Loading...
HomeMy WebLinkAboutP_Floor Plan_Level 1_v2UP UP FD UP B A4.02 A A4.01 D A4.04 E A4.04 575.57 SF R/R ELEC. PLE PLE PLNW PLS PLW PB PA PC PD PE PF 338.75' A7.02 1 A7.01 1 A7.03 1 MAILROOM 41' - 0"26' - 2"N STAIR RETAIL A 334.47' 335.38' 338.75' 338.75' LOBBY / LEASING BACK OF HOUSE OFFICE S STAIR C A4.03 76' - 11 1/2"16' - 7 1/2"38' - 8"18' - 8" 7' - 10" 27' - 2"13' - 0" 23' - 0" 338.75' 335.75' 334.00' 4 8 ' - 7 1 /4 " 31' - 0 1/2"65' - 10"8' - 9 1/2"WATER / FIRE PARKING BIKE ROOM EQ-5 SECURED PARKING PG ENTRY VESTIBULE GN-9 GN-9 GN-9 V A N EQ-2 EQ-2 SP-4 SP-3 DR-1 SP-8 SP-3 SP-3 FN-1 FN-1 F A4.05 H A4.06 G A4.05 GATE TO R/R 12' - 0" P1 P2 P3 P4 P5 P7 P8 P9 P10P0 29' - 9 1/2"16' - 7 3/4" 11' - 7"35' - 10 1/2"9' - 10 1/2"51' - 1 1/2"24' - 10"18' - 7 1/2" 9' - 7 1/2" 17' - 11 1/2" 225' - 11 1/4" 335.50' 334.00'DRIVE AISLE WIDTH23' - 0"20' - 6"91' - 8"122' - 2"14' - 0"26' - 0"11' - 2"24' - 10"3' - 2"8' - 10"17' - 8"P6 W.11 3 HR EW.313 HRW.71 NR W.75 2 HR W.113 HRW.113 HREW.201 HRW.81W.113 HREW.313 HREW.31 3 HR EW.31 3 HR W.113 HRW.81W.113 HRW.113 HREW.313 HR1-021-11 1-08 1-071-09 1-031-15 1-04 1-06 P11 W.113 HRVANVAN WC-1 WC-2 WC-4 ELECTRICAL TRANSFORMER 1 6 ' - 5 " 2 ' - 5 3 /4 " 1 6 ' - 5 " 1 1 ' - 2 1 /2 " 3' - 0 1/2" 25' - 0" 3' - 0"3' - 1 1/4"18' - 0"2' - 8"18' - 0"2' - 8"18' - 4"3' - 0 3/4" 1 6 ' - 1 0 1 /2 "1 ' - 8 "1 4 ' - 0 "S-06 S-05 S-04 S-03 S-02 S-01 S-07 S-08 10' - 4" 13' - 3" 11' - 9" 16' - 0" 7' - 0" 7' - 3" S-09 S-10 SD-05 SD-06 SD-04SD-03 SD-02 SD-01 BK-3 BK-3 A2.21 1 LINE OF FUTURE DEMISING WALL (APPROXIMATE LOCATION) B7.35 B15.35 B7.35 B7.35 B11.35 DR-1 VP-4 VP-5 1-17RETAIL B ELEV 6%8%3 % 3%8%1.THIS DRAWING IS INTENDED TO REFERENCE OR SHOW CERTAIN SITE FEATURES WHERE APPLICABLE REFER TO CIVIL AND LANDSCAPE DRAWINGS FOR INFORMATION NOT SHOWN HERE. SEE SHEET A1.00 FOR SITE PLAN INFORMATION. 2.THIS DRAWING IS INTEDED TO SHOW BUILDING SHELL ONLY. SEE ENLARGED UNIT AND COMMON AREA PLANS FOR ADDITIONAL INFORMATION. 