HomeMy WebLinkAboutCallidus Duplexes C19-002232 Civil Construction PermitDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Construction Permit: C19002232
IVR Number: 19002232
Permit Information
Permit Name: Frontage and Utility improvements for the Sapphire Duplex's
Address/Location:04/30/2019Application Date:7227800115Parcel Number: 3119 NE 20TH ST
Permit Type:05/04/2021Issue Date:Engineering
Permit Work Class:05/04/2022Expiration Date:Construction
Plan Reviewer: Michael Sippo 425-430-7298
Description: Frontage and Utility improvements for the Callidus Duplex's
Contacts
Name Address PhoneTypeBilling
Troy Schmeil
Sapphire Homes Inc
16805 SE 43rd Ct
Bellevue, WA 98006
B: (425) 818-8829
H: (425) 818-8829
C: (206) 954-4945
O: (206) 660-1238
ApplicantX
Bill Bertch
CW Design Inc
PO Box 476
Renton, WA 98057
B: (425) 271-0082Architect
Todd Emry
Van Hoof Construction LLC
718 GRIFFIN Ave
ENUMCLAW, WA 98022-3418
B: (253) 261-5054
C: (253) 257-9302
Contractor
Business License Number: 38667Construction Contractor: VANHOHC884J3
Han Phan
PBG, LLC
5130 S 166th Ln
SeaTac, WA 98188
B: (206) 446-1292
C: (206) 229-6422
Engineer
SAPPHIRE HOMES INC 16805 SE 43RD CT
BELLEVUE , WA 98006
Owner
Troy Schmeil
Sapphire Homes Inc
16805 SE 43rd Ct
Bellevue, WA 98006
B: (425) 818-8829
H: (425) 818-8829
C: (206) 954-4945
O: (206) 660-1238
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES