HomeMy WebLinkAboutR-417704PAVEMENT/GRADING NOTES
1. ASPHALT PAVEMENT MATERIALS; CONFORM WITH WSDOT SPEC
5-04.2
2. CONCRETE PAVEMENT MATERIALS; CONFORM WITH WSDOT SPEC
5-05.2
3. ASPHALT PAVEMENT CONSTRUCTION; CONFORM WITH WSDOT SPEC
5-04.3
4. CONCRETE PAVEMENT CONSTRUCTION; CONFORM WITH WSDOT SPEC
5-05.3
5. PAVEMENT JOINTS; CONFORM WITH DETAILS ON SHEET C501-5D
6. PROVIDE REINFORCED CONCRETE COLLARS AT ALL CATCH BASINS,
MANHOLES AND PVC DRAINS PER DETAILS ON SHEET C501-6M
7. GRADE ADA ACCESSIBLE PARKING STALLS AND ACCESS AISLES AT A
MAXIMUM SLOPE OF 2.0% IN ALL DIRECTIONS
8. PAVEMENT SUBGRADE PREPARATION; CONFROM WITH WSDOT STD
SPEC 2-06
9. CONSTRUCTION GEOTEXTILE FOR SEPARATION; CONFORM WITH WSDOT
STD SPEC 2-12
10. CDT SHALL MEET REQUIREMENTS OF WSDOT STD SPEC 2-09.3(1)E
EARTHWORK NOTES
1. DO NOT COMMENCE EARTH MOVING OPERATIONS UNTIL TEMPORARY
EROSION AND SEDIMENTATION CONTROL MEASURES ARE IN PLACE.
2. PROTECT AND MAINTAIN EROSION AND SEDIMENTATION CONTROLS
DURING EARTH MOVING OPERATIONS.
3. EXCAVATION AND COMPACTION UNDER STRUCTURES SHALL BE IN
ACCORDANCE WITH WSDOT STANDARD SPECIFICATION SECTIONS
2-03.3(14) AND 2-09.
4. PAVEMENT SUBGRADE PREPARATION SHALL BE IN ACCORDANCE WITH
WSDOT STANDARD SPECIFICATION SECTION 2-06.
5. EXCAVATION AND TRENCHING DURING WET CONDITIONS SHALL
COMPLY WITH KING COUNTY CONSTRUCTION DEWATERING PERMIT,
DEWATERING PLAN, AND GEOTECHNICAL ENGINEER'S
RECOMMENDATIONS.
ALL AGGREGATES SHALL CONFORM TO THE FOLLOWING WSDOT STANDARD
SPECIFICATIONS:
BORROW (GRAVEL)
9-03.14(1)
BORROW (SELECT)
9-03.14(2)
BORROW (COMMON)
9-03.14(3)
BORROW (GRAVEL FOR STRUCTURAL EARTH WALL)
9-03.14(4)
CRUSHED SURFACING TOP COURSE
9-03.9(3)
CRUSHED SURFACING BASE COURSE
9-03.9(3)
GRAVEL BASE
9-03.10
GRAVEL BACKFILL FOR PIPE ZONE BEDDING
9-03.12(3)
GRAVEL BACKFILL FOR DRAINS
9-03.12(4)
GRAVEL BACKFILL FOR DRYWELLS
9-03.12(5)
STREAMBED COBBLES (6°)
9-03.11(2)
ROCK FOR EROSION AND SCOUR PROTECTION
CUSS A AND CLASS B
9-13.4
QUARRY SPALLS
9-13.1(5)
PERMEABLE BALLAST
9-03.9(2)
STOCKPILED TOPSOIL NOTES
1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER
APPROVED DEVICE) DAILY BETWEEN OCTOBER I AND MARCH 31. OUTSIDE
OF THE WET SEASON, STOCKPILES SHALL BE COVERED FOR WEEKENDS OR
OTHER EXTENDED PERIODS OF NON-USE.
2. IN ANY SEASON, SEDIMENT LEACHING FROM STOCKPILES MUST BE
PREVENTED.
3. TOPSOIL SHALL NOT BE PLACED WHILE IN FROZEN OR MUDDY CONDITION,
WHEN THE SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST
THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED
SODDING OR SEEDING.
4, PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL
BE MAINTAINED ACCORDING TO THE APPROVED PIAN.
CONSTRUCTION DEWATERING
1. GROUND WATER IS ANTICIPATED TO BE 3 TO 4 FEET BELOW EXISTING GRADES.
EXCAVATIONS FOR STRUCTURES AND UTILITIES BELOW THIS DEPTH WILL NEED TO
BE DEWATERED FOLLOWING THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
PREFERRED DEWATERING METHODS ARE AS FOLLOWS:
1-2 FEET BELOW GROUNDWATER LEVEL
• TEMPORARY CONTROLS USING SUMPS AND PUMPS
2-FEET OR MORE BELOW GROUNDWATER LEVEL
• SHEET PILE COFFERDAMS EMBEDDED INTO SHALLOW CIAY/SILT LAYER
2, CONTRACTOR SHALL PROVIDE DEWATERING PUN, LABOR AND EQUIPMENT
COORDINATE DEWATERING WITH BOEING CONSTRUCTION MANAGEMENT, SITE
ENVIRONMENTAL ENGINEERING AND THEIR GEOTECHNICAL ENGINEER. PROJECT TEAM
WILL COORDINATE ROLES AND RESPONSIBILITIES FOR PROPER WATER MANAGEMENT
3. SEE SHORING DETAILS ON SHEETS SCOT AND SS02 AND SITE STRUCTURAL NOTES
ON SHEETS C501-ID AND C501-1E.
CITY OF RENTON RECOMMENDED CONSTRUCTION SEQUENCE
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE CONSOLIDATED
WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS REQUIRED.
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. CONSTRUCT SEDIMENT PONDS AND TRAPS.
8. GRADE AND STADIUM CONSTRUCTION ROADS.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.)
SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS
CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY (E.G., CONCRETE -RELATED PH
MEASURES FOR UTILITY, VAULT OR ROADWAY CONSTRUCTION)
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON
SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS
CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION PREVENTION IS ALWAYS IN
ACCORDANCE WITH THE CINS EROSION AND SEDIMENT CONTROL STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY
SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, OR
EQUIVALENT.
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS
REMOVED IF APPROPRIATE.
WSP AC
3330I 9N AV meS h
CALL 48 HOURS
SMNe3OO
300
9B0012Kb
fTL:
BEFORE YOU DIG
C2Wry, 1-
1-QFIB-424-.>JrJ.>
FM:CM)431-2250
FAX: (2M) 431-2250
SYM
REVISION
SY
APPROVED
DATE
CRIS
APRON R - CENTRAL
C180242
WSP
SPT
I 07/09/21
REVISION I BY I APPROVED I DATE
J
4,0
HORIZONTAL DATUM:
WASHINGTON STATE COORDINATE SYSTEM
OF 1983, NORTH ZONE
VERTICAL CONTROL : ELEVATIONS SHOWN HEREON ARE REFERENCED TO
NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD-29) ALSO KNOWN AS
SEA LEVEL DATUM OF 1929
OEM
USCEZAUHN
NGVD 29
WE WASHINGTON HIGH WATER (MAY ISO
21.85
IS.OI
W(E WASHIIWHON LOW WATER (FOB 15TH)
2015
1153
WE W.ISHINGTON MM. WATER BY UW
2T.00
15.18
AUSTIN DATUM (OFFENSE PLANT 1942)
0.DO
-6.82
CORPS OF ENGINEERS W. WASH. DATUM
B.CO
-6.82
ROAD 29
6.BR
OA0
BLCG 4-20 BOOR ELEMDON
270
90.18
THE ABOVE TABLE OF VERTICAL DATUM IS BASED UPON THE ASSUMPTION
THAT THE ORIGINAL DEFENSE PLANT DATUM FOR RENTON AIRFIELD IN 1942
WAS LAKE WASHINGTON DATUM AS ESTABLISHED AND PUBLISHED BY THE
U.S. ARMY CORPS OF ENGINEERS AND HIRAM CHITTENDEN LOCKS.
PROJECT BENCHMARKS
DNA 501 DHA 503
SCRIBED "X" SCRIBED "X°
N 184238.715 N 184323.742
E 1300109.968 E 1300591.873
EL 19.51 EL 21.37
i L_BOEArw"
ALL EXISTING FEATURES
INCLUDING BURIED UTILITIES ARE SHOWN
AS INDICATED BY RECORD LOCATION OR FIELD TIED AS A RESULT
OF A UTILITY PAINT -OUT DURING THE COURSE OF THE FIELD
SURVEY. DUANE HARTMAN & ASSOCIATES, INC. (DHA) ASSUMES
NO LIABILI FOR THE ACCURACY OF THE RECORD INFORMATION
AND/OR THE UTILITY PAINT -OUT. FOR THE FINAL LOCATION OF
THE EXISTING UTILITIES IN AREAS CRITICAL TO CONSTRUCTION,
CONTACT THE UTILITY OWNER/AGENCY AND UTILITIES
UNDERGROUND CENTER (800/424-5555).
TOPOGRAPHIC MAPPING:
THE MAP SHOWN HEREON IS THE RESULT OF A TOPOGRAPHIC
SURVEY BY DUANE HARTMAN & ASSOCIATES, INC. (DHA)
COMPLETED IN MAY 2018. DHA ASSUMES NO UABILIIY, BEYOND
SAID DATE, FOR ANY FUTURE SURFACE FUTURE MODIFICATIONS
OR CONSTRUCTION ACTIVITIES THAT MAY OCCUR WITHIN OR
ADJOINING THE PERIMETER OF THIS SURVEY. CONTACT DHA
(425/483-5355) FOR SITE UPDATES AND VERIFICATIONS.
HOR2ONoo AL CONTROL PLAN O
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
APPROVED�PTTC
PROJECT BENCHMARK
N 184238.715
E 1300109.968
g�4 g11G
PROJECT BENCHMARK
N 184323.742
E 1300591.873 -------X^\
[CIVIL PER
GENERAL NOTES AND HORIZONTAL CONTROL
R-4177004 1
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
C180242
01-1C
C 180242 1
comp
RTN-YD-0501-iC
07/09/91
RENTON SITE
MASTER S 11