Minor Franchise Permit: MFP21005028
IVR Number: 21005028
Permit Information
Permit Name: North Renton COR Node 290 Seg 10
Address/Location:10/14/2021Application Date:0886600040Parcel Number: 955 PARK AVE N
Permit Type:10/25/2021Issue Date:Franchise
Permit Work Class:10/25/2022Expiration Date:Minor Utility
Job Number: Node 290 seg 10Franchise Type:Telephone
Description: CORE WEST WALL OF CTL VAULT TO BREAK OUT. OPEN TRENCH WEST TO SIDEWALK AND PLACE (1) 2436
HH. INSTALL NEW SPLICE CASE AND COIL SLACK FOR FUTURE CONNECTION TO SMALL CELL.
Contacts
Name Address PhoneTypeBilling
Michael Karalus
Waeco
18543 Cascade View Dr SE
Monroe, WA 98272
ApplicantX
Rachel Fenton
Extenet Systems LLC
3030 Warrenville Rd
Lisle, IL 60532
Applicant
Wade Edelbrock
Waeco Construction LLC
18543 Cascade View Dr SE
Monroe, WA 98272
B: (360) 794-7785
C: (206) 423-7074
Contractor
Business License Number: 37230Construction Contractor: WAECOCL930LF
CPT THE LANDING LLC 2425 E CAMELBACK RD #750
PHOENIX , AZ 85016
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
ExteNet
NW-WA-STTKNT07-VZW
Michael Karalus
955 Park Ave N
Core existing CTL vault in south bound travel lane and trench west
(425)408-2595
michael.karalus@waecoeng.com
North Renton_Node 290_Seg 10
X
Waeco Construction LLC (360)794-7785
WAECOCL930LF 37230
10/14/21
to set new HH in sidewalk. Place (1)-4" conduit and pull fiber through.
X XX
X 11
MFP21005028
Scott Warlick CED 10/25/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 3/18/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/18/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
▪ Include map(s) showing the location of the project and work area.
▪ Be legible lettering and clear, contrasting, symbols of viewing or printing.
▪ Must indicate street names, and north arrow and scale.
▪ Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Waeco Construction LLC
Michael Karalus (425) 408-2595
18543 Cascade View Dr SE Monroe/ WA 98272
X
X
North Renton_Node 290_Seg 10
955 Park Ave N
Core existing CTL vault in south bound travel lane and trench west
to set new HH in sidewalk. Place (1)-4" conduit and pull fiber through.
MFP21005028
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 10/25/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 3/18/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
• Must have approved Traffic Control Plan (TCP) prior to commencing the work.
• Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
• WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
• All permit conditions shall be met.
NOTES:
• Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
• In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 3/18/2021
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Michael Karalus
10/14/2021
Page 1 of 1
North Renton Node 290 Seg 10 Overview Map
MFP21005028
Page 1 of 1
NOTES:
1. ALL SIGNS ARE 36" - 48" ACROSS
2. ASTERISK DENOTATES X, L, OR B DISTANCES ARE NOT TO SCALE
3. CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS
4. STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN
5. FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED
6. IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'
7. SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB
8. NO PARK SIGNS ARE TO BE PUT UP 72 HOURS PRIOR TO CONSTRUCTION
SIGN SPACING = XRURAL ROADS 45/55 MPH 500'
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'
RURAL ROADS & URBAN ARTERIALS 25/30 MPH 200'
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100'
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERCHANGE RAMPS, AT-GRADE INTERSECTIONS AND
DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FITROADWAY CONDITIONS.
