Loading...
HomeMy WebLinkAbout0895.06 SWFR 339.pdf CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. Project No. Page Report No. MLP 0895.06 1 of 3 339 Time On Site Time Off Site Date Day of Week 1:45 2:05 10/6/21 Wednesday NPDES Permit No. Reviewed WAR307963 Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N - Chain link fence installed along site perimeter 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck F N - Quarry spall construction entrance - Light track out observed, continue to sweep offsite roads during trucking operations 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N - Onsite stormwater vault plugged 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Sediment Pond (Temp. or Perm.) • Water Truck G N - Silt fence installed around majority of site perimeter - Stormwater sump SE of construction entrance - Subsurface drain installed under construction entrance to divert water to sump - Straw wattles N of entrance to divert water to sump 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM F N - Grading road in northern and eastern portions of the site 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors G N - Straw wattles in place to divert water away from slopes along western perimeter - Slopes covered in straw 7. Protect Drain Inlets • Catch Basin Inserts • Gutter; Road G N - CB inserts installed in offsite catch basins 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets - - N/A 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling G N - Stormwater treated with dry ice to lower pH to suitable levels - Chemical/material storage onsite 10. Control Dewatering G N - Via KC Sewer Discharge Permit as needed 11. Maintain BMPs F N - Continue sweeping offsite roads 12. Maintain SWPPP & Site Logbook G N - Available upon request 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement - - N/A CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. Project No. Page Report No. MLP 0895.06 2 of 3 339 Time On Site Time Off Site Date Day of Week 1:45 2:05 10/6/21 Wednesday NPDES Permit No. Reviewed WAR307963 Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed?  Yes  No List the action items in the table below: Element # Description and Location Action Required Completion Date Current Weather: __54°F, Light Rain_ _ Precipitation since last inspection (approximate): 0.86 inches Precipitation in the last 24 hours (approximate): 0.28 inches Type of Visit:  Weekly  Monthly  Post–Storm Event Phase of Active Construction (check all that apply):  Pre-Construction  Clearing/Demo/Grading  Infrastructure/Roads  Concrete pours  Vertical Construction  Utilities  Offsite improvements  Site temporarily stabilized  Final Stabilization Was water quality sampling part of this inspection?  Yes  No If “Yes”: • Record results in the table below. • Hanna Turbidity Meter # _________ Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes - - - - - - “This report is true, accurate, and complete to the best of my knowledge and belief.” Inspector Name: Maggie Perme CESCL Number: ECO-3-4042106 Inspection Date: 10/6/21 CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. Project No. Page Report No. MLP 0895.06 3 of 3 339 Time On Site Time Off Site Date Day of Week 1:45 2:05 10/6/21 Wednesday NPDES Permit No. Reviewed WAR307963 Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC BMP LEGEND JOB SHACK STORMWATER VAULT TEMPORARY SEDIMENT POND/TRAP WATTLE SILT FENCE CONSTRUCTION ENTRANCE SUBSURFACE DRAIN CHEMICAL/MATERIAL STORAGE CATCH BASIN INSERT CONCRETE WASHOUT