Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutP_D-RENTON STA-PERMIT-A_ALL SHEET PLANS© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_1-10.dwg TAB:S01 Date Exported: 09/22/21 - 15:44 by syiVICINITY MAPS
SHEET INDEX
W E
N
S
0
SCALE IN FEET
2,000 4,000 0
SCALE IN FEET
500 1,000
1. VICINITY MAPS AND SHEET INDEX
2. NEIGHBORHOOD MAP
3. MAPPED FLOOD PLAIN AND WETLANDS & SHORELINES
4. SITE PLAN WITH PROPOSED SWITCHGEAR BUILDING
5. GENERAL NOTES CIVIL/STRUCTURAL CONSTRUCTION NOTES
6. PROPOSED SWITCHGEAR BUILDING DETAIL
7. RENTON SWITCHGEAR FOUNDATION DETAILS
8. NEW 5 kV SWITCHGEAR PROPOSED LOCATION CIVIL SITE PLAN
9. TESC DETAILS
10. HAULING AND TRANSPORTATION ROUTES
DATA SOURCE:
MAPBOX OPEN STREET MAP, 2016.
PROJECTION: NAD83 WASHINGTON STATE
PLANES, NORTH ZONE, US FOOT.
PROJECT SITE
SW 23RD STREET
PROJECT SITE
APPLICANT/DEVELOPER:
OLYMPIC PIPE LINE COMPANY LLC
CONTACT INFORMATION:
EDWARD SMITH
600 SW 39TH STREET SUITE 275
RENTON, WA 98057
(425) 981-2520
CONSULTING ENGINEER
GEOENGINEERS
17425 NE UNION HILL ROAD, SUITE 250
REDMOND, WA 98052
(425) 861-6012 (CARLA WOODWORTH)
TAX PARCEL NO:
302305 - 9084LIND AVENUE SWOWNER NAME AND ADDRESS:
BP PROPERTY TAX
P.O. BOX 941709
HOUSTON, TX 77094
SITE ADDRESS:
2319 LIND AVENUE SW
RENTON, WA 98057
ZONING:
IH-HEAVY INDUSTRIALS
PROJECT DESCRIPTION:
INSTALL A PRE-MANUFACTURED
SWITCHGEAR ENCLOSURE ON A NEW
CONCRETE PAD, WITH
POWER/ELECTRICAL CONTROLS TO
AND FROM THE NEW SWITCHGEAR
BUILDING.
Tax Parcel No.
3023059084
E VALLEY ROADHIGHWAY 167SW 27TH STREETOAKESDALE AVENUE SWLEGAL DESCRIPTION FOR TAX PARCEL 302305-9084:
PARCEL A: PORTION OF NW QTR NW QTR STR 30-23-05 DAF: COMMENCING AT NW CORNER OF SAID SECTION 30 TH S00-49-06W ALONG W
LINE OF SAID SECTION 180.01 FT TO INTERSECTION WITH LINE PARALLEL WITH & 180 FT SLY MEASURED AT RIGHT ANGLE TO N LINE OF SAID
SECTION 30 TH S89-52-05E ALONG SAID LINE 20.00 FT TO INTERSECTION WITH LINE PARALLEL WITH & 20 FT ELY MEASURED AT RIGHT ANGLE
FROM SAID W LINE OF SECTION 30 & TPOB TH S89-52-05E ALONG SAID LINE PARALLEL WITH & 180 FT SLY TO N LINE OF SEC 30 DISTANCE OF
910.93 FT TO POINT ON LINE 70 FT WLY MEASURED AT RIGHT ANGLE & PARALLEL FROM E LINE OF SAID NW QTR NW QTR SECTION 30 TH
S01-35-08W ON LINE PARALLEL WITH & 70 FT WLY MEASURED AT RIGHT ANGLE TO SAID E LINE 577.01 FT TH N88-24-52W 903.22 FT TO POINT
