Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Final Agenda Packet
CITY OF RENTON AGENDA - City Council Regular Meeting 7:00 PM - Monday, December 6, 2021 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way Due to the COVID-19 pandemic, Councilmembers are attending this meeting remotely through Zoom. Audience comments will be accommodated through Zoom. Speakers must click the link to the registration form (linked below), fill it out, and submit it by 5 p.m. on the day of the Council meeting. The public may also submit comments in writing to cityclerk@rentonwa.gov by 5 p.m. on the day of the meeting. Registration is not required for those who wish to speak during public hearings. Registration for Audience Comment Registration will be open at all times, but speakers must register by 5 p.m. on the day of a Council meeting in order to be called upon. Anyone who registers after 5 p.m. on the day of the Council meeting will not be called upon to speak and will be required to re-register for the next Council meeting if they wish to speak at that next meeting. • Request to Speak Registration Form • You may also copy/paste the following URL into your browser: https://forms.office.com/g/bTJUj6NrEE • You may also call 425-430-6501 or email jsubia@rentonwa.gov or cityclerk@rentonwa.gov to register. Please provide your full name, city of residence, email address and/or phone number, and topic in your message. • Instructions for Virtual Attendance For those wishing to attend by Zoom, please (1) click this link: https://us02web.zoom.us/j/84938072917?pwd=TUNCcnppbjNjbjNRMWpZaXk2bjJnZz09 (or copy the URL and paste into a web browser) or (2) call-in to the Zoom meeting by dialing 253- 215-8782 and entering 849 3807 2917 Passcode 156708, or (3) call 425-430-6501 by 5 p.m. on the day of the meeting to request an invite with a link to the meeting. Those providing audience comments will be limited to 5 minutes each speaker unless an exception is granted by the Council. Attendees will be muted and not audible to the Council except during times they are designated to speak. Advance instructions for how to address the Council will be provided to those who sign up in advance to speak and again during the meeting. 1. CALL TO ORDER 2. ROLL CALL 3. SPECIAL PRESENTATION a) GSCA Crystal Award-Willowcrest Townhomes Partnership 4. PUBLIC HEARING a) Extend Economic Recovery Signs and Permits Ordinance b) Right-of-Way ADA Transition Plan 5. ADMINISTRATIVE REPORT a) Administrative Report 6. AUDIENCE COMMENTS NOTICE to all participants: Pursuant to state law, RCW 42.17A.555, campaigning for any ballot measure or candidate in City Hall and/or during any portion of the council meeting, including the audience comment portion of the meeting, is PROHIBITED. 7. CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a) Approval of Council Meeting minutes of 11/22/2021. Council Concur b) AB - 3018 Mayor Pavone reappoints the following individuals to the Renton Municipal Arts Commission, with terms expiring December 31, 2024: Ms. Evelyn Reingold; Ms. Mary Clymer, Ms. Brianna Burroughs; Ms. Kaie Wise; and Ms. Caren Sumption. Council Concur c) AB - 3009 Community & Economic Development Department recommends approval of a 100-percent waiver of the eligible development fees and an 80-percent waiver of eligible impact fees, per Renton Municipal Code (RMC) 4-1-210C.4, for the Sunset Gardens development, 76 new multi-family units located at 2900 NE 10th St; and defer the execution and recording of restrictive covenant documents to prior to the issuance of Temporary Certificate of Occupancy for the building in order to expedite permit review and issuance. Refer to Finance Committee d) AB - 3010 Community & Economic Development Department recommends approval of a 100-percent waiver of the eligible development fees and an 80-percent waiver of eligible impact fees, per Renton Municipal Code (RMC) 4-1-210C.4, for the Watershed Apartments project, 145 new multi-family units located at 615 and 617 Williams Ave S; and defer the execution and recording of restrictive covenant documents to prior to the issuance of Temporary Certificate of Occupancy for the buildings in order to expedite permit review and issuance. Refer to Finance Committee e) AB - 3024 Equity, Housing, and Human Services Department recommends approval of a grant agreement, with the Renton Housing Authority, committing $1,500,000 for their Sunset Gardens affordable housing project; a 76-unit affordable rental housing unit that redevelops the Renton Housing Authority's current office building into a new four-story mixed use building. Refer to Finance Committee f) AB - 3019 Finance Department submits a utility bill leak adjustment request from Henry Friedman, for a non-residential property located at 532 Rainier Ave S, and recommends an adjustment in the amount of $4,457.91 for applicable Renton water and sewer and King County Sewer portions of the utility bill in accordance with Renton Municipal Code 8- 4-46 and 8-5-23. Refer to Finance Committee g) AB - 3020 Finance Department submits a utility bill leak adjustment request from Car Wash Enterprises, Inc., a commercial property located at 800 S Grady Way, and recommends an adjustment in the amount of $4,085.64 for the applicable Renton water and sewer and King County Sewer portions of the utility bill in accordance with Renton Municipal Code 8-4-46 and 8-5-23. Refer to Finance Committee h) AB - 3021 Finance Department submits a utility bill leak adjustment request from Beijing Men, owner of a multi-family property located at 2011 Jefferson Ave NE, and recommends an adjustment in the amount of $2,015.15 for applicable Renton water and sewer and King County Sewer portions of the utility bill in accordance with Renton Municipal Code 8-4-46 and 8-5-23. Refer to Finance Committee i) AB - 3022 Finance Department submits a utility bill leak adjustment request from Renton Preservation, LP, owner of a multi-family property located at 3000 Royal Hills Drive SE, and recommends an adjustment in the amount of $6,165.03 for applicable Renton water and sewer and King County Sewer portions of the utility bill in accordance with Renton Municipal Code 8-4-46 and 8-5-23. Refer to Finance Committee j) AB - 3006 Human Resources / Risk Management Department recommends approval of the 2022 Excess Loss insurance contract, with Symetra, in the amount of $838,000, for 2022. Refer to Finance Committee k) AB - 3008 Human Resources / Risk Management Department recommends approval of the City of Renton's 2022 liability insurance renewal with Alliant, with an estimated 25- 30% increase over the 2021 premium of $542,239, for liability and insurance coverage for the airport, law enforcement, unmanned aircraft (drones) and underground storage tanks. Refer to Finance Committee l) AB - 3027 Parks & Recreation Department requests approval to hire a Youth Athletics/Fitness Recreation Coordinator at Step D of salary grade a18, effective December 16, 2021. Refer to Finance Committee m) AB - 3016 Parks & Recreation Department - PPNR recommends approval of an agreement with Davey Resources Group, Inc., in the amount of $144,540, for certified arborist inspection services for 2022. Refer to Finance Committee n) AB - 3017 Parks & Recreation Department - PPNR recommends approval of a three-year agreement, with Canber Corps, in the amount of $207,682.73 per year (total $623,048.19 over the three-year period), for groundskeeping work at 45 separate sites located within City limits. Refer to Finance Committee o) AB - 3023 Police Department recommends approval of an interagency agreement with the Washington Traffic Safety Commission, in order to receive up to $9,900 in grant funds, for reimbursement of overtime costs related to conducting multi-jurisdictional, high-visibility enforcement traffic safety emphasis patrols in support of Target Zero priorities of reducing traffic related deaths and serious injuries. Refer to Finance Committee p) AB - 3026 Public Works Transportation Systems Division recommends approval to execute the Regional Mobility Capital Construction Grant Agreement, with the Washington State Department of Transportation, to accept $2,000,000 in grant funds, and approval of all subsequent amendments to the agreement necessary to accomplish the Rainier Ave S Corridor Improvement - Phase 4 project. Refer to Finance Committee q) AB - 3005 Public Works Utility Systems Division recommends adoption of an ordinance approving the 2022 Solid Waste Utility revenue requirements which is required to correct a substantial imbalance in the generator of revenue versus cost by the service sector (residential vs. commercial). Refer to Utilities Committee 8. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a) Committee of the Whole: Allocation of Lodging Tax Funding for 2022 b) Committee on Committees: 2022 Council Committee Assignments c) Finance Committee: Vouchers, 2022 Salary Table* d) Utilities Committee: 2021 Surface Water Utility System Plan*; Change Order No. 1 to CAG-21-001 with SCI Infrastructure, LLC for the Downtown Utility Improvement Project 9. LEGISLATION Resolution: a) Resolution No. 4455: Adopt Surface Water Utility Plan (See Item 8.d) Ordinances for first reading: b) Ordinance No. 6040: 2022 Salary Table (See Item 8.c) c) Ordinance No. 6041: D-185 – Bonus Density 3rd Party Reporting (Approved via 3/22/2021 Planning and Development Committee) d) Ordinance No. 6042: D-186 – Cottage Housing (Approved via 3/22/2021 Planning and Development Committee) e) Ordinance No. 6043: D-188 – Impact Fee Credit (Approved via 6/14/2021 Planning and Development Committee) f) Ordinance No. 6044: D-189 – Setbacks in Commercial Zones (Approved via 6/14/2021 Planning and Development Committee) g) Ordinance No. 6045: D-190 – Applicability of Design Regulations (Approved via 6/14/2021 Planning and Development Committee) h Ordinance No. 6046: D-191 - ADUs with Religious Institutions (Approved via 9/13/2021 Planning and Development Committee) i) Ordinance No. 6047: D-192 - Fence Regulations (Approved via 6/14/2021 Planning and Development Committee) j) Ordinance No. 6048: D-196 - Height and Setbacks in RMF Zone (Approved via 9/13/2021 Planning and Development Committee) k) Ordinance No. 6049: D-199 - Residential Accessory Structures (Approved via 9/13/2021 Planning and Development Committee) Ordinance for first reading and advanced for second and final reading: l) Ordinance No. 6039: Extending Economic Recovery Signs and Permits (See Item 4.a) 10. NEW BUSINESS (Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.) 11. ADJOURNMENT COMMITTEE OF THE WHOLE MEETING AGENDA (Preceding Council Meeting) 6:15 p.m. - MEETING REMOTELY Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 To view Council Meetings online, please visit rentonwa.gov/councilmeetings PUBLICHEARING FOREXTENDINGINTERIMZONINGCONTROLS FORECONOMICRECOVERY:Renton City CouncilDecember 6, 2021Presented by: Brittany Gillia, Assistant Planner425-430-7246bgillia@rentonwa.govAGENDA ITEM #4. a) BACKGROUNDBACKGROUNDEmergency Ordinance 5974 was adopted on July 13, 2020Established interim zoning control to temporarily allow:•“Economic Recovery Right-of-Way Use Permits”; and•“Economic Recovery Signs”Ord. 5974 was extended and amended via Ord 5997 and extended again via Ord 6018. If Ord. 6018 is not extended it is set to expire on December 7, 2021.Emergency Ordinance 5974 was adopted on July 13, 2020Established interim zoning control to temporarily allow:•“Economic Recovery Right-of-Way Use Permits”; and•“Economic Recovery Signs”Ord. 5974 was extended and amended via Ord 5997 and extended again via Ord 6018. If Ord. 6018 is not extended it is set to expire on December 7, 2021.AGENDA ITEM #4. a) BACKGROUNDBACKGROUNDThe ordinance states:The ongoing presence of the COVID-19 pandemic is affecting businesses; andOn June 30th, 2021 Washington state reopened under the “Washington Ready Plan”; andWashington is still in a state of emergency due to the COVID-19 pandemic; and There is a continued need for economic recovery mitigation measures to assist businesses.The ordinance states:The ongoing presence of the COVID-19 pandemic is affecting businesses; andOn June 30th, 2021 Washington state reopened under the “Washington Ready Plan”; andWashington is still in a state of emergency due to the COVID-19 pandemic; and There is a continued need for economic recovery mitigation measures to assist businesses.AGENDA ITEM #4. a) BACKGROUNDBACKGROUNDOrd. 6018 extended the allowance of:•“Economic Recovery Right-of-Way Use Permits”; and•“Economic Recovery Signs”“Economic Recovery Right-of-Way Use Permits” that were issued as part of Ord. 5974 or Ord. 5997 that remained valid through June 7, 2021 were extended to coincide with the new expiration periodOrd. 6018 extended the allowance of:•“Economic Recovery Right-of-Way Use Permits”; and•“Economic Recovery Signs”“Economic Recovery Right-of-Way Use Permits” that were issued as part of Ord. 5974 or Ord. 5997 that remained valid through June 7, 2021 were extended to coincide with the new expiration periodAGENDA ITEM #4. a) BACKGROUNDBACKGROUNDOrdinance 6018 extended the following:A statement that parkletsthat are “pre-fabricated and engineered” as well as parklets without structural components are within the scope of Economic Recovery Revocable Right-of-Way PermitsRequired Temporary Use Permits for businesses who wish to temporarily expand their operations into an adjacent tenant space are temporarily waivedOrdinance 6018 extended the following:A statement that parkletsthat are “pre-fabricated and engineered” as well as parklets without structural components are within the scope of Economic Recovery Revocable Right-of-Way PermitsRequired Temporary Use Permits for businesses who wish to temporarily expand their operations into an adjacent tenant space are temporarily waivedAGENDA ITEM #4. a) BACKGROUNDBACKGROUNDOrdinance 6018 further extended the following:A limited number of short-term parking stallsare established for curbside pick-upor to go orders within the Center Downtown (CD) zoneCity Center Parking Garage fees are waived for parking periods up to 10 hoursOrdinance 6018 further extended the following:A limited number of short-term parking stallsare established for curbside pick-upor to go orders within the Center Downtown (CD) zoneCity Center Parking Garage fees are waived for parking periods up to 10 hoursAGENDA ITEM #4. a) PROPOSEDEXTENSIONPROPOSEDEXTENSIONInterim zoning controls are proposed to be extended until June 6, 2022“Economic Recovery Right-of-Way Use Permits” are proposed to be available until June 6, 2022“Economic Recovery Right-of-Way Use Permits” that were issued as part of Ord. 5974, Ord. 5997 and/or Ord. 6018 and remain valid through December 7, 2021 are proposed to beextended to coincide with the new expiration periodInterim zoning controls are proposed to be extended until June 6, 2022“Economic Recovery Right-of-Way Use Permits” are proposed to be available until June 6, 2022“Economic Recovery Right-of-Way Use Permits” that were issued as part of Ord. 5974, Ord. 5997 and/or Ord. 6018 and remain valid through December 7, 2021 are proposed to beextended to coincide with the new expiration periodAGENDA ITEM #4. a) Staff Contact:Brittany Gillia, Assistant Planner425-430-7246bgillia@rentonwa.govNEXTSTEPSNEXTSTEPSTonight:Accept public testimony regarding the proposed extension of interim zoning controls, with first and second reading, to be effective immediately upon adoptionIf adopted, the Ordinance will sunset on June 6, 2022and all Economic Recovery business expansions and signage must be removedContact Brittany Gillia at bgillia@rentonwa.gov or via the Business Assistance Hotline at (206)503-1742 to schedule a 30-minute planning session for permit applicationsTonight:Accept public testimony regarding the proposed extension of interim zoning controls, with first and second reading, to be effective immediately upon adoptionIf adopted, the Ordinance will sunset on June 6, 2022and all Economic Recovery business expansions and signage must be removedContact Brittany Gillia at bgillia@rentonwa.gov or via the Business Assistance Hotline at (206)503-1742 to schedule a 30-minute planning session for permit applicationsAGENDA ITEM #4. a) Staff Contact:Brittany Gillia, Assistant Planner425-430-7246bgillia@rentonwa.govQUESTIONS?QUESTIONS?AGENDA ITEM #4. a) Barrier Free Mobility Improving Access in Public Rights of Way City of Renton Right-of-Way ADA Transition Plan Update 2021 December 6, 2021 AGENDA ITEM #4. b) The ADA Transition Plan The Americans with Disabilities Act (ADA) •Signed into law in 1990 •Protects the rights of citizens with disabilities The Americans with Disabilities Act (ADA) requires that public entities having responsibility for, or authority over, facilities, streets, roads, sidewalks and/or other areas meant for public use develop a Transition Plan to make their facilities meet accessibility standards.AGENDA ITEM #4. b) AGENDA ITEM #4. b) A transition plan includes: Self Evaluation Physical Inventory Consider public feedback on problem areas and priorities Prioritize for Greatest Impact AGENDA ITEM #4. b) Renton ADA Transition Plan (2015) What was MISSING from 2015 plan? •Detailed self-evaluation •Future replacement schedule per funding programs •Grievance Policy in multiple accessible formats •Stakeholder input AGENDA ITEM #4. b) What does a transition plan do for a city? •Outlines how to make City facilities accessible over several years •Allows the City to receive grant funding from state and federal sources •Provides residents a way to request services and file grievances •Puts the City on a path toward limiting legal risk exposure by showing good faith effort to take steps to remove barriers to accessibility within available funding AGENDA ITEM #4. b) Renton ADA Transition Plan Update This update included: ❖Missing elements from 2015 plan ❖Limited risk exposure for City by demonstrating transition progress ❖Implemented robust stakeholder outreach strategy and involve stakeholders in prioritization process ❖Provides a more detailed prioritization framework and funding strategy for removing barriers ❖Identified a process for tracking progress towards meeting the barrier removal schedule using the City’s GIS platform ❖Brought together internal listening sessions at the City on policies and procedures on how to address ADA barriers ❖Used City’s GIS data to guide the City on how to include barrier removal across all project types AGENDA ITEM #4. b) Aligned with other City efforts 8 Domains of Livability as identified by AARP & World Health Organization •Renton joined as an AARP Age-Friendly City with a commitment to “the belief that the places where we live are more livable, and better able to support people of all ages, when local leaders commit to improving the quality of life for the very young, the very old, and everyone in between.” •The process to develop the ADA Transition Plan aligned with the AARP Age-Friendly ‘Transportation’ Domain AGENDA ITEM #4. b) Self-Evaluation AGENDA ITEM #4. b) Prioritization Scores AGENDA ITEM #4. b) #Recommended Actions Status 1 Update City design standards to match ADA Standards Underway 2 Identify an official responsible for Transition Plan implementation within the Public Works Department Complete 3 Modify a Citywide Accessible Pedestrian Signal (APS) policy Pending 4 Educate City staff, consultants, and contractors on ADA standards On-going 5 Develop a standard grievance process for barriers to accessibility Complete 6 Develop a consistent and centralized MEP documentation database Pending 7 Develop performance measures and processes to track removal of barriers Pending 8 Continue data collection for pedestrian features in the public right-of-way Pending 9 Review and clarify policies relating to accessibility and implementation of accessible features in construction projects Pending 10 Evaluate all City Programs and Activities as they relate to the ADA Pending 11 Look for opportunities to increase existing barrier removal funding to address all high priority barriers Pending Plan Recommendations AGENDA ITEM #4. b) The ADA Transition Plan is a living document. Oversee Construction /Implementation Customer Interface / Address Complaints Planning FacilitiesIt is meant to be updated, showing the City’s progress to becoming Barrier Free.AGENDA ITEM #4. b) Staff Recommendation •Solicit public comment on Draft Right-of-Way ADA Transition Plan Update •Include any public comment into final document •Incorporate any public comments into final document for adoption on December 13th AGENDA ITEM #4. b) Mayor’s Office Memorandum DATE: December 6, 2021 TO: Randy Corman, Council President Members of Renton City Council FROM: Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer SUBJECT: Administrative Report • City Hall has been open since July for in-person services at our Finance and Police Counters, Monday through Wednesday, 9 a.m. to 3 p.m. Our Municipal Court counter is open Thursday and Friday, 8:30 a.m. to 4:30 p.m., while hearings are conducted via zoom. Our staff continues to provide (and improve) virtual and online customer services such as our Virtual Permit Counter and our Recreation Programming reservation process. Space is limited in each facility and masks are required when inside a city facility as we follow guidance that protects both you and our employees. For more information, please visit our website. • Help us prevent local residential street flooding by monitoring catch basins near your home and keep them clear of leaves and other debris. Street sweepers are dispatched daily to clean up debris along major arterials. • The holidays are all about the spirit of giving. Donate new, unwrapped toys, jackets, hats, gloves and socks at the Holiday Gift Drive on Thursday, December 9. You can drop off your donations from 12:30-6:30 p.m. at the Renton Community Center, 1715 Maple Valley Highway. Gifts will be distributed to families in need who have been screened by Renton Salvation Army. • King County Fire Chiefs Association will be hosting a Diversity and Recruitment Workshop on Saturday, December 11, from 8:15 a.m. to 2:30 p.m. Fire service professionals will be discussing preparation for written exams, acing the oral boards, physical and mental wellness, and medical and psychological exams. Breakfast and lunch will be served. To register for this event visit http://www.kingcountyfirechiefs.org/king-county-diversity-and-recruitment- workshop-event-registration/. • The Emergency Feeding Program/SOS in partnership with the City of Renton will host free lunch events for the unsheltered and those residents with food insecurities throughout the city. These events will be held at 300 Rainier Avenue North from 12:30 to 2 p.m. on Tuesday, December 14 and December 21. Food and drinks, personal hygiene kits, cleaning supplies, and socks will be available. Parking is AGENDA ITEM #5. a) Randy Corman, Council President Members of Renton City Council Page 2 of 3 December 6, 2021 located on the west side of the Renton Airport, north of the intersection of Rainier Avenue North and Airport Way. • Renton History Museum is hosting two new exhibits through February 11, 2022. The Annual Art Show of the Brain Injury Alliance of Washington is in the main gallery, featuring 23 pieces by 22 artists. These works demonstrate the healing power of creativity. Also in the main gallery is Life on the Rivers, an exhibit that explores the central role of the Black and the Cedar Rivers in the lives of Renton’s earliest residents, the Duwamish People, and the white settlers who came later. Renton History Museum is located at 235 Mill Ave. S.; hours are Wednesday through Friday, 10 am to 4 pm. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. All projects are weather permitting and unless otherwise noted, streets will always remain open. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations: Monday, December 6 through Friday, December 10, 8:30 am to 3:00 pm.: Possible single intermittent lane closure on SW 16th Street from Lind Avenue SW to East Valley Hwy due to utility construction. Questions may be directed to Tom Main, 206-999-1833. Monday, December 6 through Friday, December 10, 8:30 am to 3:00 pm.: Single intermittent lane closures on East Valley Road from 1900 block to the 2400 block due to utility construction. Questions may be directed to Tom Main, 206-999-1833. Monday, December 6 through Friday, December 10, 8:30 am to 3:00 pm.: Single intermittent lane closures at the intersection of Oakesdale Avenue SW and SW 27th Street due to utility construction. Questions may be directed to Tom Main, 206-999-1833. Tuesday, December 7, 2021, 8:00 a.m. to 11:00 a.m.: Maple Valley Highway, Southbound direction, lane #1, will be closed for bridge maintenance. Tuesday, December 7, 2021, 12:00 p.m. to 3:00 p.m.: Southwest Grady at Longacres Drive Southwest, Westbound direction, lane #1, will be closed for bridge maintenance. Williams Avenue South and Wells Avenue South Conversion Project: Impacts to traffic will continue throughout this area between South 2nd Street and South 3rd Street. Please visit the project webpage at https://rentonwa.gov/ww for more information. Lake Washington Loop Trail Project Logan Avenue South and Airport Way: Intermittent lane closures continue during the month of December. For more AGENDA ITEM #5. a) Randy Corman, Council President Members of Renton City Council Page 3 of 3 December 6, 2021 information and project updates, please visit the project webpage at https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9346818. Downtown Utility Improvement Project: The Downtown Utility Improvement Project requires several roadway closures and detours between now and project completion in 2022. For more information on current upcoming road closures and traffic impacts or to sign up for email or text alerts visit the project website at https://rentonwa.gov/duip. Sunset Lane NE: On-going Street Closure through October 4, 2023 (City of Renton Resolution No. 4446). FULL STREET CLOSURE on Sunset Lane NE between NE 10th Street and Harrington Place NE in support of the Solera Development Project (LUA20-000305). Questions may be directed to Brad Stocco, 425-282-2373. AGENDA ITEM #5. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES CITY OF RENTON MINUTES - City Council Regular Meeting 7:00 PM - Monday, November 22, 2021 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way CALL TO ORDER Mayor Pavone called the meeting of the Renton City Council to order at 7:00 PM. ROLL CALL Councilmembers Present: Randy Corman, Council President Angelina Benedetti, Council Position No. 2 Valerie O'Halloran, Council Position No. 3 Ryan McIrvin, Council Position No. 4 Ed Prince, Council Position No. 5 Ruth Pérez, Council Position No. 6 Kim-Khánh Vǎn, Council Position No. 7 (All councilmembers attended remotely) Councilmembers Absent: ADMINISTRATIVE STAFF PRESENT Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer Alex Tuttle, Senior Assistant City Attorney Jason Seth, City Clerk Judith Subia, Council Liaison Shane Moloney, City Attorney Kristi Rowland, Deputy Chief Administrative Officer Chip Vincent, Community & Economic Development Administrator Martin Pastucha, Public Works Administrator Kari Roller, Finance Department Administrator Ellen Bradley-Mak, Human Resources and Risk Management Administrator Cailín Hunsaker, Parks & Trails Director Amanda Askren, Interim Economic Development Director Ron Straka, Public Works Utility Systems Director Kim Gilman, HR Labor Manager AGENDA ITEM #7. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES Wendy Rittereiser, HR Benefits Manager Chief Jon Schuldt, Police Department Administrator Commander Ryan Rutledge, Police Department (All City staff attended remotely except City Clerk Seth) PUBLIC HEARING a) Chelan Ave (RSD) Street Vacation Petition (VAC-21-001): This being the date set, and proper notices having been posted and published in accordance with local and State laws, Mayor Pavone opened the public hearing to consider a petition for the vacation of a portion of Chelan Ave NE (approximately the 1100 block of Chelan Ave NE), north of NE 10th St. (File No. VAC-21-001; Petitioner Renton School District). Interim Economic Development Director Amanda Askren reviewed the petition’s location and background. She noted that an updated petition was verified as sufficient by City staff on September 24, 2021. Ms. Askren remarked that the vacation petition is to vacate 10,234 square feet of right-of-way (ROW) that was dedicated to King County by multiple deeds. These street ROWs were annexed to the City of Renton in 2005. This petition is in conjunction with proposed and active land development for a new elementary school for the Renton School District. As part of the school development, the portions of existing street known as Chelan Ave NE will need to be vacated to meet the proposed building location and improvements. In addition to this street vacation, the project will dedicate utility easements during the development process. Concluding, Ms. Askren reported that the Community and Economic Development Department recommends that Council approve the request to vacate subject to the following conditions: • Dedication of 10,234 square feet of Chelan Ave NE in two locations. • Petitioner to provide an appraisal of the vacation area. There being no public comments, correspondence or deliberations, it was MOVED BY PRINCE, SECONDED BY CORMAN, COUNCIL CLOSE THE PUBLIC HEARING. CARRIED. ADMINISTRATIVE REPORT CAO Ed VanValey reviewed a written administrative report summarizing the City’s recent progress towards goals and work programs adopted as part of its business plan for 2021 and beyond. Items noted were: • The Emergency Feeding Program/SOS in partnership with the City of Renton will host a free lunch event for the unsheltered and those residents with food insecurities on Tuesday, November 23 at 300 Rainier Avenue North from 12:30 to 2 p.m. Food and drinks, personal hygiene kits, cleaning supplies, and socks will be available. Parking is located on the west side of the Renton Airport, north of the intersection of Rainier Avenue North and Airport Way. • As part of Small Business Saturday, Renton Farmers Market invites you to our first Holiday Farmers Market on Saturday, November 27 from 12-4 pm at Piazza Park, AGENDA ITEM #7. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES located at South 3rd Street and Burnett Avenue South. Vendors will have fresh produce, honey, ciders, salsa, hummus, wine, meats and cheeses, and more. The SNAP Market Match incentive program for SNAP and P-EBT shoppers is available, which is a dollar-for-dollar match of up to $40 per day to be used for fresh produce. COVID-19 safety protocols recommend masks for shoppers and ask you to maintain physical distancing between other shoppers and vendors. Take advantage of 10 hours of free parking at the City Parking Garage, entrance located off South 2nd Street between Burnett and Logan Avenues, and just 1 block from the market. You can shop all of Downtown Renton and enjoy Small Business Saturday festivities all day long. • The city is seeking applicants to fill nine positions on the new Equity Commission, including a youth representative aged 18 to 25. Apply now through Tuesday, November 30 for consideration to serve on the commission. Visit our website at Equity Commission to apply. All Renton residents and business owners are eligible. • Help us prevent local residential street flooding by monitoring catch basins near your home and keep them clear of leaves and other debris. Street sweepers are dispatched daily to clean up debris along major arterials. • Preventative street maintenance will continue to impact traffic and result in occasional street closures. AUDIENCE COMMENTS • Nick Van Valkenberg, Renton, noted he is the president of a homeowners' association for a neighborhood located adjacent to the proposed Chelan Ave NE street vacation area, and expressed concern about the loss of trees that currently provide privacy between the neighborhood and the proposed new school site. Mayor Pavone noted that staff will contact him and provide additional site details and plans. CONSENT AGENDA Items listed on the Consent Agenda were adopted with one motion, following the listing. a) Approval of Council Meeting minutes of November 15, 2021. Council Concur. b) AB - 3012 Community & Economic Development Department recommended setting a public hearing on December 6, 2021 to consider adopting an ordinance to extend interim zoning controls most recently adopted by Ordinance 6018 that provides the ability to utilize the no- fee Economic Recovery Revocable Right-of-Way Permit and Economic Recovery Signage, waives land use requirements for temporary business expansions in adjacent vacant storefronts, establishes short-term curbside pick-up stalls in the Center Downtown, and waives fees in the Downtown Parking Garage for up to 10 hours until June 6, 2022. Council Concur; Set Public Hearing on 12/06/2021. c) AB - 3015 Community & Economic Development Department recommended approval of the 2022 Lodging Tax Fund allocations as recommended by the Lodging Tax Advisory Committee; and approval to execute the related contracts with the successful applicants. Refer to Committee of the Whole. d) AB - 3014 Executive Services Department recommended adoption of the 2022 State Legislative Agenda and 2022 Regional-Federal Priorities documents. Council Concur. AGENDA ITEM #7. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES e) AB - 3003 Executive Services Department recommended approval of an interlocal agreement, titled Consortium Project Agreement 78, with the Community Connectivity Consortium, at no cost to the City of Renton, for the completion of fiber optic pathway from Valley Medical Center to the King County RCECC C3 Node Site. Refer to Finance Committee. f) AB - 3013 Finance Department recommended adoption of an ordinance approving the 2022 Salary Table incorporating changes from the 2021 Salary Table that were separately approved by Council. Refer to Finance Committee. g) AB - 2914 Public Works Airport recommended approval to execute a Local Agency Agreement with the Federal Aviation Administration to accept $59,000 in grant funds to be used for airport operations. Council Concur. h) AB - 3007 Public Works Utility Systems Division recommended adoption of a resolution adopting the 2021 Surface Water Utility System Plan. Refer to Utilities Committee. i) AB - 3011 Public Works Utility Systems Division recommended approval of Change Order No. 1 to CAG-21-001, contractor SCI Infrastructure, LLC, in the amount of $2,852,413.72, for additional and authorized work related to the installation of utilities for the Downtown Utility Improvement Project. Refer to Utilities Committee. MOVED BY CORMAN, SECONDED BY MCIRVIN, COUNCIL CONCUR TO APPROVE THE CONSENT AGENDA, AS PRESENTED. CARRIED. UNFINISHED BUSINESS a) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to approve the following payments: 1. Accounts Payable – total payment of $5,363,862.15 for vouchers 396180-396185, 396196-396447, 10367-10378, 10380; payroll benefit withholding vouchers 6690, 6692, 6694, 6695, 6697, 6700-6710, 396187-396195 and three wire transfers. 2. Payroll – total payment of $1,564,772.00 for payroll vouchers that include 591 direct deposits and 10 checks. (10/16/21-10/31/21 pay period). 3. Kidder Mathews vouchers 1026-1045 totaling $34,909.19. 4. Municipal Court vouchers 017929-017942 totaling $34,678.00. MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. b) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to accept the Washington State Department of Commerce Grant – 2019 Local and Community Project Grant (#19-96619-020) in the amount of $1,455,000 to reimburse construction costs of the Family First Community Center. Staff recommended that the Mayor and City Clerk be authorized to execute this grant. MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. c) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to approve the 2022 healthcare contract with Kaiser Permanente, for active employees and LEOFF 1 retirees, and authorized the Mayor and City Clerk to sign the implementing documents when ready. The contract cost has increased 5.2%, a total cost of about $177,000 for 2022. AGENDA ITEM #7. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. d) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to approve the 2022 healthcare contract with HMA (Healthcare Management Administrators), and authorized the Mayor and City Clerk to sign the implementing documents, when ready. The contract is unchanged except for an overall 3% rate increase, with a total cost of $343,980 for approximately 630 members (560 active members and 70 retirees). MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. e) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to approve the request to reorganize the Municipal Court by reclassifying the Court Services Director (m38) to Judicial Administrative Officer (m49); restructure the Probation Department by retitling it the Office of Court Services and Supervision and reclassifying the incumbent Probation Officer (a18) to Case Manager (a21, Step E) and adding an additional Case Manager (a21) position, effective January 1, 2022. MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. f) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to adjust the salary grades of the non-represented positions listed below, effective January 1, 2022. The salary increases for these 14 classifications, were established after an extensive salary study and review of over 13 comparable cities’ data: 1. Application Support Manager, to grade m37; 2. Building Official, to grade m36; 3. Communications Manager, to grade m29; 4. Development Engineering Manager, to grade m36; 5. Facilities Manager, to grade m31; 6. HR Benefits Manager to grade m34; 7. HR Labor Manager to grade m38; 8. IT Director to grade m41; 9. Maintenance Managers for Streets, Fleet, and Wastewater, to grade m32; 10. Parks Maintenance Manager, to grade m31; 11. Planning Manager, to grade m36; 12. Risk Manager, to grade m34; 13. Transportation Managers in Operations, Design, and Planning, to grade m37; and 1. 14. Utilities Engineering Manager, to grade m37. MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. g) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to approve the 2022 non-represented salary increase to 4% over the 2021 Salary Table. MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. AGENDA ITEM #7. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES h) Finance Committee Chair O'Halloran presented a report concurring in the staff recommendation to reclass the positions listed below, effective January 1, 2022. Funds to implement these reclassifications will be provided in a budget adjustment in the first quarter of 2022. 1. Accounting Supervisor in Finance (1 FTE), to Utility Accounts Supervisor, grade a22 2. Water Meter Technician in Public Works-Maintenance Services (1 FTE), to Water Meter System Specialist, grade a11 3. Civil Engineer 3 in Public Works-Utility Systems, Public Works-Transportation, and CED-Planning division (23 FTEs), title unchanged, grade a33 4. Civil Engineer 2 in Public Works-Utility Systems (2 FTEs), title unchanged, grade a30 5. Principal Civil Engineer in Public Works-Transportation Systems (1 FTE), title unchanged, grade a36 6. Community Program Coordinator in Police-Administrative Services (3 FTEs), to Communications & Community Engagement Coordinator, grade pn67 7. Administrative Secretary I in Public Works-Transportation Systems (2 FTE's), to Engineering Specialist II, grade a19 8. City Attorney's Civil Division Paralegal (1 FTE), to Senior Paralegal, grade a22 9. Assistant Development Engineering Manager in CED-Planning (1 FTE), to Construction Manager, grade m34 10. Engineering Specialist 3 - GIS in Public Works-Utility Systems (1 FTE), to GIS Analyst 3, grade a26 11. Transportation Maintenance Manager in Public Works-Transportation Systems (1 FTE), to Intelligent Transportation Systems and Maintenance Manager, grade m37 12. Senior Service Desk Technician in Executive Services-IT division (3 FTEs), to Client Technology Services Specialist 2, grade a19 MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. i) Planning & Development Committee Chair Prince presented a report concurring in the staff recommendation to initiate the public planning process for the Urban Forest Management Plan 2022-2032 (UMFP) and directed staff to return to Council with a recommended course of action to adopt the UMFP after completion of the public planning process. MOVED BY PRINCE, SECONDED BY PÉREZ, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. LEGISLATION Resolution: a) Resolution No. 4454: A resolution was read adopting the Rainier/Grady Junction TOD Subarea Plan. MOVED BY PRINCE, SECONDED BY MCIRVIN, COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. Ordinances for second and final reading: b) Ordinance No. 6036: An ordinance was read amending Section 8-5-15 of the Renton Municipal Code, clarifying City sewer rates for 2021 and 2022, establishing the King County Metro Wastewater pass through rate for 2022, providing for severability, and establishing an effective date. AGENDA ITEM #7. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES MOVED BY BENEDETTI, SECONDED BY O'HALLORAN, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. c) Ordinance No. 6037: An ordinance was read amending Section 5-5-3 of the Renton Municipal Code, amending business license regulations to exempt certain residential landlords from business license registration requirements, clarifying application review process and the City’s authority to deny licenses, providing for severability, and establishing an effective date. MOVED BY PRINCE, SECONDED BY PÉREZ, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. d) Ordinance No. 6038: An ordinance was read amending Section 5-25-4 of the Renton Municipal Code to update and phase out the business and occupation tax annual cap with fixed caps through 2024 and replacing the cap starting in 2025 with a rate reduction for taxes paid by an individual taxpayer above twelve million dollars in a given tax year; repealing definitions for inflation adjustment from RMC 5-25-2.P and 5-26-3.D; providing for severability; and establishing an effective date. MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. NEW BUSINESS Please see the attached Council Committee Meeting Calendar. Council President Corman remarked that tonight is Councilmember Benedetti’s final Council meeting, and expressed his sincere appreciation for her commitment to community service. He noted that Ms. Benedetti brought a wealth of experience to the position as a long-time leader of the King County Library System, the Renton Planning Commission, the Renton Foundation, and for her role working on the City’s downtown core plan. He thanked her for her service and noted that a gift could be picked up at City Hall. Councilmember Benedetti expressed appreciation for Council President Corman’s kind words, and thanked everyone for allowing her the privilege to serve the Renton community. She also thanked Council for their kindness, compassion, and professionalism. Councilmember McIrvin echoed the comments made by Council President Corman, and noted that although Councilmember Benedetti’s tenure was short, it was impactful. Councilmember Prince thanked Councilmember Benedetti for her service to the community. Mayor Pavone thanked Councilmember Benedetti for her service, and noted that she served exceptionally well during these difficult and trying times. Mayor Pavone added that serving as a Councilmember during the COVID-19 pandemic was challenging, and noted that he is reassured knowing that Ms. Benedetti would continue to serve the community in the future. Additionally, Council President Corman noted that someone will need to take over his appointment to the Renton Regional Fire Authority Governing Board. AGENDA ITEM #7. a) November 22, 2021 REGULAR COUNCIL MEETING MINUTES MOVED BY CORMAN, SECONDED BY MCIRVIN, COUNCIL REPLACE COUNCIL PRESIDENT CORMAN'S PLACE ON THE RENTON REGIONAL FIRE AUTHORITY GOVERNING BOARD WITH COUNCILMEMBER O'HALLORAN, EFFECTIVE JANUARY 1, 2022. CARRIED. Councilmember McIrvin asked if a step had been missed regarding the street vacation petition addressed earlier in the meeting. After clarification from staff, he noted that Council needed to accept the petition and direct an appraisal be ordered for the proposed vacation area. MOVED BY MCIRVIN, SECONDED BY CORMAN, COUNCIL ACCEPT THE CHELAN AVE NE STREET VACATION PETITION (VAC-21-001) AND DIRECT THE PETITIONER TO PROVIDE AN APPRAISAL OF THE PROPOSED VACATION AREA. CARRIED. ADJOURNMENT MOVED BY PRINCE, SECONDED BY CORMAN, COUNCIL ADJOURN. CARRIED. TIME: 7:42 P.M. Jason A. Seth, MMC, City Clerk Jason Seth, Recorder 22 Nov 2021 AGENDA ITEM #7. a) Council Committee Meeting Calendar November 22, 2021 November 29, 2021 Monday 5th Monday – No Meetings December 6, 2021 Monday 2:15 PM Utilities Committee, Vice Chair O’Halloran – VIDEOCONFERENCE * 1. 2021 Surface Water Utility System Plan 2. Change Order No. 1 to CAG-21-001 with SCI Infrastructure, LLC for the Downtown Utility Improvement Project 3. Emerging Issues in Utilities 3:15 PM Community Services Committee, Chair Văn – VIDEOCONFERENCE 1. Recreation Division Update on Programs and Holiday Events 4:00 PM Finance Committee, Chair O’Halloran – VIDEOCONFERENCE 1. 2022 Salary Table 2. Vouchers * 3. Emerging Issues in Finance 4:30 PM Committee on Committees, Chair McIrvin – VIDEOCONFERENCE 1. 2022 Council Committee Assignments 5:30 PM Transportation Committee, Chair McIrvin – VIDEOCONFERENCE 1. Emerging Issues in Transportation 6:15 PM Committee of the Whole, Chair Corman – VIDEOCONFERENCE 1. Allocation of Lodging Tax Funding for 2022 7:00 PM Council Meeting - VIDEOCONFERENCE * revised 12/02/21 AGENDA ITEM #7. a) AB - 3018 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Reappointments to Renton Municipal Arts Commission RECOMMENDED ACTION: Council Concur DEPARTMENT: Mayor Pavone STAFF CONTACT: April Alexander, Executive Assistant EXT.: x6520 FISCAL IMPACT SUMMARY: None SUMMARY OF ACTION: Mayor Pavone reappoints the following to the Renton Municipal Arts Commission for terms expiring on 12/31/24: Ms. Evelyn Reingold Ms. Mary Clymer Ms. Brianna Burroughs Ms. Kaie Wise Ms. Caren Sumption EXHIBITS: A. Recommendation memo STAFF RECOMMENDATION: Confirm Mayor Pavone's reappointments of Ms. Reingold, Ms. Clymer, Ms. Burroughs, Ms. Wise and Ms. Sumption to the Renton Municipal Arts Commission with terms expiring 12/31/24. AGENDA ITEM #7. b) DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: November 15, 2021 TO: Armondo Pavone, Mayor FROM: C.E. “Chip” Vincent, CED Administrator SUBJECT: Request for Reappointments to the Renton Municipal Arts Commission This memorandum is to request reappointment of the following Renton Municipal Arts Commission members, whose terms expire December 31, 2021. If reappointed, their new terms will expire on December 31, 2024. Evelyn Reingold is currently the longest‐serving member of the Renton Municipal Arts Commission. Serving on the Commission since August 2006, Evelyn brings a wealth of institutional knowledge as well as cultural and personal experience to her position and dedication to public service. Evelyn prides herself on making cultural connections and looks for these links when she’s engaging children with SAM’s art as a docent, representing the Commission at community events and utilizing art as a bridge between individuals and communities. Mary Clymer has been instrumental to the recent success and growth of the Commission. Mary has served on the Commission since 2015, taking on the role of Chair for the last two years. She has provided remarkable leadership through effective strategy and set an example for others through her endless commitment to increasing the art consciousness of Renton. Brianna Burroughs is passionate about putting art in the hands of the public. With a professional background in Urban Planning, Brianna understands the impact art can have in creating pride‐of‐place within a community, and loves being on the Commission to help connect art to public spaces. Since her term began in 2019, Brianna has been actively involved in engaging the public through the creation of art projects at community events and fosters connections between the Commission and the residents of Renton through her facilitation of the Commission’s Instagram account. Kaie Wise has been instrumental in the Commission’s work to provide grant funding for artists and arts organizations in Renton. Kaie’s dedication to the Commission, her keen sense of program management and her grant writing skills have provided a critical lens AGENDA ITEM #7. b) Armondo Pavone, Mayor Page 2 of 2 November 15, 2021 through which the grants program has viewed, analyzed, and selected worthy proposals that provide opportunities for Renton residents to experience and engage with the arts. Caren Sumption joined the Commission in March 2021; filling the seat vacated by Duffy Delgado. During Caren’s short time serving with the Commission, she has been instrumental in bridging the gap between the City and the local community of screenwriters and artists specializing in written word. As a professional writer, Caren is active in several writing groups including the National Writers Union and Science Fiction & Fantasy Writers of America and took an immediate interest in working to support the film industry in Renton. Caren is excited to continue to build on the relationships she has fostered in the last year and to continue to bring literary voices and events to Renton and to assist in the creation of opportunities for residents to engage with the arts. Christie Randolph has served as a member of the Renton Municipal Arts Commission since February 2020. Christie has made the decision to move back to her home in Ballard and to resign her position on the Commission effectively immediately. Christie’s dedication to the Commission and her leadership on the Grants Committee will be greatly missed. While pained to let Christie go, the RMAC is delighted that Evelyn, Mary, Brianna, Kaie and Caren continue to express a willingness to serve their community and request that you forward their names to the Renton City Council with your recommendation for their reappointment to the Renton Municipal Arts Commission for a full three‐year term. _____________________________ C.E. “Chip” Vincent CED Administrator AGENDA ITEM #7. b) AB - 3009 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Fee Waiver Request – Sunset Gardens Multi-family RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Community & Economic Development Department STAFF CONTACT: Alex Morganroth, Senior Planner EXT.: 7219 FISCAL IMPACT SUMMARY: The estimated total fees requested to be waived for the Sunset Gardens project is $984,130. If approved, these waived fees would represent an estimated savings of approximately $13,000 per multi -family unit. SUMMARY OF ACTION: The Renton Housing Authority has requested a waiver of development and impact fees for the Sunset Gardens project. The project includes 76 new residential multi-family (flats) units at 2900 NE 10th St. The subject site is 1.28 acres in size and is located within the Center Village (CV) zoning designation. In addition, the Renton Housing Authority has requested deferral of the execution and recording of the restrictive covenant documents prior to the issuance of Temporary Certificate of Occupancy (TCO) for t he building in order to expedite permit review and issuance. The area of the site where the new units are proposed is owned by RHA and is currently developed with a one- story office building occupied by RHA staff. All of the proposed dwelling units would be affordable as defined by the Renton Municipal Code. The housing authority would own and continue to manage the Sunset Gardens apartments following construction and occupancy. EXHIBITS: A. Issue Paper B. Permit Fee Waiver Table C. Resolution STAFF RECOMMENDATION: Approve a 100 percent waiver of the eligible development fees and an 80 percent waiver of the eligible impact fees as provided in Renton Municipal Code (RMC) 4-1-210C.4 for the Sunset Gardens development and authorize the Mayor to enter into the contract with the applicant to effectuate the fee waiver. In addition, defer the execution and recording of the restrictive covenant documents to prior to the issuance of Temporary Certificate of Occupancy (TCO) for the building in order to expedit e permit review and issuance. AGENDA ITEM #7. c) DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:December 6, 2021 TO:Randy Corman, Council President Members of Renton City Council VIA:Armondo Pavone, Mayor FROM:C.E. “Chip” Vincent, CED Administrator x6588 STAFF CONTACT:Alex Morganroth, Senior Planner x7219 SUBJECT:Fee Waiver Request – Sunset Gardens Multi- family ISSUE: Should the City waive certain development and impact fees for the Sunset Gardens project? RECOMMENDATION: Approve a 100 percent waiver of the eligible development fees and 80 percent of the transportation, parks, and fire impact mitigation fees as provided in Renton Municipal Code (RMC) 4-1-210C.4 for the Sunset Gardens development. BACKGROUND SUMMARY: The Renton Housing Authority has requested a waiver of development and impact mitigation fees for the Sunset Gardens project. The project includes 76 new residential multi-family (flats) units at 2900 NE 10th St. The subject site is 1.28 acres in size and is located within the Center Village (CV) zoning designation. The subject waiver was applied for close to submittal of the civil construction permit application. Therefore, a portion of the fees have already been paid and will need to be refunded should the waiver be approved. AGENDA ITEM #7. c) The area of the site where the new units are proposed is owned by RHA and is currently developed with a one-story office building occupied by RHA staff. All of the proposed dwelling units would be affordable as defined by the Renton Municipal Code. The housing authority would own and continue to manage the Sunset Gardens apartments following construction and occupancy. The “Waived Fees – Affordable Rental-Occupied Housing Incentive,” RMC 4-1-210C is intended to encourage new affordable rental housing in the City by waiving certain development and mitigation fees for eligible affordable rental housing projects. As such, the Renton Housing Authority has requested that the following permit fees, impact fees, and system development charges be waived for the Sunset Gardens development project: •Building permit and plan review fees; •Public Works plan and inspection fees; •Transportation and Parks impact mitigation fees; •Fire impact fees; o Per State Law, 80 percent of the transportation, parks, and fire impact mitigation fees would be waived and 20 percent of the fees would be paid by the applicant. •Civil plan review and inspection fees; •Water, Surface Water, and Wastewater system development charges; and •Technology surcharge fees The estimated total fees requested to be waived for the Sunset Gardens project is $984,130. If approved, these waived fees would represent an estimated savings of approximately $13,000 per multi-family unit. Per RMC 4-1-210C.3, to qualify for a fee waiver, projects must demonstrate compliance with the following criteria: include a minimum of thirty (30) units in the CD zone; designate and rent one hundred percent (100%) of the housing units as AGENDA ITEM #7. c) affordable housing for households at or below sixty percent (60%) of median income; remain affordable for a minimum of thirty (30) years; and the applicant/owner shall demonstrate experience and/or ability to provide affordable housing. The project complies with all eligibility criteria for the affordable rental housing incentive. In addition, the applicant, Renton Housing Authority, has previously developed a significant number of affordable housing projects in Renton and has a prevent track record of providing high quality, functional residential communities. Per RMC 4-1-210C.6, if the fee waiver is approved by City Council, the applicant would be required to submit a restrictive covenant for the property for review and approval by the Community and Economic Development Administrator. The restrictive covenant is required to ensure the dwelling units are maintained as affordable for a minimum of 30-years. The restrictive covenant must be executed and recorded at the applicant’s expense prior to the issuance of the building permit, unless otherwise approved by City Council. Staff is recommending deferring the execution and recording of the restrictive covenant documents to prior to the issuance of Temporary Certificate of Occupancy (TCO) for the building in order to expedite permit review and issuance. Per RMC 4-1-210C.7, if the fee waiver is approved by City Council, the applicant is required to enter into a contract with the City that is approved by City Council regarding the terms and conditions of the project as it relates to the affordable rental housing incentive. As the contract would be executed and recorded later in the development process and prior to TCO similar to the above- referenced restrictive covenant, staff recommends the City Council authorize the Mayor to enter into the contract with the applicant to effectuate the fee waiver. CONCLUSION: AGENDA ITEM #7. c) The Sunset Gardens project, a new 76-unit affordable rental housing development, meets the eligibility criteria for the waived fees as identified in RMC 4-1-210C.3. Authorizing the Mayor to enter into the contract with the applicant to effectuate the fee waiver will assist in providing new affordable rental housing and supports the City’s ongoing redevelopment efforts in the Sunset Area. Deferring the execution and recording of the restrictive covenant documents to prior to the issuance of Temporary Certificate of Occupancy (TCO) for the building will expedite permit review and issuance. AGENDA ITEM #7. c) Renton Housing Authority –Sunset Gardens Development Waived Fees (Estimate) Building Permit Fee $51,000 Building Permit Plan Review Fee $33,000 Water System Development Charge $178,600 Surface Water System Development Charge $2,000 Wastewater System Development Charge $115,500 Public Works/Civil Plan Review and Inspection Fees $12,000 Technology Surcharge Fee $4,750 Fire Impact Mitigation Fee @$964.53 per unit x 80%* *the remaining 20% would be the applicant’s responsibility and is not included in calculation $58,640 Transportation Impact Mitigation Fee @$6,717.09 per unit x 80%* * the remaining 20% would be the applicant’s responsibility and is not included in calculation $408,400 Parks Impact Mitigation Fee @$1,977.62 per unit x 80%* * the remaining 20% would be the applicant’s responsibility and is not included in calculation $120,240 Estimated Waived Fees* *Please note this is an estimated fee calculation. Final fee calculations are determined at the time of building and construction permit submittal. Fees are based on a number of factors that are calculated on the final permit documents, which were not yet prepared at the date of this issue paper. $984,130 AGENDA ITEM #7. c) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, WAIVING CERTAIN DEVELOPMENT AND IMPACT FEES FOR THE SUNSET GARDENS PROJECT. WHEREAS, the Renton Housing Authority received administrative site plan approval LUA21-000168 on August 22, 2021 for the Sunset Gardens development located in the City of Renton’s Center Village (CV) Zone at 2900 NE 10th St that would provide 76 affordable rental housing units within one (1) new multi-family building; and WHEREAS, the Renton Housing Authority submitted a written request dated April 16, 2021 (attached as Exhibit A and incorporated by this reference) to the Department of Community and Economic Development for a 100 percent fee waiver of building permit fees; building permit plan review fees; surface water system development charges; Public Works plan review and inspection fees and technology surcharge fees; and an 80 percent fee waiver of fire, transportation, and parks impact fees; and technology surcharge fees (the “Request”); and WHEREAS, the Request was made before civil construction permit application pursuant to RMC 4-1-210.C.5; and WHEREAS, in the Request, the Renton Housing Authority specified that the Sunset Gardens project is planned to consist of entirely new construction of 76 housing units, and 100 percent of the housing units will be reserved for affordable housing as defined by RMC 4-1-210; and AGENDA ITEM #7. c) RESOLUTION NO. _______ 2 WHEREAS, pursuant to the City’s affordable rental housing incentive RMC 4-1-210.C, the City Council may waive specific fees for new affordable rental housing projects in the City that meet the eligibility requirements set forth therein; and WHEREAS, the total estimated development and impact fees for the Sunset Gardens project total $984,130.00; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I.Renton Housing Authority and its proposed Sunset Gardens project at 2900 NE 10th St meet the eligibility criteria for fee waivers identified in RMC 4-1-210.C. SECTION II.The City Council, contingent upon compliance with the terms of SECTION III of this resolution, fully waives the following fees for the Renton Housing Authority Sunset Gardens project: A. Building permit fees; B. Building permit plan review fees; C. Surface water system development charges; D. Public Works plan review and inspection fees; E. Civil plan review and inspection fees; and F. Technology surcharge fees. SECTION III.The City Council, contingent upon compliance with the terms of SECTION IV of this resolution, waives 80 percent of the following fees for the Renton Housing Authority Sunset Gardens project: A. Transportation and parks impact mitigation fees; AGENDA ITEM #7. c) RESOLUTION NO. _______ 3 B. Fire impact mitigation fees; SECTION IV.To be eligible for this waiver, Renton Housing Authority shall comply with and continue to remain in full compliance with all applicable requirements of RMC 4-1-210.C and RCW 82.02.060, including, but not limited to, recording the restrictive covenant required by RMC 4-1-210.C.6 prior to the issuance of a Temporary Certificate of Occupancy (TCO) for any portion of the project. PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2021. ______________________________ Jason A. Seth, City Clerk APPROVED BY THE MAYOR this ______ day of _____________________, 2021. ______________________________ Armondo Pavone, Mayor Approved as to form: ______________________________ Shane Moloney, City Attorney RES.####:date AGENDA ITEM #7. c) AB - 3010 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Fee Waiver Request – Watershed Apartments RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Community & Economic Development Department STAFF CONTACT: Alex Morganroth, Senior Planner EXT.: 7219 FISCAL IMPACT SUMMARY: The estimated total fees requested to be waived for the Watershed Apartments project is $1,264,150. If approved, these waived fees would represent an estimated savings of $8,718 per multi-family unit SUMMARY OF ACTION: GMD Development has requested a waiver of development and impact fees for the Watershed Apartments project. The project includes 145 new residential multi-family (flats) units at 615 and 617 Williams Ave S. The subject site is 1.34 acres is comprised of four (4) parcels. Three (3) parcels are located within the Center Downtown (CD) zoning designation and one parcel is located within the Residential -14 du/ac (R-14) zoning designation. In addition, GMD Development has requested deferral of the execution and r ecording of the restrictive covenant documents prior to the issuance of Temporary Certificate of Occupancy (TCO) for the building in order to expedite permit review and issuance. The area of the site where the new units are proposed is owned by GMD Development and is currently developed with a four-plex and billboard sign. All of the proposed dwelling units would be affordable as defined by the Renton Municipal Code. GMD Development would own and continue to manage the Watershed Apartments following construction and occupancy. EXHIBITS: A. Issue Paper B. Permit Fee Waiver Table C. Resolution STAFF RECOMMENDATION: Approve a 100 percent waiver of the eligible development fees and an 80 percent waiver of the eligible impact fees for 100 of the 145 total units of the Watershed Apartments development as provided in Renton Municipal Code (RMC) 4-1-210C.4. and authorize the Mayor to enter into the contract with the applicant to effectuate the fee waiver. In addition, defer the execution and recording of the restrictive covenant documents prior to the issuance of Temporary Certificate of Occupancy (TCO) for the building in order to expedite permit review and issuance. AGENDA ITEM #7. d) DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:December 6, 2021 TO:Randy Corman, Council President Members of Renton City Council VIA:Armondo Pavone, Mayor FROM:C.E. “Chip” Vincent, CED Administrator x6588 STAFF CONTACT:Alex Morganroth, Senior Planner x7219 SUBJECT:Fee Waiver Request – Watershed Apartments ISSUE: Should the City waive certain development and impact fees for the Watershed Apartments project? RECOMMENDATION: Approve a 100 percent waiver of the eligible development fees and 80 percent of the transportation, parks, and fire impact fees as provided in Renton Municipal Code (RMC) 4-1- 210C.4 for the Watershed Apartments development. BACKGROUND SUMMARY: GMD Development has requested a waiver of development and impact fees for the Watershed Apartments project. The project includes 145 new residential multi-family (flats) units at 615 and 617 Williams Ave S. The subject site is 1.38 acres in size and is located within the Center Downtown (CD) and Residential-14 du/ac (R-14) zoning designations. The subject fee waiver was requested shortly before the civil construction permit application was submitted to the City. Therefore, a portion of the fees requested to be waived have already been AGENDA ITEM #7. d) paid and will need to be refunded should the waiver be approved. The area of the site where the new units are proposed is owned by GMD Development and is currently developed with a four-plex and standalone billboard sign. All of the proposed dwelling units would be affordable as defined by the Renton Municipal Code. GMD Development would own and continue to manage the Watershed Apartments following construction and occupancy. The “Waived Fees – Affordable Rental-Occupied Housing Incentive,” RMC 4-1-210C is intended to encourage new affordable rental housing in the City by waiving certain development and mitigation fees for eligible affordable rental housing projects. As such, GMD Development has requested that the following permit fees, impact fees, and system development charges be waived for the Watershed Apartments project: •Building permit and plan review fees; •Public Works plan and inspection fees; •Transportation and Parks impact mitigation fees; •Fire impact mitigation fees; o Per State Law, 80 percent of the transportation, parks, and fire impact fees would be waived and 20 percent of the fees would be paid by the applicant. •Civil plan review and inspection fees; •Water, Surface Water, and Wastewater system development charges; and •Technology surcharge fees Per RMC 4-1-210C.4, only fees for up to one hundred (100) dwelling units may be waived. Therefore, the estimated fee waiver was calculated on a proportional basis so as to only count fees applicable to the first one hundred (100) dwelling units. Based on a total of one hundred (100) dwelling units, the estimated total fees requested to be waived for the Watershed Apartments AGENDA ITEM #7. d) project is $1,264,150. If approved, these waived fees would represent an estimated savings of $8,718 per multi-family unit, based on a total of 145 units. Per RMC 4-1-210C.3, to qualify for a fee waiver, projects must demonstrate compliance with the following criteria: include a minimum of thirty (30) units in the CD zone; designate and rent one hundred percent (100%) of the housing units as affordable housing for households at or below sixty percent (60%) of median income; remain affordable for a minimum of thirty (30) years; and the applicant/owner shall demonstrate experience and/or ability to provide affordable housing. The project complies with all eligibility criteria for the affordable rental housing incentive. In addition, the applicant, GMD Development, has previously developed affordable rental housing in many other Seattle area communities, including Renton, and has a track record of providing high quality, functional residential communities. Per RMC 4-1-210C.6, if the fee waiver is approved by City Council, the applicant would be required to submit a restrictive covenant for the property for review and approval by the Community and Economic Development Administrator. The restrictive covenant is required to ensure the dwelling units are maintained as affordable for a minimum of 30years. The restrictive covenant must be executed and recorded at the applicant’s expense prior to the issuance of the building permit, unless otherwise approved by City Council. Staff is recommending deferring the execution and recording of the restrictive covenant documents to prior to the issuance of Temporary Certificate of Occupancy (TCO) for the first building in order to expedite permit review and issuance. Per RMC 4-1-210C.7, if the fee waiver is approved by City Council, the applicant is required to enter into a contract with the City that is approved by City Council regarding the terms and conditions of the project as it relates to the affordable rental AGENDA ITEM #7. d) housing incentive. As the contract would be executed and recorded later in the development process and prior to TCO similar to the above- referenced restrictive covenant, staff recommends the City Council to authorize the Mayor to enter into the contract with the applicant to effectuate the fee waiver. CONCLUSION: The Watershed Apartments project, a new 145-unit affordable rental housing development, meets the eligibility criteria for the waived fees as identified in RMC 4-1-210C.3. Authorizing the Mayor to enter into the contract with the applicant to effectuate the fee waiver will assist in providing new affordable rental housing and will support the City’s ongoing efforts to increase residential density in the S Grady Way corridor and downtown area. Deferring the execution and recording of the restrictive covenant documents prior to the issuance of Temporary Certificate of Occupancy (TCO) for the building will expedite permit review and issuance. AGENDA ITEM #7. d) Renton Housing Authority – Watershed Apartments Development Waived Fees (Estimate) Building Permit Fee $142,600 Building Permit Plan Review Fee $92,700 Water System Development Charge $255,000 Surface Water System Development Charge $28,000 Wastewater System Development Charge $175,000 Public Works/Civil Plan Review and Inspection Fees $6,700 Technology Surcharge Fee $12,100 Fire Impact Mitigation Fee @$964.53 per unit x 80%* * the remaining 20% would be the applicant’s responsibility and is not included in calculation $111,900 Transportation Impact Mitigation Fee @$6,717.09 per unit x 80%* * the remaining 20% would be the applicant’s responsibility and is not included in calculation $780,000 Parks Impact Mitigation Fee @$1,977.62 per unit x 80%* * the remaining 20% would be the applicant’s responsibility and is not included in calculation $229,400 Total Fees $1,833,400 Per RMC 4-1-210.C.4, Fees: For each site, a maximum of eighty percent (80%) of applicable impact fees and up to one hundred percent (100%) of all other applicable fees for up to one hundred (100) dwelling units may be waived. $1,264,150 AGENDA ITEM #7. d) Development Fees Calculation: Total Development Fees = $712,100 Prorated for 100 units (100/145 = 0.69) = $491,350 (712,100 x 0.69) Total Impact Fees per Unit = $9,659 At 80% = $7,728 (9,659 x 0.8) Total Impact Fees for 100 units = $772,800 (7,728 x 100) Total Development and Impact Fees for 100 units = $1,264,150 (772,800 + 491,350) Estimated Waived Fees* *Please note this is an estimated fee calculation. Final fee calculations are determined at the time of building and construction permit submittal. Fees are based on a number of factors that are calculated on the final permit documents, which were not yet prepared at the date of this issue paper. $1,264,150 AGENDA ITEM #7. d) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, WAIVING CERTAIN DEVELOPMENT AND IMPACT FEES FOR THE WATERSHED APARTMENTS PROJECT. WHEREAS, GMD Development received administrative site plan approval LUA21-000239 on October 19, 2021 for the Watershed Apartments development located in the City of Renton’s Center Downtown (CD) and Residential-14 du/ac (R-14) Zones at 615 and 617 Williams Ave S that would provide 145 affordable rental housing units within one new multifamily building; and WHEREAS, the GMD Development submitted a written request dated August 17, 2021 (attached as Exhibit A and incorporated by this reference) to the Department of Community and Economic Development for a 100 percent fee waiver of building permit fees; building permit plan review fees; surface water system development charges; Public Works plan review and inspection fees and technology surcharge fees; and an 80 percent fee waiver of fire, transportation, and parks impact fees; and technology surcharge fees (the “Request”); and WHEREAS, the Request was made before civil construction permit application pursuant to RMC 4-1-210.C.5; and WHEREAS, in the Request, the GMD Development specified that the Watershed Apartments project is planned to consist of entirely new construction of 145 housing units, and 100 percent of the housing unit will be reserved for affordable housing as defined by RMC 4-1- 210; and AGENDA ITEM #7. d) RESOLUTION NO. _______ 2 WHEREAS, pursuant to the City’s affordable rental housing incentive RMC 4-1-210.C, the City Council may waive specific fees for new affordable owner-occupied housing projects in the City that meet the eligibility requirements set forth therein; and WHEREAS, pursuant to RMC 4-1-210.C.4, fees for a maximum of one hundred (100) dwelling units may be waived; and WHEREAS, the total estimated development and impact fees for one hundred (100) of the one hundred and forty five (145) total units of the Watershed Apartments project total $1,264,150.00; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I.GMD Development and its proposed Watershed Apartments project at 615 and 617 Williams Ave S meet the eligibility criteria for fee waivers identified in RMC 4-1- 210.C. SECTION II.The City Council, contingent upon compliance with the terms of SECTION III of this resolution, fully waives the following fees for 100 units of the GMD Development Watershed Apartments project: A. Building permit fees; B. Building permit plan review fees; C. Surface water system development charges; D. Public Works plan review and inspection fees; E. Civil plan review and inspection fees; and F. Technology surcharge fees. AGENDA ITEM #7. d) RESOLUTION NO. _______ 3 SECTION III.The City Council, contingent upon compliance with the terms of SECTION IV of this resolution, waives 80 percent of the following fees for 100 units of the GMD Development Watershed Apartments project: A. Transportation and parks impact mitigation fees; B. Fire impact mitigation fees; SECTION IV.To be eligible for this waiver, GMD Development shall comply with and continue to remain in full compliance with all applicable requirements of RMC 4-1-210.C and RCW 82.02.060, including, but not limited to, recording the restrictive covenant required by RMC 4-1-210.C.6 prior to the issuance of a temporary certificate of occupancy for any portion of the project. PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2021. ______________________________ Jason A. Seth, City Clerk APPROVED BY THE MAYOR this ______ day of _____________________, 2021. ______________________________ Armondo Pavone, Mayor Approved as to form: ______________________________ Shane Moloney, City Attorney AGENDA ITEM #7. d) RESOLUTION NO. _______ 4 RES.