Loading...
HomeMy WebLinkAboutMFP21005289.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21005289 IVR Number: 21005289 Permit Information Permit Name: ExteNet Systems - Fiber - EXTENET - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202Address/Location:11/01/2021Application Date:1253810260Parcel Number: 1001 SW 34TH ST Permit Type:11/22/2021Issue Date:Franchise Permit Work Class:11/22/2022Expiration Date:Minor Utility Job Number: SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202Franchise Type:Telephone Description: ExteNet Systems Inc. master franchise agreement, ORD 6013 EXTENET PHASE 2 SEG 16 S 007401 P 023588 NW WA WINONASC 00202 OPEN TRENCH/ DIRECTIONAL DRILL WEST FROM EXISTING VAULT PLACED UNDER (SOUTH RENTON PHASE 2 SEG 12 S 007400 P 023587 CTL PLANS) TO PROPOSED 233LA VAULT. PULL (1) 144F CABLE THROUGH COIL AND SPLICE. RESTORATION PER CITY OF RENTON STANDARDS Contacts Name Address PhoneTypeBilling Michael Smith North Sky Communications 21320 84th Ave S Kent, WA 98032 Applicant Rachel Fenton Extenet Systems LLC 3030 Warrenville Road Warrenville Rd, Suite 340 Lisle, IL 60532 Applicant MGC Permits MGC Technical 6244 185th AVE NE, STE 250 REDMOND, WA 98052 ApplicantX Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 GK SERVICES CO 5995 OPUS PKWY #500 MINNETONKA , MN 55343 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP21005289 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 11/22/2021 NO.123PROJECT NAME: EXTENET - TUKWILA - PHASE 2 - SEG 16 - TCPSNORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - TCPS.dwgPERMIT NUMBER: RRRRR RRRRCONFIDENTIAL/PROPRIETARYSHEET: OF 12TUKWILA TCP REQUIREMENTS1.SIGNS DEVICES AND SPACING SHALL CONFORM TO THE MUTCD.2.PRIORITY PASSAGE SHALL BE PROVIDED TO EMERGENCY VEHICLES.3.NOTIFY TRANSIT 5 DAYS IN ADVANCE OF CARPOOL SPACE / BUS ROUTE & STOPIMPACTS.4.MUTCD DEFINED PROTECTIVE VEHICLE TO BE PLACED IN AN EFFECTIVE LOCATION TOPROTECT WORKERS (RECOMMENDED).5.MAINTAIN 11' VEHICLE TRAVEL LANE WIDTH AT ALL TIMES.6.MAINTAIN 4' OF UNAFFECTED PEDESTRIAN TRAVEL LANE ON OPEN SIDEWALKS.7.MAINTAIN 6' LANDING BEHIND OPEN ADA RAMPS AT ALL TIMES WHEN WORKING INTHEIR VICINITY.8.FLAGGERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARE TO MAINTAINOPEN SIDEWALKS AND ADA RAMPS.9.IF OPEN SIDEWALKS AND ADA RAMPS CANNOT BE MAINTAINED, CONTRACTOR IS TOPROVIDE A PATH FOR PEDESTRIAN TRAVEL THROUGH / AROUND STAGING AREA ASDEFINED BY THE MUTCD.10.ALL ADVANCED WARNING SIGNS SHALL BE MINIMUM 48"X48" BLACK ON FLUORESCENTORANGE UNLESS SPECIFIED OTHERWISE.11.CHANNELIZATION DEVICES ARE TO CONFORM TO THE MUTCD (28" RETROREFLECTIVECONES ARE SUGGESTED).12.ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS ANDDRIVEWAYS.13.STREET SHALL BE COMPLETELY CLEAR TO FULL WIDTH BETWEEN 3PM & 9AMWEEKDAYS, UNLESS EXTENDED HOURS ARE ALLOWED BY WRITTEN PERMISSIONFROM LOCAL DOT AND TC.14.LAW ENFORCEMENT OFFICERS ARE TO BE USED IN LIEU OF FLAGGERS TO CONTROLINTERSECTION TRAFFIC. MULTIPLE OFFICERS ARE TO BE USED FOR INTERSECTIONSON HIGH IMPACT STREETS.15."NO PARKING" SIGNS TO BE PLACED ON CURB SPACE, INCLUDING PAID PARKING.16.CONTRACTOR IS TO COORDINATE / FACILITATE DRIVEWAY / LOADING ZONE ACCESS.17.PROTECTIVE VEHICLE SHALL MAINTAIN 500'-1000' OF SIGHT DISTANCE TOAPPROACHING TRAFFIC.18.CONTACT REGIONAL TRAFFIC OFFICE STAFF FOR ASSISTANCE WITH SPECIFIC IN LANEOPERATIONS SUCH AS STRIPING, FOG SEAL, ETC. THAT REQUIRE ADDITIONAL PLANSAND DETAILS.35 / 40 MPH25 / 30 MPH350' ±200' ±**ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.RURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSRURAL ROADS & URBAN ARTERIALS45 / 55 MPH500' ±RURAL ROADS60 / 65 MPH800' ±RURAL HIGHWAYS55 / 70 MPHFREEWAYS & EXPRESSWAYS25 MPH or LESS100' ±**URBAN STREETS1500' ±(OR PER THE MUTCD)*ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGERAMPS, AT-GRADE INTERSECTIONS, AND DRIVEWAYS.**ADVANCED WARNING SIGNS IF FEASIBLE.SIGN SPACING = X (FEET)*TEMPORARY TRAFFIC CONTROL ZONE ELEMENTS25303540455055606570MINIMUM LONGITUDINAL BUFFER SPACE = B (FEET)155200250305360425-MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED > 45 MPHPOSTED SPEED < 45 MPHL=W•S (W = LANE WIDTH & S = POSTED SPEED)L=(W•S²)/60 (W = LANE WIDTH & S = POSTED SPEED)POSTED SPEED (MPH)LENGTH (FEET)---ROLL-AHEAD DISTANCE = R (FEET)R = 30' MINIMUM - 100' MAXIMUMMAXIMUM CHANNELIZING DEVICE SPACING (FEET)50 / 7035 / 4525 / 30206080404030POSTED SPEED (MPH)TAPERTANGENTKnow what'sbelow.before you dig.CallRNORTH SKY COMMUNICATIONS, LLCCONTACT: MICHAEL SMITH 22517 88THAVE S KENT, WA 98031 C. 206.305.5881MSMITH@NORTHSKYCOMM.COMSCOPE OF WORK:USE WORK AREA TO ACCESS EXISTING VAULT,PROOF CONDUIT AND PULL JETLINE THROUGH.STREET USE PERMIT #: TBD BY CITYHOURS: TBD BY CITYSHORT-TERM STATIONARY WORK ZONE - LANE CLOSURE (FOR URBAN ARTERIAL ROADWAY)LEGEND HIGH VISIBILITY WARNING BEACON(REQUIRED)SIGN LOCATION ANDIDENTIFICATION NUMBERW20-1CHANNELIZING DEVICESROADWORKAHEADSIGN LEGEND RIGHTLANECLOSEDAHEADARROW BOARD - SEQUENTIALCHEVRON MODE (REQUIRED)WORKVEHICLE 2' MINWORK AREA 10'X18'50'-100'LW20-1W20-1W20-5RW4-2RXXXTRAFFIC CONTROL PLAN #1 - USE SET-UP WHERE APPLICABLE ALONG SW 34TH ST (EAST BOUND LANE)1000 SW 34TH STPARCEL NO.63085000201001 SW 34TH STPARCEL NO.1253810260851 SW 34TH STPARCEL NO.1253810270SW 34TH STMFP21005289 NO.123PROJECT NAME: EXTENET - TUKWILA - PHASE 2 - SEG 16 - TCPSNORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - TCPS.dwgPERMIT NUMBER: RCONFIDENTIAL/PROPRIETARYSHEET: OF 22TUKWILA TCP REQUIREMENTS1.SIGNS DEVICES AND SPACING SHALL CONFORM TO THE MUTCD.2.PRIORITY PASSAGE SHALL BE PROVIDED TO EMERGENCY VEHICLES.3.NOTIFY TRANSIT 5 DAYS IN ADVANCE OF CARPOOL SPACE / BUS ROUTE & STOPIMPACTS.4.MUTCD DEFINED PROTECTIVE VEHICLE TO BE PLACED IN AN EFFECTIVE LOCATION TOPROTECT WORKERS (RECOMMENDED).5.MAINTAIN 11' VEHICLE TRAVEL LANE WIDTH AT ALL TIMES.6.MAINTAIN 4' OF UNAFFECTED PEDESTRIAN TRAVEL LANE ON OPEN SIDEWALKS.7.MAINTAIN 6' LANDING BEHIND OPEN ADA RAMPS AT ALL TIMES WHEN WORKING INTHEIR VICINITY.8.FLAGGERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARE TO MAINTAINOPEN SIDEWALKS AND ADA RAMPS.9.IF OPEN SIDEWALKS AND ADA RAMPS CANNOT BE MAINTAINED, CONTRACTOR IS TOPROVIDE A PATH FOR PEDESTRIAN TRAVEL THROUGH / AROUND STAGING AREA ASDEFINED BY THE MUTCD.10.ALL ADVANCED WARNING SIGNS SHALL BE MINIMUM 48"X48" BLACK ON FLUORESCENTORANGE UNLESS SPECIFIED OTHERWISE.11.CHANNELIZATION DEVICES ARE TO CONFORM TO THE MUTCD (28" RETROREFLECTIVECONES ARE SUGGESTED).12.ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS ANDDRIVEWAYS.13.STREET SHALL BE COMPLETELY CLEAR TO FULL WIDTH BETWEEN 3PM & 9AMWEEKDAYS, UNLESS EXTENDED HOURS ARE ALLOWED BY WRITTEN PERMISSIONFROM LOCAL DOT AND TC.14.LAW ENFORCEMENT OFFICERS ARE TO BE USED IN LIEU OF FLAGGERS TO CONTROLINTERSECTION TRAFFIC. MULTIPLE OFFICERS ARE TO BE USED FOR INTERSECTIONSON HIGH IMPACT STREETS.15."NO PARKING" SIGNS TO BE PLACED ON CURB SPACE, INCLUDING PAID PARKING.16.CONTRACTOR IS TO COORDINATE / FACILITATE DRIVEWAY / LOADING ZONE ACCESS.17.PROTECTIVE VEHICLE SHALL MAINTAIN 500'-1000' OF SIGHT DISTANCE TOAPPROACHING TRAFFIC.18.CONTACT REGIONAL TRAFFIC OFFICE STAFF FOR ASSISTANCE WITH SPECIFIC IN LANEOPERATIONS SUCH AS STRIPING, FOG SEAL, ETC. THAT REQUIRE ADDITIONAL PLANSAND DETAILS.35 / 40 MPH25 / 30 MPH350' ±200' ±**ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.RURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSRURAL ROADS & URBAN ARTERIALS45 / 55 MPH500' ±RURAL ROADS60 / 65 MPH800' ±RURAL HIGHWAYS55 / 70 MPHFREEWAYS & EXPRESSWAYS25 MPH or LESS100' ±**URBAN STREETS1500' ±(OR PER THE MUTCD)*ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGERAMPS, AT-GRADE INTERSECTIONS, AND DRIVEWAYS.**ADVANCED WARNING SIGNS IF FEASIBLE.SIGN SPACING = X (FEET)*TEMPORARY TRAFFIC CONTROL ZONE ELEMENTS25303540455055606570MINIMUM LONGITUDINAL BUFFER SPACE = B (FEET)155200250305360425-MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED > 45 MPHPOSTED SPEED < 45 MPHL=W•S (W = LANE WIDTH & S = POSTED SPEED)L=(W•S²)/60 (W = LANE WIDTH & S = POSTED SPEED)POSTED SPEED (MPH)LENGTH (FEET)---ROLL-AHEAD DISTANCE = R (FEET)R = 30' MINIMUM - 100' MAXIMUMMAXIMUM CHANNELIZING DEVICE SPACING (FEET)50 / 7035 / 4525 / 30206080404030POSTED SPEED (MPH)TAPERTANGENTKnow what'sbelow.before you dig.CallRNORTH SKY COMMUNICATIONS, LLCCONTACT: MICHAEL SMITH 22517 88THAVE S KENT, WA 98031 C. 206.305.5881MSMITH@NORTHSKYCOMM.COMSCOPE OF WORK:USE WORK AREA TO ACCESS EXISTING VAULT,PROOF CONDUIT AND PULL JETLINE THROUGH.STREET USE PERMIT #: TBD BY CITYHOURS: TBD BY CITYSHORT-TERM STATIONARY WORK ZONE - LANE CLOSURE (FOR URBAN ARTERIAL ROADWAY)LEGEND HIGH VISIBILITY WARNING BEACON(REQUIRED)SIGN LOCATION ANDIDENTIFICATION NUMBERW20-1CHANNELIZING DEVICESROADWORKAHEADSIGN LEGEND RIGHTLANECLOSEDAHEADW20-1SW 34TH STOAKSDALE AVE SWW20-5RW20-1X W20-5RW20-1X WORKVEHICLE 2' MIN50'-100'WORK AREA 10'X15'TRAFFIC CONTROL PLAN #2 - USE SET-UP WHERE APPLICABLE ALONG SW 34TH ST (EAST BOUND LANE)1000 SW 34TH STPARCEL NO.63085000201001 SW 34TH STPARCEL NO.1253810260W16-7LMFP21005289 NO.123PROJECT NAME: PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202NORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - PLANS.dwgPERMIT NUMBER: RSITE LOCATIONSHEET INDEXSCOPE OF WORK:Know what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 17ADDRESS: 1001 SW 34TH ST, RENTON, WA 98057PROJECT NAME: EXTENET - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202- PLANS1.COVER SHEET / SITE LOCATION2.LEGEND3. GENERAL NOTES4-5. DESIGN VIEWS A-B6. UNDERGROUND DETAILS7. SITE PHOTOSCONTACTSMATT FRASERMGC TECHNICAL CONSULTING, INC.6244 185TH AVE NEREDMOND, WA 98052C.206.618.5254MATT@MGCTECHNICAL.COMNORTH SKY COMMUNICATIONS,LCC CONTACT:MICHAEL SMITH22517 88TH AVE SKENT, WA 98031C.206.305.5881MSMITH@NORTHSKYCOMM.COMS H E E T 5 S H E E T 4ENDSTART OPEN TRENCH/ DIRECTIONAL DRILL WESTFROM EXISTING VAULT PLACED UNDER(SOUTH RENTON - PHASE 2 - SEG 12 -S-007400 P-023587 - CTL PLANS) TOPROPOSED 233LA VAULT. PULL (1) 144FCABLE THROUGH COIL AND SPLICE.MFP21005289 NO.123PROJECT NAME: PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202NORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - PLANS.dwgPERMIT NUMBER: RKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 27#F#F#F##LEGENDMFP21005289 NO.123PROJECT NAME: PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202NORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - PLANS.dwgPERMIT NUMBER: RGENERAL NOTESKnow what'sbelow.before you dig.CallRGENERAL NOTES:UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTINGAND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTINGTHE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THEDISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED.TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK ISFOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALLOTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THECONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.SPECIFICALLY STATED OTHERWISE.CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCHALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE RENTON ENGINEERINGALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTHCONFIDENTIAL/PROPRIETARYSHEET: OF 37The locations of utilities shown on these drawing are only approximate. MGC TECHNICAL CONSULTING, INC. hereby disclaims any responsibilityto third parties for the accuracy of this information. Persons working in the area covered by this drawing must contact the statewideCall-Before-You-Dig System to ascertain the location of underground utilities prior to performing any excavation.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORKSTANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE RENTON REGULATIONS AND APPLICABLE STATEAND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLESTANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIREINSPECTED AND APPROVED BY THE RENTON INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TOBE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ONTHESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THEFIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCALUTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTION POINTSUTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.CONTRACTOR SHALL NOTIFY THE RENTON INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTHTHE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE RENTON AND ALL UTILITY COMPANIES WITH REGARDACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLETHE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDSTIMES.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION,TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, ORALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESSFOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE RENTON, THE CONTRACTOR SHALL SUBMIT ATRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIESWITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFICCONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BEHELD WITH RENTON.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THEINTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVEDOR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALLCONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT ATTHE CONSTRUCTION SITE AND AVAILABLE TO THE RENTON INSPECTOR AT ALL TIMES.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATIONALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TOTIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THETIME PERIOD APPROVED BY THE RENTON.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.MFP21005289 NO.123PROJECT NAME: PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202NORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - PLANS.dwgPERMIT NUMBER: RRRRRCONFIDENTIAL/PROPRIETARYSHEET: OF 47CONSTRUCTION NOTESMATCH TO SHEET 5DESIGN VIEW A Know what'sbelow.before you dig.CallR#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #7 FOR SITE PHOTOGRAPHS.SW 34TH ST1000 SW 34TH STPARCEL NO.63085000201001 SW 34TH STPARCEL NO.125381026080' 17'43'19' 11'11'11'11'851 SW 34TH STPARCEL NO.1253810270MATCH TO PROJECT SOUTH RENTON - PHASE 2 - SEG 12 - S-007400 P-023587- CTL PLANS 3PROPOSED BORE (1) 4" CONDUIT, REPAIR SURFACE AS PERCITY OF RENTON STANDARDS. PULL (3) 1.25 INNERDUCTAND (1) 144F CABLE THROUGH.2PROPOSED (1) 4X6 BORE PIT. REPAIR SURFACE AS PER CITYOF RENTON STANDARDS.1PROPOSED OPEN TRENCH (1) 4" CONDUIT, REPAIRSURFACE AS PER CITY OF RENTON STANDARDS. PULL (3)1.25 INNERDUCT AND (1) 144F CABLE THROUGH.POTHOLE UTILITY CROSSING PRIOR TO BORE. MAINTAINMINIMUM 2' VERTICAL CLEARANCE AT THE CROSSING FROMEXISTING UTILITIES.RESTORATION NOTESARESTORE LANDSCAPE PER RENTON STANDARDS.DRESTORE ASPHALT PER RENTON STANDARDS.ERESTORE CURB & GUTTER PER RENTONSTANDARDS.123ADED1194'9' 2'5'18'20'MFP21005289 NO.123PROJECT NAME: PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202NORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - PLANS.dwgPERMIT