1 I�I'Pt � LDD _ EXIST/N S X 1 O O
M mmmi
LOD 1 — _
P1 1STS\ _ n'z �s 11Pz i Lon i
1��_
1���1 III 1P1 _ mO 7 B s TO, n- I 1 26 �x za zsi
LOD ��������� I 1 f L=m�� LD .w
SDP �� \�25�/
a
r —
--- — SDP — — — — — — — — — ® a
8L LOD I CL 81 {f ZC CC of Sf -
1 II
IN-..,._ B
1 1
SDP
N 1�L agimmTaw LOD I = IT VDA - -
1
�✓ 1, "SDP 1 1 <`_ �,I
`� GO — — — — — r 1 �21 22 23 24 38® 39 w 11
1 I 1 1 1
e _ 1 SDP N WW IF
oD — — —
— —
' ____ _________2v-____ f _ _ _ _ _ _ —MID,
_!
1® --
25,
1,1 - r 1 ® /
y� a 00
1 i
EROSION AND SEDIMENT CONTROL NOTES
L BEFOREANTCONSTRI IONORDEVELOPMENTACTIVIWQGGURS. APRE"CONSTRUCTION
MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CO.
THE APPLICANT, AND THE APPLICANTS CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF
ECOLOGY (ECOLOGY( CONSTRUCT ON STORM WATER GEN ERTL PERMIT, IF R IS REQUIRED
FOR THE PROTECT THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MNIITCAING
REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER
GENERAL PERMIT
3. THE USE PLAN SET SHNL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE
ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO
POST PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
<. THE BOON GAMES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND
AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE
PLAB(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN
ACCORDANCE WITH APPENDIX D OF ME CItt OF RENTON SURFACE WATER DESIGN MANUAL
(RENTON BYNM) PRIOR TO THE START OF CONSTRUCTION. WRING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND ME CLEAVING LIMITS SHALL BE PERMITTED ME
CLEARING LOU In SHALL BE MAINTAINED BY THE APPLIM IPSC SUPERVISOR FOR THE
SCRATCH O CONSTRUCTION.
5, STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING BE
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ME KEPT CLEAN AND TRACK OUT TO ROAD
RIGHTOF WAY DOES NOTOCCUR FOR THE DURATION CFTHE PROJECT. E SEDIMENTIS
TUCKED OFFSITE. PUBLIC ROAD$ SHALL BE CLEANED THOROUGHLY AT THE END OF EACH
DAY, OR MORE FREQUENTY DURING WET WEATHER, ASNECESSARY TO PREVENT
SEDIMENT FROM ENTERING WATERS OF NE STATE.
S. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED WRITE OR IN DESIGNATED
CONCRETE WASHOUT AREAS ONLY DO NDT WASH OUT CONCRETE TRUCKS ONTO THE
GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS
CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
]. ALL REQUIRED USE BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND
CLEARING ANONR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO
SURFACE WATER DRAINAGE SYSTEMS AN D ADJACENT PROPERTIES. ALL ESL BMPS SHALL
BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH THE THAT CLEARING ANDIOR
CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ONSITE EROMON HAS PASSED. ALL ESC
BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN
STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST THE
IMPLEMENTATION, MAINTENANCE, REPLACED ENT , ENHANCEMENT, AND REMOVAL OF ESC
BMPS SHALL BE THE RESPONSIBILITY OF TH E APPLICANT
N0,
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE MURAL, TO POLLUTE
RUNOFF SHALL BE DISPOSED OF PROPERLY
8, THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS
TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND
UNEXPECTED OR SEASONAL CONDITIONS DICTATE, WE APPLICANT SHALL ANTICIPATE THAT
MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON TIE
PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, R SHALL BE TIE OBLIGATION
AND HESPONSIBI LILY OF THE APPLICANT TO ADDRESS MY N EN CONDITIONS THAT MAY BE
CREATED BY THE ACTMT IES AND TO PROVIDE ADOUICNAL ESC BMPS, EVER AND ABOVE
MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS FLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF
STORM DRAINAGE DESIGN, SITE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR
STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER
FACILITIES SHALL BE SUBMITTED TO ME CITY FOR RENEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER I ST THROUGH ARIL 33TH)
OR SEVEN DAYS DURING THE DRY SEASON (MAY 1 ST THROUGH SEPTEMBER BOTH) SHALL BE
IMMEDNTELYUMILIZEDWITHTHEA ROVEDESCCOVERMETHODS(E.G., SEEDING.
MULCHING. PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX OF THE RENTON
SWOM.