ON SAID LINE PARALLEL WITH & 20 FT ELY MEASURED AT RIGHT ANGLE TO W LINE OF SECTION 30 TH N00-49-06E ALONG SAID PARALLEL LINE
553.95 FT TO TPOB; TGW PARCEL B: COMMENCING AT SAID NW CORNER OF SECTION 30 TH S00-49-06W ALONG W LINE OF SAID SECTION
180.01 FT TO INTERSECTION WITH LINE PARALLEL WITH & 180 FT SLY MEASURED AT RIGHT ANGLE TO N LINE OF SAID SECTION 30 TH
S89-52-05E ALONG SAID LINE 20.00 FT TO INTERSECTION WITH LINE PARALLEL WITH & 20 FT ELY MEASURED AT RIGHT ANGLE TO SAID W LINE
OF SECTION 30 & TPOB TH S89-52-05E ALONG SAID LINE PARALLEL WITH & 180 FT SLY TO N LINE OF SEC 30 DISTANCE OF 910.93 FT TO POINT
ON LINE 70 FT WLY MEASURED AT RIGHT ANGLE & PARALLEL TO E LINE OF SAID NW QTR NW QTR SECTION 30 & TPOB OF HEREIN DESCRIBED
PARCEL TH CONTINUING S89-52-05E ALONG SAID LINE PARALLEL WITH & 180 FT SOUTH MEASURED AT RIGHT ANGLE TO N LINE OF SECTION
30 DISTANCE OF 30.01 FT TO POINT ON LINE 40 FT WLY MEASURED AT RIGHT ANGLE & PARALLEL TO SAID E LINE OF NW QTR NW QTR
SECTION 30 TH S01-35-08W ON SAID LINE PARALLEL WITH & 40 FT WLY OF E LINE OF NW QTR NW QTR SECTION 30 DISTANCE OF 577.77 FT TH
N88-24-52W 30.00 FT TH N01-35-08E ON SAID LINE PARALLEL WITH & 40 FT WLY OF SAID E LINE OF NW QTR NW QTR SECTION 30 DISTANCE OF
577.01 FT TO TPOB TCO 17-929
DATA SOURCE:
AERIAL PHOTO FROM MICROSOFT
BING AERIAL, 2020.
NOTES:
PROJECT SITE TOTAL SQUARE FOOTAGE: 529,649 SQ. FT.
NEW BUILDING SQUARE FOOTAGE: 330 SQ. FT.
NO NEW IMPERVIOUS.
NO PROPOSED NEW PARKING SPACES.
NO EXISTING VEGETATION WILL BE REMOVED.
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
SW 23RD STREET
LIND AVENUE SWTax Parcel No.
3023059084
E VALLEY ROADVALLEY HIGHWAY 167SW 27TH STREETOAKESDALE AVENUE SWPROJECT SITE
Tax Parcel No.
3023059086
Tax Parcel No.
1253810090Tax Parcel No.
2523049004
Tax Parcel No.
1253800120
Tax Parcel No.
1253800110
Tax Parcel No.
2193100010
Tax Parcel No.2193100090Tax Parcel No.
1253790010
Tax Parcel No.1253800080Tax Parcel No.
2193100100
Tax Parcel No.
2523049064Tax Parcel No.
2523049058
Tax Parcel No.
2523049001
Tax Parcel No.
3023059007
Tax Parcel No.
3340400285
Tax Parcel No.
1923059076
Tax Parcel No.
1923059095
Tax Parcel No.
1923059013 Tax Parcel No.
3340400425
Tax Parcel No.
3340400585
Tax Parcel No.
2423049020
Tax Parcel No.
2423049115
Tax Parcel No.
3340400006
Tax Parcel No.
1923059016
Tax Parcel No.
3023059002
Tax Parcel No.
3340404000
Tax Parcel No. 3023059083
Tax Parcel No.
