HomeMy WebLinkAboutDOE7_NOA_Project Acceptance_210909DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must
fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning
Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR21-000350 Boeing Apron D Slot Drain Replacement / LUA21-000343, SSDP
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: September 9, 2021
PROJECT NAME/NUMBER: PR21-000350 Boeing Apron D Slot Drain Replacement
/ LUA21-000343, SSDP
PROJECT LOCATION: 737 Logan Ave N (APN's 0723059046 & 0723059001)
APPLICANT/PROJECT CONTACT
PERSON:
Mark Clement, The Boeing Company / 737 Logan Ave
N, Renton, WA 98057 / mark.d.clement@boeing.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also https://cutt.ly/QWZExgy
PROJECT DESCRIPTION: The applicant is requesting a Shoreline Substantial Development Permit for a
storm water slot drain installation on Apron D at the Boeing plant site. The subject properties (APN 0723059001 and
0723059046) are located to the east of the Cedar River along the southern shore of Lake Washington. The site, home to
the Boeing 737 plant and associated support buildings, is located in the Urban Center (UC) zone and has a Comprehensive
Plan designation of Commercial Mixed Use (CMU). The project would include saw cutting and removing approximately
750 sq. ft. of existing concrete followed by the installation of approximately 96 linear feet of 13-inch slot drain to be
connected to an existing catch basin. The proposed work would occur approximately 105 feet from the Cedar River
Ordinary High Water Mark (OHWM) at the closest point. A High Seismic Hazard is mapped on the project site. In addition,
the proposed work would occur within the Cedar River Reach A regulated shoreline area (Shoreline High Intensity
overlay). No change in access to the site is proposed and no new impervious surface would be added. According to the
applicant, no tree or vegetation removal would occur a part of the project. The applicant submitted a stormwater memo
and Habitat Data Narrative Report with the application.
DATE OF APPLICATION: September 9, 2021
NOTICE OF COMPLETE
APPLICATION:
September 9, 2021
PERMITS/REVIEW REQUESTED: Shoreline Substantial Development Permit
OTHER PERMITS WHICH MAY BE
REQUIRED:
Construction Permit
REQUESTED STUDIES: Drainage Report and Habitat Report
Comments on the above application must be submitted in writing by 5:00 PM on September 23, 2021. Per RMC 4-9-
190.E.6, a thirty (30) day public comment is required for all Shoreline Development Permit applications. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton,
CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA)
or project address in your comments. Anyone who submits written comments will automatically become a party of
record and will be notified of any decision on this project.
NOTICE
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
CONTACT PROJECT PLANNER: Alex Morganroth, Senior Planner
Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov
N 6th St Logan Ave N