13. NET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER
ISE AND APRIL WTI, UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANYAREANEEDINGADDEBONALESCMEASURES, NOT REQUIRING IMMEDIATE ATTENTION,
SHALL BE ADDRESSED WITHIN SEVEN (7)DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTS➢ AND MAINTAINED AT A MINIMUM OF
ONCE A MONTH OR W ITH I N N HOURS FOLLOWING A STORM EVENT. INSPECTION AND
MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REWIRED BY THE CITY
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTMtt, CATCH BASIN INSERTS PER
THE CITY STANDARD PLAN 216.R SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS
DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS ME
RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO SEDIMENT POND OR TRAP. ALL
CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED So OF THE CAPACITY OF THE CATCH
BASIN$UMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO
PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO WE
DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMNATER FMILItt LOCATION USED AS A TEMPORARY SETTLING
BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS ANN SHALL MOVES
ADEQUATE STORAGE CAPACItt. IF TIE TEMPORARY FXILItt IS TO ULTIMATELY FUNCTION
AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, ME TEMPORARY FM ILHY BULL BE
19. AREAS DESIGNATED ON NE PLPN(SI CONTAINING EXISTING STORMWATER FACILITIES OR
ONSITE SUPS (MENDED SOILS, BICRETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE
CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND
COMPACTION DURING CONSTRUCTION.
20, PRIOR TO NE BEGINNING OF THE WET SEASON (OCTOBER ISTI. ALL DISTURBED AREAS
SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN
PREPARATION FOR ME WINTER WINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED
WITHIN ME WEEK OF ME BEGINNING OF THE NET SEASON. AN EXHIBIT OF THOSE AREAS
TO BE SODDED OR SEEDED ANN THOSE AREAS TO REMAIN UNCOVERED SHALL BE
SUBMITTED TO TIE CITY FOR REVIEW.
21, PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROTECT SNE SHALL BE STABILIZED
THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH
WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LAN ESCAPED BEFORE OCTOBER 1 ST.
22, ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STAB ILIUSTION AND EROSION
CONTROL ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAKING WAILS. AIL
ROCKERIES IN CITY ROAD RIGHTS,0E-WAY SHALL BE CONSTRUCTED IN ACCORDANCE NTH
KEY MAP
APPROX. 1' _ ]W
EROSION & SEDIMENT CONTROL LEGEND
LOD
LIMITS OF DISTURBANCE
ROCK SOCK
SDP
SILT DIKE ON PAVEMENT
®l
I _.I
IP7
INLET PROTECTION
®�
Igm
IP2
INLET PROTECTION
PROPOSED ASPHALT PAVEMENT
PROPOSED LANDSCAPING
SBPPP NOTE
CONTRACTOR SHALL PREVENT ANY EROSION AND/OR SEDIMENTATION
TRANSPORT FROM BEING RELEASED FROM THE REPAIR AREAS THROUGHOUT
CONSTRUCTION, CONTRACTOR SHALL UTILIZE BMPS (STRAW WATTLES, SILT
DIKE ON PAVEMENT, ETC.) AS NECESSARY TO PREVENT RUNOFF FROM THE
REPAIR AREAS.
CAUTION - NOTICE TO CONTRACTOR
1. ALL UTILITY LDCATIONS SHOWN ARE BASED ON MAPS
PROVIDED BY THE APPROPRIATE UTILITY COMPANY 0
AND SURFACE EVIDENCE AT THE DARE OF
0
SURVEYEYAND IS i0 BE CONSIDERED AN APPROXIMATE
LOCATION ONLY. IT ITHE CONTRACTOR'S
RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF Knowwharsbalovift.
ALL UTUTIES, PUBLIC OR PRIVATE, WHETHER SHOWN CNN before You dig.
ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION.
REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR
TO CONSTRUCTION,
2. WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY, IT IS THE
CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE HORIZONTAL AND
VERTICAL LOCATION OF SUCH EXISTING UTILITY, EITHER THROUGH
POTHOLING OR ALTERNATIVE METHOD. REPORT INFORMATION TO THE
ENGINEER PRIOR TO CONSTRUCTION.
GRAPHIC SCALE
10 0 5 10 20 AO
(IN FEET)
liftsh loft
R-418514
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING Q
Scott Warlick 8/30/2021
TJKAS
NOTED
w ""°'°'e/'°°I
DnruM
CITY OF
; RENTON
Planning/Building/Public Works Dept.
WALMART#2516
WALMART SUPERCENTER PICKUP EXPANSION
CONSTRUCTION DOCUMENTS
EROSION AND SEDIMENT CONTROL PLAN
Mo%
JSa
°"°'""M8B
� � n�
REVISION
BY
DATE
APPR
...ewE�
n
Iz
_0
U)
z
CL
W
d
U
d
I—