####:date AGENDA ITEM #7. d) AB - 3024 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Grant Agreement with the Renton Housing Authority for Sunset Gardens RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Equity, Housing, and Human Services Department STAFF CONTACT: Hannah Bahnmiller, Housing Programs Manager EXT.: 7262 FISCAL IMPACT SUMMARY: The fiscal impact of the grant agreement with the Renton Housing Authority for Sunset Gardens is $1,000,000 from 2021 HB 1590 revenue and $500,000 from 2022 HB 1590 revenue. SUMMARY OF ACTION: In 2020 the Washington State Legislature approved, and the governor signed, House Bill 1590 amending RCW 82.14.530 (“HB 1590”). As amended by HB 1590, RCW 82.14.530 authorizes the councilmanic imposition of a local sales and use tax that may not exceed 1/10 of 1% for specified housing and related services for targeted population groups whose income is at or below 60% of median income. On October 5th, 2020, the Renton City Council unanimously adopted Ordinance 5983 which authorized the additional sales and use tax for housing and related services in accordance with the legislation. The imposition of the tax became effective January 1, 2021. On August 9, 2021, City Council authorized the Administration to proceed with committing $1,500,000 to the Renton Housing Authority (RHA) Sunset Gardens affordable housing project. Sunset Gardens is a 76-unit affordable rental housing project that redevelops the site of RHA’s existing office building into a new 4-story mixed-use building. RHA office and resident space will occupy the ground floor with the housing units on the second, third, and fourth floors. All of the units will be affordable with half serving those whose income is at or below 30% median income and half serving those at or below 50% median income. One hundred percent (100%) of the residents served by the project will HB 1590 eligible target populations with an intended focus on veterans, persons with disabilities, and seniors. EXHIBITS: A. Issue Paper B. Agreement STAFF RECOMMENDATION: Approve the grant agreement with the Renton Housing Authority for $1,500,000 for Sunset Gardens and authorize the Mayor and City Clerk to execute the agreement. AGENDA ITEM #7. e) Equity, Housing & Human Services Department Memorandum DATE:November 29, 2021 TO:Randy Corman, Council President Members of Renton City Council VIA:Armondo Pavone, Mayor FROM:Preeti Shridhar, EHHS Administrator STAFF CONTACT:Hannah Bahnmiller, Housing Programs Manager ext. 7262 SUBJECT:Grant Agreement with the Renton Housing Authority for Sunset Gardens ISSUE: Should Council approve an agreement to provide the previously authorized $1,500,000 in grant funds to the Renton Housing Authority (RHA) for the 76-unit Sunset Oaks affordable rental housing project? RECOMMENDATION: Approve the grant agreement with the Renton Housing Authority for $1,500,000 for Sunset Gardens and authorize the Mayor and City Clerk to execute the agreement. BACKGROUND SUMMARY: On August 9, 2021, the City Council authorized the Administration to proceed with committing $1,500,000 to the Renton Housing Authority Sunset Gardens affordable housing project. Sunset Gardens is a 76-unit affordable rental housing project that redevelops the site of RHA’s existing office building into a new 4-story mixed-use building. RHA office and resident space will occupy the ground floor with the housing units on the second, third, and fourth floors. All of the units will be affordable with half serving those whose income is at or below 30% median income and half serving those at or below 50% median income. One hundred percent (100%) of the residents served by the project will HB 1590 eligible target populations with an intended focus on veterans, persons with disabilities, and seniors. AGENDA ITEM #7. e) Randy Corman, Council President Page 2 of 3 December 1, 2021 BACKGROUND: HB 1590 Funding In 2020, the Washington State Legislature approved, and the governor signed, House Bill 1590 amending RCW 82.14.530 (“HB 1590”). As amended by HB 1590, RCW 82.14.530 authorizes the councilmanic imposition of a local sales and use tax that may not exceed 1/10 of 1% for specified housing and related services for targeted population groups whose income is at or below 60% of median income. Allowed uses of the funds include: 1. Constructing affordable housing. 2. Constructing mental and behavioral health-related facilities. 3. Funding the operations and maintenance costs of new units of affordable and facilities where housing-related programs are provided, or newly constructed evaluation and treatment centers. 4. Funding the operation, delivery, or evaluation of mental and behavioral health treatment programs and services or housing-related services. At least 60% of the revenues collected must be used for above items 1, 2, and 3, with the balance used for item 4 above. The affordable housing, facilities, and housing-related programs funded with the moneys collected from the sales and use tax may only be provided to persons within any of the following population groups whose income is at or below 60% of median income: persons with behavioral health disabilities, veterans, senior citizens, homeless (or at risk of being homeless) families with children, unaccompanied homeless youth or young adults, persons with disabilities, or domestic violence survivors. On October 5, 2020, the City Council unanimously adopted Ordinance 5983 which authorized the additional sales and use tax for housing and related services in accordance with the legislation. The imposition of the tax became effective January 1, 2021, and the City began to collect revenue in March 2021. In 2021, the Washington State Legislature approved, and the governor signed, Engrossed House Bill 1070 further amending RCW 82.14.530 to include reference to the acquisition of facilities and modify target populations to include all persons who are homeless or at-risk of being homeless. On August 9, 2021, City Council authorized the Administration to proceed with committing $1,500,000 to the RHA’s Sunset Gardens affordable housing project. AGENDA ITEM #7. e) Randy Corman, Council President Page 3 of 3 December 1, 2021 As of November 1, 2021, the City has collected nearly $2,497,760 in revenue from the sales and use tax. Sunset Gardens Sunset Gardens is a 76-unit affordable rental housing project that redevelops RHA's existing office building into a new 4-story mixed-use building. RHA office and resident space will occupy the ground floor with the 32 studio and 44 one-bedroom units on the second, third and fourth floors. All 76 of the units will be affordable with half serving those whose income is at or below 30% median income and half serving those at or below 50% median income. One hundred percent (100%) of the residents served by the project will HB 1590 eligible target populations with an intended focus on veterans, persons with disabilities, and seniors. RHA will own and continue to manage the Sunset Gardens apartments following construction and occupancy. The total project cost is approximately $45,000,000, including nearly $33,000,000 for the residential portion of the development, $6,500,000 for the podium and site development, and $6,000,000 for the new RHA office and resident service space. Including the City’s HB 1590 funds approved by City Council on August 9, 2021, RHA has over 88% of the total funds needed for the project projected or secured. To fill the project’s remaining approximate $6,000,000 gap, RHA is requesting $1,500,000 from King County and $4,500,000 from the State Housing Trust Fund. RHA plans to start construction in the second quarter of 2022 and anticipates completed construction with full occupancy by the fourth quarter of 2023. CONCLUSION: City Council authorized the distribution of $1,500,000 in funding from revenue collected under HB 1590 in August 2021. Approving the contract and authorizing the Mayor and City Clerk to execute the agreement will support the construction of Sunset Gardens and continue a long and successful partnership between RHA and the City to address the community’s affordable housing needs. AGENDA ITEM #7. e) GRANT BENEFICIARY AGREEMENT SALES AND USE TAX FUND GRANT THIS AGREEMENT, dated for reference purposes only as Month XX, XXXX, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Renton Housing Authority (“RHA”) (“Grantee”), a Washington public corporation and sets forth the terms and conditions under which the City will provide a grant to RHA from 2021 and 2022 Sales and Use Tax revenue. The City and the Grantee are referred to collectively in this Agreement as the “Parties.” Once fully executed by the Parties, this Agreement is effective as of the last date signed by both parties. RECITALS: WHEREAS, Renton has adopted Ordinance No. 5983 authorizing sales and use tax funds for housing and related services in accordance with RCW 82.14.530, as it was amended by House Bill 1590 (Chapter 222, Laws of 2020) and Engrossed Substitute House Bill 1070 (Chapter 27, Laws of 2021); and WHEREAS, as amended by HB 1590 and ESHB 1070, RCW 82.14.530 authorizes, under specified circumstances, the imposition of a local sales and use tax that may not exceed one-tenth of one percent for: “(i) constructing or acquiring affordable housing, which may include emergency, transitional, and supportive housing and new units of affordable housing within an existing structure, and facilities providing housing-related services, or acquiring land for these purposes;” (RCW 84.14.530(2)(a)(i)); and WHEREAS, the affordable housing and facilities providing housing-related programs constructed with the moneys collected from the sales and use tax may only be provided to persons within any of the following population groups whose income is at or below sixty percent (60%) of King County median income: persons with behavioral health disabilities; veterans; senior citizens; homeless (or at risk of being homeless), including families with children; unaccompanied homeless youth or young adults; persons with disabilities; or domestic violence survivors; and WHEREAS, RHA’s Sunset Gardens project (“Sunset Gardens” or “Project”) is a new construction project which will help increase the available supply of affordable housing in Renton; and AGENDA ITEM #7. e) PAGE 2 OF 13 WHEREAS, Sunset Gardens is comprised of seventy-six (76) studio and one-bedroom housing units; and WHEREAS, all housing units will be reserved as rental housing opportunities to households that are eligible under RCW 82.14.530 and earn no more than sixty percent (60%) of the King County median income as established by the U.S. Department of Housing and Urban Development (HUD); and WHEREAS, the City is authorized to award this Sales and Use Tax Grant in support of the Project pursuant to RCW 35.21.685. NOW, THEREFORE, in consideration of the mutual benefits and covenants herein referred to, and incorporating the language above in this Agreement, it is hereby agreed by and between the Parties as follows: AGREEMENT 1. Grant Amount. The total amount to be awarded to Grantee under the program is not to exceed $1,500,000.00 (one million five hundred thousand dollars), with $1,000,000.00 (one million dollars) allocable to 2021 Sales and Use Tax revenue and $500,000.00 (five hundred thousand dollars) allocable to 2022 Sales and Use Tax revenue, as a reimburseable sum according to the disbursement process noted below. Except as specifically provided herein, the Grantee shall be solely responsible for payment of any taxes imposed as a result of this Agreement. a. Award Disbursement. i. The award will be disbursed based on actual reimbursable expenses described in paragraph 4 of this Agreement. ii. Invoice. On a monthly, or no less than quarterly basis during any quarter during which reimburseable expenses are incurred, Grantee shall submit an invoice in a format acceptable to the City, including a description of what work has been performed, and supporting documentation including, but not limited to, invoices or reports showing completion of work for which reimbursement is sought. iii. No waiver. Payment for any reimbursement shall not constitute a waiver by the City of any remedies it may have for any breach of this Agreement by the Grantee. iv. If sufficient funds are not appropriated or allocated for payment under this Agreement for any future fiscal period, the City shall not be obligated to make disbursements for amounts incurred after the end of the current fiscal year. No penalty or expense shall accrue to the City in the event this provision applies. AGENDA ITEM #7. e) PAGE 3 OF 13 b. Contingent Funding. Funding is contingent upon RHA obtaining a Certificate of Occupancy by January 1, 20251, and ensuring that for a minimum period of fifty (50) years, the seventy-six (76) units remain as affordable to households that are eligible under RCW 82.14.530 and earn no more than sixty percent (60%) AMI c. Repayment of Funds; Recoupment. If any funds provided to Grantee were used in a manner that is not consistent or allowable as outlined in this Agreement, Grantee shall return funds to City in the amount determined to be ineligible. Grantee further agrees that it is financially responsible for and will repay the City any and all indicated amounts following an audit exception (i.e., breakdown of internal controls that may result in failure to meet grant outcomes) which occurs due to Grantee’s failure, for any reason, to comply with the terms of this Agreement. This duty to repay the City shall not be diminished or extinguished by the termination of the Agreement. i. If the Certificate of Occupancy is not obtained by January 1, 2025 or the units subject to this Agreement, or units reserved for households per the terms of this Agreement for the entire period (at least 50 years), Grantee agrees to repay the entire disbursement provided, plus interest, unless such interest is otherwise waived by the Renton City Council, upon receipt of repayment demand by the City of Renton. ii. In the event of repayment demand, the award disbursed shall bear interest at the rate of twelve percent (12%) per annum from the date of the execution of the Agreement. The repayment of the disbursement with interest shall not excuse or cure any default by Grantee under the Agreement. iii. If the interest rate specified is higher than the rate then permitted by law, the interest rate shall be decreased to the maximum legal interest rate then permitted by law. 2. Term. This Agreement shall be in effect from the date of mutual execution, or January 1,2022, whichever is later and terminate fifty (50)years from the date of execution or January 1, 2072, whichever is later. This term may be extended by mutual written agreement as described in , or the Agreement may be earlier terminated according to the process and terms at paragraph XX. 3. Termination. The City reserves the right to terminate this Agreement as follows: a. Termination for convenience. The City reserves the right to terminate this Agreement prior to disbursement of funds with thirty (30) days advance notification to RHA. AGENDA ITEM #7. e) PAGE 4 OF 13 b. Termination for lack of appropriation or allocation of funds. The City reserves the right pursuant to 1.a.iv. of this Agreement. c. Termination for Breach. The City reserves the right to terminate this Agreement in the event RHA fails to meet material terms of this Agreement during its term. d. Repayment. In the event of Termination after disbursement of any funds, such Termination will result in an immediate demand for all disbursed funds, with interest pursuant to 1.c.ii of this Agreement. 4. Scope of Work. Grantee shall construct at least seventy-six (76) dwelling units. All units are reserved for households that are eligible under RCW 82.14.530 and with a household income not more than 60% of the King County median income; this reservation will be in place for the entire term of this Agreement. This Agreement is not intended, and should not be construed, to guarantee or act as approval of any permit required for the Project referenced herein. With respect to the Sunset Gardens Project, and for the entire term of the Agreement, Grantee agrees to: a. Obtain all development and building permits necessary; and b. Construct the Sunset Gardens Project substantially as presented to the City (76 units comprised of 32 studio units and 44 one-bedroom units); and c. Submit a copy of the Certificate of Occupancy for the Project not later than January 1, 2025; and d. Rent all residential dwelling units in the Project to populations eligible under RCW 82.14.530; and e. Submit an annual written certification and report to the EHHS Administrator identified in paragraph 11 not later than January 31 for the preceding calendar year including such information the City may deem necessary or useful, and at a minimum to include: i. Certification that Grantee ahs been in compliance with affordable housing requirements and other responsibilities described in this Agreement; and ii. Breakdown of rental units leased during the year; and iii. Household income for each dwelling unit during the year; and iv. The City will accept this certification and report in a form Grantee provides to regulatory agencies. 5. Grantee Responsibilities. a. Grantee understands and agrees that funds provided under this Agreement may only be used in compliance with RMC 5-10 and RCW 82.14 and any other applicable provisions of law. b. The Grantee understands and acknowledges that providing false information on any documents submitted to the City or its designees as part of the Grantee’s participation in the Grant may constitute fraud, justify termination AGENDA ITEM #7. e) PAGE 5 OF 13 of this Agreement, trigger the Grantee’s obligation to return funds, and may be subject to civil and/or criminal penalties and/or sanctions. c. No Employee Relationship. The Grantee understands and acknowledges that neither the Grantee nor any officer, employee or agent of the Grantee shall be considered to be an employee of the City, nor entitled to any benefits accorded City employees, by virtue of the services provided under this Agreement. The City shall not be responsible for assuming the duties of an employer with respect to the Grantee or any employee of the Grantee. d. Non-discrimination. During the performance of this Agreement, Grantee and its subcontractors shall comply with all federal and state nondiscrimination laws, including but not limited to, chapter 49.60 RCW, Washington’s Law Against Discrimination, and 42 U.S.C. 12101 et seq., the Americans with Disabilities Act (ADA). In the event of Grantee’s noncompliance or refusal to comply with any nondiscrimination law,regulation, or policy, this Agreement may be rescinded, canceled, or terminated in whole or in part. e. Insurance. RHA shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with performance of the work hereunder by RHA, their agents, representatives, employees or subcontractors. i. No Limitation: The maintenance of insurance by RHA, as required by this Agreement, shall not be construed to limit the liability of RHA to the coverage provided by such insurance, or otherwise limit Renton’s recourse to any remedy available at law or in equity. ii. RHA shall secure and maintain: 1. Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. 2. Professional liability insurance, in the minimum amount of $1,000,000 for each occurrence, shall also be secured for any professional services being provided to Renton that are excluded in the commercial general liability insurance. 3. Automobile Liability insurance: With a minimum combined single limit for bodily injury and property damage of $1,000,000 for each accident. This is required of all RHA and professional service providers where a vehicle will be used on the contract. Renton may request a copy of Consultant’ driving record abstract. 4. Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. 5. It is agreed that on RHA’s commercial general liability policy, the City of Renton will be named as an Additional Insured on a non- AGENDA ITEM #7. e) PAGE 6 OF 13 contributory primary basis. Renton’s insurance policies shall not be a source for payment of any RHA Contractor liability. 6. Subject to Renton’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to Renton before executing the work of this Agreement. 7. RHA shall provide Renton with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. 8. Termination: Notwithstanding any other provision of this Agreement, the failure of RHA to comply with the above provisions of this section shall subject this Agreement to immediate termination without notice to any person in order to protect the public interest. 9. Subcontractors. RHA shall ensure that each subcontractor of every tier obtain at a minimum the same insurance coverage and limits as stated herein for RHA. 6. Scope of Eligible Expenditures: a. Grant funds awarded under this Agreement may only be used to pay or reimburse expenditures directly related to the construction of residential dwelling units of the Sunset Gardens Project. Specifically expenses to be reimbursed may include Grantee-accepted invoices from the primary construction contractor dating from the time such contract was entered, which may pre-date the date of execution of this contract but in any case were invoiced to Grantee not earlier than January 1, 2021. b. Grant funds awarded under this Agreement may be lent by Grantee to an entity in which Grantee retains sole management control (e.g., sole general partner in an LLC or sole partner in a Limited Partnership) for the purposes of the Scope of Work, so long as the entity complies with all terms of this Agreement. c. No grant funds awarded under this agreement shall be used for the RHA office or resident service space which is included in the overall Sunset Gardens Project. d. No grant funds awarded under this agreement shall be used to pay or reimburse costs for expenditures for which Grantee has received any other funding, whether state, federal or private in nature, for that same expense. 7. Location of Project. a.King County Tax Parcel Number: 7227900075 b.Legal Description:° AGENDA ITEM #7. e) PAGE 7 OF 13 BLOCK 37 IN REPLAT OF BLOCKS 12, 13, 14, 36, 37 AND 38 OF CORRECTED PLAT OF RENTON HIGHLANDS NO. 2, AS PER PLAT RECORDED IN VOLUME 59 OF PLATS ON PAGES 52 AND 53,RECORDS OF KING COUNTY; EXCEPT THAT PORTION OF BLOCK 37, CORRECTED PLAT OF RENTON HIGHLANDS NUMBER 2, RECORDED IN VOLUME 59 OF PLATS ON PAGE 52, RECORDS OF KING COUNTY, WASHINGTON, LYING SOUTHEASTERLY OF THE FOLLOWING DESCRIBED ARC: COMMENCING AT THE SOUTHEAST CORNER OF SAID BLOCK 37; THENCE NORTH 16°05'00" EAST ALONG THE EASTERLY LINE OF SAID BLOCK 37, 13.75 FEET TO THE BEGINNING OF A 12.04 FOOT RADIUS CURVE, HAVING A CENTRAL ANGLE OF 98°04'01", AND A RADIUS POINT WHICH BEARS NORTH 73°55'00" WEST FROM SAID POINT OF BEGINNING; THENCE SOUTHWESTERLY 20.60 FEET ALONG THE ARC OF SAID CURVE TO THE SOUTHERLY LINE OF BLOCK 37 AND THE TERMINUS OF SAID CURVE; AND EXCEPT THAT PORTION OF BLOCK 37, CORRECTED PLAT OF RENTON HIGHLANDS NUMBER 2, RECORDED IN VOLUME 59 OF PLATS ON PAGE 52, RECORDS OF KING COUNTY, WASHINGTON, LYING SOUTHWESTERLY OF THE FOLLOWING DESCRIBED ARC: COMMENCING AT THE SOUTHWEST CORNER OF SAID BLOCK 37; THENCE SOUTH 54°35'42" EAST, ALONG THE SOUTH LINE OF SAID BLOCK 37, 15.87 FEET TO THE BEGINNING OF AN 18.98 FOOT RADIUS CURVE, HAVING A CENTRAL ANGLE OF 80°30'56", AND A RADIUS POINT WHICH BEARS NORTH 35⁰24'18" EAST FROM SAID POINT OF BEGINNING; THENCE NORTHWESTERLY 26.67 FEET ALONG THE ARC OF SAID CURVE TO THE WESTERLY LINE OF BLOCK 37 AND THE TERMINUS OF SAID CURVE; AND EXCEPT THAT PORTION OF BLOCK 37, CORRECTED PLAT OF RENTON HIGHLANDS NUMBER 2, RECORDED IN VOLUME 59 OF PLATS ON PAGE 52, RECORDS OF KING COUNTY, WASHINGTON, LYING NORTHWESTERLY OF THE FOLLOWING DESCRIBED ARC: COMMENCING AT THE NORTHWEST CORNER OF SAID BLOCK 37; THENCE SOUTH 52°51'00" EAST ALONG THE NORTH LINE OF SAID BLOCK 37, 13.79 FEET TO THE BEGINNING OF A 13.51 FOOT RADIUS CURVE, HAVING A CENTRAL ANGLE OF 91°24'55", AND A RADIUS POINT WHICH BEARS SOUTH 37°09'00" WEST FROM SAID POINT OF BEGINNING; THENCE SOUTHWESTERLY 21.56 FEET ALONG THE ARC OF SAID CURVE TO THE WESTERLY LINE OF BLOCK 37 AND THE TERMINUS OF SAID CURVE; AGENDA ITEM #7. e) PAGE 8 OF 13 SITUATE IN THE CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON; 8. Records: Maintenance, Access, Disclosure a. Grantee shall maintain all records and accounts with respect to all matters covered by this Agreement, including personnel, property, financial, and programmatic records and documents sufficient to evidence compliance with RMC 5-10 and RCW 82.14 regarding the foregoing. At a minimum, retained records shall include: i. Notice of Grant Award; ii. Motions, resolutions, or minutes documenting Board or Council actions; iii. A copy of this Agreement; iv. Correspondence regarding budget revision requests; v. Copies of all invoices and reports submitted to the City of Renton for this project. b. These records shall be maintained for as long as may be required by applicable Washington State records retention laws, but in any case for a period of six (6) years after termination of this Agreement, whichever is later, to ensure proper accounting for all funds and compliance with the Agreement. c. If any litigation, claim or audit is started before the expiration of the six (6) year period provided in Section 5(b) above, the records shall be retained until all litigation, claims, or audit findings involving the records have been resolved. a. The City or their authorized representative(s) shall have the right of access to records (electronic and otherwise) of Grantee in order to conduct audits or other investigations. b. Grantee acknowledges that records may be subject to disclosure under the Public Records Act, Ch. 42.56 RCW. i. To the full extent the City determines necessary to comply with the Washington State Public Records Act, Grantee shall make a due diligent search of all records in its possession or control relating to this Agreement and the Work, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. ii. In the event Grantee believes said records need to be protected from disclosure, it may, at Grantee’s own expense, seek judicial protection. Grantee shall indemnify, defend, and hold harmless the City for all AGENDA ITEM #7. e) PAGE 9 OF 13 costs, including attorneys’ fees, attendant to any claim or litigation related to a Public Records Act request for which Grantee has responsive records and for which Grantee has withheld records or information contained therein, or not provided them to the City in a timely manner. iii. Grantee shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. The provisions of this section shall survive the expiration or termination of this Agreement. 6. Disclaimer by the City. The City expressly disclaims any and all responsibility or liability to Grantee or third persons for the actions of Grantee or third persons resulting in death, bodily injury, property damages, or any other losses resulting in any way from the performance of this Agreement or any other losses resulting in any way from the performance of the Agreement, or any subcontract thereto. This Agreement does not in any way establish an agency relationship between or among the City and/or Grantee. 7. Conflict of Interest. a. Grantee designees, agents, members, officers, employees, consultants, and any other public official who exercises or who has exercised any functions or responsibilities with respect to the Program during his or her tenure, or who is in a position to participate in a decision-making process or gain inside information with regard to the Program, are barred from any interest, direct or indirect, in any grant or proceeds of the Program, or benefit there from, which is part of this Agreement at any time during or after such person's tenure. b. The City’s Code of Ethics and Washington State law prohibit City employees from soliciting, accepting, or receiving any gift, gratuity or favor from any person, firm or corporation involved in a contract or transaction. To ensure compliance with the City’s Code of Ethics and state law, the Grantee shall not give a gift of any kind to City employees or officials. Grantee also confirms that Grantee does not have a business interest or a close family relationship with any City officer or employee who was, is, or will be involved in selecting the Grantee, negotiating or administering this Agreement, or evaluating the Grantee’s performance of the Work. 8. Waiver/Conflict of Terms. a. Any waiver by the Grantee or the City of the breach of any provision of this Agreement by the other party will not operate, or be construed, as a waiver of any subsequent breach by either party or prevent either party from thereafter enforcing any such provisions. AGENDA ITEM #7. e) PAGE 10 OF 13 b. In the event of any inconsistencies between Grantee proposals and this Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to this Agreement are incorporated by reference only to the extent of the purpose for which they are referenced within this Agreement. To the extent a Grantee prepared exhibit conflicts with the terms in the body of this Agreement or contains terms that are extraneous to the purpose for which it is referenced, the terms in the body of this Agreement shall prevail and the extraneous terms shall not be incorporated herein. 9. Modification. This Agreement may only be amended by written agreement signed by both Parties. 10. Notice. Any notice required under this Agreement will be in writing, addressed to the appropriate party at the address which appears below (as modified in writing from time to time by such party), and given personally, by registered or certified mail, return receipt requested, by facsimile or by nationally recognized overnight courier service. Time period for notices shall be deemed to have commenced upon the date of receipt, EXCEPT facsimile delivery will be deemed to have commenced on the first business day following transmission. Email and telephone may be used for purposes of administering the Agreement, but shall not be used to give any formal notice required by the Agreement. CITY OF RENTON Preeti Shridhar, Administrator City of Renton Equity, Housing and Human Services Department 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-6569 Email: pshridhar@rentonwa.gov GRANTEE Mark Gropper, Executive Director Renton Housing Authority 2900 NE 10th St. Renton, WA 98056 425-266-1850 Email: mrg@rentonhousing.org 11. Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or encumber any rights, duties or interests accruing from this Agreement without the written consent of the other. 12. Severability. In the event any term or condition of this Agreement or application thereof to any person or circumstances is held invalid, such invalidity shall not affect other terms, conditions, or applications of this Agreement that can be given effect without the invalid AGENDA ITEM #7. e) PAGE 11 OF 13 term, condition, or application. To this end, the terms and confit5ions of the Agreement are declared severable. 13. Governing Laws. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King City Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King City, Washington, or its replacement or successor. 14. Indemnification. To the maximum extent permitted by law, Grantee shall, at its cost and expense, protect, defend, indemnify, and hold harmless the City, its directors, officers, employees, and agents, from and against any and all demands, liabilities, causes of action, costs and expenses (including attorneys’ fees), claims, judgments, or awards of damages, arising out of or in any way resulting from the acts or omissions of Grantee, its directors, officers, employees, or agents, relating in any way to Grantee’s performance or non- performance under the Agreement. Grantee agrees that its obligations under this paragraph extend to any demands, liabilities, causes of action, or claims brought by, or on behalf of, any of its employees or agents. For this purpose, Grantee, by mutual negotiation, hereby waives, as respects the City only, any immunity that would otherwise be available against such claims under any industrial insurance act, including Title 51 RCW, other Worker’s Compensation act, disability benefit act, or other employee benefit act of any jurisdiction which would otherwise be applicable in the case of such claim. These indemnification obligations shall survive the termination of the Agreement, and specifically include: a. RHA Agency Indemnification. RHA represents to Renton that it has or will have adequate supervision and that all applicable rules, regulations, statutes and ordinances will be complied with in their entirety. RHA agrees to indemnify, hold and defend Renton, its elected officials, officers, employees, agents and volunteers harmless from any and all claims, demands, losses, actions, violations and liabilities (including costs and all attorney’s fees) to or by any and all persons or entities, including without limitation, their respective agents, licensees, or representatives, arising from, resulting from, or connected with the Agreement to the extent caused by the negligent acts, errors, or omissions of RHA, its partners, shareholders, agents, employees, or by RHA’s breach of this Agreement. RHA waives any immunity that may be granted to it under the Washington State Industrial Insurance Act, Title 51 RCW. RHA’s indemnification shall not be limited in any way by any limitation of the amount of damages, compensation, or benefits payable to or by any third-party under workers’ compensation acts, disability benefit acts, or any other benefits acts or federal, state or municipal benefits programs. b. RHA agrees that it is as fully responsible to Renton for the acts and omissions of its subcontractors and their employees and agents, as it is for the acts and omissions of its own employees and agents. AGENDA ITEM #7. e) PAGE 12 OF 13 15. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. 16. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. 17. Binding Effect. The Parties each bind themselves, their partners, successors, assigns, and legal representatives to the other party to this Agreement, and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants of the Agreement. 18. Complete Agreement. This Agreement sets forth the complete expression of the agreement between the Parties, and any oral representations or understandings not incorporated herein are excluded. The Parties may execute this Agreement in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ GRANTEE By:____________________________ Armondo Pavone Mayor Mark Gropper Executive Director _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form AGENDA ITEM #7. e) PAGE 13 OF 13 By: __________________________ Shane Maloney City Attorney AGENDA ITEM #7. e) AB - 3019 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Utility Billing Leak Adjustment for Henry Friedman RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Finance Department STAFF CONTACT: Terri Weishaupt, Accounting Supervisor EXT.: 6920 FISCAL IMPACT SUMMARY: None SUMMARY OF ACTION: The Finance Department received a request for a leak adjustment from Henry Friedman, a non-residential property located at 532 Rainier Ave S, Renton, WA. This account, number 001437 -000, receives water and sewer service from the city, as well as King County Metro Sewer services. The water leak was located in the main water line and was identified sometime during July 2021 and was repaired on August 4, 2021. A request for a leak adjustment was received in August 2021. The requested adjustment covers the July and August 2021 billing periods and the adjustment breaks down as follows: Water $0 A water adjustment has been granted in the last 5 years and is not available for this leak. Sewer $1591.79 KC Sewer $2866.12 Total $4457.91 EXHIBITS: A. 001437-000 Leak Adjustment STAFF RECOMMENDATION: Staff recommends an adjustment to this account in the amount of $4,457.91 for the applicable Renton water and sewer, and King County Sewer portions of the bill in accordance with C ity Code 8-4-46 and 8-5-23. AGENDA ITEM #7. f) Service Address:Account # 1437‐000 Month Billed Prior Year 1 Prior Year 2 Average Excess Consumption WATER SEWER KC SEWER Jul‐21 208 15 13 14 194 ‐ 194.00 194.00 minus 7.5 swr 200.5 200.5 3.62 3.51 6.32 ‐ 680.94 1,226.08 Aug‐21 280 26 13 19.5 260.5 260.50 260.50 minus 7.5 swr 271.5 260.5 Rate per 100 ccf 3.62 3.51 6.32 ‐ 914.36 1,646.36 Water Sewer KC Sewer ‐$ $ 1,595.30 $ 2,872.44 Total: $ 4,467.74 Water refunds are calculated at 50% of the excess consumption. Sewer refunds are calculated at 100% of the excess consumption after subtracting 7.5 units that are included in the flat rate. Leak Adjustment Calculation ‐ Multi‐Family H:\Finance\Utility Billing\springbrook\LEAK‐BILLING ADJ\Leak Adjustments 532 Rainier Ave S Unit 536 7.5 units included in flat rate for sewer Rate per 100 ccf Sub‐Total By Service: AGENDA ITEM #7. f) Leak Adjustment InformaƟonBy comaparison periods‐Prior 2 yearsBilled Consumption Amountsand Consumption Customer #: 001437-000Service Address: 532 RAINIER AVE SName: HENRY FRIEDMANClass: 04 COMM$45.2413$18.5413$33.2213$45.2413$18.5413$33.2213$53.2515$25.8015$45.3015$92.3026$63.6426$111.7426$752.96208$703.76208$1267.16208$1013.60280$956.48280$1722.20280Consumption40248070645Consumption2072Consumption1131Consumption40247Consumption2072Consumption1131202120202019AGENDA ITEM #7. f) UƟlity Rates Reference:070645 Customer#: 001437‐000 cons lvl rate/ccf minimum rate minimum rate minimum rate 0.00 0.00 0.00 0.00 45.33 6.04 17.95 3.55 30.51 3.44 0.00 0.00 18.31 3.62 31.12 3.51 47.37 6.32 7.501MF/Comm/monthly402KC Sewer 7.501MF/Comm/monthly207Renton Sewer .0013/4" Non-Residential113Water 202120202019 req_description request _ date codecust _ sequence cust _ no Notice of Constant\Unusual Consumption 0 4AMR 28-July-2021 LETTER-AMR Major Leak-1437 0 4 INMJ 27-July-2021 Investigate Major Leak-Running at 114cf per hour-1437 0 4 INMJ 09-July-2018 Investigate Major Leak-going up each day now at 10cf per h1437 AGENDA ITEM #7. f) Data export DATE RANGE 08/17/2021 to 08/24/2021 - DEVICE 68708847 - ACCOUNT 001437-000 - RADIO 17495496 - PROCESSED DATE/TIME Aug 24, 2021 5:40:23 PM - UPLOADED DATE/TIME Aug 24, 2021 10:00:00 AM - CUSTOMER HENRY FRIEDMAN - LOCATION 532 Rainier Ave S Unit 536 Renton WA 980552411 Metric Time Read Quality Bin Flags Source Type DeliveredCF 08/24/21 12:00: 00 308326 Raw RNTN-ReadReport.20210824130001.csv; 2380 Reads DeliveredCF 08/24/21 11:00: 00 308323 Raw RNTN-ReadReport.20210824130001.csv; 2380 Reads DeliveredCF 08/24/21 10:00: 00 308318 Raw RNTN-ReadReport.20210824130001.csv; 2380 Reads DeliveredCF 08/24/21 09:00: 00 308311 Raw RNTN-ReadReport.20210824130001.csv; 2380 Reads DeliveredCF 08/24/21 08:00: 00 308309 Raw RNTN-ReadReport.20210824090001.csv; 2393 Reads DeliveredCF 08/24/21 07:00: 00 308307 Raw RNTN-ReadReport.20210824090001.csv; 2393 Reads DeliveredCF 08/24/21 06:00: 00 308306 Raw RNTN-ReadReport.20210824090001.csv; 2393 Reads DeliveredCF 08/24/21 05:00: 00 308306 Raw RNTN-ReadReport.20210824090001.csv; 2393 Reads DeliveredCF 08/24/21 04:00: 00 308306 Raw RNTN-ReadReport.20210824050001.csv; 2458 Reads DeliveredCF 08/24/21 03:00: 00 308305 Raw RNTN-ReadReport.20210824050001.csv; 2458 Reads DeliveredCF 08/24/21 02:00: 00 308305 Raw RNTN-ReadReport.20210824050001.csv; 2458 Reads DeliveredCF 08/24/21 01:00: 00 308304 Raw RNTN-ReadReport.20210824050001.csv; 2458 Reads DeliveredCF 08/24/21 00:00: 00 308302 Raw RNTN-ReadReport.20210824010001.csv; 7336 Reads DeliveredCF 08/23/21 23:00: 00 308302 Raw RNTN-ReadReport.20210824010001.csv; 7336 Reads DeliveredCF 08/23/21 22:00: 00 308300 Raw RNTN-ReadReport.20210824010001.csv; 7336 Reads DeliveredCF 08/23/21 21:00: 00 308296 Raw RNTN-ReadReport.20210824010001.csv; 7336 Reads DeliveredCF 08/23/21 20:00: 00 308292 Raw RNTN-ReadReport.20210823210002.csv; 2350 Reads DeliveredCF 08/23/21 19:00: 00 308289 Raw RNTN-ReadReport.20210823210002.csv; 2350 Reads DeliveredCF 08/23/21 18:00: 00 308281 Raw RNTN-ReadReport.20210823210002.csv; 2350 Reads DeliveredCF 08/23/21 17:00: 00 308272 Raw RNTN-ReadReport.20210823210002.csv; 2350 Reads DeliveredCF 08/23/21 16:00: 00 308266 Raw RNTN-ReadReport.20210823170001.csv; 2464 Reads DeliveredCF 08/23/21 15:00: 00 308261 Raw RNTN-ReadReport.20210823170001.csv; 2464 Reads DeliveredCF 08/23/21 14:00: 00 308255 Raw RNTN-ReadReport.20210823170001.csv; 2464 Reads DeliveredCF 08/23/21 13:00: 00 308253 Raw RNTN-ReadReport.20210823170001.csv; 2464 Reads AGENDA ITEM #7. f) —‘“Renton0walerLeakAdjuslmeniRequestformDate:/9/CityAccountNumber:d2/ServiceAddress:53kA‘i”I,ê3,$.BillingPeriod:—LocationType:SingleFamilyResidential-DNon-Residential-LeakAdjustmentPolicy(Ordinance5600,6-15-2011)TheCitywillprocessandgrantnomorethanonewaterbillingadjustmentforwaterleaksonthecustomers’sideofthewatermeterperwaterserviceconnectionevery’five(5)years.Adjustmentswillbecalculatedoverthebillingperiodswhenthewaterleakoccurred,uptoamaximumoftwo(2)regularmeterreadingcycles.Leakadjustmentswillbegrantedforservicelinesonlybetweenthemeterandthefoundationofthebuilding.üAwrittenrequestforawaterbillingadjustmentmustbesubmittedtoUtilityBillingCustomerServicewithinsixty(60)daysofdiscoveryofthewaterleakand/orsixty(60)daysofreceiptofanoticefromtheCityregardinghighwaterconsumptionandthataleakmighthaveoccurred.Thewrittenrequestmustincludetheserviceaddress,billingperiodsoverwhichtheleakoccurred,locationoftheleakandacopyoftherepairreceiptwithaclearwrittendescriptionofthecompletedrepair.Photosverifyingtherepairandthelocationoftheleakarestronglyrecommended.AdjustmentMethodology(Ordinance5210,6-5-06)DThewaterportionofthebillwillbeadjustedbychargingforonly50%oftheexcessconsumptionchargeoverthebillingperiod(s)whentheleakoccurred.Exampleofanadjustedwaterbillingcalculation:(0.50XConsumptioninexcessofhistoricalaverageforbillingperiod)XCommodityRate.Adjustmentsgreaterthan$2,000shallbesubmittedtotheFinanceCommitteeforapprovalordenial.TherewillbenoadjustmentoftheBasicMonthlyChargeoranyotherwatercharge.(Ord.5210,6-5-2006)DFornon-residentialseweraccounts,afulladjustmentofthesewerbillwillbemadeforallleakedwaterthatdidnotenterthesanitarysewersystem.Theadjustmentwillbedeterminedbyaveragingnormalwaterconsumptionfrompreviousrepresentativebillingperiodsandchargingwastewatervolumeratesbasedonthisnormalaveragevolume.Adjustmentsgreaterthan$2,000shallbesubmittedtotheFinanceCommitteeforapprovalordenial.Therewillbenoadjustmentofthebasechargeoranyothersewercharge.DateLeakwasrepaired:_f_._LLLeakRepairedBy:C-Pt’,eiiiLocationofLeak:Ji!fC9TypeofLeak:PropertyOwnerName:/-/I,1/‘t7//L47#A”ContactPhone#:2i4i732i_790PropertyOwnerSignature5’Date:t/_]”Note:Attachrepairreceiptstothisrequestforin.Adjustmentwillnotbeprocessedwithoutproofofrepair.ApprovedDeniedReason_____________________________________________________________inccc(RAF)YLA/AVRFNTONWARUS7PHONE:(425)-430-6852FAX:(425)-430-6855—ORD.56584/23/2012AGENDA ITEM #7. f) HenryFriedman8803SE78ThStMercerIslandWA98040Ihaveauthorizedthisservicetobeperformedandamsatisfiedwiththecompletionoftheworkasdescribed.Today’sDate:81412021INVOICEizri814120210000025128SERVICELOCATION:HenryFriedman-534RainierAveSRentonWA98055ThePlumbingJoint351UnionAveNERentonWA98059Phone:800-464-3204CODHenry206-232-7590TERMSLOCATIONCONTACTSERVICETECHNICIANONSITETIME$PQ:NUMBERLT07:56AM-02:38PM1.00Minimum(FirstHalfHour)189.00189.006.25TechnicianLabor(RegTimeMon-Sat)-$65/QuarterHour260.001,625.004.00ApprenticeLabor(RegTimeMon-Sat)-$50/QuarterHour200.00800.002.00BarbFitting/PolyAdapter-1”SIipX1”IpBrass42.7885.562.001’PexXFemaleAdapter44.3388.662.001’PexRing1.302.601.501”PexPipe6.9910.491.00TeflonTape2.002.001.00Tru-BluPipeDope(blue)3.003.004.00RubberGloves2.008.001.00Dugup,removed,andreplacedasectionofmainlinewaterpipe.Turnedwaterbackonwithnoleaksorotherissuesfound.Thankyouforyourbusiness!Thisinvoiceiscoveredundera1YearWarrantyonPartsandLaborfromdateofservice.Thiswarrantydoesnotcoverdrains,freezingorwherewaterpressureisover80lbs.PastduebalancestransferredtoaCollectionAgencymayincuraLateChargeplusanyCollectionFees.Forquestionsregardingyourinvoicepleaseemail:dispatch©plumbingjoint.comSUBTOTALTAXTOTAL$2,814.31$284.25$3,098.56AGENDA ITEM #7. f) 813/2021ThePlumbingJoint351UnionAveNERentonWA98059Phone:800-464-3204INVOICE______0000025093HenryFriedman8803SE78ThStMercerIslandWA98040SERVICELOCATION:HenryFriedman-534RainierAveSRentonWA98055Ihaveauthorizedthisservicetobeperformedandamsatisfiedwiththecompletionoftheworkasdescribed.Today’sDate:81312021CustomerSignatureSUBTOTAL$650.00TAX$65.65TOTAL$715.65VisaXXXXXXXXXXXX5477$715.65Auth03501GBALANCE$0.004guADoRssICODIHenry206-232-7590LTQTYDESCRIPTIONEACHAMOUNT08:07AM-08:35AM1.00LeakDetectionandUtilityLocating650.00650.00PaymentReceivedThankyouforyourbusiness1Thisinvoiceiscoveredundera1YearWarrantyonPartsandLaborfromdateofservice.Thiswarrantydoesnotcoverdrains,freezingorwherewaterpressureisover8Olbs.PastduebalancestransferredtoaCollectionAgencymayincuraLateChargeplusanyCollectionFees.Forquestionsregardingyourinvoicepleaseemail:dispatch©plumbingjoint.comAGENDA ITEM #7. f) HenryFriedman$803SE78ThStMercerIslandWA98040HourThePlumbingJoint351UnionAveNERentonWA98059Phone:800-464-3204INVOICE•;:jgj_______7/30/20210000025014.HenryFriedman-534RauiierAveSRerttonWA98055ThankyouforyourbusinessThisinvoiceiscoveredundera1YearWarrantyonPartsandLaborfromdateofserviceThswarrantydoesnotcoverdrainsfreezingorwherewaterpressureisover80lbsPastduebalancestiansterredtoaCollectionAgencymayincuraLateChargeplusanyCollectionFeesFoiquestionsregardingyourinvoicepleaseemail.dispatchplumbIngJOIfltcorn$1.053.50TAX$10641$1,159.91$115991TOTAL10xxxxxXXXXXXXS477Auth08475GBALANCE100Minimum(FirstHaltHour)100Dugmultipleholestohuntforaleakingpipe.IwasunabletofindrI.Customerdecidedtohaveleakdetectioncometofindtheproblemarea3505%DiscountOffLabor(CannotbeappliedtoServiceMinimurnj$6175/Quarter18900189002470086450,ill$0.00AGENDA ITEM #7. f) AB - 3020 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Utility Billing Leak Adjustment for Car Wash Enterprises Inc. RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Finance Department STAFF CONTACT: Terri Weishaupt, Accounting Supervisor EXT.: 6920 FISCAL IMPACT SUMMARY: None SUMMARY OF ACTION: The Finance Department received a request for a leak adjustment from Car Wash Enterprises Inc., a non-residential property located at 800 S Grady Way, Renton, WA. This account, number 020311-001, receives water and sewer service from the city, as well as King County Metro Sewer services. The water leak was located in the main water line and was identified sometime during late August 2021 and was repaired on October 7th, 2021. A request for a leak adjustment was received in October 2021. The requested adjustment covers the September 2021 billing periods and the adjustment breaks down as follows: Water $635.31 Sewer $1232.01 KC Sewer $2218.32 Total $4085.64 EXHIBITS: A. 20311-001 Leak Adjustment STAFF RECOMMENDATION: Staff recommends an adjustment to this account in the amount of $4,085.64 for the applicable Renton water and sewer, and King County Sewer portions of the bill in accordance with City Code 8 -4-46 and 8-5-23. AGENDA ITEM #7. g) Service Address: Account # 20311‐001 Month Billed Prior Year 1 Prior Year 2 Average Excess Consumption WATER SEWER KC SEWER Sep‐21 714 425 301 363 351 175.50 351.00 351.00 minus 7.5 swr 706.5 351 3.62 3.51 6.32 635.31 1,232.01 2,218.32 00 ‐ ‐ ‐ minus 7.5 swr 0 0 Rate per 100 ccf 3.43 3.51 6.32 ‐ ‐ ‐ Water Sewer KC Sewer 635.31$ 1,232.01$ 2,218.32$ Total: $ 4,085.64 Leak Adjustment Calculation ‐ Non‐Residential Sub‐Total By Service: 7.5 units included in flat rate for sewer Water refunds are calculated at 50% of the excess consumption. H:\Finance\Utility Billing\springbrook\LEAK‐BILLING ADJ\Leak Adjustments 800 S Grady Way Sewer refunds are calculated at 100% of the excess consumption after subtracting 7.5 units that are included in the flat rate. Rate per 100 ccf AGENDA ITEM #7. g) Leak Adjustment InformaƟonBy comaparison periods‐Prior 2 yearsBilled Consumption Amountsand Consumption Customer #: 020311-001Service Address: 800 S GRADY WAYName: CAR WASH ENTERPRISES INC-TUNNEClass: 04 COMM$1047.48301$989.10301$1772.74301$1508.75425$1436.20425$2521.70425$2584.68714$2479.82714$4465.08714Consumption40249070150Consumption2072Consumption1241202120202019AGENDA ITEM #7. g) UƟlity Rates Reference:070150 Customer#: 020311‐001 cons lvl rate/ccf minimum rate minimum rate minimum rate 0.00 0.00 0.00 0.00 45.33 6.04 68.68 3.55 30.51 3.44 0.00 0.00 70.05 3.62 31.12 3.51 47.37 6.32 7.501MF/Comm/monthly402KC Sewer 7.501MF/Comm/monthly207Renton Sewer .0011 1/2" Non-Residential124Water 202120202019 req_description request _ date codecust _ sequence cust _ no Notice of Constant\Unusual Consumption 1 4AMR 23-September-2021 LETTER-AMR Major Leak-20311 1 4 INMJ 16-September-2021 Investigate Major Leak-now running at 40cf per hour-20311 1 4AMR 19-August-2021 LETTER-AMR Major Leak-20311 1 4 INMJ 16-August-2021 Investigate Major Leak-Running at 8cf per hour-20311 AGENDA ITEM #7. g) CITYOF—‘-‘Renton0WaterLeakAdjustmentRequestForm______________________Date:jflJ19/Z-iCityAccountNumber:)20IServiceAddress:32()‘CL)BillingPeriod:/Z12—1LocationType:SingleFamilyResidential-DNon-Residential-‘LeakAdjustmentPolicy(Ordinance5600,6-15-2011)ETheCitywillprocessandgrantnomorethanonewaterbillingadjustmentforwaterleaksonthecustomers’sideofthewatermeterperwaterserviceconnectioneveryfive(5)years.Adjustmentswillbecalculatedoverthebillingperiodswhenthewaterleakoccurred,uptoamaximumoftwo(2)regularmeterreadingcycles.Leakadjustmentswillbegrantedforservicelinesoniybetweenthemeterandthefoundationofthebuilding.EAwrittenrequestforawaterbillingadjustmentmustbesubmittedtoUtilityBillingCustomerServicewithinsixty(60)daysofdiscoveryofthewaterleakand/orsixty(60)daysofreceiptofanoticefromtheCityregardinghighwaterconsumptionandthataleakmighthaveoccurred.Thewrittenrequestmustincludetheserviceaddress,billingperiodsoverwhichtheleakoccurred,locationoftheleakandacopyoftherepairreceiptwithaclearwrittendescriptionofthecompletedrepai1Photosverifyingtherepairandthelocationoftheleakarestronglyrecoinmended.AdjustmentMethodology(Ordinance5210,6-5-06)DThewaterportionofthebillwillbeadjustedbychargingforonly50%oftheexcessconsumptionchargeoverthebillingperiod(s)whentheleakoccurred.Exampleofanadjustedwaterbillingcalculation:(0.50XConsumptioninexcessofhistoricalaverageforbillingperiod)XCommodityRate.Adjustmentsgreaterthan$2,000shallbesubmittedtotheFinanceCommitteeforapprovalordenial.TherewillbenoadjustmentoftheBasicMonthlyChargeoranyotherwatercharge.(Ord.5210,6-5-2006)EFornon-residentialseweraccounts,afulladjustmentofthesewerbillwillbemadeforallleakedwaterthatdidnotenterthesanitarysewersystem.Theadjustmentwillbedeterminedbyaveragingnormalwaterconsumptionfrompreviousrepresentativebillingperiodsandchargingwastewatervolumeratesbasedonthisnon-nalaveragevolume.Adjustmentsgreaterthan$2,000shallbesubmittedtotheFinanceCommitteeforapprovalordenial.Therewillbenoadjustmentofthebasechargeoranyothersewercharge.DateLeakwasrepaired:....JiY,J..Z\...LeakRepairedBy:‘Sth€(?‘kLocationofLeak:C4cjJC6oocTypeofLeak:\€ck’(’PropertyOwnerName:Co(w6Oflkerri’ContactPhone#:ZoGIPropertyOwnerSignatureDate:C2/j/ZlNote:Attachrepairreceiptstothisrequestform.Adjustmentit’llhotbeprocessedwithoatproofofrepair.ApprovedDeniedReason____________________________________________________________________inccc(RADYWAYRFNTONWAcqflç7PHONF-fAYc)-An-Rc2PAY-(42c).Afl4cRcc—ORflcPA/r/ni,AGENDA ITEM #7. g) ClearwaterLeakDetection,Inc.—‘----PCBOX692LEARWATERLEAKDETECTIONBlackDiamond,WA98010Invoice:DateIInvoice#J10/7/2021DueonreceiptServiceDateItemDescriptionAmount10/7/2021LEAKDETE...LeakDetectionServices1,800.OOT10/7/2021LEAKDETE...CardServiceFee54.00CityofRenton,NoTaxCollected,ServiceOnly0.00Total$1,854.00Phone:(253)405-235610/7/20216739DueDateTermsAGENDA ITEM #7. g) PLUMBING,HEATING,&ROOTER‘ThePlumbersPeopleI?eeonmnicnd”Integrity&Skillsincethe1970’s6608220thStreetSW,MountlakeTerrace,WA98043P0Soc1637,Lynnwooct,WA98046Seattle(206)783.4129Eaststde(425)455-1310Fax(206)784-4924FISCHPC131R1TO:1WY’l?2A”(.tVWI4‘4e‘Wif1’EIitvpv1S&).S1’1C3q’viLLrIUWüiiNWFcWLl’YLfIOJ’),LiIARIJ1I’LLALftIJ2((.Fo-it-ninhoI1i’l00191)PfI)Jfl’lQ.IYlacitVLf2Clf(otndbckdk1../o%%AJørZ_5..-L-fc.INVOICENO[42ILc3JOBPHONEDATEOFORDERtol’gIaiOBNAME/LOCATIONrI4A/((fl/XJA-S1A,.05LjtttLyWag17tS7PHONE2’lq/9——ORDERTAKENBY4-LtWLgiogDoflTERMS,PeyrhmotdoeuponEorEpIetion.1b%IrtiereStpertrto,HhBiter30days.ç——---srulL&L(4J___Jo9i2SIGNATURE(IherebyeokrrooIedgetheSOtiotOolorycoorpletionoltheobovodo/vEbodworkIThank9oufPAYTI-IlSAMOIJNT-.-‘SALESTAXAGENDA ITEM #7. g) •••AGENDA ITEM #7. g) AB - 3021 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Utility Billing Leak Adjustment for Beijing Men RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Finance Department STAFF CONTACT: Terri Weishaupt, Accounting Supervisor EXT.: 6920 FISCAL IMPACT SUMMARY: None SUMMARY OF ACTION: The Finance Department received a request for a leak adjustment from Beijing Men, owner of a Multifamily property located at 2011 Jefferson Ave Ne, Renton, WA. This account, number 051035-000, receives water and sewer service from the city, as well as King County Metro Sewer services. The water leak was not located in the main water line and was identified sometime during July 2021 and was repaired on August 14th, 2021. A request for a leak adjustment was received in August 2021. This adjustment only includes a leak adjustment to the sewer charges as leak adjustments for water are only granted for leaks within the service line as defined by lines between the meter and the foundation of the building. Because this leak was within the building, no adjustment was made for the water charges during this period. The requested adjustment covers the July and August 2021 billing periods and the adjustment breaks down as follows: Water $0 Does not qualify Sewer $719.55 KC Sewer $1295.60 Total $2015.15 EXHIBITS: A. 051035-000 Leak Adjustment STAFF RECOMMENDATION: Staff recommends an adjustment to this account in the amount of $2,015.15 for the applicable Renton water and sewer, and King County Sewer portions of the bill in accordance with City Code 8-4-46 and 8-5-23. AGENDA ITEM #7. h) Service Address: Account # 51035‐000 Month Billed Prior Year 1 Prior Year 2 Average Excess Consumption WATER SEWER KC SEWER Jul‐21 123 12 12 12 111 ‐ 111.00 111.00 minus 7.5 swr 115.5 115.5 3.43 3.51 6.32 ‐ 389.61 701.52 Aug‐21 110 13 17 15 95 95.00 95.00 minus 7.5 swr 102.5 95 Rate per 100 ccf 3.43 3.51 6.32 ‐ 333.45 600.40 Water Sewer KC Sewer ‐$ 723.06$ 1,301.92$ Total: $ 2,024.98 Water refunds are calculated at 50% of the excess consumption. Sewer refunds are calculated at 100% of the excess consumption after subtracting 7.5 units that are included in the flat rate. Leak Adjustment Calculation ‐ Multi‐Family H:\Finance\Utility Billing\springbrook\LEAK‐BILLING ADJ\Leak Adjustments 2011 Jefferson Ave NE Unit 13 7.5 units included in flat rate for sewer Rate per 100 ccf Sub‐Total By Service: AGENDA ITEM #7. h) UƟlity Rates Reference:140492 Customer#: 051035‐000 cons lvl rate/ccf minimum rate minimum rate minimum rate 0.00 0.00 0.00 0.00 45.33 6.04 35.59 3.36 30.51 3.44 0.00 0.00 36.30 3.43 31.12 3.51 47.37 6.32 7.501MF/Comm/monthly402KC Sewer 7.501MF/Comm/monthly207Renton Sewer .0011" MTF119MWater 202120202019 req_description request _ date codecust _ sequence cust _ no Notice of Constant\Unusual Consumption AGENDA ITEM #7. h) Leak Adjustment InformaƟonBy comaparison periods‐Prior 2 yearsBilled Consumption Amountsand Consumption Customer #: 051035-000Service Address: 2011 JEFFERSON AVE NEName: BEIJING MENClass: 03 MTF$39.4812$15.1712$27.1812$55.9317$32.0217$57.3817$40.3212$15.4812$27.1812$43.6813$18.9213$33.2213$421.89123$405.41123$729.96123$377.30110$359.78110$647.80110Consumption40248140492Consumption2072Consumption119M1Consumption40247Consumption2072Consumption119M1202120202019AGENDA ITEM #7. h) water Leak Adjustment Request Form -----..-.-ItentOil 8 Date:!2K_!_!_!/.J >f> I Service Address: ;XJll 1 ,;J/'r ?<f of(, City Account Number: ob IO~ r;-{)DU Jefler~Dll be ;<)l ~ Billing Period: 7 /,/~>I -7 @o/..>0>"/ Location Type: Single Family Residential -D Non-Residential -[6ZI Leak Adjustment Policy (Ordinance 5600, 6-15-2011) D The City will process and grant no more than one water billing adjustment for water leaks on the customers' side of the water meter per water service connection every five (5) years. Adjustments will be calculated over the billing periods when the water leak occurred, up to a maximum of two (2) regular meter reading cycles. Leak adjustments will be granted for seiviee~•!!rtmfWee.t t~~ aildthe.faunt'lation .afthe building. D A written request for a water billing adjustment must be submitted to Utility Billing Customer Service within sixty ( 60) days of discovery of the water leak and/or sixty ( 60) days of receipt of a notice from the City regarding high water consumption and that a leak might have occurred. The written request must include the service address, billing periods over which the leak occurred, location of the leak and a copy of the repair receipt with a clear written description of the completed repair. Photos verifYing the repair and the location of the leak are strongly recommended. Adjustment Methodology (Ordinance 5210, 6-5-06) D The water portion of the bill will be adjusted by charging for only 50% of the excess consumption charge over the billing period(s) when the leak occurred. Example of an adjusted water billing calculation: (0.50 X Consumption in excess of historical average for billing period) X Commodity Rate. Adjustments greater than $2,000 shall be submitted to the Finance Committee for approval or denial. There will be no adjustment of the Basic Monthly Charge or any other water charge. (Ord. 5210, 6-5-2006) D For non-residential sewer accounts, a full adjustment of the sewer bill will be made for all leaked water that did not enter the sanitary sewer system. The adjustment will be determined by averaging normal water consumption from previous representative billing periods and charging wastewater volume rates based on this normal average volume. Adjustments greater than $2,000 shall be submitted to the Finance Committee for approval or denial. There will be no adjustment of the base charge or any other sewer charge. Date Leak was repaired:...........8........!4.J>e>-f Leak Repaired By: 1tJ888 J.,,-l-C.. Location of Leak: f nce.,,ln 'l tJcifkc.., line f71r [. iJg,t/ /...efiJeen hfc-Ae" ~ gat/wD!t'L J Type of Leak: p ~ f e I ~"ltrnJ Property Owner N.ame' 6,;~~ Contact Phone#'~ I>> It _2j'J'i Property Owner S1gnature._L.......LZ-___________ ___:=-=----~-------Date:__L/ id I ~>/ Note: Attach repair receipts to this request form. Adjustment will not be processed without proof of repair. Approved D Denied D Reason. ________________________ _ 1055 S GRADY WAY, RENTON WA 98057 PHONE: (425)-430-6852 FAX: (425)-430-6855 -ORD. 5658 4/23/2012 AGENDA ITEM #7. h) Service Information Beijing Men 2011 Jefferson Ave NE Renton, WA 98056 Job Date: 08/14/2021 Job Item Open wall and cabinet Replace leaking pipe Patch wall, put back cabinet Invoice TW888LLC 12715 Bel Red Rd #204 ,,. Bellevue, WA 98005 206-841-1888 $150 $850 $300 Job Subtotal: $1300 Tax: $131.3 Total Due: $1431.3 AGENDA ITEM #7. h) Account Statement @isg.MHIM14.MM4Ji•ifll._ __ . A.c .. c.o.u.n ... 1.N,.0-. .,= .o.s.,1 .. o .. 3s .. -... o.o.o,_ BEIJINGME:N Service Address: BillingDate: 7130/2021 Service Period: Current Charges: .. Account Balance: 2011 JEFFERSON AVE Nt UNIT 13 Current Charge1> Due: 8/24/2021 7/1/2021 to 7/30/2021 1727.37 $1.,727.37 Mi;M94M1Hij¥-.. ·-------·-P.e.r.o.1e.m.:•$•5•7._ss Water 1"MTF Sewer M.F/Comrn/monthty •Storm Drainage Medium intensity <.5 acre (50 to King County Sewer l\llF!Comrn/monthly TOTAL CURRENT CHARGES 458.19 .436.53 55.32 777.33 $1,727.37 "U&i!Mlii•-.. ·------------- I::\ CITYOF vRenton S.GradyWay Phone:J25~430·f:>852 Hours: 8 a.m. to 5 p.m, Mon. -Fri . 'iM·i'H4'"MAi¥•-· ..... _,... .... _________ _ Previous Balance 202.47 Thank Youforyo:Urpayment (202.47) Additional Billing . 0.00 Cur.rent Charges 1,727.37 CURRENf BALANCE: $1,727.37 liiii·l"l''Ml*i.W·-·· ._._ ... · ------------- •H·iHH¥--. ·.··· ·.·· .·· .· .. · · .. ··· .. ··. · .. ··.·.· ·····.···· • Renton's annual Water Qua!ityReport is now available! Learn about your water source .and t~atment, how. we comply with strict water standards, and water saving teehniques, Visit: rentoriwa.gov/waterquality. For a print~ copy, call 425~43CH287 or email liml'loff@rentonwa.gov~ tfyou have renters on your property, please share this important me.ssage with.them~ *tii*llhr.';f-1MiH1HiH"''----------------140 120H---_.;..---------------------....i 100W---------------~-------.-...i Prior Usage Serial No 73863596 PrevklU$.R.eading · · C.l!rteot Reading .Date 6/2812021 Reiaaing Date Reading . 1236 7/26/2021 1359 Cons 123 ,, ' , ' ' ---------------------------~---------------------------~---------~--------I:\ CITY OF \;/Renton Service Address: 2011 JEFFERSON AVE NE Cy: 3 Ref: 140492 Bill Date: 7/30/2021 D Address Change on Reverse. 1lllll•ll•1 1l1l1lll1ll1l1111ll111ll1l•11llll11ll11111llllllll1l11 BEIJING MEN c/o SHU-MEI WANG 1633 185TH AVE NE BELLEVUE, WA 98008-3310 IMPORTANT: PLEASE REMIT THIS STUB WITH PAYMENT FOR ACCURATE PROCESSING Total Due: $1,727.37 ACCOUNT: 051035-000 I AUTO PAY I AMOUNT ENCLOSED:, ..................... . UTILITY DIVISION CITY OF RENTON PO BOX 9119 RENTON WA 98057-3002 130510350002001727372 AGENDA ITEM #7. h) AB - 3022 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Utility Billing Leak Adjustment for Renton Preservation LP RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Finance Department STAFF CONTACT: Terri Weishaupt, Accounting Supervisor EXT.: 6920 FISCAL IMPACT SUMMARY: None SUMMARY OF ACTION: The Finance Department received a request for a leak adjustment from Renton Preservation LP, a Multifamily property located at 3000 Royal Hills Dr SE , Renton, WA. This account, number 056172 -015, receives water and sewer service from the city, as well as King County Metro Sewer services. The water leak was located in the main water line and was identified sometime during August 2021 and was repaired on August 24, 2021. A request for a leak adjustment was received in August 2021. The requested adjustment covers the August 2021 billing periods and the adjustment breaks down as follows: Water $915.81 Sewer $1874.34 KC Sewer $3374.88 Total $6165.03 EXHIBITS: A. 056172-015 Leak Adjustment STAFF RECOMMENDATION: Staff recommends an adjustment to this account in the amount of $6,165.03 for the applicable Renton water and sewer, and King County Sewer portions of the bill in accordance with City Code 8 -4-46 and 8-5-23. AGENDA ITEM #7. i) Service Address: Account # 56172‐015 Month Billed Prior Year 1 Prior Year 2 Average Excess Consumption WATER SEWER KC SEWER Aug‐21 565 29 33 31 534 267.00 534.00 534.00 minus 7.5 swr 557.5 557.5 3.43 3.51 6.32 915.81 1,874.34 3,374.88 Water Sewer KC Sewer 915.81$ 1,874.34$ 3,374.88$ Total: $ 6,165.03 Water refunds are calculated at 50% of the excess consumption. Sewer refunds are calculated at 100% of the excess consumption after subtracting 7.5 units that are included in the flat rate. Leak Adjustment Calculation ‐ Multi‐Family H:\Finance\Utility Billing\springbrook\LEAK‐BILLING ADJ\Leak Adjustments 3000 Royal Hills DR SE 7.5 units included in flat rate for sewer Rate per 100 ccf Sub‐Total By Service: AGENDA ITEM #7. i) UƟlity Rates Reference:280716 Customer#: 056172‐015 cons lvl rate/ccf minimum rate minimum rate minimum rate 0.00 0.00 0.00 0.00 45.33 6.04 68.68 3.36 30.51 3.44 0.00 0.00 70.05 3.43 31.12 3.51 47.37 6.32 7.501MF/Comm/monthly402KC Sewer 7.501MF/Comm/monthly207Renton Sewer .0011 1/2" MTF124MWater 202120202019 req_description request _ date codecust _ sequence cust _ no Notice of Constant\Unusual Consumption 15 4 INMJ 11-August-2021 Investigate Major Leak-Running at 116cf per hour-56172 15 4 16-February-2021 LETTER-LEAK?-56172 15 4 INMJ 17-November-2020 Investigate Major Leak-Running at 15cf per hour-56172 15 4 INMJ 31-August-2020 Investigate Major Leak-Running at 151cf per hour-56172 AGENDA ITEM #7. i) Leak Adjustment InformaƟonBy comaparison periods‐Prior 2 yearsBilled Consumption Amountsand Consumption Customer #: 056172-015Service Address: 3000 ROYAL HILLS DR SEName: RENTON PRESERVATION LPClass: 03 MTF$108.5733$85.9433$150.4533$95.4129$72.4629$129.8629$1145.76341$1147.24341$2014.34341$1937.95565$1956.83565$3523.40565Consumption40248280716Consumption2072Consumption124M12021202020192018AGENDA ITEM #7. i) AGENDA ITEM #7. i) AGENDA ITEM #7. i) AGENDA ITEM #7. i) AB - 3006 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Renewal of Stop Loss Coverage 2022 RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Human Resources / Risk Management Department STAFF CONTACT: Ellen Bradley-Mak, Administrator EXT.: 7657 FISCAL IMPACT SUMMARY: Expenditure Required: $838,000 Amount Budgeted: $838,000 Note that this includes the cost for active employees and LEOFF 1 retirees. SUMMARY OF ACTION: The City provides medical coverage through a self-funded plan, which means that the City pays for claims out of the Renton Employee Healthcare Plan fund by utilizing a third-party administrator to process claims. To preserve the fiscal stability of the plan, it is necessary to carry excess loss (stop loss) insurance to protect the City from the cost of high-dollar claims. The City bids this coverage each year. Due to insurance market conditions, the cost has increased 50% from last year, to $838,000 for 2022. This coverage carries an individual deductible amount of $250,000, which will remain unchanged from last year. EXHIBITS: A. Stop Loss Renewal - Symetra STAFF RECOMMENDATION: Approve the 2022 Excess Loss insurance contract with Symetra, and authorize the Mayor and City Clerk to sign the implementing documents when ready. AGENDA ITEM #7. j) SLM-6291 12/20 RENEWAL PREPARED FOR City of Renton January 1, 2022 Symetra Life Insurance Company First Symetra National Life Insurance Company of New York Symetra Stop Loss IN PARTNERSHIP WITH: GALLAGHER BENEFIT SERVICES INC AGENDA ITEM #7. j) Renewal prepared for: City of Renton Symetra Stop Loss Prepared October 20, 2021 271655 6 days 99.9% You have challenges; we have solutions We know you have options when choosing a stop loss carrier. We also know that finding the right partner is important. You need to work with professionals who understand the self-funded industry, who realize the importance of building the right stop loss policy at the right price, and who deliver on their promises year after year. When you renew with us, you’ll find a seamless continuation of all the benefits you’ve come to expect from your Symetra stop loss policy. Things like: •Fast and fair claims practices. •Most catastrophic claims reviewed and processed within 24 hours through our Preferred ASO Claim Advance program. •No new lasers or increase on existing lasers at renewal; laser at renewal available by request. •Gapless option for renewal run-out contracts means claims paid outside the run-out period are still eligible for reimbursement. •Cost containment and alternative treatment plans to help control costs without sacrificing quality of care. •24/7 online policy administration via Group Online (GO). •Access to Symetra Compliance Solutions for professional support navigating the health care landscape. Put our expertise to work for you Symetra has been in the stop loss business for over 45 years.1 In fact, we helped pioneer it. Our experienced team continues to be available as needed to help you understand and protect your self-funded plan. 2020 performance highlights:2 Most claims paid within 6 business days Contract amendments average just 3 business days Claims financial accuracy score The average tenure of a Symetra stop loss client is five years, with approx. 300 clients that have been with us for 10 years or more (as of April 2020). 