Loading...
HomeMy WebLinkAboutR-418514AS -BUILT SET M N O N ro U N U' 0 LD I 3 v vi a� 0 z c 0 'o a� 0 U N W 1 U I N af 0 0 a U 'o D •S n O N Ln N O O O L 0 0 3 a Of L z W J Ll CONSTRUCTION AREA A FLOW APRON: "`•• — — — — :' i.':.i �•:. ADHESIVE :.'• . 4 :. uiI ,••.,. ILu;: • •'~ .� — — — — •.. y: :' i<'. • . ,. ADHESIVE : i• : � Via••'' }.'� • " M. � • ,• ,. .`. a I I..i DIKE PLAN VEIW NOTES: 1. INSTALLED SILT DIKE UNIT SHALL HAVE CONTINUOUS AND FIRM CONTACT WITH PAVEMENT. 2. ADHESIVES SHALL BE LIQUID NAIL OR APPROVED EQUAL FOR CONCRETE PAVEMENT APPLICATIONS AND EMULSIFIED ASPHALT FOR ASPHALT APPLICATIONS, ADHESIVE SHALL BE PLACED WHERE THE UNITS OVERLAP AND A 20" STRIP ALONG BOTH EDGES. FLOW ADHESIVES SECTION A —A ADHESIVE SILT DIKE sDP (ON EXISTING PAVEMENT N. T. S. o"o"o"o"o"o"o"o"o"o"o"o"o"o"o" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0080---- 0 0 0 0, O°O° o°0°Il __ F000 o000 oll _ r I� 0 oo0 '00°1 _ -� pogo o0o01l . :'.... - l - I�0000 p00OOOi -- JOpOO °O°OII' o°o°ll Ido°o° 00000,0 llI�0000 0 0 0 0 0 0 0 T. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2020202 _O202o io 2o202020202020° GRATED INLET -J AGGREGATE NOTES CONCRETE BLOCKS WIRE MESH WIRE MESH SEE NOTE 2 FINISHED GRADE J AGGREGA PLAN SECTION APRON ON THIS SIDE OF THE DIKE SHALL BE FOLDED UNDER THE DIKE SECTION 20" AND GLUED DOWN A —OVERLAP PER MANUFACTURER'S RECOMMENDATIONS EXISTING CONCRETE OR ASPHALT PAVEMENT CONCRETE BLOCKS ♦ FILTERED WATER GRATEDINLET 1. PLACE CONCRETE BLOCKS IN A SINGLE ROW AROUND PERIMETER OF INLET ON THEIR SIDES, WITH ENDS OF ADJACENT BLOCKS ABUTTING. 2. HEIGHT OF BARRIER VARIES. USE STACKS OF 4", 8", OR 12" BLOCKS. MIN. HEIGHT OF BARRIER SHALL BE 12" AND MAX. HEIGHT SHALL BE 24". 3. PLACE HARDWARE CLOTH/WIRE MESH W/ MAX. 1/2" OPENINGS OVER VERTICAL FACE OF CONCRETE BLOCKS. 4. THE AGGREGATE SHALL BE 3/4"-2" ANGULAR CLEAN STONE, WHICH WILL SLOW THE FLOW OF THE WATER AND ALLOW IT TO FILTER THROUGH AND OVER THE MATERIAL BEFORE ENTERING THE INLET. MAINTENANCE NOTES: 1. INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BASIN (IF USING INSERT -TYPE DEVICE) OR UPGRADIENT OF THE INLET. 2. REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY. 3. INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW -RATES THAT MAY CAUSE DOWNSTREAM FLOODING. 4. CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. ENSURE THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. 5. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION. BLOCK AND AGGREGATE INLET PROTECTION 8 N.T.S. CONCRETE A BLOCKS AGGREGATE ° °° 00 ° °0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 °o � " .° .°::✓t ,,{. � ..�.. }..°.. °,-a logo 000 05 GUTTER I WIRE MESH CURB CURB INLET A PLAN WIRE MESH MAINTAIN ACCESS TO COVER FOR INSPECTION CONCRETE BLOCKS FILTERED WATER CURB INLET °° RUNOFF ♦o°o° cli AGGREGATE-) CONCRETE GUTTER ���%jam%/�%/��%/� >X>// % SUB -GRADE SECTION A —A NOTES 1. PLACE CONCRETE BLOCKS IN A SINGLE ROW AROUND PERIMETER OF CURB INLET ON THEIR SIDES, WITH ENDS OF ADJACENT BLOCKS ABUTTING. 2. HEIGHT OF BARRIER VARIES. USE STACKS OF 4", 8", OR 12" BLOCKS. TOP OF BARRIER MUST BE LOWER THAN TOP OF CURB ELEVATIONS ADJACENT TO INLET. MAX. HEIGHT SHALL BE 24". 3. PLACE HARDWARE CLOTH/WIRE MESH W/ MAX. 1/2" OPENINGS OVER VERTICAL FACE OF CONCRETE BLOCKS. 4. THE AGGREGATE SHALL BE 3/4" - 2" ANGULAR CLEAN STONE WHICH WILL SLOW THE FLOW OF WATER AND ALLOW IT TO FILTER THROUGH AND OVER THE MATERIAL BEFORE ENTERING THE INLET. 5. IF ROAD OR PARKING AREA IS OPEN TO PUBLIC, VERIFY SUITABILITY OF BMP WITH AGENCIES HAVING JURISDICTION AND WITH CEC. MAINTENANCE NOTES: 1. INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BASIN (IF USING INSERT -TYPE DEVICE) OR UPGRADIENT OF THE INLET. 2. REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY. 3. INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW -RATES THAT MAY CAUSE DOWNSTREAM FLOODING. 4. CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. ENSURE THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. 5. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION. BLOCK AND AGGREGATE CURB INLET PROTECTION P 2 N.T.S. SOURCE BOX C-5 Rock Sock ( IDS) 0=11C R5 1.h` I,r»1u5; ..Rum R*4k F.�ii{ EC IM *;M NE9H 1 �' (1�141iA � 1'+ M AI WX r LVAI) n1 IIt laf%H � �rt twin + wft -a; fl' f7}hl $ lIwxm 49 c*r11;10 SLmfXr• JI ,�#TrIERrIfJ= F lAiirrl ��x" r is'- W Ce RLM ro g v" Ofr El 3EL7E1l SE T HOCK SUCK � RCc K. SQC� P i AN A.1rr � ar xmT °�i&L EiF ruLca w%Tw w iucuA� �tW QF 14' {F11MU5; C■U+SHEM ROES AM *FIV-m iLN Awr*N L *0 mEsig 9ECun-p To Cma9 EF mu r7arw iQl r MZINTE�LD 9�9. is JR1 XLlimi6mE TO 11LLNa Awri5 T" �c �SEU AWVMNC AjXX 5}�E WN {'f�'J9kW �* AJr0 11' Iu' ia1rAr6KL SNRf wR 50=4S9 C.A14 'wi C%ULpPEG {TYW_A L.Y y!•-1111pk I14fI_+r'5 rG A%mnG CapS ROCK ��� JOINTING 04140111m TAR I sly ++�wr n+,L�, 5LQ I4% 6 1ki %R %&N h4, . � �GQ � 20 5 W+r��� �{f'�Ta4+lF5 FdP. 4� + ��45E IV�RE�+�E FOR �€Y1Efl'EFE � � rG rF, � r1a �-I �I..L i� F£�rl�� i� 1ti.L F4XK SEC[ 015"&LA114111 hPME I � PLAN 'JIEw �N POCH •4GCATIOH(q) OF R15tm %OM i cRL19NED mxK �WC.L mE L3' ImPh15� N s E wm A r�AGT_IIRCD «g C&L S{F'J I ✓ W lWRk L4 % Y � PiIIATm *40m u1 Tmn 1aT (i w1vJ] 3 NW W� M Wr+1`L Ot kr�r lW 4t 19 remit AMILINT VVJM, TIC (d4AW L Wj � llm r iakYiai,lLd etadr. IY V. 40i'wi.lEimr{6 MAUuti r4b VCTH OF iA' * tiara WSH 7�LL IFE SMURM L1611C 'PtW �14Q•'i Q9 1W � AT O' Ll "S � .uwft Am At 1' �hd" my dym d3r &,x X 5NE LILWUFAdlti; vAT m 1fw EHE L19E OF FLFEF FAEH� AS AN fil_!TnNa41`uE rf4 9AiE UfSH FUR TiF Ri}CF EI„05�IRE RS-1 t��K ��CK.�E&1 IEB r.QNj L As--, Urbad LNadlog MPJ kIWA CL}r IkMI DEold 14tweirkr 24I (I Ueh M Sb rm E4ainaLM ['%iLCM I WMUM9 YOlMW 3 SOIL EROSION/SEDIMENTATION CONTROL OPERATION TIME SCHEDULE NOTE: GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR ESTIMATED PROJECT SCHEDULE CONSTRUCTION SEQUENCE JAN FEB MA APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MA APR MAY JUN JUL AUG SEP OCT NOV DEC TEMPORARY CONSTRUCTION EXITS TEMPORARY CONTROL MEASURES SEDIMENT CONTROL BASIN(S)/TRAP(S) STRIP & STOCKPILE TOPSOIL ROUGH GRADING STORM FACILITIES SITE CONSTRUCTION FINISH GRADING PERMANENT CONTROL STRUCTURES FOUNDATION / BUILDING CONSTRUCTION LANDSCAPING/SEED/FINAL STABILIZATION 1) CONTRACTOR MUST COMPLETE TABLE WITH ESTIMATED DATES OF PROJECT ACTIVITIES PRIOR TO BMP CERTIFICATION. 2) TIME SCHEDULE MUST COINCIDE WITH THE SWPPP IMPLEMENTATION SEQUENCE. NOTE: INFORMATION FOR AS -BUILT DRAWINGS SUPPLIED BY GENERAL CONTRACTOR. V� CCD #6 REVISION JSB 07/30/21 SURVEYED: TJ K DESIGNED: JSB DRAWN: JSB CHECKED: RCJ BY DATE AP P R APPROVED: BDA SCALE: AS NOTED VERnCAL: NAVE) 1988 HORIZONTAL NAD 1983/1991 DATUM z R-418514 u) IN COMPLIANCE WITH CITY OF RENTON STANDARDS Q rof W��_Cl' .� 4� / 3 CITY OF WALMART #2516 PRI RENTON WALMART SUPERCENTER PICKUP EXPANSION 1%319 CONSTRUCTION DOCUMENTS Planning/Building/Public Works Dept. EROSION AND SEDIMENT CONTROL PLAN NOTES AND DETAI6\ I..L X L/u LL i C) n QQ DAM 07/29/2021 RELDBOOK: BOOK PAGJF: —PAGE-1 L DRAWING NO: C7.1 `Q