NUMBER: RCONFIDENTIAL/PROPRIETARYSHEET: OF 57CONSTRUCTION NOTESMATCH TO SHEET 4DESIGN VIEW B Know what'sbelow.before you dig.CallR#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #7 FOR SITE PHOTOGRAPHS.SW 34TH ST1000 SW 34TH STPARCEL NO.63085000201001 SW 34TH STPARCEL NO.125381026079' 17'43'19' 11'11'11'11' OAKSDALE AVE SW 3PROPOSED BORE (1) 4" CONDUIT, REPAIR SURFACE AS PERCITY OF RENTON STANDARDS. PULL (3) 1.25 INNERDUCTAND (1) 144F CABLE THROUGH.2PROPOSED (1) 4X6 BORE PIT. REPAIR SURFACE AS PER CITYOF RENTON STANDARDS.4PROPOSED (1) 233LA VAULT, CORE VAULT AND PLACECONDUIT. REPAIR SURFACE AS PER CITY OF RENTONSTANDARDS. COIL (1) 144F CABLE THROUGH.1PROPOSED OPEN TRENCH (1) 4" CONDUIT, REPAIRSURFACE AS PER CITY OF RENTON STANDARDS. PULL (3)1.25 INNERDUCT AND (1) 144F CABLE THROUGH.RESTORATION NOTESARESTORE LANDSCAPE PER RENTON STANDARDS.DRESTORE ASPHALT PER RENTON STANDARDS.ERESTORE CURB & GUTTER PER RENTONSTANDARDS.POTHOLE UTILITY CROSSING PRIOR TO BORE. MAINTAINMINIMUM 2' VERTICAL CLEARANCE AT THE CROSSING FROMEXISTING UTILITIES.4123DAADE28'231'4'22' 19' 6' 17' 21'MFP21005289 NO.123PROJECT NAME: PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202NORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - PLANS.dwgPERMIT NUMBER: RKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 67UNDERGROUND TYPICALS233LA VAULT DETAILSCALE: NTSNo. 23-2436PVAULTNo. 233-BLCOVERMANHOLE COVER AND FRAMELOADING: BUILT TO AN H2O RATING UP TO 150 KIPTYPICAL TRENCH IN SOIL DETAILSCALE: NTSPANEL WIDTH PER PLAN12"MIN.12"MIN.3" HMA (CL 12") (MATCHEX. IF GREATER)EX. ASPHALT SURFACE6" MIN. COMPACT MINERALAGGREGATE TYPE 2COMPACTED BACKFILL6" SAND COVER6" SAND BEDDING24"12"6"6"3' MIN.TYPICAL ASPHALT PATCH DETAILSCALE: NTSEXISTING GROUNDWARNING TAPEBACKFILL(8" LAYERS)6" MIN.12"36" MIN. DEPTH4"BACKFILL(COMPACTED @ 90%)HDPE DUCTCLEAN BACKFILLBACKFILL(COMPACTED EARTH @ 90%)MFP21005289 NO.123PROJECT NAME: PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202NORTH SKY COMMUNICATIONS ENGINEER: MICHAEL SMITHENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 1001 SW 34TH ST RENTON, WA 98057DRAWING NAME: SOUTH RENTON - PHASE 2 - SEG 16 S-007401 P-023588 - NW-WA-WINONASC-00202 - PLANS.dwgPERMIT NUMBER: RSITE PHOTOGRAPHSCONSTRUCTION NOTESKnow what'sbelow.before you dig.CallRPHOTO #1: FACING SOUTH ON EAST SIDE OF LIND AVE SWPHOTO #2: FACING SOUTH ON EAST SIDE OF LIND AVE SWCONFIDENTIAL/PROPRIETARYSHEET: OF 773PROPOSED BORE (1) 4" CONDUIT, REPAIR SURFACE AS PERCITY OF RENTON STANDARDS. PULL (3) 1.25 INNERDUCTAND (1) 144F CABLE THROUGH.2PROPOSED (1) 4X6 BORE PIT. REPAIR SURFACE AS PER CITYOF RENTON STANDARDS.4PROPOSED (1) 233LA VAULT, CORE VAULT AND PLACECONDUIT. REPAIR SURFACE AS PER CITY OF RENTONSTANDARDS. COIL (1) 144F CABLE THROUGH.1PROPOSED OPEN TRENCH (1) 4" CONDUIT, REPAIRSURFACE AS PER CITY OF RENTON STANDARDS. PULL (3)1.25 INNERDUCT AND (1) 144F CABLE THROUGH.1232314MFP21005289