Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
To: RJ Development Date: October 8, 2021
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Jeff Bennett
Email: jeffb@accrete.build
No. of
Copies Date Description
1 10/4 – 10/7/21 Daily Field Report(s) # 312-314
Comments:
CC:
1: Mark Richardson ATTN: mark@accrete.build
2: Jennifer Vogele ATTN: jennifer@accrete.build
3: Jonathan Chavez ATTN: jchavez@rentonwa.gov
4: Joe W ATTN: joew@accrete.build
5: Brittany Perry ATTN: brittany@accrete.build
6: ATTN:
7: ATTN:
8: ATTN:
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 312
Time On Site Time Off Site Date Day of Week
12:15 PM 1:15 PM
10/4/21
Monday
Travel Time Weather
1.00Hr. RT 60F, Cloudy
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
At the client’s request, ESNW rep was onsite to test and observe parking lot subgrade conditions at the Weatherly
Inn development.
Parking Lot Subgrade:
ESNW rep arrived onsite and observed contractor placing approximately 4-inches to 10-inches of 1 1/4-inch
crushed recycled concrete as parking lot subgrade material. ESNW rep observed contractor grading and
compacting parking lot subgrade material with a scraper grader and vibratory drum roller. ESNW rep used a ½-
inch steel T-probe to probe locations along the parking lot subgrade, and observed the subgrade to be dense,
firm, unyielding, and suitable for support of the proposed parking lot. ESNW rep observed that the contractor
had achieved minimum compaction standards of 95% of the modified proctor value or greater in tested
locations.
ESNW rep will return as requested to continue observation and testing of further earthwork activities.
Fig.1: Parking lot subgrade along Eastern margin of Weatherly Inn development
Jackson Lundgren, G.I.T.
Senior Field Technician
206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 312
Time On Site Time Off Site Date Day of Week
12:15 PM 1:15 PM
10/4/21
Monday
Travel Time Weather
1.00Hr. RT 60F, Cloudy
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Test Number Test Location
(Parking lot
subgrade) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
317 See map SG 7 120.2 12.6 116.7 97
318 See map SG 7 120.2 13.1 115.8 96
319 See map SG 7 120.2 13.8 116.0 97
320 See map SG 7 120.2 12.9 114.9 96
321 See map SG 7 120.2 13.8 118.7 99
322 See map SG 7 120.2 14.2 115.2 96
323 See map SG 7 120.2 12.8 116.1 97
324 See map SG 7 120.2 13.6 118.9 99
325 See map SG 7 120.2 14.0 115.1 96
Fig. 2: Approximate location of compaction tests 317-325 on parking lot subgrade
2/2
317
318
319
320
321
322
323
324
325
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 313
Time On Site Time Off Site Date Day of Week
9:30 AM 10:15 AM 10/6/21 Wednesday
Travel Time Weather
1.00Hr. RT 60F, Cloudy
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Fig. 2: Approximate location of compaction tests 317-325 on parking lot subgrade
At the client’s request, ESNW rep was onsite to test and observe access road subgrade conditions at the Weatherly
Inn development.
Access Road Subgrade:
ESNW rep arrived onsite and observed contractor had encountered an approximately 15-foot by 15-foot area of
saturated and organic material in the site access roadway. ESNW rep observed contractor over-excavating
approximately 12-inches to 18-inches to dense, firm, and unyielding native soil conditions. ESNW rep used a ½-
inch steel T-probe to probe locations along the over-excavated section of roadway subgrade, and
observed the native subgrade to be dense, firm, unyielding, and suitable for support of the proposed
roadway. Contractor relayed area would be backfilled with 2-inch to 4-inch quarry spalls over woven geotextile
fabric.
ESNW rep will return as requested to continue observation and testing of further earthwork activities.
Fig.1: Over-excavated roadway subgrade at the entrance to the Weatherly Inn development
Jackson Lundgren, G.I.T.
Senior Field Technician
1/1
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 314
Time On Site Time Off Site Date Day of Week
12:15 PM 1:00 PM 10/7/21 Thursday
Travel Time Weather
1.00Hr. RT 60F, Cloudy
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
At the client’s request, ESNW rep was onsite to test and observe parking lot subgrade conditions at the Weatherly
Inn development.
Parking Lot Subgrade:
ESNW rep arrived onsite and observed contractor placing approximately 4-inches to 10-inches of 1 1/4-inch
crushed recycled concrete as parking lot subgrade material. ESNW rep observed contractor grading and
compacting parking lot subgrade material with a scraper grader and vibratory drum roller. ESNW rep used a ½-
inch steel T-probe to probe locations along the parking lot subgrade, and observed the subgrade to be dense,
firm, unyielding, and suitable for support of the proposed parking lot. ESNW rep observed that the contractor
had achieved minimum compaction standards of 95% of the modified proctor value or greater in tested
locations.
ESNW rep will return as requested to continue observation and testing of further earthwork activities.
Fig.1: Parking lot subgrade West of main building of Weatherly Inn development
Jackson Lundgren, G.I.T.
Senior Field Technician
206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 314
Time On Site Time Off Site Date Day of Week
12:15 PM 1:00 PM 10/7/21 Thursday
Travel Time Weather
1.00Hr. RT 60F, Cloudy
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Johannsen Brad LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Test Number Test Location
(Parking lot
subgrade) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
326 See map SG 7 120.2 13.1 114.9 96
327 See map SG 7 120.2 12.8 116.0 97
328 See map SG 7 120.2 14.0 115.7 96
329 See map SG 7 120.2 13.2 114.8 96
330 See map SG 7 120.2 13.1 117.6 98
331 See map SG 7 120.2 12.6 116.8 97
332 See map SG 7 120.2 12.5 115.2 96
333 See map SG 7 120.2 13.4 114.9 96
334 See map SG 7 120.2 12.7 116.3 97
335 See map SG 7 120.2 13.1 117.1 97
336 See map SG 7 120.2 13.2 117.1 96
Fig. 2: Approximate location of compaction tests 326-325 on parking lot subgrade
2/2
327
328 329 330
331
332
333
334
326
335
336