HomeMy WebLinkAboutAdden 6AMENDMENT NO. 6 TO AGREEMENT FOR LIFT STATION AND FORCE MAIN REHABILITATION THIS AMENDMENT, datedfor reference purposes only as September 13, 2021,is by and between the City of Renton (the “City”), a Washington municipal corporation, and RH2 Engineering, Inc.RH2 Engineering, Inc.(“Consultant”), a Washington corporationWashington corporation. The City and the Consultant are referred to collectively in this Amendmentas the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-050, dated March 20, 2017, to provide necessary services for the Lift Station and Force Main Rehabilitation Group 1 Facilities (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, change the time for performance, and change the compensation in order to complete design of lift station and force main improvements. NOW THEREFORE, It is mutually agreed upon that CAG-17-050 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-6A-6, which is attached and incorporated herein. 2.Time of Performance:Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit B-6B-6. All Work shall be performed by no later than December 31, 2022. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $520,826 from $608,043 to $1,128,869, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit C-6C-6, which is attached and incorporated herein. 4.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CAG-17-050, Adden #6-21 PAGE 2 OF 2 CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Armondo Pavone Mayor Tony V. Pardi President _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Cheryl Beyer Senior Assistant City Attorney Contract Template Updated 06/17/2021 10-14-2021 Approved by Cheryl Beyer via 8/24/2021 email 1 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX EXHIBIT A-6 Scope of Work Amendment No. 6 to CAG-17-050 City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Preliminary (Group 2) and Final (Group 1B and Group 2) Design for Rehabilitation Improvements and Services During Bidding August 2021 Background In 2017, the City of Renton (City) retained RH2 Engineering, Inc., (RH2) for the predesign, design, and services during bidding and construction for improvements to 17 wastewater lift stations (LS) and associated force mains to be completed in multiple phases over several years. The project started with the City breaking down these facilities into Phase 1 and Phase 2 based on rehabilitation priority. However, a few of the Phase 1 LS projects required property acquisition and other permitting requirements. In an effort to prevent delaying the improvements to the remaining lift stations, the City decided to divide the Phase 1 lift stations into Groups 1A and 1B. It is anticipated that the Phase 2 lift stations will be divided into different groups as well. The following provides a detailed breakdown of the lift stations by phases and groups: PHASE 1 (COMPLETED) Group 1A Valley. The rehabilitation improvements for these facilities have been designed, bid, and constructed as part of Amendments Nos. 2 and 4. PHASE 2 Group 1B: Cottonwood, Devil preliminary 60-percent design has been completed for these four lift stations. Continuing property acquisition efforts likely will result in addressing further design for the Cottonwood Lift Station separately from the other three Group 1B facilities. Completion of the final design and advertisement for bidding is slated to occur by the end of 2021. o Group 1C: At the time this Scope of Work was prepared, the required easement for the Cottonwood LS was still being negotiated to accommodate the proposed electrical building and generator. The timeline of when the City will be able to obtain an easement from the property owner is uncertain. Therefore, this lift station will be improved later, under a separate group number, as part of Phase 4. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 2 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX PHASE 3 Group 2: Liberty, Wedgewood, Lake Washington Beach, Lake Washington No. 2, Lake Washington Flushing Station, Talbot Crest, Long, Westview, and Kensington Crest. These lift stations have been assessed initially for anticipated improvements in coordination with City staff. RH2 will start with conceptual design to 30-percent design and evaluate anticipated construction costs, as well as progressing to preliminary 60-percent design for all 9 of these facilities. Due to Kensington Crest likely requiring acquisition of an easement, it will be deferred to Group 2B at the 60-percent milestone, along with any other facility that is determined to require an easement. o Group 2A: Liberty, Wedgewood, Lake Washington Beach, Lake Washington No. 2, Lake Washington Flushing Station, Talbot Crest, Long, and Westview. Plans for rehabilitation of these lift stations will be developed from the 60-percent preliminary design level to 90-percent final design, and finally proceed to bidding and construction. o Group 2B: This amendment will determine the easement requirements for the Kensington Crest improvements for the City to begin the acquisition process. The timeline for securing an easement