5 years3 days AGENDA ITEM #7. j) Renewal prepared for: City of Renton Symetra Stop Loss Prepared October 20, 2021 271655 Option 1 – keeping the same deductible at renewal Plan year 1 Plan year 2 Increase Paid claim amount $300,000 $330,000 10% Specific deductible $150,000 $150,000 0% Symetra reimbursement $150,000 $180,000 20% Option 2 – raising the deductible at renewal Plan year 1 Plan year 2 Increase Paid claim amount $300,000 $330,000 10% Specific deductible $150,000 $165,000 10% Symetra reimbursement $150,000 $165,000 10% Understanding stop loss rates Pricing stop loss is a complex process and there are many factors that impact rates, especially at renewal. Here are some things we consider when determining the best possible price for your plan: Plan design: what services are covered; how much are employee copays, coinsurance, deductibles and/or premiums; are there wellness or other value-add programs included? Group population: how many people are covered; where do members live and/or receive care; what are the demographics of the group? Managed care networks: are provider and hospital networks helping to lower plan risk; what is the network usage rate? Claims experience: what is the claims experience history; how many claims, to date, are over the Specific deductible; how many are expected before the end of the plan year? Medical trend: how much are health care costs projected to increase? Share of risk: what is your deductible threshold and risk tolerance; how will rising medical trend impact your plan and the accompanying stop loss policy? Lowering premium renewal increases through deductible leveraging Annual renewal is an opportunity to review how your plan performed over the past year, and to evaluate whether your current Specific deductible is still appropriate. This is especially true when rising medical costs are paired with higher than expected claims, as this combination typically means a rate adjustment is needed for the new plan year. Leveraged trend or, as applied, deductible leveraging, can help mitigate higher renewal rates by sharing the impact of medical trend between the health plan and Symetra stop loss via a higher Specific deductible. Here’s how it works: For illustrative purposes only. With deductible leveraging, you’re trading lower premiums for a higher Specific deductible due to medical trend increases. It can be an effective way to help control the impact of rising costs on your plan. If you’re interested in deductible leveraging for your renewal, talk with your Symetra stop loss professional. Based on Symetra renewal data from August 1, 2015 to July 1, 2020. What does a typical Symetra renewal look like? During the last five years: AGENDA ITEM #7. j) Renewal prepared for: City of Renton Renewal Status: Firm if accepted by 11/17/2021 Symetra Stop Loss Prepared October 20, 2021 271655 SPECIFIC STOP LOSS COVERAGE Plan Description Current Option 1 Option 2 Plan DescriptionCoverages Medical, Rx Medical, Rx Medical, Rx Contract Type Paid Paid Paid Annual Specific Deductible per Individual $250,000 $250,000 $275,000 Transplant Exclusion No No No No New Laser Option Included Included Included Maximum Lifetime Reimbursement Unlimited Unlimited Unlimited Maximum Policy Period Reimbursement Unlimited Unlimited Unlimited Reimbursement Percentage 100%100%100% Quoted Rate(s) Per Month Enrollment Single 250 $32.89 $49.36 $43.92 Family 369 $103.84 $155.84 $140.53 Composite 619 $75.18 $112.84 $101.51 Estimated Annual Premium $558,474 $838,140 $754,027 Quoted Rate(s) include Commission of 0.00%0.00%0.00% AGENDA ITEM #7. j) Renewal prepared for: City of Renton Renewal Status: Firm if accepted by 11/17/2021 Symetra Stop Loss Prepared October 20, 2021 271655 AGGREGATE STOP LOSS COVERAGE Plan Description Current Option 1 Option 2 Plan DescriptionCoverages Medical, Rx Medical, Rx Medical, Rx Contract Type Paid Paid Paid Aggregate Corridor 200%200%200% Loss Limit per Individual $250,000 $250,000 $275,000 Maximum Annual Reimbursement $1,000,000 $1,000,000 $1,000,000 Reimbursement Percentage 100%100%100% Estimated Annual Aggregate Deductible $19,847,390 $22,916,455 $23,000,637 Minimum Aggregate Deductible $17,862,651 $20,624,810 $20,700,573 Monthly Aggregate Claim Factors Enrollment Medical, Rx Card Single 250 $1,402.86 $1,619.10 $1,625.05 Family 369 $3,531.80 $4,078.40 $4,093.38 Composite 619 $2,671.97 $3,085.15 $3,096.48 Quoted Rate(s) per Month Enrollment Composite 619 $.00 $.00 $.00 Estimated Annual Premium $1 $1 $1 OVERALL COST SUMMARY Plan Description Current Option 1 Option 2 Plan DescriptionEstimated Total Annual Fixed Cost $558,475 $838,141 $754,028 Aggregate Variable $19,847,390 $22,916,455 $23,000,637 Estimated Maximum Annual Liability $20,405,865 $23,754,596 $23,754,665 OTHER OPTIONS Rate cap option: Renewal rates are capped at a maximum increase of 60% assuming no material changes to the group plan have taken place (i.e. plan changes, changes in specific deductible, commission level or administrator). If there are material changes, first the specific rates will be produced using the rate cap, then material changes will be accounted for in order to arrive at the renewal rate level. The cap applies to both the rates and aggregating specific deductible (if applicable). AGENDA ITEM #7. j) Renewal prepared for: City of Renton Renewal Status: Firm if accepted by 11/17/2021 Symetra Stop Loss Prepared October 20, 2021 271655 PROPOSAL QUALIFICATIONS AND CONTINGENCIES The terms of this proposal are based upon the policyholder having exercised commercially reasonable efforts to obtain and provide to Symetra all information set forth in this offer, together with all information identified in any prior proposal for coverage for the upcoming policy period. Except for the Plan Document or Plan Amendment, all requested information must be received no later than 15 days prior to the proposed effective date of coverage, otherwise we reserve the right to withdraw the proposed terms and return any premiums remitted. Any secondary documents (i.e. “stop loss agreements”, “procurement documents”, “service contracts”, etc.) must be disclosed to and approved by Symetra prior to the Employer’s acceptance of our proposal. Subsequent undisclosed agreements may not be approved. By delivering this proposal for coverage, the producer represents and warrants to Symetra that it and each of the persons or entities acting with or on behalf of the producer in the sale or solicitation of such coverage maintains such insurance producer licenses and appointments as are required by each state in which the coverage has been or will be solicited, and in all states in which the policy(ies) will be issued. This proposal is authorized for delivery only if the foregoing representation and warranty is true and correct. This is a firm offer, which may be bound with no additional underwriting requirements provided that: 1. It is accepted in writing by the expiration date as shown above; 2. The policyholder has exercised commercially reasonable efforts to obtain and provide to Symetra all information requested in this proposal and any prior proposal for coverage for the upcoming policy period; 3. The data and information submitted to Symetra is, to the best of the policyholder’s knowledge after due inquiry, materially accurate and materially complete as of the date of policyholder’s written acceptance of this firm offer. Any material inaccuracies or material omissions in the data or other information submitted may require changes in underwriting, including but not limited to changes in the terms, rates and/or factors; and 4. The policyholder and its authorized agent agree that following acceptance of this firm offer, the policyholder or its authorized agent promptly notify Symetra upon becoming aware of any covered individual who (i) receives prior authorization approval for hospital confinement exceeding 30 days or more and/or (ii) becomes a listed transplant candidate, in each case so that Symetra can initiate appropriate cost containment efforts. For the avoidance of doubt, the provision of such notice pursuant to this item 4. will not change terms of the accepted offer. If updated information is received by Symetra prior to written acceptance or the expiration date has passed, we retain the right to alter the terms, rates and/or factors. We will not be bound by any typographical errors or omissions contained herein. FIRM RENEWAL OFFER This proposal is based on the following network(s): BLUES For inclusion of RX coverage under the specific and/or aggregate when there is a separate PBM, we require written documentation that we are in receipt of all prescription drug experience reports. Otherwise, RX will not be a covered expense under the excess loss policy. The loss limit shown in the aggregate excess loss section of the proposal applies to all coverage listed within that section regardless of what is in the individual excess loss section. Only claims up to the individual case level deductible will accumulate toward the aggregate attachment point This renewal/proposal reflects the continuation of the current plan of benefits. This quote is subject to Symetra's stop loss policy provisions, limitations and exclusions. This quote/renewal excludes state assessment fees and is based on the group (through its TPA) collecting any such fee assessed with respect to the group's self-insured benefit plan and remitting such fee to the state on the group's behalf. The group may be required to notify their TPA of any covered residents that would fall under an assessment program. Symetra's quote excludes coverage of such fees. In the event Symetra is required to be involved in the administration or collection of an assessment fee on the group's behalf, the assessment fee will be charged to and collected monthly from the group pursuant to the Premium Taxes and State Assessments provision of the Stop Loss Insurance Policy. AGENDA ITEM #7. j) Renewal prepared for: City of Renton Renewal Status: Firm if accepted by 11/17/2021 Symetra Stop Loss Prepared October 20, 2021 271655 Check the box next to the selected proposal option; for Specific only coverage, when both Specific and Aggregate coverages are listed, please also check the box to decline Aggregate coverage. Option Specific Aggregate 1 $250,000 / Paid $250,000 / Paid 2 $275,000 / Paid $275,000 / Paid Decline Aggregate coverage This is a firm offer, which may be bound with no additional underwriting requirements provided it is accepted in writing by the expiration date as shown above. The Premium, Aggregate Deductibles and all other terms are based on the data submitted. Any inaccurate or incomplete data submitted may require changes in underwriting. If updated information is received by Symetra prior to written acceptance or the expiration date has passed, we retain the right to alter the terms, rates and/or factors. We will not be bound by any typographical errors or omissions contained herein. Please indicated your acceptance on this offer by having an authorized representative or agent of City of Renton sign below: Authorized Signature:Date: Printed Name:Printed Title: Company or Firm Name: x City of Renton AGENDA ITEM #7. j) Renewal prepared for: City of Renton Symetra Stop Loss Prepared October 20, 2021 271655 Plan Sponsor’s Plan Document Submission and Symetra Acceptance Required. As stated in Symetra’s Proposal for Group Stop Loss Insurance, the Plan Sponsor’s Plan Document must be submitted to Symetra no later than 90 days after the proposed effective date of Stop Loss Insurance coverage. The Stop Loss Insurance policy (“Policy”) requires that only eligible charges payable under the terms of the Plan Document as approved by Symetra will be covered expenses eligible for reimbursement under the Policy. The policy will be issued after the Plan Document is received and approved by Symetra or a signed Confirmation of Medical Benefit Plan is submitted to Symetra by the prospective policyholder. Symetra withhold reimbursement of covered expenses prior to the receipt and acceptance of the final signed Plan Sponsor’s Plan Document or amendment. In reviewing the Plan Document for acceptance, Symetra will consider whether the Plan Document: 1.Adequately addresses key plan components, including but not limited to eligibility rules, benefits promised, plan administration, discretionary language for court review of benefit claims, subrogation and coordination of benefits provisions. 2.Addresses the Plan’s obligations under federal law, including a.ERISA (Employee Retirement Income Security Act) required provisions, b.ACA (Affordable Care Act) required provisions; or c.a statement of grandfathered status, if applicable. Symetra will have no liability for reimbursing Plan Sponsor obligations that are not clearly stated in the Plan Document whether or not the Plan remains obligated in the absence of express inclusion. It is recommended that the Plan Document include express reference to other federal mandates and laws to which Plan is subject or a “conformity with law” provision. 3.Contains typical exclusions or limitations, including but not limited to: a.Experimental/investigations treatment (except as required by ACA), and b.non-medically necessary treatment The absence of or inadequate treatment of these subjects in the Plan Document may result in a superseding provision in the Stop Loss policy. AGENDA ITEM #7. j) Renewal prepared for: City of Renton Symetra Stop Loss Prepared October 20, 2021 271655 Your partner for stop loss success www.symetra.com www.symetra.com/ny Symetra® is a registered service mark of Symetra Life Insurance Company. Financial Strength Ratings: A.M. Best: A “Excellent” (3rd highest of 16); Moody’s A1 “Good” (5th highest of 21); Standard & Poor’s: A “Strong” (6th highest of 21). Ratings are subject to change. Please refer to www.symetra.com/ratings for current information. Ratings as of July 23, 2021. Symetra Life Insurance Company (est. 1957) is a direct subsidiary of Symetra Financial Corporation. First Symetra National Life Insurance Company of New York (est. 1990) is a direct subsidiary of Symetra Life Insurance Company and is an indirect subsidiary of Symetra Financial Corporation (collectively, “Symetra”). Neither Symetra Financial Corporation nor Symetra Life Insurance Company solicits business in the state of New York and they are not authorized to do so. Each company is responsible for its own financial obligations. Stop loss policies are insured by Symetra Life Insurance Company, 777 108th Avenue NE, Suite 1200, Bellevue, WA 98004. Base policies are ELC-24000 7/19 or LGC-12000 9/06, filed as Excess Loss. In New York, stop loss policies are insured by First Symetra National Life Insurance Company of New York, New York, NY. Mailing address: P.O. Box 34690, Seattle, WA 98124. Policy form numbers are ELC-24000/NY 7/19 or LGC-12000/NY 9/08, filed as Excess Loss. Coverage may be subject to exclusions, limitations, reductions and termination of benefit provisions. Products are not available in any U.S. territory. Symetra Compliance Solutions is provided by Enquiron® through Symetra and may not be available in all states. Symetra assumes no responsibility or liability for any resources or content provided by Enquiron®. Enquiron® is not affiliated with Symetra Life Insurance Company or any of its affiliates. ©2021 Enquiron®. All rights reserved. 145 years for Symetra Life Insurance Company; 17 years for First Symetra National Life Insurance Company of New York as of 2021. 2 Performance highlights based on financial and quarterly audits for 2020. Symetra is a financially strong, well-capitalized company on the rise, as symbolized by our brand icon—the swift. Swifts are quick, hardworking and nimble—everything we aspire to be when serving our customers. We’ve been in business for more than half a century with a commitment to creating employee benefit products that people need and understand. We appreciate your business and look forward to the opportunity to continue serving you with professional, informative and responsive service. Our guiding principles of Value, Transparency and Sustainability (VTS) are at the core of all we do. •Value: Products and solutions people need at a competitive price—backed by outstanding customer service. •Transparency: Clear communication so people understand what they are buying. •Sustainability: Products that stand the test of time and fiscal responsibility to ensure we are there for our customers. AGENDA ITEM #7. j) AB - 3008 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Renewal of the City's Liability Insurance Policies for 2022 RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Human Resources / Risk Management Department STAFF CONTACT: Ellen Bradley-Mak, Administrator EXT.: 7657 FISCAL IMPACT SUMMARY: We anticipate having Alliant's quote for the 2022 premiums by the time of the Finance Committee meeting on December 13. SUMMARY OF ACTION: Council approval is requested for renewal of the City's Liability Insurance for the period of January 1, 2022 - January 1, 2023. The coverage includes excess insurance for liability and insurance coverage for the airport, law enforcement, unmanned aircraft (drones) and underground storage tanks (UST). Liability insurance premiums in 2021 were $542,239. The City of Renton has not suffered any large losses that affect this renewal but due solely to "hard market" conditions, the City is anticipating a signif icant increase in premium for this renewal, of about 25%-30%. Quotes for coverage should be available for the City's review by or before the Finance Committee meeting on December 13. Risk Management may recommend adjustment to the policies in order to obtain sufficient coverage at favorable rates. Rates are secured through a third party broker who was approved by Council in 2015: Alliant Insurance Services. Factors determining premiums include market conditions, the City's loss run history, levels of coverage, and the City's self-insured retention. Upon approval by Council, the City will bind insurance policies through Alliant. EXHIBITS: n/a STAFF RECOMMENDATION: Approve the City's 2022 liability insurance renewal and authorize the Mayor and City C lerk to sign the implementing documents when ready. AGENDA ITEM #7. k) AB - 3027 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Request to Hire Recreation Coordinator at Step D RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Parks & Recreation Department STAFF CONTACT: Carrie Nass, Recreation Division Director (interim) EXT.: 6624 FISCAL IMPACT SUMMARY: N/A - Position is already budgeted. SUMMARY OF ACTION: The Parks and Recreation Department's Recreation Division is requesting to hire the Youth Athletics/Fitness Recreation Coordinator at grade a18 step D. The recruitment for this position opened in October 2021 and yielded over 30 candidates. Six candidates were selected from the pool to be interviewed. The candidate chosen to hire, Sean Conway, has ten years of experience in the field. Sean has a Bachelor’s in Sports Management with Minors in Communications and Spanish and a Master’s degree in Leadersh ip and Management. Sean also has a Certified Parks and Recreation Professional certification issued by the National Parks and Recreation Association. The combined experience and education for Sean Conway, lends to a higher step placement. EXHIBITS: N/A STAFF RECOMMENDATION: Approve the request to hire a Youth Athletics/Fitness Recreation Coordinator at Step D of salary grade a18, effective December 16, 2021. AGENDA ITEM #7. l) AB - 3016 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Professional Services Agreement for Certified Arborist Inspector Services RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Parks & Recreation Department - PPNR STAFF CONTACT: Ian Gray, Urban Forestry & Natural Resources Manager EXT.: x6601 FISCAL IMPACT SUMMARY: Funding for this project is in the 2022 Parks and Recreation (formerly Community Services) - Parks Planning and Natural Resources Division Operating Budget in the amount of $157,700 as part of the Contracted Services line item (001.000000.020.576.81.41.003). SUMMARY OF ACTION: An agreement for a Consulting Certified Arborist Inspector was authorized and completed in 2021. The Parks Planning and Natural Resources Division receives up to 900 requests for services annually from Renton residents, businesses, City Departments and others. During 2021, over 1,329 trees were inspected; 350 Work Requests were completed; and 475 Work Order requests were handled. Inspections were done for City Planners, Code Compliance and Permitting Inspectors, other City Staff, Developers, homeowner associations and individual home owners regarding general public tree issues, permitting, code violations, safety, and storm damage. The Consulting Certified Arborist Inspector receives tree requests, coordinates site visits, collects tree data, recommends treatments, communicates tree information to City Staff, property owners and others, and maintains the work order system and tree inventory database. Other duties include tree maintenance work, mapping and inventory of newly planted street and City facility trees, assistance with data collection for planting, pruning and removal projects, and preparing production reports, among others. Funds were allocated in the 2021 and 2022 budgets contributed by the Parks and Recreation Department. EXHIBITS: A. 2022 Certified Consulting Arborist Inspector Agreement STAFF RECOMMENDATION: The Parks and Recreation Department recommends approval of the Agreement with Davey Resource Group, Incorporated in the amount of $144,540. AGENDA ITEM #7. m) AGREEMENT FOR CERTIFIED ARBORIST INSPECTOR SERVICES THIS AGREEMENT, dated ________January, 2022, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Davey Resource Group, Inc. (“Consultant”), a Corporation licensed to do business in Washington . The City and the Consultant are referred to collectively in this Agreement as the “Parties.” Once fully executed by the Parties, this Agreement is effective as of the last date signed by both parties. 1.Scope of Work: Consultant agrees to provide Certified Arborist Inspection Services as specified in Exhibit A, which is attached and incorporated herein and may hereinafter be referred to as the “Work.” 2.Changes in Scope of Work: The City, without invalidating this Agreement, may order changes to the Work consisting of additions, deletions or modifications. Any such changes to the Work shall be ordered by the City in writing and the Compensation shall be equitably adjusted consistent with the rates set forth in Exhibit A or as otherwise mutually agreed by the Parties. 3.Time of Performance: Consultant shall commence performance of the Agreement pursuant to the schedule(s) set forth in Exhibit A. All Work shall be performed by no later than December 31, 2022. 4.Compensation: A.Amount. Total compensation to Consultant for Work provided pursuant to this Agreement shall not exceed $144,540.00 plus any applicable state and local sales taxes. Compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A. The Consultant agrees that any hourly or flat rate charged by it for its Work shall remain locked at the negotiated rate(s) unless otherwise agreed to in writing or provided in Exhibit A. Except as specifically provided herein, the Consultant shall be solely responsible for payment of any taxes imposed as a result of the performance and payment of this Agreement. B.Method of Payment. On a monthly or no less than quarterly basis during any quarter in which Work is performed, the Consultant shall submit a voucher or invoice in a form specified by the City, including a description of what Work has been performed, the name of the personnel performing such Work, and any hourly labor charge rate for such personnel. The Consultant shall also submit a final bill upon completion of all AGENDA ITEM #7. m) PAGE 2 OF 12 Work. Payment shall be made by the City for Work performed within thirty (30) calendar days after receipt and approval by the appropriate City representative of the voucher or invoice. If the Consultant’s performance does not meet the requirements of this Agreement, the Consultant will correct or modify its performance to comply with the Agreement. The City may withhold payment for work that does not meet the requirements of this Agreement. C.Effect of Payment. Payment for any part of the Work shall not constitute a waiver by the City of any remedies it may have against the Consultant for failure of the Consultant to perform the Work or for any breach of this Agreement by the Consultant. D.Non-Appropriation of Funds. If sufficient funds are not appropriated or allocated for payment under this Agreement for any future fiscal period, the City shall not be obligated to make payments for Work or amounts incurred after the end of the current fiscal period, and this Agreement will terminate upon the completion of all remaining Work for which funds are allocated. No penalty or expense shall accrue to the City in the event this provision applies. 5.Termination: A.The City reserves the right to terminate this Agreement at any time, with or w ithout cause by giving ten (10) calendar days’ notice to the Consultant in writing. In the event of such termination or suspension, all finished or unfinished documents, data, studies, worksheets, models and reports, or other material prepared by the Consultant pursuant to this Agreement shall be submitted to the City, if any are required as part of the Work. B.In the event this Agreement is terminated by the City, the Consultant shall be entitled to payment for all hours worked to the effective date of termination, less all payments previously made. If the Agreement is terminated by the City after partial performance of Work for which the agreed compensation is a fixed fee, the City shall pay the Consultant an equitable share of the fixed fee. This provision shall not prevent the City from seeking any legal remedies it may have for the violation or nonperformance of any of the provisions of this Agreement and such charges due to the City shall be deducted from the final payment due the Consultant. No payment shall be made by the City for any expenses incurred or work done following the effective date of termination unless authorized in advance in writing by the City. 6.Warranties And Right To Use Work Product: Consultant represents and warrants that Consultant will perform all Work identified in this Agreement in a professional and workmanlike manner and in accordance with all reasonable and professional standards and laws. Compliance with professional standards includes, as applicable, performing the AGENDA ITEM #7. m) PAGE 3 OF 12 Work in compliance with applicable City standards or guidelines (e.g. design criteria and Standard Plans for Road, Bridge and Municipal Construction). Professional engineers shall certify engineering plans, specifications, plats, and reports, as applicable, pursuant to RCW 18.43.070. Consultant further represents and warrants that all final work product created for and delivered to the City pursuant to this Agreement shall be the original work of the Consultant and free from any intellectual property encumbrance which would restrict the City from using the work product. Consultant grants to the City a non- exclusive, perpetual right and license to use, reproduce, distribute, adapt, modify, and display all final work product produced pursuant to this Agreement. The City’s or other’s adaptation, modification or use of the final work products other than for the purposes of this Agreement shall be without liability to the Consultant. The provisions of this section shall survive the expiration or termination of this Agreement. 7.Record Maintenance: The Consultant shall maintain accounts and records, which properly reflect all direct and indirect costs expended and Work provided in the performance of this Agreement and retain such records for as long as may be required by applicable Washington State records retention laws, but in any event no less than six years after the termination of this Agreement. The Consultant agrees to provide access to and copies of any records related to this Agreement as required by the City to audit expenditures and charges and/or to comply with the Washington State Public Records Act (Chapter 42.56 RCW). The provisions of this section shall survive the expiration or termination of this Agreement. 8.Public Records Compliance: To the full extent the City determines necessary to comply with the Washington State Public Records Act, Consultant shall make a due diligent search of all records in its possession or control relating to this Agreement and the Work, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. In the event Consultant believes said records need to be protected from disclosure, it may, at Consultant’s own expense, seek judicial protection. Consultant shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim or litigation related to a Public Records Act request for which Consultant has responsive records and for which Consultant has withheld records or information contained therein, or not provided them to the City in a timely manner. Consultant shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. The provisions of this section shall survive the expiration or termination of this Agreement. 9.Independent Contractor Relationship: A.The Consultant is retained by the City only for the purposes and to the extent set forth in this Agreement. The nature of the relationship between the Consultant and the City during the period of the Work shall be that of an independent contractor, not AGENDA ITEM #7. m) PAGE 4 OF 12 employee. The Consultant, not the City, shall have the power to control and direct the details, manner or means of Work. Specifically, but not by means of limitation, the Consultant shall have no obligation to work any particular hours or particular schedule, unless otherwise indicated in the Scope of Work or where scheduling of attendance or performance is mutually arranged due to the nature of the Work. Consultant shall retain the right to designate the means of performing the Work covered by this agreement, and the Consultant shall be entitled to employ other workers at such compensation and such other conditions as it may deem proper, provided, however, that any contract so made by the Consultant is to be paid by it alone, and that employing such workers, it is acting individually and not as an agent for the City. B.The City shall not be responsible for withholding or otherwise deducting federal income tax or Social Security or contributing to the State Indu strial Insurance Program, or otherwise assuming the duties of an employer with respect to Consultant or any employee of the Consultant. C.If the Consultant is a sole proprietorship or if this Agreement is with an individual, the Consultant agrees to notify the City and complete any required form if the Consultant retired under a State of Washington retirement system and agrees to indemnify any losses the City may sustain through the Consultant’s failure to do so. 10.Hold Harmless: The Consultant agrees to release, indemnify, defend, and hold harmless the City, elected officials, employees, officers, representatives, and volunteers from any and all claims, demands, actions, suits, causes of action, arbitrations, mediations, proceedings, judgments, awards, injuries, damages, liabilities, taxes, losses, fines, fees, penalties, expenses, attorney’s or attorneys’ fees, costs, and/or litigation expenses to or by any and all persons or entities, arising from, resulting from, or related to the negligent acts, errors or omissions of the Consultant in its performance of this Agreement or a breach of this Agreement by Consultant , except for that portion of the claims caused by the City’s sole negligence. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real estate…) then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees and volunteers, Consultant’s liability shall be only to the extent of Consultant’s negligence. It is further specifically and expressly understood that the indemnification provided in this Agreement constitute Consultant’s waiver of immunity under the Industrial AGENDA ITEM #7. m) PAGE 5 OF 12 Insurance Act, RCW Title 51, solely for the purposes of th is indemnification. The Parties have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 11.Gifts and Conflicts: The City’s Code of Ethics and Washington State law prohibit City employees from soliciting, accepting, or receiving any gift, gratuity or favor from any person, firm or corporation involved in a contract or transaction. To ensure compliance with the City’s Code of Ethics and state law, the Consultant shall not give a gift of any kind to City employees or officials. Consultant also confirms that Consultant does not have a business interest or a close family relationship with any City officer or employee who was, is, or will be involved in selecting the Consultant , negotiating or administering this Agreement, or evaluating the Consultant’s performance of the Work. 12.City of Renton Business License: The Consultant shall obtain a City of Renton Business License prior to performing any Work and maintain the business license in good standing throughout the term of this agreement with the City. Information regarding acquiring a city business license can be found at: http://www.rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9824882 Information regarding State business licensing requirements can be found at: http://dor.wa.gov/doing-business/register-my-business 13.Insurance: Consultant shall secure and maintain: A.Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B.In the event that Work delivered pursuant to this Agreement either directly or indirectly involve or require Professional Services, Professional Liability, Errors and Omissions coverage shall be provided with minimum limits of $1,000,000 per occurrence. "Professional Services", for the purpose of this section, shall mean any Work provided by a licensed professional or Work that requires a professional standard of care. C.Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. D.Commercial Automobile Liability for owned, leased, hired or non-owned, leased, hired or non-owned, with minimum limits of $1,000,000 per occurrence combined single limit, if there will be any use of Consultant’s vehicles on the City’s Premises by or on behalf of the City, beyond normal commutes. AGENDA ITEM #7. m) PAGE 6 OF 12 E.Consultant shall name the City as an Additional Insured on its commercial general liability policy on a non-contributory primary basis. The City’s insurance policies shall not be a source for payment of any Consultant liability, nor shall the maintenance of any insurance required by this Agreement be construed to limit the liability of Consultant to the coverage provided by such insurance or otherwise limit the City’s recourse to any remedy available at law or in equity. F.Subject to the City’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to the City before performing the Work. G.Consultant shall provide the City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. 14.Delays: Consultant is not responsible for delays caused by factors beyond the Consultant’s reasonable control. When such delays beyond the Consultant’s reasonable control occur, the City agrees the Consultant is not responsible for damages, nor shall the Consultant be deemed to be in default of the Agreement. 15.Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or encumber any rights, duties or interests accruing from this Agreement without the written consent of the other. 16.Notices: Any notice required under this Agreement will be in writing, addressed to the appropriate party at the address which appears below (as modified in writing from time to time by such party), and given personally, by registered or certified mail, return receipt requested, by facsimile or by nationally recognized overnight courier service. Time period for notices shall be deemed to have commenced upon the date of receipt, EXCEPT facsimile delivery will be deemed to have commenced on the first business day following transmission. Email and telephone may be used for purposes of administering the Agreement, but should not be used to give any formal notice required by the Agreement. CITY OF RENTON Ian Gray, Urban Forestry Manager 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-6601 E-mail Address Fax: (425) 430-6603 CONSULTANT Attn: Ian Scott c/o Legal Department Davey Resource Group 295 S. Water Ave, Kent, OH 44240 Phone: (206)-714-3147 E-mail Address Fax: (330)-673-0860 17.Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Consultant agrees as follows: AGENDA ITEM #7. m) PAGE 7 OF 12 A.Consultant, and Consultant’s agents, employees, representatives, and volunteers with regard to the Work performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of Work or any other benefits under this Agreement, or procurement of materials or supplies. B.The Consultant will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C.If the Consultant fails to comply with any of this Agreement’s non-discrimination provisions, the City shall have the right, at its option, to cancel the Agreement in whole or in part. D.The Consultant is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws, worker's compensation, and Title VI of the Federal Civil Rights Act of 1964, and will comply with City of Renton Council Resolution Number 4085. 18.Miscellaneous: The parties hereby acknowledge: A.The City is not responsible to train or provide training for Consultant. B.Consultant will not be reimbursed for job related expenses except to the extent specifically agreed within the attached exhibits. C.Consultant shall furnish all tools and/or materials necessary to perform the Work except to the extent specifically agreed within the attached exhibits. D.In the event special training, licensing, or certification is required for Consultant to provide Work he/she will acquire or maintain such at his/her own expense and, if Consultant employs, sub-contracts, or otherwise assigns the responsibility to perform the Work, said employee/sub-contractor/assignee will acquire and or maintain such training, licensing, or certification. AGENDA ITEM #7. m) PAGE 8 OF 12 E.This is a non-exclusive agreement and Consultant is free to provide his/her Work to other entities, so long as there is no interruption or interference with the provision of Work called for in this Agreement. F.Consultant is responsible for his/her own insurance, including, but not limited to health insurance. G.Consultant is responsible for his/her own Worker’s Compensation coverage as well as that for any persons employed by the Consultant. 19.Other Provisions: A.Approval Authority. Each individual executing this Agreement on behalf of the City and Consultant represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of the City or Consultant. B.General Administration and Management. The City’s project manager is Ian Gray. In providing Work, Consultant shall coordinate with the City’s contract manager or his/her designee. C.Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. D.Conflicts. In the event of any inconsistencies between Consultant proposals and this Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to this Agreement are incorporated by reference only to the extent of the purpose for which they are referenced within this Agreement. To the extent a Consultant prepared exhibit conflicts with the terms in the body of this Agreement or contains terms that are extraneous to the purpose for which it is referenced, the terms in the body of this Agreement shall prevail and the extraneous terms shall not be incorporated herein. E.Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington and the City of Renton. Consultant and all of the Consultant’s employees shall perform the Work in accordance with all applicable federal, state, county and city laws, codes and ordinances. F.Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. AGENDA ITEM #7. m) PAGE 9 OF 12 G.Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. Consultant hereby expressly consents to the personal and exclusive jurisdiction and venue of such court even if Consultant is a foreign corporation not registered with the State of Washington. H.Severability. A court of competent jurisdiction’s determination that any provision or part of this Agreement is illegal or unenforceable shall not cancel or invalidate the remainder of this Agreement, which shall remain in full force and effect. I.Sole and Entire Agreement. This Agreement contains the entire agreement of the Parties and any representations or understandings, whether oral or written, not incorporated are excluded. J.Time is of the Essence. Time is of the essence of this Agreement and each and all of its provisions in which performance is a factor. Adherence to completion dates set forth in the description of the Work is essential to the Consultant’s performance of this Agreement. K.Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. L.Binding Effect. The Parties each bind themselves, their partners, successors, assigns, and legal representatives to the other party to this Agreement, and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants of the Agreement. M.Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s failure to enforce any provision of this Agreement shall not be a waiver and shall not prevent either the City or Consultant from enforcing that provision or any other provision of this Agreement in the future. Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any prior or subsequent breach unless it is expressly waived in writing. N.Counterparts. The Parties may execute this Agreement in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. AGENDA ITEM #7. m) PAGE 10 OF 12 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON By:_________________________ Armondo Pavone Mayor, City of Renton ____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Moloney City Attorney CONSULTANT By:____________________________ Ian Scott PNW Area Manager, Davey Resource Group _________________________________ Date AGENDA ITEM #7. m) Exhibit A - Scope of Work City of Renton Parks and Recreation Department 2022 Certified Arborist Inspector Services Scope of Work: Provide inspection services to a diverse citizen base including City staff from different departments, the general public and outside governmental organizations, to include: •Receive communications from various sources about trees and respond back with information to resolve issues and concerns. •Complete caller information forms, inspection forms and work order forms of various kinds, including electronically. •Inspect trees on both public and private property under various terrain and weather conditions. Inspections include completing the tree inventory forms by adding new trees and modifying information on existing trees previously inventoried. •Inventory new trees or potential planting sites and existing trees not previously inventoried. Locate newer subdivisions containing new street trees using a combination of City records and meeting with City Planning staff to locate areas. •Add and/or modify tree inventory information using existing City computerized systems. Inventory trees using designated computer programs when required. •Ascertain the locations of trees within the public right-of-way and trees on private property. This includes accurate measurement of right-of-way location in relation to the tree(s). •Inspect trees using the methods found in the International Society of Arboriculture Best Management Practices Tree Risk Assessment publication. •Accurately categorize trees by public or private, species, diameter, condition rating, location rating, problem codes, treatment codes and work prioritization from emergency through routine activity. •Schedule meetings with customers when requested. •Respond to customers following inspections through work scheduling dates. This includes face to face conversations, written correspondence and email communications. Document all communications on appropriate forms. •Gather data and information to compile easily understood reports. Prepare a final summary report of progress during the final three weeks of this project. Provide monthly progress reports including days and hours worked, number of work orders inspected, and number of trees inspected, as well as other pertinent information requested by the City. •Provide a company-owned pickup truck and safety cones at all times. •Work with City-provided computers and computer programs, iPad, and iPad apps to enter data into electronic or paper formats. PAGE 11 OF 12 AGENDA ITEM #7. m) •Perform minor tree work from the ground using various hand and power tools common to tree work. Minor tree work includes: small diameter pruning, light brush dragging, tree planting preparation, sweeping and raking. No lifting requirements shall exceed 50 pounds. •It is assumed the Inspector will prioritize workplace safety and conduct tree work within their comfort level. Inspector may call for an all stop on task assignments to check with their senior manager if there are safety concerns. •Supply at all times, tools such as hand pruners, pole loppers, pole saw, hand saw, machete, and personal protective equipment. •Prepare lists of locations for high priority or other work. •Disclaimer of Assessment of Future Conditions. The information to be provided by Consultant is an assessment that shall be considered accurate only at the time of observation. Trees are living organisms that grow, respond to their environment, mature, decline, and fail over time. Consultant makes no representation concerning the effect over time of site distributions, environmental or internal conditions of the trees. Contractor will provide certified arborist inspection services for the City during normal business hours, except for City designated holidays. Costs: Per Paragraph 4.A. Total compensation to Consultant for Work provided pursuant to this Agreement shall not exceed $144,540.00 plus any applicable state and local sales taxes. RATES: $73 Per hour, Per Service, Per Arborist PAGE 12 OF 12 AGENDA ITEM #7. m) AB - 3017 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: 2022-2024 Contract Groundskeeping Agreement RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Parks & Recreation Department - PPNR STAFF CONTACT: Ian Gray, Urban Forestry & Natural Resources Manager EXT.: x6601 FISCAL IMPACT SUMMARY: Funding for this project is in the 2022 Parks and Recreation (formerly Community Services) - Parks Planning and Natural Resources Division Operating Budget in the amount of $265,963.00 as part of the Maintenance line item (001.000000.020.81.48.003). SUMMARY OF ACTION: An agreement for landscape maintenance services was authorized in 2019 and completed in 2021. The Parks Planning and Natural Resources Division is responsible for the landscape maintenance of 45 sites across the city. These are properties which do not naturally fall within the remit of either Public Works or Parks and Trails crews. The Urban Forestry & Natural Resources Manager regularly monitors these areas throughout the city and checks on the completeness and quality of the work done by the contractor. The Contract Groundskeeping agreement has different services and frequencies depending on the site. They include areas such as park frontages, facilities, natural areas, greenways, trails, and right -of-way or street-side locations. Duties include weeding, maintaining planting beds, litter removal, edging, mowing, leaf removal, shrub pruning, moss control, debris clearance on trails and renewing woodchip mulch in planting beds. Funds were allocated in the 2021 and 2022 budgets contributed by the Parks and Recreation Department. EXHIBITS: A. 2022-2024 Groundskeeping Agreement STAFF RECOMMENDATION: The Parks and Recreation Department recommends approval of the Agreement with Canber Corps in the amount of $207,682.73 per annum for three (3) years at a total cost of $623,048.19, contingent upon funding. AGENDA ITEM #7. n) 2022 – 2024 CONTRACT GROUNDSKEEPING For City of Renton Public Property CITY OF RENTON PARKS AND RECREATION DEPARTMENT PARKS PLANNING & NATURAL RESOURCES DIVISION 1055 South Grady Way RENTON, WASHINGTON 98057 CITY REPRESENTATIVE: IAN GRAY (425)430-6601 igray@rentonwa.gov Parks and Recreation Department 1 AGENDA ITEM #7. n) SYNOPSIS OF CONTRACT SERVICES INFORMATION A.Contract: 2022 through 2024 Contract Groundskeeping. B.Contract Description: The contractor will furnish all labor, materials, and equipment to perform groundskeeping services for listed rights-of-way, park, open space areas, trails, City facilities and all associated street frontages, parking lots, and sidewalks. This contract covers a period of three years, provided funding is available in any of the years. C.Contract Locations: Rights-of-Way, Facilities, Parks, Trails, and Open Space Groundskeeping (see maps) 1.Park Ave. N. Frontage. From North 1st Street to North 6th Street, both sides of street. Clean sidewalks, curblines and tree grates. Remove litter, leaves, and weeds. Keep debris from entering private property. 2.North 3rd Street Frontage. From Burnett Avenue North to Factory Avenue North, both sides of street. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering private property. Protect homeowner flower plantings. 3.Northeast Park Drive Frontage. From Logan Avenue North to 400 feet east of I-405, north side of street only. Clean sidewalks and curblines. Remove litter, leaves and weeds. Mow turf north of sidewalk. Lightly prune shrubs and groundcovers to keep within planting strips. Add wood chip mulch. Keep debris from entering streets. 4.Boeing Frontage. Park Avenue North from North 6th Street to North 7th, only boulevards on north and south side of Boeing pedestrian bridge. From North 7th Street to North 8th Street, both sides of street and boulevards. North 8th Street, south side only, from Garden Avenue North to Logan Avenue North. Logan Avenue North, east side only, from North 6th Street to North 8th Street. Mow and edge planting strips, clean sidewalks and curblines, remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within boulevards or to rejuvenate. Add fine pine bark mulch to shrub beds and tree rings. Keep debris from entering private property. 5.Houser Way By-Pass Boulevard. Shrub bed north of 430 Sunset Boulevard Northeast (on Sunset), at end of I-405 exit ramp. Clean curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering surrounding street areas. 6.Sunset Boulevard North Frontage. East side of Sunset Boulevard North from Bronson Way North (SR 169) to Northeast 3rd Street, including beneath south side of I-405 overpass. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street areas. 7.Factory Place North Triangle. Vacant lot east of 1526 N. 3rd Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Keep debris from entering private property. 2 AGENDA ITEM #7. n) 8.South Cedar Avenue. Between South 4th Street and Houser Way South, including beneath the south side of I-405 overpass. Includes seating area, all shrub beds, and stairway. Clean staircase, curblines and parking lots. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering surrounding street areas and private properties. 9.I-405 Wall at Cedar River Park. From Houser Way underpass to Maple Valley Highway (SR 169 off ramp). Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding park areas. 10.Cedar River Park Frontage. South side of SR 169 from I-405 to park’s east property line, including the center boulevard and 180’ south along park entrance both sides of road. Operate and maintain irrigation system. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street and park areas. 11.Maple Valley Berm/Frontage. North side of SR 169 from 140th Place Southeast to 149th Avenue Southeast. Mow turf. Clean pathway. Remove litter, leaves, and weeds. Add wood chip mulch to tree rings. Keep debris from entering street, pathway and park areas. 12.Northeast Sunset Boulevard Triangle. Sunset Boulevard Northeast and Northeast Park Drive, north of 1170 Sunset Boulevard Northeast. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets and private property. 13.Northeast Sunset Boulevard Frontage. Edmonds Avenue Northeast to 2502 Northeast Sunset Boulevard, first driveway on north side of Sunset; sidewalks only, both sides of street. From 2502 NE Sunset Boulevard to Harrington Ave. NE; sidewalks both sides of street and turf areas (north side of street, north of sidewalk to fence). From Harrington Avenue Northeast to Northeast 12th Street, south side only up to but not including Walgreens, sidewalk and planting strips. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Keep debris from entering streets and pivate property areas. 14.Harrington Avenue Northeast Boulevard. Harrington Avenue Northeast and Northeast 5th Street (north of 2721 Harrington Avenue NE). Mow turf. Remove litter, leaves, and weeds. Keep debris from entering surrounding streets and private property areas. 15.Northeast 2nd Street Frontage. North side of Northeast 2nd Street from Monroe Avenue Northeast to Public Works gate at 3555 Northeast 2nd Street. Clean curblines. Remove litter, leaves, and weeds. Lightly prune shrubs to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering street. 16.Public Works Shops, Saturday Only Site. 3555 Northeast 2nd Street. Mow turf and edge. Clean employee parking lots, sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within planting beds, clear building walls or to rejuvenate. Add fine pine bark mulch to tree wells and shrub beds. 3 AGENDA ITEM #7. n) 17. Northeast 4th Street Frontage. North side of street from Union Avenue Northeast to 4350 Northeast 4th Street and; south side of street from 4301 to 4405 Northeast 4th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Add fine pine bark mulch to tree wells. Keep debris from entering surrounding street and private property areas. 18.Harrington Avenue Northeast Frontage. West side of street from Northeast 16th Street, south to Northeast 12th Street. East side of street, from Northeast 16th Street to Northeast 10th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets and private property areas. 19.Duvall Avenue Northeast Frontage. West side of street from 1827 Duvall Avenue Northeast to 4626 Northeast 24th Street, then from 2501 Duvall Avenue Northeast at wall to Renton city limits. East side of street from 1702 Duvall Avenue Northeast to 2322 Duvall Avenue Northeast, then from driveway at 4702 Northeast 25th Street to Southeast 95th Way intersection. Clean sidewalks and curbline. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets and private property areas. 20.Creek Parkway Frontage. East side of street from NE 95th Way to Southeast May Valley Road. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune trees and shrubs to keep within beds. Add wood chip mulch to tree and shrub beds. 21. Talbot Road Frontage. South of I-405 overpass to South Puget Drive, including beneath overpass. Mow and edge turf. Remove litter, leaves and weeds. Add fine pine bark mulch to tree rings. Keep debris from entering surrounding private property. 22.Lake Avenue Open Space. Vacant lot at 1511 Lake Avenue South. Mow turf. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding private property. 23.Talbot Hill Reservoir Park. 1900 Talbot Road South. Mow and edge turf, including along streets. Clean parking lot. Remove litter, leaves and weeds. Empty trash cans and replace with new liners. Lightly prune groundcover and shrubs to keep within beds, clearance along walls, or to rejuvenate. Add wood chip mulch to tree rings and shrub beds. 24.Shattuck Avenue South Frontage. Between Houser Way South and South 4th Place, both sides of street and beneath railroad overpass. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep debris from entering surrounding streets and private property areas. 25.Rainier Avenue South Frontage. Between South Grady Way and 250 Rainier Avenue South, both sides of street and boulevards. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds; add fine pine bark mulch to planting strips. Keep debris from entering surrounding private property. 4 AGENDA ITEM #7. n) 26.Southwest Grady Way Frontage. North side of Southwest Grady Way fromOakesdale Avenue Southwest to Longacres Avenue Southwest at King County Metro driveway, 1520 Southwest Grady Way. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds between street and fence, including gateway sign area. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds. Keep debris from entering surrounding streets. 27.Oakesdale Avenue Southwest/Black River Frontage. Between 602 Oakesdale Avenue Southwest and 1,060 feet north to end of sidewalk on Monster Road Southwest, north side of street, including the center boulevard. Mow turf and edge. Clean parking lot, sidewalks (including bridge) and curblines. Remove litter, leaves and weeds. Empty trash containers and replace liners. Keep debris from entering street. 28.Southwest 27th Street Frontage. From Oakesdale Avenue Southwest to Naches Avenue Southwest, both sides of street, including center boulevard. Mow and edge turf. Clean bike path, sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets and private property areas. 29.Springbrook Trail. Segment 1: From Black River Riparian Forest trailhead along Oakesdale Avenue Southwest to Southwest 16th Street. Mow turf. Clean trail, sidewalks and curblines. Remove litter, leaves, moss and weeds. Lightly prune trees/shrubs to keep out of trail shoulders. Empty trash containers and replace liners. Segment 2: At 800 Southwest 27th Street beginning 1,055 feet north of Southwest 27th Street to Southwest 43rd Street. Mow turf. Clean trail, sidewalks and curblines. Remove litter, moss, leaves and weeds. Lightly prune shrubs to keep out of trail shoulders. Pressure wash trail boardwalk segment south of Southwest 27th Street. Empty trash containers and replace liners. 30.Springbrook Trail – Boeing-Longacres Segment (From SW 16th Street to the north property line and parking lot at 1905 Raymond Avenue SW, a total distance of approximately 1,460 feet. Clean trail, remove litter, control moss, and clean 2 interpretative signs.) 31.Edlund Farm Open Space. 17611 Southeast 103rd Avenue. Mow field, planting strip and edge along street. Clean sidewalks and curblines. Remove litter. Exclude immediate areas around houses maintained by residents. 32.Cleveland Farm Open Space. 19415 Talbot Road South. Mow fields. Remove litter. Control blackberry shrubs at Southwest entrance. Exclude area around house maintained by residents. Schedule field mowing during periods of dry soil conditions. 33.11017 SE 186th Place. Vacant lot. Mow field. Clean sidewalk and curbline. Remove litter. Control blackberry. 5 AGENDA ITEM #7. n) 34. Tiffany-Cascade Connector Trail and Frontage. East of 12130 Southeast 160th Street. Mow grass north of sidewalk/street and two passes on trail from Southeast 160th Street to pipeline. Clean sidewalks and curblines. Remove litter. Keep debris from entering surrounding streets. 35.Lake Washington Boulevard North Frontage. 4350 Lake Washington Boulevard North. Mow and edge turf. Clean sidewalks and curblines, including east side of bridge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Empty trash container and replace liner. Keep debris from entering street. 36.May Creek Trail. 4350 Lake Washington Boulevard North. Control invasive plants including blackberry, knotweed, and horsetail in natural area. Clean area of litter. 37.Seahawks Sign. Southwest corner of Seahawks Way and Lake Washington Boulevard North. Clean sidewalk and curblines. Lightly prune shrubs and groundcover to keep within beds, maintain sign visibility or to rejuvenate. Remove litter, leaves and weeds. Add fine pine bark mulch. 38.Ripley Lane Trail. East of 5031 Ripley Lane North at trailhead, then 875 feet north to Renton city limits. Mow and edge turf, including street frontage. Clean pathway and street of litter, stones/debris, leaves and weeds. Prune vegetation away from fence or to keep trail open to both sides. Empty trash can and replace with new liner. 39.New Sunset Park 2715 Block NE 10 Street: Two open fields between Sunset Lane NE and NE 10 Street; weed two detention ponds. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to detention pond. 40.Logan Avenue North Frontage The east side of Logan Avenue North, including boulevards and east side of sidewalks, from the Cedar River, north to North 6th Street. Boulevards, sidewalks, curblines, and shrub beds. 41.Duvall Avenue Northeast Boulevard. Two boulevards north and south of NE 8th Street. Clean curbline. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets. 42.Heritage Park Shrub Bed. 233 Union Avenue NE: Large shrub bed between turf and asphalt pathway. Remove litter, leaves and weeds. Add wood chip mulch. Added shrub bed area. 43.Harrington Avenue Northeast- South Unit Frontage. East side of street from Northeast 8th Place, south to Northeast 7th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets and private property areas. 44.Sunset Lane and NE 10 Street Frontages. 2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Boulevard and NE 10 Avenue moving counterclockwise: Newly created planting strips between sidewalks and curbs along the north side of NE 10 Street from NE Sunset Boulevard to Glenwood Avenue NE; also both sides of street adjacent to the Renton Highlands Library on NE 10 Avenue; along the southerly and westerly side of Sunset Lane NE from Glenwood Avenue NE to NE 10th Avenue at the library; along Harrington Avenue NE between NE Sunset Boulevard and Sunset Lane NE on both sides of the street; along both sides of the street on Glenwood Avenue NE and along both sides of Harrington Avenue NE north of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of NE 10 Street. Sidewalks, curblines, and shrub beds containing shrubs, groundcovers, perennials and mulch. Remove litter, leaves and weeds. Add wood chip mulch. 45.Sunset Park Phase Two. 2715 Block NE 10 Street: new park area south of New Sunset Park between Sunset Lane NE and NE 10 Street; weed rain gardens. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to beds and gardens. 6 AGENDA ITEM #7. n) City of Renton Contract Groundskeeping The City of Renton has requested services for CONTRACT GROUNDSKEEPING. The Contractor will provide three (3) years of complete groundskeeping services, including materials and supplies, for at least 45 sites through December 31, 2024, based upon available funding in any given year. Questions and requests shall be addressed to: Ian Gray - Project Manager, Urban Forestry & Natural Resources City of Renton Community Services Department 1055 South Grady Way, 6th Floor Renton, WA 98057 Telephone (425) 430-6601 Email: igray@rentonwa.gov 7 AGENDA ITEM #7. n) PROPOSAL FORM FOR CONTRACT GROUNDSKEEPING To: Ian Gray CITY OF RENTON COMMUNITY SERVICES DEPARTMENT CITY HALL -6TH FLOOR 1055 SOUTH GRADY WAY RENTON, WA 98057 The undersigned hereby certifies that they have carefully examined the Request for Proposal entitled "CONTRACT GROUNDSKEEPING" and they have examined the site of the work and the location where said work is to be performed, and fully understands the manner in which payment is proposed to be made for the cost thereof, hereby proposes to furnish all materials and to perform all labor which may be required to complete said work upon the terms and conditions provided in the said Request for Proposal for consideration of the following amount: A.PROPOSAL For all work specified in the Request for Proposal for Contract Groundskeeping, the lump sum of: Two hundred seven thousand, six hundred eighty two dollars and Amount in writing seventy-three cents dollars($ 207,682.73 l including tax, PER YEAR.Amount in number The following breakdown of cost is requested for City of Renton budget purposes only. The lump sum cost per year provided above will be the only cost used in evaluating the proposal. B.CONDITIONS OF PROPOSAL 1.Overhead and Profit: The above Proposal Price shall include overhead and profit. 2.Sales Tax:The above p roposal shall include Washington State Sales Tax. C.PERIOD OF PROPOSAL VALIDITY/ACCEPTAN CE OF PROPOSAL 1.Validity of ProposalThe undersigned hereby agrees that this PROPOSAL as described in paragraph "A" shall be a valid and firm offering for the period of sixty (60) days from closing time for the "Receipt of Proposals." 2.Acceptance of ProposalWithin sixty (60) days after the opening of FORM OF PROPOSAL, the City will act either to acceptthe Propo sal from the selected contractor or to reject the Propo sal. The City reserves the right to request extensions of such Proposal acceptance period. The acceptance of a Proposal will be evidenced by a written Notice of Intent to Award Contract to the Contractor whose Proposal is under 17 8 AGENDA ITEM #7. n) consideration for acceptance, together with a request to furnish evidence of insurance to execute the agreement set forth in the Request for Proposal. D.EXECUTION OF CONTRACT If written "Notice of Intent to Award Contract" is mailed, emailed, telegraphed, facsimiled, or delivered to the undersigned within the •period of Proposal Validity• noted above, or any time thereafter before this Proposal is withdrawn, the undersigned will, within the (10) days after the date of such notification, execute a Contract in the form provided in the Request for Proposal. E.EXECUTION OF PROPOSAL Name of Firm Canber Corps Address PO Box 2668 City Renton State WA Zip Code 98056 Telephone _____ { ..... 4 .... 2 ..... 5___._}_2_7_1-_8_27_2 ____ FAX ( 425 ) 271-8316 The undersigned designates the above as the firm and address to which "NOTICE OF CONTRACT AWARD" may be mailed, emailed, hand delivered, or delivered via facsimile. NOTE: If a Contractor is a corporation. write state of incorporation; and if a partnership, give full names and addresses of all partners below: Washington state The undersigned certifies that the above is a firm and valid PROPOSAL to accomplish all work and comply with all requirements of the Request for Proposal. Date 9/29/21 Signature� Signed Title President Jeff Candler Printed 18 9 AGENDA ITEM #7. n) COMBINED AFFIDAVIT AND CERTIFICATION FORM Non-Collusion, Anti-Trust, and Minimum Wage NON-C OLLUSION AFFIDAVIT Being duly sworn, deposes and says, that he is the identical person who submitted the foregoing Proposal or Proposal, and that such Proposal is genuine and not sham or collusive or made in the interest or on behalf of any person not therein named, and further, that the deponent has not directly induced or solicited any other Proposer on the foregoing work or equipment to put in a sham Proposal, or any other person or corporation to refrain from proposing, and that deponent has not in any manner sought by collusion to secure to himself or to any other person any advantage over other Proposer or Proposers. AND CERTIFICATION RE: ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER Vendor and purchaser recognize that in actual economic practice overcharges resulting from anti-trust violations are in fact usually borne by the purchaser. Therefore, vendor hereby assigns to purchaser any and all claims for such over charges as to goods and materials purchased in connection with this order or contract, except as to overcharges resulting from anti-trust violations commencing after the date of the Proposal. quotation, or other event establishing the price under this order or contract. In addition, vendor warrants and represents that such of his suppliers and subcontractors shall assign any and all such claims to purchaser, subject to the aforementioned exception. AND MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having been duly sworn, deposed, say, and certify that in connection with the performance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work; not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the principal contract: that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. FOR: NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM WAGE AFFIDAVIT. Proposal for Groundskeeping Name of Project Canber Corps Name of Proposefs Firm �nature of Authort!ed Re presentative of Proposer Notary Public in and for the State of Washington Residing at Hobart, WA 23 10 AGENDA ITEM #7. n) Certification of Compliance with Wage Payment Statutes The bidder hereby certifies that, within the three-year period immediately preceding the proposal solicitation date, the proposer is no t a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and corre ct. Canber Corps Proposer's Business Name Signature of Authorized Official• Jeff Candler Printed Name President Title 9/30/21 Renton WA Date City State Check One: Sole Proprietorship D Partnership □Joint Venture □Corporation � LLC □ State of Incorporation, or if not a corporation, State where business entity was formed: Washington If a co-partnership, give firm name under which business is tran sacted: *If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. Template updated 2-12-19 11 AGENDA ITEM #7. n) THIS AGREEMENT (“Agreement”) is made as of the_______day of_______, 2021, (the “Effective Date”) by and between the City of Renton, a non-charter code city under RCW 35A, and a municipal corporation under the laws of the State of Washington (“City”), through its Parks and Recreation Department and Canber Corps, (“Contractor”), a company, who are collectively referred to as the “Parties”, to provide groundskeeping services, City and Contractor agree as set forth below. 1.Scope of Services: Contractor will provide all material and labor necessary to perform all work described in the Proposal which is attached and fully incorporated into this Agreement by reference as Attachment “A” - the “Frequency Schedule.” The Costs associated with each site and service frequencies are referenced in this Agreement as Attachment “B” “Section 8-B, 2022-2024 Cost Per Task”. 2.Changes in Scope of Services: City, without invalidating this Agreement, may order changes to the Scope of Services consisting of additions, deletions or modifications, the Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes in the work shall be authorized by written Change Order signed by the Parties. 3.Time of Performance: Contractor shall commence performance of the Agreement no later than 30 calendar days after the Agreement’s Effective Date. 4.Term of Agreement: The Term of this Agreement shall end at completion of the Scope of Services, on December 31st, 2024. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of City and Contractor. Termination: A.The City reserves the right to terminate this Agreement at any time, with or without cause by giving ten (10) calendar days’ notice to the Contractor in writing. B.In the event this Agreement is terminated by the City, the Contractor shall be entitled to payment for all hours worked to the effective date of termination, less all payments previously made. If the Agreement is terminated by the City after partial performance of Work for which the agreed compensation is a fixed fee, the City shall 2022-2024 Contract Groundskeeping Agreement 12 AGENDA ITEM #7. n) pay the Contractor an equitable share of the fixed fee. This provision shall not prevent the City from seeking any legal remedies it may have for the violation or nonperformance of any of the provisions of this Agreement or from withholding payment for reasonably disputed charges. No payment shall be made by the City for any expenses incurred or work done following the effective date of termination unless authorized in advance in writing by the City. 5.Agreement Sum: The total amount of this Agreement is the sum of $207,682.73 which includes Washington State Sales Tax. This amount may be adjusted to a mutually agreed amount based on changes to the Scope of Services. 6.Consideration: In exchange for Contractor’s performance of the items and responsibilities identified in the Scope of Services, City agrees to make payment of the amount identified as the Agreement Sum. 7.Prevailing Wage/ Method of Payment/ Retainage/ Bonding: Payment by the City for the Work will only be made after the Work has been performed and a voucher or invoice is submitted in a form acceptable to the City. A.Prevailing Wage Rates: Contractor must comply with the State of Washington prevailing wage requirements. Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project and at the beginning of each calendar year and an Affidavit of Wages Paid at the end of each calendar year and at the end of the project with the Washington State Department of Labor and Industries. *Final payment will be held until Affidavit of Wages Paid is submitted for each period/calendar year or end of project. The State of Washington prevailing wage rates applicable for this project, which is located in King County, may be found at the following website address of the Department of Labor and Industries: http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp Pursuant to WAC 296-127-011, the applicable effective date for prevailing wage rates paid for the duration of this contract shall be the date the contract is executed as reflected in the “Effective Date” identified at the top of the first page of this Agreement. Upon request, the City will provide a copy of the applicable prevailing wages for this project. Alternatively, the rates may be viewed at the City of Renton City Hall by making an appointment with the contact person identified herein or prior to contract award with the contact person identified as the City of Renton contact in Paragraph 13 AGENDA ITEM #7. n) 15 Notices of this agreement. B.City shall have the right to withhold payment to Contractor for any work not completed in a satisfactory manner until such time as Contractor modifies such work so that the same is satisfactory. C.Final Acceptance. Final Acceptance of the Project occurs when the Urban Forestry & Natural Resources Manager has determined that the Project is one hundred percent (100%) complete and has been constructed in accordance with the Plans and Specifications. D.Payment in the Event of Termination. In the event this Contract is terminated by the either party, the Contractor shall not be entitled to receive any further amounts due under this Contract until the work specified in the Scope of Work is satisfactorily completed, as scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under the Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by the City or which may be sustained by the City or which may be sustained by the reason of such refusal, neglect, failure or discontinuance of Contractor performing the work, such excess shall be paid by the City to the Contractor. If the City’s expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to the City. Such expense and damages shall include all reasonable legal expenses and costs incurred by the City to protect the rights and interests of the City under the Contract. 8.Hold Harmless: Contractor shall indemnify, defend and hold harmless City, its elected officials, officers, agents, employees and volunteers, from and against any and all claims, losses or liability, or any portion of the same, including but not limited to reasonable attorneys’ fees, legal expenses and litigation costs, arising from injury or death to persons, including injuries, sickness, disease or death of Contractor’s own employees, agents and volunteers, or damage to property caused by Contractor’s negligent act or omission, except for those acts caused by or resulting from a negligent act or omission by City and its officers, agents, employees and volunteers. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real estate…) then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the contractor and City, its officers, officials, employees and volunteers, Contractor’s 14 AGENDA ITEM #7. n) liability shall be only to the extent of Contractor’s negligence. It is further specifically and expressly understood that the indemnification provided in this Agreement constitute Contractor’s waiver of immunity under the Industrial Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 9. Insurance: Contractor shall secure and maintain: A. Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B.Professional liability insurance, in the minimum amount of $1,000,000 for each occurrence, shall also be secured for any professional services being provided to City that are excluded in the commercial general liability insurance. C.Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. D.It is agreed that on Contractor’s commercial general liability policy, the City will be named as an Additional Insured on a non-contributory primary basis. City’s insurance policies shall not be a source for payment of any Contractor liability. E.Subject to City’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to City before executing the work of this Agreement. F.Contractor shall provide City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. 10.Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Contractor agrees as follows: A. Contractor, and Contractor’s agents, employees, representatives, and volunteers with regard to the services performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of services or any other benefits under this Agreement, or procurement of materials or supplies. 15 AGENDA ITEM #7. n) B.The Contractor will take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C.If Contractor fails to comply with any of this Agreement’s non-discrimination provisions, City shall have the right, at its option, to cancel the Agreement in whole or in part. D.Contractor is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws and worker's compensation. 11.Independent Contractor: Contractor’s employees, while engaged in the performance of any of Contractor’s services under this Agreement, shall be considered employees of the Contractor and not employees, agents, representatives of City and as a result, shall not be entitled to any coverage or benefits from the City of City. Contractor’s relation to City shall be at all times as an independent contractor. Any and all Workman’s Compensation Act claims on behalf of Contractor employees, and any and all claims made by a third-party as a consequence of any negligent act or omission on the part of Contractor’s employees, while engaged in services provided to be rendered under this Agreement, shall be the solely Contractor’s obligation and responsibility. 12.City of Renton Business License: Unless exempted by the Renton Municipal Code, Contractor shall obtain a City of Renton Business License prior to performing any Work and maintain the business license in good standing throughout the term of this agreement with the City. Information regarding acquiring a city business license can be found at: https://www.rentonwa.gov/Tax Information regarding State business licensing requirements can be found at: https://dor.wa.gov/doing-business/register-my-business 13.Record Keeping and Reporting: Contractor shall maintain accounts and records, which properly reflect all direct and indirect costs expended and Services provided in the performance of this Agreement. The Contractor agrees to provide access to and copies of any records related to this Agreement as required by the City to audit expenditures and charges and/or to comply with the Washington State Public Records Act (Chapter 42.56 16 AGENDA ITEM #7. n) RCW). 14.Public Records Compliance. To the full extent the City determines necessary to comply with the Washington State Public Records Act, Contractor shall make a due diligent search of all records in its possession, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. In the event Contractor believes said records need to be protected from disclosure, it shall, at Contractor’s own expense, seek judicial protection. Contractor shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim or litigation related to a Public Records Act request for which Contractor has responsive records and for which Contractor has withheld records or information contained therein, or not provided them to the City in a timely manner. Contractor shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. 15. Other Provisions: A.Administration and Notices. Each individual executing this Agreement on behalf of City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of City or Contractor. Any notices required to be given by the Parties shall be delivered at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth below. Any notice so posted in the United States mail shall be deemed received three (3) calendar days after the date of mailing. This Agreement shall be administered by and any notices should be sent to the undersigned individuals or their designees. CITY OF RENTON Ian Gray 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-6601 E-mail Address: igray@rentonwa.gov CONTRACTOR Jeff Candler PO Box 2668 Renton, WA 98056 Phone: (425)-271-8272 E-mail : jeff@canberlandscaping.com B.Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. C.Assignment and Subcontract. Contractor shall not assign or subcontract any portion of this Agreement without the City of Renton’s prior express written consent. 17 AGENDA ITEM #7. n) D.Compliance with Laws. Contractor and all of the Contractor’s employees shall perform the services in accordance with all applicable federal, state, county and city laws, codes and ordinances. A copy of this language must be made a part of any contractor or subcontractor agreement. E.Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the terms of this contract shall prevail. F.Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. G.Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. H.Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. I.Severability. A court of competent jurisdiction’s determination that any provision or part of this Agreement is illegal or unenforceable shall not cancel or invalidate the remainder of this Agreement, which shall remain in full force and effect. J.Sole and Entire Agreement. This Agreement contains the entire agreement of the Parties and any representations or understandings, whether oral or written, not incorporated are excluded. K.Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. L.Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s failure to enforce any provision of this Agreement shall not be a waiver and shall not prevent either City or Contractor from enforcing that provision or any other provision of this Agreement in the future. Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any prior or subsequent breach unless it is expressly waived in writing. 18 AGENDA ITEM #7. n) IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of Effective Date. CITY OF RENTON By: CONTRACTOR By: Armondo Pavone Mayor, City of Renton 1055 South Grady Way Renton, WA 98057 Jeff Candler President, Canber Corps PO Box 2688 Renton, WA Date Date Attest Jason A. Seth City Clerk Approved as to Legal Form By: Shane Moloney City Attorney, City of Renton Clb (1708) Non-standard 19 AGENDA ITEM #7. n) Canber Corps. PO Box 2668 Renton, WA 98056 425-271-8272 Sales tax Site #Name Sub-total 10.10%Total 1 Park Ave N Frontage 2510.00 253.51 2763.51 2 North 3rd Street Frontage 4588.00 463.39 5051.39 3 Northeast Park Drive Frontage 2978.00 300.78 3278.78 4 Boeing Frontage 7318.00 739.12 8057.12 5 Houser Way Bypass Boulevard 1448.00 146.25 1594.25 6 Sunset Boulevards North Frontage 1568.00 158.37 1726.37 7 Factory Place North Triangle 468.00 47.27 515.27 8 South Cedar Avenue 2626.00 265.23 2891.23 9 I-405 Wall to Cedar River park 2478.00 250.28 2728.28 10 Cedar River Park Frontage 4016.00 405.62 4421.62 11 Maple Valley Highway Berm/Frontage 3610.00 364.61 3974.61 12 Northeast Sunset Blvd Triangle 1307.00 132.01 1439.01 13 Northeast Sunset Blvd Frontage 4890.00 493.89 5383.89 14 Harrington Ave Northeast Blvd 324.00 32.72 356.72 15 Northeast 2nd Street Frontage 1838.00 185.64 2023.64 16 Public Works Shops (Saturday only site)10762.00 1086.96 11848.96 17 Northeast 4th Street Frontage 3412.00 344.61 3756.61 18 Harrington Ave Northeast 8284.00 836.68 9120.68 19 Duvall Ave Northeast Frontage 9988.00 1008.79 10996.79 20 Coal Creed Parkway Frontage 2032.00 205.23 2237.23 21 Talbot Road Frontage 4968.00 501.77 5469.77 22 Lake Avenue Open Space 1362.00 137.56 1499.56 23 Talbot Hill Reservoir park 7464.00 753.86 8217.86 24 Shattuck Ave South Frontage 1916.00 193.52 2109.52 25 Rainier Avenue South 15770.00 1592.77 17362.77 26 Southwest Grady Way Frontage 6108.00 616.91 6724.91 27 Oakesdale Ave S.W./Black River Fontage 5102.00 515.30 5617.30 28 Southwest 27th Street Frontage 4946.00 499.55 5445.55 29 Springbrook Trail 10122.00 1022.32 11144.32 30 Springbrook Trail - Boeing-Longacres Segment 1200.00 121.20 1321.20 31 Edlund Farm Open Space 6500.00 656.50 7156.50 32 Cleveland Farm Open Space 3600.00 363.60 3963.60 33 Southeast 186th Place Open Space 1926.00 194.53 2120.53 34 Tiffany-Cascade Connector Frontage 2000.00 202.00 2202.00 35 Lake Washington Boulevard north Frontage 3038.00 306.84 3344.84 36 May Creek Trail 820.00 82.82 902.82 37 Seahawks Sign Frontage 545.00 55.05 600.05 38 Ripley Lane Trail and Frontage 1504.00 151.90 1655.90 39 New Sunset Park 4064.00 410.46 4474.46 40 Logan Avenue North Frontage 7780.00 785.78 8565.78 41 Duvall Boulevards 3000.00 303.00 3303.00 42 Heritage Park 7318.00 739.12 8057.12 43 Harrington Ave NE - South Unit Frontage 4937.00 498.64 5435.64 44 Sunset Lane and NE 10 Street Frontages 4612.00 465.81 5077.81 45 Sunset Park Phase 2 1584.00 159.98 1743.98 TOTAL 188,631.00$ 19,051.73$ 207,682.73$ City of Renton ~ cost per Task Summary per site ~ 2022 bid 20 AGENDA ITEM #7. n) Tree Wells Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding 176.00 Trunk or root sprouts Herbicide pre-emerge 72.00 72.00 72.00 Herbicide post-emerg 60.00 60.00 60.00 Fertilize Mulch 200.00 Leaf removal 88.00 176.00 352.00 Prune groundcover 66.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 154.00 168.00 96.00 96.00 356.00 344.00 156.00 96.00 156.00 168.00 272.00 448.00 GRAND TOTAL $2,763.51 SITE: #1: Park Ave N Frontage From N 1st St to N 6th St both sides of street. Clean sidewalks, curblines and tree grates. Remove litter, leaves & weeds. Private property Keep debris from entering private property 2022 ~ COST PER TASK TOTAL $2,510.00 SST $253.51 21 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00 Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 Fertilize 120.00 120.00 120.00 120.00 Herbicide 48.00 48.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 48.00 48.00 48.00 Herbicide post-emerg 48.00 48.00 Fertilize Mulch 200.00 Leaf removal 44.00 176.00 88.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 30.00 250.00 506.00 386.00 706.00 338.00 386.00 506.00 386.00 502.00 474.00 118.00 GRAND TOTAL $5,051.39 SITE: #2: North 3rd Street Frontage From Burnett Ave North to Factory Ave North, both sides of street. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves& weeds. Add wood chip mulch to tree rings. Keep debris from entereing private property. Protect homeowner flower plantings. 2022 ~ COST PER TASK TOTAL $4,588.00 SST $463.39 22 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 176 176 Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 90.00 90.00 90.00 Herbicide post-emerg 45.00 45.00 Fertilize Mulch 352.00 Leaf removal 264.00 132.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 Litter 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 Monthly Costs 0.00 70.00 248.00 158.00 555.00 158.00 424.00 158.00 158.00 203.00 688.00 158.00 GRAND TOTAL $3,278.78 SITE: #3: Northeast park Drive Frontage From Loagan Ave North to 400 feet east of I-405, North side of street only. Clean sidewalks & curblines. Remove litter, leaves & weeds. Mow turf North of sidewalk. Lightly prune shrubs and groundcovers to keep within planting strips. Add wood chip mulch. Keep debris from entering streets. 2022 ~ COST PER TASK TOTAL $2,978.00 SST $300.78 23 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 66.00 132.00 396.00 396.00 396.00 132.00 132.00 396.00 132.00 132.00 Trim/edge 66.00 66.00 132.00 132.00 132.00 66.00 66.00 132.00 66.00 66.00 Fertilize 150.00 150.00 Herbicide 150.00 150.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 132 Bed Weeding 44.00 88.00 44.00 88.00 44.00 88.00 44.00 88.00 44.00 Herbicide pre-emerge 90.00 90.00 90.00 Herbicide post-emerg 60.00 60.00 Fertilize Mulch 454.00 Leaf removal 88.00 352.00 176.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 22.00 22.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00 44.00 Litter 22.00 22.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00 44.00 Monthly Costs 132.00 176.00 420.00 1092.00 1262.00 924.00 420.00 434.00 748.00 674.00 772.00 264.00 GRAND TOTAL $8,057.12 SITE: #4: Boeing Frontage Park Ave N from N 6th St to N 7th, only boulevards on north & south side of Boeing pedestrian bridge. From North 7th St to North 8th St, both sides of street and boulevards. North 8th St, south side only, from Garden Ave North to Logan Ave N. Logan Ave N, east side only, from North 6th St to North 8th St. Mow and edge planting strips, clean sidewalks and curblines, remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within boulevards or to rejuvenate. Add fine bark mulch to shrub beds and tree rings. Keep debris from entering private property area. 2022 ~ COST PER TASK TOTAL $7,318.00 SST $739.12 24 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 176 Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 60.00 60.00 Herbicide post-emerg 60.00 Fertilize Mulch 200.00 220.00 Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00 Monthly Costs 20.00 20.00 124.00 64.00 264.00 320.00 84.00 84.00 84.00 64.00 300.00 20.00 GRAND TOTAL $1,594.25 SITE: #5: Houser Way Bypass Boulevard Shrub bed North of 430 Sunset Blvd NE (on Sunset), at end of K-405 exti ramp. Clean curlines. Remove litter, leaves & weeds. Ligthly prune shrubs & groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entereing surrounding street areas 2022 ~ COST PER TASK TOTAL $1,448.00 SST $146.25 25 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 Herbicide pre-emerge 60.00 60.00 Herbicide post-emerg 60.00 60.00 Fertilize Mulch 392.00 Leaf removal 88.00 88.00 Prune Groundcover 88.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00 Monthly Costs 31.00 53.00 113.00 53.00 505.00 73.00 73.00 133.00 73.00 53.00 289.00 119.00 GRAND TOTAL $1,726.37 SITE: #6: Sunset Boulevards North Frontage East side of Sunset Blvcd N from Bronson Way N (SR169) to NE 3rd St, including beneath S side of I-405 overpass. Clean sidewalks & curblines. Remove Litter, leaves & weeds. Lightly prune groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street areas 2022 ~ COST PER TASK TOTAL $1,568.00 SST $158.37 26 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 22.00 44.00 44.00 44.00 44.00 44.00 Trim/edge 22.00 22.00 22.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 0.00 0.00 64.00 64.00 64.00 86.00 20.00 64.00 86.00 20.00 0.00 0.00 GRAND TOTAL $515.27 SITE: #7: Factory Place North Triangle Vacant lot E of 1526 N 3rd St. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves & weeds. Keep debris from entering private property 2022 ~ COST PER TASK TOTAL $468.00 SST $47.27 27 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 88.00 88.00 88.00 88.00 88.00 Herbicide pre-emerge 150.00 Herbicide post-emerg 72.00 72.00 Fertilize Mulch 1000.00 Leaf removal 88.00 88.00 Prune Groundcover 176.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00 Monthly Costs 20.00 20.00 280.00 114.00 1130.00 150.00 62.00 134.00 150.00 42.00 394.00 130.00 GRAND TOTAL $2,891.23 SITE: #8: South Cedar Avenue Between S 4th St and Houser Way S, including beneath the S side of I-405 overpass. Including seating area, all shrub beds, and stairway. Clean staircase, curblines, and parking lots. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within plating bed or to rejuvenate. Add wood chip mulch. Keep debris from entereing surrounding street 2022 ~ COST PER TASK TOTAL $2,626.00 SST $265.23 28 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 120.00 120.00 120.00 Herbicide post-emerg 72.00 72.00 Fertilize Mulch 1118.00 Leaf removal 88.00 88.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 20.00 64.00 184.00 64.00 1254.00 64.00 184.00 64.00 136.00 64.00 272.00 108.00 GRAND TOTAL $2,728.28 SITE: #9: I-405 Wall to Cedar River Park From Houser Way underpass to Maple Valley Hwy (SR169 off ramp). Clean sidewalks and curblines. Remove litter, leaves & weeds. Lightly prune shrubs & groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding park areas. 2022 ~ COST PER TASK TOTAL $2,478.00 SST $250.28 29 AGENDA ITEM #7. n) Irrigation System Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Start-up 150.00 Winterize 150.00 Monitor/Adjust 60.00 60.00 60.00 60.00 60.00 60.00 TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 22.00 44.00 44.00 44.00 88.00 44.00 44.00 88.00 44.00 22.00 Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Fertilize Herbicide 90.00 90.00 Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 90.00 90.00 90.00 Herbicide post-emerg 90.00 90.00 Fertilize Mulch 166.00 Leaf removal 176.00 176.00 Prune Groundcover 176.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 52.00 162.00 274.00 274.00 650.00 288.00 334.00 244.00 468.00 394.00 428.00 448.00 GRAND TOTAL $4,421.62 SITE: #10: Cedar River Park Frontage South side of SR169 from I-405 to park's E property line, including the center boulevard and 190' South along park entrance both sides of road. rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street and park areas. Operate and maintain irrigation system. Mow & edge turf. Clean sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to 2022 ~ COST PER TASK TOTAL $4,016.00 SST $405.62 30 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 396.00 396.00 396.00 396.00 396.00 396.00 396.00 Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge 90.00 90.00 90.00 Herbicide post-emerg 90.00 90.00 Fertilize Mulch 148.00 Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 20.00 110.00 416.00 416.00 506.00 654.00 20.00 20.00 506.00 416.00 506.00 20.00 GRAND TOTAL $3,974.61 SITE: #11: Maple Valley Highway Berm/Frontage N side of SR 169 from 140th Pl SE to 149th Ave SE. Mow turf. Clean pathway. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering street, pathway and parking areas. 2022 ~ COST PER TASK TOTAL $3,610.00 SST $364.61 31 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 44.00 88.00 88.00 88.00 44.00 44.00 88.00 88.00 44.00 Trim/edge 44.00 44.00 44.00 44.00 44.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch 84.00 Leaf removal 88.00 44.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 15.00 15.00 15.00 15.00 30.00 30.00 30.00 30.00 30.00 15.00 15.00 15.00 Monthly Costs 15.00 15.00 103.00 103.00 246.00 118.00 118.00 74.00 162.00 103.00 191.00 59.00 GRAND TOTAL $1,439.01 SITE: #12: Northeast Sunset Boulevard Triangle Sunset Blvd NE & NE Park Dr, N of 1170 Sunset Blvd NE. Mowe & edge turf. Clean sidewalks and curblines. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets and private property 2022 ~ COST PER TASK TOTAL $1,307.00 SST $132.01 32 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 176.00 176.00 352.00 352.00 352.00 176.00 176.00 176.00 176.00 176.00 Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Fertilize 90.00 Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 54.00 54.00 Herbicide post-emerg 42.00 42.00 Fertilize Mulch Leaf removal 220.00 440.00 440.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00 Monthly Costs 20.00 284.00 428.00 460.00 522.00 480.00 304.00 304.00 346.00 504.00 778.00 460.00 GRAND TOTAL $5,383.89 SITE: #13: Northeast Sunset Boulevard Frontage Edmonds Ave NE to 2502 NE Sunset Blvd, first driveway on N side of Sunset; sidewalks only, both sides of street. From 2502 NE sunset Blvd to Harrington Ave NE; sidewalks both sides of street and turf areas (North side of street, North of sidwalk to fence). From Harrington Ave NE to NE 12th St, South side only up to but including Walreens, sidewalk & palnting strips. Mow & edge turf. Clean sidwalks and curblines. Remove litter, leaves & weeds. Keep debris from entering streets and private property areas. 2022 ~ COST PER TASK TOTAL $4,890.00 SST $493.89 33 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 44.00 44.00 44.00 44.00 44.00 44.00 Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 10.00 10.00 10.00 10.00 10.00 10.00 Monthly Costs 0.00 0.00 54.00 54.00 54.00 54.00 0.00 0.00 54.00 54.00 0.00 0.00 GRAND TOTAL $356.72 SITE: #14: Harrington Ave Northeast Boulevard Harrington Ave NE and NE 5th St (North of 2721 Harrington Ave NE). Mow turf. Remove litter, leaves and weeds. Keep debris from entering surrounding streets and private proerpty areas. 2022 ~ COST PER TASK TOTAL $324.00 SST $32.72 34 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 150.00 Herbicide post-emerg 60.00 60.00 Fertilize Mulch 800.00 Leaf removal 154.00 154.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 20.00 20.00 214.00 20.00 924.00 20.00 64.00 80.00 64.00 20.00 218.00 174.00 GRAND TOTAL $2,023.64 SITE: #15: Northeast 2nd Street Frontage North side of NE 2nd St fro mMonroe Ave NE to Public Works gate @ 3555 NE 2nd St. Clean curlines. Remove litter, leaves & weeds. Lightly prune shtrubs to keep within palnting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering street. 2022 ~ COST PER TASK TOTAL $1,838.00 SST $185.64 35 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 352.00 528.00 704.00 704.00 704.00 704.00 528.00 704.00 704.00 352.00 Trim/edge 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 120.00 120.00 120.00 Herbicide post-emerg 60.00 60.00 Fertilize Mulch 1650.00 Leaf removal 132.00 264.00 264.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 30.00 492.00 854.00 910.00 2620.00 910.00 1030.00 734.00 970.00 1042.00 876.00 294.00 GRAND TOTAL $11,848.96 SITE: #16: Public Works Shops (Saturday ONLY site) 3555 NE 2nd St. Mow turf and edge. Clean employee parking lots, sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs & goundcovers to keep within planting beds, clear building walls or to rejuvenate. Add fine pine bark mulch to tree wells and shrub beds. 2022 ~ COST PER TASK TOTAL $10,762.00 SST $1,086.96 36 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 55.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 55.00 Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Fertilize 120.00 120.00 120.00 Herbicide 90.00 90.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch 114.00 Leaf removal 352.00 88.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 74.00 173.00 348.00 318.00 342.00 228.00 348.00 228.00 318.00 348.00 525.00 162.00 2022 ~ COST PER TASK TOTAL $3,412.00 SST $344.61 GRAND TOTAL $3,756.61 SITE: #17: Northeast 4th Street Frontage North side of street from Union Ave NE to 4350 NE 4th St and; South side of street from 4301 to 4405 NE 4th St. Mow & edge turf. Remove sidewalks U curblines. Remove litter, leaves & weeds. Add fine pine bark mulch to tree wells. Keep debris from entering surrounding street and private property areas. 37 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 110.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 110.00 Trim/edge 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 Fertilize 90.00 90.00 90.00 Herbicide 66.00 66.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 396.00 Bed Weeding 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch 296.00 Leaf removal 396.00 396.00 396.00 Prune Groundcover 220.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 20.00 10.00 Monthly Costs 0.00 790.00 702.00 678.00 908.00 832.00 702.00 612.00 678.00 1098.00 878.00 406.00 2022 ~ COST PER TASK TOTAL $8,284.00 SST $836.68 GRAND TOTAL $9,120.68 SITE: #18: Harrington Ave Northeast West side of street from NE 16th St, South to NE 12th St. East side of street, from NE 16th St to NE 10th St. Mow & edge turf. Clean sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers in swales to keep withing beds or to rejuvenate. Add wood chip mulch to tree rings & to swale shrub beds. Keep debris from entering surrounding streets and private property areas. 38 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 528 Bed Weeding 264.00 264.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 264.00 264.00 Herbicide pre-emerge 110.00 110.00 Herbicide post-emerg 120.00 120.00 Fertilize Mulch 1952.00 Leaf removal 264.00 528.00 528.00 Prune Groundcover 88.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 294.00 294.00 668.00 558.00 3158.00 558.00 668.00 558.00 678.00 822.00 822.00 910.00 2022 ~ COST PER TASK TOTAL $9,988.00 SST $1,008.79 GRAND TOTAL $10,996.79 SITE: #19: Duvall Ave Northeast Frontage West side of street from 1827 Duvall Ave NE to 4626 NE 24th St, then from 2501 duvall Ave NE at wall to Renton city limits. East side of street from 1702 Duvall Ave NE to 2322 Duvall Ave NE, then from driveway at 4702 NE 25th St to SE 95th Way intersection. Clean sidewalks & curbline. Remove litter, leaves & weeds. Lightly prune shrubs & groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streetrs or private property areas. 39 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 132.00 132.00 Bed Weeding 44.00 44.00 44.00 44.00 88.00 88.00 88.00 88.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 60.00 60.00 60.00 Herbicide post-emerg 60.00 60.00 Fertilize Mulch 380.00 Leaf removal 88.00 88.00 88.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 Monthly Costs 54.00 54.00 246.00 54.00 538.00 230.00 158.00 98.00 114.00 142.00 202.00 142.00 2022 ~ COST PER TASK TOTAL $2,032.00 SST $205.23 GRAND TOTAL $2,237.23 SITE: #20: Coal Creek Parkway Frontage East side of street from NE 95th Way to SE May Valley Rd. Clean sidewalks and curblines. Remove litter, leaves & weeds. Light prune trees and schrubs to keep within beds. Add wood chip mulch to tree and shrub beds 40 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00 Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 Fertilize 90.00 90.00 90.00 Herbicide 120.00 120.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 75.00 75.00 75.00 Herbicide post-emerg Fertilize Mulch 177.00 Leaf removal 176.00 352.00 352.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 30.00 206.00 503.00 458.00 590.00 338.00 428.00 338.00 533.00 604.00 558.00 382.00 2022 ~ COST PER TASK TOTAL $4,968.00 SST $501.77 GRAND TOTAL $5,469.77 SITE: #21: Talbot Road Frontage South of I-405 overpass to Sought Puget Drive, including beneath overpass. Mow and edge turf. Remove litter, leaves & weeds. Add fine pine bark mulch to tree rings. Keep debris from entering surrounding private property. 41 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 66.00 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00 Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 20.00 86.00 86.00 152.00 152.00 152.00 152.00 152.00 152.00 152.00 86.00 20.00 2022 ~ COST PER TASK TOTAL $1,362.00 SST $137.56 GRAND TOTAL $1,499.56 SITE: #22: Lake Avenue Open Space Vacant lot at 1511 Lake Ave S. Mow turf. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding private property 42 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 176.00 352.00 704.00 704.00 704.00 352.00 352.00 352.00 352.00 176.00 Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 132 Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 66.00 66.00 Herbicide post-emerg Fertilize Mulch 592.00 Leaf removal 352.00 352.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 30.00 338.00 580.00 866.00 1458.00 866.00 646.00 514.00 580.00 514.00 690.00 382.00 2022 ~ COST PER TASK TOTAL $7,464.00 SST $753.86 GRAND TOTAL $8,217.86 SITE: #23: Talbot Hill Reservoir Park 1900 Tablot Road South. Mow & edge turf, including along streets. Clean parking lot. Remove litter, leaves & weeds. Empty trash cans and reaplce with new liners. Lightly prune gourndcover and shrubs to keep within beds, clearance along walls, or to rejuvenate. Add wood chip mulch to tree rings & shrub beds. 43 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 88.00 Bed Weeding 55.00 55.00 110.00 110.00 110.00 110.00 55.00 55.00 55.00 55.00 Herbicide pre-emerge 90.00 90.00 90.00 Herbicide post-emerg 120.00 Fertilize Mulch 296.00 Leaf removal 88.00 44.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 20.00 75.00 165.00 130.00 426.00 220.00 250.00 75.00 75.00 75.00 341.00 64.00 2022 ~ COST PER TASK TOTAL $1,916.00 SST $193.52 GRAND TOTAL $2,109.52 SITE: #24: Shattuck Ave South Frontage Between Houser Way South and South 4th Place, both sides of street and beneath railroad overpass. Remove litter, leaves & weeds. Lightly prune shrubs & groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep debris from entering surrounding streets & private property areas. 44 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 286.00 286.00 286.00 286.00 Bed Weeding 132.00 132.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 132.00 132.00 Herbicide pre-emerge 255.00 255.00 Herbicide post-emerg 168.00 168.00 168.00 Fertilize Mulch 1564.00 Leaf removal Prune Groundcover 132.00 132.00 132.00 132.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 Litter 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 255 Monthly Costs 696.00 951.00 1510.00 1092.00 3242.00 1347.00 1510.00 1260.00 1092.00 1678.00 696.00 696.00 2022 ~ COST PER TASK TOTAL $15,770.00 SST $1,592.77 GRAND TOTAL $17,362.77 SITE: #25: Rainier Avenue South Between South Grady Way and 250 Rainier Ave S, both sides of street and boulevards. Clean sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds; add fin pine bark mulch to planting strips. Keep debris from entering surrounding private property. 45 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 88.00 176.00 352.00 352.00 352.00 176.00 176.00 176.00 176.00 176.00 Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Fertilize Herbicide 72.00 72.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 150.00 150.00 150.00 Herbicide post-emerg 66.00 66.00 66.00 Fertilize Mulch 1160.00 Leaf removal 88.00 352.00 176.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 40.00 40.00 80.00 80.00 40.00 40.00 40.00 20.00 20.00 20.00 Monthly Costs 20.00 196.00 454.00 552.00 1746.00 520.00 454.00 370.00 376.00 438.00 786.00 196.00 2022 ~ COST PER TASK TOTAL $6,108.00 SST $616.91 GRAND TOTAL $6,724.91 SITE: #26: southwest Grady Way Frontage North side of SW Grady Way from Oaksdale Ave SW to Longacres Ave SW at King County metro driveway, 1520 SW Grady Way. Mow & edge turf. Clean sidwalks & curlines. Remove litter, leaves & weeds between street and fence, including gateway sign area. Lighly prune shrubs & groundcovers to keep within beds to rejuveante, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds. Keed debris from 46 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 88.00 176.00 352.00 352.00 352.00 176.00 176.00 352.00 176.00 88.00 Trim/edge 44.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00 Fertilize Herbicide 105.00 105.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 308 Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal 264.00 528.00 528.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 30.00 162.00 250.00 575.00 470.00 778.00 250.00 250.00 575.00 514.00 690.00 558.00 2022 ~ COST PER TASK TOTAL $5,102.00 SST $515.30 GRAND TOTAL $5,617.30 SITE: #27: Oakesdale Ave S.W. / Black River Frontage Between 602 Oaksdale Ave SW and 1,060 feet N to end of sidewalk on Monster Road SW, N side of street, including the center Blvd Mow turf & edge. Clean parking lot, sidewalks (including bridge) & curblines. Remove litter, leaves & weeds. Empty trach containers and replace liners. keep debris from entering street. 47 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 110.00 220.00 440.00 440.00 440.00 220.00 220.00 220.00 220.00 110.00 Trim/edge 88.00 88.00 176.00 176.00 Fertilize Herbicide 105.00 105.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge 90.00 90.00 Herbicide post-emerg 72.00 72.00 Fertilize Mulch 192.00 Leaf removal 176.00 176.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 10.00 10.00 20.00 40.00 40.00 40.00 20.00 20.00 20.00 20.00 10.00 10.00 Monthly Costs 10.00 252.00 462.00 805.00 964.00 524.00 284.00 284.00 461.00 284.00 430.00 186.00 2022 ~ COST PER TASK TOTAL $4,946.00 SST $499.55 GRAND TOTAL $5,445.55 SITE: #28: Southwest 27th Street Frontage From Oakesdale Ave SW to Naches Ave SW, both sides of street, including center blvd. Mow & edge turf. Clean bike path, sidewalks & curblines. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets & private property areas. 48 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 176.00 Trim/edge 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Blackberry 55.00 55.00 Prune Tree Branches 44.00 44.00 Herbicide pre-emerge Herbicide post-emerg 120.00 Moss Removal 220.00 Mulch Leaf removal 572.00 1144.00 286.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Pressure wash boardwalk 3000.00 Litter 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 Monthly Costs 50.00 50.00 732.00 512.00 731.00 3512.00 512.00 512.00 512.00 1183.00 1480.00 336.00 2022 ~ COST PER TASK TOTAL $10,122.00 SST $1,022.32 GRAND TOTAL $11,144.32 SITE: #29: Springbrook Trail Segment 1: From Black River riparian Forest trailhead along Oakesdale Ave SW to SW 16th St. Mow turf. Clean trail, sidewalks & curblines. Rove litter, leaves, moss & weeds. Lightly prune trees/shrubs to keep out of trail shoulders. Empty trash containers & replace liners. Segment 2: At 800 SW 27th St Beginning, 1,055 feet north of SW 27th St to SW 43rd St. Mow turf. Clean trail, sidewalks & curblines. Remove litter, moss and weeds. Lightly prune shrubs to keep out of trail shoulders. Empty trash containers and replace liners. 49 AGENDA ITEM #7. n) Hards Services Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Clean pathway & signs 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 Monthly Costs 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 2022 ~ COST PER TASK TOTAL $1,200.00 SST $121.20 GRAND TOTAL $1,321.20 SITE: #30: Springbrook Trail - Boeing-Longacres Segment (from SW 16th Street to the N property line and parking lot @ 1905 Raymond Ave SW, a total distance of approx 1,460 feet. Clean trail, remove litter, control moss and clean 2 interpretative signs) 50 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1500.00 1500.00 1500.00 1500.00 Trim/edge 75.00 75.00 75.00 75.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 50.00 50.00 50.00 50.00 Monthly Costs 0.00 0.00 1625.00 0.00 1625.00 0.00 1625.00 0.00 0.00 1625.00 0.00 0.00 2022 ~ COST PER TASK TOTAL $6,500.00 SST $656.50 GRAND TOTAL $7,156.50 SITE: #31: Edlund Farm Open Space 51 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1200.00 1200.00 1200.00 Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter Monthly Costs 0.00 0.00 0.00 0.00 1200.00 0.00 1200.00 0.00 0.00 1200.00 0.00 0.00 2022 ~ COST PER TASK TOTAL $3,600.00 SST $363.60 GRAND TOTAL $3,963.60 SITE: #32: Cleveland Farm Open Space 19415 Talbot Rd S. Mow fields. Remove litter. Control blackberry shrubs at SW entrance. Exclude areas around house maintainted by residents. Scheudle field mowing during periods of dry soil conditions 52 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 539.00 539.00 539.00 Trim/edge 88.00 88.00 88.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 15.00 15.00 15.00 Monthly Costs 0.00 0.00 0.00 0.00 642.00 0.00 642.00 0.00 642.00 0.00 0.00 0.00 2022 ~ COST PER TASK TOTAL $1,926.00 SST $194.53 GRAND TOTAL $2,120.53 SITE: #33: 11017 Southeasst 186th Place Open Space Vacant lot. Mow field. Clean sidewalk and curbline. Control blackberry 53 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 20.00 20.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 20.00 20.00 2022 ~ COST PER TASK TOTAL $2,000.00 SST $202.00 GRAND TOTAL $2,202.00 SITE: #34: Tiffany-Cascade Connector Frontage East of 12130 SE 160th st. Mow grass North of sidewalk/street & two passes on trail from SE 160th St to pipeline. Clean sidewalks & curblines. Remove litter. Keep debris from entering surrounding streets. 54 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00 Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 Herbicide pre-emerge 72.00 Herbicide post-emerg 72.00 72.00 Fertilize Mulch 64.00 Leaf removal 88.00 88.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 30.00 162.00 344.00 272.00 408.00 272.00 272.00 272.00 344.00 360.00 272.00 30.00 2022 ~ COST PER TASK TOTAL $3,038.00 SST $306.84 GRAND TOTAL $3,344.84 SITE: #35: lake Washingtopn Boulevard North Frontage 4350 Lake Washington Boulevard nroth. Mow & edge turf. Clean sidewalks, & curblines, including East side of bridge. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Empty trash container and replace liner. Keep debris from entering street 55 AGENDA ITEM #7. n) Knotweek Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Herbicide-post emerge 300.00 Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 100.00 100.00 100.00 100.00 Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 Monthly Costs 0.00 0.00 130.00 0.00 130.00 0.00 130.00 300.00 130.00 0.00 0.00 0.00 2022 ~ COST PER TASK TOTAL $820.00 SST $82.82 GRAND TOTAL $902.82 SITE: #36: May Creek Trail 4350 Lake Washington boulevard North. Contraol invasive palnts including blackberry, knotweek, & horsetail in natural area. Clean are of litter. 56 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch 125.00 Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 10.00 10.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00 10.00 Monthly Costs 10.00 54.00 20.00 64.00 145.00 64.00 20.00 64.00 20.00 64.00 10.00 10.00 2022 ~ COST PER TASK TOTAL $545.00 SST $55.05 GRAND TOTAL $600.05 SITE: #37: Seahawks Sign Frontage Southwest corner of Seahawk Way and Lake Washington Blvd. North. Clean sidewalks & curblines. Lightly prune shrubs & groundcover to keep within beds, maintain sign visibiltiy of to rejuvenate. Remove litter, leaves & weeds. Add fine pine bark mulch 57 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 44.00 Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 88.00 88.00 88.00 88.00 Bed Weeding Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch Leaf removal Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 30.00 74.00 118.00 206.00 118.00 206.00 118.00 206.00 118.00 206.00 74.00 30.00 2022 ~ COST PER TASK TOTAL $1,504.00 SST $151.90 GRAND TOTAL $1,655.90 SITE: #38: Ripley Lane Trail and Frontage East of 5031 ripley Lane North at trailhead, then 872 feet north to RentonCity limits. Mow & edge turf, including street frontage. Clean pathway & street of litter stones/debri, leaves & weeds. Prune vegetation away from fence or to keep trail open to both sides. Empty trash can and reaplce with new liner 58 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 88.00 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00 88.00 Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch 900.00 Leaf removal 132.00 528.00 264.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 Monthly Costs 128.00 128.00 216.00 216.00 1116.00 216.00 216.00 216.00 216.00 348.00 656.00 392.00 2022 ~ COST PER TASK TOTAL $4,064.00 SST $410.46 GRAND TOTAL $4,474.46 SITE: #39: New Sunset Park (2715 Black NE 10th St: Two open fields between Sunset Lane NE and NE10th St; weed two detention ponds Clean sidewalks, and curlines. Mow truf and edge. Remove litter, leaves and weeds. Add wood chip mulch to detention pond.) 59 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 176.00 176.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 176.00 Herbicide pre-emerge 90.00 90.00 90.00 Herbicide post-emerg 90.00 90.00 90.00 Fertilize Mulch 1600.00 Leaf removal 88.00 264.00 352.00 Prune Groundcover 88.00 88.00 88.00 88.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 Monthly Costs 250.00 340.00 514.00 516.00 2114.00 516.00 604.00 426.00 514.00 604.00 780.00 602.00 2022 ~ COST PER TASK TOTAL $7,780.00 SST $785.78 GRAND TOTAL $8,565.78 SITE: #40: Logan Avenue North Frontage of Logan Ave North, including boulevards, and East side of sidewalks, from the Cedar River, North to North 6th St. Boulevards, sidewalks, curblines shrub bed 60 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 132 Bed Weeding 66.00 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00 66.00 Herbicide pre-emerge 96.00 96.00 96.00 Herbicide post-emerg 96.00 96.00 Fertilize Mulch 596.00 Leaf removal 44.00 88.00 88.00 Prune Groundcover 132.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Litter 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 Monthly Costs 76.00 76.00 238.00 142.00 966.00 142.00 238.00 142.00 238.00 186.00 260.00 296.00 2022 ~ COST PER TASK TOTAL $3,000.00 SST $303.00 GRAND TOTAL $3,303.00 SITE: #41: Duvall Boulevards between NE 4th St and NE 8th St 61 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 Herbicide pre-emerge 360.00 360.00 Herbicide post-emerg 120.00 120.00 120.00 120.00 Fertilize Mulch 2600.00 Leaf removal 132.00 264.00 264.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 22.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 218.00 360.00 600.00 360.00 2840.00 240.00 360.00 600.00 240.00 492.00 504.00 504.00 2022 ~ COST PER TASK TOTAL $7,318.00 SST $739.12 GRAND TOTAL $8,057.12 SITE: #42: Heritage Park 62 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 44.00 Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Fertilize 90.00 90.00 90.00 Herbicide 75.00 75.00 Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 198.00 Bed Weeding 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 Herbicide pre-emerge 90.00 90.00 90.00 Herbicide post-emerg 90.00 90.00 Fertilize Mulch 475.00 Leaf removal 220.00 220.00 220.00 Prune Groundcover 66.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 30.00 30.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 30.00 30.00 Monthly Costs 30.00 450.00 460.00 355.00 755.00 436.00 460.00 280.00 355.00 680.00 426.00 250.00 2022 ~ COST PER TASK TOTAL $4,937.00 SST $498.64 GRAND TOTAL $5,435.64 SITE: #43: Harrington Ave NE - South Unit Frontage (East side of street from NE 8th place, soudht to NE 7th street. Mow and edge turf. Clean sidwalks and curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers in swals to keep within beds or to rejuvenate. Add wood chipmulch to tree rings and to swals shrub beds. Keep debris from entering surrounding streets and private property areas.) 63 AGENDA ITEM #7. n) Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00 Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch 1600.00 Leaf removal 44.00 88.00 88.00 Prune Groundcover 44.00 44.00 44.00 Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 Litter 20.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 Monthly Costs 64.00 194.00 260.00 304.00 1860.00 260.00 304.00 260.00 260.00 348.00 282.00 216.00 containing shrubs, grouncovers, perennials and mulch. Remove litter, leaves & weeds. Add wood chip mulch.) Addendum 6 to CAG-16-078. 2022 ~ COST PER TASK TOTAL $4,612.00 SST $465.81 GRAND TOTAL $5,077.81 SITE: 44: Sunset Lane and NE 10 Street Frontages (2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Blvd and NE 10 Ave moving counterclockwise: newly created planting strips between sidewalks and curbs along the North side of NE 10 St from NE Sunset Blvd to Glenwood Ave NE; also both sides of street adjacent to the Renton Highlands Library on NE 10 Ave; alongthe Southerly and Westerly side of sunset Lane NE from Glenwood ave NE to NE 10th Ave at the library; along Harrington Ave Ne between NE Sunset Blvd and Sunset Lane NE on both sides of the street; along both sides of the street on glenwood Ave NE and along both sides of Harrington Ave NE North of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of NE 10 Street sidewalks, curblines and shrub beds 64 AGENDA ITEM #7. n) TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 Herbicide pre-emerge Herbicide post-emerg Fertilize Mulch 200.00 Leaf removal 88.00 176.00 352.00 Prune Groundcover Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Monthly Costs 64.00 64.00 64.00 64.00 264.00 64.00 64.00 64.00 64.00 152.00 240.00 416.00 2022 ~ COST PER TASK TOTAL $1,584.00 SST $159.98 GRAND TOTAL $1,743.98 SITE: #45: Sunset Park Phase 2 (2715 block NE 10th St: new park arSouth of new Sunset Park between Sunset Lane NE & NE 10th St; weed rain gardens and beds. Clean sidwalks, and curblines. Mow turf and edge. Remove litter, leaves & weeds. Add wood chip mulch to rain gardens and beds) 65 AGENDA ITEM #7. n) SCOPE OF WORK for GROUNDSKEEPING SERVICES The number in the maintenance schedule is a minimum; HOWEVER, some areas may need to be done more frequently to assure that the task is maintained to City’s standards. Work will be performed in accordance with Section 11, Frequency Schedules for all sites (45 locations). The Frequency Schedules section and Section 2 provide a brief description of the site specifics and work to be performed. A.Service Locations by Category Rights-of Way (see Section 2 for a full description of each site) Site 1 - Park Ave. North FrontageSite 2 - North 3rd Street FrontageSite 3 - Northeast Park Drive FrontageSite 4 - Boeing FrontageSite 5 - Houser Way BypassSite 6 - Sunset Boulevard North FrontageSite 7 - Factory Place FrontageSite 8 - South Cedar AvenueSite 9 - I-405 Wall at Cedar River ParkSite 10 - Cedar River Park FrontageSite 11 - Maple Valley Highway Berm FrontageSite 12 - Northeast Sunset Boulevard TriangleSite 13 - N.E. Sunset Boulevard FrontageSite 14 - Harrington Avevenue Northeast BoulevardSite 15 - Northeast 2nd Street FrontageSite 17 - Northeast 4th Street FrontageSite 18 - Harrington Avenue Northeast FrontageSite 19 - Duvall Avenue Northeast FrontageSite 20 - Coal Creek Parkway FrontageSite 21 - Talbot Road FrontageSite 24 - Shattuck Avenue South FrontageSite 25 - Rainier Avenue South FrontageSite 26 - Southwest Grady Way FrontageSite 27 - Oakesdale Avenue Southwest/Black River FrontageSite 28 - Southwest 27th Street FrontageSite 35 - Lake Washington Boulevard North FrontageSite 37 - Seahawks SignSite 40 - Logan Avenue North FrontageSite 41 - Duvall BoulevardsSite 43 - Harrington Ave NE - South Unit FrontageSite 44 - Sunset Lane and NE 10 Street Frontages Parks Site 23 - Talbot Hill Reservoir Park Site 39 - New Sunset Park Phase 1 Site 42 - Heritage Park Site 45 - Sunset Park Phase 2 66 AGENDA ITEM #7. n) Trails Site 29 - Springbrook Trail Site 30 - Springbrook Longacres Site 38 - Ripley Lane Trail City Facilities Site 16 - Public Works Shops Open Space Areas Site 22 - Lake Ave. Open Space Site 31 - Edlund Farm Open Space Site 32 - Cleveland Farm Open Space Site 33 - 11017 SE 186th Place Open Space Site 34 - Tiffany-Cascade Connector Open Space Site 36 - May Creek Trail Open Space The Contractor, at its sole cost and expense, shall supply all labor, tools, specialized equipment, material, supplies, supervision and transportation to perform the services. B.Pesticide Certification State of Washington, Department of Agriculture, Pesticide Certification License. Provide a copy of each individual license for company staff who will apply pesticides (upon award of contract). C.Time Performance The Contractor shall follow a weekly work schedule as set forth in an annual maintenance schedule, (Section 11, Attachment A, Sites 1 thru 45). Work shall, to the extent possible, be performed on the same day each week. In no case shall work be performed more than 24 hours after the regularly scheduled day without notification and consent of the Project Manager. The Contractor shall provide a daily location of work schedule prior to beginning work and updated as the schedule may change. D.Invoice The Contractor will submit a detailed monthly invoice, together with maintenance and chemical log. All invoices shall describe the task completed (e.g. mowing) and the corresponding amount for that task. All invoices submitted in less detailed forms will be returned for correction. Payments may be delayed until the invoice has been submitted in the proper form. No interest on the payment will be due by the City for invoices not in the proper form. E.General Turf Maintenance 1.Mowing: Generally, grass shall be mowed once a week during the mowing seasons from March - October and once every other week in February and November. Mowing height shall leave grass 67 AGENDA ITEM #7. n) blades that stand about 1.5 inches above soil grade for park-like locations and streets and 3 to 5 inches for field mowing locations. Sweeping, blowing and cleaning debris from mowing operations are included in this description. See Frequency Schedules for deviations. 2.Trim/edge: All hard surfaces and tree well edges will be edged every other week during the mowing season and the surface either swept or blown clean. Method of edging will be mechanical edger for all hard edge surfaces and monofiliment line for all soft edges. All debris shall be swept clean and removed, not left in streets or on adjacent property. See Frequency Schedules for deviations. 3.Aerate/overseed: Aerate and overseed once per year with a three way mix (Kentucky Blue, Creeping Fescue, Rye). The Contractor will submit a list of recommended seed to the Project Manager before applications. This activity should be included as part of number 1. Mowing above. See Frequency Schedules for deviations. 4.Fertilize: All turf will be fertilized two times a year (see Maintenance Schedule) with a minimum 28-7-14 fertilizer, or an approved equal. See Frequency Schedules for deviations. 5.Herbicide: All turf will receive no more than two applications per year. See Frequency Schedules for deviations. The Contractor will provide twenty-four (24) hours advance notice to the Project Manager before making any applications. Authorization to proceed will be given by the Project Manager once the site has been inspected. The Contractor should also inspect the lawn areas on a regular basis for insect or pest problems. If, in the opinion of the Contractor, additional treatments are necessary, the Contractor shall notify the Project Manager. After each application the Contractor will turn in a “Pesticide Application Record” form (Section 11-E) to the Project Manager. The “Pesticide Application Record” form will be submitted with the monthly invoice. The Contractor will provide posting in conformance to State of Washington Department of Agriculture regulations after application of chemicals. Signs will be removed twenty-four hours following application. The Contractor will submit a list of recommended chemicals for approval by the Project Manager before each application. 6.Litter: Empty trash containers at each site visit; replacing plastic bags. Pick up loose litter in all areas upon each site visit. F. Shrub Maintenance 1.Pruning: Ornamental shrubs shall not be pruned except: 1.) to remove singular broken branches, 2.) to perform clearance pruning, 3.) to provide a clear line of sight, or 4.) to rejuvenate individual shrubs. Singular branches which are over-hanging onto and are impediments to pedestrian or vehicular traffic may be pruned back. Boxing or rounding-over shrubs into a formal shape or hedge should not occur without prior approval from the Project Manager. Any damage to plant material due to Contractor negligence shall be the responsibility of the Contractor to replace. Shrubs shall be hand pruned to maintain the integrity of the plant and its location in the landscape. Gas powered hedge trimmers shall not be used to prune shrubs. The Contractor may be required to replace plants at their expense damaged as a result of poor pruning practices including damage by use of gas-powered hedge trimmers. 68 AGENDA ITEM #7. n) 2.Bedwork/weeding: Bed areas will be kept in a weed-free condition. Hand weeding is encouraged. In addition, beds will receive an approved pre-emergent and/or post-emergent herbicide as prescribed in the Frequency Schedule and in accordance with the manufacturer’s recommendations. 3.Site Issues and Pest Control: The Contractor should inspect the plant area on a regular basis for site issues such as broken trees and pest problems. If any site or pest problems are found the Contractor shall notify the Project Manager immediately. 4.Fertilize: All plant materials will receive the required application of fertilizer identified in the Frequency Schedule and in accordance with the manufacturer’s recommendations. See Frequency Schedules for deviations. 5.Wood and Bark Mulch: Additional wood or bark mulch will be provided annually to maintain a maximum depth of two inches, when measured in May. The Contractor will hand weed each site prior to installing mulch. The Contractor will provide a sample of the new mulch to the Project Manager before placing. See Sections 2, or 11 regarding which sites receive wood mulch and which to receive bark mulch. See Frequency Schedules for deviations. 6.Leaf removal: All areas will be kept free of leaves during the fall. The leaves will be picked up weekly and removed from the site as per the Frequency Schedule. See Frequency Schedules for deviations. G.Ground Cover Maintenance All ground cover in beds will be weeded per the Frequency Schedule. Ground cover will be trimmed or sheared at the edge of hard surfaces and beds will be trimmed to prevent encroachment into lawn, shrubs or trees. H.Hard Surfaces The entrance drives, sidewalks, curbs, trails and other hard surfaces will be kept free of leaves, moss, litter, trash and/or garbage. The use of power blowers is acceptable; however, the debris will be removed and not blown onto adjacent property, street surfaces, or planting beds. Undesirable vegetation in sidewalks, curbs, and other hard surfaces shall receive an approved herbicide application, mechanically removed (e.g. pulled), treated with vinegar or moss control products and removed. In no case will any pre-or-post emergent herbicides with residual characteristic (i.e. Casoron) be used in these areas. I.Irrigation Irrigation operations, maintenance, and repair will be performed by the Community Services Department at all locations except one: At Site #10, Cedar River Park Frontage, irrigation operations and maintenance will be performed by the Contractor. The Contractor shall notify the Project Manager in advance for repairs or other issues with the irrigation system. J.Traffic Control When working on street median, traffic circles and/or on street edges, the Contractor shall be responsible for approved traffic control at all times. At minimum, Contractor’s employees shall wear bright-colored personal protective equipment including safety vests, hard hats, gloves and protective hearing and eye equipment and; provide and use safety cones and “work ahead” signs appropriate for the location and to adequately protect the public and Contractor’s employees. 69 AGENDA ITEM #7. n) K.Notification Notify the Community Services Department at 425-430-6600 immediately upon discovery of any unsafe or hazardous conditions. Notify Project Manager immediately upon discovery of broken, damaged or stolen equipment, supplies, materials, trees, shrubs, irrigation, facilities, trash containers, and the like or any vandalism and graffiti. In addition, notify the Project Manager of any additional tasks required beyond the Frequency Schedules in Section 11; provide cost estimates consistent with the amounts shown in the Cost per Task sheets in Section 9, prevailing wage rates, and obtain written approval from the Project Manager prior to scheduling such work. 70 AGENDA ITEM #7. n) Site 1: Park Ave. N. Frontage (From North 1st Street to North 6th Street, both sides of street. Clean sidewalks, curblines and tree grates. Remove litter, leaves, and weeds. Keep debris from entering private property.) Frequency Schedule Tree Wells Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Trunk Sprouts 1 Weeding Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 1 Fertilize Mulch - wood chip 1 Leaf Removal 1 2 4 Clean out wells 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 2 2 2 2 2 2 2 2 2 2 2 Litter 4 4 4 4 4 4 4 4 4 4 4 71 AGENDA ITEM #7. n) Site 1: Park Ave. N. Frontage (From N. 1st St. to N. 6th St., both sides of street.) Site Map 72 AGENDA ITEM #7. n) Site 2: North 3rd Street Frontage (From Burnett Avenue North to Factory Avenue North, both sides of street. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering private property. Protect homeowner flower plantings.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 4 4 4 4 4 4 4 4 2 Trim/edge 2 2 2 2 2 2 2 2 2 2 Fertilize 1 1 1 1 Herbicide 1 1 Aerate/Overseed Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 2 2 2 2 2 2 2 2 2 2 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge avoid applying to planted plants 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 1 4 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Section 9, Trim/Edge Applies Here Litter 4 4 4 4 4 4 4 4 4 4 4 4 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 73 AGENDA ITEM #7. n) Site 2: North 3rd Street Frontage (from Burnett Avenue North to Factory Avenue North, both sides of street.) Site Map 74 AGENDA ITEM #7. n) Site 3: Northeast Park Drive Frontage (From Logan Avenue North to 400 feet east of I-405, north side of street only. Clean sidewalks and curblines. Remove litter, leaves and weeds. Mow turf north of sidewalk. Lightly prune shrubs and groundcovers to keep within planting strips. Add wood chip mulch. Keep debris from entering streets.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 1 1 1 1 1 1 1 Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 1 Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 2 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 1 1 1 1 1 1 1 1 1 1 1 Litter 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 75 AGENDA ITEM #7. n) Site 3: Northeast Park Drive Frontage (from Logan Avenue North to 400 feet east of I -405, north side of street only ) Site Map 76 AGENDA ITEM #7. n) Site 4: Boeing Frontage (Park Avenue North from North 6th Street to North 7th, only boulevards on north and south side of Boeing pedestrian bridge. From North 7th Street to North 8th Street, both sides of street and boulevards. North 8th Street, south side only, from Garden Avenue North to Logan Avenue North. Logan Avenue North, east side only, from North 6th Street to North 8th Street. Mow and edge planting strips, clean sidewalks and curblines, remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within boulevards or to rejuvenate. Add fine pine bark mulch to shrub beds and tree rings. Keep debris from entering private property.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 4 4 4 2 2 4 2 2 Trim/edge 1 1 2 2 2 1 1 2 1 1 Fertilize 1 1 Herbicide 1 1 Aerate/Overseed Shrub Beds/Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 2 1 2 1 2 1 2 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 1 4 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 1 1 2 4 4 4 2 2 4 2 2 2 Litter 1 1 2 4 4 4 2 2 4 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 77 AGENDA ITEM #7. n) Site 4: Boeing Frontage (On Park Ave. from N. 6th St. to N. 7th St., from N. 7th Street to N. 8th Street; south half of N. 8th St. between Garden Ave. N. to Logan Ave. N.; east half of Logan Ave. N. from N. 8th Street & N. 6th Street) Site Map 78 AGENDA ITEM #7. n) Site 5: Houser Way Bypass Boulevard (Shrub bed north of 430 Sunset Boulevard Northeast (on Sunset), at end of I-405 exit ramp. Clean curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering surrounding street areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 Herbicide - post-emerge 1 Fertilize Mulch - wood chips 1 Leaf Removal 4 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 2 2 2 2 4 4 4 4 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 79 AGENDA ITEM #7. n) Site 5: Houser Way Bypass Boulevard (north of 420 Sunset Boulevard North, between north and south bound lanes at end of exit ramp) Site Map 80 AGENDA ITEM #7. n) Site 6: Sunset Boulevard North Frontage (East side of Sunset Boulevard North from Bronson Way North (SR 169) to Northeast 3rd Street, including beneath south side of I-405 overpass. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 2 2 Prune Groundcover 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 1 1 1 1 1 1 1 1 1 1 1 1 Litter 2 2 2 2 2 4 4 4 4 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 81 AGENDA ITEM #7. n) Site 6: Sunset Boulevard North Frontage [East side of Sunset from Bronson Way North (SR 169) to Northeast 3rd Street (including beneath ov erpasses).] Site Map 82 AGENDA ITEM #7. n) Site 7: Factory Place North Triangle (Vacant lot east of 1526 N. 3rd Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Keep debris from entering private property.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 2 2 2 2 Trim/edge 1 1 1 Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 2 2 2 2 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 83 AGENDA ITEM #7. n) Site 7: Factory Place North Triangle (vacant lot east of 1526 N. 3rd Street, mow turf, clean sidewalks and curblines, remove litter, leaves and weeds. Keep debris from entering private property ) Site Map 84 AGENDA ITEM #7. n) Site 8: South Cedar Avenue (Between South 4th Street and Houser Way South, including beneath the south side of I-405 overpass. Includes seating area, all shrub beds, and stairway. Clean staircase, curblines and parking lots. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering surrounding street areas and private properties.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 Herbicide - pre-emerge 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 2 2 Prune Groundcover 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 1 1 1 1 1 1 1 1 1 1 Litter 2 2 2 2 2 4 4 4 4 2 2 2 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 85 AGENDA ITEM #7. n) Site 8: South Cedar Avenue (between South 4th Street and Houser Way South, along and under I-405 overpass. Includes seating area, all shrub beds, and stairway.) Site Map 86 AGENDA ITEM #7. n) Site 9: I-405 Wall at Cedar River Park (From Houser Way underpass to Maple Valley Highway (SR 169 off ramp). Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding park areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 1 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 2 2 2 2 4 4 4 4 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 87 AGENDA ITEM #7. n) Site 9: I-405 Wall at Cedar River Park (1715 Maple Valley Highway. From Houser Way North underpass north to SR 169, along I-405 off-ramp.) Site Map 88 AGENDA ITEM #7. n) Site 10: Cedar River Park Frontage (South side of SR 169 from I-405 to park’s east property line, including the center boulevard and 180’ south along park entrance both sides of road. Operate and maintain irrigation system. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street and park areas. Operate and Maintain Irrigation System at this Site Only Frequency Schedule Irrigation System Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Start-up 1 Winterize 1 Monitor/Adjust 1 1 1 1 1 1 Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 2 2 4 2 2 4 2 1 Trim/edge 1 1 1 1 1 1 1 1 1 1 Fertilize Herbicide 1 1 Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 2 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 2 2 Prune Groundcover 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 1 1 1 1 1 1 1 1 1 1 1 1 Litter 2 2 2 2 2 2 2 2 2 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 89 AGENDA ITEM #7. n) Site 10: Cedar River Park Frontage (1715 Maple Valley Highway. South side of SR 169, from I-405 overpass, including boulevard, east to park entrance, including 180 feet south into entrance on both sides of park road.) Operate and Maintain Irrigation System at this Site Only Site Map 90 AGENDA ITEM #7. n) Site 11: Maple Valley Highway Berm/Frontage (North side of SR 169 from 140th Place Southeast to 149th Avenue Southeast. Mow turf. Clean pathway. Remove litter, leaves, and weeds. Add wood chip mulch to tree rings. Keep debris from entering street, pathway and park areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 1 1 1 1 1 Trim/edge Fertilize Herbicide Aerate/Overseed Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - wood chips 1 Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 91 AGENDA ITEM #7. n) Site 11: Maple Valley Highway Berm/Frontage (north side of SR 169 from 140th Place Southeast to 149 Avenue Southeast.) Site Map 92 AGENDA ITEM #7. n) Site 12: Northeast Sunset Boulevard Triangle (Sunset Boulevard Northeast and Northeast Park Drive, north of 1170 Sunset Boulevard Northeast. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets and private property.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 2 2 1 1 2 2 1 Trim/edge 1 1 1 1 1 Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch - wood chips 1 Leaf Removal 2 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 2 2 2 4 4 4 4 4 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 93 AGENDA ITEM #7. n) Site 12: Northeast Sunset Boulevard Triangle (Sunset Boulevard Northeast and Northeast Park Drive, northwest of 1170 Sunset Boulevard Northeast) Site Map 94 AGENDA ITEM #7. n) Site 13: Northeast Sunset Boulevard Frontage Edmonds Avenue Northeast to 2502 Northeast Sunset Boulevard, first driveway on north side of Sunset; sidewalks only, both sides of street. From 2502 NE Sunset Boulevard to Harrington Ave. NE; sidewalks both sides of street and turf areas (north side of street, north of sidewalk to fence). From Harrington AvenueNortheast to Northeast 12th Street, south side only up to but not including Walgreens, sidewalk and planting strips. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Keep debris from entering streets and pivate property areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 2 4 4 4 2 2 2 2 2 Trim/edge 1 1 1 1 1 1 1 1 1 1 Fertilize 1 Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch Leaf Removal 1 2 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 2 2 2 4 4 4 4 4 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 95 AGENDA ITEM #7. n) Site 13: Northeast Sunset Boulevard Frontage [from Edmonds Ave NE to NE 12 Street: •Edmonds Ave. NE to 2502 NE Sunset Blvd. (first driveway on north side of Sunset; sidewalks only, on both sides). •From 2502 NE Sunset Blvd. to Harrington Ave. NE; sidewalks (both sides) & turf areas (north of sidewalk to fence). •From Harrington Ave. NE to NE12th Street – south side only up to but not including Walgreens; sidewalk & turf areas.] Site Map 96 AGENDA ITEM #7. n) Site 14: Harrington Avenue Northeast Boulevard [Harrington Avenue Northeast and Northeast 5th Street (north of 2721 Harrington Avenue NE). Mow turf. Remove litter, leaves, and weeds. Keep debris from entering surrounding streets and private property areas.] Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 1 1 1 1 Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 97 AGENDA ITEM #7. n) Site 14: Harrington Avenue Northeast Boulevard (Harrington Avenue Northeast and Northeast 5th Street; north of 2721 Harrington Avenue Northeast.) Site Map 98 AGENDA ITEM #7. n) Site 15: Northeast 2nd Street Frontage (North side of Northeast 2nd Street from Monroe Avenue Northeast to Public Works gate at 3555 Northeast 2nd Street. Clean curblines. Remove litter, leaves, and weeds. Lightly prune shrubs to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering street.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 Herbicide - pre-emerge 1 Herbicide - post-emerge 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 1 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 99 AGENDA ITEM #7. n) Site 15: Northeast 2nd Street Frontage (North side of Northeast 2nd Street from Monroe Ave NE to Public Works Shop gate at 3555 NE 2nd St.) Site Map 100 AGENDA ITEM #7. n) Site 16: Public Works Shops (Saturday Only Site) (3555 Northeast 2nd Street. Mow turf and edge. Clean employee parking lots, sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within planting beds, clear building walls or to rejuvenate. Add fine pine bark mulch to tree wells and shrub beds.) Maintenance work can only occur on Saturday at this location Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 3 4 4 4 4 3 4 4 2 Trim/edge 1 2 2 2 2 2 2 2 2 1 Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 1 2 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 101 AGENDA ITEM #7. n) Site 16: Public Works Shops (Saturday Only Site) (3555 Northeast 2nd Street) Maintenance work can only occur on Saturday at this location Site Map 102 AGENDA ITEM #7. n) Site 17: Northeast 4th Street Frontage (North side of street from Union Avenue Northeast to 4350 Northeast 4th Street and; south side of street from 4301 to 4405 Northeast 4th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Add fine pine bark mulch to tree wells. Keep debris from entering surrounding street and private property areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 4 4 4 4 4 4 4 4 2 Trim/edge 2 2 2 2 2 2 2 2 2 2 Fertilize 1 1 1 Herbicide 1 1 Aerate/Overseed Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Tree Rings - fine pine bark 1 Leaf Removal 4 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4 Litter 4 4 4 4 4 4 4 4 4 4 4 4 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 103 AGENDA ITEM #7. n) Site 17: Northeast 4th Street Frontage (North side of street from Union Ave. NE to 4350 NE 4th St; south side of street from 4301 to 4405 NE 4th St.) Site Map 104 AGENDA ITEM #7. n) Site 18: Harrington Avenue Northeast Frontage (West side of street from Northeast 16th Street, south to Northeast 12th Street. East side of street, from Northeast 16th Street to Northeast 10th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets and private property areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 4 4 4 4 4 4 4 4 2 Trim/edge 2 2 2 2 2 2 2 2 2 2 Fertilize 1 1 1 Herbicide 1 1 Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 2 2 2 2 2 2 2 2 2 Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch - wood chips 1 Leaf Removal 2 2 1 Prune Groundcover 1 Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 4 4 4 4 4 4 4 4 2 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 105 AGENDA ITEM #7. n) Site 18: Harrington Avenue Northeast Frontage (West side of street from NE 16th St. to NE 12th St; East side of street from NE 16th St. to NE 10th St.) Site Map 106 AGENDA ITEM #7. n) Site 19: Duvall Avenue Northeast Frontage (West side of street from 1827 Duvall Avenue Northeast to 4626 Northeast 24th Street, then from 2501 Duvall Avenue Northeast at wall to Renton city limits. East side of street from 1702 Duvall Avenue Northeast to 2322 Duvall Avenue Northeast, then from driveway at 4702 Northeast 25th Street to Southeast 95th Way intersection. Clean sidewalks and curbline. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets and private property areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 1 2 2 2 2 2 2 2 2 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 1 2 2 Prune Groundcover 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 107 AGENDA ITEM #7. n) Site 19: Duvall Avenue Northeast Frontage (West side of street from 1827 Duvall Ave. NE to 4626 NE 24th St, then from 2501 Duvall Ave. NE, at wall, to Renton city limits; East side of street from 1702 Duvall Ave. NE to 2322 Duvall Ave. NE, then from driveway at 4702 NE 25th St. to SE 95th Way intersection) Site Map 108 AGENDA ITEM #7. n) Site 20: Coal Creek Parkway Frontage (East side of street from NE 95th Way to Southeast May Valley Road. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune trees and shrubs to keep within beds. Add wood chip mulch to tree and shrub beds.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 1 Bed Weeding 1 1 1 1 2 2 2 2 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 1 1 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 109 AGENDA ITEM #7. n) Site 20: Coal Creek Parkway Frontage (East side of street from SE 95th Way to SE May Valley Rd.) Site Map 110 AGENDA ITEM #7. n) Site 21: Talbot Road Frontage (South of I-405 overpass to South Puget Drive, including beneath overpass. Mow and edge turf. Remove litter, leaves and weeds. Add fine pine bark mulch to tree rings. Keep debris from entering surrounding private property.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 4 4 4 4 4 4 4 4 2 Trim/edge 2 2 2 2 2 2 2 2 2 2 Fertilize 1 1 1 Herbicide 1 1 Aerate/Overseed Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge Fertilize Mulch - fine pine bark 1 Leaf Removal 1 2 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 4 4 4 4 4 4 4 4 4 4 4 4 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 111 AGENDA ITEM #7. n) Site 21: Talbot Road Frontage (South of I-405 overpass to Puget Drive, both sides of street including beneath overpass) Site Map 112 AGENDA ITEM #7. n) Site 22: Lake Avenue Open Space (Vacant lot at 1511 Lake Avenue South. Mow turf. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding private property.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 2 2 2 2 2 2 2 1 Trim/edge Fertilize Herbicide Aerate/Overseed Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 113 AGENDA ITEM #7. n) Site 22: Lake Avenue Open Space (vacant lot at 1511 Lake Avenue South.) Site Map 114 AGENDA ITEM #7. n) Site 23: Talbot Hill Reservoir Park (1900 Talbot Road South. Mow and edge turf, including along streets. Clean parking lot. Remove litter, leaves and weeds. Empty trash cans and replace with new liners. Lightly prune groundcover and shrubs to keep within beds, clearance along walls, or to rejuvenate. Add wood chip mulch to tree rings and shrub beds.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 4 4 4 2 2 2 2 1 Trim/edge 1 1 1 1 1 1 1 1 1 1 Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 Herbicide - post-emerge Fertilize Mulch - wood chips 1 Leaf Removal 2 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 115 AGENDA ITEM #7. n) Site 23: Talbot Hill Reservoir Park (1900 Talbot Road South) Site Map 116 AGENDA ITEM #7. n) Site 24: Shattuck Avenue South Frontage (Between Houser Way South and South 4th Place, both sides of street and beneath railroad overpass. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep debris from entering surrounding streets and private property areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 1 2 2 2 2 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 Fertilize Mulch - wood chips 1 Leaf Removal 2 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 2 2 2 2 1 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 117 AGENDA ITEM #7. n) Site 24: Shattuck Avenue South Frontage (between South 4th Place and Houser Way South, both sides of street, small boulevard and underpass) Site Map 118 AGENDA ITEM #7. n) Site 25: Rainier Avenue South (Between South Grady Way and 250 Rainier Avenue South, both sides of street and boulevards. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds; add fine pine bark mulch to planting strips. Keep debris from entering surrounding private property. See detailed plan for specific maintenance boundaries.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 1 1 1 Bed Weeding 1 1 4 4 4 4 4 4 4 4 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal Prune Groundcover 1 1 1 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4 Litter 8 8 8 8 8 8 8 8 8 8 8 8 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 119 AGENDA ITEM #7. n) Site 25: Rainier Avenue South (between South Grady Way and 250 Rainier Avenue South, both sides of street and boulevards.) See detailed site plan of areas for specific maintenance boundaries Site Map 120 AGENDA ITEM #7. n) Site 26: Southwest Grady Way Frontage (North side of Southwest Grady Way from Oakesdale Avenue Southwest to Longacres Avenue Southwest at King County Metro driveway, 1520 Southwest Grady Way. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds between street and fence, including gateway sign area. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds. Keep debris from entering surrounding streets.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 4 4 4 2 2 2 2 1 Trim/edge 1 1 1 1 1 1 1 1 1 1 Fertilize Herbicide 1 1 Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 1 4 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 2 2 4 4 2 2 2 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 121 AGENDA ITEM #7. n) Site 26: Southwest Grady Way Frontage (North side of SW Grady Way from Oakesdale Ave. SW to Longacres Ave. SW up to King County Metro driveway at 1520 SW Grady Way.) Site Maps 122 AGENDA ITEM #7. n) Site 27: Oakesdale Ave. S.W./Black River Frontage (Between 602 Oakesdale Avenue Southwest and 1,060 feet north to end of sidewalk on Monster Road Southwest, north side of street, including the center boulevard. Mow turf and edge. Clean parking lot, sidewalks (including bridge) and curblines. Remove litter, leaves and weeds. Empty trash containers and replace liners. Keep debris from entering street.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 4 4 4 2 2 4 2 1 Trim/edge 1 1 2 2 2 1 1 2 1 1 Fertilize Herbicide 1 1 Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal 1 2 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 4 4 4 4 4 4 4 4 4 4 4 4 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 123 AGENDA ITEM #7. n) Site 27: Oakesdale Ave. S.W./Black River Frontage (North of 602 Oakesdale Ave. SW to 1,060 feet north at end of sidewalk.) Site Maps 124 AGENDA ITEM #7. n) Site 28: Southwest 27th Street Frontage (From Oakesdale Avenue Southwest to Naches Avenue Southwest, both sides of street, including center boulevard. Mow and edge turf. Clean bike path, sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets and private property areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 4 4 4 2 2 2 2 1 Trim/edge 1 1 2 2 2 1 1 1 1 1 Fertilize Herbicide 1 1 Aerate/Overseed Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 2 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 2 4 4 4 2 2 2 2 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 125 AGENDA ITEM #7. n) Site 28: Southwest 27th Street Frontage (between Oakesdale Avenue Southwest and Naches Avenue Southwest.) Site Map 126 AGENDA ITEM #7. n) Site 29: Springbrook Trail (Segment 1: From Black River Riparian Forest trailhead along Oakesdale Avenue Southwest to Southwest 16th Street. Mow turf. Clean trail, sidewalks and curblines. Remove litter, leaves, moss and weeds. Lightly prune trees/shrubs to keep out of trail shoulders. Empty trash containers and replace liners. Segment 2: At 800 Southwest 27th Street beginning 1,055 feet north of Southwest 27th Street to Southwest 43rd Street. Mow turf. Clean trail, sidewalks and curblines. Remove litter, moss, leaves and weeds. Lightly prune shrubs to keep out of trail shoulders Empty trash containers and replace liners.) Pressure wash trail boardwalk segment south of Southwest 27th Street Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 2 2 2 2 2 2 2 1 Trim/edge 1 1 1 1 1 1 1 1 1 Fertilize Herbicide Aerate/Overseed Tree/Shrub Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Blackberry 1 1 Prune Tree Branches 1 1 Herbicide - pre-emerge Herbicide - post-emerge 1 Moss Removal 1 Mulch Leaf Removal 2 4 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Pressure wash boardwalk 1 Litter 4 4 4 4 4 4 4 4 4 4 4 4 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 127 AGENDA ITEM #7. n) Site 29: Springbrook Trail (from Black River Riparian Forest trailhead south to SW 16th St.; from 1,055 feet north of SW 27th St. to SW 43rd St.) Site Map 128 AGENDA ITEM #7. n) Site 30: Springbrook Trail – Boeing-Longacres Segment (From SW 16th Street to the north property line and parking lot at 1905 Raymond Avenue SW, a total distance of approximately 1,460 feet. Clean trail, remove litter, control moss, and clean 2 interpretative signs.) Frequency Schedule Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Clean pathway & signs 2 2 2 2 2 2 2 2 2 2 2 2 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping Site Map 129 AGENDA ITEM #7. n) Site 31: Edlund Farm Open Space (17611 Southeast 103rd Avenue. Mow field, planting strip and edge along street. Clean sidewalks and curblines. Remove litter. Exclude immediate areas around houses maintained by residents. Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 1 1 Trim/edge 1 1 1 1 Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 130 AGENDA ITEM #7. n) Site 31: Edlund Farm Open Space (17611 Southeast 103rd Avenue. Mow and edge turf, clean sidewalks and curblines; remove litter, leaves, and weeds; keep debris from entering surrounding streets and private property areas. Exclude immediate area around houses that are maintained by the residents.) Site Map 131 AGENDA ITEM #7. n) Site 32: Cleveland Farm Open Space (19415 Talbot Road South. Mow fields. Remove litter. Control blackberry shrubs at Southwest entrance. Exclude area around house maintained by residents. Schedule field mowing during periods of dry soil conditions.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 1 Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 132 AGENDA ITEM #7. n) Site 32: Cleveland Farm Open Space (19415 Talbot Road South) Site Map 133 AGENDA ITEM #7. n) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 1 Trim/edge 1 1 1 Fertilize Herbicide Aerate/Overseed Blackberry Shrubs Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping Site 33: 11017 Southeast 186th Place Open Space (Vacant lot. Mow field. Clean sidewalk and curbline. Remove litter.) 134 AGENDA ITEM #7. n) Site 33: 11017 Southeast 186th Place Open Space (Vacant lot south of 11018 SE 186th Place) Site Map 135 AGENDA ITEM #7. n) Site 34: Tiffany-Cascade Connector Trail and Frontage (East of 12130 Southeast 160th Street. Mow grass north of sidewalk/street and two passes on trail from Southeast 160th Street to pipeline. Clean sidewalks and curblines. Remove litter. Keep debris from entering surrounding streets.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 1 1 1 1 1 1 1 Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 2 2 2 2 2 2 2 2 2 2 2 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 136 AGENDA ITEM #7. n) Site 34: Tiffany-Cascade Connector Frontage (east of 12130 Southeast 160th Street) Site Map 137 AGENDA ITEM #7. n) Site 35: Lake Washington Boulevard North Frontage (4350 Lake Washington Boulevard North. Mow and edge turf. Clean sidewalks and curblines, including east side of bridge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Empty trash container and replace liner. Keep debris from entering street.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 4 4 4 4 4 4 4 4 2 Trim/edge 1 1 1 1 1 1 1 1 1 1 Fertilize Herbicide Aerate/Overseed Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 1 1 1 1 Herbicide - pre-emerge 1 Herbicide - post-emerge 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 1 1 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 4 4 4 4 4 4 4 4 4 4 4 4 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 138 AGENDA ITEM #7. n) Site 35: Lake Washington Boulevard North Frontage (4350 Lake Washington Boulevard North) Site Map 139 AGENDA ITEM #7. n) Site 36: May Creek Trail (4350 Lake Washington Boulevard North. Control invasive knotweed in natural area. Prune vegetation encroaching to edge of pathway. Clean area of litter.) Frequency Schedule Knotweed Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Herbicide - post emerg.1 Pathway Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 1 1 1 Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 140 AGENDA ITEM #7. n) Site 36: May Creek Trail (4350 Lake Washington Boulevard North) Site Map 141 AGENDA ITEM #7. n) Site 37: Seahawks Sign Frontage (Southwest corner of Seahawks Way and Lake Washington Boulevard North. Clean sidewalk and curblines. Lightly prune shrubs and groundcover to keep within beds, maintain sign visibility or to rejuvenate. Remove litter, leaves and weeds. Add fine pine bark mulch.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs Bed Weeding 1 1 1 1 1 Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch - fine pine bark 1 Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 2 2 2 2 2 2 2 2 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 142 AGENDA ITEM #7. n) Site 37: Seahawks Sign Frontage (at the soutwest corner of Lake Washington Blvd. N. and Seahawks Way) Site Map 143 AGENDA ITEM #7. n) Site 38: Ripley Lane Trail and Frontage (East of 5031 Ripley Lane North at trailhead, then 875 feet north to Renton city limits. Mow and edge turf, including street frontage. Clean pathway and street of litter, stones/debris, leaves and weeds. Prune vegetation away from fence or to keep trail open to both sides. Empty trash can and replace with new liner.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 1 2 2 2 2 2 2 2 2 1 Trim/edge Fertilize Herbicide Aerate/Overseed Blackberry/invasives Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 1 1 1 Bed Weeding Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch Leaf Removal Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter, stones, debris 1 1 2 2 2 2 2 2 2 2 1 1 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 144 AGENDA ITEM #7. n) Site 38: Ripley Lane Trail and Frontage (east of 5031 Ripley Lane North at trailhead, then 875 feet north to city limits) Site Map 2022-2024 CONTRACT LANDSCAPE MAINTENANCE Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 145 AGENDA ITEM #7. n) Site 39: New Sunset Park (2715 Block NE 10 Street: Two open fields between Sunset Lane NE and NE 10 Street; weed two detention ponds. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to detention pond.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Fields Mow Planting Strips Trim/edge Fertilize Herbicide Aerate/Overseed 2 Detention Ponds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 2 2 4 4 4 4 4 4 4 4 2 2 Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch - wood chips 1 Leaf Removal 1 4 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Section 9, Trim/Edge Applies Here Litter 4 4 4 4 4 4 4 4 4 4 4 4 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 146 AGENDA ITEM #7. n) 33 339911i’It--t‘+)3*+9+333*4++343*3\+3÷33444*33394r..N:;J433,14**+3 3 3*33.4+.4.4 .44**9343493i* *4*+3333*11913343 9**33+333 9**933+334**3*+-t33**TI‘I*-•*++9**4---33 33*43333333*+331++.4*3333 33 43*43*3•3333.4*3++3 33 34*3—I+•339*431333-33**334tjt+3333*333333*93339**+33 33 3*+343433*43 33 3*33334337t43**3*+9*+37343-*3C33 3+3*1+33.433333 33**‘4‘44%‘4IEpIFI?L--’S.SSite 39 Sunset Neighborhood ParkShrub Bed Areas: weed 2 detention ponds, clean sidewalks and curblines, mow turf and edge, remove litter/leaves/weeds, add wood chip mulch to beds/pondSite 392022-2024 CONTRACT GROUNDSKEEPING Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 147AGENDA ITEM #7. n) Site 40: Logan Avenue North Frontage (The east side of Logan Avenue North, including boulevards and east side of sidewalks, from the Cedar River, north to North 6th Street. Boulevards, sidewalks, curblines, and shrub beds.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Turf Trim/edge Fertilize Herbicide Aerate/Overseed Shrub and G.C. Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 2 2 4 4 4 4 4 4 4 4 4 2 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 1 Fertilize Mulch - fine bark 1 Leaf Removal 1 4 2 Prune Groundcover 1 1 1 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding See Shrub and G.C. Beds Above Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4 Litter 4 4 4 4 4 4 4 4 4 4 4 4 2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right- of-Way, Facilities, Parks, Trails and Open Space Landscaping 148 AGENDA ITEM #7. n) Site 40 Logan Avenue North Notes From Cedar River lo N 6 Street. eallt side of street and two boulCl\lards only 0 512 Q 256 512 Fftll GS_ 1984_ Web_Mercator_Auxihary _Sphere Legend Weed shrub beds, remove litter and leaves, add fine bark mulch along east side of Logan Avenue North, two boulevards, and short sections along North 3rd and 4th Streets. 2022-2024 CONTRACT GROUNDSKEEPINGRight-of-Way, Facilities, Parks, Trails and Open Space Landscaping 149 AGENDA ITEM #7. n) Site 41: Duvall Avenue Northeast Boulevard (Two boulevards north and south of NE 8th Street. Clean curbline. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow Trim/edge Fertilize Herbicide Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 1 2 2 2 2 2 2 2 2 1 1 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - fine pine bark 1 Leaf Removal 1 2 2 Prune Groundcover 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 1 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right- of-Way, Facilities, Parks, Trails and Open Space Landscaping 150 AGENDA ITEM #7. n) Clean curb line. Remove litter, leaves and weeds. Lightly prune shrubs and ground cover plants to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets. 2022-2024 CONTRACT GROUNDSKEEPING Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 151 AGENDA ITEM #7. n) Site 42: Heritage Park Shrub Bed Frequency Schedule Shrub Bed Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 2 2 2 2 2 2 2 2 2 2 2 2 Herbicide - pre-emerge 1 1 Herbicide - post-emerge 1 1 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 1 2 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Included as part of above Bed Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 1 2 2 2 2 2 2 2 2 2 2 1 Litter 1 1 1 1 1 1 1 1 1 1 1 1 2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right- of-Way, Facilities, Parks, Trails and Open Space Landscaping (233 Union Avenue NE: Large shrub bed between turf and asphalt pathway. Remove litter, leaves and weeds. Add wood chip mulch. Added shrub bed area.) 152 AGENDA ITEM #7. n) HeritageParkShrubBedLegendPontsofInterestParksWaterbQdiesNotesNone0—-—--J128064128FeiGS19$4WeSMercatorAuxarySphereStreets2015sidRdDdni1Gee.Sar,12CatheExtentl44kInformationTechnologyGISRononMapSupprlRntvnwa11)6/201BIinanuc&ITDivisionene*edMcOqVlETc.riirrenwTHISMAPISNOTTOBEUSEDFORNAVIGATIONRemove litter, leaves and weeds. Add wood chip mulch.Site 422022-2024 CONTRACT GROUNDSKEEPING Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 153AGENDA ITEM #7. n) Site 43: Harrington Avenue Northeast- South Unit Frontage (East side of street from Northeast 8th Place, south to Northeast 7th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets and private property areas.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Mow 2 4 4 4 4 4 4 4 4 2 Trim/edge 2 2 2 2 2 2 2 2 2 2 Fertilize 1 1 1 Herbicide 1 1 Aerate/Overseed Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Prune Shrubs 1 Bed Weeding 1 2 2 2 2 2 2 2 2 2 Herbicide - pre-emerge 1 1 1 Herbicide - post-emerge 1 1 Fertilize Mulch - wood chips 1 Leaf Removal 2 2 1 Prune Groundcover 1 Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow Litter 2 2 4 4 4 4 4 4 4 4 2 2 2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right- of-Way, Facilities, Parks, Trails and Open Space Landscaping 154 AGENDA ITEM #7. n) Site 43: Harrington Avenue Northeast- South Unit Frontage (Reference Point: 820 Harrington Ave. NE: East side of street from Northeast 8th Place, south to Northeast 7th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets and private property areas.) . .., .,,. rr...::,.1 W1'J ·,� rt��::· oJ..u; ��•kHT•,--.:-,(•,o..,..,.._-,., _""'],:, .. 1,, .... -:� t3G ;-w:."?.��/�w. ;�:�.""� �- '?�. � �"P::;,.1;�:1:".'i�"•-.e �!-� iff'� it�.:. .,. tr:�: ... ·:,. u v-t.:.n • :�.?� c.�t'J,�:�/'.i"" ,o., ... r-::J •""ll: �'°' V .... to.-1 •• :,,:,: IIX&.-i -•-•• .,,.....r,: "IA""C l -• r,e,� fifij ��=�,-,,·,1 :-::���',._U1Cllt:-•'lt'ftv --�-=-w.'"l' - . l < HBB ·,_,,' l\,Ulll'Njf:,,l.:.,'E•.Llll!'-lfllt .... S.C� !.Ntnc;."lf�.1'>1rr lill([/11CO'Ml'UN Site Map 2022-2024 CONTRACT GROUNDSKEEPING Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 155 AGENDA ITEM #7. n) Site 44: Sunset Lane and NE 10 Street Frontages (2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Boulevard and NE 10 Avenue moving counterclockwise: Newly created planting strips between sidewalks and curbs along the north side of NE 10 Street from NE Sunset Boulevard to Glenwood Avenue NE; also both sides of street adjacent to the Renton Highlands Library on NE 10 Avenue; along the southerly and westerly side of Sunset Lane NE from Glenwood Avenue NE to NE 10th Avenue at the library; along Harrington Avenue NE between NE Sunset Boulevard and Sunset Lane NE on both sides of the street; along both sides of the street on Glenwood Avenue NE and along both sides of Harrington Avenue NE north of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of NE 10 Street. Sidewalks, curblines, and shrub beds containing shrubs, groundcovers, perennials and mulch. Remove litter, leaves and weeds. Add wood chip mulch.) Frequency Schedule Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Bed Weeding 1 2 2 2 2 2 2 2 2 1 0 Herbicide - pre-emerge Herbicide - post-emerge Fertilize Mulch - wood chips 1 Leaf Removal 1 2 2 Prune Groundcover 1 1 1 Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Weeding Included as part of above Bed Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Sweep/blow 2 4 4 4 4 4 4 4 4 4 4 4 Litter 2 4 4 4 4 4 4 4 4 4 4 4 2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right- of-Way, Facilities, Parks, Trails and Open Space Landscaping 156 AGENDA ITEM #7. n) Site 44: Sunset Lane and NE 10 Street Frontages (2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Boulevard and NE 10 Avenue moving counterclockwise: Newly created planting strips between sidewalks and curbs along the north side of NE 10 Street from NE Sunset Boulevard to Glenwood Avenue NE; also both sides of street adjacent to the Renton Highlands Library on NE 10 Avenue; along the southerly and westerly side of Sunset Lane NE from Glenwood Avenue NE to NE 10th Avenue at the library; along Harrington Avenue NE between NE Sunset Boulevard and Sunset Lane NE on both sides of the street; along both sides of the street on Glenwood Avenue NE and along both sides of Harrington Avenue NE north of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of NE 10 Street. Sidewalks, curblines, and shrub beds containing shrubs, groundcovers, perennials and mulch. Remove litter, leaves and weeds. Add wood chip mulch.) Addendum 6 to CAG-16-078. Above descriptions depicted as areas that are in color on the map. Sunset Neighborhood Park Site Map 2022-2024 CONTRACT GROUNDSKEEPING Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 157 AGENDA ITEM #7. n) Site 45: Sunset Park Phase 2 (2715 Block NE 10 Street: new park area south of New Sunset Park between Sunset Lane NE and NE 10 Street; weed rain gardens. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to beds and gardens.) Frequency Schedule Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Mow Fields Mow PlantinQ Strips Trim/edge Fertilize Herbicide Aerate/Overseed 2 Detention Ponds June July Aug Sept Oct Nov Bed Weeding Jan Feb Mar Apr May 2 2 2 4 4 4 4 4 4 2 2 Herbicide -pre-emerge Herbicide -post-emerge Fertilize Mulch -wood chips 1 Leaf Removal 1 2 Prune Groundcover Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Weeding Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Sweep/blow Section 9, Trim/Edge Applies Here Litter 4 4 4 4 4 4 4 4 4 4 4 Dec Dec 2 2 Dec Dec 4 2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right- of-Way, Facilities, Parks, Trails and Open Space Landscaping 158 AGENDA ITEM #7. n) )::PDWeed rain gardens and beds. Clean sidewalks, and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to rain gardens and bedsSite 45Site Map2022-2024 CONTRACT GROUNDSKEEPINGRight-of-Way, Facilities, Parks, Trails and Open Space Landscaping 159AGENDA ITEM #7. n) AB - 3023 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Interagency Agreement between Renton Police Department and the Washington Traffic Safety Commission RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Police Department STAFF CONTACT: Dan Figaro, Commander EXT.: 7506 FISCAL IMPACT SUMMARY: If the grant is awarded, the Renton Police Department would be eligible for reimbursement of overtime costs up to $9,900 between October 1, 2021 and September 30, 2022. SUMMARY OF ACTION: Receive funds from the Washington Traffic Safety Commission to conduct multi-jurisdictional, high visibility enforcement traffic safety emphasis patrols in support of Target Zero priorities of reducing traffic related deaths and serious injuries. EXHIBITS: A. Agreement STAFF RECOMMENDATION: Approve an interagency agreement with the Washington Traffic Safety Commission to receive up to $9,900 in grant funds to conduct multi-jurisdictional, high visibility enforcement traffic safety emphasis patrols in support of Target Zero priorities of reducing traffic related deaths and serious injuries. AGENDA ITEM #7. o) INTERAGENCY AGREEMENT BETWEEN THE Washington Traffic Safety Commission AND _________________________________ THIS AGREEMENT is made and entered into by and between the Washington Traffic Safety Commission, hereinafter referred to as “WTSC,” and _________________________________, hereinafter referred to as “SUB-RECIPIENT.” NOW THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein, or attached and incorporated and made a part hereof, the Parties mutually agree as follows: 1. PURPOSE OF THE AGREEMENT The purpose of this Agreement is to provide funding, provided by the United States Department of Transportation (USDOT) National Highway Traffic Safety Administration (NHTSA) and allowed under the Assistance Listings Catalog of Federal Domestic Assistance (CFDA) numbers 20.600 and 20.608, for traffic safety grant project 2022-HVE-4449-Region 7/8 Target Zero Task Force, specifically to provide funding for the law enforcement agencies in WTSC Region 7/8 to conduct overtime high-visibility enforcement (HVE) traffic safety emphasis patrols as outlined in the Statement of Work (SOW), in support of Target Zero priorities. The Target Zero Manager (TZM) and/or the Law Enforcement Liaison (LEL) shall coordinate the SOW with the SUB-RECIPIENT with the goal of reducing traffic crashes. Grant 2022-HVE-4449-Region 7/8 Target Zero Task Force was awarded to the Region 7/8 to support collaborative efforts to conduct HVE activities. By signing this agreement, the SUB-RECIPIENT is able to seek reimbursement for approved overtime expenses incurred as a participant in the region’s HVE grant. 2. PERIOD OF PERFORMANCE The period of performance of this Agreement shall commence upon the date of execution by both Parties, but not earlier than October 1, 2021, and remain in effect until September 30, 2022 unless terminated sooner, as provided herein. 3. STATEMENT OF WORK SCOPE OF WORK: AGENDA ITEM #7. o) Problem and Opportunity Statement / Project Overview The main causes of serious injury and fatality collisions on Washington’s roadways are driver impairment through drug and/or alcohol use, and distracted driving. Motorcyclists also represent a high number of injured and killed as a result of unsafe and poorly trained riders and the challenges vehicle drivers face in observing motorcycles on the road. This project will fund locally coordinated high visibility enforcement mobilizations for distracted driving and motorcycle safety. Selected regions will also be given funding for Impaired Driving HVE. Overtime patrols will be organized by local Target Zero Managers (TZMs) & the statewide Law Enforcement Liaison networks and their local Target Zero Task Force. These patrols will also be coordinated with the Washington State Patrol (WSP). Target Zero Managers will establish or strengthen relationships with key WSP district personnel to improve interagency coordination. Goal Prevent traffic crashes to reduce traffic related deaths and serious injuries through active, visible, consistent, and targeted traffic law enforcement. Strategy Prevent drivers from engaging in high-risk behaviors by increasing their perception of the risk of receiving a citation through high visibility enforcement campaigns (HVE). HVE Campaigns influence driver behavior by creating the perception that there is an increased risk of engaging in risky driving behaviors. This perception is achieved through 1) an increase in media messages about upcoming emphasis periods so that the targeted drivers know when the patrols will occur and what will be enforced and 2) drivers have the perception of increased enforcement because they can see a significant and noticeable increase in law enforcement presence (officers pulling cars over) that reinforces the media messages they received and influences them to modify their driving behavior. Objectives and Requirements for All High Visibility Patrols 1. SUB-RECIPIENT will participate in their task force to plan and execute HVE events. The SUB- RECIPIENT in cooperation with the local task force will: a. Conduct robust planning for each HVE event. WTSC recommends creating an operational plan developed by the local traffic safety task force for each HVE event that includes: i. Goals for the event – For example, what behaviors is the event intended to influence? ii. Summary of participating law enforcement agencies, target violations, and target locations. iii. Summary of the public outreach that will be done to promote the event so that drivers in the targeted locations are forewarned and can anticipate it. iv. Use data and information such as crash data, anecdotes of near misses, and professional judgement to pick target locations where the patrols will occur. AGENDA ITEM #7. o) b. The planning for HVE events will be data informed; based on crash data, anecdotal evidence, and the professional judgement of task force members. c. Execute the event using multiple officers (a minimum of three) at the same time in the same target areas to create a visible presence so that the driving public has the perception of law enforcement omnipresence on the targeted roads. Enforcement is highly visible – clearly more than a typical day. d. Participating officers should maximize their contacts during their patrols so that their activity contributes to the goals of the HVE event. See this requirement described below in the section called Other Considerations, Exceptions, And Notes Regarding HVE Events. e. Promote the event through all earned, owned and, if funded, paid media that is available so that the public is made aware of the event before, during, and after the enforcement takes place. Translate messages as needed to reach the majority of drivers in the targeted locations. f. Invite local media involvement in the effort to reach communities in which HVE will occur. g. Strive to actively enforce traffic safety laws focused on collision causing behaviors in priority areas throughout the year outside of HVE events. h. Ensure all participating personnel will use the WEMS system provided by the WTSC to record all activities in digital activity logs conducted by their commissioned officers pursuant to the HVE events. Participating officers will fill out all applicable fields of the digital activity log and use the comments field to provide details on an irregularities, challenges or other details that would help explain what was encountered during their shift. SUB-RECIPIENT will also ensure all supervisors and fiscal staff have the ability to review and edit those activity logs. i. Ensure all participating personnel will receive a briefing prior to the event so that every participant understands the purpose and goals of the HVE event. This can be done in person (preferred) or electronic via telephone or virtual software. Below is a recommended briefing checklist: i. Event goals, and summary of participating law enforcement agencies and officers, target violations, and target locations. ii. List of on-call DREs and request procedures iii. How to fill out their digital activity log in WEMS iv. Information on how the Mobile Impaired Driving Unit will be used (if applicable) v. Dispatch information vi. Spotter processes (if applicable) vii. Available Draeger machines and locations AGENDA ITEM #7. o) j. Ensure all officers participating in these patrols is BAC certified and received and passed the SFST refresher training. k. Support the promotion of HVE events utilizing all of their owned media channels (i.e., Facebook, Twitter, website, email newsletters, or other social media). l. Ensure at least one individual available for weekend media contacts, beginning at noon on Fridays before HVE mobilizations. Objectives and Requirements for Distracted Driving HVE Patrols 1. SUB-RECIPIENT must use the spotter method for all distracted driving HVE events. This method will utilize a team of no less than three officers – one spotter identifying violations and at least two officers responding to violations. 2. Participating officers will document, in the “Comments” box of their activity log, the names of the spotter and chasers with which they were working. 3. SUB-RECIPEINTS utilizing motorcycle officers are exempt from the spotter requirement. 4. SUB-RECIPIENT agrees that distracted driving patrols conducted without using the spotter method will not be compensated by the WTSC. 5. SUB-RECIPIENT will only expend funds for these HVE events in support of the national distracted driving campaign from April 4 to April 11. 6. SUB-RECIPIENT may expend funds outside of the April national campaign, but only when 1) the Target Zero Manager receives written approval from WTSC in advance and 2) the event is in support of a distracted driving focused HVE event organized by the Task Force. Patrols conducted outside of the campaign window, and without pre-approval from WTSC will not be reimbursed. Objectives and Requirements for Motorcycle Safety HVE Patrols 1. SUB-RECIPIENT will focus on the illegal and unsafe driving actions of all other motor vehicles when relating to motorcycles. This includes speeding, failure to yield to a motorcycle, following too closely to a motorcycle, distracted driving, etc. 2. SUB-RECIPIENT ensures that enforcement will focus on the illegal and unsafe driving actions of motorcycles that are known to cause serious and fatal crashes. This includes impaired driving, speeding, and following too closely. 3. The SUB-RECIPIENT will utilize motorcycle officers in these patrols to the fullest extent possible. 4. The SUB-RECIPIENT will only expend funds for these motorcycle HVE events in support of the following campaigns: 5. It’s a Fine Line – (July 8-10, July 15-17, or July 22-24). Note: Patrols must take place Friday, Saturday, or Sunday during the campaign. 6. Oyster Run Event – Summer 2022 (Region 11 only). AGENDA ITEM #7. o) 7. ABATE Spring Opener – Summer 2022 (Region 12 only). 8. Hog Wild Ocean Shores Motorcycle Event – Summer 2022 (Region 2 only). 9. Motorcycle HVE Patrols must take place Friday, Saturday, or Sunday during the It’s a Fine Line campaign, however the local Traffic Safety Task Force can request to conduct patrols during other days in the week if data shows the need for this or for special events. These requests must be sent to Mark Medalen via email (mmedalen@wtsc.wa.gov) at least one week in advance of the proposed event. During special events, patrols should be scheduled during the dates of the event and could start one day before the official event start date and end one day after the official event end date. Other Considerations, Exceptions, And Notes Regarding HVE Events Maximizing contacts: Participating law enforcement officers should make as many contacts as they can during their patrol in the spirit of changing driving behavior. Active, visible, consistent, and targeted traffic law enforcement has an impact on helping to modify driver behavior. A traffic stop affects future driving habits that has a positive influence on reducing the number and severity of collisions. People believe what they hear from each other and it influences what they do. Traffic stops act as a deterrent to risky driving behavior. This strategy has three primary purposes that traffic stops achieve: • The first purpose is to stop a violation of the law for public safety. Officers will accomplish this purpose merely by stopping vehicles. • The second purpose of the stop is to serve as a general deterrent to other drivers. Officers’ visible presence with a vehicle at the roadside has this symbolic effect on other drivers. • Finally, the third purpose is to change the drivers’ future driving behavior. Process Measures • Percent of officers that receive a briefing prior to HVE events. • Percent of HVE activity logs with a start date and end date / time within prescribed campaign windows. • Percent of stops resulting in an infraction or citations issued for high-risk behaviors including but not limited to impaired driving, speeding, distracted driving, and aggressive driving. Objectives and Requirements for Impaired Driving HVE Patrols 1. SUB-RECIPIENT will implement a data driven, sustained enforcement and education efforts. a. Use local traffic crash data and any other useful data to identify the locations where the enforcement patrols should occur. b. Education and local media efforts should incorporate a Positive Community Norms approach with the desired outcome of influencing drivers with the highest potential of causing traffic crashes. c. Commit to an increased level of sustained enforcement as outlined in the operations plan. NOTE: These funds are meant to provide an increase in DUI enforcement efforts, not meant to replace current DUI enforcement. 2. SUB-RECIPIENT will participate in national impaired driving HVE events including: a. Holiday DUI Patrols (December 15 – January 1) AGENDA ITEM #7. o) b. Drive Sober or Get Pulled Over (August 17 – September 5) 3. SUB-RECIPIENT will focus enforcement efforts on driving behaviors that are commonly exhibited by drivers operating a motor vehicle under the influence of alcohol/drugs or a combination. Stopping vehicles for “high discretionary” style stops should not be the priority. 4. SUB-RECIPIENT ensures all officers participating in these patrols has received the Advanced Roadside Impaired Driving Enforcement (ARIDE) training. 5. SUB-RECIPIENT should not supplant regular patrol officer activity during HVE events. Scope of Work - Impaired Driving HVE Patrols Contacts Project Manager Sara Wood, Region 8 TZM 220 4th Avenue South Kent, WA 98032 253-856-5856 Swood@kentwa.gov Project Director Tony Gomez 401 5th Ave Seattle, WA 98104 260-263-8178 Tony.Gomez@kingcounty.gov Media Contacts Sara Wood, Region 8 TZM 220 4th Avenue South Kent, WA 98032 253-856-5856 Swood@kentwa.gov Rebecca Lis, Region 7 TZM Public Health – Seattle & King County 206-477-5085 Rlis@kingcounty.gov Sgt. Robb Kramp, King County LEL Mercer Island PD 206-999-2621 Robb.kramp@mercergov.org AGENDA ITEM #7. o) 1BOperations DUI HVE patrols will use the following tiered approach. Cities that have a total of 10 or more impaired driving related serious injury or fatalities within the 2018-2020-time frame will be considered Tier 1 group. Cities that have 5-10 impaired driving related serious injuries or fatalities within the same time frame are considered the Tier 2 Group (see below). Both tiers of cities will receive funding to support monthly DUI patrols around the following coordinated dates/events. • November: Thanksgiving Weekend • December: Holiday DUI Campaign • January: Holiday DUI Campaign • February: Superbowl, President’s Day, Valentine’s Day • March: St Patrick’s Day • April: None • May: Cinco de Mayo • June: End of School/Start of 100 Deadliest Days • July: 4th of July • August: Driver Sober, Get Pulled Over Campaign • September: Driver Sober, Get Pulled Over Campaign City/county agencies will be operating within their normal jurisdictions but will coordinate their patrols and learnings through the monthly King County Target Zero Task Force meetings. While monthly dates have been identified for conducting this DUI enforcement, King County’s DUI Team will utilize crash data to inform whether the monthly dates should be adjusted, identify the times of day to deploy enforcement, and which roadways and locations within these jurisdictions to conduct the work. Crash data in King County show the following roadways problematic with regard to DUI crashes and had five or more DUI related crashes between 2018 and 2020: - I-5 - SR 18 - I-90 - SR 99 Tier 1 Cities (10+ DUIs) Tier 2 Cities (5-10 DUIs) • Auburn • Federal Way • Kent • Renton • SeaTac • Seattle • Shoreline • Tukwila • Burien • Issaquah • Kirkland • Bellevue • Redmond AGENDA ITEM #7. o) - 15th Ave – Seattle - SR 164 - SR 167 - SR 169 - I-405 - SR 515 - SR 516 - SR 522 - SR 900 - Airport Way S 2BMeasures • Number of agencies participating • Number of officers planning to deploy • Number of officers actually deployed • Number of arrests (non-DUI) • Number of DUI arrests • Type of DUI (drug, alcohol, poly) • Repeat offender • Refusal info • Number of contacts • Total number of hours worked The King County DUI Team will work within their own jurisdiction but in areas of these high crash data roadways listed above, officers will be coordinated and deployed to work these roadways during patrols. Officers chosen to work the HVE DUI enforcement events will be evaluated by their supervising agency and command staff as well as Target Zero Managers to meet the following targets and information gathering: • Officer’s current assignment at their agency • Approval from their agency and command/supervisory staff to work the enforcement events • Participation in King County Task Force or previous coordinated enforcement events • Specialized DUI enforcement training (ARIDE, Drug Recognition Officer certified, Standardized Field Sobriety Test (SFST) trained) Operation plans will be developed and submitted by either Region 7 or Region 8 Target Zero Manager to WTSC at least two weeks before the enforcement takes place. The operation plan will include date, time of patrols, which agencies will be working them, estimated funding to be spent during each emphasis, briefing information, media outreach in conjunction with WTSC state campaigns or using local police departments’ PIOs to disseminate the media releases. We will also provide a post operation plan which will include the work and results from each monthly enforcement AGENDA ITEM #7. o) 3BPublicity/Earned Media Efforts Publicity and media efforts associated with the impaired driving HVE events with a multi-pronged approach to include: • During HVE events a designated law enforcement officer point of contact will be established to ensure availability to quickly respond to media requests. • Press releases (English and Spanish) to support communications for at least 50% of the outlined HVE patrol events • Public Health – Seattle & King County (Public health Insider) blog posts to support at least 3 impaired driving related events • Facebook posts to support all HVE patrol events • We hope to support earned media for at least two of the impaired driving related events • Will develop a contact list of local participating agencies that can support media requests and inquiries during all scheduled HVE patrol events 4BVisibility Efforts TZMs will work with local organizations to support the visibility of all enforcement effort before the scheduled patrols. This may include using any of the following methods to support the visibility within the community: • Electronic message boards • Social media posts across all the participating police departments • Printed and posted brochure or flyers 5BMeasures • Number of Media requests responded to • Number of social media posts • Number of rack cards disseminated • Number of message boards posted in the community • Number of events attended AGENDA ITEM #7. o) Budget and Budget Narrative Tier 1 = 8 police departments 10 hours per month x $90 (officer OT average across departments) x 11 months Tier 1 = $9,900 estimated per department Auburn, Federal Way, Kent, Renton, SeaTac, Seattle, Shoreline, Tukwila Tier 2 = 5 police departments 6 hours per month x $90 (officer OT average across departments) x 11 months Tier 2 = $5,940 estimated per department: Bellevue, Burien, Issaquah, Kirkland, Redmond **$90 per hour estimate for OT costs across all participating police departments – some OT rates are lower and some are higher so $90 is the average OT rate** AGENDA ITEM #7. o) 3.1. MILESTONES AND DELIVERABLES Mobilization Dates Holiday DUI December 15, 2021 – January 1, 2022 U Drive. U Text. U Pay. April 4 – 11, 2022 It’s a Fine Line July 8 – 24, 2022 DUI Drive Sober or Get Pulled Over August 17 – September 5, 2022 3.2. COMPENSATION 3.2.1. Compensation for the overtime work provided in accordance with this Agreement has been established under the terms of RCW 39.34. The cost of accomplishing the work described in the SOW will not exceed dollar total from amounts listed below. Payment for satisfactory performance of the overtime work shall not exceed this amount unless the WTSC and SUB-RECIPIENT mutually agree to a higher amount in a written Amendment to this Agreement executed by both the WTSC and SUB-RECIPIENT. Comp-time is not considered overtime and will not be approved for payment. All law enforcement agencies who are active members of the Region 7/8 traffic safety task force with a fully executed grant agreement are eligible to participate in this grant. 3.2.2. WTSC will reimburse for personnel overtime expenses at 150 percent of the officer’s normal salary rate plus SUB-RECIPIENT’s contributions to employee benefits, limited to the following: • FICA • Medicare • Any portion of L & I that is paid by the employer (SUB-RECIPIENT) • Retirement contributions paid by the employer (SUB-RECIPIENT) can be included if the contribution is based on a percentage of their hours worked Health insurance, or any other benefits not listed above, are not eligible for reimbursement. The SUB-RECIPIENT will provide law enforcement officers with appropriate equipment (e.g., vehicles, radars, portable breath testers, etc.) to participate in the emphasis patrols. 3.2.3. Funding alterations are permitted as follows: Upon agreement by the regional TZM and all other parties impacted by a proposed budget alteration, the allocation amounts may be increased or decreased without amending this agreement. HVE grant funds should be managed collaboratively by the SUB- RECIPIENT and the TZM. These alterations must be requested through email communication among all involved parties, including the TZM, and the WTSC Fiscal Analyst. This communication shall include an HVE Allocation Adjustment form, which details the funding alterations. AGENDA ITEM #7. o) Funds within the same HVE campaign budget category only, can be increased and decreased across parties, so long as the modified total does not exceed the regional total allocation per funding category. 3.2.4. These funds, designated for salaries and benefits, are intended to pay for the hourly overtime costs and proportional amounts of fringe benefits of commissioned staff pursuing the activities described in the statement of work. These funds may not be used for any other purpose for example any work required to maintain a law enforcement commission including recertification trainings like firearm qualification. 3.2.5. Dispatch: WTSC will reimburse communications officers/dispatch personnel for work on this project providing SUB-RECIPIENT has received prior approval from their region’s TZM. This activity must be overtime and only the expenses listed in section 3.2 and its subsections will be reimbursed. 3.2.6. Transport Officers: WTSC will reimburse transport officers for their work on this project providing SUB-RECIPIENT has received approval from their regions TZM. The TZM will work with the regional LEL to determine if need is warranted for the type of HVE activity. This activity must be overtime and only the expenses listed in section 3.2 and its subsections will be reimbursed. 3.2.7. The law enforcement agency involved will not schedule individual officer overtime shifts for longer than eight hours. WTSC understands there may be instances when more than eight hours are billed due to DUI processing or other reasons and an explanation should be provided on the WEMS Officer Activity Log. 3.2.8. The law enforcement agency involved will ensure that any reserve officer for whom reimbursement is claimed has exceeded his/her normal weekly working hours when participating in an emphasis patrol and is authorized to be paid at the amount requested. Reserve officers may only be paid at the normal hourly rate and not at the 150 percent overtime rate. 3.3. SUMMARY OF PROJECT COSTS The WTSC has awarded $174,020.00 to the Region 7/8 Traffic Safety Task Force for the purpose of conducting coordinated overtime HVE activities. By signing this agreement, the SUB-RECIPIENT is able to seek reimbursement for approved overtime expenses incurred as a participant in this grant. All activity must be coordinated by the region’s traffic safety task force and TZM in order to be eligible for reimbursement. The funding for Region 7/8 is as follows: EMPHASIS PATROL Impaired Driving Patrols (Section 402, CFDA 20.600) $97,020.00 Distracted Driving Patrols (Section 402, CFDA 20.600) $49,000.00 Motorcycle Safety $28,000.00 AGENDA ITEM #7. o) (164 Funds, CFDA 20.608) TOTAL $174,020.00 3.3.1. The funds issued under this Agreement are only to be used for the specified category and shall not be commingled between categories. APPLICABLE STATE AND FEDERAL TERMS AND CONDITIONS: 4. ACTIVITY REPORTS The SUB-RECIPIENT agrees to have all personnel who work HVE patrols submit a WEMS Officer Activity Log within 24 hours of the end of all shifts worked. These same logs will be associated with invoices as detailed in the “BILLING PROCEDURE” section. Use of the Officer Activity Log in the WTSC’s online grant management system, WEMS, is required. Supervisor review and accuracy certification will also be done in WEMS. 5. ADVANCE PAYMENTS PROHIBITED No payments in advance of or in anticipation of goods or services to be provided under this Agreement shall be made by the WTSC. 6. AGREEMENT ALTERATIONS AND AMENDMENTS This Agreement may be amended by mutual agreement of the Parties in the form of a written request to amend this Agreement. Such amendments shall only be binding if they are in writing and signed by personnel authorized to bind each of the Parties. Changes to the budget, SUB-RECIPIENT’S Primary Contact, and WTSC Program Manager can be made through email communication and signatures are not required. 7. ALL WRITINGS CONTAINED HEREIN This Agreement contains all the terms and conditions agreed upon by the Parties. No other understandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed to exist or to bind any of the Parties hereto. 8. ASSIGNMENT The SUB-RECIPIENT may not assign the work to be provided under this Agreement, in whole or in part, without the express prior written consent of the WTSC, which consent shall not be unreasonably withheld. The SUB-RECIPIENT shall provide the WTSC a copy of all third-party contracts and agreements entered into for purposes of fulfilling the SOW. Such third-party contracts and agreements must follow applicable federal, state, and local law, including but not limited to procurement law, rules, and procedures. If any of the funds provided under this Agreement include funds from NHTSA, such third-party contracts and agreements must include the federal provisions set forth in this Agreement in sections 34 through 42. 9. ATTORNEYS’ FEES In the event of litigation or other action brought to enforce the Agreement terms, each Party agrees to bear its own attorney fees and costs. 10. BILLING PROCEDURE All invoices for reimbursement of HVE activities will be done using the WTSC’s grant management system, AGENDA ITEM #7. o) WEMS. WEMS Officer Activity logs will be attached to invoices, directly linking the cost of the activity to the invoice. Because the activity, approval, and invoicing are all done within WEMS, no back up documentation is required in most cases. Once submitted by the SUB-RECIPIENT, invoices are routed to the regional TZM for review and approval. The TZM will submit all approved invoices to the WTSC via WEMS within 10 days of receipt. Payment to the SUB-RECIPIENT for approved and completed work will be made by warrant or account transfer by WTSC within 30 days of receipt of such properly documented invoices acceptable to WTSC. Upon expiration of the Agreement, any claim for payment not already made shall be submitted within 45 days after the expiration date of this Agreement. All invoices for goods received or services performed on or prior to June 30, 2021, must be received by WTSC no later than August 10, 2022. All invoices for goods received or services performed between July 1, 2022 and September 30, 2022, must be received by WTSC no later than November 15, 2022. 11. CONFIDENTIALITY/SAFEGUARDING OF INFORMATION The SUB-RECIPIENT shall not use or disclose any information concerning the WTSC, or information which may be classified as confidential, for any purpose not directly connected with the administration of this Agreement, except with prior written consent of the WTSC, or as may be required by law. 12. COST PRINCIPLES Costs incurred under this Agreement shall adhere to provisions of 2 CFR Part 200 Subpart E. 13. COVENANT AGAINST CONTINGENT FEES The SUB-RECIPIENT warrants that it has not paid, and agrees not to pay, any bonus, commission, brokerage, or contingent fee to solicit or secure this Agreement or to obtain approval of any application for federal financial assistance for this Agreement. The WTSC shall have the right, in the event of breach of this section by the SUB-RECIPIENT, to annul this Agreement without liability. 14. DISPUTES 14.1. Disputes arising in the performance of this Agreement, which are not resolved by agreement of the Parties, shall be decided in writing by the WTSC Deputy Director or designee. This decision shall be final and conclusive, unless within 10 days from the date of the SUB-RECIPIENT’s receipt of WTSC’s written decision, the SUB-RECIPIENT furnishes a written appeal to the WTSC Director. The SUB-RECIPIENT’s appeal shall be decided in writing by the Director or designee within 30 days of receipt of the appeal by the Director. The decision shall be binding upon the SUB-RECIPIENT and the SUB-RECIPIENT shall abide by the decision. 14.2. Performance During Dispute. Unless otherwise directed by WTSC, the SUB-RECIPIENT shall continue performance under this Agreement while matters in dispute are being resolved. 15. GOVERNANCE 15.1. This Agreement is entered into pursuant to and under the authority granted by the laws of the state of Washington and any applicable federal laws. The provisions of this Agreement shall be construed to conform to those laws. AGENDA ITEM #7. o) 15.2. In the event of an inconsistency in the terms of this Agreement, or between its terms and any applicable statute or rule, the inconsistency shall be resolved by giving precedence in the following order: 15.2.1. Applicable federal and state statutes and rules 15.2.2. Terms and Conditions of this Agreement 15.2.3. Any Amendment executed under this Agreement 15.2.4. Any SOW executed under this Agreement 15.2.5. Any other provisions of the Agreement, including materials incorporated by reference 16. INCOME Any income earned by the SUB-RECIPIENT from the conduct of the SOW (e.g., sale of publications, registration fees, or service charges) must be accounted for, and that income must be applied to project purposes or used to reduce project costs. 17. INDEMNIFICATION 17.1. To the fullest extent permitted by law, the SUB-RECIPIENT shall indemnify and hold harmless the WTSC, its officers, employees, and agents, and process and defend at its own expense any and all claims, demands, suits at law or equity, actions, penalties, losses, damages, or costs of whatsoever kind (“claims”) brought against WTSC arising out of or in connection with this Agreement and/or the SUB-RECIPIENT’s performance or failure to perform any aspect of the Agreement. This indemnity provision applies to all claims against WTSC, its officers, employees, and agents arising out of, in connection with, or incident to the acts or omissions of the SUB-RECIPIENT, its officers, employees, agents, contractors, and subcontractors. Provided, however, that nothing herein shall require the SUB-RECIPIENT to indemnify and hold harmless or defend the WTSC, its agents, employees, or officers to the extent that claims are caused by the negligent acts or omissions of the WTSC, its officers, employees or agents; and provided further that if such claims result from the concurrent negligence of (a) the SUB-RECIPIENT, its officers, employees, agents, contractors, or subcontractors, and (b) the WTSC, its officers, employees, or agents, or involves those actions covered by RCW 4.24.115, the indemnity provisions provided herein shall be valid and enforceable only to the extent of the negligence of the SUB-RECIPIENT, its officers, employees, agents, contractors, or subcontractors. 17.2. The SUB-RECIPIENT waives its immunity under Title 51 RCW to the extent it is required to indemnify, defend, and hold harmless the WTSC, its officers, employees, or agents. 17.3. The indemnification and hold harmless provision shall survive termination of this Agreement. 18. INDEPENDENT CAPACITY The employees or agents of each Party who are engaged in the performance of this Agreement shall continue to be employees or agents of that Party and shall not be considered for any purpose to be employees or agents of the other Party. 19. INSURANCE COVERAGE 19.1. The SUB-RECIPIENT shall comply with the provisions of Title 51 RCW, Industrial Insurance, if required by law. AGENDA ITEM #7. o) 19.2. If the SUB-RECIPIENT is not required to maintain insurance in accordance with Title 51 RCW, prior to the start of any performance of work under this Agreement, the SUB-RECIPIENT shall provide WTSC with proof of insurance coverage (e.g., vehicle liability insurance, private property liability insurance, or commercial property liability insurance), as determined appropriate by WTSC, which protects the SUB- RECIPIENT and WTSC from risks associated with executing the SOW associated with this Agreement. 20. LICENSING, ACCREDITATION, AND REGISTRATION The SUB-RECIPIENT shall comply with all applicable local, state, and federal licensing, accreditation, and registration requirements and standards necessary for the performance of this Agreement. The SUB- RECIPIENT shall complete registration with the Washington State Department of Revenue, if required, and be responsible for payment of all taxes due on payments made under this Agreement. 21. RECORDS MAINTENANCE 21.1. During the term of this Agreement and for six years thereafter, the SUB-RECIPIENT shall maintain books, records, documents, and other evidence that sufficiently and properly reflect all direct and indirect costs expended in the performance of the services described herein. These records shall be subject to inspection, review, or audit by authorized personnel of the WTSC, the Office of the State Auditor, and federal officials so authorized by law. All books, records, documents, and other material relevant to this Agreement will be retained for six years after expiration. The Office of the State Auditor, federal auditors, the WTSC, and any duly authorized representatives shall have full access and the right to examine any of these materials during this period. 21.2. Records and other documents, in any medium, furnished by one Party to this Agreement to the other Party, will remain the property of the furnishing Party, unless otherwise agreed. The receiving Party will not disclose or make available this material to any third Parties without first giving notice to the furnishing Party and giving them a reasonable opportunity to respond. Each Party will utilize reasonable security procedures and protections to assure that records and documents provided by the other Party are not erroneously disclosed to third Parties. 22. RIGHT OF INSPECTION The SUB-RECIPIENT shall provide right of access to its facilities to the WTSC or any of its officers, or to any other authorized agent or official of the state of Washington or the federal government, at all reasonable times, in order to monitor and evaluate performance, compliance, and/or quality assurance under this Agreement. The SUB-RECIPIENT shall make available information necessary for WTSC to comply with the right to access, amend, and receive an accounting of disclosures of their Personal Information according to the Health Insurance Portability and Accountability Act of 1996 (HIPAA) or any regulations enacted or revised pursuant to the HIPAA provisions and applicable provisions of Washington State law. The SUB- RECIPIENT shall upon request make available to the WTSC and the United States Secretary of the Department of Health and Human Services all internal policies and procedures, books, and records relating to the safeguarding, use, and disclosure of Personal Information obtained or used as a result of this Agreement. 23. RIGHTS IN DATA 23.1. WTSC and SUB-RECIPIENT agree that all data and work products (collectively called “Work Product”) pursuant to this Agreement shall be considered works made for hire under the U.S. Copyright Act, 17 USC AGENDA ITEM #7. o) §101 et seq., and shall be owned by the state of Washington. Work Product includes, but is not limited to, reports, documents, pamphlets, advertisement, books, magazines, surveys, studies, computer programs, films, tapes, sound reproductions, designs, plans, diagrams, drawings, software, and/or databases to the extent provided by law. Ownership includes the right to copyright, register the copyright, distribute, prepare derivative works, publicly perform, publicly display, and the ability to otherwise use and transfer these rights. 23.2. If for any reason the Work Product would not be considered a work made for hire under applicable law, the SUB-RECIPIENT assigns and transfers to WTSC the entire right, title, and interest in and to all rights in the Work Product and any registrations and copyright applications relating thereto and any renewals and extensions thereof. 23.3. The SUB-RECIPIENT may publish, at its own expense, the results of project activities without prior review by the WTSC, provided that any publications (written, visual, or sound) contain acknowledgment of the support provided by NHTSA and the WTSC. Any discovery or invention derived from work performed under this project shall be referred to the WTSC, who will determine through NHTSA whether patent protections will be sought, how any rights will be administered, and other actions required to protect the public interest. 24. SAVINGS In the event funding from state, federal, or other sources is withdrawn, reduced, or limited in any way after the effective date of this Agreement and prior to completion of the SOW under this Agreement, the WTSC may terminate the Agreement under the "TERMINATION FOR CONVENIENCE" clause, without the 30-day notice requirement. The Agreement is subject to renegotiation at the WTSC’s discretion under any new funding limitations or conditions. 25. SEVERABILITY If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid, such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid provision, if such remainder conforms to the requirements of applicable law and the fundamental purpose of this Agreement, and to this end the provisions of this Agreement are declared to be severable. 26. SITE SECURITY While on WTSC premises, the SUB-RECIPIENT, its agents, employees, or sub-contractors shall conform in all respects with all WTSC physical, fire, or other security policies and applicable regulations. 27. TAXES All payments of payroll taxes, unemployment contributions, any other taxes, insurance, or other such expenses for the SUB-RECIPIENT or its staff shall be the sole responsibility of the SUB-RECIPIENT. 28. TERMINATION FOR CAUSE If the SUB-RECIPIENT does not fulfill in a timely and proper manner its obligations under this Agreement or violates any of these terms and conditions, the WTSC will give the SUB-RECIPIENT written notice of such failure or violation, and may terminate this Agreement immediately. At the WTSC’s discretion, the SUB- AGENDA ITEM #7. o) RECIPIENT may be given 15 days to correct the violation or failure. In the event that the SUB-RECIPIENT is given the opportunity to correct the violation and the violation is not corrected within the 15-day period, this Agreement may be terminated at the end of that period by written notice of the WTSC. 29. TERMINATION FOR CONVENIENCE Except as otherwise provided in this Agreement, either Party may terminate this Agreement, without cause or reason, with 30 days written notice to the other Party. If this Agreement is so terminated, the WTSC shall be liable only for payment required under the terms of this Agreement for services rendered or goods delivered prior to the effective date of termination. 30. TREATMENT OF ASSETS 30.1. Title to all property furnished by the WTSC shall remain property of the WTSC. Title to all property furnished by the SUB-RECIPIENT for the cost of which the SUB-RECIPIENT is entitled to be reimbursed as a direct item of cost under this Agreement shall pass to and vest in the WTSC upon delivery of such property by the SUB-RECIPIENT. Title to other property, the cost of which is reimbursable to the SUB-RECIPIENT under this Agreement, shall pass to and vest in the WTSC upon (i) issuance for use of such property in the performance of this Agreement, or (ii) commencement of use of such property in the performance of this Agreement, or (iii) reimbursement of the cost thereof by the WTSC in whole or in part, whichever first occurs. 30.2. Any property of the WTSC furnished to the SUB-RECIPIENT shall, unless otherwise provided herein or approved by the WTSC, be used only for the performance of this Agreement. 30.3. The SUB-RECIPIENT shall be responsible for any loss or damage to property of the WTSC which results from the negligence of the SUB-RECIPIENT or which results from the failure on the part of the SUB- RECIPIENT to maintain and administer that property in accordance with sound management practices. 30.4. If any WTSC property is lost, destroyed, or damaged, the SUB-RECIPIENT shall immediately notify the WTSC and shall take all reasonable steps to protect the property from further damage. 30.5. The SUB-RECIPIENT shall surrender to the WTSC all property of the WTSC upon completion, termination, or cancellation of this Agreement. 30.6. All reference to the SUB-RECIPIENT under this clause shall also include SUB-RECIPIENT's employees, agents, or sub-contractors. 31. WAIVER A failure by either Party to exercise its rights under this Agreement shall not preclude that Party from subsequent exercise of such rights and shall not constitute a waiver of any other rights under this Agreement. APPLICABLE CERTIFICATIONS AND ASSURANCES FOR HIGHWAY SAFETY GRANTS (23 CFR PART 1300 APPENDIX A): AGENDA ITEM #7. o) 32. BUY AMERICA ACT The SUB-RECIPIENT will comply with the Buy America requirement (23 U.S.C. 313) when purchasing items using federal funds. Buy America requires the SUB-RECIPIENT to purchase only steel, iron, and manufactured products produced in the United States, unless the Secretary of Transportation determines that such domestically produced items would be inconsistent with the public interest, that such materials are not reasonably available and of a satisfactory quality, or that inclusion of domestic materials will increase the cost of the overall project contract by more than 25 percent. In order to use federal funds to purchase foreign produced items, the WTSC must submit a waiver request that provides an adequate basis and justification, and which is approved by the Secretary of Transportation. 33. DEBARMENT AND SUSPENSION Instructions for Lower Tier Certification 33.1. By signing this Agreement, the SUB-RECIPIENT (hereinafter in this section referred to as the “lower tier participant”) is providing the certification set out below and agrees to comply with the requirements of 2 CFR part 180 and 23 CFR part 1300. 33.2. The certification in this section is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the federal government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. 33.3. The lower tier participant shall provide immediate written notice to the WTSC if at any time the lower tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. 33.4. The terms covered transaction, debarment, suspension, ineligible, lower tier, participant, person, primary tier, principal, and voluntarily excluded, as used in this clause, have the meanings set out in the Definitions and Covered Transactions sections of 2 CFR part 180. 33.5. The lower tier participant agrees by signing this Agreement that it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by NHTSA. 33.6. The lower tier participant further agrees by signing this Agreement that it will include the clause titled “Instructions for Lower Tier Certification” including the “Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transaction,” without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions, and will require lower tier participants to comply with 2 CFR part 180 and 23 CFR part 1300. 33.7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that AGENDA ITEM #7. o) the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the List of Parties Excluded from Federal Procurement and Non-procurement Programs. 33.8. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 33.9. Except for transactions authorized under paragraph 35.5. of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, the department or agency with which this transaction originated may disallow costs, annul or terminate the transaction, issue a stop work order, debar or suspend you, or take other remedies as appropriate. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transactions 33.10. The lower tier participant certifies, by signing this Agreement, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. 33.11. Where the lower tier participant is unable to certify to any of the statements in this certification, such participant shall attach an explanation to this Agreement. 34. THE DRUG-FREE WORKPLACE ACT OF 1988 (41 U.S.C. 8103) 34.1. The SUB-RECIPIENT shall: 34.1.1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and shall specify the actions that will be taken against employees for violation of such prohibition. 34.1.2. Establish a drug-free awareness program to inform employees about the dangers of drug abuse in the workplace; the SUB-RECIPIENT’s policy of maintaining a drug-free workplace; any available drug counseling, rehabilitation, and employee assistance programs; and the penalties that may be imposed upon employees for drug violations occurring in the workplace. 34.1.3. Make it a requirement that each employee engaged in the performance of the grant be given a copy of the statement required by paragraph 36.1.1. of this section. 34.1.4. Notify the employee in the statement required by paragraph 36.1.1. of this section that, as a condition of employment under the grant, the employee will abide by the terms of the statement, notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five AGENDA ITEM #7. o) days after such conviction, and notify the WTSC within 10 days after receiving notice from an employee or otherwise receiving actual notice of such conviction. 34.1.5. Take one of the following actions within 30 days of receiving notice under paragraph 36.1.3. of this section, with respect to any employee who is so convicted: take appropriate personnel action against such an employee, up to and including termination, and/or require such employee to participate satisfactorily in a drug abuse assistance or rehabilitation program approved for such purposes by a federal, state, or local health, law enforcement, or other appropriate agency. 34.1.6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of all of the paragraphs above. 35. FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA) In accordance with FFATA, the SUB-RECIPIENT shall, upon request, provide WTSC the names and total compensation of the five most highly compensated officers of the entity, if the entity in the preceding fiscal year received 80 percent or more of its annual gross revenues in federal awards, received $25,000,000 or more in annual gross revenues from federal awards, and if the public does not have access to information about the compensation of the senior executives of the entity through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 or section 6104 of the Internal Revenue Code of 1986. 36. FEDERAL LOBBYING 36.1. The undersigned certifies, to the best of his or her knowledge and belief, that: 36.1.1. No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. 36.1.2. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form- LLL, Disclosure Form to Report Lobbying, in accordance with its instructions. 36.1.3. The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including sub-contracts, sub-grants, and contracts under grant, loans, and cooperative agreements), and that all sub-recipients shall certify and disclose accordingly. 36.2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the AGENDA ITEM #7. o) required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 37. NONDISCRIMINATION (Title VI, 42 U.S.C. § 2000d et seq.) 37.1. During the performance of this Agreement, the SUB-RECIPIENT agrees: 37.1.1. To comply with all federal nondiscrimination laws and regulations, as may be amended from time to time. 37.1.2. Not to participate directly or indirectly in the discrimination prohibited by any federal non- discrimination law or regulation, as set forth in Appendix B of 49 CFR Part 21 and herein. 37.1.3. To permit access to its books, records, accounts, other sources of information, and its facilities as required by the WTSC, USDOT, or NHTSA. 37.1.4. That, in the event a contractor/funding recipient fails to comply with any nondiscrimination provisions in this contract/funding Agreement, the WTSC will have the right to impose such contract/agreement sanctions as it or NHTSA determine are appropriate, including but not limited to withholding payments to the contractor/funding recipient under the contract/agreement until the contractor/funding recipient complies, and/or cancelling, terminating, or suspending a contract or funding agreement, in whole or in part. 37.1.5. To insert this clause, including all paragraphs, in every sub-contract and sub-agreement and in every solicitation for a sub-contract or sub-agreement that receives federal funds under this program. 38. POLITICAL ACTIVITY (HATCH ACT) The SUB-RECIPIENT will comply with provisions of the Hatch Act (5 U.S.C. 1501-1508), which limit the political activities of employees whose principal employment activities are funded in whole or in part with federal funds. 39. PROHIBITION ON USING GRANT FUNDS TO CHECK FOR HELMET USAGE The SUB-RECIPIENT will not use 23 U.S.C. Chapter 4 grant funds for programs to check helmet usage or to create checkpoints that specifically target motorcyclists. This Agreement does not include any aspects or elements of helmet usage or checkpoints, and so fully complies with this requirement. 40. STATE LOBBYING None of the funds under this Agreement will be used for any activity specifically designed to urge or influence a state or local legislator to favor or oppose the adoption of any specific legislative proposal pending before any state or local legislative body. Such activities include both direct and indirect (e.g., “grassroots”) lobbying activities, with one exception. This does not preclude a state official whose salary is supported with NHTSA funds from engaging in direct communications with state or local legislative officials, in accordance with customary state practice, even if such communications urge legislative officials to favor or oppose the adoption of a specific pending legislative proposal. 