Loading...
HomeMy WebLinkAbout0895.06 SWFR 342.pdf CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. Project No. Page Report No. MLP 0895.06 1 of 3 342 Time On Site Time Off Site Date Day of Week 11:25 11:45 10/13/21 Wednesday NPDES Permit No. Reviewed WAR307963 Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits •Buffer Zones around Sensitive Areas •Silt Fence G N - Chain link fence installed along site perimeter 2. Establish Construction Access •Fabric; Quarry Spalls •Wheel Wash •Sweeper Truck F N - Light track out observed, continue to sweep offsite roads during trucking operations 3. Control Flow Rates •Stormwater Vault or Facility •Straw Wattles •Check Dams G N - Onsite stormwater vault plugged 4. Install Sediment Controls •Silt Fence •Straw Bale Barriers •Vegetation •Straw •Sediment Ponds, Traps & Filters •Treatment •Sediment Pond (Temp. or Perm.) •Water Truck G N - Silt fence installed around majority of site perimeter; some silt fence near entrance removed to work on frontage improvements, to be reinstalled at end of work day - Stormwater sump SE of construction entrance - Subsurface drain installed under construction entrance to divert water to sump - Straw wattles N of entrance to divert water to sump 5. Stabilize Soils •Nets & Blankets •Mulch, Bark & Rock •Hydroseeding; Grass •Plastic Sheeting •Straw Stockpiles •Stockpiles •PAM F N - Much of site is paved 6. Protect Slopes •Benching; Track-Walking •Pipe Slope Drains •Plastic Sheeting; Anchors F N - Straw wattles in place to divert water away from slopes along western perimeter - Soil on slopes compacted 7. Protect Drain Inlets •Catch Basin Inserts •Gutter; Road G N - CB inserts installed in offsite catch basins 8. Stabilize Channels and Outlets •Channel Lining •Check Dam •Outlet Protection •Nets and Blankets - - N/A 9. Control Pollutants •Chemical Storage Area Covered •Concrete Handling G N - Stormwater treated with dry ice to lower pH to suitable levels - Chemical/material storage onsite 10. Control Dewatering G N - Via KC Sewer Discharge Permit as needed 11. Maintain BMPs F N - Continue sweeping offsite roads 12.Maintain SWPPP & Site Logbook G N - Available upon request 13. Protect Low-Impact Development (LID BMPs) •Bioretention Rain Garden Facilities •Permeable Pavement - - N/A CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. Project No. Page Report No. MLP 0895.06 2 of 3 342 Time On Site Time Off Site Date Day of Week 11:25 11:45 10/13/21 Wednesday NPDES Permit No. Reviewed WAR307963 Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No List the action items in the table below: Element # Description and Location Action Required Completion Date Current Weather: __49°F, Partly Cloudy_ _ Precipitation since last inspection (approximate): 0.35 inches Precipitation in the last 24 hours (approximate): 0.10 inches Type of Visit:  Weekly  Monthly  Post–Storm Event Phase of Active Construction (check all that apply): Pre-Construction  Clearing/Demo/Grading  Infrastructure/Roads  Concrete pours  Vertical Construction Utilities Offsite improvements  Site temporarily stabilized Final Stabilization Was water quality sampling part of this inspection? Yes No If “Yes”: •Record results in the table below. •Hanna Turbidity Meter # _________ Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes - - - - - - “This report is true, accurate, and complete to the best of my knowledge and belief.” Inspector Name: Maggie Perme CESCL Number: ECO-3-4042106 Inspection Date: 10/13/21 CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. Project No. Page Report No. MLP 0895.06 3 of 3 342 Time On Site Time Off Site Date Day of Week 11:25 11:45 10/13/21 Wednesday NPDES Permit No. Reviewed WAR307963 Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC BMP LEGEND JOB SHACK STORMWATER VAULT TEMPORARY SEDIMENT POND/TRAP WATTLE SILT FENCE CONSTRUCTION ENTRANCE SUBSURFACE DRAIN CHEMICAL/MATERIAL STORAGE CATCH BASIN INSERT CONCRETE WASHOUT