is unknown; therefore, this lift station and any other Group 2A facilities that necessitate easement acquisition will be improved under a separate group number and as part of Phase 4. PHASE 4 Group 1C: Once easement negotiations are finalized for the Cottonwood LS, improvement plans will be developed from 60-percent to 90-percent design, and subsequently proceed to bidding and construction. Group 2B: Once easement negotiations are finalized for the Kensington Crest LS and any other facilities that need easements, improvement plans will be developed from 60-percent to 90-percent design, and subsequently proceed to bidding and construction. Currently, RH2 is under contract to complete the design for the Group 1B and 1C lift stations: Baxter, Cottonwood, the remaining portion of East Valley. RH2 also is under contract to provide one (1) round of services during bidding (SDB). As part of Phase 2, RH2 will complete the design for improvements to the three Group 1B facilities, to be advertised for bidding by the end of 2021. Phase 4 will be completed on an independent schedule and design track, depending upon time needed to resolve any property acquisition and permitting needs. Table 1 identifies the Groups 1B, 1C, 2A, and 2B projects included in this amendment and the anticipated types of improvements involved. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 3 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Table 1: Detailed Phasing and Tasks for Facility Rehabilitation Efforts City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 4 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX The Amendment No. 5 Scope of Work that follows provides for the following services for all nine Group 2 lift stations listed previously: predesign analysis; conceptual 30-percent design plans; preliminary 60-percent designs; final design plans; and SDB. Additionally, this Amendment No. 5 describes the sequencing of tasks and deliverables so that all previously and currently contracted tasks are completed logically and efficiently. The following is an overview of the initial authorization and amendments that have been executed throughout the phases of this project. ORIGINAL CONTRACT (Executed March 20, 2017 COMPLETED): Task 1 Desktop Review of Each Lift Station and Force Main Task 2 Visit Each Lift Station Task 3 Predesign Project Analysis Task 4 Project Planning/Next Steps for Design AMENDMENT NO. 1 STORMWATER PUMP STATION TELEMETRY REPLACEMENT (Executed August 24, 2017 COMPLETED): Task 5 Project Administration Task 6 Stormwater Pump Station Telemetry Panel Upgrades Design Task 7 Sewer Lift Station Telemetry Panel Upgrades Design Task 8 Services During Bidding AMENDMENT NO. 2 GROUP 1 FACILITIES FINAL DESIGN AND SERVICES DURING BIDDING (Executed July 11, 2018): Phase 1 (Group 1A) Lift Stations (COMPLETED): Task 9 Final Design Plans for Group 1A Lift Station Rehabilitation Improvements Task 10 Stormwater Lift Station Telemetry Panel Installation Design Task 11 Specifications for Group 1A Lift Station Rehabilitation Improvements Task 12 Services During Bidding and Award Phase 2 (Group 1B) Lift Stations: Task 13 Geologic Exploration, Survey, and Hydraulic Analysis Task 14 Final Design Plans for Group 1B Lift Station Rehabilitation Improvements Task 15 Specifications for Group 1B Lift Station Rehabilitation Improvements Task 16 Permitting for Group 1B Lift Station Rehabilitation Improvements Task 17 Services During Bidding and Award for Group 1B City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 5 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Task 18 Stormwater Pump Station Telemetry Services During Construction Task 19 Sewer Lift Station Telemetry Services During Construction AMENDMENT NO. 3 PHASE 1 (GROUP 1A) LIFT STATION SERVICES DURING CONSTRUCTION (Executed April 11, 2019 COMPLETED): Task 20 Services During Construction for Group 1A Lift Stations AMENDMENT NO. 4 REVISED SCHEDULE (Executed July 1, 2020): No Task Amendment extended contract completion date to June 30, 2021. AMENDMENT NO. 5 REVISED SCHEDULE (Executed July 22, 2021): No Task Amendment extended contract completion date to December 31, 2021. PREDESIGN AND CONCEPTUAL PLANNING As of this Amendment, the four Group 1B (Baxter, and East Valley) preliminary facility design plans have been completed to the 60-percent milestone as part of previous amendments. The following Predesign and Conceptual Planning tasks outline the expected effort required to complete the initial assessment of needed improvements and anticipated level of design effort for the nine Group 2 (Liberty, Wedgewood, Lake Washington Beach, Talbot Crest, Long, Westview, Kensington Crest, Lake Washington No. 2, and Lake Washington Flushing Station) facilities to reach the 60-percent preliminary design stage. Assumptions: No further easement or property acquisition is anticipated for any of the Group 1B facilities. No major changes in approach or scope of improvements are expected for any of the Group 1B facilities. Task 21 Project Management Objective: Manage the RH2 project team and maintain files and records. Monitor the project scope, budget, and schedule. Approach: Prepare, monitor, and update the project schedule monthly. Provide monthly invoices with progress reports documenting work performed and budget status. Maintain project files and records. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 6 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX RH2 Deliverables: Monthly project schedule updates in electronic PDF format. Monthly invoices documenting monthly progress of work completed and earned value compared to contract value in electronic PDF format. Project records maintained and filed. Task 22 Desktop Review of Lift Stations and Force Mains (Group 2) Objective: Review as-constructed records of each Group 2 LS and force main (FM) to identify anticipated improvements and additional information needed to be obtained during site visits. Approach: Download and review as-constructed records of the following Group 2 LS and FM facilities. Liberty LS and FM Wedgewood LS Lake Washington Beach LS and FM Talbot Crest LS Long LS Westview LS Kensington Crest LS Lake Washington No. 2 LS Lake Washington Flushing Station Identify measurements, photographs, and other information to obtain during site visits. Assumptions: Electronic as-constructed records for all Group 2 facilities are webmap portal (CoR Maps). RH2 will rely upon the accuracy and completeness of any information, data, and materials generated or produced by the City or others in relation to this Scope of Work. RH2 Deliverables: Site observation checklists for each of the nine (9)Group 2 sites/alignments. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 7 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Task 23 Visit Lift Stations (Groups 1B and 2) Objective: Visit LS and FM alignmentsto identify recommended improvements and site constraints. Approach: Visit and photograph each of the nine (9) LSs reviewed in Task 22 (Group 2) to document existing conditions and features. Prepare site visit report notes. Document dimensions as needed for recommended improvements. Evaluate coating conditions at the following Group 1B and Group 2 lift stations: re-evaluate due to time elapsed since previous effort. Additionally, RH2 will inspect the identified bridge for improvements required to rehabilitate to functional and durable condition. Lake Washington Beach evaluate in conjunction with scheduled City maintenance activity. Kensington Crest evaluate in conjunction with scheduled City maintenance activity. Confirm with City staff and/or update the scope of improvements detailed in Table1 included in the Background section for each LS and FM site slated for rehabilitation, including desired FM flushing port frequency and other design criteria. Attend one (1) meeting with the City to discuss the planned improvements before proceeding with Task 24. Prepare meeting agenda and minutes. Assumptions: It is assumed that surveying will not be needed for this initial project phase. RH2 intends to illustrate the locations of the improvements using digital photographs and drawings based on as-constructed records. Provided by City: Access to each lift station and force main alignment during the site visits. Assist with measurement verifications. City to coordinate with RH2 to identify or confirm recommended improvements for each LS and FM included in the Groups 1B and 2 facilities. Attendance at meeting with RH2. RH2 Deliverables: List of planned improvements for predesign, following site visits, for discussion with City staff in electronic PDF format. Meeting agenda and minutes in electronic PDF format. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 8 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Attendance at meeting with City. Task 24 Predesign Project Analysis (Group 2) Objective: Prepare conceptual 30-percent design plans for all nine (9) Group 2 LS and FM projects. The primary purpose of preparing conceptual plans is to quantify the design development effort. Many of the plans and details developed as part of this Task will be further developed during the design phase of the project. Some details will be common to several LS or FM sites. Approach: Evaluate the characteristics of the site geology and topography for accommodating retaining walls and emergency generators in the slopes for the Talbot Crest and Long Lift Stations. Prepare preliminary recommendations regarding level of effort and whether it will be more feasible to construct improvements during Phase 3 (Group 2A)or Phase 4 (Groups 1C and 2B). Review available soil, geologic, and groundwater information for each site, observe sites for current slope conditions, evaluate requirements for slope stabilization needed to accommodate construction and operation of emergency generators, and provide a summary with initial recommendations to the design team. Prepare a cover sheet and general construction notes for the project. Prepare a vicinity map that identifies the location of the LS and FM sites included in this phase. Prepare conceptual site and utility plans showing FM improvements and details. Lift stations scheduled for