41. DESIGNATED CONTACTS AGENDA ITEM #7. o) The following named individuals will serve as designated contacts for each of the Parties for all communications, notices, and reimbursement regarding this Agreement: The Contact for the SUB- RECIPIENT is: The Target Zero Manager for Region 7/8 is: The Contact for WTSC is: Sara Wood Region 8 Target Zero Manager swood@kentwa.gov 253-856-5856 Hilary Torres WTSC Program Manager htorres@wtsc.wa.gov 360-725-9888 42. AUTHORITY TO SIGN The undersigned acknowledges that they are authorized to execute this Agreement and bind their respective agencies or entities to the obligation set forth herein. IN WITNESS WHEREOF, the parties have executed this Agreement. ________________________________________ Signature ________________________________________ Printed Name ________________________________________ Title ________________________________________ Date WASHINGTON TRAFFIC SAFETY COMMISSION ________________________________________ Signature ________________________________________ Printed Name ________________________________________ Title ________________________________________ Date AGENDA ITEM #7. o) AB - 3026 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: Regional Mobility Capital Construction Grant Agreement with the Washington State Department of Transportation for the Rainier Avenue South Corridor Improvements Project – Phase 4A RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Heather Gregersen, Program Development Coordinator EXT.: 7393 FISCAL IMPACT SUMMARY: The Transportation Systems Division was awarded funding through the Washington State Department of Transportation (WSDOT) for the Rainier Avenue South Corridor Improvements Project – Phase 4 (TIP No. 21- 26) in the amount of $2,000,000. There is no local match requirement at the time of obligation, although additional funds will be assigned when federal funding secured for the project becomes available in June 2022. SUMMARY OF ACTION: The City has been awarded a $2,000,000 grant award from the Washington State Department of Transportation (WSDOT) via the Regional Mobility Grant competition. Current funds assigned through this agreement reflect total funding appropriated by the Washington State Legislature for the project in the 2021- 2023 budget biennium to help fund construction of Phase 4 of the project that is set to begin in June 2022. The Rainier Avenue South Corridor Improvements - Phase 4 project (TIP #21-26) continues the infrastructure improvements to the Rainier Avenue South corridor between S 3rd St to NW 3rd Pl (approximately 1000 ft north of Airport Way). This phase includes infrastructure improvements for enhanced transit mobility and improved traffic and pedestrian safety by improving access and mobility for one of the busiest arterials in Renton. Project elements include sidewalk widening with streetscaping, adding a pedestrian actuated traffic signal, upgrading existing traffic signals, planted buffer strips, and landscaped medians. The Rainier Avenue South Corridor Improvements - Phase 4 project was awarded a Surface Transportation Program (STP) grant for Design in the amount of $2,600,000 in 2014 and another for Right of Way in the amount of $3,000,000 in 2020. EXHIBITS: A. Regional Mobility Capital Construction Grant Agreement STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute the Regional Mobility Capital Construction Grant Agreement in the amount of $2,000,000 with the Washington State Department of Transportation and all subsequent amendments to the agreements necessary to accomplish the Rainier Avenue South Corridor Improvements – Phase 4 project. AGENDA ITEM #7. p) WSDOT Contact: Jeff Petterson 360-705-7917 THIS AGREEMENT, entered into by the Washington State Department of Transportation, hereinafter “WSDOT,” and the Contractor identified above, hereinafter the “CONTRACTOR,” either of which may be referred to individually as the “PARTY” and collectively as the “PARTIES.” WHEREAS, the State of Washington in its Sessions Laws of 2021, Chapter 333 Section 220 authorizes funding for Public Transportation Programs and other special proviso funding as identified in the budget through its 2021-2023 biennial appropriations to WSDOT; and WHEREAS, WSDOT Public Transportation Division administers Regional Mobility Grant Program funds to provide assistance solely for transportation projects as identified in LEAP Transportation Document 2021-2 ALL PROJECT as developed on April 23, 2021, Program- Public Transportation Program (V); WHEREAS, the CONTRACTOR has requested funds for the project or program(s) shown under Section 1 (hereinafter known as the “Project”) which has been selected by WSDO T for funding assistance. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: Regional Mobility Grant Program Capital Construction Grant Agreement Agreement Number PTD0417 Contractor: Term of Agreement July 1, 2021 through June 30, 2023 City of Renton Vendor # SWV00122000 0 1055 S Grady Way CFDA # N/A Renton, WA 98057-3232 DUNS 092278894 Service Area As defined in Section 1 - Scope of Work and Budget Contact: Heather Gregersen 425-430-7393 City of Renton PTD0417 1 of 15 AGENDA ITEM #7. p) Section 1 Scope of Work and Budget Project Title: City of Renton - Rainier Avenue South Corridor Improvements – Phase 4A UPIN # 20210026 Project Limits (County or Counties): King Scope of Work: Continue construction of previous Rainier Ave. improvements and improve access and mobility between the Renton Growth Center and connections to regional transportation facilities of I-405, SR 167, SR 900, and the Tukwila Sounder Station. Includes construction of BAT lanes, transit facility upgrades and other improvements. Funds Federal Award Identification # Current Percentage Current Funds Projected Funds Total Current and Projected Funds Regional Mobility Funds N/A 16.67% $ 2,000,000 - $ 2,000,000 Contractor’s Funds N/A 83.33% $ 10,000,000 - $ 10,000,000 Total Project Cost N/A 100% $ 12,000,000 - $ 12,000,000 Budget: Current Funds reflect total funding appropriated by the Washington State Legislature for the Project in the 2021-2023 biennium. Projected Funds (if applicable) are subject to appropriation by the Washington State Legislature, once appropriated, funds will be added to this AGREEMENT by written amendment. Contractor’s Funds reflect the total commitment over the life of the Project. Project Milestones Note: The Project Milestone table is for planning purposes. While the total funding and match (contractor’s funds) must be maintained, funding may be moved to different phases as mutually agreed upon by both PARTIES. Phases Date Preliminary Engineering Start Date 01/2015 Right of Way Certification (if applicable) 06/2022 Contract Award Date 09/2022 Construction Operationally Completed 09/2024 City of Renton PTD0417 2 of 15 AGENDA ITEM #7. p) Section 2 Purpose of Agreement A. The purpose of this AGREEMENT is for WSDOT to provide capital funding to the CONTRACTOR for the design, acquisition, construction and/or improvements of capital facilities and infrastructure to be used in the provision of transportation services to persons in the State of Washington, referred to as the “Project.” Reference to the “Project” shall include all such capital facilities, infrastructure and/or associated equipment (“Equipment”) designed, acquired, constructed, improved or installed under this AGREEMENT. B. On projects where WSDOT is providing only state funds and the contractor is using funds received directly from the federal government as their share or part thereof on the project, the contractor must assume full responsibility for complying with all federal rules and regulations. If the contractor is found in non-compliance with federal rules and regulations, the contractor shall provide a written notification to WSDOT supplying details related to the non-compliance. Both PARTIES will analyze and determine the impact on the scope, schedule, and funding of the project. Remedies required up to and including return of funds will be identified to ensure the project’s scope of work is met as intended. Section 3 Scope of Project The CONTRACTOR agrees to perform the work and complete the Project as described and detailed in Section 1. The CONTRACTOR shall complete the Project within the project limits described Section 1. Section 4 General Compliance Assurance The CONTRACTOR agrees to comply with all instructions as prescribed in the Regional Mobility Grants Program Guidebook , hereinafter referred to as the “Guidebook”, and any amendments thereto, found at https://wsdot.wa.gov/transit/grants/apply-manage-your-grant, which by this reference is incorporated herein as if fully set forth in this AGREEMENT. The CONTRACTOR agrees that WSDOT, and/or any authorized WSDOT representative, shall have not only the right to monitor the compliance of the CONTRACTOR with respect to the provisions of this AGREEMENT but also have the right to seek judicial enforcement with regard to any matter arising under this AGREEMENT. Section 5 Term of Project The Project period of this AGREEMENT shall commence and terminate on the dates shown in the caption space header titled “Term of Agreement” regardless of the date of execution of this AGREEMENT, unless terminated as provided herein. The caption space header titled “Term of Agreement” and all caption space headers above are by this reference incorporated herein into the AGREEMENT as if fully set forth in the AGREEMENT. Section 6 State Review of Project WSDOT shall review the Project identified in this AGREEMENT as Section 1, at least semiannually to determine whether the Project is making satisfactory progress. If WSDOT has awarded funds, but the CONTRACTOR does not report satisfactory activity within one (1) year of the initial grant award, WSDOT shall review the Project to determine whether the grant should be terminated as provided in Section 34, Termination. City of Renton PTD0417 3 of 15 AGENDA ITEM #7. p) Section 7 Project Costs and Minimum Contractor’s Match Requirement A. The reimbursable costs of the Project shall not exceed the amounts detailed in Section 1. The CONTRACTOR agrees to expend eligible funds, together with other funds allocated for the Project, in an amount sufficient to complete the Project as detailed in Section 1. If at any time the CONTRACTOR becomes aware that the cost of the Project will exceed or be less than the amount identified in Section 1, the CONTRACTOR shall notify WSDOT in writing within thirty (30) calendar days of making that determination. B. The CONTRACTOR is required to provide a minimum match of funds for the Project as identified in Section 1 – Scope of Work and Budget, indicated as Contractor’s Funds. Any reduction in match will result in a proportional reduction in grant funds. Section 8 Inspection of the Project The CONTRACTOR shall inspect any Project Equipment purchased pursuant to this AGREEMENT at the time of delivery to the CONTRACTOR. The CONTRACTOR has 15 calendar days from delivery to either accept or reject the Project Equipment. If rejected, the CONTRACTOR shall provide a written notice specifying the Project Equipment deficiencies to its vendor and WSDOT, allowing the vendor a reasonable amount of time to cure the deficiencies or defect. Upon receipt and acceptance of Project Equipment, the CONTRACTOR agrees that it has fully inspected the Project Equipment and accepts it as suitable for the purpose under this AGREEMENT, as being in good condition and state of good repair, and that the CONTRACTOR is satisfied with the Project Equipment and that the Project Equipment complies with all applicable regulations, rules, and laws. Payment to the vendor must occur within thirty days of the Project Equipment acceptance. Section 9 Use of Park and Ride Facilities In order to be eligible to receive a Regional Mobility grant, a transit agency must establish a process for private transportation providers to apply for the use of park and ride facilities. Tier and Consolidated Grant funded projects are explicitly excluded from the provisions of Section 9-Use of Park and Ride Facilities. Section 10 Miscellaneous Charges and Conditions The CONTRACTOR shall pay and be solely responsible for all storage charges, parking charges, late fees, and fines, as well as any fees and taxes, except applicable state sales or use tax, which may be imposed with respect to the Project by a duly constituted governmental authority as the result of the CONTRACTOR’s use or intended use of the Project. All replacements, repairs, or substitutions of parts or Project Equipment shall be at the cost and expense of the CONTRACTOR. Section 11 Payment A. State and/or federal funds may be used to reimburse the CONTRACTOR for allowable expenses incurred in completing the Project as described in Section 1. Allowable Project expenses shall be determined by WSDOT as described in the Guidebook, and any amendments thereto. In no event shall the total amount reimbursed by WSDOT exceed the Total Project Cost, less any Contractor’s Funds, identified in Section 1. B. Payment will be made by WSDOT on a reimbursable basis for actual net Project costs incurred within the timeframe in the caption space titled “Term of Agreement.” Such costs to be reimbursed shall be calculated as described in the Guidebook, and any amendments thereto. WSDOT shall make no payments for costs incurred prior to the beginning or after the end date of City of Renton PTD0417 4 of 15 AGENDA ITEM #7. p) the “Term of Agreement” as set forth in the caption space header above. The CONTRACTOR shall submit an invoice detailing and supporting the costs incurred. Such invoices may be submitted no more than once a month and no less than once per quarter. If approved by WSDOT, said invoices shall be paid by WSDOT within thirty (30) days of submission to WSDOT. Payment is subject to the submission to and approval by WSDOT of appropriate invoices, reports, and financial summaries. Any financial summaries submitted to WSDOT must include a record of the actual costs. C. The CONTRACTOR shall submit an invoice for completed work in the same state fiscal period, as defined in RCW 43.88, starting on July 1 and ending on June 30 the following year within the timeframe set forth in the caption space header of this AGREEMENT entitled “Term of Agreement” during which the work was performed. Reimbursement requests must be received by July 15 of each state fiscal period. If the CONTRACTOR is unable to provide an invoice by this date, the CONTRACTOR shall provide an estimate of the charges to be billed so WSDOT may accrue the expenditures in the proper fiscal period. Any subsequent reimbursement request submitted will be limited to the amount accrued as set forth in this section. Any payment request received after the timeframe prescribed above will not be eligible for reimbursement. Section 12 Assignments, Subcontracts, and Leases A. The CONTRACTOR shall submit to WSDOT a copy of any contract, amendment, or change order thereto pertaining to this Project for review and documentation. This includes any completed Project facilities and/or infrastructure under this AGREEMENT, or other actions obligating the CONTRACTOR in any manner with any third party with respect to its rights and responsibilities under this AGREEMENT, including any leasing and/or lending the Project or any part thereof to be used by anyone not under the CONTRACTOR’s direct supervision. B. The CONTRACTOR agrees to include all applicable sections of the AGREEMENT such as Section 4, Sections 12 through 26 and Section 30, Section 33 and Section 34 of this AGREEMENT in each subcontract and in all contracts it enters into for the employment of any individuals, procurement of any materials, or the performance of any work to be accomplished under this AGREEMENT. Section 13 Reports and Project Use A. The CONTRACTOR agrees that the Project shall be used for the provision of transportation services within the area indicated in Section 1 for the term of the Project plus four years after the project is complete, as set forth in the Guidebook, and any amendments thereto. The CONTRACTOR further agrees that it will not use or permit the use of the Project in a negligent manner or in violation of any applicable law, or so as to avoid any insurance covering the same, or permit the Project to become subject to any lien, charge, or encumbrance. Should the CONTRACTOR unreasonably delay or fail to use the Project during the Project term and reporting period, the CONTRACTOR agrees that it may be required to refund up to the entire amount of the “State and/or Federal Funds” expended on the Project. The CONTRACTOR shall immediately notify WSDOT when any Project facilities and/or infrastructure is withdrawn from Project use or when the Project or any part thereof is used in a manner substantially different from that identified in Section 1. If the Project is permanently removed from transportation services, the CONTRACTOR agrees to immediately notify WSDOT of its intentions regarding the disposal of the Project or any part of the Project thereof. B. Reports. The CONTRACTOR shall submit quarterly reports to WSDOT for the Term of Project, regarding the progress of the Project. If this is a Regional Mobility or Transit project (TIER), annual performance reports for four calendar years after the project is operationally complete, as prescribed in the Guidebook, and any amendments thereto, or as WSDOT may require, including, City of Renton PTD0417 5 of 15 AGENDA ITEM #7. p) but not limited to, interim and annual reports. The CONTRACTOR shall keep satisfactory written records with regard to the use of Project and shall submit the following reports to, and in a form and at such times prescribed by WSDOT as set forth in the Guidebook, and any subsequent amendments thereto: 1. A draft Performance Measurement Plan (PMP) must be submitted to WSDOT before submitting the first reimbursement request. If the contractor does not submit a PMP and is nonresponsive to requests from WSDOT for improvements and information, the contractor may be deemed out of compliance. 2. An Annual Performance Report that includes a summary of overall project performance and supporting data. 3. Reports describing the current usage of the Project and other data which WSDOT may request from the CONTRACTOR by memos, e-mails or telephone requests. 4. In the event any portion of the Project sustains disabling damage, the CONTRACTOR shall notify WSDOT immediately after the occasion of the damage, including the circumstances thereof. 5. The CONTRACTOR shall collect and submit to WSDOT, at such time as WSDOT may require, such financial statements, data, records, contracts, and other documents related to the Project as may be deemed necessary by WSDOT. C. Remedies for Misuse or Noncompliance. If WSDOT determines that the Project has been used in a manner materially different from Section 1, WSDOT may direct the CONTRACTOR to repay WSDOT the State funded share of the Project. WSDOT may also withhold payments should it determine that the CONTRACTOR has failed to materially comply with any provision of this AGREEMENT. Section 14 Maintenance of the Project The CONTRACTOR shall make all necessary repairs and reasonably maintain the Project to assure it remains in good and operational condition until the end of its useful life. The useful life of a constructed project is determined based on the Architectural/Engineering requirements for each type of structure, materials used, industry standards, and other federal and/or state standards and specifications. All service, materials, and repairs in connection with the use and operation of the Project during its useful life shall be at the CONTRACTOR’s expense. CONTRACTORS who are transit agencies must also have a Transit Asset Management Plan certified by WSDOT that details the transit agency’s plan to maintain the Project. All other CONTRACTORS must submit a written Maintenance Plan to WSDOT for approval prior to the occupation and/or operations of the Project. The CONTRACTOR agrees, at a minimum, to maintain the Project and service or replace parts at intervals recommended in the manuals and/or instructions provided by the subcontractors and/or component manufacturers, or sooner if needed. The CONTRACTOR shall have the Project routinely inspected and make arrangements for any appropriate service and repair under the manufacturer’s warranty, if applicable. WSDOT shall not be liable for repairs. The CONTRACTOR shall retain records of all maintenance and parts replacement performed on the Project in accordance with Section 22, Audits, Inspection, and Retention of Records. The CONTRACTOR shall provide copies of such records to WSDOT, upon request. Section 15 Compliance with State Design Standards The CONTRACTOR agrees the Project design must comply with all applicable Washington State Standard Specifications for Road, Bridge, and Municipal Construction, and any applicable revisions thereto. Projects that wish to use design standards that differ from state standards must submit a request to WSDOT’s Public Transportation Division and obtain documented approval before design work commences. City of Renton PTD0417 6 of 15 AGENDA ITEM #7. p) Section 16 No Obligation by the State Government No contract between the CONTRACTOR and its subcontractors shall create any obligation or liability of WSDOT with regard to this AGREEMENT without WSDOT’s specific written consent, notwithstanding its concurrence in, or approval of, the award of any contract or subcontract or the solicitations thereof and the CONTRACTOR hereby agrees to include this provision in all contracts it enters into for the design, acquisition, and construction of facilities and/or infrastructure related to the Project, or the performance of any work to be accomplished under this AGREEMENT. Section 17 Ethics A. Relationships with Employees and Officers of WSDOT. The CONTRACTOR shall not extend any loan, gratuity or gift of money in any form whatsoever to any employee or officer of WSDOT, nor shall the CONTRACTOR knowingly rent or purchase any Project equipment and materials from any employee or officer of WSDOT. B. Employment of Former WSDOT Employees. The CONTRACTOR hereby warrants that it shall not employ on a full, part-time, or other basis during the period of this AGREEMENT, any professional or technical personnel who are, or have been, at any time during the period of this AGREEMENT, in the employ of WSDOT without written consent of WSDOT. Section 18 Compliance with Laws and Regulations The CONTRACTOR agrees to abide by all applicable state and federal laws and regulations including but not limited to, those concerning employment, equal opportunity employment, nondiscrimination assurances, project record keeping necessary to evidence compliance with such federal and state laws and regulations, and retention of all such records. The CONTRACTOR will adhere to all applicable nondiscrimination provisions in Chapter 49.60 RCW. Except when a federal statute or regulation pre-empts state or, local law, no provision of this AGREEMENT shall require the CONTRACTOR to observe or enforce compliance with any provision, perform any other act, or do any other thing in contravention of state or local law. Thus if any provision or compliance with any provision of this AGREEMENT violates state, or local law, or would require the CONTRACTOR to violate state or local law, the CONTRACTOR agrees to notify WSDOT immediately in writing. Should this occur, WSDOT and the CONTRACTOR agree to make appropriate arrangements to proceed with or, if necessary, expeditiously, terminate the Project. Section 19 Labor Provisions Overtime Requirements. No CONTRACTOR or subcontractor contracting for any part of the Project work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty (40) hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty (40) hours in such workweek. CONTRACTOR will comply with all applicable provisions of Title 49 RCW, Labor Regulations. Section 20 Environmental Requirements and Archeological Preservation The CONTRACTOR agrees to comply with all applicable requirements of chapter 43.21C RCW “State Environmental Policy Act” (SEPA). The CONTRACTOR also agrees to comply with all applicable requirements of Executive Order 05-05, Archeological and Cultural Resources, for all capital construction projects or land acquisitions for the purpose of a capital construction project, not undergoing Section 106 review under the National Historic Preservation Act of 1966 (Section 106). City of Renton PTD0417 7 of 15 AGENDA ITEM #7. p) Section 21 Accounting Records A. Project Accounts. The CONTRACTOR agrees to establish and maintain for the Project either a separate set of accounts or separate accounts within the framework of an established accounting system that can be identified with the Project. The CONTRACTOR agrees that all checks, payrolls, invoices, contracts, vouchers, orders, or other accounting documents pertaining in whole or in part to the Project shall be clearly identified, readily accessible and available to WSDOT upon request, and, to the extent feasible, kept separate from documents not pertaining to the Project. B. Documentation of Project Costs and Program Income. The CONTRACTOR agrees to support all allowable costs charged to the Project, including any approved services contributed by the CONTRACTOR or others, with properly executed payrolls, time records, invoices, contracts, or vouchers describing in detail the nature and propriety of the charges. The CONTRACTOR also agrees to maintain accurate records of all program income derived from implementing the Project. Section 22 Audits, Inspection, and Retention of Records A. Submission of Proceedings, Contracts, Agreements, and Other Documents. During the term of the Project and for six (6) years thereafter, the CONTRACTOR agrees to retain intact and to provide any data, documents, reports, records, contracts, and supporting materials relating to the Project as WSDOT may require. Project closeout does not alter these recording and record- keeping requirements. Should an audit, enforcement, or litigation process be commenced, but not completed, during the aforementioned six (6) year period then the CONTRACTOR’s obligations hereunder shall be extended until the conclusion of that pending audit, enforcement, or litigation process. B. General Audit Requirements. The CONTRACTOR agrees to obtain any other audits required by WSDOT at CONTRACTOR’s expense. Project closeout will not alter the CONTRACTOR’s audit responsibilities. C. Inspection. The CONTRACTOR agrees to permit WSDOT, and the State Auditor, or their authorized representatives, to inspect all Project work materials, payrolls, maintenance records, and other data, and to audit the books, records, and accounts of the CONTRACTOR and its contractors pertaining to the Project. The CONTRACTOR agrees to require each third party contractor to permit WSDOT, the State Auditor, or their duly authorized representatives, to inspect all work, materials, payrolls, maintenance records, and other data and records involving that third party contract, and to audit the books, records, and accounts involving that third party contract as it affects the Project. Section 23 Permitting The CONTRACTOR agrees to be solely responsible for all required Federal, State and/or local permitting as related to the Project. Section 24 Loss or Damage to the Project A. The CONTRACTOR, at its own expense, shall cover any loss, theft, damage, or destruction of the Project’s facilities, associated equipment and/or infrastructure using either of the following methods: 1. The CONTRACTOR shall maintain property insurance for facilities, associated equipment and/or infrastructure adequate to cover the value of the Project; the CONTRACTOR shall supply a copy of the Certificate of Insurance specifying such coverage to WSDOT with the first request for reimbursement, and supply proof of renewal annually thereafter; or City of Renton PTD0417 8 of 15 AGENDA ITEM #7. p) 2. The CONTRACTOR shall certify that it has self-insurance and provide a written certificate of self-insurance to WSDOT with the first request for reimbursement, and annually thereafter. The CONTRACTOR will cover from its own resources the costs of repairing or replacing any Project facilities, associated equipment and/or infrastructure, if it is stolen, damaged, or destroyed in any manner. B. If the damage to the Project does not result in a total loss, payments for damage shall be paid directly to the CONTRACTOR. The CONTRACTOR shall, within thirty (30) days, either: 1. Devote all of the insurance proceeds received to repair the Project and place it back in service, and the CONTRACTOR shall, at its own expense, pay any portion of the cost of repair which is not covered by insurance; or 2. In the event the CONTRACTOR certified to self- insurance, devote all funds necessary to repair the Project and place it back into service. C. If the Project is a total loss, either by theft or damage, the insurance proceeds or equivalent shall be paid directly to the CONTRACTOR and within fifteen (15) days the CONTRACTOR shall pay WSDOT its proportionate funded share of such proceeds received. The CONTRACTOR shall within sixty (60) days of loss, theft, or damage, notify WSDOT that it either: 1. Intends to replace the lost Project facilities, associated equipment and/or infrastructure; or 2. Does not intend to replace the lost Project facilities, associated equipment and/or infrastructure. D. If the CONTRACTOR intends to replace the Project facilities, associated equipment and/or infrastructure then WSDOT will reimburse the CONTRACTOR upon receipt of an approved invoice, funds up to the amount WSDOT received in insurance proceeds. E. Coverage, if obtained or provided by the CONTRACTOR in compliance with this section, shall not be deemed as having relieved the CONTRACTOR of any liability in excess of such coverage as required by the limitation of liability section of this AGREEMENT, or otherwise. Section 25 Liens on the Project WSDOT shall be listed as the legal owner on titles and hold titles for all vehicles the CONTRACTOR acquires using federal funds through WSDOT’s grant program. WSDOT will have legal ownership to any non-vehicle Project Equipment the CONTRACTOR acquires or modifies using the “Federal and/or State Funds” identified in Section 1. For the purposes of this Agreement, equipment shall mean all tangible, nonexpendable, personal property that has a service life of more than one year and an acquisition and installation cost of $5,000 or more per unit. If the Contractor acquires vehicles using state funds provided through WSDOT’s grant program, WSDOT may within its discretion, allow the CONTRACTOR to be listed as the legal owner and hold title. In all cases, WSDOT will maintain a copy of titles for all funded vehicles under this agreement and oversight responsibility on those vehicles through their minimum useful life. The CONTRACTOR has legal title to the Project and any portion thereof during its useful life as set forth in this Section and agrees that it shall not use the Project or any portion thereof as collateral, nor shall the CONTRACTOR encumber the Project in any way without the consent of WSDOT, which consent shall not be unreasonably witheld or delayed. If the CONTRACTOR determines to discontinue use of the Project before the end of its useful life, it shall consult with WSDOT as to appropriate isposition alternatives, including transferring the use of the Project to another agency for purposes consistent with the original grant award or reimbursing WSDOT for its proportional State funded share of the disposal price. The CONTRACTOR shall follow the terms stated in Section 12A regarding use and disposal of the Project and/or any portion thereof. City of Renton PTD0417 9 of 15 AGENDA ITEM #7. p) Section 26 Limitation of Liability A. The CONTRACTOR shall indemnify, defend, and hold WSDOT, its agents, employees, and officers harmless from and process and defend at its own expense any and all claims, demands, suits at law or equity, actions, penalties, losses, damages, or costs (hereinafter referred to collectively as “claims”), of whatsoever kind or nature brought against WSDOT arising out of, in connection with or incident to this AGREEMENT and/or the CONTRACTOR’s performance or failure to perform any aspect of this AGREEMENT. This indemnity and defense provision applies to all claims against WSDOT, its agents, employees and officers arising out of, in connection with or incident to the negligent acts or omissions of the CONTRACTOR, its agents, employees, officers and subcontractors of any tier. Provided, however, that nothing herein shall require the CONTRACTOR to indemnify, defend, and hold harmless or defend WSDOT, its agents, employees or officers to the extent that claims are caused by the negligent acts or omissions of WSDOT, its agents, employees or officers; and provided further that if such claims result from the concurrent negligence of (a) the CONTRACTOR its employees, agents, officers or contractors and (b) the STATE, its employees or authorized agents, or involves those actions covered by RCW 4.24.115, the indemnity and defense provisions provided herein shall be valid and enforceable only to the extent of the negligence of the CONTRACTOR, its employees, officers, authorized agents, and/or contractors. The indemnification and hold harmless provision shall survive termination of this AGREEMENT. B. The CONTRACTOR shall be deemed an independent contractor for all purposes, and the employees of the CONTRACTOR or its subcontractors and the employees thereof, shall not in any manner be deemed to be employees of WSDOT. C. The CONTRACTOR agrees that its obligations under this AGREEMENT extend to any claim, demand, and/or cause of action by, or on behalf of its employees or agents while performing under this AGREEMENT. For this purpose, the CONTRACTOR, by MUTUAL NEGOTIATION, hereby waives any immunity that would otherwise be available to it against such claims under the Industrial Insurance provisions in Title 51 RCW. D. In the event either the CONTRACTOR or WSDOT incurs attorney’s fees, costs or other legal expenses to enforce the provisions of this section of this AGREEMENT against the other PARTY, all such fees, costs and expenses shall be recoverable by the prevailing PARTY. Section 27 Personal Liability of Public Officers No officer or employee of WSDOT shall be personally liable for any acts or failure to act in connection with this AGREEMENT, it being understood that in such matters he or she is acting solely as an agent of WSDOT. Section 28 WSDOT Advice The CONTRACTOR bears complete responsibility for the administration and success of the Project as it is defined by this AGREEMENT and any amendments thereto. If the CONTRACTOR solicits advice from WSDOT on problems that may arise, the offering of WSDOT advice shall not shift the responsibility of the CONTRACTOR for the correct administration and success of the Project, and WSDOT shall not be held liable for offering advice to the CONTRACTOR. Section 29 Forbearance by WSDOT Not a Waiver Any forbearance by WSDOT in exercising any right or remedy hereunder, or otherwise afforded by applicable law, shall not be a waiver of or preclude the exercise of any such right or remedy. City of Renton PTD0417 10 of 15 AGENDA ITEM #7. p) Section 30 Lack of Waiver In no event shall any WSDOT payment of funds to the CONTRACTOR constitute or be construed as a waiver by WSDOT of any CONTRACTOR breach, or default. Such payment shall in no way impair or prejudice any right or remedy available to WSDOT with respect to any breach or default Section 31 Changed Conditions Affecting Performance The CONTRACTOR hereby agrees to immediately notify WSDOT of any change in conditions or law, or of any other event, which may affect its ability to perform the Project in accordance with the provisions of this AGREEMENT. Section 32 Agreement Modifications Either PARTY may request changes to this AGREEMENT. Any changes to the terms of this AGREEMENT must be mutually agreed upon and incorporated by written amendment to this AGREEMENT. Such written amendment to this AGREEMENT shall not be binding or valid unless signed by persons authorized to bind each of the PARTIES. Provided, however, that changes to the federal award identification number, DUNS, project title, federal ID number, CFDA number, milestones, UPIN the contact person of either PARTY, or dollar amount changes that do not affect the Project total cost, will not require a written amendment, but will be approved and documented by WSDOT through an administrative revision. WSDOT shall notify the CONTRACTOR of the revision in writing. Section 33 Disputes A. Disputes. Disputes, arising in the performance of this AGREEMENT, which are not resolved by agreement of the PARTIES, shall be decided in writing by the WSDOT Public Transportation Division’s Assistant Director or designee. This decision shall be final and conclusive unless within ten (10) days from the date of CONTRACTOR’S receipt of WSDOT’s written decision, the CONTRACTOR mails or otherwise furnishes a written appeal to the Director of the Public Transportation Division or the Director’s designee. The CONTRACTOR’s appeal shall be decided in writing by the Director of the Public Transportation Division within thirty (30) days of receipt of the appeal by the Director of the Public Transportation Division or the Director’s designee. The decision shall be binding upon the CONTRACTOR and the CONTRACTOR shall abide by the decision. B. Performance During Dispute. Unless otherwise directed by WSDOT, CONTRACTOR shall continue performance under this AGREEMENT while matters in dispute are being resolved. C. Claims for Damages. Should either PARTY to this AGREEMENT suffer injury or damage to person, property, or right because of any act or omission of the other PARTY or any of that PARTY’s employees, agents or others for whose acts it is legally liable, a claim for damages therefore shall be made in writing to such other PARTY within thirty (30) days after the first observance of such injury or damage. D. Rights and Remedies. All remedies provided in this AGREEMENT are distinct and cumulative to any other right or remedy under this document or afforded by law or equity, and may be exercised independently, concurrently, or successively and shall not be construed to be a limitation of any duties, obligations, rights and remedies of the PARTIES hereto. No action or failure to act by WSDOT or CONTRACTOR shall constitute a waiver of any right or duty afforded any of them under this AGREEMENT, nor shall any such action or failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically agreed in writing. City of Renton PTD0417 11 of 15 AGENDA ITEM #7. p) Section 34 Termination A. Termination for Convenience. WSDOT and/or the CONTRACTOR may suspend or terminate this AGREEMENT, in whole or in part, and all or any part of the financial assistance provided herein, at any time by written notice to the other PARTY. WSDOT and the CONTRACTOR shall agree upon the AGREEMENT termination provisions including but not limited to the settlement terms, conditions, and in the case of partial termination the portion to be terminated. Written notification must set forth the reasons for such termination, the effective date, and in case of a partial termination the portion to be terminated. However, if, in the case of partial termination, WSDOT determines that the remaining portion of the award will not accomplish the purposes for which the award was made, WSDOT may terminate the award in its entirety. The PARTIES may terminate this AGREEMENT for convenience for reasons including, but not limited to, the following: 1. The requisite funding becomes unavailable through failure of appropriation or otherwise; 2. WSDOT determines, in its sole discretion, that the continuation of the Project would not produce beneficial results commensurate with the further expenditure of funds; 3. The CONTRACTOR is prevented from proceeding with the Project as a direct result of an Executive Order of the President with respect to the prosecution of war or in the interest of national defense; or an Executive Order of the President or Governor of the State with respect to the preservation of energy resources; 4. The CONTRACTOR is prevented from proceeding with the Project by reason of a temporary preliminary, special, or permanent restraining order or injunction of a court of competent jurisdiction where the issuance of such order or injunction is primarily caused by the acts or omissions of persons or agencies other than the CONTRACTOR; or 5. The State Government or WSDOT determines that the purposes of the statute authorizing the Project would not be adequately served by the continuation of financial assistance for the Project. 6. In the case of termination for convenience under subsections A.1-5 above, WSDOT shall reimburse the CONTRACTOR for all costs payable under this AGREEMENT that the CONTRACTOR properly incurred prior to termination. The CONTRACTOR shall promptly submit its claim for reimbursement to WSDOT. If the CONTRACTOR has any property in its possession belonging to WSDOT, the CONTRACTOR will account for the same, and dispose of it in the manner WSDOT directs. B. Termination for Default. WSDOT may suspend or terminate this AGREEMENT for default, in whole or in part, and all or any part of the financial assistance provided herein, at any time by written notice to the CONTRACTOR, if the CONTRACTOR materially breaches or fails to perform any of the requirements of this AGREEMENT, including: 1. Take any action pertaining to this AGREEMENT without the approval of WSDOT, which under the procedures of this AGREEMENT would have required the approval of WSDOT; 2. Jeopardizes its ability to perform pursuant to this AGREEMENT, United States of America laws, Washington state laws, or local governmental laws under which the CONTRACTOR operates; 3. Failure to perform the Project or any part thereof including, but not limited to: a) Failure to build the Project according to the design specifications and all applicable building code required standards; b) Failure to remedy all material defects in the performance of the Project and correct all faulty workmanship by the CONTRACTOR or its subcontractors in a timely manner; c) Failure to take any necessary and reasonable action which could affect the ability of the Project to perform its designated function or takes any action which could shorten its useful life for Project use or otherwise; or d) Failure to make reasonable and appropriate use of the Project real property, facilities, equipment and/or infrastructure. 4. Fails to make reasonable progress on the Project or other violation of this AGREEMENT that endangers substantial performance of the Project; or City of Renton PTD0417 12 of 15 AGENDA ITEM #7. p) 5. Fails to perform in the manner called for in this AGREEMENT, or fails, to comply with or, is in material violation of, any provision of this AGREEMENT. WSDOT shall serve a notice of termination on the CONTRACTOR setting forth the manner in which the CONTRACTOR is in default hereunder. If it is later determined by WSDOT that the CONTRACTOR had an excusable reason for not performing, such as events which are not the fault of or are beyond the control of the CONTRACTOR, such as a strike, fire or flood, WSDOT may: a) allow the CONTRACTOR to continue work after setting up a new delivery of performance schedule, or b) treat the termination as a termination for convenience. C. WSDOT, in its sole discretion may, in the case of a termination for breach or default, allow the CONTRACTOR ten (10) business days, or such longer period as determined by WSDOT, in which to cure the defect. In such case, the notice of termination will state the time period in which cure is permitted and other appropriate conditions. If the CONTRACTOR fails to remedy to WSDOT's satisfaction the breach or default within the timeframe and under the conditions set forth in the notice of termination, WSDOT shall have the right to terminate this AGREEMENT without any further obligation to CONTRACTOR. Any such termination for default shall not in any way operate to preclude WSDOT from also pursuing all available remedies against CONTRACTOR and its sureties for said breach or default. D. In the event that WSDOT elects to waive its remedies for any breach by CONTRACTOR of any covenant, term or condition of this AGREEMENT, such waiver by WSDOT shall not limit WSDOT's remedies for any succeeding breach of that or of any other term, covenant, or condition of this AGREEMENT. Section 35 Venue and Process In the event that either PARTY deems it necessary to institute legal action or proceedings to enforce any right or obligation under this AGREEMENT, the PARTIES hereto agree that any such action shall be initiated in the Superior Court of the State of Washington situated in Thurston County. The PARTIES agree that the laws of the State of Washington shall apply. Section 36 Changed Conditions Affecting Performance The CONTRACTOR hereby agrees to immediately notify WSDOT in writing of any change in conditions or law, or of any other event, including any current or prospective dispute, which may adversely affect WSDOT’s interest in the Project or affect CONTRACTOR’s ability to perform the Project in accordance with the provisions of this AGREEMENT. Section 37 Subrogation A. Prior to Subrogation. WSDOT may require the CONTRACTOR to take such reasonable action as may be necessary or appropriate to preserve the CONTRACTOR’s right to recover damages from any person or organization alleged to be legally responsible for injury to the Project or other property in which WSDOT has a financial interest. B. Subrogation. WSDOT may require the CONTRACTOR to assign to WSDOT all right of recovery against any person or organization for loss, to the extent of WSDOT’s loss. Upon assignment, the CONTRACTOR shall execute, deliver, and do whatever else reasonably necessary to secure WSDOT’s rights. The CONTRACTOR shall do nothing after any loss to intentionally prejudice the rights of WSDOT. C. Duties of the Contractor. If WSDOT has exercised its right of subrogation, the CONTRACTOR shall cooperate with WSDOT and, upon WSDOT’s request, assist in the prosecution of suits and enforce any right against any person or organization who may be liable to City of Renton PTD0417 13 of 15 AGENDA ITEM #7. p) WSDOT due to damage to the Project. The CONTRACTOR shall attend hearings and trials as requested by WSDOT, assist in securing and giving evidence as requested by WSDOT, and obtain the attendance of witnesses as requested by WSDOT. Section 38 Severability If any covenant or provision of this AGREEMENT shall be adjudged void, such adjudication shall not affect the validity or obligation of performance of any other covenant or provision, or any part thereof, which in itself is valid if such remainder conforms to the terms and requirements of applicable law and the intent of this AGREEMENT. No controversy concerning any covenant or provision shall delay the performance of any other covenant or provision except as herein allowed. Section 39 Counterparts This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed to be an original having identical legal effect. Section 40 Complete Agreement This document contains all covenants, stipulations, and provisions agreed upon by the PARTIES. No agent or representative of WSDOT or the CONTRACTOR has authority to make, and neither WSDOT nor the CONTRACTOR shall be bound by or be liable for, any statement, representation, promise or agreement not set forth herein or made by written amendment hereto. Section 41 Order of Precedence Any conflict or inconsistency in this AGREEMENT and its attachments will be resolved by giving documents precedence in the following order: 1. Federal Law 2. State Law 3. This AGREEMENT 4. The Guidebook Section 42 Agreement Close Out The CONTRACTOR shall notify WSDOT if the AGREEMENT is completed prior to the end date set forth in the caption header, “Term of Agreement” by written notification and in its capital Quarterly Progress Report, as referenced in the Guidebook, and any amendments thereto, for the quarter in which the project is completed. WSDOT will prepare an amendment to modify the AGREEMENT to reflect the actual amount spent and the Project completion date. WSDOT will send a close out letter to the CONTRACTOR. Section 43 Execution This AGREEMENT is executed by the Director, Public Transportation Division, State of Washington, Department of Transportation or the Director’s designee, not as an individual incurring personal obligation and liability, but solely by, for and on behalf of the State of Washington, Department of Transportation, in the capacity as Director, Public Transportation Division, or as a designee. Section 44 Binding Agreement The undersigned acknowledge that they are authorized to execute this AGREEMENT and bind their respective agency(ies) and/or entity(ies) to the obligations set forth herein. City of Renton PTD0417 14 of 15 AGENDA ITEM #7. p) IN WITNESS WHEREOF, the PARTIES hereto have executed this AGREEMENT the day and year signed last below. WASHINGTON STATE CONTRACTOR DEPARTMENT OF TRANSPORTATION Brian Lagerberg, Director Authorized Representative Public Transportation Division _________________________________ Title _____________________________________ Print Name _______________________________ _________________________________ Date Date City of Renton PTD0417 15 of 15 AGENDA ITEM #7. p) AB - 3005 City Council Regular Meeting - 06 Dec 2021 SUBJECT/TITLE: 2022 Solid Waste Utility Revenue and Fund Requirements RECOMMENDED ACTION: Refer to Utilities Committee DEPARTMENT: Public Works Utility Systems Division STAFF CONTACT: Ron Straka, Utility Systems Director EXT.: 7239 FISCAL IMPACT SUMMARY: The proposed revenue increase will generate an additional $712,000.00 in 2022 for the Solid Waste Utility fund. The Solid Waste Utility Fund is projected to expand an additional $1.08 million in 2022. The expenses will exceed revenue by $368,000, the amount that will be covered by the fund balance. SUMMARY OF ACTION: During the preparation of the 2021/2022 solid waste rates staff identified a substantial imbalance in the generator of revenue versus cost by the service sector (i.e. residential vs. commercial). It appeared that the commercial sector subsidy of the single-family residential rate was greater than previously noted. Staff identified this issue to the Utility Committee at the time of 2021/2022 Solid Waste Rates presentation. Staff committed to study the issue and prepare a recommended plan to rebalance the rat e for City Council consideration. After adoption of the 2021/2022 rates, several actions have occurred that have impacted the assumption and revenue requirements for the 2022 solid waste rates. First, per the City’s contract with Republic Services, the contractor was due an increase on January 01, 2022, based upon the June 2021 CPI-W which was 6.29%. In the adopted rates for 2022, the rate assumption was a CPI of 2%. Second, King County Solid Waste adopted a 9% disposal rate increase for 2022 which will result in more expenditure based upon our current disposal volumes. Thirdly, the Hazardous Waste Program fee increased by 5.45%, which will increase expenditures based upon the updated number of accounts and services levels. The accumulated effect of these increases are projected to see expenditures over revenue by $1,000,000 in 2022. The staff and consultant study of the rate imbalance and identification of options has been accomplished. The preferred option that staff is proposing is an option that does not make an immediate drastic change to the rate structure but continues the trend of single-family rate payer assuming a greater share of the cost of residential sector programs. This will continue to remain a much smaller subsidy from the commercial sect or, one that is proportional to the benefits they derive by the commercial sector from residential programs. The study examined multiple rate options, evaluated adopted assumptions, and the fund balance requirement, and concluded the following is required for the health and sustainability of the fund: • A 5% revenue increase for the Solid Waste Utility single-family and commercial roll-off, and a 3% revenue increase for commercial/multifamily effective April 1, 2022. • Reduce the annual commercial revenue support for single-family residential to $500,000 by 2026. • Achieve and maintain a fund balance reserve of $2 million by 2026. AGENDA ITEM #7. q) EXHIBITS: A. Issue Paper B. Ordinance STAFF RECOMMENDATION: Approve the proposed 2022 Solid Waste Utility revenue requirements, direct staff to prepare the necessary ordinance to implement the changes and adopt updated fund balance and subsidy requirements. AGENDA ITEM #7. q) Public Works Department Memorandum DATE:November 9, 2021 TO:Randy Corman, Council President Members of Renton City Council VIA:Armondo Pavone, Mayor FROM:Martin Pastucha, Administrator STAFF CONTACT:Ronald Straka, Utility Systems Director SUBJECT:2022 Solid Waste Utility Revenue and Fund Requirements ISSUE: Should Council approve the proposed 2022 Solid Waste Utility revenue requirement, direct staff to prepare the necessary ordinance to implement the changes, and adopt updated fund balance reserve and subsidy requirements? RECOMMENDATION: •Approve the proposed 2022 revenue increase of 5% for the Solid Waste Utility single-family residential and commercial roll-off effective April 1, 2022. •Approve the proposed 2022 revenue increase of 3% for the Solid Waste Utility commercial/multifamily effective April 1, 2022. •Approve a fund requirement to achieve annual commercial revenue support for single-family residential of $500,000 by 2026. •Approve a fund requirement to achieve and maintain a fund balance reserve of $2 million by 2026. •Direct staff to prepare the ordinance allowing the city to charge the 2022 Solid Waste rates beginning April 1, 2022. BACKGROUND The 2021-2022 solid waste rates analysis identified a substantial imbalance in the commercial subsidy of single-family residential (single-family) rates, and called to question its long-term sustainability. While presenting the 2021-2022 solid waste rate options and recommendations, staff committed to further study the subsidy and develop recommendations for Council consideration to stabilize and restore more equitable rates between customer sectors for the sustainability of the fund. AGENDA ITEM #7. q) Randy Corman, Council President Page 2 of 8 December 1, 2021 / TPam Rate Model Assumptions The 2021-2022 adopted solid waste rates were modeled in 2020 using our best assumptions available at that time. Key assumptions that have a significant impact on solid waste revenue requirements and rates include the King County Solid Waste Disposal Fee, the Hazardous Waste Program Fee, and the annual CPI-W, all wage earners and clerical for Seattle, Tacoma, and Bellevue (CPI-W) required by the collection contract to adjust contractor’s compensation. At the study’s launch, the rate model was updated to reflect actual, adopted fees and the published CPI-W used to adjust the contractor’s compensation. While the model used to set the 2021-2022 rates assumed a 2% CPI-W increase for 2022, representing a historical average CPI rate, the actual CPI-W came in much higher at 6.29%. Additionally, the Metropolitan King County Council adopted new Solid Waste Disposal Fees increasing the solid waste fund’s per ton disposal revenue requirement by nine percent (9%). Local Hazardous Waste Management fees increase 5.45% in 2022 as well. These updated assumptions suggested the adopted 2022 rates would not be sufficient to cover costs while also meeting fund goals. Questions Considered for Rate Design There are myriad assumptions built into any rate model design to achieve specific goals. This study revisited existing rate design assumptions to review, retain or modify, and confirm their alignment with the Solid Waste Utility program and financial goals. For instance, as we initially considered the imbalance of the commercial revenue support of single-family costs, initial rate model scenarios, analysis of the subsidy imbalance, and discussions of the issues helped determine a course of action to responsibly correct cost-share imbalances, and allocate rates that are equitable and meet Solid Waste program and financial goals. Primary questions for review included: •Should the commercial to single-family revenue imbalance be completely or only partially eliminated? There is justification for some level of subsidy from the commercial sector to the single-family sector. The single-family sector has been unduly burdened with handling waste and recyclables created by choices in product design and packaging made or used by the commercial sector. The single-family sector has also contributed more to city waste prevention and recycling goals than the commercial sector. While the current subsidy of over a million dollars annually is unsustainable, our review concluded that the five-hundred thousand dollars ($500,000) goal is a reasonable amount of commercial support of the single- family sector costs. This subsidy question should be reviewed periodically. When the commercial sector improves its waste prevention and recycling performance and shows a full commitment to solid waste sustainability goals, the city may choose to eliminate this sector’s revenue support of the single-family sector. AGENDA ITEM #7. q) Randy Corman, Council President Page 3 of 8 December 1, 2021 / TPam •Should the revenue support imbalance be fully eliminated all at once or over a defined time to smooth the impact to customers? The study modeled options that eliminated the subsidy all at once and over a five-year rate period (2022 – 2026). Staff concluded both options to eliminate the subsidy resulted in an increased burden on the single-family sector. However, in consideration of retaining a $500,000 commercial sector subsidy of the single-family sector, staff concluded that reducing the current subsidy over a five-year rate period resulted in less burden on the ratepayer. •Should the model retain the current conservation rate design that encourages waste prevention and recycling through incentive pricing? In addition to cross-subsidies between the three customer sectors (single-family, commercial/multifamily, and roll-off), there are also subsidies within the service levels of each customer sector. For example, smaller garbage cart subscribers pay a lower monthly rate than would be imposed if they paid the full costs of collection and disposal for their cart size. For single-family customers, this type of subsidy and an overall sectoral balance of revenues and costs requires that rates for larger carts exceed their collection and disposal costs. This type of subsidy and incentive pricing has been shown to increase recycling and composting and has also demonstrated significant gains in source reduction thereby increasing public health, environmental, and cost benefits from reduced landfill disposal which in turn has extended the life of our regional disposal system. Staff concluded this element of rate design, in place since the inception of the waste prevention and recycling program in 1989 has been effective in meeting the sustainability objectives of the Solid Waste Utility, and should be retained. •Should the model retain the current rate design that encourages collection efficiencies? Currently, the commercial sector rate design incentivizes less frequent collections. For this sector, there is a need to balance diversion incentive deviations from full cost-of-service to account for the objective of minimizing collection frequency (fewer truck trips/week). Fully linear, collection-container- volume-based rates incentivize diversion by charging fees calculated to reflect the amount of garbage container capacity. However, this means, as an example, that a customer using a three-yard detachable front-load container picked up twice weekly would pay the same rate as a customer having a six-yard detachable picked up just once a week. Balancing the cost-of-service and diversion incentive rates (such as volume-based linear), is required to promote AGENDA ITEM #7. q) Randy Corman, Council President Page 4 of 8 December 1, 2021 / TPam lower collection frequencies that reduce CO2 emissions and advance environmental sustainability. •What fund balance reserve level is required for sustainable rate-making? The current adopted minimum fund balance for the Solid Waste Utility is $400,000. The review of the adopted minimum fund balance concluded the amount was insufficient to ensure the fund balance reserve could accommodate disruptions in the receipt of rate revenues or unexpected cost increases to maintain solid waste services. Current monthly disposal costs alone exceed the adopted minimum fund balance criteria. Informed by the rate model, staff concluded that the minimum fund balance should be set at two million dollars ($2 million) and a goal to achieve this level by 2026. •Should a separate rate-stabilization fund be established and included in the rate model to smooth any potential spike in rates over the long term? A rate stabilization fund allows for excess revenue to be set aside and used to minimize the magnitude of a rate increase in the event there are dramatic cost increases or revenue decreases. The Solid Waste Utility is vulnerable to external cost increases such as King County Disposal Fees, CPI-W spikes, or Local Hazardous Waste Program rates, which can have significant consequences on customer rates. While a separate rate stabilization fund could be used to decrease the size of city solid waste rate increases to cover these external impacts or other revenue impacts resulting from increased recycling and other waste prevention efforts, staff concluded that revision of the fund balance reserve criteria may accomplish the same objective. A separate rate-stabilization fund rate model assumption was rejected for this review. •Should rate equity be considered for discounted rates currently based solely on the combination of income threshold, age, and disability, or should access to discounted rates be available to other low-income residents? The existing discounted rate policy, which provides a fifty percent reduction in rates, requires rates to be subsidized by other ratepayers, and is currently available only to income-qualifying, disabled, or low-income customers aged sixty-one and greater. The current income threshold is $58,423 annually for a single resident with an additional $5,000 of income considered for each additional household member. Currently, there are no discounts available for other low-income residents living at or below the threshold established for senior or disabled residents. With equity, and economic justice a primary tenet of the 2021 City of Renton Business Plan, “Build an inclusive informed city with equitable outcomes for all in support of social, economical, and racial justice”, it AGENDA ITEM #7. q) Randy Corman, Council President Page 5 of 8 December 1, 2021 / TPam may be time to examine how discounted rates are defined for the solid waste utility and consider broadening the definition to other income-qualifying residents. Staff concluded this question was outside the scope and timeline of this study. While an important question to ask, the addition of low-income residents within this discounted rate class would require additional subsidy. A separate study that examines the impact of expanding the definition of this rate class would need to be completed. It was suggested that any study of this question should include impacts to the city’s Water, Wastewater, and Surface Water Utilities that also provide senior citizen, and disabled discounted rates per city code. Modeled Options For purposes of the study, the model was updated to reflect actual cost assumptions versus projected assumptions assigned in the model used for the adopted 2021-2022 rates. The effect of the disposal fee and CPI-W increases taken together represents a 7.2% increase in disposal and collection costs alone. Table 1. summarizes various scenarios modeled. Each scenario modeled rates for 2022 – 2027 which helped inform the selection of the recommended rate proposal. Table 1. Rate Model Scenarios Model Scenarios Rate Increase By Sector Effective Rate Average of 3 mo. of base rate + 9 mo. of Option rate) 2022 Effective Date Cross Subsidy Goal $500K Fund Balance Reserve Goal Base Case Adopted Rates 2% -Single-family 0% -Com/MF 2% - Roll-off Retains 2022 rates as adopted in 2020 January 1 $2.4M Option 1a 1b 1c 5% - Single-family 4% - Com/MF 5% - Roll-off 4.3% - Single-family 3.0% - Com/MF 4.3% - Roll-off April 1 X 1a. $2.4M 1b. $2.0M 1c. $1.75M Option 2a 2b 2c 4% - Single-family 2% - Com/MF 4% - Roll-off 3.5% - Single-family 1.5% - Com/MF 3.5% - Roll-off April 1 X 2a. $2.4M 2b. $2.0M 2c. $1.75M Option 3 All Sectors Revenue =Costs by 2026 2% -Single-family 0% -Com/MF 2% - Roll-off Retains 2022 rates as currently adopted January 1 Eliminate Subsidy $2.4M AGENDA ITEM #7. q) Randy Corman, Council President Page 6 of 8 December 1, 2021 / TPam Rate Projections by Option The following three figures graphically represent the rate projections for each option summarized in Table 1. Figure 1. Single-Family Annual Rate Increase 2022-2027 by Option illustrates the rate impact to single-family rates when the commercial rate revenue no longer provides support of single-family costs. The initial spike in 2023 helps to raise revenue quickly for sectoral obligations, and results in knocking down rate increases in subsequent years. However, rates in the range of seven (7%) to twelve percent (12%) for single-family customers are untenable. Commercial/multifamily rates represented in Figure 2, also spike in 2023, increasing from zero percent in 2022 to six- and one-half percent (6.5%) in 2023. Some relief is returned in the years 2024 – 2026 but the rate increases again in 2027. In each figure, the effect of a rate increase in April 2022 illustrates the gains that can be made to respond to external cost increases such as the King County disposal fee increase and the collection contract CPI-W adjustment, while also maintaining the goals of decreasing the current commercial revenue support of the single-family sector to $500,000 annually by 2026. A rate increase in April 2022 also eases rate increases in subsequent years, thus smoothing rates over the six-year projection. While the Option 1b single-family and roll-off rate increase for April 1, 2022, is five percent (5%), with commercial/multifamily at four percent (4%), when averaged with the rates adopted for the first quarter 2022, the effective annual rate increase for each sector is a manageable 4.3% for single-family and roll-off and 3% for commercial/multifamily. Figure 1. Single-Family Annual Rate Increase 2022-2027 by Option 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% 2021 2022 2023 2024 2025 2026 2027 Single Family Sector Annual Rate Increase Scenarios 2022 -2027 SF 4-2-4 $2.4M FB SF 4-2-4 $2.0M FB SF 4-2-4 $1.75M FB SF 5-4-5 $2.4M FB SF 5-4-5 $2.0M FB SF 5-4-5 $1.75M FB SF Rev = Cost $2.4M FB AGENDA ITEM #7. q) Randy Corman, Council President Page 7 of 8 December 1, 2021 / TPam Figure 2. Commercial/Multifamily Annual Rate Increase 2022-2027 by Option -6.00% -4.00% -2.00% 0.00% 2.00% 4.00% 6.00% 8.00% 2021 2022 2023 2024 2025 2026 2027 Commercial/Multifamily Sector Annual Rate Change Scenarios 2022 -2027 COM 4-2-4 $2.4M FB COM 4-2-4 $2.0M FB COM 4-2-4 $1.75M FB COM 5-4-5 $2.4M FB COM 5-4-5 $2.0M FB COM 5-4-5 $1.75M FB COM Rev = Cost $2.4M FB Figure 3. All Sectors Average Rate Increase Revenue = Costs by 2026 -2.0% 0.0% 2.0% 4.0% 6.0% 8.0% 10.0% 2021 2022 2023 2024 2025 2026 2027 Three Sector Average Annual Rate Change Scenarios 2022 -2027 ALL 4-2-4 $2.4M FB ALL 4-2-4 $2.0M FB ALL 4-2-4 $1.75M FB ALL 5-4-5 $2.4M FB ALL 5-4-5 $2.0M FB ALL 5-4-5 $1.75M FB ALL Rev = Cost $2.4M FB AGENDA ITEM #7. q) Randy Corman, Council President Page 8 of 8 December 1, 2021 / TPam Table 2. Option 1b. Cost Impact for Sample Customers Customer & Service Level Monthly Cost January-March Monthly Cost Beginning April 1 Average Effective Monthly Cost Annual Total Cost Increase Single-Family EOW 35G Cart $24.00 $24.71 $24.53 $6.39 Multifamily Weekly 35G Cart $31.27 $32.52 $32.21 $11.25 Commercial 4 YD 1xWeekly $363.40 $377.94 $374.31 $130.86 Table 2 illustrates the cost impact the proposed revenue increase as outlined in Table 1 will have on customers. The Customer & Service Level column represents those customers and service levels that typify the most common subscriptions for the sector. Conclusion Implementing the proposed 2022 Solid Waste Utility revenue requirements will allow the city to respond to significant cost increases resulting from the higher than historically average, and unanticipated, CPI-W rate used to adjust the collection contractor compensation and the nine percent (9%) King County per-ton disposal increase. Approving an adjustment to the fund balance reserve requirement, as well as reducing the overall commercial revenue support for the single-family sector, will stabilize and restore more equitable rates between customers for the long-term sustainability of the fund while preserving service standards and programs that continue to deliver results for the city’s environmental stewardship commitments. cc: Kari Roller, Finance Administrator Kristin Trivelas, Financial Services Director Linda Knight, Utility Systems, Solid Waste Coordinator Stacy Robinson, Senior Financial Analyst Teresa Phelan, Utility Systems Senior Program Specialist Angel Mitchell, Utility Systems Administrative Secretary AGENDA ITEM #7. q) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SECTION 8‐1‐10 OF THE RENTON MUNICIPAL CODE, ESTABLISHING THE SOLID WASTE COLLECTION SERVICES RATES STARTING APRIL 1, 2022 FOR ALL CUSTOMER CLASSES, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. Section 8‐1‐10 of the Renton Municipal Code is amended as follows: 8‐1‐10: RATES FOR SERVICES: The following schedule is hereby adopted as the monthly charges to be paid to the City for services rendered in each category: A. Residential Customers: 1. For garbage cans, carts, and/or garbage units: Single‐family Every Other Week Garbage & Recycling, Weekly Yard Waste & Food Scraps Cart Service Level 2021 Renton SWU Monthly Rates January 1 – March 31, 2022 Renton SWU Monthly Rates Starting April 1, 2022 Renton SWU Monthly Rates 20 Gallon Contractor Cart $14.31 $14.60 $15.03 35 Gallon Contractor Cart $23.53 $24.00 $24.71 45 Gallon Contractor Cart $29.66 $30.26 $31.14 64 Gallon Contractor Cart $41.28 $42.11 $43.34 96 Gallon Contractor Cart $60.95 $62.17 $64.00 Each Additional 35 Gallon Cart $23.53 $24.00 $24.71 Senior 20 Gallon Cart Rate $3.58 $3.65 $3.76 AGENDA ITEM #7. q) ORDINANCE NO. ________ 2 (75% subsidy)/for Existing customers prior to May 31, 2008 Senior 20 Gallon Cart Rate (50% subsidy) $7.15 $7.29 $7.51 Senior 35 Gallon Cart Rate (50% subsidy) $11.77 $12.01 $12.36 Senior 45 Gallon Cart Rate (50% subsidy) $14.82 $15.12 $15.56 Senior 64 Gallon Cart Rate (50% subsidy) $20.66 $21.07 $21.69 Senior 96 Gallon Cart Rate (50% subsidy) $30.68 $31.30 $32.21 Extra Garbage, up to 15 gallons per unit/per pickup $4.38 $4.46 $4.60 Extra 96 Gallon Yard Waste Cart Rental $2.43 $2.48 $2.55 Residential Return Trip Charge per pickup $6.30 $6.43 $6.62 Cart Cleaning (per cart, per cleaning) $12.14 $12.38 $12.75 Drive‐in Charge (per month) $6.64 $6.78 $6.97 Overweight/Oversize Container (per pickup) $3.51 $3.58 $3.69 Re‐delivery (one or more containers) $12.14 $12.38 $12.75 Sunken Can Surcharge $8.34 $8.50 $8.76 2. Residential customers are allowed to change their garbage service level once per year without incurring an administrative fee. Each garbage service level change per year above the once per year allowance will result in an administrative fee of thirty‐five dollars ($35.00). The one (1) year period shall begin January 1 and shall end December 31 each year. 3. Senior and/or disabled customers who qualified under Subsection 8‐4‐ 31.C of this Title for low‐income rates for seventy‐five percent (75%) subsidy prior to May 31, 2008, are eligible for a three dollars and fifty‐eight cents ($3.58) fee for 2021 and three dollars and sixty‐five cents ($3.65) fee for January 1 – March 31, 2022, and three dollars and seventy‐six cents ($3.76) starting April 1, 2022, for 20 AGENDA ITEM #7. q) ORDINANCE NO. ________ 3 Gallon Cart service. For services other than 20 Gallon Cart service, the rate schedule at the fifty percent (50%) subsidy as provided in Subsection 8‐1‐10.A.1 will apply. All senior and/or disabled customers qualifying under Subsection 8‐4‐ 31.C for low‐income rates after May 31, 2008, are eligible for a fifty percent (50%) subsidy of the charges for the service level selected. 