HomeMy WebLinkAboutP_CIVIL_CONSTRUCTION_PLANS_211004_V1SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS30'30'15'15'LOT A7,762.4SFLOT B7,547.2SFDSDSDSDS20' SETBACK13' ROWDEDICATION5' SETBACK15'SETBACK12' DRIVELANE21'60'26'45'4' WALKWAY20' DRIVEWAY4' WALKWAY20' DRIVEWAY5' SETBACK5' SETBACK15' ESMT1'20' SETBACK9.4'5'8'8'5'6'13'1.5' THICKENEDEDGESSSSSSSSSITE18055APRIL 15, 2021REV DESCRIPTIONREV DATEREVph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFSITE PLANC1.0DAFDAFUTILITY, SURVEY, & CONSTRUCTION PLANDISCREPANCIESTHE EXISTING SITE SURVEY, EXISTING TOPO INFORMATI.ONAND LOCATION OF UTILITIES SHOWN ON THESE PLANS WEREPERFORMED AND SUPPLIED BY OTHERS. THE ENGINEERPROVIDES NO GUARANTEE OF THE ACCURACY OF THIS SURVEYAND UTILITY INFORMATION. IN THE EVENT OF ANY CONFLICTSOR DISCREPANCIES BETWEEN THESE PLANS AND THE ACTUALFIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY ANDCONSULT WITH FURR ENGINEERING SERVICES TO RESOLVEALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.CONFLICTS SHALL BE ADDRESSED AS FOLLOWS:UTILITIES: THE CONTRACTOR SHALL BE RESPONSIBLE FORVERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALLUTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BYCALLING 1-800-424-555 FOR MARKING, THEN BY POTHOLING THEUTILITIES AND SURVEYING THE HORIZONTAL AND VERTICALLOCATION PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALLNOTIFY THE ENGINEER OF ANY CONFLICTS AND CONSULT WITHFURR ENGINEERING SERVICES TO RESOLVE ALL PROBLEMSPRIOR TO PROCEEDING WITH CONSTRUCTION.SURVEY CONFLICTS: ANY DISCREPANCIES BETWEENTHE SURVEY AND TOPO INFORMATION SHOWN ON THESEPLANS AND THE ACTUAL FIELD CONDITIONS ONCE THE SITEHAS BEEN CLEARED, SHALL BE BROUGHT TO THE ATTENTIONOF FURR ENGINEERING SERVICES TO RESOLVE ALL PROBLEMSPRIOR TO PROCEEDING WITH CONSTRUCTION.PLAN DISCREPANCIES: IN THE EVENT THAT ANYDISCREPANCIES ARE FOUND ON THESE APPROVEDENGINEERING PLAN SHEETS, THE CONTRACTOR SHALL NOTIFYTHE ENGINEER OF ANY CONFLICTS AND CONSULT WITH FURRENGINEERING SERVICES TO RESOLVE ALL PROBLEMS PRIOR TOPROCEEDING WITH CONSTRUCTION.SURVEY LEGEND:BENCHMARK: CITY OF RENTON:RENTON 1837 ELEV. = 317.22 NAVD88DATUMNAVD 1988LEGAL DESCRIPTION:LOT A, CITY OF RENTON LOT LINE ADJUSTMENT NO.ULA-00-011-LLA AS RECORDED UNDER RECORDING NUMBER20000601900016, RECORDS OF KING COUNTY, WASHINGTON.REFERENCE SURVEY:RENTON LOT LINE ADJUSTMENT A.F.N. 20000601900016SHEET INDEX:C1.0SITE PLANC2.0TESC PLANC3.0GRADING & DRAINAGE PLANC3.1ROAD DETAILS AND NOTESC3.2STORM DETAILS AND NOTESC4.0SEWER AND WATER PLANC4.1SEWER AND WATER DETAILSC5.0TRAFFIC CONTROL PLANC5.1TRAFFIC CONTROL PLANC6.0TREE RETENTION PLANC7.0LANDSCAPE PLANC7.1LANDSCAPE NOTES AND DETAILS1 OF 1 BOUNDARY/TOPOGRAPHIC SURVEYNPROJECT TEAM:APPLICANT:INDERJIT MANGATQUALITY HOMESPO BOX 6058KENT, WA 98064(253) 293-1578AQHOMES@YAHOO.COMCIVILENGINEER:FURR ENGINEERING SERVICES PLLC4715 142ND PL SW UNIT#BDEANFURR(206) 890-8291FURRENGINEERING@GMAIL.COMCHS ENGINEERS12507 BEL-RED. STE. 101BELLEVUE, WA 98005425.637.3639SURVEYOR:UTILITIES:ELECTRICITY/GAS:CABLE:PHONE:SEWER/WATER:GARBAGE:FIRE:STORM:PUGET SOUND ENERGYCOMCAST/XFINITYCOMCASTCENTURY LINKCITY OF RENTONREPUBLIC SERVICESKING COUNTY FIRE DISTRICT #40CITY OF RENTONGEOTECHNICALCONSULTANTCOBALT GEOSCIENCESP.O. BOX 82243KENMORE, WA 98028(206) 331-1097COBALTGEO@GMAIL.COMLEGAL OWNER:BALRAJ MANGAT2732 ABERDEEN AVE NERENTON, WA 98056PROPOSED CB12" SD (TYP)13'HALF STREETGRIND ANDOVERLAYPEDESTRIAN RAMPPEDESTRIAN RAMP6"SS @ 2% MIN.CONNECT TO EXIST. 8" SEWER MAIN5'SIDEWALKEXISTING HOUSE TO REMAINASPHALT RAMPCONNECT TOEXISTING CBLANDSLIDE HAZARD BOUNDARYOBTAINED FROM COR GIS MAP13'HALF STREETPARCEL #:334390-14004' SQ PEDESTRIAN REFUGELANDINGSITE ADDRESS:2732 ABERDEEN AVE NERENTON, WA 98056NPROPOSEDTREE (TYP)8'LANDSCAPESTRIPRELOCATEEX SIGNEX FIRE HYDRANTTO REMAINEX POLETO REMAINFOG LINEEXIST TREESTO REMAINPROPOSED HOUSELOT A WATER METERTO BE REMOVEDLANDSLIDE HAZARD BOUNDARYOBTAINED FROM COR GIS MAPRELOCATEEX SIGNRELOCATEEX MAILBOXRELOCATEDMAILBOX1' CURB12" STOP BAR8' LANDSCAPESTRIP5' SIDEWALK6"SS @ 2% MIN.EXIST 27" FIR TREETO REMAINEXIST UTILITYPOLE TO REMAIN12'LANDSCAPESTRIP1" WATER METER1" WATER METER3'LANDSCAPESTRIP6" SSCO6" SSCOEXIST. DRIVEWAY ADJACENTPROPERTY TO THE SOUTHPROP. SSMHPROP. 8" SSEXTENSIONAPPLY FOR STREET MODIFICATION TOREDUCE 16' ALLEY REQUIREMENT TO 15'IN THIS LOCATION(2) 9'X20' PARKING STALLSREQUIRED FOR EACH LOT12'PAVED1' MIN2' MINALLEYVARIES15' MINA-P/LEASEMENTLEGENDCATCH BASIN TYPE 1PROPOSED CONCRETEPROPOSED ASPHALTPROPERTY BOUNDARYSTORM DRAIN LINESURFACE FLOW ARROWRIDGELINEEXIST TREESTO REMAINOVERHEAD UTILITIES TOBE UNDERGROUNDEDPROP.12" STORMDRAIN XTENSIONPROP.12" STORMDRAIN EXTENSIONOVERHEAD UTILITIES TOBE UNDERGROUNDEDOVERHEAD UTILITIES TOBE UNDERGROUNDEDPROPOSEDDRYWELL (TYP)ASPHALT RAMPABERDEEN AVE NE NE 28TH ST.Know what'sbelow.before you dig.CallR1.5'4" HMA3" CSTC6" CSBC12"NATIVE SOIL COMPACTEDTO 95% PROCTOR SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS30'30'15'15'DSDSDSDS18055APRIL 15, 2021REV DESCRIPTIONREV DATEREVph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFEXISTING CONDITIONSTESC PLANC2.0DAFDAFCONSTRUCTION SEQUENCE1.CONTRACTOR TO ARRANGE AND ATTEND A PRE-CONSTRUCTION CONFERENCE WITH THE CITY OF RENTON PRIOR TO BEGINNING SITEWORK.2.IDENTIFY AND MARK LIMITS OF CLEARING.3.A COPY OF THE APPROVED TESC/SWPP PLAN IS TO BE KEPT ONSITE AT ALL TIMES DURING CONSTRUCTION.4.INSTALL TEMPORARY ROCK CONSTRUCTION ENTRANCE, FILTER FABRIC FENCES, TEMPORARY SEDIMENT TRAP AND TEMPORARY INTERCEPTOR SWALES AS REQUIRED.5.A MINIMUM OF ONE SET OF APPROVED CONSTRUCTION DRAWINGS AND A COPY OF THE CITY OF RENTON DESIGN AND CONSTRUCTION STANDARDS SHALL BE MAINTAINED IN GOOD(LEGIBLE) CONDITION ONSITE AT ALL TIMES.6.BEGIN SITE GRADING AND UTILITY INSTALLATION GRADE AND PAVE ACCESS DRIVEWAY.7.CONSTRUCT FRONTAGE IMPROVEMENTS8.A TRAFFIC CONTROL PLAN IS TO BE SUBMITTED BY THE CONTRACTOR TO THE CITY OF RENTON AND APPROVED BY THE CITY PRIOR TO ANY SITE RELATED ACTIVITIES (INCLUDINGOFFSITE UTILITY CONNECTIONS) THAT REQUIRE ROAD CLOSURE OR DISRUPTION OF ACCESS TO NEARBY BUSINESSES THAT WILL LAST MORE THAN 15 MINUTES.9.MAINTAIN TESC FACILITIES IN PROPER OPERATING CONDITION DURING ALL PHASES OF CONSTRUCTION. RELOCATE TESC FACILITIES AS NEEDED AS CONSTRUCTION PROGRESSES.10.COORDINATE UTILITY CONSTRUCTION AND CONNECTIONS WITH UTILITY PROVIDERS.11.COMPLETE ONSITE, OFFSITE AND BUILDING