Loading...
HomeMy WebLinkAboutR-417745CALL 48 HOURS " I BEFORE YOU DIG 1-800-424-5555 SYM 1 RENSION ORIG I APRON R - CENTRAL BIORETENTION LAYOUT AT 673B C�17� SCALE: 1" = 5' C18F SCALE: 1 5' II wsp AC 3MI 3 0AaxIv�e Xutlt wM Re Sao0 M: (2 Wry, 1- 9B0012Kb reL: GM)431-2250 FAX: (2M)431d250 BY I APPROVED C180242I WEE I SPT ELATE 07/09/21 REVISION BY I APPROVED I DATE BIORETENTION LAYOUT AT 670A J C�18j SCALE: 1" = 5' i L -BOEArw" ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED�PTTC LEGEND —SLS STORM CONVEYANCE PIPE UD SLOTTED UNDERDRAIN PIPE TOP OF PONDING/BOTTOM OF FREEBOARD TOP OF SOIL/BOTTOM OF FUNDING GENERAL NOTES 1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) _ NGVD29 + 3.60 FEET. 2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 3. PERMANENT WATER QUALITY TREATMENT FACILRIES SHALL NOT BE USED TO CONVEY OR CONTAIN CONSTRUCTION STORM WATER. NEW FACILITIES SHALL BE KEPT OFFLINE UNTIL PROJECT IS COMPLETE. THE CONTRACTOR SHALL CLEAN AND FLUSH ALL PARTS OF THE SYSTEM PRIOR. SEE GENERAL NOTES ON SHEET C501-1A AND C501-1B. 4. SEE SHEETS C17E. C17C C18E, AND C18F FOR OVERFLOW STRUCTURE INFORMATION AND CONVEYANCE PIPE INFORMATION. 5. SEE BIORETENTION LANDSCAPING PLANS ON SHEETS L501-7A THROUGH L501-7B FOR PLANTING DETAILS. 6. BIORETENTION SOIL MEDIA SHALL BE PER THE BIORETENTION SOIL MEDIA STANDARD SPECIFICATIONS PROVIDED IN REFERENCE SECTION 11-C OF THE 2017 CITY OF RENTON SURFACE WATER DESIGN MANUAL. SEE SHEET C501-6K. 7. STREAMBED COBBLES SHALL BE PER WSDOT STANDARD SPEC SECTION 9-30.11(2) 8. EXTRUDED CURB SHALL BE WSDOT STD PLAN F-10.42-00 TYPE 6 9. INSTALL NEW/SALVAGED CONCRETE WHEELSTOP PER DETAIL 5, SHEET C501-6H. 10. SLOTTED UNDERDRAIN SHALL BE SLOTTED SUBSURFACE DRAIN PVC PER ASTM D1785 SCH 40. SLOTS SHOULD BE CUT PERPENDICULAR TO THE LONG AXIS OF THE PIPE AND BE 0.04 TO 0.069 INCHES BY 1 INCH LONG AND BE SPACED 0.25 INCHES APART (SPACED LONGITUDINALLY). SLOTS SHOULD BE ARRANGED IN FOUR ROWS SPACED ON 45-DEGREE CENTERS AND COVER 1/2 OF THE CIRCUMFERENCE OF THE PIPE. OBSERVATION WELL CONSTRUCTED OF NON -PERFORATED MATERIAL SHALL BE LOCATED AT END OF PIPE. OBSERVATION PORT SHALL HAVE LOCKING CAST-IRON LID. 11. CONTRACTOR SHALL VERIFY DEPTH TO SEASONAL HIGH GROUNDWATER PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER IMMEDIATELY IF DEPTH IS LESS THAN 7.5-FEET FROM EXISTING GRADE. 12. CONTRACTOR'S AS -BUILT RECORD DOCUMENTS SHALL INCLUDE IN -PLACE INFILTRATION RATE FOR EACH COMPLETE BIORETENTION CELL. INFILTRATION RATE TEST SHALL BE PERFORMED USING THE PILOT INFILTRATION TEST (PIT) METHOD AT THE FINISHED SURFACE OF THE BIORETENTION SOIL MIX WITH A MAXIMUM 6-INCH PONDING DEPTH. 13. CONTRACTOR SHALL RELOCATE AND/OR ENCASE ELECTRICAL CONDUIT IN CDT AS DIRECTED BY THE ENGINEER AND BOEING. CONSTRUCTION NOTES EXISTING PARKING STALL STRIPING WHEEL STOP EXTRUDED CURB ® 6" SLOTTED UNDERDRAIN. SEE NOTE 10. OBSERVATION WELL EDGE OF ASPHALT/TOP OF FREE BOARD TOP OF PONDING/BOTTOM OF FREE BOARD TOP OF SOIL/BOTTOM OF PONDING CONVEYANCE PIPE CONNECTIONS PER PLAN 10 PROTECT EXISTING PARKING LOT LIGHTING TO REMAIN 11 STREAMBED COBBLE LINED PRE -SETTLING CELL 12 PROTECT EXISTING LIGHTING CONDUIT. RELOCATE AND/OR ENCASE IN CDF AS DIRECTED BY ENGINEER. 13 GRADE TO DRAIN TO BIORETENTION CELL, SEE LANDSCAPING PLANS FOR TOPSOIL REQUIREMENTS. 14 PROVIDE 18-INCH MINIMUM WIDTH CURB CUT [CIVIL PERMIT STORM DETAILS R-4177045 IN COMPLIANCE WITH CITY OF RENTON STANDARDS YEVEIAMN ENOINEENNOO Ichavez 0825/2021 C1802421 U KIV1 07/09/21 RENTON SITE MASTER S 11 C 180242 1-- RTN-YD-0501-6J