4. Premium Weekly Collection: Single‐family residential customers may elect to have their garbage collected weekly for an additional fee of twenty‐four dollars and two cents ($24.02) per month for 2021 and twenty‐four dollars and fifty cents ($24.50) per month for January 1 – March 31, 2022, and twenty‐five dollars and twenty‐two cents ($25.22) starting April 1, 2022. This fee will be added to the monthly garbage billing as an extra Premium Service Fee. 5. Miscellaneous Services: The City of Renton offers miscellaneous services at the following rates: Services Cost per Pick Up On‐Call Bulky Waste Collection 2021 Rates January 1 – March 31, 2022 Rates Starting April 1, 2022 Rates White Goods, except Refrigerators/Freezers per unit $76.91 $78.45 $80.76 Refrigerators/Freezers per unit $82.30 $83.94 $86.42 Sofas/Chairs per unit $71.52 $72.95 $75.10 Mattresses per unit $68.82 $70.20 $72.26 B. Commercial Customers: 1. Multi‐family Carts: Customers have the following cart‐based services available: AGENDA ITEM #7. q) ORDINANCE NO. ________ 4 Multi‐family (“MF”) Cart Service Level 2021 SWU Monthly Rates January 1 – March 31, 2022 SWU Monthly Rates Starting April 1, 2022 Renton SWU Monthly Rates MF One 20 Gallon Cart $24.05 $24.05 $25.01 MF One 35 Gallon Garbage Cart $31.27 $31.27 $32.52 Weekly MF One 45 Gallon Garbage Cart $38.80 $38.80 $40.35 Can and MF One 64 Gallon Contractor Cart $46.29 $46.29 $48.14 Cart MF One 96 Gallon Contractor Cart $61.32 $61.32 $63.77 Extra MF Can or Units ‐32 Gallon Equivalent $6.52 $6.52 $6.78 MF Weekly 64 Gallon Yard Waste (incl. Cart) $45.22 $45.22 $47.03 2. Commercial Carts: Customers have the following contractor cart‐based services available: Commercial Cart Service Level 2021 SWU Monthly Rates January 1 – March 31, 2022 SWU Monthly Rates Starting April 1, 2022 Renton SWU Monthly Rates One 20 Gallon Cart $37.97 $37.97 $39.49 One 35 Gallon Garbage Cart $42.23 $42.23 $43.92 Weekly One 45 Gallon Garbage Cart $48.14 $48.14 $50.07 Commercial One 64 Gallon Garbage Cart $54.26 $54.26 $56.43 Can and One 96 Gallon Garbage Cart $66.66 $66.66 $69.33 Cart Extra Units – 32 Gallon Equivalent $6.78 $6.78 $7.05 Weekly 64 Gallon Yard Waste Cart $45.22 $45.22 $47.03 Customer Event Service (3 Carts: Garbage, Recycle, Yard Waste/Day) $37.67 $37.67 $39.18 AGENDA ITEM #7. q) ORDINANCE NO. ________ 5 3. Commercial Detachable Containers One (1) to Eight (8) Yards: The rate for the handling of detachable containers approved by the City’s contractor and the City for use by commercial, industrial and multi‐family residence establishments shall be as follows: a. Monthly Rates: Commercial Service Level 2021 SWU Monthly Rates January 1 – March 31, 2022 SWU Monthly Rates Starting April 1, 2022 Renton SWU Monthly Rates 1 Cubic Yard, 1 pickup/week $113.98 $113.98 $118.54 1 Cubic Yard, 2 pickups/week $214.04 $214.04 $222.60 1 Cubic Yard, 3 pickups/week $314.15 $314.15 $326.72 1 Cubic Yard, 4 pickups/week $414.21 $414.21 $430.78 1 Cubic Yard, 5 pickups/week $514.29 $514.29 $534.86 1.5 Cubic Yards, 1 pickup/week $156.24 $156.24 $162.49 1.5 Cubic Yards, 2 pickups/week $298.59 $298.59 $310.53 1.5 Cubic Yards, 3 pickups/week $440.93 $440.93 $458.57 Commercial 1.5 Cubic Yards, 4 pickups/week $583.28 $583.28 $606.61 Detachable 1.5 Cubic Yards, 5 pickups/week $725.61 $725.61 $754.63 Container 2 Cubic Yards, 1 pickup/week $196.97 $196.97 $204.85 (Loose) 2 Cubic Yards, 2 pickups/week $380.04 $380.04 $395.24 2 Cubic Yards, 3 pickups/week $563.11 $563.11 $585.63 2 Cubic Yards, 4 pickups/week $746.18 $746.18 $776.03 2 Cubic Yards, 5 pickups/week $929.26 $929.26 $966.43 3 Cubic Yards, 1 pickup/week $280.25 $280.25 $291.46 3 Cubic Yards, 2 pickups/week $546.63 $546.63 $568.50 3 Cubic Yards, 3 pickups/week $812.99 $812.99 $845.51 3 Cubic Yards, 4 pickups/week $1,079.36 $1,079.36 $1,122.53 AGENDA ITEM #7. q) ORDINANCE NO. ________ 6 3 Cubic Yards, 5 pickups/week $1,345.74 $1,345.74 $1,399.57 4 Cubic Yards, 1 pickup/week $363.40 $363.40 $377.94 4 Cubic Yards, 2 pickups/week $712.93 $712.93 $741.45 4 Cubic Yards, 3 pickups/week $1,062.44 $1,062.44 $1,104.94 4 Cubic Yards, 4 pickups/week $1,411.84 $1,411.84 $1,468.31 4 Cubic Yards, 5 pickups/week $1,761.48 $1,761.48 $1,831.94 6 Cubic Yards, 1 pickup/week $527.26 $527.26 $548.35 6 Cubic Yards, 2 pickups/week $1,040.63 $1,040.63 $1,082.26 6 Cubic Yards, 3 pickups/week $1,554.00 $1,554.00 $1,616.16 6 Cubic Yards, 4 pickups/week $2,067.37 $2,067.37 $2,150.06 6 Cubic Yards, 5 pickups/week $2,580.75 $2,580.75 $2,683.98 8 Cubic Yards, 1 pickup/week $690.15 $690.15 $717.76 8 Cubic Yards, 2 pickups/week $1,366.40 $1,366.40 $1,421.06 8 Cubic Yards, 3 pickups/week $2,042.63 $2,042.63 $2,124.34 8 Cubic Yards, 4 pickups/week $2,718.89 $2,718.89 $2,827.65 8 Cubic Yards, 5 pickups/week $3,395.14 $3,395.14 $3,530.95 Extra Cubic Yard Lloose cubic yard in container, per cubic yard/per pickup $23.09 $23.09 $24.01 Extra Cubic Yard Loose on ground, per cubic yard/per pickup $35.53 $36.95 Commercial Service Level 2021 SWU Monthly Rates January 1 – March 31, 2022 SWU Monthly Rates Starting April 1, 2022 Renton SWU Monthly Rates Commercial 1 Cubic Yard Compactor $271.83 $271.83 $282.70 Detachable 1.5 Cubic Yards Compactor $392.82 $392.82 $408.53 Container 2 Cubic Yards Compactor $504.84 $504.84 $525.03 (Compacted) 3 Cubic Yards Compactor $743.51 $743.51 $773.25 4 Cubic Yards Compactor $982.50 $982.50 $1,021.80 AGENDA ITEM #7. q) ORDINANCE NO. ________ 7 6 Cubic Yards Compactor $1,459.75 $1,459.75 $1,518.14 b. Rental Rates: Rental rates for one (1) to eight (8) yard containers will be paid in the monthly rates. c. Minimum Pickups: Minimum pickups for containers and compactors between one (1) and eight (8) yards will be once per week. 4. Extra Charges: a. The following extra charges will apply for commercial services, including Multi‐family and Commercial Cart, Detachable and Roll Off Container services: Commercial Cart & Detachable Extra Service Fees 2021 January 1 – March 31, 2022 Starting April 1, 2022 Renton SWU Monthly Rates 1 Yard Extra Pickup $29.13 $29.13 $30.30 1.5 Yard Extra Pickup $39.93 $39.93 $41.53 2 Yard Extra Pickup $50.35 $50.35 $52.36 3 Yard Extra Pickup $71.63 $71.63 $74.50 4 Yard Extra Pickup $92.87 $92.87 $96.58 6 Yard Extra Pickup $134.76 $134.76 $140.15 8 Yard Extra Pickup $176.39 $176.39 $183.45 1 Yard Compactor Extra Pickup $69.48 $69.48 $72.26 1.5 Yard Compactor Extra Pickup $100.40 $100.40 $104.42 2 Yard Compactor Extra Pickup $129.03 $129.03 $134.19 3 Yard Compactor Extra Pickup $190.02 $190.02 $197.62 4 Yyard Compactor Extra Pickup $251.10 $251.10 $261.14 6 Yard Compactor Extra Pickup $373.08 $373.08 $388.00 AGENDA ITEM #7. q) ORDINANCE NO. ________ 8 Commercial cart carry out charge if over 50 feet, per 25 ft/cart, container/pickup $7.01 $7.01 $7.29 Return trip for carts/containers not available for collection at regularly scheduled pickup time $31.17 $31.17 $32.42 Redelivery of Cart $10.44 10.44 $10.86 Redelivery of Container $20.87 $20.87 $21.70 Cleaning (per cart, per yard container capacity) $10.44 $10.44 $10.86 Stand‐by Time for containers (per minute) $6.20 $6.20 $6.45 Roll Off Extra Service Fees 2021 January 1 – March 31, 2022 Starting April 1, 2022 Renton SWU Monthly Rates Return Trip for Drop Box $33.33 $34.00 $35.00 Container Cleaning Drop Box (per yard capacity) $12.03 $12.27 $12.63 Drop Box to Other Facility (per one‐way mile) $3.39 $3.46 $3.56 Solid Lid on Drop Box (monthly rental) $84.83 $86.53 $89.07 Drop Box Turn Around Charge $24.25 $32.74 $25.46 Stand‐by Time for Drop Box (per minute) $1.71 $1.74 $1.80 Hourly Rates Rear/Side‐Load Packer + Driver $117.21 $119.55 $123.07 Front Load Packer + Driver $117.21 $119.55 $123.07 Drop Box Truck + Driver $101.90 $103.94 $107.00 Additional Labor (per person) $44.56 $45.46 $46.79 AGENDA ITEM #7. q) ORDINANCE NO. ________ 9 b. Any extra yardage charges determined by the collection contractor due to overflowing containers will be charged per yard at the one (1) yard rate listed under subsection 8‐1‐10.B.3.a. 5. Special Services: a. Special Event Services: Bundled Garbage, Recycling, and Yard Waste Cart‐based service is available upon request to customers sponsoring Special Events within the City. The daily fee for Special Event Services is thirty‐ seven dollars and sixty‐seven cents ($37.67) in 2021 and thirty‐seven dollars and sixty‐seven cents ($37.67) in for January 1 – March 31, 2022, and thirty‐nine dollars and eighteen cents ($39.18) starting April 1, 2022, per one (1) set of bundled carts. b. Special Services Unspecified: Whenever special services not contained within this schedule are required, the rate charged for those special services shall be negotiated between the City and the collection contractor. C. Commercial Roll Off Customers: Commercial Roll Off customers are those who have a ten (10) to forty (40) yard container or compactor. These large disposal containers are lifted, hauled, and weighed at the disposal facility. Commercial container customers pay solid waste fees based upon the number of pickups, corresponding weight‐based fees and a container rental fee. Compactor customers pay solid waste fees based upon the number of pickups and a corresponding weight‐based disposal fees. AGENDA ITEM #7. q) ORDINANCE NO. ________ 10 1. Base Pickup Fees: The base pickup fees are as follows on a per occurrence basis: Commercial Roll Off Rates are Per Pickup 2021 January 1 – March 31, 2022 Starting April 1, 2022 Renton SWU Monthly Rates 10 Yards Container $247.83 $252.79 $260.22 15 Yards Container $266.03 $271.35 $279.33 20 Yards Container $273.31 $278.78 $286.98 25 Yards Container $284.80 $290.51 $299.04 30 Yards Container $296.31 $302.25 $311.13 40 Yards Container $317.04 $323.39 $332.89 10‐15 Yards Compactor $279.84 $285.44 $293.83 20 Yards Compactor $304.75 $310.85 $319.99 25 Yards Compactor $316.15 $322.48 $331.96 30 Yards Compactor $327.55 $334.12 $343.93 40 Yards Compactor $347.92 $354.89 $365.32 The minimum pickups are twice per month. 2. Rental Rates: The following are rental rates for permanent roll off containers: Monthly Rental Rates 2021 January 1 – March 31, 2022 Starting April 1, 2022 Renton SWU Monthly Rates 10 Yards Container $50.85 $51.87 $53.39 15 Yards Container $72.59 $74.04 $76.22 20 Yards Container $94.28 $96.17 $98.99 25 Yards Container $105.15 $107.26 $110.41 AGENDA ITEM #7. q) ORDINANCE NO. ________ 11 30 Yards Container $116.02 $118.35 $121.82 40 Yards Container $142.98 $145.84 $150.13 3. Disposal Fees: In addition to the base collection charge per pickup and the monthly rental fee, the customer must pay weight‐based disposal fees plus applicable tax. D. (Rep. by Ord. 4898, 3‐19‐2001) E. Temporary Services: Temporary Services are Commercial Container and Roll Off services not to exceed ninety (90) days of service. Customers will be billed for container delivery, container rental, and container pickup based upon the number of pickups. For ten (10) to forty (40) yard containers, customers will be billed separate disposal charges based upon weight‐based fees plus all applicable taxes. Customers will be required to provide an advanced payment in the amount of four hundred dollars ($400.00) for two (2) yard to eight (8) yard detachable containers and eight hundred dollars ($800.00) for ten (10) to forty (40) yard Roll Off containers. The advanced payment will be held and applied to the final billing for services provided. 1. Temporary Container Base Pickup Fees: Commercial Temporary Service Per Pickup 2021 January 1 – March 31, 2022 Starting April 1, 2022 2 Yard Temporary $64.42 $64.42 $67.00 4 Yard Temporary $115.95 $115.95 $120.59 6 Yard Temporary $165.16 $165.16 $171.77 8 Yard Temporary $192.09 $192.09 $199.77 AGENDA ITEM #7. q) ORDINANCE NO. ________ 12 10 – 40 Yard Temporary $219.38 $223.77 $230.35 2. Temporary Container Rental Fees: Commercial Temporary Daily Rental 2021 January 1 – March 31, 2022 Starting April 1, 2022 2 Yard Temporary $6.44 $6.44 $6.70 4 Yard Temporary $6.44 $6.44 $6.70 6 Yard Temporary $6.44 $6.44 $6.70 8 Yard Temporary $6.44 $6.44 $6.70 10 – 40 Yard Temporary $9.78 $9.98 $10.27 Commercial Temporary Monthly Rental 2021 January 1 – March 31, 2022 Starting April 1, 2022 2 Yard Temporary $195.88 $195.88 $203.79 4 Yard Temporary $195.88 $195.88 $203.79 6 Yard Temporary $195.88 $195.88 $203.79 8 Yard Temporary $195.88 $195.88 $203.79 10 – 40 Yard Temporary $297.48 $303.56 $312.38 3. Temporary Container Delivery Fee: A fee in the amount of sixty‐nine dollars and ninety‐eight cents ($69.98) in 2021 and seventy‐one dollars and thirty‐ nine cents ($71.39) in for January 1 – March 31, 2022, and seventy‐three dollars and forty‐eight cents ($73.48) starting April 1, 2022, will be charged for each temporary container delivered to the customer. F. Classification and Appeal: Service category classifications shall be on the basis of the type and volume of solid waste and the purpose and type of the dwelling or facility being served as determined by the Public Works Administrator AGENDA ITEM #7. q) ORDINANCE NO. ________ 13 of the City, or the Administrator’s duly authorized representative. Any person who shall deem their classification improper may appeal to the Solid Waste Coordinator within forty‐five (45) days following their classification or change of classification. After the decision of the Solid Waste Coordinator, if the party appealing is still aggrieved, then the party may appeal to the Public Works Administrator, whose decision shall be final. SECTION III. Those rates starting April 1, 2022 shall become effective with billings computed on or after April 1, 2022. SECTION IV. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION V. This ordinance shall be effective April 1, 2022. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _______________________, 2021. Armondo Pavone, Mayor AGENDA ITEM #7. q) ORDINANCE NO. ________ 14 Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2200:11/9/21 AGENDA ITEM #7. q) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, ADOPTING THE 2021 SURFACE WATER UTILITY SYSTEM PLAN. WHEREAS, the 2021 Surface Water Utility System Plan (Plan) is a comprehensive citywide surface water document intended to guide programmatic and capital improvement needs for Renton’s Surface Water Utility for the next six years and for future years’ guidance; and WHEREAS, the purpose of the Plan is to examine the existing surface water management system, with primary focus on projects and programs that identify and minimize flooding, erosion, and water quality problems, as well as improve riparian habitat and meet regulatory requirements; and WHEREAS, the Plan was reviewed by the City of Renton Environmental Review Committee, which issued a Determination of Non‐Significance on November 18, 2020; and WHEREAS, a Notice of Environmental Determination was made public, and no comments or appeals were received during the public comment and appeal periods, which ended December 2, 2020; and WHEREAS, the Plan is compatible with the intent of the City’s adopted Comprehensive Plan; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The City Council hereby adopts the Plan, a copy of which is attached hereto as Exhibit “A” and incorporated by this reference. AGENDA ITEM # 9. a) RESOLUTION NO. _______ 2 PASSED BY THE CITY COUNCIL this ______ day of _____________________, 2021. ______________________________ Jason A. Seth, City Clerk APPROVED BY THE MAYOR this ______ day of _____________________, 2021. ______________________________ Armondo Pavone, Mayor Approved as to form: ______________________________ Shane Moloney, City Attorney RES:1898:11/9/21 AGENDA ITEM # 9. a) RESOLUTION NO. _______ 3 EXHIBIT “A” 2021 SURFACE WATER UTILITY SYSTEM PLAN AGENDA ITEM # 9. a) City of Renton DECEMBER 2021 Osborn Consulting, Inc. | 425.451.4009 | OsbornConsulting.com SURFACE WATER UTILITY SYSTEM PLAN AGENDA ITEM # 9. a) AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE This Surface Water Utility System Plan was partially developed by SAIC between 2007 and 2009. Osborn Consulting was contracted by the City in late 2019 to update and finalize the draft plan. Further updates were introduced by Surface Water staff in 2021. The conclusions, observations and recommendations contained herein attributed to Osborn Consulting, Inc. constitute the opinions of Osborn Consulting, Inc. To the extent that statements, information, and opinions provided by the client or others have been used in the preparation of this report, Osborn Consulting, Inc. has relied upon the same to be accurate, and for which no assurances are intended and no representations or warranties are made. Osborn Consulting, Inc. makes no certification and gives no assurances except as explicitly set forth in this report. AGENDA ITEM # 9. a) AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE i 2021 Surface Water Utility System Plan CITY OF RENTON TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................... E-1 SECTION 1 HISTORY, ACCOMPLISHMENTS, AND GOALS ................................................... 1-1 1.1 Introduction ........................................................................................................ 1-1 1.2 History, Program Description, and Accomplishments ........................................ 1-1 1.3 Utility Mission ..................................................................................................... 1-1 1.4 Utility Goals ......................................................................................................... 1-3 1.5 Plan Development Process.................................................................................. 1-4 SECTION 2 DRAINAGE BASIN AND SERVICE AREAS .......................................................... 2-1 2.1 Introduction ........................................................................................................ 2-1 2.2 Study Area General Description .......................................................................... 2-1 2.3 Existing System Description ................................................................................ 2-4 2.4 Drainage Basins ................................................................................................... 2-9 SECTION 3 CURRENT SURFACE WATER MANAGEMENT PROGRAM .................................. 3-1 3.1 General Description ............................................................................................ 3-1 3.2 Engineering, Planning, Compliance, and Coordination ....................................... 3-5 3.3 Inspection, Operations, and Maintenance ......................................................... 3-8 3.4 Administration .................................................................................................. 3-12 3.5 Management ..................................................................................................... 3-13 3.6 Summary of Existing Program ........................................................................... 3-13 SECTION 4 REGULATORY REQUIREMENTS AND CITY POLICIES ......................................... 4-1 4.1 Introduction ........................................................................................................ 4-1 4.2 Regulatory Requirements ................................................................................... 4-1 4.3 City Ordinances and Regulations ........................................................................ 4-2 4.4 State Regulations ................................................................................................ 4-5 4.5 Federal Regulations ........................................................................................... 4-11 4.6 Summary of Permits Required .......................................................................... 4-13 4.7 Program Policies ................................................................................................ 4-16 SECTION 5 FUTURE PROGRAM NEEDS ............................................................................. 5-1 5.1 Introduction ........................................................................................................ 5-1 5.2 NPDES Permit Compliance .................................................................................. 5-1 5.3 City Maintenance on Residential Facilities ......................................................... 5-7 5.4 Annexations ........................................................................................................ 5-7 5.5 Vegetation Maintenance .................................................................................... 5-9 AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE ii 5.6 Infill Development ............................................................................................... 5‐9 5.7 Asset Management ........................................................................................... 5‐10 5.8 Culvert Inventory .............................................................................................. 5‐12 5.9 Surface Water Utility System Plan Update ....................................................... 5‐12 5.10 Surface Water Utility Coordination ................................................................... 5‐12 5.11 Continuation of Existing Surface Water Initiatives ........................................... 5‐16 5.12 Summary ........................................................................................................... 5‐16 SECTION 6 CAPITAL IMPROVEMENT PROJECT NEEDS ....................................................... 6‐1 6.1 General ................................................................................................................ 6‐1 6.2 Flood Risk Reduction ........................................................................................... 6‐1 6.3 Water Quality ...................................................................................................... 6‐3 6.4 Existing Water Quality and Its Effects on Beneficial Uses ................................... 6‐4 6.5 Habitat Restoration and Protection .................................................................... 6‐8 6.6 Miscellaneous Programs and Regulatory Projects .............................................. 6‐9 6.7 Capital Project Prioritization ............................................................................... 6‐9 SECTION 7 RECOMMENDATIONS AND PLANNED ACTIONS ............................................... 7‐1 7.1 Summary of Recommended Surface Water Management Program Changes ... 7‐1 7.2 Planned Capital Improvement Program ............................................................. 7‐2 REFERENCES ..................................................................................................................... R‐1 List of Appendices Appendix A Issue Papers Appendix B Basin Report Cards Appendix C Cost Estimates Appendix D Summary of Regulatory Compliance Recommendations Memo Appendix E Programmatic and Operational Fact Sheets Appendix F Drainage Complaints Appendix G CIP Fact Sheets LIST OF TABLES Table 2‐1: Renton Drainage Basin Areas Table 2‐2: Surface Water Management Inventory Data Table 2‐3: Predicted Peak Flows (cfs) for the May Creek Tributaries within the City of Renton Table 2‐4: Predicted Peak Flows (cfs) for the Kennydale Subbasins Table 2‐5: Predicted Peak Flows (cfs) for the NE 44th Street Exit Drainage Area Subbasin Table 2‐6: Predicted Peak Flows (cfs) for the North Renton Subbasin Table 2‐7: Predicted Peak Flows (cfs) for the Cedar River Basin Table 2‐8: Predicted Peak Flows (cfs) for the West Hill Subbasin Table 2‐9: Predicted Peak Flows at Selected Locations (cfs) for the Black River Basin Table 2‐10: Predicted Peak Flows (cfs) for the Soos Creek Basin Table 3‐1: Utility Surface Water Program Elements Table 3‐2: Surface Water Management Inventory Data Table 3‐3: Maintenance Program Activities Table 3‐4: Average 2015‐2019 Staffing Expenditures for Program Elements Table 4‐1: Category 5 Assessed Waters in Renton AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE iii Table 4-2: Permits Needed for Projects Table 4-3: 2015 Comprehensive Plan Land Use Element – Protecting the Natural Environment and Ensuring Natural Resources for the Future Goals and Policies Table 4-4: 2015 Comprehensive Plan Transportation Element – General Goals and Policies Table 4-5: 2015 Comprehensive Plan Economic Development Element – General Goals and Policies Table 4-6: 2015 Comprehensive Plan Parks, Recreation, Natural Areas, and Trails Element – General Goals and Policies Table 4-7: 2015 Comprehensive Plan Utilities Element – General Goals and Policies Table 4-8: 2015 Comprehensive Plan Capital Facilities Element – General Goals and Policies Table 5-1: Summary of Key NPDES Permit Elements and Budget Requirements (based on Permit Effective 8/19) Table 5-2: Summary of Ongoing and Future Program Needs Table 6-1: Locations of Flooding Problems Table 6-2: Existing Beneficial Uses Table 6-3: 6-Year CIP Summary Table 6-4a: Flooding Problems: May Creek Basin Table 6-4b: Flooding Problems: East Lake Washington Basin Table 6-4c: Flooding Problems: West Lake Washington Basin Table 6-4d: Flooding Problems: Cedar River Basin Table 6-4e: Flooding Problems: Black River Basin Table 6-4f: Flooding Problems: Soos Creek Basin Table 6-4g: Flooding Problems: Citywide Small Drainage Problem Projects Table 6-5: Water Quality Retrofit: East Lake Washington, Black River, Cedar River and May Creek Basins Table 6-6: Habitat Problems: Cedar River, May Creek, Lake Washington, and Black River Basins Table 6-7: Programs and Regulatory Compliance Table 6-8: Prioritized Capital Improvement Projects for Flood Risk Reduction/Water Quality Treatment Table 7-1: Surface Water Utility 2021-2026 Capital Improvement Program (CIP) LIST OF FIGURES Figure 2-1. Surface Water Drainage Basins Figure 2-2. Surface Water Stormwater Facilities Figure 2-3. Water Quality Facilities Figure 2-4: Previous Delineation of Surface Water Drainage Basins Used for Modeling Figure 3-1. Surface Water Utility Support Organization Chart Figure 3-2. Surface Water Staff within Public Works Department Figure 3-3. Community and Economic Development Department Organizational Detail Figure 5-1. SWM Maintenance and Engineering FTEs per 1000 Residents by Year and Population Figure 6-1. Sockeye in Cedar River (Yr. 2010) Figure 6-2. Flooding Problems and Annual Maintenance Project Locations Figure 6-3. Water Quality Retrofit, Annexation Problems, and Habitat Project Locations AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE iv LIST OF ABBREVIATIONS TERM DEFINITION BA Biological Assessment BE Biological Evaluation BMP Best Management Practice BO Biological Opinion BOD Biochemical Oxygen Demand BRPS Black River Pump Station CAO Critical Areas Ordinance CCTV Closed‐circuit television CEQ Council for Environmental Quality CFR Code of Federal Regulations CFS Cubic feet per second CIP Capital Improvement Project City City of Renton CMP Corrugated Metal Pipes CRC Cedar River Council CRS Community Rating System CWA Clean Water Act DDT Dichlorodiphenyltrichloroethane DFIRM Digital Flood Insurance Rate Map District King County Drainage District Number One DNR Department of Natural Resources EA Environmental Assessment Ecology Washington State Department of Ecology EIA Effective Impervious Area EIS Environmental Impact Study EPA Environmental Protection Agency ERP Ecosystem Restoration Program ESA Endangered Species Act ESGRWP East Side Green River Watershed Project Plan and Environmental Impact Statement FEMA Federal Emergency Management Agency FTE Full‐time employee GIS Geographic Information System GMA Growth Management Act GPM Gallons per minute TERM DEFINITION HEC‐RAS Hydrologic Engineering Center’s River Analysis System HOA Homeowner association HPA Hydraulic Project Approval HSPF Hydrologic Simulation Program – FORTRAN IDDE Illicit Discharge Detection and Elimination JARPA Joint Aquatic Resource Permit Application KCFCD King County Flood Control District KMDP Kennydale Master Drainage Plan LAMP Levee Analysis and Mapping Procedure LID Low Impact Development LOMR Letter of Map Revision LWD Large Woody Debris MS4 Municipal Separate Storm Sewer System NEPA National Environmental Policy Act NFIP National Flood Insurance Program NOAA National Oceanic and Atmospheric Administration NOI Notice of Intent NPDES National Pollutant Discharge Elimination System O&M Operation and Maintenance PCBs Polychlorinated biphenyls PCR Polymerase chain reaction pH Potential of Hydrogen RC Resource Conservation RCW Revised Code of Washington RMC Renton Municipal Code SBUH Santa Barbara Urban Hydrograph SEPA State Environmental Policy Act SMA Shoreline Management Act SMP Shoreline Master Program SWM Surface Water Management SWPPP Stormwater Pollution Prevention Plan AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE v LIST OF ABBREVIATIONS (continued) SWUSP Surface Water Utility System Plan TMDL Total Maximum Daily Load TOD Transit Oriented Development TSS Total Suspended Solids UGB Urban Growth Boundary USACE United States Army Corps of Engineers USC United States Code USEPA United States Environmental Protection Agency USFWS United States Fish and Wildlife Service Utility Renton’s Surface Water Utility Section UW University of Washington UWCIG University of Washington Climate Impacts Group WAC Washington Administrative Code WDFW Washington State Department of Fish and Wildlife WQI Water Quality Index WRIA Water Resource Inventory Area WSDOT Washington State Department of Transportation TERM DEFINITION AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-1 EXECUTIVE SUMMARY This Surface Water Utility System Plan (SWUSP) represents the City of Renton’s (City’s) first comprehensive city-wide surface water planning effort since the 1990s. In summary, the SWUSP examines the existing surface water management system, with primary focus on projects and programs that identify and minimize flooding, erosion, and water quality problems as well improve riparian habitat and meet regulatory requirements. Furthermore, the SWUSP is intended to guide programmatic and capital improvement needs for Renton’s Surface Water Utility (Utility) for the next six years and for future years’ guidance. This includes identifying and developing long-term solutions, prioritizing needs that reflect the community’s priorities, quantifying Operation and Maintenance (O&M) needs of the Utility and making sure that there is adequate funding to implement recommendations. MISSION STATEMENT The Surface Water Utility’s goal is to sustainably manage the quantity and quality of surface water runoff in the City to reduce flood hazards, protect public safety, prevent property damage, improve water quality, and protect fish habitat and environmental resources. BACKGROUND ON THE SURFACE WATER UTILITY Utility was created in 1987 as an entity within the Utility Systems Division to maintain, manage, and implement the City’s Surface Water Management (SWM) Program. At that time, its main task was to focus on solving quantity-related flooding problems through the planning, design, maintenance, and construction of drainage facilities and the improved maintenance of existing facilities. The surface water program has evolved over the years. Today, Utility manages the quantity and quality of surface water runoff in the City to reduce flood hazards, protect public safety and prevent property damage, protect water quality, and protect and restore fish and wildlife habitat. Utility includes the Engineering and Maintenance and Operations programs, which include the following activities: 1. Maintaining, repairing, replacing, and improving the City’s storm system infrastructure. 2. The planning, design, permitting and construction of surface water projects as part of Utility’s Capital Improvement Program. 3. Regulatory compliance associated with the Western Washington Phase II Municipal Stormwater permit, the Clean Water Act, and the Endangered Species Act. 4. Customer service regarding drainage complaints, flooding or water quality problems, utility billing and other technical assistance regarding surface water management, along with public education, public involvement, and stewardship programs. 5. Technical assistance to other City Departments and Divisions (Transportation, Planning, Development Services, and Community Services) regarding projects and surface water standards. 6. Manage City’s compliance with the Community Rating System (CRS) Program within the National Flood Insurance Program (NFIP). AGENDA ITEM # 9. a) EXECUTIVE SUMMARY O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-2 7. Assisting in the review of new construction for compliance with surface water design standards and the updating of design standards for new construction. 8. Storm system GIS mapping and management of Utility assets. 9. Emergency management, planning, and response associated with flooding and other disasters. 10. Coordination with other cities and counties, along with state and federal agencies, on regional surface water management topics related to flooding, water quality and habitat, and State/Federal Regulatory requirements. 11. Watershed management, planning, and studies. As of the end of 2020, Utility serves approximately 24,465 customers over an area of approximately 24 square miles. Utility maintains approximately 286 miles of drainage pipeline and culverts, approximately 24 miles of open channel conveyance systems, 17,043 drainage structures, 127 stormwater ponds, 66 stormwater tanks, and 68 stormwater vaults. Some of the significant accomplishments of the Utility include: • Completion of over $85.7 million in Utility capital projects between 1992 and 2020. • Basin planning efforts in the May Creek, Cedar River, and Black River Basins. • Completed the Cedar River Section 205 Flood Hazard Reduction Project that included dredging the lower 1.25 miles of the Cedar River, construction of associated levees and floodwalls, constructing multiple mitigation spawning channels and maintaining the facilities to comply with the US Army Corps of Engineers (USACE) Federal Emergency Management Administration (FEMA) Program. This project included dredging the Lower Cedar River twice, in 1998 and 2016. • Produced updated digital flood insurance rate maps (DFIRMs) and flood studies along 5 miles of the lower Cedar River and 2.8 miles along Springbrook Creek. • Implemented a significant number of the flooding and riparian habitat improvements identified in the Eastside Green River Watershed Plan, including replacement of major culvert crossings at SW 34th Street and SW 27th Street. • In partnership with WSDOT, developed the 124-acre Springbrook Creek Wetland and Habitat Mitigation Bank. • Received over $50 million in grants and matching funds from various agencies and taxing districts including FEMA, King County Flood Control District (KCFCD), USACE, the Washington State Department of Transportation (WSDOT), the Washington State Department of Ecology (Ecology), King County, King Conservation District and Drainage District #1 that were applied to City projects to reduce flooding and improve water quality and stream habitat. • Completed green street connections projects that combined water quality retrofits with drainage improvements. • Addressed miscellaneous emergency stormwater projects as well as numerous small drainage problems. AGENDA ITEM # 9. a) EXECUTIVE SUMMARY O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-3 CHALLENGES FACING THE SURFACE WATER PROGRAM Although Utility has made significant accomplishments, there remain future challenges that must be considered when defining recommendations for new program direction. The following are some of the most significant challenges. NPDES PROGRAM A significant impact to the City’s program is the increasing state and federal stormwater regulations, primarily, the Western Washington Phase II Municipal Stormwater Permit, also known as the National Pollutant Discharge Elimination System (NPDES) Permit, (NPDES Permit) issued to the City by the Washington State Department of Ecology (Ecology). The City has been ramping up its surface water program since 2007 to be in compliance with this permit. The current permit, which became effective August 1, 2019, has timetables for several elements that mandate full compliance before it expires on July 31, 2024. The most notable changes to the current 5-year permit include new requirements for implementation of a stormwater planning program and a source control program for existing development. Both of these elements will result in increased demand on City resources compared to the previous permit. This is further discussed in Sections 4.4.8 and 5.2. TMDL Total Maximum Daily Load (TMDL) is a study required under Section 303(d) of the Clean Water Act that evaluates and determines the allowable pollutant loading for a water body that exceeds state standards for various pollutants. Once the state determines that a particular water body exceeds a pollutant standard, it is placed on the 303(d) list for a TMDL. Renton has several water bodies that are on the 303(d) list that require TMDL studies to be performed. Renton TMDLs are discussed in more detail in Section 4.4.6. REGULATED FLOODPLAIN IN THE GREEN RIVER VALLEY KCFCD finalized the scoping summary report for the Lower Green River Corridor Flood Hazard Management Plan as a part of the Environmental Impact Study (EIS) associated with the plan in June of 2019. The purpose of this plan is to implement an integrated long-term approach to reduce flood risk within the Lower Green River Corridor, which extends into the southwestern portion of Renton. The plan is intended to reduce flood risk while balancing other important basin objectives, such as improving fish habitat and supporting the economic prosperity of the region. Communication and coordination between the City of Renton and KCFCD has been ongoing throughout the preliminary stages of formulating the Flood Hazard Management Plan. Further details are discussed in Section 2.4.5.3 CONTROLLING FLOODING FROM THE CEDAR RIVER One major Utility task is working alongside KCFCD and USACE on the Cedar River Section 205. The Cedar River Section 205 includes periodic maintenance dredging and repairs to the USACE-built facilities, including floodwalls, levees, spawning channels. The City was the sponsor for the USACE Cedar River Section 205 Flood Hazard Reduction Project, which plays an important role in protecting the City from major flooding that has previously caused millions of dollars in damages. In general, large sediment deposits reduce the flood protection in the lowest 1.25 miles prior to discharging into Lake Washington. The 2006 King County Flood Hazard Management Plan identified the dredging of this reach as a major AGENDA ITEM # 9. a) EXECUTIVE SUMMARY O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-4 project. Maintenance dredging occurred in the summer of 2016. The funding for the project was provided by KCFCD at an estimated cost of $4.8 million. KCFCD is a special purpose taxing district that was established by King County in 2007 to protect the public from injury and damage from flood hazards and provide a proactive, regional approach to flooding. The district is especially important in county- wide funding for the repair of levees and revetments. Cedar River flood mitigation is further described in Section 2.4.3.3. CEDAR RIVER LEVEE RE-CERTIFICATION In July 2012, the City received notification from USACE that the certification issued for right and left bank levees along the lower 1.23 miles of the Cedar River will expire on August 31, 2013, and future re- certification will be the responsibility of the City. Certification of the levees is essential so that FEMA accredits the levees as providing protection from the 100-year flood and avoid mapping the properties protected by the levees (Renton Municipal Airport and Boeing 737 Plant) in the regulatory floodplain. Levees certified to current FEMA standards must demonstrate that they meet the design, operation, and maintenance requirements described in Title 44, Chapter 1, Section 65.10 of the Code of Federal Regulations. The challenge presented by this effort consists of certifying the levee system based on current standards. Upon conducting various structural, geotechnical, and hydraulic analyses in 2018, the City determined that certain sections of the levees need to be raised to meet current freeboard requirements, and that the levee embankment needs to be widened at certain levee to floodwall transitions. Currently, the City is designing and permitting the required improvements to achieve FEMA accreditation and has secured funding for design and construction from KCFCD. Meanwhile, the City expects to maintain current floodplain designation for the protected areas (Zone X not Zone AE), because FEMA elected to seclude the floodplain of the Lower Cedar River from the King County Digital Flood Insurance Rate Map (DFIRM) update. By secluding the Cedar River levees (and other levees in King County) from the update, FEMA can advance the adoption of the DFIRM and subsequently individually assess the level of flood protection of the secluded levees. The City expects to have the levees certified and accredited prior to FEMA taking any action in that regard. HOWARD HANSON DAM AND GREEN RIVER VALLEY Although now operating at full capacity, concerns over reduced storage capacity due to seepage problems at the Howard Hanson Dam and potential flooding of the Green River Valley caused the City to expend significant resources in flood preparedness between 2009 and 2011. In 2009, USACE notified the City and other Green River Valley cities of several sinkholes that had formed in the right embankment of the Howard Hanson Dam after a significant rain event in January 2009. This led USACE engineers to believe that the right embankment could fail if they continued to operate the dam at full capacity. To minimize risk of failure, USACE informed the Green River valley communities that it would need to reduce storage capacity, which could result in the release of more water from the dam during extreme rain events and result in a higher risk of flooding. In coordination with USACE, King County, and other valley cities, the City implemented pre-disaster preparations and preventative measures and continued these measures through 2010. To make the dam fully operational, USACE completed repairs to the dam in the fall of 2011 and can now operate the dam to its full capacity. Further details of the Howard Hanson Dam are discussed in Section 2.4.5.4. AGENDA ITEM # 9. a) EXECUTIVE SUMMARY O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-5 FEDERAL RULING REGARDING CULVERT BARRIERS TO FISH PASSAGE On March 29, 2013, the US District Court for the Western District of Washington issued a permanent injunction requiring state roads owned by WSDOT, the Washington State Department of Natural Resources, the Washington State Department of Fish and Wildlife (WDFW), and the Washington State Parks and Recreation Commission to operate with culvert crossings that are suitable for fish passage. The decision reinforces treaty fishing rights granted by the federal government to Native American tribes in Washington State dating back to the 1860s. The permanent injunction required the State to prepare a list of all culverts with barriers to fish passage in Western Washington within 6 months. WSDOT must also provide fish passage for culverts with barriers by 2030. Although the court ruling focused on State-owned culverts, it is possible it could be broadened in the future to include other governmental entities such as counties and cities. To proactively address the potential liability that the City may face in the future, Utility will begin the process of conducting a stream inventory of all culvert crossings. This information will be used to field survey each culvert crossing in an effort to identify fish passage issues and develop solutions with priority rankings that can be incorporated in the utility’s Capital Improvement Project (CIP) program. Fish passage barriers are described further in Section 5.8. FLOODING, WATER QUALITY, AND HABITAT PROBLEMS The City identified 48 flooding problems, ranging from nuisance flooding to flooding of buildings and arterials (in addition to potential flooding from the Green River) (see Figure 6-2 for locations). The City aims to use CIP funds to reduce flooding for as many of these areas as possible. See the 6-year CIP in Appendix G, which lists projects prioritized for completion in 2021-2026. The Cedar River, May Creek, Springbrook Creek, Maplewood Creek, Black River, and Lake Washington are all listed on Ecology’s 303(d) list of impaired waters. All of these water bodies originate upstream of the City within other upstream jurisdictions that likely contribute to downstream water quality problems. Nevertheless, the City of Renton wants to improve stormwater quality within the City. Water quality problems are typically addressed by the City through development regulations, operational activities (such as street sweeping and catch basin cleaning to remove pollutants before they reach streams), and public education. Protecting and restoring habitat is both a City and a regional objective. The City participates in regional water resource inventory area (WRIA) planning efforts. WRIA planning is done in response to the state Salmon Recovery Planning Act, which in turn was a response to the Endangered Species Act listings. Portions of the City are in two WRIAs. May Creek, Cedar River, and the East and West Lake Washington Basins are all part of WRIA 8. The Springbrook/Black River, Cedar River, and Soos Creek Basins are part of WRIA 9. Salmon conservation plans for WRIAs 8 and 9 were completed in 2005 with the City having adopted these plans and are a sponsoring participant. These plans, together with other plans prepared throughout the Puget Sound region, became part of the official Puget Sound Salmon Recovery Plan approved by NOAA Fisheries in 2007. These plans contain recommendations for protecting and restoring salmon habitat, from general land-use recommendations applicable throughout the watershed to small and large, site-specific habitat restoration projects. The City plans to be a participant on many of the identified projects located within its jurisdiction. Flooding, water quality, and habitat projects are discussed in further detail in Section 6. AGENDA ITEM # 9. a) EXECUTIVE SUMMARY O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-6 INCREASING OPERATION AND MAINTENANCE DEMANDS Another challenge to the Utility is increased operation and maintenance as a result of expansion of the service area through previous annexations. This is particularly true for the 2008 Benson Hill annexation, which increased the City’s area by 32%, increased infrastructure through new construction and development, and added capital improvement projects. Additionally, Utility maintenance staff have assumed responsibility for maintaining vegetation on all City right-of-way, easements and wastewater, water, and surface water facilities. The City also assumed responsibility for maintenance of over 100 residential stormwater facilities beginning in 2012, following a new City Policy that was issued in 2010. City staff resources were increased as a result of the Benson Hill annexation and have generally increased in the last 5 years to keep pace with population growth. However, additional resources are recommended to accommodate the additional operation and maintenance demands, such as increased vegetation maintenance, assumed responsibility of residential stormwater facilities, and new NPDES requirements. INCREASING EMPHASIS ON ASSET MANAGEMENT AND SUSTAINABILITY The need to effectively manage assets (e.g. pipes, structures and facilities) is crucial to the success of the Utility’s operations and its ability to meet regulatory requirements. The City is currently using a combination of CityWorks, GIS, and GraniteNet for its asset management strategy. CityWorks is used to track work orders. GraniteNet is used for condition assessment data and prioritization of asset replacement or rehabilitation. GIS, integrated with CityWorks and GraniteNet, is used to display information and track projects and maintenance activity. The asset management program was driven by the need to assess the condition of corrugate metal pipes at risk of failure. However, it is now recommended that the Utility expand their pipe condition assessment program to include non- corrugated metal pipes (CMP) to capture the condition of all pipes at risk of collapse or failure. Fostering environmental sustainability is a goal adopted by the City Council in the current (2022-2027) business plan. Sustainability is a core principle in the operation of the Utility and Section 4.7.1 describes how the Utility is meeting the sustainability goal set in the current business plan. RECOMMENDATIONS Solutions were considered to solve the City’s surface water problems and future challenges, including: • Capital projects. • Regulatory measures. • Programmatic and policy measures. In general, capital projects are best suited for addressing acute, site -specific problems, and regulatory or programmatic measures affect the entire City. The following paragraphs summarize the plan findings. Refer to Section 7 in the report for more detailed information. REGULATORY COMPLIANCE: • Develop and implement a source control program for existing land uses. • Evaluate receiving water conditions in City watersheds and select high priority watershed for which to develop a Stormwater Management Action Plan. AGENDA ITEM # 9. a) EXECUTIVE SUMMARY O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-7 • Map private stormwater systems connected to the City’s MS4. OTHER FUTURE PROGRAM NEEDS AND POLICY CONSIDERATIONS: • Continue to monitor the increased resources from infill development relative to maintenance staff levels and make adjustments as needed. • Continuation of Residential Plat Stormwater Management Facility and Maintenance and Operation. • Continuation of existing surface water initiatives, including the Mosquito Abatement Program, Stormwater Facility Fencing Program, City-Wide Drainage Maintenance Program, and Stream Flow/Water Quality Monitoring Program. • Enhance the current Asset Management Program to include non-CMP pipes. • Update the Surface Water Utility System Plan every 6 years. • Continue with agency coordination such as WSDOT, KCFCD, FEMA, USACE, and Ecology on issues related to surface water management within the City. CAPITAL IMPROVEMENT PROGRAM The plan includes a comprehensive list of capital projects proposed to reduce flooding and improve water quality and habitat. Overall, there were substantially more flooding problems identified than could be solved within a six-year planning period. As such, a prioritization scheme was developed with City staff to help guide the timing of project implementation. A three-tiered priority system was developed, as summarized in the following table. TABLE E-1: PROJECTS TO REDUCE FLOODING Priority Level/Description Number of Projects Costs (2020 dollars) Priority 1 - Highest priority projects considering such things as public safety; flooding of arterials that potentially close emergency vehicle access; the number of buildings flooded (numerous buildings vs. one or a few) and the extent of flooding and potential cost of flood damage; and the recurrence of flooding (how often an area gets flooded). 15 $46.6 million Priority 2 - Projects that may include many of the same factors as the Priority 1, but that are not considered a significant safety hazard, may flood one or a few buildings compared to several, or may be subject to flooding on vary rare occasions. 22 $12.3 million Priority 3 - Third priority projects reflect projects that temporarily flood local streets or public/private yards but do not result in significant safety hazards or property damage. 14 $9.2 million AGENDA ITEM # 9. a) EXECUTIVE SUMMARY O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE E-8 Based on current financial scenarios (discussed below), the City will plan to implement most of the Priority 1 projects within the 6-year CIP planning period with some projects expected to extend beyond the 6-year planning period. Priority 2 and 3 projects would be implemented in subsequent years as funding becomes available. OPERATIONS AND MAINTENANCE Continue to uphold the maintenance and operation program level of service to ensure proper maintenance of City storm systems and facilities, to protect public safety and property by preventing flooding, and meet regulatory requirements by improving water quality and habitat. WATER QUALITY Several of the projects identified can integrate water quality enhancements to provide a water quality benefit and flood reduction. While most water quality problems are being addressed primarily by water quality programs (e.g., development regulations, operational activities such as catch basin cleaning, and public education), to meet compliance with the NPDES Permit program, three water quality retrofit projects are proposed that would significantly improve water quality within the City. These projects are discussed in more detail in Section 6. HABITAT As mentioned previously, salmon conservation plans for WRIAs 8 and 9 were completed in 2005, with the WRIA 8 plan updated in 2017, and adopted by the City. These plans contain recommendations for ESA compliance by protecting and restoring salmon habitat, from general land-use recommendations applicable throughout the watershed to small and large, site-specific habitat restoration projects. The City is committed to helping implement the recommendations of these plans through a variety of methods: partial funding, local sponsorship, expedited permitting, and engineering/planning coordination. Twenty-six projects have been identified in which the City can improve habitat conditions. No detailed cost estimates have been prepared for these projects and a very preliminary high-level cost range between $4M and $8M is estimated. The level of local support provided by the City will vary for each project. The list of projects is given in Table 6-6 of this plan and their locations are shown on Figure 6-4. AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 1-1 SECTION 1 HISTORY, ACCOMPLISHMENTS, AND GOALS 1.1 INTRODUCTION This Surface Water Utility System Plan (SWUSP) examines the existing surface water management program with the primary focus of identifying and solving flooding, erosion, habitat, and water quality problems as well as meeting regulatory requirements. The SWUSP is also intended to guide programmatic and capital improvement needs for the City of Renton’s Surface Water Utility (Utility) for the next six years and beyond. This includes identifying and developing long-term solutions, prioritizing projects that reflect the community’s needs, quantifying operation and maintenance (O&M) needs of the Utility, and making sure that there is adequate funding to implement recommendations. 1.2 HISTORY, PROGRAM DESCRIPTION, AND ACCOMPLISHMENTS The City of Renton (City) was incorporated in 1901. Early land alterations in the City included dredging, channelizing the Green and Cedar Rivers to improve navigation, constructing rail corridors and coal mines, and clearing land associated with agriculture and forestry. Flood control within Renton during the early 1900s consisted of drainage courses made to protect forests and agricultural practices. As the population grew, the lowlands changed from forest and agriculture to urban development. This urban development included heavy investments into industrial activities, because Lake Washington, the lower Cedar River, and the Duwamish waterway were all transportation corridors where industrial activity existed. Adjacent areas have been annexed to the City since its initial incorporation and additional annexations will likely continue in the future. Portions of Utility’s infrastructure (facilities and conveyance systems) are aging and in need of repair and improvement. This aging infrastructure coupled with new development must be maintained, managed, and implemented in a way that meets regulatory requirements, enhances the City’s existing storm drainage system, and does not exacerbate existing problems. Utility was created in 1987 as an entity within the Public Works Department, Utility Systems Division to maintain, manage, and implement the City’s Surface Water Management (SWM) Program. At that time, its main task was to focus on quantity-related flooding problems through the planning, design, maintenance, and construction of public drainage facilities; review and approval of the construction of private drainage facilities; and improving maintenance of existing facilities. The surface water program has evolved over the years as described below. 1.3 UTILITY MISSION Utility’s mission is to serve our customers by sustainably managing the quantity and quality of surface water runoff in the City to reduce flood hazards, protect public safety, prevent property damage, improve water quality and protect fish and environmental resources. Where applicable, the City will coordinate the management of the system with other regional and adjacent jurisdiction efforts. AGENDA ITEM # 9. a) HISTORY, ACCOMPLISHMENTS, AND GOALS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 1‐2 The desired outcome of Utility programs and services is to reduce flooding hazards and to help protect the environmental, recreational, and aesthetic uses of the City's streams, lakes, rivers, and wetlands, which contribute to the livability and appeal of the community. 1.3.1 PROGRAM DESCRIPTION AND ACCOMPLISHMENTS The Engineering and Maintenance and Operations program includes the following activities: 1. Maintaining, operating, repairing, replacing, and improving the City’s storm system infrastructure. 2. The planning, design, permitting, and construction of surface water projects as part of Utility’s Capital Improvement Program. 3. Regulatory compliance with state and federal regulatory requirements associated with the Western Washington Phase II Municipal Stormwater permit, the Clean Water Act (CWA), the Federal Emergency Management Agency (FEMA) National Flood Insurance Program, and the Endangered Species Act (ESA). 4. Customer service regarding drainage complaints, flooding and water quality problems, utility billing, and other technical assistance regarding surface water management, along with public education, public involvement, and stewardship programs. 5. Technical assistance to other City Departments and Divisions (Transportation, Planning, Development Services, and Community Services) regarding drainage improvements in their projects, critical area protection standards, and compliance with Surface Water design standards. 6. Manage City’s compliance with the Community Rating System (CRS) Program within the National Flood Insurance Program (NFIP). 7. Secondary review of new private development construction for compliance with surface water design standards and updating of design standards for new construction. 8. Storm system GIS mapping and management of Utility assets. 9. Emergency management, planning, and response associated with flooding and other disasters. 10. Coordination with other cities, counties, along with state and federal agencies, on regional surface water management topics related to flooding, water quality, and habitat. 11. Watershed management, including planning and investigative studies. Utility serves approximately 24,465 customers and is responsible for the maintenance, repair, and replacement of approximately 286 miles of drainage pipeline and culverts, along with approximately 24 miles of open channel conveyance systems. Utility is responsible for the maintenance, repair, and replacement of approximately 17,043 drainage structures, three stormwater pump stations, and 435 publicly maintained flow control (detention) and water quality treatment facilities, including ponds, vaults, tanks, bioswales, and Filterra units. The Utility is responsible for the management of approximately 136 acres of City owned parcels with flow control facilities, water quality facilities, and pump stations within the City that are not public right‐of‐way. Some of the significant accomplishments of the Surface Water Utility include: AGENDA ITEM # 9. a) HISTORY, ACCOMPLISHMENTS, AND GOALS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 1-3 • Completing over $85.7 million in Surface Water Utility Capital Improvement Projects between 1992 and 2020. • Basin planning efforts in the May Creek, Cedar River, and Black River Basins. • Completed the Cedar River Section 205 Flood Hazard Reduction Project that included dredging the lower 1.25 miles of the Cedar River, construction of associated levees and floodwalls, constructing multiple mitigation spawning channels and maintaining the facilities to comply with the USACE FEMA Program. This project included dredging the Lower Cedar River twice: in 1998 and 2016. • Produced updated digital flood insurance rate maps (DFIRMs) and flood studies along 5 miles of the lower Cedar River and 2.8 miles along Springbrook Creek. • Implemented a significant number of the flooding and riparian habitat improvements identified in the Eastside Green River Watershed Plan, including replacement of major culvert crossings at SW 34th Street and SW 27th Street. • In partnership with WSDOT, developed the 124-acre Springbrook Creek Wetland and Habitat Mitigation Bank. • Received over $50 million in grants and matching funds from various agencies and taxing districts including FEMA, KCFCD, USACE, WSDOT, Ecology, King County, and the King Conservation District and Drainage District #1 that were applied to City projects to reduce flooding and improve water quality and stream habitat. • Completed green street connections projects that combined water quality retrofits with drainage improvements. • Addressed miscellaneous emergency stormwater projects and numerous small drainage problems. 1.4 UTILITY GOALS Utility’s goals include flood risk reduction, water quality improvement, and aquatic habitat and environmental resource conservation, while carrying out the policies and priorities set by elected officials and the City’s business plan. The Surface Water Utility provides five basic services: • Flood risk reduction. • Regulatory and water quality compliance. • Aquatic habitat and environmental resource protection. • Maintenance of the storm water system. • Customer service. Flood risk reduction involves protecting public safety by preventing flood damage to property and preventing disruption of mobility and critical services caused by stormwater flows that exceed system capacity. This is accomplished primarily through the planning, design, construction, operation and AGENDA ITEM # 9. a) HISTORY, ACCOMPLISHMENTS, AND GOALS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 1-4 maintenance of channels, pipes, roadside ditches, culverts, detention ponds, and natural and man-made open water courses. Regulatory and water quality compliance programs reduce pollution through public education and involvement, implementation of regulations (inspections and code enforcement of commercial and residential facilities), maintenance of infrastructure (through system catch basin cleaning, and other activities), and capital projects that provide treatment and reduce pollutants. This program is largely driven by required compliance with the Clean Water Act (CWA) and the NPDES Phase II Municipal Stormwater permit as described in Section 1.3.1, but is also important for maintaining the aesthetics and livability of the community. Often water quality capital projects are integrated into flood risk reduction projects. This program area also includes addressing sources of pollution and implementing management practices that reduce non-point pollution in stormwater from public and private sources. The aquatic habitat and environmental resource protection program area involves identifying and preserving existing habitat; identifying high-quality stream habitat in the City; implementing development standards that protect environmental resources including critical areas such as streams and wetlands and their buffers; improving water quality; providing public education; and coordinating public efforts to protect or enhance habitat. The Utility provides customer service by providing responses to questions and complaints, public education, flood hazard monitoring and response assistance during flood events. 1.5 PLAN DEVELOPMENT PROCESS In developing this Plan, representatives from various City Departments were included in identifying current flooding, water quality, erosion, and habitat problems within the City. City staff also assisted in identifying the level and cost of current programmatic responsibilities and developing priorities for future capital and programmatic needs. Those involved during development of the Plan included staff from Surface Water Engineering, Maintenance Services, Community and Economic Development Services, and Finance. In addition, as part of the development of the capital improvement program and programmatic needs, workshops were held with City staff to discuss the existing program, NPDES permitting requirements, and stormwater infrastructure maintenance. Utility engineering and maintenance personnel and management participated in identifying and reviewing capital stormwater improvement projects that need to be programmed in the future. The list of major storm system deficiencies was augmented based on citizen complaints. Utility staff also reviewed King County complaints in annexed areas in order to identify problems related to flooding, water quality, and habitat/environmental preservation. The public will be involved in the process of developing this Plan through the State Environmental Policy Act (SEPA) process. A draft of this Plan will be included on the City’s website for the public to view and provide comments. Copies of the draft SWUSP will be available for public download and review, and the public is always invited to attend City Council meetings or committee meetings that discuss this Plan. AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐1 SECTION 2 DRAINAGE BASIN AND SERVICE AREAS 2.1 INTRODUCTION This section contains descriptions of the study area, the existing surface water system, and the drainage basins within the City of Renton and tributary portions of the City’s urban growth areas. 2.2 STUDY AREA GENERAL DESCRIPTION The major drainage basins within the city limits and Urban Growth Boundary (UGB) include portions of the May Creek Basin, the Cedar River Basin, the Black River Basin, the Soos Creek Basin, and a portion of the Lower Empire subbasin of the Duwamish River Basin. The May Creek, Cedar River, and Soos Creek Basins extend upstream outside the current city limits into the UGB and unincorporated King County. The Duwamish River Basin extends downstream to the northwest beyond the city limits. In addition to these larger drainage basins within the city limits, there are several smaller basins that empty directly into Lake Washington and comprise the East Lake Washington and West Lake Washington Basins. The basins are shown on Figure 2‐1. Table 2‐1 summarizes the total basin areas as well as the area of each basin within the city limits and the area of the basin outside the city limits and within the UGB. The South Lake Washington Basin is excluded from the study area, because it consists entirely of private property and private stormwater conveyance systems. The drainage basins within the Renton city limits and UGB have undergone extensive modifications due to various residential and industrial developments in the area. The drainage basins were heavily forested in the 1860s when coal deposits were discovered in the region prior to early settlement of the Renton area. Between the 1860s and the 1890s, coal mining and logging flourished throughout the region. Following closure of the mines, the logging and lumber mills remained, and much of the existing forests were cleared. Urban development began during the early part of the 20th century as the valley areas were settled by crop and dairy farmers. The City of Renton was incorporated in 1901 (HDR, 1995). Before the area was settled, the Cedar River and Lake Washington flowed via the Black River into the Green River and the Duwamish estuary. At that time, this watershed accounted for 692 square miles from the Lake Washington basin to the Duwamish Estuary. The majority of this area was the 607 square mile Cedar River watershed. In addition, the White River was once a major tributary of the Green River, adding an additional 494 square miles to the total Green River drainage area. Today, the White River is part of the Puyallup River watershed. The Cedar River flows into Lake Washington and is a separate watershed from the Green River. Figure 2‐1. Basin Locations AGENDA ITEM # 9. a) Cedar Main Urban Soos Creek Main Johns Creek Panther Creek West Hill Madsen Creek Honey Creek Springbrook Creek Molasses Creek South Renton Bryn Mawr Orting Hills Ginger Creek Cedar Grove Rolling Hills Creek Maplewood Creek Peterson Creek Lower Empire Lower May Creek May Creek Thunder Hills Creek Upper Springbrook Creek South Kennydale RH Creek Greenes Creek Lake Washington - East West Kennydale RH Creek Summerfield Creek Lake Washington - South Lake Kathleen Prepared: 7/30/2020Surface Water Utility Comprehensive Plan Figure 2-1Surface Water Drainage Basins Renton City Limits Urban Growth Boundary Watercourse Streets Drainage Basin Boundary±0 1 20.5 Miles Lower Cedar River Black River Soos Creek Duwamish River West LakeWashington East LakeWashington May Creek LakeWashington West Lake Washington Bryn Mawr West HillSoos Creek Soos Creek MainMay Creek Greenes Creek Honey Creek Lake Kathleen Lower May Creek May Creek RH CreekLower Cedar River Cedar Grove Cedar Main Urban Ginger Creek Madsen Creek Maplewood Creek Molasses Creek Orting Hills Peterson Creek Summerfield CreekEast Lake Washington Johns Creek Lake Washington - East South Kennydale West KennydaleSouth Lake Washington Lake Washington - SouthDuwamish River Lower EmpireBlack River Panther Creek Rolling Hills Creek South Renton Springbrook Creek Thunder Hills Creek Upper Springbrook CreekSouth LakeWashington AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-3 TABLE 2-1: RENTON DRAINAGE BASIN AREAS Basin Total Basin Area1 Basin Area within Current City Limits2 Basin Area between Current City Limits and the Urban Growth Boundary (UGB)3 Potential Future Surface Water Utility Service Area4 (square miles) (square miles) (square miles) (square miles) May Creek 13.8 2.8 0.5 3.3 East Lake Washington 4.4 2.9 0.0 2.9 Cedar River 25.3 7.5 7.0 14.5 West Lake Washington 16.5 0.5 1.9 2.4 Black River 20.2 8.1 0.1 8.2 Soos Creek 12.3 1.5 1.4 2.9 Duwamish 16.0 0.1 0.8 0.9 Total Square Miles 108.5 23.4 11.7 35.1 1. Areas determined using the subbasin delineations provided by the City. 2. Areas determined using the city limits provided by the City. 3. Areas determined using the city limits and UGB provided by the city. 4. Areas determined as basin area within current city limits plus area between the current city limits and UGB. In anticipation of lowering Lake Washington as a result of the construction of the Hiram Chittenden Locks, the Cedar River was diverted into Lake Washington between 1912 and 1916. The Black River, which previously drained Lake Washington, dried up in 1916 when the water level in Lake Washington lowered. The following list gives a general history of the Green and Cedar River areas: 1911 White River permanently diverted from Green River to Puyallup River. 1912 Masonry Dam closed on the Cedar River and drinking water diverted for the City of Seattle. 1913 Drinking water diversion on the Green River constructed by the City of Tacoma. 1916 Lake Washington outflow directed to Hiram Chittenden Locks and lake levels lowered 9 feet. 1916 Cedar River discharge diverted from the Black River to Lake Washington, and due to the lake lowering, the Black River dried up, except for drainage from Springbrook Creek. 1917 Duwamish Waterway constructed. 1940s Most of Green/Duwamish wetlands converted to developed land. 1962 Howard Hanson Dam built for Green River flood control. These major actions reduced flood risk and improved navigation and provided drinking water. They also created two distinct watersheds, WRIAs 8 and 9. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐4 2.3 EXISTING SYSTEM DESCRIPTION Renton’s drainage system consists of built facilities and natural channels that convey and treat surface water prior to its discharge into receiving waters. Prior to 1987, when Utility was formed, the City storm drainage facilities were managed within the street and roadway programs, and there was no dedicated staff that focused on the storm water system. As a consequence, the City lacked problem identification, inventory data, and other system details due to the lack of a dedicated stormwater utility. Since forming, Utility has developed Geographic Information System (GIS) of the Utility’s storm system infrastructure. The GIS mapping shows the location of the infrastructure, type of asset, and other data associated with the asset. The Storm System Inventory Maps generated using GIS, and the associated GIS inventory, are incorporated as part of this Plan by reference. The inventory includes the sizes, lengths, type and characteristics of facilities that are known to be the responsibility of the City. Maps are located online here: http://rentonwa.gov/city_hall/administrative_services/Information_technology/maps___g_i_s_data The following sections provide a general description of the built drainage system components according to function, which primarily includes conveyance and stormwater (water quality and flow control) facilities. Table 3‐3 summarizes the estimated quantity of drainage system infrastructure and Figure 2‐2 and 2‐3 show all of the publicly maintained flow control and water quality facilities located within the City, respectively. AGENDA ITEM # 9. a) [Ú [Ú [Ú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§¨¦405 §¨¦405 UV900 UV900 UV900 UV169 UV515 UV181 UV515 UV167 UV167 UV167 Lake Youngs Lake Boren Panther Lake LakeWashington Black RiverForbay Figure 2-2: Surface Water Stormwater Facilities µ Surface Water Utility - GIS | Printed Date: 12/07/2020 0 0.5 10.25 Miles Facility Type ?>Pond $#Tank ]\Vault [Ú Pump Station City of Renton AGENDA ITEM # 9. a) ]\ nm nm "B? nm nm gY ]\ nm?> gY gY ")Î gY gY "? ]\ nm ?> lh, gY nm gY nm gY ]\ nm gY nm nm gY gY UUr gY nm gY nm£ gY ?> nm nm gY gY gY nm ]\ gY gY gY "? UTr UUr nm ?> gY nm nm nm ]\ nm ?> gY gY nm gY nm "? nm ]\ ]\ nm ]\ gY gY gY gY UTr "? ") ]\ gY nm nm "? gY ]\ UX gY nm¤ ]\ nm nm nm nm gY gY ?> ]\ gY gY gY gY nm "? ") "? ]\ nm ]\ nm gY nm gY gY ]\ nm gY "B? gY "? UX ?> ]\ nm gY gY UTr ")Î nm nm nm gY "? nm "? ?> gY nm gY nm gYgY gY nm nm nm nm nm UX gY gY nm nm ?> gY nm "? nm£ ]\ nm gY gYgY gY ?> nm UUr nm gY ?> ]\ §¨¦405 §¨¦405 UV900 UV900 UV900 UV169 UV515 UV181 UV515 UV167 UV167 UV167 LakeYoungs Lake Boren Panther Lake LakeWashington Black RiverForbay Figure 2-3: Water Quality Facilitiesµ Surface Water Utility - GIS | Printed Date: 12/07/2020 0 0.5 10.25 Miles Water Quality Facility nm Bioswale nm£Rain Garden nm¤Sand Filter gY Filterra ")Media Filter Drain ")Î Modified Media Filter Drain UTr Oil/Water Separator Baffle UUr Oil/Water Separator Coalescing UX Perk Filter - Oldcastle "?Stormfilter - Contech "B?Stormfilter - ADS Bayfilter nm Stormwater Wetland ?