CONSTRUCTION AND OBTAIN CIYTjUTILITY PROVIDER APPROVAL. INSTALL LANDSCAPING IN CONFORMANCE WITH LANDSCAPE PLANS.STABILIZE ALL EXPOSED AREAS.12.REMOVE REMAINING TESC MEASURES AS DIRECTED BY THE CITY OF RENTON INSPECTOR AFTER CITY APPROVAL.THE 13 ELEMENTS OF A CONSTRUCTION SWPPP1.PRESERVE VEGETATION/MARK CLEARING LIMITS: THE CLEARING LIMITS ARE INDICATED ON THE PLAN SHEET. FURTHERMORE, CLEARING AND GRADING WILL BE LIMITED TO ONLYAREAS THAT NEED TO BE DISTURBED FOR GRADING/ CONSTRUCTION OF THE SITE AND FRONTAGE IMPROVEMENTS. CONSTRUCTION WILL REQUIRE REGARDING THE ENTIRE SITE.FIELD MARKING THE CLEARING LIMITS SHALL BE COMPLETED PRIOR TO CLEARING AND GRADING ACTIVITIES.BMP'S: PRESERVE NATURAL VEGETATION (VEG)2.ESTABLISH CONSTRUCTION ACCESS: ACCESS TO THE CONSTRUCTION SITE SHALL BE LIMITED TO THE ROCK CONSTRUCTION ENTRANCE. THE ROCK CONSTRUCTION ENTRANCESHALL BE INSTALLED OFF OF THE STREET TO PROVIDE ACCESS TO THE CONSTRUCTION VEHICLE/EQUIPMENT STAGING AND EMPLOYEE PARKING AREAS.BMP'S: ROCK CONSTRUCTION ENTRANCE (CE)3.CONTROL OF FLOW RATES: STORM WATER DETENTION: NO DETENTION IS PROPOSED FOR THE SITE SINCE THE WORK SHOULD BE COMPLETED IN A SHORT PERIOD OF TIME.BMP'S NONE PROPOSED4.INSTALLATION OF SEDIMENT CONTROLS: SEDIMENT CONTROL WILL BE PROVIDED THROUGH A COMBINATION OF FILTRATION THROUGH THE SURROUND ON-SITE VEGETATION, ORFILTER FENCE IF REQUIRED. ,BMP'S: SILT FENCE (SF) SEDIMENT TRAP (ST) INTERCEPTOR SWALE (IS), INLET PROTECTION (IP) AS REQUIRED5.SOILS STABILIZATION: TEMPORARY AND PERMANENT SOIL STABILIZATION WILL BE PROVIDED. TEMPORARY STABILIZATION WILL BE PROVIDED THROUGH THE APPLICATION OFSTRAW AND/ OR PLASTIC SHEETING TO EXPOSED, WORKED EARTH. FROM OCTOBER 1 UNTIL APRIL 30, NO EXPOSED SOIL MAY REMAIN EXPOSED AND UNWORKED FOR MORETHAN TWO DAYS; AFTER MAY 1, NO EXPOSED SOIL MAY REMAIN EXPOSED AND UNWORKED FOR MORE THAN SEVEN DAYS.BMP'S: STRAW COVERING, PLASTIC SHEETING, FINAL LANDSCAPING(AS REQUIRED)6.SLOPE PROTECTION: THERE ARE NO SLOPES ON THE SITE. HOWEVER, STOCK PILES SHALL BE PROTECTED FROM EROSION THROUGH COVER AND PREVENTION OFCONCENTRATED SURFACE RUNOFF FLOWS.BMP'S: PLASTIC SHEETING, (AS REQUIRED)7.PROTECTION OF PERMANENT DRAIN INLETS: INLET PROTECTION WILL BE PROVIDED FOR ALL CATCH BASINS.BMP'S: INLET PROTECTION (IP).8.STABILIZATION OF CHANNELS AND OUTLETS: ALL CHANNEL SLOPES SHALL BE CONSTRUCTED AND PROTECTED AGAINST EROSION IN ACCORDANCE WITH CITY CODE.BMP'S: NONE REQUIRED9.POLLUTANT CONTROL: POLLUTANTS SHALL BE CONTROLLED THROUGH THE ON-SITE BMP'S PROPOSED ABOVE.10.DEWATERING CONTROL: DE-WATERING: INTERCEPTION OF THE WATER TABLE IS NOT EXPECTED TO OCCUR. NO BMP'S ARE PROPOSED.11.BMP MAINTENANCE: ALL BMP'S AND SWPPP ELEMENTS SHALL BE INSPECTED DAILY AND MAINTAINED AS REQUIRED.12.PROJECT MANAGEMENT: THE PROJECT SHALL BE MANAGED IN A COOPERATIVE EFFORT BY THE PROJECT MANAGER, CONTRACTOR, ENGINEER, AND THE CITY INSPECTOR.DURING THE CONSTRUCTION PROCESS, IF UNFORESEEN ISSUES ARISE THAT CANNOT BE RESOLVED ON SITE, CONSTRUCTION ACTIVITY (OTHER THAN SWPPP MAINTENANCE)SHALL BE HALTED AND THE OWNER'S REPRESENTATIVE AND THE PROJECT ENGINEER ARE TO BE CONTACTED AND INFORMED OF THE SITUATION.13.PROTECT LID FACILITIES: INFILTRATION FACILITIES ARE PROPOSED. THE CONTRACTOR IS REQUIRED TO LOCATED THESE AREAS PRIOR TO CONSTRUCTION AND INSTALL ABARRIER (I.E. SILT FENCE OR HIGH-VIS FENCE) AROUND THE FACILITY TO PROTECT THE UNDERLYING SOILS FROM COMPACTION.REMOVEEX. GARAGESAWCUTUSE EXISTING DRIVEWAY FOR EARLYDEMOLITION AND SITE PREPARATIONREMOVE EX. CONCRETE DRIVEWAYAFTER USEINSTALL CONSTRUCTION/SILT FENCEAROUND INFILTRATION AREA.AREA MUST NOT BE SUBJECTCONSTRUCTION EQUIPMENTCOMPACTION. (TYP)PROTECT YARD DRAIN ANDCATCH BASINS WITH INLETPROTECTION (TYP)SILT FENCE (TYP)CONSTRUCTIONENTRANCEBENCHMARK: CITY OF RENTON:RENTON 1837 ELEV. = 317.22 NAVD88DATUMNAVD 1988LEGAL DESCRIPTION:LOT A, CITY OF RENTON LOT LINE ADJUSTMENT NO.ULA-00-011-LLA AS RECORDED UNDER RECORDING NUMBER20000601900016, RECORDS OF KING COUNTY, WASHINGTON.REFERENCE SURVEY:RENTON LOT LINE ADJUSTMENT A.F.N. 20000601900016ASPHALT TO BE REMOVEDORANGE BARRIER FENCESILT FENCECONSTRUCTION ACCESSINLET PROTECTIONSTOCKPILE AREASAWCUT/LIMITS OF GRINDEX. TREES TO REMAINPROTECT EXISTING TREES WITH CHAIN LINK FENCEREMOVE EXISTING TREES/SHRUBSTO BE REMOVEDTREE PROTECTION FENCINGTBRSTOCKPILETREES #5-#18 APPEAR TO BE ON THEADJACENT PROPERTY. CARESHOULD BE TAKEN AROUND THEROOT ZONE OF THE EXISTING TREES.NLANDSLIDE HAZARD BOUNDARYOBTAINED FROM COR GIS MAP1.CONTRACTOR SHALL PREPARE A SEATTLE AND KING COUNTYPUBLIC HEALTH "REPORT OF WASTE WATER TANKABANDONMENT" APPLICATION AND RETURN COMPLETED FORMTO PUBLIC HEALTH – SEATTLE & KING COUNTY,ENVIRONMENTAL HEALTH DIVISION, 14350 SE EASTGATEWAY,BELLEVUE, WA, 98007, TEL. (206) 296-4932.2.PRIOR TO ABANDONMENT THE SEPTIC TANK AND ALL SEWAGEEFFLUENT IN DRAIN FIELD MUST BE PUMPED AND DISPOSED OFBY A WASHINGTON STATE CERTIFIED LIQUID WASTE PUMPERHAULER TO AN APPROVED DISPOSAL FACILITY.3.THE SEPTIC TANK AND DISTRIBUTION STRUCTURES MUST BEREMOVED AND DISPOSED OF PROPERLY.4.PRIOR TO REMOVAL OF ANY TYPE OF “DRAINFIELD,” THESYSTEM MUST BE ALLOWED A DRYING OUT PERIOD OF SIXTY(60) DAYS OR LONGER BEFORE REMOVAL TO ENSURE THAT NOLIQUID SEWAGE EFFLUENT IS PRESENT. THIS WILL MINIMIZETHE POTENTIAL FOR DIRECT HUMAN CONTACT WITH ANYSEWAGE AND HELP PREVENT SPILLS OR LEAKAGE ON BOTHPRIVATE PROPERTY AND PUBLIC ROADWAYS.5.THE GEO-TEXTILE FABRIC AND DISTRIBUTION PIPING ORSYNTHETIC MEDIA MUST BE REMOVED, DRIED AND DISPOSEDOF AT A PERMITTED SANITARY LANDFILL AS MUNICIPAL SOLIDWASTE. THIS MATERIAL MUST NOT BE MIXED WITH THE SOIL IFTHE SOIL IS TO BE REUSED OR SPREAD.6.THE DISTRIBUTION MEDIA, IF ROCK, MUST BE HAULED OFF SITEFOR BURIAL OR STOCKPILING IN A REMOTE LOCATION TOMINIMIZE HUMAN EXPOSURE TO POTENTIAL PATHOGENS ANDALLOW FOR PATHOGEN DIE-OFF.7.BACKFILL WITH CLEAN GRAVEL OR FILL SOIL.SEPTIC SYSTEM ABANDONMENT NOTES:SEPTIC TANK ANDDRAINFIELD. SEEREMOVAL NOTESREMOVEEX FENCEREMOVE FENCESURVEY LEGEND:SAWCUTTBRTBRSAWCUTPROPOSEDLOT LINEREMOVE UTILITIESBY OTHERSTBRREMOVEFENCEREMOVE UTILITIESBY OTHERSREMOVE UTILITIESBY OTHERSABANDON EXWATER METERAT MAINREMOVE UTILITIESBY OTHERS - TO BEUNDERGROUNDEDSAWCUTKnow what'sbelow.before you dig.CallR SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS30'30'15'15'LOT A7,762.4SFLOT B7,547.2SFDSDSDSDS5-FOOT WIDE CONCSIDEWALK PER CORSTAND PLAN 102YD-1RIM 307.87IE 6" (S) 305.37IE 6" (N) 305.37DRYWELL #19' DIA. X 4' DPDRYWELL #39' DIA. X 3' DPYD-3RIM 307.55IE 6" (SE) 305.05IE 6" (NWW) 305.05CONCRETE DRIVEWAY TYPE R1BPER COR STD PLAN 104.3PERPENDICULAR CURBRAMP B PER WSDOTSTD PLAN F-40.15-035' WIDE ASPHALT RAMP (7.5% MAX.)20' SETBACK13' ROWDEDICATIONPT STA:10+38.17OFF:13.00' RTRAFFIC CURB AND GUTTERCOR STD PLAN 101L=39.39', R=25.00'Δ90°15'56"N89°14'07"W 118.16'PC STA:0+53.13OFF:13.00' L29LF, 12" SD @ 1.09%IE 12" (N)=300.28STA:10+72.44OFF:9.40' LSTA:10+22.06OFF:9.31' LPAINT 4" WHITE FOGLINEREFUGE AREA INEXISTING ASPHALTEX. STOP SIGN ANDSTOP BAR TOREMAINYD-2RIM 308.36IE 8" (W) 305.86IE 6" (S) 305.86DRYWELL #26.6' DIA. X 3' DP5' SETBACK15'SETBACK12' DRIVELANE21'60'26'45'4' WALKWAY20' DRIVEWAY4' WALKWAY20' DRIVEWAY5' SETBACK5' SETBACK15' ESMT1'20' SETBACK6" RD @2% MIN. (TYP)6" RD @2% MIN. (TYP)END CURB AND GUTTERMATCH EXISTINGSTA:1+72.80, OFF:13.48' LPERPENDICULAR CURBRAMP B PER WSDOTSTD PLAN F-40.15-039.4'5'8'8'5'6'BEGIN CURB AND GUTTER STA:11+56.33OFF:13.50' REX FH TOREMAINEX POLE TOREMAINGFF=308+8" SD @ 2% MIN. (TYP)ABANDON EX WATERMETER AT MAINPAVEMENT RESTORATIONPER COR STD DETAIL 11013'12" IE 304.93(S)12" IE 304.93(NE)TOP=307.990+45.76, 13.24' LTCB 3 TYPE 112" IE 303.10(S)12" IE 303.10(N)TOP=306.101+63.33, 12.00' LTCB 4 TYPE 1118LF 12" SD @ 1.56%12" IE 300.49(S)12" IE 300.49(N)TOP=304.482+31.76, 14.47' LTCB 5 TYPE 168LF 12" SD @ 3.81%43LF 12" DI @ 0.50%143LF 8" PVC @ 0.50%1+57.60, 16.95' RTTOP=306.38IE IN 298.65SSMH 1, TYPE 2 48"12" IE 305.13(SW)12" IE 305.13(E)TOP=308.340+27.34, 48.29' LTCB 2 TYPE 140LF 12" SD @ 0.50%12" IE 305.97(W)TOP=308.970+27.82, 153.65' LTCB 1 TYPE 1105LF 12" SD @ 0.80%5' WIDE ASPHALT RAMP (7.5% MAX.)STA:0+14.96STOP BAR PER COR STD PLAN 128STOP SIGN PER COR STD PLAN 129STA:2+57.98OFF:16.31' LSTA:2+65.77OFF:17.02' LSTA:2+83.03OFF:27.17' LCB 6RIM 307.2IE 8" (NW) 304.2CB 7RIM 307.6IE 8" (N) 304.6307.8307.8RELOCATE EX SIGN1.5' THICKENEDEDGENE 27TH ST EXISTING GRADE@ CLNE 28TH ST 143LF 8" PVC @ 0.50%SSMH 18" IE 298.65 (N)RIM EL 306.3843LF 12" DI @ 0.50%EX CB12" IE 300.28 (N)RIM EL 302.78CB 4 TYPE 112" IE 303.10 (N)12" IE 303.10 (S)RIM EL 306.10CB 5 TYPE 112" IE 300.49 (N)12" IE 300.49 (S)RIM EL 304.48118LF 12" SD @ 1.56%CB 3 TYPE 112" IE 304.93 (NE)12" IE 304.93 (S)RIM EL 307.99EX SMH8" IE 297.93 (S)RIM EL 307.58PC STA:0+53.13ELEV:307.30END CURB AND GUTTERSTA:1+72.80ELEV:305.94FINISH GRADE@ FLOW LINE18055APRIL 15, 2021REV DESCRIPTIONREV DATEREVph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFGRADING ANDDRAINAGE PLANC3.0DAFDAFDRAINAGE NOTESSURFACE WATER DRAINAGE NOTES AND SPECIFICATIONS1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE HELD WITH THECITY OF RENTON PLAN REVIEWER.2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1996 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPALCONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OFRENTON PUBLIC WORKS DEPARTMENT.3.THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILEIN THE PUBLIC WORKS DEPARTMENT. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROMTHE CITY OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.4.A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.5.DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 METERS, AND FOR HORIZONTAL CONTROLSHALL BE NORTH AMERICAN DATUM 1983/1991 METERS UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON PUBLIC WORKSDEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS.6.ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, ANDTHEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON-SITE EROSIONHAS PASSED.7.ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALLCONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITYSECTION.8.GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON APPROVEDSTANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE PUBLIC WORKS DEPARTMENT,SURFACE WATER UTILITY SECTION.9.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THISSHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL ASPLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THEPIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C", WITH THEEXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED O MINIMUM 95 FOR PAVEMENT AND STRUCTURAL FILLAND 90 OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6 INCHES OVER AND UNDER PVC PIPE.10.GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT TREATMENT #1 ORBETTER INSIDE AND OUTSIDE.11.STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE PIPE, OR 15 FEET FROMTHE TOP OF ANY CHANNEL BANK.12.ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.13.OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT OF WAY WILL NOT BE ALLOWED UNLESS SPECIFICALLYAPPROVED BY CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS ADMINISTRATOR.14.ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED. SHALL BE OF SOUND QUARRY ROCK PLACED TO ADEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 70 PASSING; 2 - 4 INCH ROCK /30 - 40 PASSING; AND LESS THAN 2 INCH ROCK / 10 - 20 PASSING.15.ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESSAPPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIEDAS-BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY UPON COMPLETION.16.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF THECONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITYOF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDEDDURING CONSTRUCTION.17.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROTECTIVEEQUIPMENT, F1AGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, ANDTO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY WORK WITHINTHE TRAVELED RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLANAPPROVE BY THE PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOTSTANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.18.SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER PROTECTION AREA (APA).N1' CURBLEGENDCATCH BASIN TYPE 1YARD DRAINDRYWELLPROPOSED CONCRETEPROPOSED ASPHALTPROPERTY BOUNDARYSTORM DRAIN LINE6" ROOF DRAINSURFACE FLOW ARROWRIDGELINEGRIND ANDOVERLAYGRIND ANDOVERLAYSCALE: H:1"=20' ; V:1"=5'ABERDEEN AVE NER25'R26'ESTIMATED EARTHWORK QUANTITIESCUT = 500 CYFILL = 550 CYNET = 50 CY (FILL)30'15'EX R/W13' DEDICATED R/W28'5'CONC.WALK8'LANDSCAPINGEX PAVEVARIES11'2'EX R/W℄R/WR/WSAW CUT EXIST. EDGE OF PAVEMENT 2' INSIDE W/NEAT LINE CUT, CLEAN HEATAND TACK EDGES W/SEALER CSS-1 ANDSEAL WITH HOT ASPHALT CEMENT3" CLS B ASPHALT OR MATCH EXISTWHICHEVER IS GREATER3" COMPACTED ATB OR CLS 16' COMPACTED DEPTH GRAVEL BORROWNE 28TH ST HALF STREET IMPROVEMENTSSECTION ANTS2%ABERDEEN AVE HALF STREET IMPROVEMENTSSECTION BNTS30'30'5'CONC.WALK8'LANDSCAPINGEX PAVEVARIES11'2'EX R/W℄R/WR/W3" COMPACTED ATB OR CLS 16' COMPACTED DEPTH GRAVEL BORROW2%SAW CUT EXIST. EDGE OF PAVEMENT 2' INSIDE W/NEAT LINE CUT, CLEAN HEATAND TACK EDGES W/SEALER CSS-1 ANDSEAL WITH HOT ASPHALT CEMENT3" CLS B ASPHALT OR MATCH EXISTWHICHEVER IS GREATER0.5'0.5' 18055APRIL 15, 2021REV DESCRIPTIONREV DATEREVph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFROAD DETAILSAND NOTESC3.1DAFDAFCITY OF RENTON TRENCH RESTORATION AND STREET OVERLAY REQUIREMENTSPURPOSETHE PURPOSE OF THIS CODE SECTION IS TO ESTABLISH GUIDELINES FOR THE RESTORATION OF CITYSTREETS DISTURBED BY INSTALLATION OF UTILITIES AND OTHER CONSTRUCTION ACTIVITIES. ANYPUBLIC OR PRIVATE UTILITIES, GENERAL CONTRACTORS, OR OTHERS PERMITTED TO WORK IN THEPUBLIC RIGHT-OF-WAY WILL ADHERE TO THE PROCEDURES SET FORTH IN THIS POLICY.DEFINITIONENGINEER: THE TERM “ENGINEER” SHALL DENOTE THE CITY PROJECT MANAGER, INSPECTOR AND/ORPLAN REVIEWER, OR THEIR DESIGNATED REPRESENTATIVE.APPLICATIONTHE FOLLOWING STANDARDS IN THIS SECTION SHALL BE FOLLOWED WHEN DOING TRENCH OREXCAVATION WORK WITHIN THE PAVED PORTION OF ANY CITY OF RENTON RIGHT-OF-WAY.MODIFICATIONS OR EXEMPTIONS TO THESE STANDARDS MAY BE AUTHORIZED BY THE COMMUNITYAND ECONOMIC DEVELOPMENT ADMINISTRATOR, OR AUTHORIZED REPRESENTATIVE, UPONWRITTEN REQUEST BY THE PERMITTEE, THE PERMITTEE’S CONTRACTOR OR ENGINEER, ANDDEMONSTRATION OF AN EQUIVALENT ALTERNATIVE.HOURS OF OPERATIONSHOURS FOR WORK WITHIN THE ROADWAY FOR ASPHALT OVERLAYS OR TRENCH RESTORATION SHALLBE AS DIRECTED BY THE TRAFFIC CONTROL PLAN REQUIREMENTS AND THE TRAFFIC OPERATIONSENGINEER.INSPECTIONTHE ENGINEER MAY DETERMINE IN THE FIELD THAT A FULL STREET-WIDTH (EDGE-OF-PAVEMENT TOEDGE-OF-PAVEMENT) OVERLAY IS REQUIRED DUE TO CHANGES IN THE PERMIT CONDITIONS SUCHAS, BUT NOT LIMITED TO THE FOLLOWING:1.THERE HAS BEEN DAMAGE TO THE EXISTING ASPHALT SURFACE DUE TO THE CONTRACTOR’SEQUIPMENT.2.THE TRENCH WIDTH WAS INCREASED SIGNIFICANTLY OR THE EXISTING PAVEMENT ISUNDERMINED OR DAMAGED.3.ANY OTHER CONSTRUCTION RELATED ACTIVITIES THAT REQUIRE ADDITIONAL PAVEMENTRESTORATION.CITY OF RENTON STANDARDSALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARDAND SUPPLEMENTAL SPECIFICATIONS(CURRENT ADOPTED VERSION) EXCEPT WHERE OTHERWISENOTED IN THESE STANDARDS. MATERIALS AND WORKMANSHIP ARE REQUIRED TO BE IN CONFORMANCEWITH STANDARDS FOR THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPALCONSTRUCTION PREPARED BY THE WASHINGTON STATE CHAPTER OF THE AMERICAN PUBLIC WORKSASSOCIATION (APWA) AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) ANDSHALL COMPLY WITH THE CURRENT EDITION, AS MODIFIED BY THE CITY OF RENTON SUPPLEMENTALSPECIFICATIONS.1.AN ASPHALT PAVER SHALL BE USED IN ACCORDANCE WITH SECTION 5-04.3(3) OF STANDARDSPECIFICATIONS. A “LAYTON BOX” OR EQUAL MAY BE USED IN PLACE OF THE POWER-PROPELLEDPAVER. ROLLERS SHALL BE USED IN ACCORDANCE WITH SECTION 5-04.3(4) OF THE STANDARDSPECIFICATIONS. “PLATE COMPACTORS” AND “JUMPING JACKS” SHALL NOT BE USED IN LIEU OFROLLERS.2.TRENCH BACKFILL AND RESURFACING SHALL BE AS SHOWN IN THE CITY OF RENTON STANDARDDETAILS, UNLESS MODIFIED BY THE CITY PERMIT. SURFACING DEPTHS SHOWN IN THE STANDARDDETAILS ARE MINIMUMS AND MAY BE INCREASED BY THE ENGINEER TO MEET TRAFFIC LOADS ORSITE CONDITIONS.3.REQUIREMENT FOR PATCHING, OVERLAY, AND OVERLAY WIDTHS:ALL TRENCH AND PAVEMENT CUTS SHALL BE MADE BY SAWCUT OR BY GRINDING. SAWCUTS ORGRINDING SHALL BE A MINIMUM OF ONE FOOT (1') OUTSIDE THE TRENCH WIDTH. THE TOP TWO INCHES(2") OF ASPHALT SHALL BE GROUND DOWN TO A MINIMUM DISTANCE OF ONE FOOT (1') BEYOND THEACTUAL OUTSIDE EDGES OF THE TRENCH AND SHALL BE REPLACED WITH TWO INCHES (2") OF CLASS BASPHALT, PER CITY OF RENTON STANDARD PLANS. AT THE DISCRETION OF THE ENGINEER, A FULLSTREET WIDTH OVERLAY MAY BE REQUIRED.LANE-WIDTH OR A FULL STREET-WIDTH OVERLAY WILL BE DETERMINED BASED UPON THE LOCATIONAND LENGTH OF THE PROPOSED TRENCH WITHIN THE ROADWAY CROSS-SECTION. CHANGES IN FIELDCONDITIONS MAY WARRANT IMPLEMENTATION OF ADDITIONAL OVERLAY REQUIREMENTS.a.TRENCHES (ROAD CROSSINGS):(1)THE MINIMUM WIDTH OF A TRANSVERSE PATCH (ROAD CROSSING) SHALL BE SIX ANDONE-HALF FEET (6.5'). SEE CITY OF RENTON STANDARD PLANS.(2)ANY AFFECTED LANE WILL BE GROUND DOWN TWO INCHES (2") AND PAVED FOR THE ENTIREWIDTH OF THE LANE.(3)THE PATCH SHALL BE A MINIMUM OF ONE FOOT (1') BEYOND THE EXCAVATION AND PATCHLENGTH SHALL BE A MINIMUM OF AN ENTIRE TRAVELED LANE.(4)IF THE OUTSIDE OF THE TRENCHING IS WITHIN THREE FEET (3') OF ANY ADJACENT LANE LINE,THE ENTIRE ADJACENT TRAVELED LANE AFFECTED WILL BE REPAVED.(5)AN AREA INCLUDING THE TRENCH AND ONE FOOT (1') ON EACH SIDE OF THE TRENCH BUTNOT LESS THAN SIX AND ONEHALF FEET (6.5') TOTAL FOR THE ENTIRE WIDTH OF THEAFFECTED TRAVELED LANES WILL BE GROUND DOWN TO A DEPTH OF TWO INCHES (2"). ATWO-INCH (2") OVERLAY OF CLASS B ASPHALT WILL BE APPLIED PER CITY STANDARDS.b.TRENCHES RUNNING PARALLEL WITH THE STREET:(1)THE MINIMUM WIDTH OF A LONGITUDINAL PATCH SHALL BE FOUR AND ONE-HALF FEET (4.5').SEE CITY OF RENTON STANDARD PLANS.(2)IF THE TRENCHING IS WITHIN A SINGLE TRAVELED LANE, AN ENTIRE LANE-WIDTH OVERLAYWILL BE REQUIRED.(3)IF THE OUTSIDE OF THE TRENCHING IS WITHIN THREE FEET (3') OF ANY ADJACENT LANE LINE,THE ENTIRE ADJACENT TRAVELED LAND AFFECTED WILL BE OVERLAID.(4)IF THE TRENCHING IS GREATER THAN OR EQUAL TO 30% OF LANE PER BLOCK (660 FOOTMAXIMUM BLOCK LENGTH), OR IF THE TOTAL PATCHES EXCEED 12 PER BLOCK, THEN THELANES AFFECTED WILL BE OVERLAID. MINIMUM OVERLAY SHALL INCLUDE ALL PATCHESWITHIN THE BLOCK SECTION.