Loading...
HomeMy WebLinkAboutRS_Hazardous_Materials_Statement_210923_v1.pdf1 Planning Division City of Renton 1055 South Grady Way, Renton, WA 98057 Estefania Escamilla 4G Development & Consulting, Inc. Phone: 619-654-4431 Email: eescamilla@4gdev.com Address: PO BOX 270571, San Diego, CA 92198 and delineators to keep the traffic flow moving. · How will circulation through the site work during construction? Once the driveway on Rainier is closed, will vehicles be forced to access the site to/from the signal at S 3rd Place?All vehicles will have the same access as they currently do. Once we are ready to transfer from current DT to new DT the ac- cess point on Rainier will change. The ac- cess point will be a little more north, and then we will close off the current access point to finish Phase 4. I can hope on a call with yourself or TENW to explain. To reiter- ate, it is our goal to always have the DT open and street access open. How will circulation through the site work during construction? Once the driveway on Rainier is closed, will vehicles be forced to access the site to/from the signal at S 3rd Place?All vehicles will have the same access as they currently do. Once we are ready to transfer from current DT to new DT the ac- cess point on Rainier will change. The ac- cess point will be a little more north, and then we will close off the current access point to finish Phase 4. I can hope on a call with yourself or TENW to explain. To reiter- ate, it is our goal to always have the DT open and street access open.