3340400005
SW 19TH STREET
145
'E160'
13
5
'E
E
E
PROPOSED
SWITCHGEAR
BUILDING
LOCATION
WORK AREA
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_2-10.dwg TAB:S02 Date Exported: 09/22/21 - 13:21 by syiNEIGHBORHOOD MAP
W E
N
S
0
SCALE IN FEET
300 600DATA SOURCE:
AERIAL PHOTO FROM MICROSOFT BING AERIAL, 2020. CITY OF RENTON, 2020, GIS DATA SHAPEFILES PARCELS.
VERTICAL DATUM: NAVD 88.
PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT.
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
SW 23RD STREET
LIND AVENUE SWTax Parcel No.
3023059084
E VALLEY ROADVALLEY HIGHWAY 167SW 27TH STREETOAKESDALE AVENUE SWPROJECT SITE
PANTHER CREEK
SPRINGBROOK
CREEK
SW 19TH STREET
145'
160'
135
'E
E
E
PROPOSED
SWITCHGEAR
BUILDING
LOCATION
WORK AREA
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
SW 23RD STREET
LIND AVENUE SWTax Parcel No.
3023059084
E VALLEY ROADVALLEY HIGHWAY 167SW 27TH STREETOAKESDALE AVENUE SWPROJECT SITE
PANTHER CREEK
SPRINGBROOK
CREEK
SW 19TH STREET
145'
160'
135
'E
E
E
PROPOSED
SWITCHGEAR
BUILDING
LOCATION
WORK AREA
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_3-10.dwg TAB:S03 Date Exported: 09/22/21 - 13:21 by syiFEMA FLOOD ZONE
W E
N
S
0
SCALE IN FEET
400 800
APPROXIMATE LIMITS OF
WETLANDS (AS PROVIDED
BY THE CITY OF RENTON)
CREEKS
LEGEND
DATA SOURCE:
AERIAL PHOTO FROM MICROSOFT BING AERIAL, 2020.
CITY OF RENTON, 2020, GIS DATA SHAPEFILES WETLANDS, CREEKS, SHORELINES, AND FEMA FLOOD ZONES.
VERTICAL DATUM: NAVD 88.
PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT.
WETLANDS & SHORELINES
W E
N
S
0
SCALE IN FEET
400 800
APPROXIMATE LIMITS OF
SPECIAL FLOOD HAZARD
AREAS (100 YEAR FLOOD)
(AS PROVIDED BY THE
CITY OF RENTON)
CREEKS
LEGEND
APPROXIMATE LIMITS OF SHORELINE
HIGH INTENSITY (AS PROVIDED BY
THE CITY OF RENTON)
APPROXIMATE LIMITS OF URBAN
CONSERVANCY (AS PROVIDED BY
THE CITY OF RENTON)
12"12"12"SSSSSSSSSSSSSSSSSSSSSDSDSDSDSDSDSDSDSDXXXXXXXXXXXXWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSXXXXXC.O.
C.O.1" FUEL OIL1 1/2" WATERASPHALT PARKING
WAREHOUSE BLDG.2"P12" FUEL-TOSCO12" GASO-TOSCO4"METER PROVER24 BBLW.168'-0"N.915'-0'1 1/2" WATER LINE
12' ASPHALT ROAD
STRAINER
HEADQUARTERS, REMOTE CONTROL
CENTER & STATION CONTROL BLDG.
(40' x 115')
F.F. EL. 19'-0"CONCRETE SIDEWALKADMINISTRATION BUILDINGC.B.
C.B.
TOP OF SLOPE
6"
P
V
C
VISITORS & STAFF
PARKING
4'x15'-6" CONC. PADEL. 18.32
16
'
A
S
P
H
A
L
T
R
O
A
D
UNIT 2UNIT 3UNIT 114"
14"
2"
SUB-STATION
TEL. BOX
C.B.CAPPEDCAPPED1" PVC
SSDRAIN FIELD-4" PERF. PIPE
ABANDONED
SSSSSSS4"
F.H.