(5)THE ENTIRE TRAVELED LANE WIDTH FOR THE LENGTH OF THE TRENCH AND AN ADDITIONALTEN FEET (10′) AT EACH END OF THE TRENCH WILL BE GROUND DOWN TO A DEPTH OF TWOINCHES (2′′). A TWO-INCH (2′′) OVERLAY OF CLASS B WILL BE APPLIED PER CITY STANDARDS.c.POTHOLING:POTHOLING SHALL MEET THE SAME REQUIREMENTS AS TRENCHING AND PAVEMENTRESTORATION. POTHOLING SHALL BE A MINIMUM OF ONE FOOT (1') BEYOND THE EXCAVATION.ALL AFFECTED LANES WILL BE GROUND DOWN TO A DEPTH OF TWO INCHES (2") AND PAVED NOTLESS THAN SIX AND ONE HALF FEET (6.5') WIDE FOR THE ENTIRE WIDTH OF THE LANE. POTHOLESGREATER THAN FIVE FEET (5') IN LENGTH, WIDTH OR DIAMETER SHALL BE RESTORED TO TRENCHRESTORATION STANDARDS. IN ALL CASES POTHOLES SHALL BE REPAIRED PER RENTONSTANDARD PLANS. RESTORATION REQUIREMENTS UTILIZING VACTOR EQUIPMENT WILL BEDETERMINED BY THE ENGINEER.4.PAVEMENT REMOVAL IN LIEU OF GRINDING:THE CONTRACTOR IN ALL CASES CAN REMOVE THE PAVEMENT IN THE REPLACEMENT AREAINSTEAD OF GRINDING OUT THE SPECIFIED TWO INCHES (2") OF ASPHALT. FULL PAVEMENTREPLACEMENT TO MEET OR EXCEED THE EXISTING PAVEMENT DEPTH WILL BE REQUIRED FORTHE AREA OF PAVEMENT REMOVAL. PATCHING OF PERVIOUS CONCRETE SHALL FOLLOWAMERICAN CONCRETE INSTITUTE (ACI) 522.1-13. POROUS ASPHALT SHALL BE SPECIFIED ON APROJECT-BY-PROJECT BASIS BY THE ENGINEER. PERMEABLE MATERIALS SHOULD BE REPLACEDIN-KIND WHERE FEASIBLE. PATCHING POROUS ASPHALT WITH CONVENTIONAL ASPHALT ISACCEPTABLE IF IT IS NO MORE THAN TEN PERCENT (10%) OF THE TOTAL FACILITY AREA OR DOESNOT IMPACT THE OVERALL FACILITY FUNCTION. APPROPRIATE PRECAUTIONS SHALL BE TAKENDURING PAVEMENT REPAIR AND REPLACEMENT EFFORTS TO PREVENT CLOGGING OF ADJACENTSURFACES.5.TRENCH BACKFILL AND RESTORATION CONSTRUCTION REQUIREMENTS:a.TRENCH RESTORATION SHALL BE EITHER BY A PATCH OR OVERLAY METHOD, AS REQUIREDAND INDICATED ON CITY OF RENTON STANDARD PLANS.b.ALL TRENCH AND PAVEMENT CUTS, WHICH WILL NOT BE OVERLAID, SHALL BE MADE BYSAWCUT OR GRINDING. SAWCUTS SHALL BE A MINIMUM OF TWO FEET (2') OUTSIDE THEEXCAVATED TRENCH WIDTH.c.ALL TRENCHING WITHIN THE TOP FOUR FEET (4') SHALL BE BACKFILLED WITH CRUSHEDSURFACING MATERIALS CONFORMING TO SECTION 4-04 OF THE STANDARD SPECIFICATIONS.ANY TRENCHING OVER FOUR FEET (4') IN DEPTH MAY USE MATERIALS APPROVED BY THEENGINEER OR MATERIALS LAB FOR BACKFILLING BELOW THE FOUR-FOOT (4') DEPTH.d.IF THE EXISTING MATERIAL (OR OTHER MATERIAL) IS DETERMINED BY THE ENGINEER TO BESUITABLE FOR BACKFILL, THE CONTRACTOR MAY USE THE NATIVE MATERIAL EXCEPT THAT THETOP SIX INCHES (6") SHALL BE CRUSHED SURFACING TOP COURSE MATERIAL.e.THE TRENCH SHALL BE COMPACTED TO A MINIMUM NINETY-FIVE PERCENT (95%) DENSITY, ASDESCRIBED IN SECTION 2- 03 OF THE STANDARD SPECIFICATIONS. IN THE TOP SIX FEET (6') OFANY TRENCH, BACKFILL COMPACTION SHALL BE PERFORMED IN EIGHT (8) TO TWELVE-INCH(12") LIFTS. ANY TRENCH DEEPER THAN SIX FEET (6') MAY BE COMPACTED INTWENTY-FOURINCH (24") LIFTS, UP TO THE TOP SIX-FOOT (6') ZONE. ALL TRENCH BACKFILL SHALL BE FIRM ANDUNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN NINETY-TWO PERCENT(92%) OF MAXIMUM DENSITY IN PERMEABLE PAVEMENT AREAS.f.ALL COMPACTION SHALL BE PERFORMED BY MECHANICAL METHODS. THE COMPACTION TESTSMAY BE PERFORMED IN FOUR-FOOT (4') VERTICAL INCREMENTS MAXIMUM. THE TEST RESULTSSHALL BE GIVEN TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO PAVING. THENUMBER AND LOCATION OF TESTS REQUIRED SHALL BE DETERMINED BY THE ENGINEER.d.TEMPORARY RESTORATION OF TRENCHES FOR OVERNIGHT USE SHALL BE ACCOMPLISHED BYUSING MC MIX (COLD MIX), ASPHALT TREATED BASE (ATB), OR STEEL PLATES, AS APPROVED BYTHE ENGINEER. ATB USED FOR TEMPORARY RESTORATION MAY BE DUMPED DIRECTLY INTOTHE TRENCH, BLADED OUT AND ROLLED. AFTER ROLLING, THE TRENCH MUST BE FILLED FLUSHWITH ASPHALT TO PROVIDE A SMOOTH RIDING SURFACE. IF THE TEMPORARY TRENCHRESTORATION DOES NOT HOLD UP, THE CONTRACTOR SHALL REPAIR THE PATCH WITHINEIGHT HOURS OF BEING NOTIFIED OF THE PROBLEM BY THE CITY. THIS REQUIREMENT APPLIES24 HOURS PER DAY, SEVEN DAYS PER WEEK. IN THE EVENT THAT THE CITY DETERMINES TOREPAIR THE TEMPORARY PATCH, THE CONTRACTOR SHALL REIMBURSE THE CITY IN ANAMOUNT THAT IS DOUBLE THE CITY’S COSTS IN REPAIRING THE PATCH, WITH THE SECONDHALF OF THE REIMBURSEMENT TO REPRESENT CITY OVERHEAD AND HIDDEN COSTS.e.ASPHALT CONCRETE CLASS E OR CLASS B SHALL BE PLACED TO THE COMPACTED DEPTH ASREQUIRED AND INDICATED ON CITY OF RENTON STANDARD PLANS OR AS DIRECTED BY THEENGINEER. THE GRADE OF ASPHALT SHALL BE AR-4000W. THE MATERIALS SHALL BE MADE INCONFORMANCE WITH SECTION 9-02.1(4) OF THE STANDARD SPECIFICATIONS.f.TACK COAT SHALL BE APPLIED TO THE EXISTING PAVEMENT AT EDGE OF SAW CUTS AND SHALLBE EMULSIFIED ASPHALT GRADE CSS-1, AS SPECIFIED IN SECTION 9-02.1(6) OF THE STANDARDSPECIFICATIONS. TACK SHALL BE APPLIED AS SPECIFIED IN SECTION 5-04 OF THE STANDARDSPECIFICATIONS.g.ASPHALT CONCRETE CLASS E OR CLASS B SHALL BE PLACED IN ACCORDANCE WITH SECTION5-04 OF THE STANDARD SPECIFICATIONS; EXCEPT THOSE LONGITUDINAL JOINTS BETWEENSUCCESSIVE LAYERS OF ASPHALT CONCRETE SHALL BE DISPLACED LATERALLY A MINIMUM OFTWELVE INCHES (12"), UNLESS OTHERWISE APPROVED BY THE ENGINEER. FINE AND COARSEAGGREGATE SHALL BE IN ACCORDANCE WITH SECTION 9-03.8 OF THE STANDARDSPECIFICATIONS.ALL STREET SURFACES, WALKS OR DRIVEWAYS WITHIN THE STREETTRENCHING AREAS SHALL BE FEATHERED AND SHIMMED TO AN EXTENT THAT PROVIDES ASMOOTH-RIDING CONNECTION AND EXPEDITIOUS DRAINAGE FLOW FOR THE NEWLY PAVEDSURFACE. FEATHERING AND SHIMMING SHALL NOT DECREASE THE MINIMUM VERTICAL CURBDEPTH BELOW FOUR INCHES (4") FOR STORM WATER FLOW. THE ENGINEER MAY REQUIREADDITIONAL GRINDING TO INCREASE THE CURB DEPTH AVAILABLE FOR STORM WATER FLOW INAREAS THAT ARE INADEQUATE. SHIMMING AND FEATHERING AS REQUIRED BY THE ENGINEERSHALL BE ACCOMPLISHED BY RAKING OUT THE OVERSIZED AGGREGATES FROM THE CLASS BMIX AS APPROPRIATE. SURFACE SMOOTHNESS SHALL BE PER SECTION 5-04.3(13) OF THESTANDARD SPECIFICATIONS. THE PAVING SHALL BE CORRECTED BY REMOVAL AND REPAVINGOF THE TRENCH ONLY. ASPHALT PATCH DEPTHS WILL VARY BASED UPON THE STREETS BEINGTRENCHED. THE ACTUAL DEPTHS OF ASPHALT AND THE WORK TO BE PERFORMED SHALL BEAS REQUIRED AND INDICATED ON CITY OF RENTON STANDARD PLANS. COMPACTION OF ALLLIFTS OF ASPHALT SHALL BE A MINIMUM NINETY-TWO PERCENT (92%) OF DENSITY ASDETERMINED BY WSDOT TEST METHOD 705. THE NUMBER OF TESTS REQUIRED SHALL BEDETERMINED BY THE ENGINEER. TESTING SHALL BE PERFORMED BY AN INDEPENDENTTESTING LAB WITH THE RESULTS BEING SUPPLIED TO THE ENGINEER. TESTING IS NOTINTENDED TO RELIEVE THE CONTRACTOR FROM ANY LIABILITY FOR THE TRENCHRESTORATION. IT IS INTENDED TO SHOW THE INSPECTOR, AND THE CITY, THAT THERESTORATION MEETS THESE SPECIFICATIONS.h.ALL JOINTS, EXCEPT THOSE ASSOCIATED WITH PERMEABLE PAVEMENT, SHALL BE SEALEDUSING PAVING ASPHALT AR4000W.i.WHEN TRENCHING WITHIN THE UNPAVED ROADWAY SHOULDER(S), THE SHOULDER SHALL BERESTORED TO ITS ORIGINAL CONDITION, OR BETTER.j.THE FINAL PATCH SHALL BE COMPLETED AS SOON AS POSSIBLE AND SHALL NOT EXCEEDFIFTEEN (15) WORKING DAYS AFTER FIRST OPENING THE TRENCH. THIS TIME FRAME MAY BEADJUSTED IF DELAYS ARE DUE TO INCLEMENT PAVING WEATHER OR OTHER ADVERSECONDITIONS THAT MAY EXIST. HOWEVER, DELAYING OF FINAL PATCH OR OVERLAY WORK ISSUBJECT TO THE ENGINEER’S APPROVAL. THE ENGINEER MAY DEEM IT NECESSARY TOCOMPLETE THE WORK WITHIN THE FIFTEEN (15) WORKING DAY TIME FRAME AND NOT ALLOWANY TIME EXTENSION. SHOULD THIS OCCUR, THE CONTRACTOR SHALL PERFORM THENECESSARY WORK, AS DIRECTED BY THE ENGINEER.k.A CITY OF RENTON TEMPORARY TRAFFIC CONTROL PLAN (FROM RENTON TRANSPORTATIONENGINEERING) SHALL BE SUBMITTED AND APPROVED BY THE ENGINEER A MINIMUM OF THREE(3) WORKING DAYS PRIOR TO COMMENCEMENT OF WORK.6.REMOVAL OF UTILITY LOCATE MARKINGS FROM SIDEWALKS REQUIRED:THE PERMITTEE WILL BE REQUIRED TO REMOVE UTILITY LOCATE MARKS ON SIDEWALKS ONLY WITHINTHE CENTER DOWNTOWN ZONE. THE PERMITTEE SHALL REMOVE THE UTILITY LOCATE MARKS WITHIN 14DAYS OF JOB COMPLETION. 18055APRIL 15, 2021REV DESCRIPTIONREV DATEREVph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFSTORM DETAILSAND NOTESC3.2DAFDAFDRAINAGE NOTESSURFACE WATER DRAINAGE NOTES AND SPECIFICATIONS1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE HELD WITH THECITY OF RENTON PLAN REVIEWER.2.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1996 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPALCONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OFRENTON PUBLIC WORKS DEPARTMENT.3.THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILEIN THE PUBLIC WORKS DEPARTMENT. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROMTHE CITY OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.4.A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.5.DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 METERS, AND FOR HORIZONTAL CONTROLSHALL BE NORTH AMERICAN DATUM 1983/1991 METERS UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON PUBLIC WORKSDEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS.6.ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, ANDTHEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON-SITE EROSIONHAS PASSED.7.ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALLCONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITYSECTION.8.GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON APPROVEDSTANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE PUBLIC WORKS DEPARTMENT,SURFACE WATER UTILITY SECTION.9.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THISSHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL ASPLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THEPIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C", WITH THEEXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED O MINIMUM 95 FOR PAVEMENT AND STRUCTURAL FILLAND 90 OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6 INCHES OVER AND UNDER PVC PIPE.10.GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT TREATMENT #1 ORBETTER INSIDE AND OUTSIDE.11.STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE PIPE, OR 15 FEET FROMTHE TOP OF ANY CHANNEL BANK.12.ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.13.OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT OF WAY WILL NOT BE ALLOWED UNLESS SPECIFICALLYAPPROVED BY CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS ADMINISTRATOR.14.ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED. SHALL BE OF SOUND QUARRY ROCK PLACED TO ADEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 70 PASSING; 2 - 4 INCH ROCK /30 - 40 PASSING; AND LESS THAN 2 INCH ROCK / 10 - 20 PASSING.15.ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESSAPPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIEDAS-BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY UPON COMPLETION.16.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF THECONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITYOF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDEDDURING CONSTRUCTION.17.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROTECTIVEEQUIPMENT, F1AGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, ANDTO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT. ANY WORK WITHINTHE TRAVELED RIGHT OF WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLANAPPROVE BY THE PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOTSTANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.18.SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER PROTECTION AREA (APA).SEE PLANSEE PLAN SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS30'30'15'15'LOT A7,762.4SFLOT B7,547.2SFDSDSDSDS20' SETBACK13' ROWDEDICATION5' SETBACK15'SETBACK12' DRIVELANE21'60'26'45'4' WALKWAY20' DRIVEWAY4' WALKWAY20' DRIVEWAY5' SETBACK5' SETBACK15' ESMT1'20' SETBACK9.4'5'8'8'5'6'13'143LF 8" PVC @ 0.50%1+57.60, 16.95' RTTOP=306.38IE IN 298.65SSMH 1, TYPE 2 48"1.5' THICKENEDEDGENE 27TH ST EXISTING GRADE@ CLNE 28TH ST 143LF 8" PVC @ 0.50%SSMH 18" IE 298.65 (N)RIM EL 306.3843LF 12" DI @ 0.50%EX CB12" IE 300.28 (N)RIM EL 302.78CB 4 TYPE 112" IE 303.10 (N)12" IE 303.10 (S)RIM EL 306.10CB 5 TYPE 112" IE 300.49 (N)12" IE 300.49 (S)RIM EL 304.48118LF 12" SD @ 1.56%CB 3 TYPE 112" IE 304.93 (NE)12" IE 304.93 (S)RIM EL 307.99EX SMH8" IE 297.93 (S)RIM EL 307.58PC STA:0+53.13ELEV:307.30END CURB AND GUTTERSTA:1+72.80ELEV:305.94FINISH GRADE@ FLOW LINE18055APRIL 15, 2021REV DESCRIPTIONREV DATEREVph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFSEWER AND WATERPLANC4.0DAFDAFCONNECT TO EXISTINGSEWER WITH NEW6" SIDE SEWER@ 2% MINNABANDON EX WATERMETER AT MAINPAVEMENT RESTORATIONPER COR STD DETAIL 110CONNECT TO EXISTINGWATER WITH NEW1" SERVICEPROPOSED1" WATER METERCONNECT TO EXISTINGWATER WITH NEW1" SERVICEPROPOSED1" WATER METERCONNECT TO EXISTINGSEWER WITH NEW6" SIDE SEWER@ 2% MIN6" SSCO6" SSCOSEWER NOTESSANITARY SEWER NOTES AND SPECIFICATIONS1.ALL WORK AND WORK MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OFTHE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THEWSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON IN THERENTON STANDARD PLANS & SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMESDURING CONSTRUCTION.2.THE HOURS OF WORK IN THE STREET RIGHT OF WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESSOTHERWISE APPROVED IN WRITING BY THE PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT. AN APPROVEDTRAFFIC CONTROL PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN PUBLIC RIGHT OF WAY.3.ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'SRESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.4.A PRE-CONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEWCONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIORTO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OFRENTON.) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS INSPECTOR 24HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION.5.CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION ANDFOR THE SAFETY 0 WORKERS AND OTHERS ON THE CONSTRUCTION SITE.6.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATEDPERMITS PRIOR TO ANY CONSTRUCTION,7.PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALLOTHER PLANS.8.A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.9.THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT DRAWING OF THE SANITARY SEWERSYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSEDPROFESSIONAL SURVEYOR.10.BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTHOF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUMDENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TOTHE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.11.OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLEDWITH CRUSHED ROCK AND MECHANICALLY COMPACTED UNLESS OTHERWISE APPROVED BY UTILITYSPECIFICATIONS DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 METERS,AND FOR HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 1983/1991 METERS UNLESS OTHERWISEAPPROVED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONSARE NOTED ON THE PLANS.12.ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OFTHE DEPARTMENT FOR THE PREVENTION OF ON-SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION.13.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITHTHE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKSDEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVEDAND MODIFIED BY THE CITY OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. THIS SHALLINCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELLAS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRELENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL BEPEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE.14.SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM 0 3034, SDR 35, ORDUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE WASTEWATER UTILITY.15.IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 12 INCHES ABOVE FINISHEDGRADE OR MUST HAVE MINIMUM 2' DIAMETER CONCRETE RING POURED AT GRADE. IN PAVED AREA. COVER MUSTSLOPE IN ALL DIRECTIONS TO MATCH PAVING.SCALE: H:1"=20' ; V:1"=5'ABERDEEN AVE NE 18055APRIL 15, 2021REV DESCRIPTIONREV DATEREVph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFSEWER AND WATERDETAILSC4.1DAFDAFN DAFTRAFFIC CONTROLPLANC5.0DAFDAFRKnow what's below.Call before you dig.18055APRIL 15, 2021ph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT7/27/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTED DAFTRAFFIC CONTROLPLANC5.1DAFDAFRKnow what's below.Call before you dig.18055APRIL 15, 2021ph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT7/27/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTED SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS30'30'15'15'LOT A7,762.4SFLOT B7,547.2SFTEMPORARY CHA I N L I N K F E N C E 18055APRIL 15, 2021ph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFTREE RETENTIONPLANC6.0DAFDAFORANGE BARRIER FENCESILT FENCEEX. TREES TO REMAINDRIP LINEREMOVE EXISTING TREES/SHRUBSNSURVEY LEGEND:Know what'sbelow.before you dig.CallRTREE NOTE:ALL TREES ARE HEALTHY AND WILL REMAIN ON PROPERTY.ALL TREES WILL BE PROTECTED WITH A 6' CHAIN LINK FENCE,SEE TESC PLAN ON SHEET C2.0TREE PROTECTION BARRIERSSHALL CONSIST OF A TEMPORARYFOUR-FOOT HIGH (MINIMUM)CHAIN LINK FENCE OR A LINE OFORANGE COLORED 2"X4" STAKESPLACED NO MORE THAN TEN FEETAPART CONNECTED BY HIGHLYVISIBLE SURVEYOR'S RIBBON, ANDSIGNS READING "TREE SAVEAREA." SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS30'30'15'15'LOT A7,762.4SFLOT B7,547.2SF18055APRIL 15, 2021ph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFLANDSCAPE PLANC7.0DAFDAFNKnow what'sbelow.before you dig.CallRPLANT SCHEDULE:TREESBOTANICAL / COMMON NAMESIZEQTYACER PALMATUM / JAPANESE MAPLEMAGNOLIA GRANDIFLORA / LITTLE GEM2" CAL. MINWELLFORMED42" CAL.MIN WELLFORMED4HYDROSEED FOR TYPICAL LAWN AREASSUNMARK NATIVE ECOTURF - OR EQUIV.Sunmark Seeds www.sunmarkseeds.comBotanical Name Common Name% by WeightFestuca rubraNative Red Fescue45%Bouteloua gracilisBlue Grama25%Buchate dactyloides Buffalograss20%Koeleria macranthaPrairie Junegrass7%Trifolium fragiferumStrawberry Clover3%1 lbs per 1,000 sf or 43.67 lbs per acreSTREET TREE, TYPMAGNOLIA TREE, TYPHYDROSEED, TYP30'30'32'5'30'GAULTHERIA SHALLON / SALAL1 GAL.@ 3 FT1,051SF30'RHODODENDRON MACROPHYLLUM /PACIFIC RHODODENDRON2 GAL.24" HT MIN8POTENTILLA FRUTICOSA /BUSH CINQUIFOIL2 GAL.24"HT MIN22ACER TRUNCATUM / PURPLEBLOW MAPLE2" CAL.MIN WELLFORMED220'10'MAPLE TREE, TYP NKnow what'sbelow.before you dig.CallR18055APRIL 15, 2021ph 206.890.82914715 142nd Pl. SW #B,Edmonds, WA 98026NE 1/4 NE 1/4 SEC. 5, T 23N, R 05E, W.M.ABERDEEN AVE 2-LOT SHORT PLAT10/4/2021RGGNAFURSEFORPIANOELTSGESINEREDE E AT D S NT AWFO.SAHII NRE E NOTR46937NOTEDDAFLANDSCAPE NOTESAND DETAILC7.1DAFDAFGENERAL LANDSCAPE NOTES1.Contractor is responsible for obtaining all necessary permits from the appropriate agency prior tocommencing work. Contractor shall contact Line Locators (811) a min. of 48 hours prior to any diggingor trenching. If there are any discrepancies with existing lines and landscaping, it is the contractor'sresponsibility to contact the landscape architect and request a site visit to address the conflicts.Contractor shall comply and conform to any and all local and state codes for work, schedules and anyother project related requirements.2.Contractor shall coordinate directly with the landscape architect for all landscape related issues,concerns, inspections and approvals. Contractor shall provide the landscape architect with a writtenrequest for a site visit to address any related items.3.Scope of work shall include any and all specified and unspecified but related incidental work to achievethe design indicated on the landscape plans. All labor, materials, subcontractors, equipment, andrelated incidental items shall be supplied and installed to achieve a complete project, unless directedotherwise by the general contractor or landscape architect.4.Contractor to verify all sub grades are set below required amendments to insure the finished grade willmatch what is intended by civil or drainage design. All sub grades and finished or final grades shall begraded to drain to the designed drainage system with positive drainage away from all structures.5.Grade Preparation:Slopes used for grass plantings or turf shall be less than 3:1 or 33 percent. Otherwise plantings shouldnot require mechanized mowing equipment.Soil Preparation:a. Where soils are compacted, planting beds should be deep tilled to a depth of at least 12 inches.Soils shall be enhanced through the addition of the following materials: bark and forestry by-products,organic matter such as composted yard waste, organics and other amendments as needed through asoils test. Where Pit Planting, see planting detail for planting ring sizes and depths. Scarify the edgesof planting pits to encourage root expansion.b. On project sites where topsoil is limited or nonexistent, a minimum depth of 6 (six) inches of sandyloam topsoil should be tilled into the soil to a depth of 12 inches through all planting areas withcompacted soils.c. For all newly planted areas, three cubic yards of composted organic matter per 1,000 square feet oflandscape area should be added to a depth of four inches to the top of the soil and Tilled in.d. Seeded areas shall be fine graded and rolled. New Soil depths in lawn areas shall be 4 Inches.6.Mulching of Newly Planted or Replanted Areas.a. Mulches must be applied to the following depths: a minimum 3 (three) inches over bare soil.b. Mulches must include organic materials, such as wood chips and shredded bark.c.Nonporous materials, such as plastic sheeting, shall not be used in any area of the landscapebecause of down-slope erosion and potential soil contamination from herbicide washing.d. Mulch should be applied regularly to and maintained in all planting areas to assist soils in retainingmoisture, reducing weed growth, and minimizing erosion.7.Contractor shall field layout all plant material and contact the landscape architect for a site visit toapprove the layout. Any field modifications shall be done by the landscape architect prior to planting.8.Contractor shall immediately notify the landscape architect of any poor drainage condition in landscapeNo standing water shall be permitted in any landscape areas - either on the surface or below thetopsoil. The landscape architect shall coordinate the drainage solution with the general contractor andcivil engineer. Once the concerns have been remedied planting shall commence.9.All groundcover to be planted in a triangular spacing formation, equal in all directions to the centers ofthe groundcovers in distances indicated in the legend. Contractor shall verify all quantities ofgroundcovers by area calculations and spacing requirements.10.Landscaping is to be per plan. Plant substitutions due to availability or otherwise will be allowed onlywith landscape architect, owner and agency approval. Any substitutions will be with material of similarsize, growth characteristics, and quality.11.All trees must be staked as necessary so as to maintain material in a healthy, vigorous growingcondition.12.Landscaping shall be installed in a professional workmanlike manner that is consistent and acceptedthroughout the industry. All landscape and irrigation work shall be performed by experienced personsfamiliar with scope of project.13.All landscape material and labor is to be guaranteed for a period of one full year from the time ofcompletion.14.When planting 'Balled and Burlapped' product, remove all burlap, string & wire from any B&B plantmaterial, cut and remove jute strings. Gently place in tact Rootbal into planting pit. If rootball breaks oris not solid - the plant is unacceptable and shall be replaced.15.Street trees shall have caliper size of at least 1 1/2" measure per American Association ofNurserymen Standards.16.Street trees shall be high branching with canopy that starts at least 6' above finish grade.17.All plant I.D. tags are to remain on the plant material until final inspection has been completed. Onceapproved all plant I.D. tags shall be removed and discarded appropriately.18.Trees shall be cared for in accordance with the American National Standards Institute (ANSI)standard practices for trees, shrubs and other woody plant maintenance (ANSI 300) in order to allowthem to reach there mature height and form.19.Pruning of street trees shall be performed per the ANSI 300 standards so as to maintain the naturalform of the tree, encourage vigorous growth to a mature spread and height, and avoid weakening thetree to create a hazard. Street trees shall not be topped pollarded, or otherwise pruned in a mannercontrary to these goals, unless there is no practicable alternative that would preserve essential utilityservices.20.Plant material selected is drought tolerant or native species. The project proponent shall beresponsible for maintaining and watering all plant material throughout the first growing season andin times of drought. Temporary irrigation shall be provided via TREE GATOR BAGS attached toeach tree. A temporary method for watering the planting areas shall consist of minimally a hose bibaccess to the area and drip hoses on a battery operated hose bib timer. For planting warrantiesfrom contractor to be ensured, contractor shall be responsible for watering the plant material andkeeping the mulch ring weed free for the first growing season as part of the contract.It is recommended to install the landscaping in the Spring (February - April) or Fall (October -December)whendormant but before hard freeze.TEMPORARY IRRIGATIONThe project proponent shall ensure that a minimum of one (1) inch of water is supplied each week tothe restoration area between May 1 and October 15 for a least the first two years following initial planting.The calculated amount of required water shall include both natural rainfall and temporary irrigation.Street trees may be substituted with approved City of Renton Street tree list. NOTES:ROYEREGISTE R E DPROFE S SIONAL LAN D S U R V42428 NOTGNIHSAWFOETATSETSIRHCP.NH JON S ENSCALE 1" = 20'LEGAL DESCRIPTION:LEGEND: