HomeMy WebLinkAboutDOE1_SMAPermitDataSheet_Apron D Slot Drain_211108
Shoreline Management Act
Permit Data Sheet and Transmittal Letter
From: (local government) To: (appropriate Ecology office)
Alex Morganroth
City of Renton
1055 S Grady Way
Renton WA, 98057
Maria Sandercock
MARI461@ECY.WA.GOV
Transmittal Date: 12/9/2020 Receipt Date: (provided by Ecology)
Type of Permit: (Indicate all that apply)
Substantial Development
Conditional Use
Variance
Revision
Other
Applicant Information:
Name: Mark Clement
Address: Address: P O Box 3707 MC 96-01
98124
Phone(s): (206) 617-2944
Local Government Decision:
Approval
Conditional Approval
Denial
Applicant's Representative: (If primary contact)
Name:
Address:
Phone(s):
Is the applicant the property owner? Yes No
Location of the Property: (Section, township, and range to the nearest ¼, ¼ section or latitude and longitude, and a
street address where available.)
NE ¼ of Section 7, Township 23N, Range 5E. Parcel Nos 0723059046 & 0723059001 (737 Logan Ave N)
Water Body Name: Cedar River Shoreline of State Significance: Yes No
Environment Designation: Shoreline High Intensity
Project Description: (Summary of the intended use or project purpose)
The applicant is requesting a Shoreline Substantial Development Permit for a storm water slot drain installation on Apron
D at the Boeing plant site. The subject properties (APN 0723059001 and 0723059046) are located to the east of the
Cedar River along the southern shore of Lake Washington. The site, home to the Boeing 737 plant and associated support
buildings, is located in the Urban Center (UC) zone and has a Comprehensive Plan designation of Commercial Mixed Use
(CMU). The project would include saw cutting and removing approximately 750 sq. ft. of existing concrete followed by the
installation of approximately 96 linear feet of 13-inch slot drain to be connected to an existing catch basin. The proposed
work would occur approximately 105 feet from the Cedar River Ordinary High Water Mark (OHWM) at the closest point. A
High Seismic Hazard is mapped on the project site. In addition, the proposed work would occur within the Cedar River
Reach A regulated shoreline area (Shoreline High Intensity overlay). No change in access to the site is proposed and no
new impervious surface would be added. According to the applicant, no tree or vegetation removal would occur a part of
the project. The applicant submitted a stormwater memo and Habitat Data Narrative Report with the application.
Local permit no. LUA21-000343
State permit no.
Notice of Application Date: September 9, 2021 Final Decision Date: November 10, 2021
By: (Local government primary contact on this application)
Alex Morganroth, Senior Planner
Phone: 425-430-7219