3.GRID PATTERNS WHERE SHOWN INDICATE LOCATION OF SCORE LINES, EXPANSION JOINTS, OR CONTRACTION JOINTS IN TOPPING SLABS AND SLABS ON GRADE. ALIGN THESE JOINTS WTIH OPEN JOINTS IN UNIT PAVERS ON PEDESTALS WHERE THE TWO MEET. SEE LANDSCAPE DRAWINGS FOR ADDITIONAL INFORMATION. 4.PROVIDE FIRE DEPARTMENT CONNECTIONS (FDC) AS REQUIRED BY LOCAL FIRE DEPARTMENT. FDC'S SHALL BE READILY VISIBLE AND ACCESSIBLE ON A STREET FRONTAGE OR WHERE OTHERWISE APPROVED AND LOCATED AT LEAST 10 FEET AWAY FROM BUILDING EXITS. FLOOR PLAN GENERAL NOTES: 5.PROVIDE RECESSED WALL HYDRANTS AT PERIMETER OF BUILDING WHERE REQUIRED BY LOCAL FIRE DEPARTMENT. 6.PROVIDE MINIMUM 1-FOOTCANDLE EMERGENCY ILLUMINATION AT INTERIOR LOBBIES AND CORRIDORS, RESIDENTIAL AND ENTRY COURTYARDS TO PUBLIC WAY. LIGHTING FIXTURES SHOWN TO ILLUSTRATE GENERAL LIGHTING INTENT ONLY ADEQUATE ILLUMINATION LEVELS IS THE RESPONSIBILITY OF THE ELECTRICAL DESIGN-BUILD CONTRACTOR. 7.EXIT SIGNS ARE MINIMUM REQUIRED. CONTRACTOR TO PROVIDE ADDITIONAL EXIT SIGNS AS REQUIRED BY AHJ. 8.PROVIDE BOLLARDS AND/OR OTHER IMPACT PROTECTION MEASURES AT MECHANICAL/ELECTRICAL EQUIPMENT WHERE EXPOSED TO MOVING TRAFFIC. SEE DETAIL 4/A8.01 © 2021 GROUPARCHITECT, INC. ALL RIGHTS RESERVED SHEET TITLE: PROJECT No. CHECKED: DRAWN: REVISIONS CLIENT: PROJECT:1735 westlake avenue north, suite 200, seattle, wa 98109206.365.1230 | www.grouparch.comORIGINAL SHEET SIZE IS 24"x36" | PLOT DATE: SHEET DATE: ISSUE: PARK 5 APARTMENTS 960 HARRINGTON AVE. NE, RENTON, WA 98056 ZARNOOR ASSOCIATES LLC PROJECT ISSUES: SITE PLAN REVIEW 50% DD SET 08/04/2021 10/05/2021 10/28/2021 11:18:50 AM LEVEL 1 FLOOR PLAN A2.01 1922 BJP KJS 10/15/21 50% DD SET SCALE: 1/8" = 1'-0"A2.01 LEVEL 1 FLOOR PLAN 1KEYNOTES WC-2 REFUSE / RECYCLE COMPACTOR WC-4 32 GALLON FOOD WASTE CONTAINER BK-3 BICYCLE WORKSTAND DR-1 OVERHEAD COILING DOOR - SEE ____ EQ-2 ELECTRIC VEHICLE CHARGING STATION EQ-5 MECHANICAL CAR PARKING SYSTEM - SEE A0.15 FN-1 SECURITY FENCE GN-9 CANOPY ABOVE SP-3 ACCESSIBLE PARKING SIGN - SEE_____ SP-4 ACCESSIBLE VAN PARKING SIGN - SEE_____ SP-8 RESTRICTED PARKING SIGN - "USPS PARKING ONLY 9AM - 5PM" VP-4 MAKE-UP AIR LOUVER PER MECHANICAL DWGS VP-5 RELIEF LOUVRE PER MECH DWGS WC-1 REFUSE / RECYCLE CONTAINER (NIC) 1 8