HomeMy WebLinkAboutRS_Hazardous_Materials_Statement_210923_v1.pdf1
Planning Division
City of Renton
1055 South Grady Way, Renton, WA 98057
Estefania Escamilla
4G Development & Consulting, Inc.
Phone: 619-654-4431
Email: eescamilla@4gdev.com
Address: PO BOX 270571, San Diego, CA 92198
and delineators to keep the traffic flow
moving.
·
How will circulation through the site work
during construction? Once the driveway on
Rainier is closed, will vehicles be forced to
access the site to/from the signal at S 3rd
Place?All vehicles will have the same access
as they currently do. Once we are ready to
transfer from current DT to new DT the ac-
cess point on Rainier will change. The ac-
cess point will be a little more north, and
then we will close off the current access
point to finish Phase 4. I can hope on a call
with yourself or TENW to explain. To reiter-
ate, it is our goal to always have the DT
open and street access open.
How will circulation through the site work
during construction? Once the driveway on
Rainier is closed, will vehicles be forced to
access the site to/from the signal at S 3rd
Place?All vehicles will have the same access
as they currently do. Once we are ready to
transfer from current DT to new DT the ac-
cess point on Rainier will change. The ac-
cess point will be a little more north, and
then we will close off the current access
point to finish Phase 4. I can hope on a call
with yourself or TENW to explain. To reiter-
ate, it is our goal to always have the DT
open and street access open.