Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_211029_v11601 Lind Construction Mitigation: Proposed Construction – 12/15/2022 to 4/1/2022 Hours & Days of Construction – Monday through Friday 5AM-2PM. There may be occasional weekend work, but don’t anticipate a ton. That would be as needed, and on Saturday with the same standard working hours noted above. Our proposed hauling / transportation will vary based on the routes that the waste management company will go to dump our dumpsters. We are proposing to have a covered dumpster on site that will be emptied on a weekly basis and depending on which hauler that is, the route may be different each week. Our project is an interior tenant improvement, we do not expect there to be any environmental impacts that need to be addressed. There will be no traffic and or transportation impacts to the City and surrounding areas due to our project. Special Hours – None; all of our hauling will be done during daytime hours noted above. Traffic Control – Our project will have no impact to the general traffic in the City and surrounding area. The building is unoccupied, has substantial parking and driveway for all traffic. There is not a need for street and/or sidewalk closures, and the work will be limited to this building only.