Loading...
HomeMy WebLinkAboutAdmin Report Mayor’s Office Memorandum DATE: October 25, 2021 TO: Randy Corman, Council President Members of Renton City Council FROM: Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer SUBJECT: Administrative Report • The King County Vaccine Verification mandate is effective today, Monday October 25. As of today, all King County residents 12 years and older will be required to show proof of full COVID-19 vaccination or results from a negative COVID test (taken within 72 hours) to enter large outdoor events, indoor recreational spaces, and most indoor bars/restaurants. For more information regarding City of Renton facilities impacted by this mandate and types of verification requested to show proof of vaccination, please visit rentonwa.gov/covid. For information about the King County mandate, please visit kingcounty.gov/verify. • City of Renton celebrated the grand opening of Sunset Oaks Apartments in the Sunset Area neighborhood on Friday, October 22. This project, a partnership including the city, King County and Renton Housing Authority, provides 60 units of affordable housing. Sunset Oaks is just one part of the Sunset Area Transformation Plan. For more information, please visit rentonhousing.org/sunset-oaks • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. All projects are weather permitting and unless otherwise noted, streets will always remain open. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations:  Williams Avenue South and Wells Avenue South Conversion Project: Impacts to traffic will continue throughout this area between South 2nd Street and South 3rd Street. Please visit the project webpage at https://rentonwa.gov/ww for more information.  Lake Washington Loop Trail Project Logan Avenue South and Airport Way: Lane closures continue until approximately November. For more information and project updates, please visit the project webpage at https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9346818.  Ongoing Trail Closure: Ripley Lane North Trail closure through fall 2021 just north of VMAC and the trailhead going north to support the WSDOT I-405 Randy Corman, Council President Members of Renton City Council Page 2 of 2 October 25, 2021 Renton to Bellevue Widening and Express Toll Lanes Project. Questions may be directed to Justin Johnson at 425-902-7172.  Downtown Utility Improvement Project: The Downtown Utility Improvement Project requires several roadway closures and detours between now and project completion in 2022. For more information on current upcoming road closures and traffic impacts or to sign up for email or text alerts visit the project website at https://rentonwa.gov/duip.  On-going Street Closure on Sunset Lane NE: On-going Street Closure through October 4, 2023 (City of Renton Resolution No. 4446) on Sunset Lane NE between NE 10th Street and Harrington Place NE in support of the Solera Development Project (LUA20-000305). Questions may be directed to Brad Stocco, 425-282-2373.