C.O.4" C.I. PIPE
1" FUEL OIL
CAPPED
1" FUEL OILNOTE 2
1 1/2" WATER
LIND AVE. S.W.GOVERNMENT LOT BOUNDARY
SAMPLEBLDG.14'-8"x10'4'x4' CONC. PAD
20" FROM ALLEN
1 1/2" WATER12" TO SEATTLE
2"4"(TYP.)16'22'(TYP.)(TYP.)16'4"
40' x 85'
F.F. EL.19'-0"
ASPHALT
PARKING
PROTECTION
CATHODIC
ANODE
12" TO SEA-TAC14" TO PORTLANDCONCRETE SIDEWALK
CONCRETE SIDEWALKN.798'-0"C.O.
2"J.B.C.O.8" WATER LINEWWWWW2" WATER
POWER
35'x50'
ASPHALT100'±6"
PVC48'8" WATER LINENE CORNER OF FILL
16" FROM ALLEN
FF EL.19'-0"2:1 SLOPE150' DRAINAGE CANALEASEMENTC.O.
RENTON SEWER CONNECTION
1" BIBB
EL.18'-9 1/4"XXXXXXXXXXXXXXXXAUTO DRAIN VALVES (TYP)ST 36" DEEP
PUMPINJECTIONCONC. VALVE BOXRECEIVER
DRASKID12" 12" BLDGDRA TANK/CONTAINMENTN.893'-1"14'-0"5'-0"4.000016" PROVER PIPE
ABANDONED IN PLACE4"4"
X
X
X
XWWWWWWWWW2"SC.O.TIE IN
4"
6"
C.O.
6"PVC
C.O.
TIE IN4"6" SPEARS FLANGEDPLUG GATE VALVEPOWER SUBSTATION
SVE PANEL
HIGH VOLT BOX
EMERG. GEN
CONTAINMENT WALLBARRICADESPANEL600 GALDIESEL OIL
POWER SUBSTATION
SUMP
2000 GAL.GATE
17'ESD-1ESD-2
ESD-3
ESD-4
FIREEXTIGUISHER
FIRE EXT.
TRUCK UNLOADINGCONTAINMENT AREA TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTPPPPPPPPPPPPPPPPPPPPPPPPPPP2
1
2
2
2
3
23
22
21
201918171615145'160'135'PROPOSED
SWITCHGEAR
BUILDING
LIND AVE. S.W.
SEE DETAIL
15'
36'
33'
7'
200'
POWER CONNECTION TO
POWER SUB-STATION TO
BE DETERMINED
MAINTAIN SETBACK 20' FROM
PROPERTY BOUNDARY
EXISTING SIDEWALK, TREES,
AND LANDSCAPING (TO REMAIN)
ALL UTILITIES
SHALL MAINTAIN
5-FEET OF
SEPARATION
WETL WETL
WETLWETLWETLWETLWETLWETLWETLWETLWETL WETLWETLSSSXXXXXXXXXXXXXXXSSSTTTTTTTTTTTTTTTTTTTTTTTTTPPPPPPPPPPPPPPEXISTING ANTENNA POLE
EXISTING SWITCH BOX
CONDUIT CROSS
PROPOSED BUILDING WILL BE
13-FEET HIGH BY 12-FEET WIDE
AND 30-FEET LONG; CONCRETE
PAD FOR BUILDING WILL BE
15-FEET WIDE BY 33-FEET LONG
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_4-10.dwg TAB:S04 Date Exported: 09/21/21 - 21:46 by syiWENSSITE PLAN WITH PROPOSED SWITCHGEAR BUILDING
0
SCALE IN FEET
20 40
DATA SOURCE:
BASE SURVEY D-603.DWG PROVIDED BY MARMAC ENGINEERING, CASNE ENGINEERING, INC. AND ELECTRIC POWER SYSTEMS, INC.
CONTOURS FROM KING COUNTY GIS DATA. CITY OF RENTON, 2020, GIS DATA SHAPEFILES WETLANDS.
VERTICAL DATUM: NAVD 88.
PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT.