TYPE OF TCP: WORK HOURS PHASE OF WORK:
TRAFFIC CONTROL PLAN
NCHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50 40 80 35/45 30 60 25/30 20 40
LANE MINIMUM TAPER LENGTH = L (FEET) WIDTH POSTED SPEED (MPH) (FEET) 25 30 35 40 45 50 10 105 150 205 270 450 500 11 115 165 225 295 495 550 12 125 180 245 320 540 600
BUFFER DATALONGITUDINAL BUFFER SPACE = BSPEED (MPH) 25 30 35 40 45 50 55 60 65 70
LENGTH (FEET) 155 200 250 305 360 425 495 570 645 730
LEGEND
TRAFFIC CONES
TEMP SIGN LOCATION
WORK VEHICLE
Page 1 of 1
TCP COMPLETED: OCTOBER 1, 2021HOURS OF TCP: 8AM-5PM24 HR CONTACT:DAVID MENDOZA951.400.9673DMENDOZA@EXTENETSYSTEMS.COMJOB NUMBER: COR NODE 290 - SEG 10JOB ADDRESS: 955 PARK AVE NDESCRIPTION: OPEN TRENCH, INSTALL NEWSPLICE CASE
PARK AVE N
N 10TH ST
N 8TH ST
11'
11'
12'
11'
11'
11'
11'
11'
11'
ROADWORK AHEAD
W20 - 1W20-1
BIKELANE ENDS
W9 - 1B
RIGHT LANE
AHEADCLOSED
W20-5R
W4 - 2W4-2R
X*X*X*
SPEEDLIMIT35
R2 - 35
30
WORK AREA
ARROWBOARD
R7-T39 NO PARKR7 - T39R7 - T3936" x 24"
MFP21005028
ADDRESS: 955 PARK AVE N, RENTON, WA 98057PROJECT NAME: COR_NODE290-SEG10SITE LOCATIONCONTACTSSITE INDEXDANIEL MENDOZASUPERVISOREXTENETDMENDOZA@EXTENETSYSTEMS.COM951.400.9673JOSEPH PARKERENGINEER MANAGERWAECO ENGINEERINGJPARKER@WAECOENG.COM253.315.33261 - COVER SHEET/SITE LOCATION2 - LEGEND3 - GENERAL NOTES4 - DESIGN VIEW5 - RESTORATION PLAN6 - SITE PHOTOGRAPHS7 - RESTORATION TYPICALS8 - UNDERGROUND TYPICALSSCOPE OF WORK:CORE WEST WALL OF CTL VAULT TO BREAKOUT. OPEN TRENCH WEST TO SIDEWALK ANDPLACE (1) 2436 HH. INSTALL NEW SPLICECASE TO SPLICE (1) 48CT FIBER TAIL ANDCOIL SLACK FOR FUTURE CONNECTION TOSMALL CELL.VICINITY MAPCOVER SHEET1ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF8SHEET 4MFP21005028
#F#F#FPX
LEGEND#2ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF8MFP21005028
GENERAL NOTES(1)All design and construction shall be in accordance with permit conditions, the King County Code (KCC),Road Standards (KCRS), Washington State DOT (WSDOT) Standard Specifications and the conditions ofpreliminary approval. It shall be the sole responsibility of the applicant and the professional civil engineer tocorrect any error, omission, or variation from the above requirements found in these plans. All correctionsshall be at no additional cost or liability to King County.(2)The design elements within these plans have been reviewed according to the King County Department ofDevelopment and Environmental Services (DDES) Engineering Review checklist. Some elements mayhave been overlooked or missed by the DDES plan reviewer. Any variance from adopted standards is notallowed unless specifically approved by King County prior to construction.(3)Approval of this road, grading, parking and drainage plan does not constitute an approval of any otherconstruction (e.g. domestic water conveyance, sewer conveyance, gas, electrical, etc.)(4)Before any construction or development activity, a preconstruction meeting must be held between theDDES's Land Use Inspection Section, the Applicant, and the Applicant's Construction Representative.(5)A copy of these approved plans must be on the job site whenever construction is in progress.(6)Grading activities (site alteration) are limited to the hours of 7 a.m. to 7 p.m. Monday through Saturday and10 a.m. to 5 p.m. on Sunday, unless otherwise approved with a written decision by the Reviewing Agency.(7)It shall be the applicant's/contractor's responsibility to obtain all construction easements necessary beforeinitiating off-site work. Easements require review and approval prior to construction.(8)Franchised utilities or other installations that are not shown on these approved plans shall not beconstructed unless an approved set of plans that meet all requirements of KCRS Chapter 8 are submitted tothe DDES's Land Use Inspection Section three days prior to construction.(9)Datum shall be KCAS unless otherwise approved by DDES.(10)Dewatering system (underdrain) construction shall be within a right-of-way or appropriate drainageeasement, but not underneath the roadway section. All underdrain systems must be constructed inaccordance with WSDOT Standard Specifications.(11)All utility trenches and roadway subgrade shall be backfilled and compacted to 95 percent density, standardproctor.(12)Open cutting of existing roadways for non-franchised utility or storm work is not allowed unless specificallyapproved by DDES and noted on these approved plans. Any open cut shall be restored in accordance withKCRS.(13)The Contractor shall be responsible for providing adequate safeguards, safety devices, protectiveequipment, flaggers, and any other needed actions to protect the life, health, and safety of the public, and toprotect property in connection with the performance of work covered by the contractor. Any work within thetraveled right-of-way that may interrupt normal traffic flow shall require at least one flagger for each lane oftraffic affected. Manual on Uniform Traffic Control Devices (MUTCD) shall apply. Work in right-of-way isnot authorized until a traffic control plan is approved by King County.3ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF8MFP21005028
PROJECT SHEETCONSTRUCTION NOTES#4ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF8231NODE NW-WA-WINONASC-00290A1231New vault to beinstalled outside ofthe tree drip lineMFP21005028
RESTORATIONSHEETRESTORATION NOTES#5ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF8ACB1CABMFP21005028
CONSTRUCTION NOTESSITEPHOTOGRAPHS16ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF8123NODE NW-WA-WINONASC-00290A231MFP21005028
RESTORATIONTYPICALS7ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF8MFP21005028
UNDERGROUNDTYPICALS8ENGINEERING FIRM: WAECO ENGINEERINGDRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\EXTENET\BUILT\21096_COR_NODE_290_SEG10\CAD FILES\COR NODE 290_SEG10_PRINTS.DWGSHEET #PROJECT NUMBER: 21096EXTENET ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: EXTENETPERMIT NUMBER: ----955 PARK AVE N,RENTON, WA 98057ORIGINALREV #0REVIEWEDAS-BUILTDATE9/28/21TECHENGCSJJP------------------------WAECO ENGINEER------------DANIEL MENDOZAJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM951.400.9673DMENDOZA@EXTENETSYSTEMS.COMKnow what's below.Call before you dig.ROF83"24"35 1/2"24"40 3/8"28 3/4"Inside DimensionsLengthWidthDepthBULK424T072HDPE STRUCTURAL FOAM/ CHANNELLSHIELD COVRChannell's SGLB AssemblyFEATURES:·Vault body: 24X36X24 inches (Open Floor)·HDPE Body - Channell Polymer Cover - Load ratedTier 22 (ANSI/SCTF 77 2010)·1 SHIELD Cover, Tier 22, with slip Resistant Tread·2 Cover locking bolts, 9/16 stainless steel hex headbolts 3/8-16 UNC x 3 12" thread bolts with washers·2 Box self centering stainless steel corrosion resistantnuts·2 Temporary drop doors: 1 each side·Minimum of 2 lifting slots in cover equipped withstainless steel pins (slots approximately 34" x 2")·4 Reinforced polymer step racks, 2 per side·2 lifting slots approximately 34" x 4" with stainless steellifting pins.WEIGHT & SHIPPING·Cover Weight:50 lbs·Box Weight:55 lbs·Assembly Weight:105 lbs·Loaded Pallet Weight: 210 lbs·Per Pallet #:2·Pallet Dimensions:58"L x 40"W x 42"HLOAD RATINGS:·ANSI/SCTE77TIER 22·Proof Load: 33,750 lbsMFP21005028