Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1981_Forest Terrace_SUBMITTAL COVER_14_comp
To:SUBMITTAL #14 - CSBC DATE: 4/21/2021 Attention:Trenton Skoda PHONE:(425)892-4041 Project:Forest Terrace (Pulte Homes) Union Ave and 95th, Renton, WA We are enclosing: Submittal Application Supplier 1 1/4" CS BC Paving ICON (A)For approval or corrections - Return (B)For review and comment (C)Approved as corrected - Return (D)Approved - Work may proceed (E)Revise and resubmit - Work may proceed (F)Revise and resubmit - Work MAY NOT proceed ACTION REQUIRED ACTION REQD. Product 1 9-03.9(3), Crushed Surfacing BC A Barghausen Consulting Engineers, Inc. 18215 72nd Ave S Kent, WA 98032 ITEM #DESCRIPTION Sample No 1815922181 Product Id 2379 1 1/4" CS BCProduct Name 9-03.9(3) Crushed Surfacing BCSpecification 10/02/2020 10:00Date Sampled Process ControlSample Type Surge PileSample Method Sample Information Notes With 25% RAP Skye SouthwardSampled By Gradation Results Result% Passing Quality Results TolerancesSieveTolerancesTestUnit Date Tested Tested By Skye Southward 2 1/2" (63mm)100 SE 73 ≥40 AASHTO T176% 2" (50mm)100 Fractured Faces (>1)93.3 ≥75 AASHTO T-335% 1 1/4" (31.5mm)100 99-100 Unfractured Faces (>1)6.7 AASHTO T-335% 1" (25mm)97 80-100 -#200 (75um)1.9 % 3/4" (19mm)86 Grad Loss 0.0 % 5/8" (16mm)78 50-80 Wash Loss (#200/75um)0.7 % 1/2" (12.5mm)67 #200/#40 0.11 3/8" (9.5mm)57 #4 (4.75mm)43 25-45 #10 (2mm)34 #40 (.425mm)17 3-18 #100 (.15mm)4 #200 (75µm)1.9 0-7.5 Summary Report StonemontQC CRH Americas Materials (AMAT)04/12/2021