evaluation of existing on-site equipment for FM maintenance, as well as other potential improvements are as follows: Liberty add cleanout accesses (CA), pig ports (PP), and magnetic marker location tags (LT). Wedgewood add CA, PP, and magnetic marker LT. Lake Washington Beach add CA, PP, and magnetic marker LT. Talbot Crest add CA, PP, and magnetic marker LT. Long add CA, PP, and magnetic marker LT. Westview add CA, PP, and magnetic marker LT. Kensington Crest add CA, PP, and magnetic marker LT. Prepare conceptual structural plans showing structural improvements to wet wells, structural slabs and pads, buildings, enclosures, and other miscellaneous structural improvements. Lift stations scheduled for structural improvements are as follows: Liberty manhole (MH) for new flow meter on discharge line, engine generator (EG) pad, and wet well (WW) attachment for mounting/storing maintenance straw. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 9 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Wedgewood EG pad/bollards and WW attachment for mounting/storing maintenance straw. Lake Washington Beach EG pad/bollards, Automatic Transfer Switch (ATS) pad/bollards, miscellaneous telemetry-related structural improvements, new security fence, and WW attachment for mounting/storing maintenance straw. Talbot Crest EG pad/bollards/access, and WW attachment for mounting/storing maintenance straw and addressing observed infiltration of water into dry well. Long MH for new flow meter on discharge line, EG pad/bollards/access, and WW attachment for mounting/storing maintenance straw. Westview MH for new flow meter on discharge line, EG pad/bollards/access, and WW attachment for mounting/storing maintenance straw. Kensington Crest EG pad/bollards/access, trenching and conduit routing from EG to LS facility, and WW attachment for mounting/storing maintenance straw. Lake Washington No. 2 improve telemetry enclosure building and door latch system, and design support system for new telemetry panel. Lake Washington Flushing Station design support system for new telemetry panel. Prepare conceptual plans needed for addressing WW coating conditions and recommended actions. Stations scheduled for addressing coating are anticipated to be: Lake Washington Beach; and Kensington Crest. Prepare conceptual mechanical/equipment plans showing pump, motor, valve, motor controls, and EG improvements. Coordinate with the Renton Regional Fire Authority and Fire Marshal regarding any required bollards needed for the EGs to comply with the Fire Code. The stations scheduled for mechanical/equipment improvements are as follows: Liberty add flow meter and install EG with noise abatement. Wedgewood install EG with noise abatement. Lake Washington Beach install EG with noise abatement. Talbot Crest add flow meter and install EG with noise abatement. Long add flow meter and install EG with noise abatement. Westview add flow meter and install EG with noise abatement. Kensington Crest install EG with noise abatement. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 10 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Prepare conceptual electrical/control plans to show electrical/control improvements, including electrical distribution modifications for installing EGs and telemetry improvements. The stations scheduled for EG installations are identified in subtask 24.7. The stations scheduled for telemetry improvements are anticipated to be: Liberty; Wedgewood; Lake Washington Beach; Talbot Crest; Long; Westview; Kensington Crest; Lake Washington No. 2; and Lake Washington Flushing Station. Prepare conceptual mechanical plans showing piping additions and reconfigurations to provide temporary wet well bypass systems for the following stations. Liberty; Wedgewood; Lake Washington Beach; Talbot Crest; Long; and Kensington Crest. Prepare a set of conceptual 30-percentdesign plans (11-inch by 17-inch) in electronic PDF for City review. The conceptual sharing website. Determine permits required for each LS site. Coordinate with City Planning Department staff regarding local permitting requirements as pertaining to the proposed improvements. Prepare an anticipated permit list for each project site to be incorporated into the technical memorandum prepared in subtask 24.13 and provide input on schedule and cost impacts associated with permitting. As of this Amendment, no permitting requirements are expected. Prepare a preliminary construction cost estimate of each individual LS for Prepare a technical memorandum summarizing the improvements scheduled for each LS and FM and submit to the City for review. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 11 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Assumptions: It is assumed that some lift station and force main details will apply to multiple locations. RH2 Deliverables: One (1) electronic PDF detailing initial findings and preliminary approach for each Group 2 LS. One (1) electronic PDF of the 30-percent conceptual plan set for City review. One (1) electronic PDF of the preliminary construction cost estimate. One (1) electronic PDF of the technical memorandum. Task 25 Facility Rehabilitation Continuity Review (Groups 1B and 1C) Objective: Evaluate current Groups 1B and 1C plans and compare them with the current conditions of the lift stations. Approach: Evaluate the progress of property acquisition at the Cottonwood LS and FM and estimate the time remaining to complete real estate actions. Provide a flow chart and schedule for next steps and a timeline once property and easement negotiations are finalized. Re-evaluate the proposed project design at the East Valley and Baxter LS facilities, as well as proposed solutions for slope stabilization . Confirm that the approach previously developed remains applicable. Update the Groups 1B and 1C to reflect current labor and material prices, as well as any revisions in approach to the four (4) Groups 1B and 1C projects. Assumptions: It is assumed that the initial scope of improvements for Groups 1B and 1C have not changed. This Task is meant to ensure a smooth design process as Groups 1B and 1C progress to final design. RH2 Deliverables: One (1) electronic PDF of the updated flow chart and schedule for the Cottonwood LS. One (1) electronic PDF of the updated preliminary construction cost estimates for the four (4) Groups 1B and 1C LS sites. Task 26 Bidding and Construction Sequencing Plan (Groups 1B and 2) Objective:Task 24 developed the conceptual 30-percent design plan sets for the nine (9)Group 2 project sites (Liberty, Wedgewood, Lake Washington Beach, Talbot Crest, Long, Westview, Kensington Crest, Lake Washington No. 2, and Lake Washington Flushing Station).It is already City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 12 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX assumed that Kensington Crest LS will be deferred to Phase 4 (Group 2B)along with the Cottonwood LS (Group 1C). This Task will determine whether any of the remaining eight (8)Group 2 projects, now classified as Group 2A facilities, should be combined with Kensington Crest and deferred to Phase 4. Otherwise, they will be part of Phase 3 (Group 2A)to be designed and advertised for bid sometime during2022. Refer to Table 1 in the Background for anticipated project phasing. Property acquisition for the Cottonwood LS and FM project likely will require a later completion of final design for that facility, postponing this work into a separate Group 1C set of projects, as described in the Background portion of this Scope of Work. Due to the expected property and easement acquisition for the Kensington Crest site and the unknown schedule that will be incurred, it is anticipated this facility will be included in Group 2B and scheduled to be bid later in a separate Phase 4 set of projects that can be completed concurrently with Group 1C. Upon finalization of this site and group organization, the remainder of the design work will progress in the following phases. Phase 3 includes tasks associated with advancing the Group 2A facilities from their current design level to bid-ready design, as well as providing SDB. Phase 4 includes tasks associated with advancing the Groups 1C and 2B facilities from their current design level to bid-ready design, as well as providing SDB. Approach: Discuss with City staff which Group 2 projects can advance to preliminary and final design (Group 2A) and which can be addressed later (Group 2B) with Group 1C facilities. Assumptions: Geotechnical investigations are anticipated for the Group 2 lift station and force main improvements, but this assumption will be validated during Phase 3 or 4 design work. Provided by City: Attendance at one (1) meeting to discuss project phasing. RH2 Deliverables: Attendance at one (1) meeting to discuss project phasing. PHASE 3 PRELIMINARY/FINAL DESIGN AND SDB FOR GROUP 2A At the startof Phase3, the sites assigned to Group 2A (Liberty, Wedgewood, Lake Washington Beach, Talbot Crest, Long, Westview, Lake Washington No. 2, and Lake Washington Flushing Station) will be at 30-percent design and ready for updating to the60-percent design milestone. The tasks that follow outline the expected effort to advance these LS facilities from 30-percent completion to bid-ready City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 13 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX design. The proposed final design and advertisement for bids for Group 2A sites is scheduled to be completed sometime during 2022. Task 27 Geologic Exploration and Surveying (Groups 2A and 2B) Objective: Perform engineering geology site investigations and reporting as needed for final design of the Group 2 facilities that warrant this effort, as well as property boundary surveying. Approach: Perform a limited geological investigation to observe, characterize, and document earth and groundwater conditions of the sites. Identify potential geologic hazards and alternatives to mitigate the identified geologic risks and evaluate potential constructability issues for the EG foundationsand associated retaining walls. RH2 will coordinate with City staff to perform test pits for geologic investigation as warranted. Prepare