PROPERTY BOUNDARY (DELINEATED WITH CHAIN LINK FENCE)
EXISTING POWER LINE
EXISTING TELEPHONE LINE
EXISTING STORM DRAIN LINE
EXISTING 6' CHAIN LINK FENCE WITH BARB WIRE
EXISTING WATER LINE
EXISTING SEWER LINE
PROPOSED ELECTRIC LINE
EXISTING CATCH BASIN
EXISTING CLEAN OUT
STAKED OR WEIGHTED STRAW WATTLES DURING CONSTRUCTION (DETAIL 1, SHEET 7)
EXISTING CONTOUR - MAJOR
EXISTING CONTOUR - MINOR
WETLAND BOUNDARY
LEGEND
PPP
DETAIL
0
SCALE IN FEET
10 20
WENSC.B.
C.O.
TTT
20
21
NOTES:
1. ELEVATION OF SITE IS RELATIVELY FLAT AT APPROXIMATE ELEVATION 19 FEET.
2. ASPHALT OR CRUSHED ROCK SURFACE PLANNED AT PROPOSED BUILDING LOCATION TO MATCH EXISTING.
3. TRENCH SPOILS WILL BE TEMPORARILY STOCKPILED ON-SITE, COVERED WITH WEIGHTED PLASTIC SHEETING, AND
THEN REUSED AS BACKFILL IF INCLEMENT WEATHER FORECAST AND BEFORE WEEKENDS.
4. MINOR GRADING OF THE EXISTING GRAVEL SURFACE WILL BE COMPLETED FOR BUILDING CONCRETE FOUNDATION
PREPARATION.
5. ALL UTILITY CROSSINGS WILL BE POTHOLED.
6. ALL UTILITIES SHALL MAINTAIN 5-FEET OF SEPARATION OTHER UTILITIES.
7. NO NEW LANDSCAPING IS PROPOSED, ALL EXISTING LANDSCAPING IN RENTON RIGHT-OF-WAY WILL BE MAINTAINED.
WETL
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_5-10.dwg TAB:S05 Date Exported: 09/21/21 - 21:47 by syi
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_6-10.dwg TAB:S06 Date Exported: 09/21/21 - 21:47 by syiWENSPROPOSED SWITCHGEAR BUILDING DETAIL
DATA SOURCE:
PDF INTO CAD REN-EL-4500_1.DWG PROVIDED ELECTRIC POWER SYSTEMS, INC., DATED 10-20-20.
SCALE: NOT TO SCALE
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_7-10.dwg TAB:S07 Date Exported: 09/21/21 - 21:48 by syi
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_8-10.dwg TAB:S08 Date Exported: 09/21/21 - 21:48 by syi
3'-4'
SCALE:
1STRAW WATTLE DETAIL
NOT TO SCALE
(ECOLOGY BMP C235)
3 FT. MIN.
10 FT.
MAXIMUM
10 FT. MAXIMUM
NOTES:
1. SANDBAGS OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC SHEETING.
2. SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF12 INCHES AND BE WEIGHTED OR
TAPED.
3. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MIL.
4. DUE TO RAPID RUNOFF CAUSED BY PLASTIC SHEETING, THIS METHOD SHALL NOT BE USED
UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY CONENTRATED RUNOFF.
SCALE:
2PLASTIC COVERING FOR STOCKPILES
NOT TO SCALE
(ECOLOGY BMP C123)
ROLL SPACING DEPENDS ON SOIL
TYPE AND SLOPE STEEPNESS
10'-25'
(3-8m)
3"-5" (75-125mm)
1" x 1" STAKE
NOTES:
1. STRAW ROLL INSTALLATION REQUIRES THE PLACEMENT AND SECURE STAKING OF THE ROLL IN A
TRENCH, 3" x 5" (75-125mm) DEEP, DUG ON CONTOUR.
2. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND ROLL.
