HomeMy WebLinkAbout0895.06 SWFR 353.pdf CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com
ESNW Rep. Project No. Page Report No. MLP 0895.06 1 of 3 353
Time On Site Time Off Site Date Day of Week
7:45 8:05 11/3/21 Wednesday
NPDES Permit No. Reviewed WAR307963
Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Erosion Control BMPs (13 Elements)
Overall Condition (Good; Fair; Poor)
Needs Repair? (Yes; No) Comments
1. Preserve Vegetation; Mark Clearing Limits
•Buffer Zones around Sensitive Areas
•Silt Fence G N -Chain link fence installed along site perimeter
2. Establish Construction Access•Fabric; Quarry Spalls
•Wheel Wash
•Sweeper Truck
F N -Metal sheets covering ground between offsite roadand onsite pavement
3. Control Flow Rates
•Stormwater Vault or Facility•Straw Wattles
•Check Dams
G N -Onsite stormwater vault plugged
4. Install Sediment Controls
•Silt Fence
•Straw Bale Barriers
•Vegetation•Straw
•Sediment Ponds, Traps & Filters
•Treatment•Sediment Pond (Temp. or Perm.)•Water Truck
G N -Silt fence installed around majority of site perimeter-Straw wattles placed along base of small slopenear Talbot Rd S
5. Stabilize Soils
•Nets & Blankets•Mulch, Bark & Rock
•Hydroseeding; Grass
•Plastic Sheeting•Straw Stockpiles•Stockpiles
•PAM
F N -Much of site is paved, including entrance andparking areas
6. Protect Slopes•Benching; Track-Walking
•Pipe Slope Drains
•Plastic Sheeting; Anchors
F N -Small slope along Talbot Rd S covered in straw
7. Protect Drain Inlets
•Catch Basin Inserts•Gutter; Road G N -CB inserts installed in offsite catch basins
8. Stabilize Channels and Outlets•Channel Lining
•Check Dam
•Outlet Protection
•Nets and Blankets
- - N/A
9. Control Pollutants
•Chemical Storage Area Covered
•Concrete Handling G N -Stormwater treated with dry ice to lower pH tosuitable levels-Chemical/material storage onsite
10. Control Dewatering G N -Via KC Sewer Discharge Permit as needed
11. Maintain BMPs F N -Continue sweeping offsite roads
12.Maintain SWPPP & Site Logbook G N -Available upon request
13. Protect Low-Impact Development (LID BMPs)
•Bioretention Rain Garden Facilities
•Permeable Pavement - - N/A
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com
ESNW Rep. Project No. Page Report No. MLP 0895.06 2 of 3 353
Time On Site Time Off Site Date Day of Week
7:45 8:05 11/3/21 Wednesday
NPDES Permit No. Reviewed WAR307963
Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes NoList the action items in the table below:
Element # Description and Location Action Required Completion Date
Current Weather: __50°F, Partly Cloudy _ _
Precipitation since last inspection (approximate): 0.20 inches
Precipitation in the last 24 hours (approximate): 0.20 inches
Type of Visit: Weekly Monthly Post–Storm Event
Phase of Active Construction (check all that apply):
Pre-Construction Clearing/Demo/Grading Infrastructure/Roads Concrete pours Vertical Construction
Utilities Offsite improvements Site temporarily stabilized Final Stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
•Record results in the table below.
•Hanna Turbidity Meter # ____10_____
Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes
MP 1 Baker tank 4125 13.97 8 Mostly clear -
MP 2 Baker tank 4152 9.46 7 Mostly clear -
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Inspector Name: Maggie Perme CESCL Number: ECO-3-4042106 Inspection Date: 11/3/21
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com
ESNW Rep. Project No. Page Report No. MLP 0895.06 3 of 3 353
Time On Site Time Off Site Date Day of Week
7:45 8:05 11/3/21 Wednesday
NPDES Permit No. Reviewed WAR307963
Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
BMP LEGEND
JOB SHACK
STORMWATER VAULT
WATTLE
SILT FENCE
CONSTRUCTION ENTRANCE
CHEMICAL/MATERIAL STORAGE
CATCH BASIN INSERT
CONCRETE WASHOUT
BAKER TANK
MONITORING POINT