an engineering geologic report for the two (2) sites that follow, which will include a summary of geological and groundwater conditions and provide recommendations to design and mitigate construction geologic hazards, the EGfoundation,and associated retaining wall. The engineering geology report will include a figure showing exploration locations, photographs, and logs from each test pit performed. Talbot Crest Long Describe survey work to be completed, including the survey limits and requirements. Coordinate with a surveyor as a subconsultant to RH2 to perform topographic survey for the LS facilities that follow. Schedule the survey work in coordination with other activities and review the survey once complete for each site surveyed. Talbot Crest to be determined during predesign Long Kensington Crest include property boundary survey data Westview optional based on predesign data and conceptual approach Assumptions: Both Long and Talbot Crest are anticipated to require up to two (2) test pits for geologic investigation. City crew to perform excavations for the test pits. It is assumed that surveying will be performed by a professional land surveyor (PLS) retained by RH2 to provide horizontal and vertical survey control and topographical information, including surface features, underground utilities, roadway and utility alignments, rights-of-way, and property lines. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 14 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Provided by City: Direction regarding whether survey is desired for the Westview LS or any other project site. Available geotechnical, environmental, and construction reports related to the LS and FM facility sites of concern to this Task. RH2 Deliverables: One (1) electronic PDF of the engineering geology report. Topographic land survey of the existing LS facilities as needed for the proposed improvements. Task 28 Final Design Plans for Lift Station Rehabilitation (Group 2A) Objective: Prepare bid-ready design plans for Group 2A rehabilitation improvements based on the 30-percent conceptual design approach completed during Task 24. Approach: Advance design plans to 60 percent and develop a 60-percent preliminary construction cost estimate for this project. Submit the 60-percent design plans and construction cost estimate to the City for review. Attend one (1) review meeting with the City. Advance design plans from 60 percent to 90 percent, including incorporating review comments from the City into the design plans and additional details for 90-percent design plans. Update the construction cost estimate based on the 90-percent design plans. Submit the 90-percent design plans and construction cost estimate to the City for review. Attend one (1) review meeting with the City. Conduct an in-house quality assurance and quality control (QA/QC) review of the 90-percent design plans. Based on review comments, prepare near bid-ready plans and details (advance from 90-percent complete to near bid-ready). Update construction cost estimate based on the near bid-ready design. Submit the near bid-ready design plans to the Renton Regional Fire Authority, as necessary for review and approval.Submit the near bid-ready design plans and cost estimate to the City for review. Address and incorporate review comments from the Fire Marshal and City and prepare bid-ready documents. Provided by the City: Attendance at 60- and 90-percent review meetings. Review comments for the 60- and 90-percent, and near bid-ready design plans sets. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 15 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX RH2 Deliverables: Attendance at 60- and 90-percent review meetings. One (1) electronic PDF of 60-percent review plans and construction cost estimate. One (1) electronic PDF of 90-percent review plans and construction cost estimate. Two (2) half-size (11-inch by 17-inch) copies of 90-percent review plans. One (1) electronic PDF of near bid-ready design plans for Fire Marshal and City review. One (1) electronic PDF of bid-ready plans and construction cost estimate. Task 29 Specifications for Lift Station Rehabilitation (Group 2A) Objective: Preparethe general and technical specifications for the proposed Group 2A rehabilitation improvements based on the 30-percent conceptual design approach completed during Task 24. Approach: that are tailored for this project. Submit 60-percent technical specifications to the City with the 60-percent design plans for review and comment. as warranted for this project. Incorporate City comments on the 60-percent technical specifications and advance to 90-percent complete. Submit 90-percent specifications to the City with the 90-percent design plans for review and comment. Conduct an in-house QA/QC review of the 90-percent standard specifications and general conditions as warranted for this project. Based on review comments, prepare near bid-ready specifications (advance from 90-percent complete to near bid-ready). Provided by the City: Review and comment on technical and general specifications at 60- and 90-percent, and near bid-ready milestones. RH2 Deliverables: One (1) electronic PDF of 60-percent technical specifications. One (1) electronic PDF of 90-percent technical and general specifications. One (1) electronic PDF of near bid-ready technical and general specifications. One (1) electronic PDF of bid-ready technical and general specifications. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 16 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Task 30 Services During Bidding and Award (Group 2A) Objective: Provide engineering services during the bidding phase of the project for Group 2A . Approach: 30.1 Prepare bid advertisement and coordinate the timing and placement with the City. The City will submit the advertisement to the appropriate publications. 30.2 Produce PDF and hard copy sets as listed in the deliverables of the plans and specifications for RH2 and City use. The City will produce additional hard copies of the bid documents as needed for bidding the project. 30.3 Respond to questions from bidders. Revise the plans, technical specifications, or construction contract conditions during the bidding process, as warranted. If needed, prepare addenda. 30.4 Assist the City with the evaluation of the qualifications and references for the apparent low bidder. Prepare recommendation of bid award letter. It is assumed that the City will perform the bid award and construction contract execution tasks and that RH2 will not be involved with the bid opening activities. 30.5 Prepare construction plan sets, specifications, and construction contract documents for the pre-construction meeting. Produce hard copies listed in the deliverables, along with a PDF version of the documents. Provided by the City: Management of and payment for the Builders Exchange of Washington online bidding process. list. Issuance of addenda, if any, to all plan holders. Bid opening attendance and tabulation of bids received. Bid award and construction contract execution. RH2 Deliverables: Bid-ready plan and specifications sets. One (1) electronic PDF and four (4) 11-inch by 17-inch hard copies: one (1) set for City use and bidding purposes; and staff use during bidding. Phone assistance to vendors and bidders during the bidding phase. Addenda in electronic PDF, if needed. Up to two (2) are assumed. Reference check of lowest bidder. One (1) electronic PDF of recommendation of bid award letter. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 17 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Construction plans sets and specifications. One (1) electronic PDF, four (4) full-size plan sets, and seven (7) half-size plan sets:two (2) full-size and four (4) half-size sets for contractor; two (2) full-size and two (2) half-size sets for City; and one (1) half-size set for RH2 file and staff use. PHASE 4 PRELIMINARY/FINAL DESIGN AND SDB FOR GROUPS 1C AND 2B At the start of Phase 4, the project assigned to Group 2B (Kensington Crest assumed to be the only site as of this Scope of Work) will be at 30-percent design and ready for updating to the 60-percent design milestone. The tasks that follow outline the expected effort to advance this LS facility from 30-percent completion to bid-ready design, as well as SDB. The proposed effort for Group 2B will be performed in coordination with and simultaneously to Group 1C (Cottonwood) LS and FM final design and SDB efforts as described in prior amendments. Upon completion of the 60-percent design milestone for the Group 2B site, further development of plans and specifications, as well as SDB, will be performed in coordination with and simultaneously to the Group 1C LS and FM final design and SDB efforts as described in prior amendments. Task 31 Final Design Plans for Lift Station Rehabilitation (Group 2B) Objective:Prepare bid-ready design plans for Group 2B rehabilitation improvements based on the 30-percent conceptual design approach completed during Task 24. Approach: Advance design plans to 60 percent and develop a 60-percent preliminary construction cost estimate for this project. Submit the 60-percent design plans and construction cost estimate to the City for review. Attend one (1) review meeting with the City. Advance design plans from 60 percent to 90 percent, including incorporating review comments from the City into the design plans and additional details for 90-percent design plans. Update the construction cost estimate based on the 90-percent design plans. Submit the 90-percent design plans and construction cost estimate to the City for review. Attend one (1) review meeting with the City. Conduct an in-house QA/QC review of the 90-percent design plans. Based on review comments, prepare near bid-ready plans and details (advance from 90-percent complete to near bid ready). Update construction cost estimate based on the nearbid-ready design plans. Submit the near bid-ready design plans to the Renton Regional Fire Authority as necessary for review and approval.Submit the near bid-ready design plans and cost estimate to the City for review. Address and incorporate review comments from the Fire Marshal and City and prepare bid ready documents. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 18 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Provided by the City: Attendance at 60- and 90-percent review meetings. Review comments for the 60- and 90-percent, and near bid-ready design plans sets. RH2 Deliverables: Attendance at 60- and 90-percent review meetings. One (1) electronic PDF of 60-percent review plans and construction cost estimate One (1) electronic PDF of 90-percent review plans and construction cost estimate. Two (2) half-size (11-inch by 17-inch) copies of 90-percent review plans. One (1) electronic PDF of near bid-ready plans for Fire Marshal and City review. One (1) electronic PDF of bid-ready plans and construction cost estimate. Task 32 Specifications for Lift Station Rehabilitation (Group 2B) Objective: Prepare the general and technical specifications for the proposed Group 2B rehabilitation improvements based on the 30-percent conceptual design approach completed during Task 24. Approach: that are tailored for this project. Submit to the City with the 60-percent design plans for review and comment. as warranted for this project. Incorporate City comments on the 60-percent technical specifications and advance to 90-percent complete. Submit to the City with the 90-percent design plans for review and comment. Conduct an in-house QA/QC review of the 90-percent standard specifications and general conditions as warranted for this project. Based on review comments, prepare near bid-ready specifications (advance from 90-percent complete to near bid-ready). Provided by the City: Review and comment on technical and general specifications at 60- and 90-percent, and near bid-ready milestones. RH2 Deliverables: One (1) electronic PDF of 60-percent technical specifications. One (1) electronic PDF of 90-percent technical and general specifications. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 19 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX One (1) electronic PDF of near bid-ready technical and general specifications. One (1) electronic PDF of bid-ready technical and general specifications. Task 33 Services During Bidding and Award (Groups 1C and 2B) Objective: Provide engineering services during the bidding phase of the project for Groups 1C (Cottonwood) and 2B (Kensington Crest assumed to be the only site as of this Scope of Work). Approach: 30.6 Prepare bid advertisement and coordinate the timing and placement with the City. The City will submit the advertisement to the appropriate publications. 30.7 Produce PDF and hard copy sets as listed in the deliverables of the plans and specifications for RH2 and City use. The City will produce additional hard copies of the bid documents as needed for bidding the project. 30.8 Respond to questions from bidders. Revise the plans, technical specifications, or construction contract conditions during the bidding process, as warranted. If needed, prepare addenda. 30.9 Assist the City with the evaluation of the qualifications and references for the apparent low bidder. Prepare recommendation of bid award letter. It is assumed that the City will perform the bid award and construction contract execution tasks and that RH2 will not be involved with the bid opening activities. 30.10 Prepare construction plan sets, specifications, and construction contract documents for the pre-construction meeting. Produce hard copies listed in the deliverables, along with a PDF version of the documents. Provided by the City: Management of and payment for the Builders Exchange of Washington online bidding process. Issuance of addenda, if any, to all plan holders. Bid opening attendance and tabulation of received bids. Bid award and construction contract execution. RH2 Deliverables: Bid-ready plan and specifications sets. One (1) electronic PDF and four (4) 11-inch by 17-inch hard copies: one (1) set for City use and bidding purposes; and three (3) sets for and staff use during bidding. Phone assistance to vendors and bidders during the bidding phase. City of Renton Lift Station and Force Main Rehabilitation Group 1 Facilities Amendment No. 6 Preliminary (Group 2) and Final (Groups 1B and 2) Design for Exhibit A-6 Rehabilitation Improvements and Services During Bidding Scope of Work 20 8/31/2021 10:46:50 AM J:\DATA\REN\117-037\CONTRACT\AMEND NO. 6\AMEND NO. 6 - EXHIBIT A-6_SOW_LIFT STATION AND FM REHAB GROUP 1BC_2AB.DOCX Addenda in electronic PDF, if needed. Up to two (2) are assumed. Reference check of lowest bidder. One (1) electronic PDF of recommendation of bid award letter. Construction plans sets and specifications. One (1) electronic PDF of plans and specifications, four (4) full-size plan sets, seven (7) half-size plan sets, and five (5) bound sets of specifications: two (2) full-size sets, four (4) half-size sets, and two (2) specifications sets for contractor; two (2) full-size, two (2) half-size sets, and two (2) specifications sets for City; and one (1) half-size set and one (1) specifications set for RH2 file and staff use. EXHIBIT B-6 SCHEDULE All remaining work shall be completed by no later than December 31, 2022