LIVE STAKE
ADJACENT ROLLS
SHALL TIGHTLY ABUT
STRAW ROLLS MUST BE
PLACED ALONG SLOPE
CONTOURS
STRAW WATTLE
(MID 9998192)
ANCHOR WEIGHTS WITH STAKES
CONVEY RUNOFF TO APPROVED LOCATION
CONVEY RUNOFF TO APPROVED LOCATION
PROVIDE ENERGY DISSIPATION AT TOE WHEN NEEDED
SEDIMENT, ORGANIC MATTER,
AND NATIVE SEEDS ARE
CAPTURED BEHIND THE
ROLLS
8"-10" DIA.
(200-250mm)
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_9-10.dwg TAB:S09 Date Exported: 09/21/21 - 21:48 by syiNOTE: SANDBAG WEIGHTS MAY BE USED WHERE
STAKING IS IMPRACTICAL. IF WEIGHTS ARE USED,
THEY WILL BE SPACED APPROXIMATELY EVERY 5 FEET.
THE ENDS OF ABUTTING WATTLES WILL OVERLAP.
NOTE: CONTRACTOR WILL FOLLOW THE SPECIFICATIONS IN BMP C151 - CONCRETE
HANDLING AND BMP C154 - CONCRETE WASHOUT AREA WHILE CONSTRUCTING THE
CONCRETE PAD FOR THE SWITCHGEAR BUILDING.
PROJECT SITE
OLYMPIC PIPE LINE COMPANY LLC
A
AP:\0\0894180\CAD\01\REV A\D-RENTON STA-PERMIT-A_10-10.dwg TAB:S10 Date Exported: 09/22/21 - 12:59 by syiHAULING AND TRANSPORTATION ROUTES
W E
N
S
0
SCALE IN FEET
800 1,600
THE PROPOSED HAUL/TRANSPORTATION ROUTE TO THE SITE WILL INCLUDE
THE FOLLOWING:
•FROM I-405; TAKE EXIT 4 TO SOUTHBOUND SR167.
•EXIT TO SW 43RD STREET AND EAST VALLEY ROADS AND HEAD
WEST (STRAIGHT) ONTO SW 41ST STREET.
•TRAVEL WEST ON SW 41ST STREET TO LIND AVENUE SW, TURN
NORTH (RIGHT) ONTO LIND AVENUE SW.
•TRAVEL NORTH ON LIND AVENUE SW TO THE
ROADWAY/DRIVEWAY ON THE SOUTH SIDE OF THE SITE.
•TURN RIGHT OFF THE ROADWAY AND ENTER SITE THROUGH
THE SOUTH ENTRANCE.
THE PROPOSED ROUTE LEAVING THE SITE WILL INCLUDE THE FOLLOWING:
•FROM THE SOUTH ENTRANCE, TURN LEFT OUT OF THE SITE TO
LIND AVENUE SW.
•TURN SOUTH (RIGHT) ONTO LIND AVENUE SW.
•EITHER PROCEED SOUTHBOUND OR NORTHBOUND ON SR167
AS FOLLOWS:
FOR SOUTHBOUND SR167:
•ROUTE WILL BE LIND AVENUE SW TO SW 41ST STREET.
•TURN LEFT ONTO SW 41ST AND TRAVEL TO THE ON-RAMP TO
SOUTHBOUND SR167.
•ENTER ON-RAMP TO SR 167.
FOR NORTHBOUND SR 167:
•ROUTE WILL BE LIND AVENUE TO SW 43RD STREET (S. 180TH
STREET).
•TURN EAST (LEFT) ONTO THE SW 43RD AND TRAVEL TO
ONRAMP TO NORTHBOUND SR 167.
•TURN LEFT ONTO THE ONRAMP FOR SR167.
•TURN RIGHT TO EITHER NORTHBOUND OR SOUTHBOUND I-405.
HAULING AND TRANSPORTATION ROUTES
LEGEND
DATA SOURCE:
MAPBOX OPEN STREET MAP, 2016.
VERTICAL DATUM: NAVD 88.
PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT.