Loading...
HomeMy WebLinkAboutMFP21003032.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21003032 IVR Number: 21003032 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:06/29/2021Application Date:1723059166Parcel Number: 330 VUEMONT PL NE Permit Type:11/15/2021Issue Date:Franchise Permit Work Class:11/15/2022Expiration Date:Minor Utility Job Number: 101115971Franchise Type:Electric Description: Puget Sound Energy Electric From BP5 bore Northwest approximately 330' before continuing 130' North to BP4 to access V04. From BP4 bore North approximately 145' to BP3 to access V03. From BP2 enter the ROW on the West side and bore East approximately 60' to access the existing bore path. Pothole all existing utilities. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL PEAK 88 RENTON 36 LLC 400 112TH AVE NE # 400 BELLEVUE , WA 98004 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101115971 405 GRANDEY WAY Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 CARRIE YLENNI CARRIE.YLENNI@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21003032 Scott Warlick CED 11/15/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG 1818151518181515BR O N S O N W A Y N E VUEMONT PL NE#333 11STOP FLAGGER STOP FLAGGER STOP FLAGGERSTOPFLAGGER W20-7ARO A D WO R K AHE A D W20-1BEPRE P A R E D TOSTO P W3-4USE MAXIMUM AVAILABLESPACE FOR SIGNSW20-7AROADWORKAHEAD W20-1W20-4ONE LANEROADAHEAD 10 0 ' 10 0 ' 10 0 'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100' W2 0 - 7 AROADWORKAHEADW2 0 - 1 W2 0 - 4 ONE LANEROADAHEAD100' 100' 100'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FLAGGER TO ASSISTPEDESTRIANSSTOPFLAGGERSPOTTER TO ESCORTPEDESTRIANS CROSSINGSTREETSIDEWALK OPEN SOUTHBOUND,NO PEDESTRIAN CROSSING AT RAMPCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY-OB101115971333 Vuemont Pl NE Renton, WA9/17/2019stephen.gadke@pse.com425-424-6431SHEET 1 of 2POTHOLE PROJECT TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. 15' WCL of Bronson WayNE & 27' SCL of Vuemont Pl .Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP21003032 1818151518181515BR O N S O N W A Y N E VUEMONT PL NE#333 11FLAGGER TO ASSISTPEDESTRIANSSPOTTER TO ESCORTPEDESTRIANS CROSSINGSTREETSIDEWALK OPEN SOUTHBOUND,NO PEDESTRIAN CROSSING AT RAMPFROM TO TOW A W A Y A R E A PHON E 8 8 8 - 9 9 9 9 INFRAS O U R C E L L C 0 0 0 0 0 0 0 0 0 0 NO PA R K I N G NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK ROADWORKAHEADW20-1RIGHTSHOULDERCLOSEDW21-5aRW1-4L100'100'100' RO A D WO R K AHE A D W20-1W1-4RUSE MAXIMUM AVAILABLESPACE FOR SIGNSS/WCLOSEDR9-9S/ WCLO S E DR9-9ROADWORKAHEADW20-1100'ROADWORKAHEADW2 0 - 1 100'maintain (2) 11' lanesCO N ETO P P E RCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. 35' ECL of Bronson WayNE & 25' SCL of Vuemont Pl .Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431NPSEPUGETSOUNDENERGY-OB101115971333 Vuemont Pl NE Renton, WA9/17/2019stephen.gadke@pse.com425-424-6431SHEET 2 of 2POTHOLE PROJECT TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP21003032 FOREMAN (CHECK BOX WHEN COMPLETED) #1 Print Name ___________________________________ Date ______________ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Material VERIFIED and CHANGES noted on Paperwork. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures #1 Foreman's Signature _______________________________________________ and that all quality requirements are met. Field Changes RED-LINED on As-built. Total PRIMARY Cable noted on As-built. Correct QC Checklist(s) reviewed. OVERHEAD APPARATUS "When performing planned work on a pole with an existing transformer or device, the Service Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge time. If you are working on a pole with the pole ground connected with a hot tap, replace it. If the transformer has split bolts on the secondary neutral or services, replace them. If the primary neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on the neutral bus, replace it. #1 #2 #2 Print Name ___________________________________ Date ______________ #2 Foreman's Signature _______________________________________________ PSE GENERAL SPECIFICATIONS General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials, equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all Street lights, area lights and floodlights. - All fault indicators will be maintained in their current location on the 1/0 cables upon completion of the job. If it is noted to remove any of the indicators they shall be returned to local PSE first response department for re-issue. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of work sketch. - Return one Foreman's copy of work sketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. Traffic /Pedestrian control notes - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -The uniform code of traffic control shall be adhered to at all times.. -Provide signs, barricades, and traffic control in conformance with local permit regulations. -Provide route for pedestrians when working on or near sidewalks. -Maintain traffic flow as required by permitting agency. NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT. REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0 JACKETED CABLE. UNDERGROUND CONSTRUCTION Additional notes to standards. -Erosion control must be placed before construction starts. Silt bags must be installed in downstream catch basins. Existing Utilities: Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage to existing utilities. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - No rocks larger than 10" shall be included in backfill. - Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. Vaults & Hand holes - Refer to PSE standard 6775.0040 "Vault and Hand hole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - Civil crew to install Conduit plug on each end until new cable to be installed. - All "spare" conduits shall be capped at each end. Surface Restoration Restore ground surface to original contour and original condition or better. Restore asphalt and concrete in accordance with requirements of local permitting agency. Cold patch or plate trench when necessary. Leave area in its original state or better at the end of construction. SCOPE OF WORK The general scope of this project is to remediate primary 1/Ø cables within the project area by the most economic means possible using replacement, or abandonment. The project involves replacing existing electrical cables in new conduit. Project type : Planned Project location : Number of Cables : 11 Cable Footage Estimated : 1,669' Cable Numbers Injected : 0 Cable Numbers Repaired : 0 Cable Numbers Abandoned : 30014,3798, 3799, 3800 Cable Numbers Replaced : , 4208, 4209, 4210, 4211, 4212, 4213, 30012 Trench Footage Estimated : 725' There will be an advance notice provided by the contractor 24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to manage access. Traffic Revisions Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work hours. For more information on the project 24-hour project information (888) 471-7339, (360) 825-5236 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POTELCO DESIGN AND Signature _________________________________________ Print Name _________________________________________ This design complies with PSE Any/all variations have been Design/Engineering Standards. QUALITY ASSURANCE pre-approved/documented by the appropriate PSE Representative. Date _________________ JOB SITE JOB SITE MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages Trench Method: CABLE REPLACEMENT Approximate Trench Footage: Abandon Cable Segments: Approximate New 1Ø/3Ø pri. Cable Footage: Approximate 2"/4" SCH80/Poly Conduit Footage: Replaced Cable Segments: Vaults: BORE 760' 4 10 190'/810' 170'/750 0 ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11462643 101115971 N/A 108109712 VICINITY MAP OVERHEAD CIRCUIT: MAP # . SCALE 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C. YLENNI 253-720-9700 01/09/19 C. TOBIN 253-548-4516 01/09/19 N/A N/A N/A M. POMEROY 206-234-6560 01/09/19 REQ-CITY OF RENTON HIG-16 VUEMONT PL NE 2019 CRP CABLE REMEDIATION PROGRAM 333 Vuemont Pl NE, Renton, WA 98056 N/A N/A N/A 101115971 AS NOTED 1/3 KING N/A N/A QSEPRE T23N, R05E, 17NE N/A N/A 2305E065 2305E088 2305E065 HIG-16 5/6/19 R.POPE ALTERNATE ROUTE N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY 101115971333 Vuemont Pl NE, Renton, WA 98056 SURFACE IMPROVEMENT AND RESTORATION 1) ALL SPOILS WILL BE HAULED OFF SITE. 5/8" MINUS CRUSHED ROCK WILL BE USED FOR BACKFILL OF ALL BORE PITS AND OPEN TRENCHES. 2) FOLLOWING FINAL GRADING ACTIVITY, HOT MIX ASPHALT WILL BE APPLIED AT FINAL RESTORATION TO PROVIDE PERMANENT EROSION PROTECTION. INDEX PAGE 1 - GENERAL NOTES PAGE 2 - SITE PLAN PAGE 3 - CABLE & CONDUIT DIAGRAM PAGE 4 - CIVIL SITE PLAN Overflow Filter fabric walls for Catch Basin Grate dewatering sedimentCollected Sediment Catch Basin Insert MID 9995728 Filter fabric skirt Secured with grate. EROSION CONTROL NOT TO SCALE 2305E088 LEGEND SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV THREE PHASE WIRE/CABLE - 12.5 KV CABLE TERMINATION BUS (J-BOX) NEW OVERHEAD TO UNDERGROUND CABLE OVERHEAD TO UNDERGROUND CABLE TERM. 10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE TOTAL UNDERGROUND XFMR (T.U.T.) NEW COMBINATION J-BOX/PADMOUNT XFMR UNDERGROUND COMBINATION J-BOX/XFMR N.T.S. = NOT TO SCALE X.F.M.R. = TRANSFORMER P.E. = POLYETHYLENE ABBREVIATIONS PRIMARY METERING CABLE SPLICE FAULT INDICATOR WILL NOT PHASE (WNØ) NORMAL OPEN (N.O.) FUSED DISCONNECT: SOLID BLADE DISCONNECT HANDHOLE PULL VAULT UNDERGROUND SWITCH UNDERGROUND J-BOX NEW PADMOUNT XFMR NEW UNDERGROUND XFMR PAD MOUNT XFMR ELECTRONIC MARKER COMBINATION J-BOX/PADMOUNT XFMR NEW UNDERGROUND COMBINATION J-BOX/XFMR TERMINATION CABLE TO REPLACE PROPERTY LINE RIGHT OF WAY CENTERLINE EASEMENT CL Primary Power in DB120 Conduit (ROW) Excavated Dirt Pile ROADSIDE Final Grade 24" Min (ROW) 36" Min Cover (PVT PROP) 36" 48" Max Backfill (No rocks over 10" diameter) 3" Sand Bedding or 5/8" minus 12" Typical TRENCH DETAIL NOT TO SCALE 12" Min Sand Shading or 5/8" minus - A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches - A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 10" in diameter. FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN 12" MIN 48" MAX 36" MIN EXISTING PAVEMENT / SIDEWALK VERTICAL SAW CUT LINE CRUSHED SURFACING MATERIAL COMPACT TO 95% MAX DENSITY. EXCAVATION AND HARD RESTORATION DETAIL NOT TO SCALE 12" MIN Primary Cable(S) 3" Sand Bedding or 5/8" minus 12" Min Sand Shading or 5/8" minus 12" MIN ASPHALT PATCH, 2" MIN MATCH EXISTING in Conduit (ROW) 36" MIN (PVT PROP) 36" For contacts below dial 1-888-CALL PSE (225-5773) Contact Information PSE: PLANNER 22884 RYEN DR NW POULSBO, WA 98370 DOUG JONES 360-394-6636 ABANDONING PRIMARY CABLES PSE std. 6825.6200 In a Vault if the cable is ______________________________________________________________________________________ In conduit, -Remove the cable ______________________________________________________________________________________ Not in conduit or it cannot be pulled out, -Cut the cable off approximately one foot from the vault wall. Cap old cable. -When practical, attach the old cable number to the cable stub. ______________________________________________________________________________________ In a Minipad hand hole ______________________________________________________________________________________ In conduit, -Remove the cable ______________________________________________________________________________________ Not in conduit or it cannot be pulled out, -Cut the cable off as much as practical -When practical, attach the old cable number to the cable stub. -Stuff the tail into the bottom of the handhole. Be sure the new cables are not trapped by the old cables or the concentric neutrals. ______________________________________________________________________________________ At Risers if the cable is ______________________________________________________________________________________ In Conduit -Remove Cable ______________________________________________________________________________________ Direct buried or it cannot be pulled out, -Cut off riser and old cable just below grade.Cap old cable. -Re-fill ground back to existing grade. and the pole will remain. -Attach the old cable number to the cable stub. ______________________________________________________________________________________ DIRECT BURIED Direct buried or it cannot be pulled out, -Remove the riser. and the pole will be replaced -Cut off old cable just below grade. -Re-fill ground back to existing grade. ______________________________________________________________________________________ The cable is direct buried or it cannot be -Cut off riser and old cable just below grade. -Re-fill ground back to existing grade. ______________________________________________________________________________________ NOTE: If the pole is to be replaced, remove the abandoned riser and elbow, and stand off brackets (unless they support other conduits). NOTE: If the riser is made of transite material, it shall be removed following procedures in standard 0100.5000, "Transite Pipe Removal and Disposal." _______________________________________________________________________________________ -Remove (not abandon) aboveground transite riser when it is encountered in the field. Belowground transite may be left in place and backfilled. (Transite is a mixture of asbestos and cement. It is nonmetallic, flame-retardant, and resistant to moisture, low temperature, and corrosive agents). -For removal use an approved certified abatement contractor. Call the Environmental Services Department 24-hour pager (206-994-3186) to have a contractor dispatched. Procedure to Abandon Primary Cables: 1. Call the Systems Operator to request a clearance. 2. Follow the directions to ensure the cable is de-energized, apply proper tags as specified in Standard Practice 0201.1011, "Switching and Clearances Handbook," and report back to the Systems Operator. 3. Obtain a clearance from the Systems Operator on the cable to be abandoned. 4. Cut the ends of the cable. 5. The cable number tag may be left on the abandoned cable. NOTE: The cable number shall not be reused. 6. Call the Systems Operator and release the clearance. 7. Remove all "Danger Do Not Operate" tags. 8. The System Operator will then close the Incident Number (I-number). Existing System: Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by PSE System Operator. MFP21003032 VUEMONT PL NE (PAVED)353 P#1723059112 P#1723059182 GATE GATE P#9476700050 ROW=60' EOP=34' BP-2 BP-3 GATEPARKING LOTPARKING LOTBP-1 BORE ~ 25'PARKING LOTVU E M O N T P L N E ( P A V E D ) BO R E ~ 3 3 0 'BORE ~ 145'BP-4 BP-5 310 PARKING LOT270 330 333 330 351 P#1723059156 P#1723059157 P#1723059153 BRO N S O N WA Y NE (PA VE D)BRONSON WAY NE (PAVED)ROW=60' EOP=27' EOP=36' ROW=70' P#1723059160 P#1723059159 P# 1 7 2 3 0 5 9 1 2 0 P#1723059166 EOP=26'BORE ~ 130'40T UNK T81501 BORE ~ 90' BORE ~ 15' BORE ~ 10' BORE ~ 15' 40T UNK AØ4208 BØ4209 CØ4210 AØ4211 BØ4212 CØ4213 AØ30013 BØ30014 AØUNK BØ30012 VU E M O N T P L N E ( P A V E D ) BRO N S O N W AY N E (P A VE D)VUEMONT PL NE (PAVED)BRONSON WAY NE (PAVED) AØ3798 BØ3799 CØ3800 EHV826 - AØ EHV827 - BØ EHV828 - CØ 1-4" - L______' EHV829 - AØ EHV830 - BØ EHV831 - CØ 1-4" - L______' UNK - BØ JUMPER EHV832 - BØ 1-2" - L______' 2-4" - L______' 1-4" - L______' ABANDON 3798 - AØ 3799 - BØ 3800 - CØ 40T T81501 1-2" - L______' 4404 - AØ 4405 - BØ 4406 - CØ EXISTING TO REMAIN 4238 - AØ 4239 - BØ 4240 - CØ EXISTING TO REMAIN 4235 - AØ 4236 - BØ 4237 - CØ EXISTING TO REMAIN EHV823 - AØ EHV824 - BØ EHV825 - CØ 1-4" - L______' 89 5 . 6 l b s 8 4 4 . 0 l b s EXISTING30013 - AØ ABANDON EHR424 - BØ 175.0 lbs 171.8 lbs32.5 lbs 32.5 lbs93.2 lbs 93.7 lbs SITE PLAN SCALE: 1:50 CIRCUIT FEET REMOVED: 725' CIRCUIT FEET ADDED: 760' EXISTING UNDERGROUND MAP: # . SCALE: 1:100 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP C. YLENNI 253-720-9700 01/09/19 C. TOBIN 253-548-4516 01/09/19 N/A N/A N/A M. POMEROY 206-234-6560 01/09/19 REQ-CITY OF RENTON HIG-16 VUEMONT PL NE 2019 CRP CABLE REMEDIATION PROGRAM 333 Vuemont Pl NE, Renton, WA 98056 N/A N/A N/A 101115971 AS NOTED 2/3 KING N/A N/A QSEPRE T23N, R05E, 17NE N/A N/A 2305E065 2305E088 2305E065 HIG-16 5/6/19 R.POPE ALTERNATE ROUTE N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY 2305E065 101115971CONSTRUCTION NOTES P01 -CUT OFF 1-4" L _____' RISER JUST BELOW GRADE -CUT OFF BARE CONCENTRIC CABLE L_____' JUST BELOW GRADE -REFILL GROUND BACK TO GRADE -REMOVE OLD C/O & TERM VAULT & EQUIPMENT TABLE SITE GRID NUMBER VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) REMARKS LB DC J01 318087 166430 EXISTING JUNCTION BOX J-BOX BELOW GRADE W/ 3-4 POS. J-BUS EXISTING 9 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V01 318090 166430 EXISTING VAULT 112.5kVA PM XFMR 120/208v EXISTING 3 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V02 318082 166428 EXISTING VAULT 300kVA PM XFMR 120/208v EXISTING 3 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V03 318089 166438 EXISTING COMBO VAULT W/ 3-4 POS. J-BUS 100kVA PM XFMR 120/240v EXISTING 7 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS V04 318075 166438 EXISTING VAULT 100kVA PM XFMR 120/240v EXISTING 1 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS J03 318054 166464 EXISTING JUNCTION BOX J-BOX BELOW GRADE W/ 3-4 POS. J-BUS EXISTING 9 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS TOTALS :32 - CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 192219.89146.11 08.89-8.89 192211155 1/11/2019 HIG-16 ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE ABANDONED CABLE LEFT IN PLACE ABANDON CIRCUITRYFROMTO 3798 10583245 P01 J01 317 YES YES 3799 10583254 P01 J01 317 YES YES 3800 10583264 P01 J01 317 YES YES 4208 10584209 J01 V01 85 YES NO 4209 10584218 J01 V01 85 YES NO 4210 10584223 J01 V01 85 YES NO 4211 10584233 J01 V02 70 YES NO 4212 10584243 J01 V02 70 YES NO 4213 10584252 J01 V02 70 YES NO 30013 10502144 J02 V03 81 YES YES 30012 10522133 J02 V04 172 YES NO TOTAL CIRCUIT FEET 725 VOLUME OF DISTURBANCE TABLE TYPE DESCRIPTION SIZE (FT)REM CU YD (APPX) GRAVEL FILL CU YD (APPX) TYPE OF SURFACE REMARKS BP-1 BORE PIT 2 X 8 1.8 1.8 HARD BP-2 BORE PIT 2 X 8 1.8 1.8 HARD BP-3 BORE PIT 2 X 8 1.8 1.8 SOFT BP-4 BORE PIT 2 X 8 1.8 1.8 SOFT BP-5 BORE PIT 2 X 8 1.8 1.8 SOFT TOTAL CU YDS (APPX)8.9 8.9 PRIMARY CABLE & CONDUIT DIAGRAM NOT TO SCALE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE REMARKS FROM TO SIZE (in)QTY DESIGN LENGTH (ft) ACTUAL LENGTH (ft) TYPE BENDS PULL (lbs) PULL REV (lbs) CABLE SIZE DESIGN LENGTH (ft) ACTUAL LENGTH (ft) CABLE NUMBERS PLEASE RECORD FOREMAN - COMPLETE DB120 POLY SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR J03 J01 4 1 710 844.0 895.6 1/0 AL JKT 730 EHV823 EHV824 EHV825 J01 V02 4 1 5 32.5 32.5 1/0 AL JKT 25 EHV826 EHV827 EHV828 J01 V01 4 1 35 171.8 175.0 1/0 AL JKT 55 EHV829 EHV830 EHV831 V03 V04 2 1 170 93.7 93.2 1/0 AL JKT 190 EHV832 TOTAL 4"750'727$/‘810' TOTAL 2"170'727$/‘190' QTS OF GLUE 2.5 GALS OF LUBE 5.2 CIVIL CREW NOTE: ALL 2" - 90° BENDS MIN 48" RADIUS SCH-80 PVC ALL 4" - 90° BENDS MIN 60" RADIUS SCH-80 PVC ALL 4" - 45° BENDS SCH-80 PVC ALL 2" - 45° BENDS SCH-80 PVC - ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL CABLE IS INTALLED CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY. FOREMAN NOTE: CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILY INJURY. MAPS & RECORDS NOTE: -J02 AND V03 IS A COMBO VAULT, NOT A SEPARATE JBOX AND PADMOUNT AS SHOWN IN EXISTING UNDERGROUND PSE MAPS. MFP21003032 VUEMONT PL NE (PAVED)GATEROW=60'EOP=34'BP-2GATEPARKING LOTPARKING LOT PA R K I N G L O T VUEMONT PL NE (PAVED)310PA R K I N G L O T270 330333330351P#1723059157P#1723059153B R O N S O N W A Y N E ( P A V E D ) BRONSON WAY NE (PAVED)ROW=60'EOP=27'EOP=36'ROW=70'P#1723059160P#1723059159P#1723059120P#1723059166EOP=26'BP-2BP-3BP-1BORE ~ 25'BORE ~ 330'BORE ~ 145'BP-4BP-7BORE ~ 130'BORE ~ 90'BORE ~ 15'BORE ~ 10'BORE ~ 15'8CABLE RUN = 9'FROM WATER LINE UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPC. YLENNI253-720-970001/09/19C. TOBIN253-548-451601/09/19N/AN/AN/AM. POMEROY206-234-656001/09/19REQ-CITY OF RENTONHIG-16 VUEMONT PL NE 2019 CRPCABLE REMEDIATION PROGRAM333 Vuemont Pl NE, Renton, WA 98056N/AN/AN/A101115971AS NOTED3/3KINGN/AN/AQSEPRET23N, R05E, 17NEN/AN/A2305E0652305E0882305E065HIG-16 5/6/19R.POPEALTERNATE ROUTEN/AN/AN/AN/AN/AN/APotelco, Inc.DESIGNED BY101115971CIVIL SITE DETAILED PLANSCALE: 1:30EXISTING WATEREXISTING POWEREXISTING TELEPHONEEXISTING GASEXISTING STORM DRAINEXISTING SEWERLEGENDEXISTING FIBER OPTICSTREET CENTER LINECLRIGHT OF WAYCABLE TO REPLACEBORE PITBORE PIT"BP"- ---SCALE: 1"=___'NEW J-BOX VAULTPROPERTY LINEEASEMENTPOT HOLEWIRE CREW FOREMAN NOTE:ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENTLOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLEDUNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULTINDICATORS ON "CABLE DIAGRAM" FOR MAPPING.CIVIL CREW FOREMAN NOTE:MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALLWORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE ATALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE.CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BERECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISHPUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS(FOREMAN'S COPIES) AT THE END OF THE JOB.CIVIL FOREMAN NOTE:POTHOLING IS REQUIRED PRIOR TO DRILLING AND THEBORE PROFILE SHALL BE PREPARED ON SITE AND PROVIDEDTO THE INSPECTOR FOR APPROVAL.NEW CONDUIT SHALL BE AT 36" MINIMUM DEPTH TO THETOP AND MAINTAIN A MINIMUM 1-FOOT VERTICALCLEARANCE BETWEEN OUTER SURFACE OF EXISTINGSTRUCTURE AND MINIMUM 5-FOOT HORIZONTALSEPARATION OF WATER MAIN, STORM DRAIN AND SEWERSTRUCTURE.CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFOREBEGINNING ANY EXCAVATION PREVENTS DAMAGE TOUNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILYINJURY.INSTALL CATCH BASIN INSERT ON ALL CB WITHCONSTRUCTION ZONE.ALL SPOILS WILL BE HAULED OFF SITE.5/8" MINUS CRUSHED ROCK WILL BE USED FOR BACKFILLElectric Cable in SCH80 POLY ConduitFinal Grade24" Typical(6" Min)36" MinCoverBackfill shall not damage the conduit.Backfill hard surface w/while directional drilling36" MinDepthFinal Grade24" Typical(6" Min)8' Longcrushed rock 5/8 minusBackfill soft surface withclean natural materialPLAN VIEWTYPICAL BORE COVERWill maintain 36" Min. depth BORE PIT DETAILNOT TO SCALEBORE PITPOT HOLE*NOTE:BORE PITS, TRENCH HATCHING & POTHOLES ARE NOTSHOWN TO SCALE FOR VISUAL PURPOSES. PLEASE SEE BOREPIT DETAIL FOR TYP. BORE PIT & TRENCH DIMENSIONS.4" Min Shading Clean NativeSoil, Sand or 5/8" Minus2" Min Bedding Clean NativeSoil, Sand or 5/8" MinusMFP21003032POTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS