,832
Relocatable Classrooms
HAZEN SERVICE AREA
Total
K-1
2
3
4-5
Sped
Other
Cap
Total
Ca
HAZELWOOD
2
0
0
0
0
0
2
0
591
HONEY DEW
8
0
0
0
6
0
2
174
510
KENNYDALE
0
0
0
0
0
0
0
0
622
MAPLEWOOD HGTS.
12
0
0
3
9
0
0
333
735
SIERRA HGTS.
8
0
0
1
3
0
4
111
583
TOTAL
28
0
0
4
18
0
6
618
2,450
2021 Capital Facilities Plan Renton School District No. 403
APPENDIX B
Permanent Teaching Stations
RENTON HIGH SERVICE
AREA
Total
K-1
2
3
4-5
Sped
Other
Cap
BRYN MAWR
25
7
3
5
0
1
9
338
CAMPBELL HILL
25
6
2
6
0
2
9
332
HIGHLANDS
32
8
4
3
7
2
8
547
LAKERIDGE
26
6
3
3
4
2
8
398
TALBOT HILL
26
8
3
2
6
1
6
460
TOTAL
109
28
12
14
17
7
31
1,737
Relocatable Classrooms
RENTON HIGH SERVICE
AREA
Total
K-1
2
3
4-5
Sped
Other
Cap
Total
Ca
BRYN MAWR
6
0
0
0
5
0
1
145
483
CAMPBELL HILL
8
0
0
3
5
0
0
217
549
HIGHLANDS
0
0
0
0
0
0
0
0
547
LAKERIDGE
6
0
0
0
1
0
5
29
427
TALBOT HILL
5
0
0
2
0
1
2
60
520
TOTAL
19
0
0
5
6
1
7
306
2,043
2021 Capital Facilities Plan Renton School District No. 403
APPENDIX B
MIDDLE SCHOOL CAPACITY
FACTORS: Student/Teacher Ratios:
Core Classes 29:1
PE 35:1
Band/Orchestra 40:1
Choir 50:1
SPED 12:1
Other 31:1
Scheduling Efficiency 0.83
Program Efficiency 0.95
Permanent Teaching Stations
SCHOOL
Total
Core
PE
Band
Choir
SPED
Other
Support
Ca
DIMMIT
41
21
3
1
1
4
5
6
794
MCKNIGHT
41
25
3
1
1
4
5
2
847
NELSEN
52
22
3
1
1
2
9
14
896
RISDON
47
24
3
2
1
7
4
6
898
TOTAL
181
92
12
5
4
17
23
28
3,435
Relocatable Classrooms
SCHOOL
Total
Core
SPED
Support
Cap
Total
Ca
DIMMIT
4
4
0
0
91
885
MCKNIGHT
8
8
0
0
183
1,030
NELSEN
8
8
0
0
183
1,079
RISDON
0
0
0
0
0
898
TOTAL
20
20
0
0
457
3,892
2021 Capital Facilities Plan Renton School District No. 403
APPENDIX B
HIGH SCHOOL CAPACITY
FACTORS: Student/Teacher Ratios:
Core Classes
29:1 (24:1 Talley)
PE
40:1
Band/Orchestra
40:1
Choir
50:1
SPED
12:1
Other
31:1 (24:1 Talley)
Scheduling Efficiency
0.80
Program Efficiency
0.90
Permanent Teaching Stations
SCHOOL
Total
Core
PE
Band
Choir
SPED
Other
Support
Ca
HAZEN
78
44
3
2
1
7
18
3
1,462
LINDBERGH
55
32
3
1
1
6
11
1
1,211
RENTON
68
34
3
1
1
7
16
6
1,389
TALLEY
24
13
1
0
0
1
6
3
397
TOTAL
225
123
10
4
3
21
51
13
4,458
Relocatable Classrooms
SCHOOL
Total
Core
SPED
Support
Cap
Total Ca
HAZEN
0
0
0
0
0
1,462
LINDBERGH
5
4
1
0
92
1,303
RENTON
0
0
0
0
0
1,389
TALLEY
0
0
0
0
0
397
TOTAL
5
4
1
0
92
4,550
2021 Capital Facilities Plan Renton School District No. 403
APPENDIX E
STUDENT GENERATION FACTORS
The formula for determining school impact fees, as established by King County Council
Ordinance 11621, Attachment A, requires that school districts provide "student factors
based on district records of average actual student generation rates for new developments
constructed over a period of not more than five years prior to the date of the fee
calculation." The Ordinance also provides that, in the event this information is not
available in the District, "data from adjacent districts, districts with similar demographics,
or county -wide averages must be used." In years past, the District has opted to use
averaging data from nearby districts, but instead chose to evaluate actual student generation
data for this year's CFP and potentially for future years evaluation, depending upon
continued development and enrollment forecasts. It is possible that some enrollment
numbers are artificially low due to the pandemic and the lack of in -person schooling,
however this will be an area the District will watch closely over the next year. The single-
family rate is lower than expected, given knowledge of King County trends. However,
there are not a lot of large single-family development projects in the District that would
tend to drive a higher student generation. This could also be a reasonable explanation of
why enrollment growth has slowed and even declined in recent years.
STUDENT GENERATION FACTORS
Elementary
(K-5)
Middle School
(6-8)
High School
(9-12)
Total
SINGLE-FAMILY
0.154
0.065
0.062
0.282
MULTI -FAMILY
0.137
0.042
0.060
0.240
TABLE 13
2021 Capital Facilities Plan Renton School District No. 403
APPENDIX E
TABLE 14
CHANGES FROM PREVIOUS PLAN
PERMANENT FACILITY CAPACITY (Students)
2019
2020
CHANGE
Elementary
6,895
6,895
0
Middle
3,435
3,435
0
High
4,458
4,458
0
Total
14,788
14,788
0
STUDENT ENROLLMENT October Headcount
2019
2020
CHANGE
Elementary
7,650
7,393
257
Middle
3,391
3,484
93
High
4,213
4,109
104
Total
15,254
14,986
268
IMPACT FEES
2019
2020
CHANGE
Single -Family
6,862
7,681
819
Multi -Family
3,582
4,989
1,407
STUDENT GENERATION FACTORS
2019
2020
CHANGE
Single -Family
Elementary
0.321
0.301
0.020
Middle
0.121
0.129
0.008
High
0.132
0.132
0.000
Total
0.586
0.561
0.025
Multi -Family
Elementary
0.153
0.176
0.023
Middle
0.068
0.077
0.009
High
0.073
0.078
0.005
Total
0.294
0.331
0.037
ADDITIONAL IMPACT FEE FACTORS
2019
2020
CHANGE
Land Acquisition per Acre
650,000
650,000
0
Temp. Building Acquisition
177,000
177,000
0
State Match Percentage
0.3809
0.3133
-17.75%
Ave. Assessed Value - Single
469,537
478,910
9,373
Ave. Assessed Value - Multi
144,672
179,200
34,528
Bond Interest Rate
4.04%
2.44%
-39.60%
Tax Rate per $1000
1.03306
1.09602
0.06296
Construction Cost Allocation
225.97
238.22
12.25