>Wet Pond ]\Wet Vault lh,Other City of Renton AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐7 2.3.1 CONVEYANCE Conveyance system components, both natural and constructed, collect and transport surface water or stormwater runoff within a drainage basin from one location to a location further downstream. There are several types of constructed conveyance system components described in the following sections. Constructed conveyance systems are designed based on hydrologic predictions of peak flow events for the drainage area; therefore, accurate hydrologic models and predictions are critical to the successful design and function of conveyance infrastructure. Recent studies conducted by the UW Climate Impacts Group indicate that future rain events in the Pacific Northwest will likely be more intense, and King County is developing projections of changes in precipitation to inform stormwater management within King County (Mauger et al., 2018). 2.3.1.1 Stormwater Pipe The City’s stormwater pipes range in diameter from 6 inches to 7 feet and convey stormwater to outfalls that discharge into the City’s streams and rivers or into Lake Washington. Concentrated flows disperse at the outfall through energy dissipation systems. Some stormwater pipes have storage or water quality treatment structures built into the system as described in Sections 2.3.2 and 2.3.3. The storage or detention pipes within the City’s stormwater system are up to approximately 12 feet in width and 8 feet in height. The total length of pipe within the City is summarized in Table 2‐2. 2.3.1.2 Culverts Culverts are short sections of pipe or concrete box structures used to convey stormwater under embankments or roads. Culvert pipes are usually circular concrete or corrugated metal. Some culverts are reinforced concrete 4‐sided boxes, or three‐sided (i.e., open bottom) with gravel substrate for fish‐friendly passage. Headwalls sometimes are located at the inlet and/or outlet of culverts to prevent undermining, deflect flow, and reduce erosion of slopes around the culvert. Frequently, there is an energy dissipation structure at a culvert outlet if exit velocities are high. Culverts within the City’s stormwater system are up to 21.5 feet in height by approximately 12 feet in height. 2.3.1.3 Pump Stations Pump stations are used to convey runoff flow downstream from low‐lying or closed depression areas that cannot be served by a gravity system. The City has three publicly maintained pump stations. One pump station is located at the Rainier Ave S/BNSF railway underpass with a capacity of 6,500 gallons per minute (GPM) (Washington State Highway Commission, 1960), and one is located at the Oakesdale Ave SW/I‐405 underpass with four 1,100 GPM pumps (City of Renton, 2012). The third pump station is located in Tukwila at SW 27th / Strander Blvd and has a capacity of 6,750 GPM (BergerABAM, 2011). 2.3.1.4 Catch Basins Catch basins are typically concrete structures with underground sumps that connect the piped storm drain system. Often, they have open grates and are located along the curb line to collect runoff from roads or gutters. The City mostly has type 1, type 2, and type 3 catch basins with differing catch basin inlets, depending on the road grade and orientation to the road curb. In some older systems there may be brick catch basins that were converted from older sewer systems or older combined systems. Most catch basins also provide some level of water quality treatment, as sediment is deposited within the sump (see Section 2.3.2.3). The total number of catch basins within the City is summarized in Table 2‐2. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-8 TABLE 2-2: SURFACE WATER MANAGEMENT INVENTORY DATA1 Type of Facility Quantity Unit Catch Basins/manholes2 17,043 Each Drainage Pipe/Culverts2 286 Miles Facilities – City Maintained3 435 Each Facilities – Private3, 4 787 Each 1. Table does not include ditches. 2. Quantities were estimated in 2020 using information available from the City's GIS. Note that this quantity does not include private systems. 3. Facilities include ponds, vaults and tanks, wetponds, bioswales, Filterras, etc. Quantities estimated in 2020 using information available from the City’s GIS 4. The quantity for private facilities includes residential subdivisions, commercial and industrial sites, and facilities not owned by the City. 2.3.1.5 Ditches Ditches are constructed earth channels, generally lined with vegetation, but sometimes with asphalt, rock, or concrete, that convey stormwater in areas not served by piped systems. 2.3.2 WATER QUALITY TREATMENT FACILITIES Water quality treatment facilities remove pollutants from stormwater runoff. Water quality treatment facility types consist of vegetated flowpath, wetpool, oil control, bioretention, filtration, and emerging technology. 2.3.2.1 Vegetated Flowpath Facilities Vegetated flowpath facilities, such as biofiltration swales and filter strips, remove pollutants through particle settling and to a lesser extent, absorption or adsorption onto grass or soil. Biofiltration swales are grass-lined, gently sloped ditches that provide water quality treatment of polluted stormwater runoff. The shape, slope, width, and length of the swale are designed to provide water quality treatment. Biofiltration swales may be wet or dry swales with different grass mixtures determined by type, soil, width and slope characteristics. Filter strips are sloped grassy areas that remove pollutants from adjacent impervious surfaces. 2.3.2.2 Wetpool Facilities Wetpool facilities such as wetponds, wetvaults, and stormwater wetlands are facilities that store a large permanent volume of water that allows for the settling (removal) of pollutant particles from stormwater runoff. Stormwater wetlands are constructed shallow ponds that treat stormwater through the biochemical and physical processes of aquatic plants. 2.3.2.3 Catch Basins and Oil Control Facilities The sump at the bottom of most catch basins is used to capture sediment and other debris from incoming stormwater. A trapped outlet (e.g., elbow or tee) that prevents most floating debris and oil from leaving the catch basin is sometimes used. Oil control facilities include baffle and coalescing plate oil/water separators. These structures are specifically designed for the removal of oil and other petroleum pollutants that are carried in AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐9 stormwater runoff from parking areas and streets. Oil/water separators are generally underground vaults and trap sediments and floatable materials in addition to removing oil. 2.3.2.4 Bioretention Bioretention facilities include cells, swales, and planters. Cells are landscaped shallow depressions. Swales are similar in design to cells, but also convey stormwater runoff. Planters are vertical walled containers that allow for infiltration. These facilities treat stormwater runoff through chemical, biological, and physical processes associated with plants and engineered soils. 2.3.2.5 Other Surface Water Quality Treatment Facilities Other surface water quality treatment facilities include filtration and emerging technology. Filtration facilities, such as sand filters, sand filter vaults, and linear sand filters, trap pollutants in or on sand particles. Emerging technologies include proprietary and public domain facilities. Proprietary facilities are protected by intellectual property rights and typically contain a filtering device that removes stormwater pollutants. Public domain facilities, such as media filter drain and compost amended biofiltration swales (CABS), remove pollutants through chemical, biological, and physical methods. 2.3.3 FLOW CONTROL FACILITIES Flow control facilities consist of retention/detention ponds and underground storage facilities (vaults and pipes) as well as infiltration ponds, tanks, vaults, trenches, manufactured systems, and catch basins. The purpose of these facilities is to temporarily store stormwater so that it can be released at a controlled rate to downstream receiving water bodies or into the ground. Flow control facilities thereby reduce increases in runoff rates from new and redevelopment construction projects to prevent downstream flooding and erosion and to protect habitat. The total number of facilities within the City, both privately‐owned and City‐owned, are summarized in Table 2‐2. 2.3.4 ON‐SITE BMPS Changes to land cover associated with proposed development and redevelopment projects within the basin can impact storm and surface water runoff, which results in changes to basin hydrology and water quality. Therefore, the impacts from installation of new impervious, new pervious, existing impervious, and replaced impervious surfaces associated with development must be mitigated by on‐site best management practices (BMPs). On‐site BMPs are methods for reducing or preventing development‐ related increases in runoff at the source of the increase and include, among others, dispersion of runoff using preserved native vegetation or other pervious surfaces, permeable pavements, bioretention, infiltration systems, and reduction of the development or redevelopment footprint. The selected and implemented on‐site BMPs vary between projects and must be selected based on site conditions following the guidance outlined in the City’s Surface Water Design Manual. 2.4 DRAINAGE BASINS The purpose of this section is to characterize the stream and river drainage basins in the City and its UGB and to summarize the status of the Renton Surface Water Utility basin planning efforts. Drainage basins and subbasins are defined as areas of land where precipitation collects and drains to a common outlet, such as a river and its tributaries, a bay, or other body of water. Precipitation is conveyed through a drainage basin by natural means, such as streams and rivers, or by constructed AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐10 means, such as storm drain systems. The basins, subbasins, and various conveyance systems are described in terms of several attributes including physical features, water quality, habitat, ongoing planning efforts, and land use. Land use attributes are typically described in terms of historical, current and future conditions to better understand impacts of development to the basin. Basin water quality can be quantified using the Water Quality Index (WQI). The WQI, originally developed by the Environmental Protection Agency (EPA) Region 10, was adapted by Ecology for use in Washington State. Ecology’s WQI is a rank of water quality for eight constituents in relation to the criteria established by Washington’s Water Quality standards (WAC 173‐201A) and guidelines for conditions in a specific ecoregion. The WQI attempts to integrate a series of key water quality parameters into a single number, ranging from 1 to 100, with higher numbers indicating better water quality. This can then be used to compare different sampling locations over time. The key water quality parameters influencing the WQI at a specific sampling location are dissolved oxygen, pH, total phosphorus, total nitrogen, turbidity, total suspended sediment, temperature, and fecal coliform bacteria (Hallock, 2002). Measurements of these parameters are aggregated over time for each sample station. Sample stations scoring 80 and above meet water quality standards or guidelines and are of “low concern,” scores 40 to 80 indicate “moderate concern,” and water quality at stations with scores below 40 are of “high concern.” King County is using Ecology’s version of the WQI. This WQI may be modified in the future as criteria change and other information becomes available. The major drainage basins located within the city limits and UGB are: May Creek Basin East Lake Washington Basin Cedar River Basin West Lake Washington Basin Black River Basin Soos Creek Basin Duwamish River Basin Information is presented according to the individual drainage basins and their respective subbasins. Subbasins and minor basins are described as they occur within each of the major basins. Basin statistics are summarized in the Basin Report Cards located in Appendix B. Estimates of predicted peak flows for each basin within the city limits presented in the following sections were obtained from previously conducted hydrologic and hydraulic studies. The available information comes from studies with varying dates and in each case the date of this information is presented. The studies that produced these flow results were performed to varying levels of detail and employed different hydrological methods and models. Several of the modeling efforts were completed prior to the implementation of current standards for new developments involving greater stormwater detention. As such, it is possible that the future flows presented in these previous modeling efforts are overestimated. Modeling results included in the following sections are based on the basin delineations shown in Figure 2‐4. The delineations shown in Figure 2‐4 have been revised since these modeling efforts were completed, as illustrated in Figure 2‐1. However, as no recent modeling efforts have been completed based on the revised basin delineations, Figure 2‐4 is included for reference for the entirety of Section 2.4 AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐11 Information from other planning studies, reports on previous flooding events, and data provided by City staff were also used. A list of reports used to prepare this information is included in the References section. AGENDA ITEM # 9. a) AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐13 2.4.1 MAY CREEK BASIN The May Creek Basin originates northeast of the city limits on the forested slopes of Cougar and Squak Mountains and the Renton Plateau. It drains a total of 14 square miles as it flows northwest through the City to Lake Washington. This basin includes the Honey Creek, Greenes Creek, RH Creek, May Creek, and Lower May Creek subbasins within the City. The May Creek Basin is located in WRIA 8, north of the Cedar River drainage basin, south of the Coal Creek and Tibbetts Creek drainage basins, and west of the Issaquah Creek drainage basin. The eastern portion of the basin contains low density residential and agricultural developments and large regional parks in the highlands. Historical logging, farming, and mining practices have been replaced by residential development in tributary basins, which still contain a significant amount of open space. The western lowland portion of the basin contains fairly dense residential development with a stream gradient increase that has formed a canyon before opening up into Lake Washington (King County, 2016). The May Creek Basin contains a number of tributaries, including Honey Creek, Gypsy Creek, and Greenes Creek located within the city limits, and Newport Hills Creek, Boren Creek, Long Marsh Creek, and others located outside of the city limits. Portions of Honey Creek have been channelized, but it remains predominately a natural stream in the upper reaches. The newer subdivisions within the lower basin contain piped drainage systems, but the older developed areas still contain a number of systems with open ditches. The mainstem of May Creek is in park land and runs through a steep, narrow, wooded canyon before reaching its outlet at Lake Washington. Poorly functioning surface water conveyance systems have caused large landslides and major localized erosion along May and Honey Creeks in several locations (King County, 2001). 2.4.1.1 Basin Water Quality May Creek is listed as impaired for fecal coliform bacteria and temperature on Ecology’s 303(d) list (Listing ID 13124) of water bodies that exceed state water quality standards. A 25‐year (1979‐2004) trend analysis of May Creek data indicated that water temperature, conductivity, and ammonia‐nitrogen have increased significantly, but pH, total suspended solids (TSS), and nutrient concentrations (ortho‐ phosphorus, nitrate, and total nitrogen) have decreased (King County, 2016). WQI indicates that as of July 2020, May Creek’s 2018 water year Water Quality Index score was 70 out of 100. May Creek is listed for temperature, fecal coliform bacteria, and bioassessment on the state’s 2016 303(d) list. Input of waste to the creek from livestock and septic systems on the upland plateau likely contribute to the presence of fecal coliform within the creek. Sediment acts as a vehicle of delivery for phosphorous and toxins to water bodies in this basin. High temperatures are also affecting water quality in this stream, partially due to basin development activities and replacement of native vegetation in non‐riparian areas. 2.4.1.2 Basin Fish Habitat The 2001 May Creek Basin Action Plan describes fish habitat in the basin (King County, 2001). The May Creek system provides habitat elements that support coho and sockeye salmon, and sea‐run cutthroat and rainbow trout. Despite the lack of physical habitat elements that would typically support a large chinook salmon population, there has been a historical run of chinook in the creek. There are good spawning grounds at the deltas formed by the confluence of tributaries with the mainstem. However, sediment eroded from streams in the Highlands and East Renton Plateau is gradually reducing the capacity of the May Creek channel in May Valley and degrading fish habitat. Furthermore, habitat complexity is limited by the lack of large woody debris in the basin streams. This results in a relative AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐14 scarcity of pools, which are an important component of stream habitat. The portion of the stream within the shoreline planning area provides spawning habitat, but all species migrate upstream past the ravine to spawn and rear in May Valley reaches. 2.4.1.3 Basin Planning Status May Creek and its subbasins were the subject of an extensive study, the May Creek Current and Future Conditions Report (May Creek Report) (King County, 1995a). This study, administered by the King County Department of Public Works, Surface Water Management (SWM), with the support of the City, documented hydrology, erosion, sedimentation, water quality, and aquatic habitat in the basin. The City and King County also entered into an interlocal agreement for the development of the May Creek Basin Action Plan (May Creek Plan) (King County, 2001). The May Creek Plan was adopted by King County, the City of Renton, and the City of Newcastle. It used the information assembled in the May Creek Report to develop plans for remediation and restoration in the basin. The May Creek Plan focused on a five‐year window to implement recommendations. Projects completed since 2001 include placement of large woody debris and outfall projects to correct ongoing hillside erosion. 2.4.1.4 Basin Hydrology As part of the May Creek Report work, King County modeled stream flows using the Hydrologic Simulation Program ‐ Fortran (HSPF). The HSPF model used recorded stream flow data from May Creek, rainfall data, and land use and channel geometry information to make long‐term hydrologic simulations. Predevelopment (forested), current (1995 conditions), future, and future mitigated (with runoff controls) land use scenarios were modeled to evaluate the effects of land use changes on hydrologic conditions in the basin (King County, 1995a). The proportion of effective impervious area has increased from 0% under predevelopment conditions to a basin‐wide average of 7% under 1995 conditions (King County, 1995a). Most of this impervious surface area is in the western and southern portions of the basin, in or near the Renton city limits. Peak flows have increased as a result of this increase in impervious area and land clearing. Erosion has occurred in the hillsides above May Valley, causing flooding and sediment deposition in the valley area, erosion in the canyon downstream of the valley, and flooding and sediment deposition in the area near the mouth of May Creek. Future land use assumptions (in 1995) were based on full development in the basin in accordance with the future land use plan developed by the City and King County as part of the growth management process. This development was predicted to increase the effective impervious area for the entire May Creek basin from 7–12%. Some of this increase in imperviousness has occurred since the estimate in the 1995 plan. Table 2‐3 presents results from the May Creek Report HSPF model for predicted peak flows for each May Creek tributary that lies within the City for the 2‐, 10‐, 25‐, and 100‐year recurrence events. The table shows flows for 1995 conditions and future conditions without mitigation of flows through the use of stormwater regulatory controls such as retention/detention ponds and infiltration systems. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐15 TABLE 2‐3: PREDICTED PEAK FLOWS (CFS) FOR THE MAY CREEK TRIBUTARIES WITHIN THE CITY OF RENTON Tributary Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1995 Future1 1995 Future1 1995 Future1 1995 Future1 Lower May Creek 341 452 556 706 666 845 835 1069 Honey Creek 63 81 85 101 95 110 109 123 Gypsy Creek 16 25 25 39 30 47 38 60 1. Future condition flows were predicted in 1995 assuming no regulatory stormwater runoff controls such as retention/detention and infiltration systems for new development. Therefore, these future condition predictions are likely overstated. Source: May Creek Current and Future Conditions Report (King County 1995a) 2.4.1.5 Lower May Creek Subbasin The Lower May Creek subbasin (see Figure 2‐1) has a total area of 0.82 square miles, with 0.77 square miles within Renton city limits. Gypsy Creek joins May Creek within the Lower May Creek subbasin, and Honey Creek joins May Creek at the upstream end of the Lower May Creek subbasin. The East Kennydale catchment is a portion of the Lower May Creek subbasin, but was analyzed as a separate subbasin in the hydrologic analysis. Lower May Creek flows through a canyon and an alluvial fan downstream of the canyon. The stream is contained within the canyon walls until it reaches the alluvial fan, which is located on the downstream (west) side of I‐405. The canyon slopes up to a plateau with suburban residential development. Hydrology ‐ 1995 Conditions: Although the hillslope areas that drain into the Lower May Creek subbasin canyon are highly developed, the May Creek canyon itself has not been developed. This is because the canyon is narrow and has steep and unstable side walls. Increased peak flows from the tributaries contribute to the erosion in the canyon. Sediment from this erosion is moved by the stream to the alluvial fan near its mouth, where it deposits along the Lake Washington shoreline. The majority of the development that has occurred along Lower May Creek is on, or adjacent to, the alluvial fan near the mouth of the stream. The additional runoff from new development on the alluvial fan adds a relatively small amount to the peak flows traveling down the mainstem of May Creek. As a result, development on the alluvial fan causes few hydrologic and flood‐related problems to the mainstem of May Creek. However, some localized flooding outside of the creek's floodplain does occur because of undersized conveyance systems. Prior to development, 2‐year peak flows traveling in the mainstem of May Creek were 30–50% smaller than the peak 2‐year flows under 1995 conditions (King County, 1995a). Additionally, the 2‐year predevelopment peak flows entering the Lower May Creek subbasin from the tributaries, such as Gypsy Creek and Honey Creek, were much smaller (less than 50%) than the 2‐year peak flows under 1995 conditions. In 1995, the mean annual flow of May Creek was 14 cubic feet per second (cfs) upstream of Coal Creek Parkway, and approximately 26 cfs in the lower reach. Hydrology ‐ Future Conditions: Future development in the Lower May Creek subbasin will probably be limited to areas outside of the canyon. Consequently, any expected increases in peak flows will result primarily from increased peak flows entering the canyon from May Valley and tributaries draining the plateau region to the east. Some additional development is also expected for the alluvial fan area downstream of the canyon. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐16 Table 2‐3 presents predicted increases in future peak flows compared to 1995 conditions. As noted in the table, these projected increases are likely overstated, because the 1995 modeling effort did not consider stormwater runoff controls such as retention/detention and infiltration systems for new development and redevelopment. 2.4.1.6 Honey Creek Subbasin (Drains to Lower May Creek) Most of the Honey Creek subbasin is located within the City of Renton on a flat, upland area known as the East Renton Plateau. A total of 1.38 square miles of the 1.58 square mile subbasin in within City limits and the Honey Creek confluence with May Creek is also within the Renton city limits. Honey Creek is the largest of the plateau tributaries and drains several major commercial areas along Sunset Boulevard NE, in addition to several fully developed neighborhoods. This subbasin has the highest density of urban land cover in the watershed. Hydrology ‐ 1995 Conditions: King County estimated 2‐year peak flows for lower Honey Creek have tripled to 63 cfs under 1995 conditions from the predeveloped (forested) condition, while the County estimated 100‐year peak flows have doubled to 109 cfs. These increases have been caused by residential and commercial development and the creation of impervious surfaces. A result of the increased peak flows is additional scour and erosion from the steep slopes between the plateau and the mainstem of May Creek. Major sediment movement into May Creek has an adverse impact on the creek’s habitat and wildlife, as well as resulting in property damage due to gully erosion and culvert blockage. Hydrology ‐ Future Conditions: Future land use planning for the Honey Creek area includes high‐density single‐family homes and commercial development. Future effective impervious area is expected to exceed 40% in the middle Honey Creek subbasin. However, because of the relatively high amount of development that already exists in the area, future development will not greatly increase runoff from this subbasin. Relatively, the 100‐year peak flows will not increase as much as 2‐year flows for the subbasin. This is partially due to a constriction in the stream channel in the vicinity of the King County sewer trunk line. As modeled, the channel at that location is contained within two culverts that limit downstream peak flows to approximately 60 cfs (King County, 1995a). This limit on peak flows helps to protect the downstream channel, but may also result in localized flooding around the culverts. 2.4.1.7 Gypsy Creek (Drains to Lower May Creek) Gypsy Creek is the furthest downstream of the May Creek tributaries on the north side of the May Creek Basin. It enters May Creek in an alluvial fan area that is moderately sloped. The gradient then steepens considerably as Gypsy Creek climbs out of the canyon to an upland plateau. The canyon channel has been recently incised and delivers significant amounts of sand to May Creek. The plateau area is partially developed with residential and rural residential areas. Only a small portion of the Gypsy Creek subbasin within the City of Renton has a piped drainage system. Hydrology ‐ 1995 Conditions: The Gypsy Creek confluence with May Creek is within the Renton city limits. Within the Gypsy Creek subbasin, the effective impervious area is approximately 11% under 1995 conditions, with peak flows for the 2‐year storm of 16 cfs (Table 2‐3). Predicted peak flows for the 25‐year and 100‐year events under 1995 conditions are 30 and 38 cfs, respectively. Hydrology ‐ Future Conditions: The effective impervious area is expected to increase from 11% to 20% under future conditions for this subbasin. Because of this increase in imperviousness, Gypsy Creek peak flows are expected to increase. It is noted however, that the increases presented in Table 2‐3 may be AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-17 overstated, because the 1995 modeling effort did not consider stormwater runoff controls such as retention/detention and infiltration systems for new development and redevelopment. 2.4.1.8 East Kennydale Catchment The East Kennydale catchment is a portion of the lower May Creek subbasin and is predominantly on the upper plateau. A large portion of this catchment (a 48-acre area) historically drained to a closed depression near the intersection of Aberdeen Avenue NE and NE 24th Street. Recurrent flooding was occurring at the low point and in the late 1990s, the City constructed a trunk drainage system that provided a new gravity outlet that extended north and west to NE 27th Street and then along Kennewick Place NE and ultimately to an existing outfall down a steep slope to May Creek. These improvements were made following a study, NE 27th Street/Aberdeen Avenue NE Storm System Improvement Project (R. W. Beck, 1997b). Hydrology - 1995 Conditions: Basin hydrology was developed as part of the NE 27th Street/Aberdeen Avenue NE Storm System Improvement Project. The study reported an impervious area percentage of 31 percent and the 25-year and 100-year peak flows to be 9.7 and 11.8 cfs, respectively. Note that the current flows as of today are much higher than this because the 48-acre area that previously drained to a closed depression now drains to May Creek. The current peak flows are more likely to resemble those estimated for future conditions. Hydrology – Future Conditions: The modeling that was done for the NE 27th Street/Aberdeen Avenue NE Storm System Improvement Project included the new trunk line to drain the closed depression and also looked at future land use conditions. Under future land use conditions, the impervious area was estimated to increase to 37 percent. Estimated peak flows for future conditions for the 25- and 100-year event are 26.1 and 31.9 cfs, respectively. These flows are likely overstated because they do not account for future on-site detention that may be required for new development and redevelopment. 2.4.2 EAST LAKE WASHINGTON BASIN The East Lake Washington Basin is within WRIA 8. The East Lake Washington Basin is composed of several subbasins that drain directly to the southeastern portion of Lake Washington, as shown in Figure 2-1. These include the West and South Kennydale subbasins near the north end of the City, the NE 44th Street Exit Drainage Area subbasin (formerly called Gypsy subbasin) lying north of the May Creek outlet, and the North Renton subbasin (see Figure 2-4) situated south of Kennydale. The North Renton subbasin drains directly to Lake Washington at Gene Coulon Memorial Beach Park via Johns Creek. The North Renton subbasin is one of the more significant drainage basins in the City because it drains a highly developed area near the core of the City. The NE 44th Street Exit Drainage Area subbasin is predominately an open ditch surface runoff system draining the steep area east of I-405 with upstream contributing Newcastle residential and Renton commercial areas. The lower portion of the subbasin has been channelized or is contained within culverts. In 2008, Utility constructed the Ripley Lane Storm System Improvement Project that included the construction of a 72-inch and 60-inch-diameter storm drain system that conveys flow from Ripley Lane to Lake Washington across the Seahawks Training Center. The project was constructed in coordination with the Seahawks and WSDOT and conveys future condition flows for the NE 44th Street Exit Drainage Area subbasin. This project reduced frequent flooding occurring along Ripley Lane N. The majority of the West and South Kennydale subbasins are dominated by open ditch runoff collection systems that outfall to Lake Washington across Lake Washington Boulevard N via several culvert AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐18 crossings. There are no substantial stream systems in the West or South Kennydale areas. South of the South Kennydale subbasin is the North Renton subbasin that drains a highly‐developed area near the core of the City. The majority of the North Renton subbasin is drained by a fully‐developed piped drainage system that discharges into Johns Creek and contains portions of the Boeing facilities, PACCAR, the Landing, I‐405, the steep portion of Sunset Boulevard, and numerous residential and other commercial properties. The furthest downstream reach of Johns Creek flows in a constructed, low gradient channel for one‐half mile prior to discharging to Lake Washington. 2.4.2.1 Basin Water Quality Lake Washington, at Gene Coulon Park (in the North Renton subbasin), is on the state’s 2016 303(d) list for fecal coliform bacteria. Water quality at this beach is affected by Johns Creek, which is listed for temperature, fecal coliform bacteria, and dissolved oxygen. In 2004, King County ended the swimming season on August 24 due to high concentrations of fecal coliform at the park. In 2005, King County again had to temporarily close the swimming beach for a week in July (King County, 2005). This prompted the City to perform the Gene Coulon Park Microbial Source Tracking Study (Herrera, 2006) to determine sources of the pollution and identify potential solutions. The study determined that the highest bacterial loadings come from residential areas that drain to Johns Creek. However, human fecal sources accounted for only 7% of the bacteria, and avian sources accounted for 50%. Avian loadings may be controllable by increased park maintenance, rooftop guards, and modified waste management practices. Lake sediments are a sink for pathogens and toxins, and sediment quality can affect lake ecology. Due to limited transport and mixing of sediments, poor sediment quality is usually localized in stream deltas and old industrial sites. A 2004 study found that some Lake Washington sites contained elevated levels of Polychlorinated biphenyls (PCBs), but that tributyltin, metals, and polyaromatic hydrocarbon levels were not above normal. Levels of Dichlorodiphenyltrichloroethane (DDT) are decreasing from historic levels when DDT was unregulated, and recent inputs are not apparent (Parametrix, 2008). Sediment deposits from upstream sources are also a vehicle for input of phosphorus to the lake. Past eutrophication in the lake (for which phosphorus is usually the main cause) has been found to result from historic direct discharge of sewage, a practice that was discontinued in the 1960s. While phosphorous inputs from upstream tributaries are not currently causing eutrophication, this is a potential result if tributary water quality deteriorates due to future buildout and associated increases in sediment and phosphorous loading (Parametrix, 2008). Tributary discharge and other runoff are also sources of pathogens and toxins that affect water quality in Lake Washington. There are 11 impaired water quality listings along Renton’s Lake Washington shoreline, such as Johns Creek (Ecology, 2020a). Johns Creek, Cedar River, Lake Washington at Gene Coulon Beach park, May Creek, and an Unnamed tributary to Lake Washington in the South Kennydale subbasin are on Ecology’s 303(d) list for pH, temperature, bacteria, and dissolved oxygen (Ecology, 2020a). These sites are associated with industrial sites or tributary mouths (Parametrix, 2008). 2.4.2.2 Basin Fish Habitat The ecology of Lake Washington has been affected by shoreline‐scale processes and human activities. Bank armoring (i.e., bulkheads) has contributed to the reduction in availability of shallow water habitat, and in combination with the alteration to riparian areas, has led to a substantial reduction in natural shoreline vegetation and large woody debris, which provide above‐ and in‐water cover for fish. In addition, sockeye salmon with a lake‐type history rely on a gravelly lakeshore and groundwater upwelling for spawning, but these features are limited by bulkheads and other modifications. Existing AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐19 cover consists primarily of docks, piers, floats, and other constructed structures. These structures provide excellent habitat for nonnative warm species such as yellow perch, brown bullhead, smallmouth bass, and largemouth bass. Such species use these structures as cover to prey on juvenile salmonids. 2.4.2.3 Basin Planning Status The Kennydale area that is part of this basin includes the West and South Kennydale subbasins. The West and South Kennydale subbasins drain to Lake Washington and are included in the Final Lake Washington/Cedar/Sammamish Watershed Chinook Salmon Conservation Plan (WRIA 8 Steering Committee, 2005). The Renton/Lake Washington Pollution Abatement Program characterized the sources of stormwater pollution arising from the North Renton subbasin through an Ecology Centennial Clean Water Fund grant. The objectives of this project included improving the quality of runoff generated within the basin and providing baseline data for future compliance with NPDES stormwater permit requirements. It included a hydrologic analysis based upon annual runoff and sampling and chemical analyses of stormwater and sediment. The project has produced three reports: a Hydrologic Analysis (R. W. Beck, 1993), a Pollution Source Characterization (Herrera, 1993a) and an Implementation Plan (Herrera, 1994). 2.4.2.4 Basin Hydrology For the East Lake Washington Basin, separate studies predicted stream flow rates for the various subbasins using different hydrologic modeling methods. These hydrologic analysis methods are described below for each subbasin. 2.4.2.5 Kennydale Subbasin The Kennydale area that is part of this basin has been divided into two subbasins by the City of Renton. The two subbasins, West and South Kennydale, both flow into Lake Washington and are discussed below. Hydrology ‐ 1995 Conditions: The West Kennydale subbasin is the northern portion of a gently sloping hillside located between I‐405 and Lake Washington. This basin has been developed into a single‐family residential area. The drainage system is comprised of both open ditches and culverts that discharge via culverts directly to Lake Washington. The South Kennydale subbasin includes a portion of gently sloping hillside, east of I‐405, and a more steeply sloped narrow strip of land between I‐405 and Lake Washington. The area east of I‐405 is fully developed into single‐family residences, whereas the hillside above the lake is less developed. In areas where development has occurred along this hillside, it has primarily been developed into multifamily units. The drainage system includes both open ditches and piped systems which discharge into Lake Washington at a number of locations. To predict flooding potential, peak flows were calculated for both subbasins (HDR, 1995); however, the methodology used to calculate these flows was not described. South Kennydale was divided into four subbasins, each draining independently into Lake Washington. Peak flows predicted for 1995 conditions varied between subbasins, depending mostly on the size of the area drained (Table 2‐4). The area drained by subbasin 4 produced more runoff, because of its larger acreage, than subbasin 2, although subbasin 2 has been developed with multifamily housing and subbasin 4 is developed with single‐family residences. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-20 Hydrology - Future Conditions: Future land use in the West Kennydale area is expected to remain medium-density, single-family homes. More change is expected in the South Kennydale area, where development of areas into medium-density single-family residential areas is expected to occur. Future flows from South Kennydale subbasin 4 more than double for the 2-year and 10-year peak events. Table 2-4 presents predicted future peak flows for the West and South Kennydale subbasins. It is noted however, that the increases presented may be overstated, because the modeling did not consider stormwater runoff controls such as retention/detention and infiltration systems for new development and redevelopment. TABLE 2-4: PREDICTED PEAK FLOWS (CFS) FOR THE KENNYDALE SUBBASINS Subbasin Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1995 Future1 1995 Future1 1995 Future1 1995 Future1 South Kennydale 1 0.3 1.2 0.9 2 1.2 2.5 1.7 3 South Kennydale 2 3.7 4.1 6.6 7.2 8.4 9 10.2 10.8 South Kennydale 3 5.0 8.6 9.9 14.5 13 17.9 16.2 21.4 South Kennydale 4 6.4 15.5 14.6 27.7 20.3 35.2 26.5 43.1 West Kennydale 29.8 Same 60.6 Same 79.0 Same 97.8 Same 1. Future condition flows were predicted in 1995 assuming no regulatory stormwater runoff controls such as retention/ detention and infiltration systems for new development. Therefore, these future condition predictions are likely overstated. Source: (HDR 1995) 2.4.2.6 NE 44th Street Exit Drainage Area (formerly Gypsy) Subbasin There is a small area of land to the north of the May Creek outlet that has been referred to as the Gypsy subbasin in previous documentation, but to avoid confusion with Gypsy Creek in the May Creek basin, this area is now referred to as the NE 44th Street Exit Drainage Area subbasin. This area drains through a culvert near the intersection of I-405 and Lake Washington Boulevard NE. Hydrology - 2005 Conditions: The area drained by this culvert is a steep slope that has been partially developed for commercial use and multifamily residential units. The most recent hydrologic modeling of this subbasin was done in 2007 as part of the Ripley Lane Drainage Improvement Project (Parametrix, 2007). This study included updating a prior StormSHED modeling of the basin by Entranco and by WSDOT that used 2005 aerials for the existing land use. The resulting peak flows for the 100-year storm are presented in Table 2-5. This study did not investigate other storm events for current land use conditions. Hydrology – Future Conditions: The Ripley Lane Drainage Improvement Project (Parametrix, 2007) also included an estimate for the 100-year storm for future land use conditions. This study did not estimate peak flows for the 2-, 10-, or 25-year storms. However, prior modeling done by WSDOT for future land use conditions provided similar results for the 100-year storm and results from this modeling effort also included the 25-year storm (and thus was added to Table 2-5). The future condition 100-year peak flow estimate represents an increase in 36% over existing conditions. Part of this increase is the result of an I-405 project that increased the basin size by draining an estimated 70 acres of additional area to Gypsy Creek (Parametrix, 2007). The remaining part of the increase is to increases in impervious area. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-21 TABLE 2-5: PREDICTED PEAK FLOWS (CFS) FOR THE NE 44TH STREET EXIT DRAINAGE AREA SUBBASIN Subbasin Name 25-Year Peak Flows 100-Year Peak Flows Existing (2005) Future Existing (2005) Future Gypsy1 — 159.5 145.4 198.2 1. From Ripley Lane Drainage Improvement Project (Parametrix, 2007); values determined using Stormshed. 2.4.2.7 North Renton Subbasin The North Renton subbasin contains some of the greatest concentrations of valuable commercial, industrial, and residential land within the City. Within the boundaries of the North Renton drainage basin, shown in Figure 2-4, are portions of the Boeing facilities, the PACCAR facility, The Landing, and numerous residential and commercial sites. The basin includes a developed upland area that slopes down to a flat valley floor. A piped drainage network conveys runoff from the area prior to discharging to Johns Creek, which flows into Lake Washington. Most of the area was developed before stormwater regulations came into effect. Therefore, runoff is conveyed directly to Johns Creek or Lake Washington via an elaborate pipe network with no detention or treatment. Almost all surface conveyance is through pipes, since many small streams were eliminated by historic land development practices. Runoff in the upper portion of the basin is collected in roadside ditches and conveyed to a network of collector storm drains installed along the roadways. Runoff in the lower basin is collected and conveyed in a series of stormwater pipes. The pipe systems discharge near the intersection of Lake Washington North and Houser Way North into an open-channel system. From this point, the water flows through a series of culverts and sections of constructed open channel (Johns Creek) through Gene Coulon Park to Lake Washington. Johns Creek has a flat slope; therefore, water in this channel can back up from Lake Washington during high flows. For this reason the creek does not experience erosion, but is subject to sediment deposition due to its low gradient. The lake is an important aquatic resource for the bird and fish species established in the wildlife habitat near the outlet, as well as for the public that use the beach and boat launch facilities. Hydrology: The South Lake Washington Roadway Improvement Report, (BHC, 2007) analyzed the capacity of the storm drain both before and after roadway construction. The hydrologic analysis of the North Renton subbasin was conducted using the Santa Barbara Urban Hydrograph (SBUH) method. The subbasin was divided into additional subbasins for analysis, presented in Table 2-6. The upland subbasins were combined into the Johns Creek (at upstream outfall) subbasin. This subbasin includes the area south of Sunset Boulevard and east of I-405. Flows from this area enter the storm system at the east end of N 8th Street. The three northernmost subbasins contain residential neighborhoods and drain to a pipe system that extends west from Sunset Boulevard to a pond on the south side of Lake Washington Boulevard prior to discharging into Johns Creek. Flow from the Boeing facilities and their maintained outfalls are not included in the table. The PACCAR/residential site was modeled individually along with the area south of N 8th Street, east of Logan, north of N 4th Street, and west of Garden Avenue S. This area drains both to the Johns Creek system via Garden Avenue as an overflow and to the N 6th Street outfall to the Cedar River. These analyses determined that the limited capacity of the downstream system has an upstream effect on flooding in localized areas of The Landing and the PACCAR/residential areas. Consequently, AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐22 improvements in the PACCAR area included the installation of a 72‐inch‐diameter storm drain between the intersection of Garden Avenue N and N 8th Street and Lake Washington Blvd. The Landing/South Lake Washington Roadway Improvement Project improved the conveyance and water quality in the valley area prior to discharge to Lake Washington. TABLE 2‐6: PREDICTED PEAK FLOWS (CFS) FOR THE NORTH RENTON SUBBASIN Outfall Name 25-Year Peak Flows 100-Year Peak Flows Johns Creek (at upstream Outfall) 4.0 4.3 North 6th Street Outfall to Cedar River 5.0 5.0 Logan Ave Outfall to Cedar River 24.4 28.2 Cedar River Park Outfall to Lake Washington 75.2 86.6 Source: South Lake Washington Roadway Improvement Drainage Report (BHC, 2007) Hydrology ‐ Future Conditions: Almost the entire North Renton subbasin has been developed, and no major changes in land use are expected to occur. Except for some minor infill in the residential areas in the east and north portion of the subbasin, little additional development is likely. In 2005, WSDOT conducted a study of the lower reach of Johns Creek in support of designating the portion of the creek west of I‐405 as a direct discharge waterbody. The WSDOT Johns Creek Report also computed stormwater flows in the North Renton subbasin which were found to generally agree with the BHC study. 2.4.3 CEDAR RIVER BASIN The Cedar River runs through downtown Renton, where it discharges into Lake Washington. The Cedar River basin extends far beyond the city boundaries and forms the southwest edge of WRIA 8. The basin includes 191 square miles, with 125 square miles that lie upstream of the City of Seattle Landsburg drinking water diversion. Almost all of the land upstream of the diversion is owned by the City of Seattle and maintained as natural environment to protect Seattle’s water resource. The upper watershed is mostly second growth forest with about 15% of the upper watershed as old growth forest. Subbasins of the Cedar River basin located entirely within Renton include the Cedar Outfall, Mt. Olivet, and Arnold. Subbasins located partially within Renton include the Maplewood and Tiffany subbasins. Collectively, these five basins are referred to as the Lower Cedar River subbasin (see Figure 2‐4). Several additional subbasins are located within the UGB, including Fairwood, Madsen, and Orting Hill. The lower Cedar River has been extensively altered. Approximately 64% of the lower Cedar River was modified on at least one bank, which, coupled with decreased flows, has narrowed the river from a historic average of 250 feet to 110 feet in width by 2001 (Kerwin, 2001). The loss of floodplain and riparian connectivity in the lower Cedar River has affected storage, sediment, and contaminants, and it has simplified in‐stream habitat. The drainage networks within this basin are quite varied. The Lower Cedar River subbasin drains downtown Renton, large portions of the Boeing facilities, and adjacent industrial and commercial areas. Closed‐pipe networks deliver surface runoff directly to the river. The upper portions of the basin collect runoff in piped systems, but typically discharge to natural stream channels before being conveyed to the Cedar River. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐23 2.4.3.1 Basin Water Quality The lower Cedar River has good water quality with the highest quality water in the upper reaches and decreasing water quality as the river flows through developed urban and suburban areas. Ecology has two water quality monitoring stations along the Cedar River, one near Landsburg and the other in Renton at Logan Street. The WQI score at these locations for water years 2016, 2017, and 2018 were above 85 for the Logan Street station and above 93 for the Landsburg station (Ecology, 2020b). Both of these scores are above the threshold value of 80 for “good” water quality, per the Washington DOE river and stream water quality index, indicating that the water quality at these locations meet expectations and these areas are of lowest concern for water quality issues. The Cedar River segment from the confluence with Molasses Creek to Lake Washington is included in the state’s 2016 303(d) list for temperature, dissolved oxygen, and pH. 2.4.3.2 Basin Fish Habitat The lower Cedar River mainstem provides habitat for chinook, coho, and sockeye salmon and steelhead, bull, and cutthroat trout (Kerwin, 2001). The Cedar River’s chinook salmon population is one of the native stocks that comprise the evolutionarily significant unit of Puget Sound chinook, which is listed as threatened under the Endangered Species Act. Fish access and passage barriers, loss of channel complexity and connectivity, increased sedimentation and altered sediment transport processes, and degradation of riparian conditions have been identified as factors of decline for the Cedar River (WRIA 8 Steering Committee, 2002). Channelization and the disconnection of the Cedar River floodplain for flood control, due to land use changes, have also decreased the amount of and prevented access to off‐channel habitat by salmonids and other organisms. This is of particular concern for chinook salmon, which use these areas for juvenile rearing. More individuals now exhibit a lake‐type life history and use Lake Washington for rearing (Parametrix, 2008). Projects to restore channel complexity are ongoing. Several opportunities to increase riparian vegetation, shallow water, and off‐channel habitat in the lowest reach of the Cedar River have been identified. USACE fish enhancement projects were completed in 1999, including constructing a groundwater‐fed spawning channel for sockeye salmon in the floodplain on the south bank of the river at river mile 4.6 and reconstructing a rock revetment that protects the Maplewood Golf Course on the north bank at river mile 4.2 to provide habitat benefits for rearing salmon juveniles (USACE, 2000). In 1999, USACE performed a study to evaluate gravel quality, quantity, and transport on the Cedar River mainstem, including the effect of bank armoring, to determine if a lack of gravel supply is limiting salmon spawning. The study determined that man‐made structures cut off sources of gravel for the mainstem. In 2001, the groundwater‐fed spawning channel was destroyed by the Nisqually Earthquake, which migrated the mainstem Cedar River into the groundwater channel. A new channel, called the Elliot Spawning Channel, was constructed in 2001, but was significantly damaged after the 2006 and 2009 Cedar River high flows. Repair and enhancement of the Elliot Channel were completed in 2016 as part of the mitigation associated with environmental permits obtained for the Cedar River Maintenance Dredging Project (GeoEngineers, 2017). 2.4.3.3 Basin Planning Status The WRIA 8 Steering Committee’s Final Lake Washington/Cedar/Sammamish Watershed chinook salmon Conservation Plan (2005) was written to organize cooperation toward restoring ecosystem health in the AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐24 watershed. The City ratified this plan in Resolution 3761. The Plan was updated in 2017 and ratified in Resolution 4336. In 1998, the City partnered with USACE to construct the Cedar River Section 205 Flood Hazard Reduction Project in an effort to reduce chronic flooding along the lower Cedar River, including areas within the Renton Airport and the Boeing aircraft manufacturing facility. The project constructed levees and floodwalls along the left and right bank of the lower 1.25 miles of the river in addition to removing over 120,000 cubic yards of dredge material. After completion of the project, the City requested that USACE certify the right lower Cedar River setback levee that was designed and constructed to contain the 100‐ yr base flood. USACE concurred with the City’s request and certified the right bank levee as containing the 100‐yr base flood in 2004. Maintenance dredging occurred in summer 2016 (Brooks et al., 2019). In 2006, as part of FEMA’s Countywide DFIRM update, the City prepared and submitted a LOMR for the purpose of revising the current effective FEMA maps for the lower Cedar River. The LOMR, based on updated hydrology and the USACE certification of the right bank levee, was approved by FEMA in 2007. The resulting floodplain maps showed areas previously designated as flood hazard areas (Zone AE) designated as shaded Zone X (areas protected by levees). In July 2012, the City received notification from USACE that the certification issued for right and left bank levees along the lower 1.23 miles of the Cedar River would expire on August 31, 2013, and future re‐certification will be the responsibility of the City. Certification of the levees is essential so that FEMA accredits the levees as providing protection from the 100‐year flood and avoid mapping the properties protected by the levees (Renton Municipal Airport and Boeing 737 Plant) in the regulatory floodplain. Levees certified to current FEMA standards have to demonstrate that they meet the design, operation, and maintenance requirements described in Title 44, Chapter 1, Section 65.10 of the Code of Federal Regulations. The challenge presented by this effort includes certifying the levee system based on current standards. Upon conducting various structural, geotechnical, and hydraulic analyses in 2018, the City determined that certain sections of the levees need to be raised to meet current freeboard requirements and that the levee embankment needs to be widened at certain levee to floodwall transitions. Currently, the City is designing and permitting the required improvements in Phase 3 of the Cedar River 205 Project Levee Recertification Project to achieve FEMA accreditation and has secured funding for design and construction from KCFCD. Meanwhile, the City expects to maintain current floodplain designation for the protected areas (Zone X not Zone AE), because FEMA elected to seclude the floodplain of the Lower Cedar River from the King County DFIRM update. By secluding the Cedar River levees (and other levees in King County) from the update, FEMA can advance the adoption of the DFIRM and subsequently individually assess the level of flood protection of the secluded levees. The City expects to have the levees certified and accredited prior to FEMA taking any action in that regard. 2.4.3.4 Basin Hydrology The City and King County entered into an interlocal agreement to develop a basin plan for the Cedar River. In November 1993, King County SWM produced the Cedar River Current and Future Conditions Report (Cedar River Report). This report includes information on the environmental setting of the Cedar River, current as of 1993 and in the geologic past, and analyses of surface water hydrology, flooding, erosion, water quality and aquatic habitats. The basin was studied for changing land use and its effects upon the river hydrology using the HSPF hydrology model. The analyses divided the river basin into three geographic components. The components included the Upper Basin, which is the area above the City of Seattle’s Landsburg Diversion, and the Middle and Lower Basins. This study addresses hydrologic problems in areas within the city boundary, within the UGB, as well as the area beyond the city limits. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐25 The Cedar River Basin planning effort also includes characterization of the hydrogeology of the basin, mapping of susceptibility to groundwater contamination, groundwater level measurements, and groundwater modeling. The results of the hydrogeologic study help to identify measures needed to protect groundwater resources, including surface water management in areas of critical groundwater recharge. The latest Cedar River flow estimates were developed by King County in March 2000. King County estimated flow values for the 10‐, 50‐, 100‐ and 500‐year flows based upon a flood frequency analysis of approximately 80 years of peak flow data (fit by a Log Pearson Type III distribution). The 10‐, 50‐, 100‐ and 500‐year return peak flows (Table 2‐7) for the Cedar River at Renton are estimated to be 5,940 cfs, 9,860 cfs, 12,000 cfs, and 18,400 cfs, respectively. These estimates were made assuming consistent Masonry Dam operations. Prior to this, King County had developed an HSPF model in 1993 as part of the Cedar River Current and Future Conditions Report. The 1993 modeling estimated local flows from subbasins within the UGB (Table 2‐7). The majority of flows in the river above 4,000 cfs in Renton are caused by peak inflows of similar magnitude from the upper basin, not by lower basin flow contributions within the UGB. Basin runoff has increased as a result of deforestation and land development, with most increases occurring during the winter flood season. Urbanization in the tributaries has caused an estimated 7% increase in mainstream flood peaks from natural conditions. Flows from the lower basin area have a minor impact on the mainstem peak discharges, but increase the duration of flooding at Renton significantly. Current levels of urbanization within the basin have increased the durations of flood flow at Renton by 12% over forested conditions. According to King County projections (King County, 1993), future land development will result in an additional 8% (unmitigated) increase in peak flows for the lower outfall area of the Cedar River. In addition, flood flow duration will also lengthen, increasing 17% over current conditions. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-26 TABLE 2-7: PREDICTED PEAK FLOWS (CFS) FOR THE CEDAR RIVER BASIN Subbasin Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1993 Future1 1993 Future1 1993 Future1 1993 Future1 Lower Basin (Outfall)2 N/A 5,940 N/A N/A N/A 12,000 N/A Tiffany/Ginger Creek3 63 69 101 111 121 134 152 172 Maplewood4 59 132 104 207 135 257 197 349 Molasses3 96 130 153 200 180 238 220 299 Summerfield3 4 7 7 10 8 13 9 16 Orting Hill3 54 88 93 136 114 160 147 195 Madsen3 132 156 217 251 262 302 331 382 1. Future condition flows were predicted in 1993 assuming no regulatory stormwater runoff controls such as retention/detention and infiltration systems for new development. 2. Flows calculated by King County in March 2000 with HEC-RAS 3. Flows calculated using HSPF 4. 1993 flows reviewed and updated by King County in 1995. Future flows calculated using HEC 1 by Parametrix Sources: Cedar River Current and Future Conditions Report (King County, 1993). Comprehensive Storm Water Plan, Maplewood Creek Basin Plan (Parametrix, 1989). City of Renton Surface Water Utility Comprehensive Plan (HDR, 1995). 2.4.3.5 Lower Cedar River Subbasin The City has designated a number of subbasins tributary to the Cedar River; however, several of these subbasins were combined in the Cedar River Report. The Arnold, Mt. Olivet, and Cedar River Outfall subbasins were combined into a larger subbasin, called the “Lower Cedar River” in the Cedar River Report; thus, individual studies of these subbasins do not exist. Well-developed storm drainage systems in these areas deliver runoff water directly to the Cedar River. Hydrology - 1993 Conditions: The lowest reach of the Cedar River is an artificial channel that was constructed to reroute the Cedar River from the Black River to Lake Washington in the early part of the 20th century as a result of the lowering of Lake Washington. The channel is wide and has a gentle gradient, which results in lower velocities that allow for the deposition of excess sediment from upstream sources. Sediment deposits reduce channel capacity and increase the risk of flooding. Much of the area surrounding the lower reach has been developed and includes a portion of the downtown area, a residential neighborhood, the Renton Municipal Airport, some commercial areas, and portions of the Boeing industrial complex. This subbasin has been urbanized since the early 20th century. Storm drains were most likely installed during development and any subsequent redevelopment. A specific hydrologic analysis has not been performed for the area. Because of the small area, and development which already exists, future flows are not expected to increase from this portion of the City. However, flooding problems in this area may increase as a result of increased flows in the Cedar River and increased sedimentation on the lower reach of the river. Land use in the Mt. Olivet subbasin, however, is quite diverse. There were two cemeteries, a ballpark, a quarry, an industrial area, a residential subdivision, cleared open land and forested land within the subbasin (HDR, 1995). Land use in the Arnold subbasin is primarily residential. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-27 The subbasin was modeled using HSPF (King County, 1993) to predict peak flows and the capacity of the drainage system to convey the flows. The Cedar River flows were further evaluated by King County in 2000. Storm events were developed from the 2-, 10-, 25-, and 100-year, 24-hour design storm; these flows are shown on Table 2-7. Hydrology – Future Conditions: The Mt. Olivet subbasin recently experienced increased commercial and residential development, so current peak flows are likely to be closer to the estimated “future” peak flows in the Cedar River Report (King County, 1993). However, since the 1993 estimates did not consider stormwater runoff controls such as retention/detention and infiltration systems for new development, they are likely overstated. 2.4.3.6 Tiffany/Ginger Creek Subbasin The Tiffany/Ginger Creek subbasin drains an area on the southwest side of the Cedar River, upstream of the Arnold subbasin. The major tributary flowing through this subbasin is Ginger Creek. The Tiffany/Ginger Creek subbasin includes the Ginger Creek drainage basin area plus an area drained by several smaller, non-designated streams. The entire area was studied as a part of the Cedar River Report; however, the County study had slight variations in watershed boundary, subbasin delineation, and land use from Renton Land Use Maps. The developed portion of the subbasin includes established drainage systems which discharge into Ginger Creek. Hydrology - 1993 Conditions: The geography of the Tiffany/Ginger Creek subbasin lends itself to varying land uses. The subbasin contains a low flat area (which is a part the Cedar River floodplain), a steeply sloping area above the flood plain, and a gently sloping plateau area at the top of the basin. Within the city limits, the lower flood plain area has been developed primarily into an industrial area. The steep slopes above this area have remained forested, as has much of the moderately sloping rise to the plateau. The plateau area, both near and beyond the city limits is nearly fully developed with single-family residential homes. Table 2-7 presents 1993 conditions and future peak annual flows for the subbasin. Hydrology - Future Conditions: The City of Renton land use plan for this subbasin indicates the possibility of additional low-density single-family residential areas in some lower areas and low- and medium-density single-family residential development in the forested areas. If this development occurs, increased downstream carrying capacity may be required. The Cedar River Report assumed that future land use will remain similar to the as-built conditions that existed in 1993 or at least slightly larger than the 1993 conditions flows. 2.4.3.7 Maplewood Creek Subbasin Maplewood Creek is a subbasin of the Cedar River that straddles the eastern Renton city limits. The creek collects flow from a plateau approximately 1,500 feet above its confluence with the Cedar River. The creek consists of two major tributaries that join on the plateau and flow down a steep ravine through the Maplewood Golf Course. The creek is a significant natural resource because of its use as recreation and open space in addition to providing fish and wildlife habitat. Substantial urban development has occurred in the plateau area of the basin, significantly impacting the natural drainage system. The creek is included in the state’s 2016 303(d) list for temperature at the confluence with Cedar River. The Maplewood Creek subbasin has been studied by both the City of Renton and King County. A detailed study of this area - the Comprehensive Storm Water Plan, Maplewood Creek Basin Plan (Parametrix, 1989) - was prepared for the City of Renton in October 1989. It analyzes current (then 1989), future and AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐28 future mitigated peak flows for the basin with current and expected land use scenarios. The future land use in this study closely resembles the future land use presented in the City’s comprehensive plan, and appears to provide good predictions of future flows. This study also identified existing and future drainage problems and solutions, and recommended development criteria. In addition, King County studied this subbasin as a part of the Cedar River Report in 1993. The resultant peak flow estimates are different between the two documents as the 1989 estimates (Parametrix) were based upon an event‐based model (HEC 1), whereas the 1993 plan (King County) used a continuous simulation model (HSPF). Hydrology ‐ 1993 Conditions: Table 2‐7 summarizes the 2‐, 10‐, 25‐, and 100‐year peak runoff estimates for 1993 conditions based on the HSPF modeling. Hydrology ‐ Future Conditions: The Renton Comprehensive Land Use Plan predicts a significant increase in residential development in the subbasin. This increase will also result in a significant increase in runoff (see Table 2‐7). Note that these increases are likely overstated, as they did not include regulatory stormwater controls (detention) for new development. 2.4.3.8 Other Subbasins Hydrology ‐ 1993 Conditions: Upstream from the Tiffany/Ginger Creek and Maplewood subbasins are several subbasins that were modeled by King County and included in the Cedar River Report. Several of these subbasins are within the UGB but partially outside of the city limits. These include the Molasses Creek, Madsen Creek, Orting Hills, and Summerfield subbasins. All of these basins have significant amounts of residential development among forested areas. Table 2‐7 presents predicted peak flows for 2‐, 10‐, 25‐ and 100‐year return periods for these subbasins, in addition to those discussed in previous sections. Hydrology ‐ Future Conditions: As urbanization and land development continue, increases in peak flows will be experienced within the upper subbasins as a result of increased low‐density, residential development. 2.4.4 WEST LAKE WASHINGTON BASIN As previously mentioned, portions of the City in WRIA 8 that drain to Lake Washington include the West Lake Washington basin (along with May Creek, the Cedar River, and the East Lake Washington Basin). The overall Lake Washington basin includes most of the 692 square miles contained in WRIA 8 (Kerwin, 2001). The portion of the Lake Washington Basin within the City is approximately 21 square miles, or roughly 3% of the basin. The West Hill subbasin is the only subbasin in the West Lake Washington basin. This subbasin is partially within the city limits. This highly urbanized subbasin is located along the southern shoreline of Lake Washington and is part of WRIA 8. This basin straddles the city limits along the southwestern shoreline of Lake Washington and includes a portion of unincorporated King County. Runoff collection from this basin in characterized by natural channels and closed pipe systems. However, virtually all of the runoff is delivered to the Black River Box Culvert, which discharges directly to Lake Washington at the northwest end of the Renton Municipal Airport. 2.4.4.1 Basin Water Quality The West Hill subbasin has been characterized in the Renton/Lake Washington Pollution Abatement Program. The objectives of this project included improving the quality of runoff generated within the AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐29 basin and providing baseline data for future compliance with NPDES stormwater permit requirements. It included a hydrologic analysis based upon annual runoff and sampling and chemical analyses of stormwater and sediment. The project has produced three reports, a Hydrologic Analysis (R. W. Beck, 1993), a Pollution Source Characterization (Herrera, 1993a) and an Implementation Plan (Herrera, 1994). The project was partially funded by an Ecology Centennial Clean Water Fund grant. 2.4.4.2 Basin Hydrology Hydrology ‐ 1993 Conditions: A hydrologic analysis was performed in 1995 using WaterWorks (HDR, 1995). This single‐event model includes an analysis of 1993 land use for the entire 736‐acre basin, approximately 40% of which is located within the City. Although most of this basin is residential, the area within the city limits contains almost all industrial and commercial development. The Renton Municipal Airport is located on the eastern edge of the basin and is zoned for industrial use. In addition, a commercial strip is located along Rainier Avenue S. Commercial and industrial land use total about 125 acres. Almost all of the runoff originating within the city limits is collected into storm drains and discharged to the Black River Box Culvert. Additional hydrologic analysis of this basin was done as part of the Renton/Lake Washington Pollution Abatement Program (R. W. Beck, 1993). However, this effort was limited to estimates of annual runoff volume for the purpose of estimating pollutant loading. Table 2‐8 presents the predicted 1993 peak flow values for this area. These estimates did not include any on‐site detention facilities for the area. TABLE 2‐8: PREDICTED PEAK FLOWS (CFS) FOR THE WEST HILL SUBBASIN Subbasin Name 1993 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows West Hill 84 155 196 240 Hydrology ‐ Future Conditions: Except for minor infill, little change in land use is expected in the future. Some of this infill will be commercial structures along major thoroughfares. 2.4.5 BLACK RIVER BASIN The Black River/Eastside Green River Basin is in WRIA 9 and includes most of the southwestern portion of the City (see Figure 2‐4). The Black River, which formerly drained Lake Washington, is now part of a system that drains the eastern side of the Green River basin, an approximately 24‐square‐mile area in the cities of Renton and Kent. The Black River Basin includes the South Renton, Rolling Hills, Panther Creek, Springbrook, and Valley subbasins, which are all located within the city limits. The original Black River Basin was extensively modified when the water level in Lake Washington was lowered. The flows from this area are collected in the Black River Pump Station (BRPS) forebay, then pumped to the Green/Duwamish River. The BRPS regulates flows into the Green River. The pump station also acts as a dam during flooding in the Green River, blocking high flows from the Green River from flooding up into the Black River, Springbrook Creek, and the Earlington Industrial Park in Renton. The BRPS must reduce pumping rates when Green River flow exceeds 9,500 cfs at the Auburn gaging station, per operational procedures and the Green River Interlocal Agreement (R. W. Beck 2007). If flows reach 12,000 cfs, the BRPS may have to completely stop the pumps (R. W. Beck, 2007). AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐30 On the valley floor, land use is primarily commercial and industrial, and contains multiple natural wetlands. On the eastern upper plateau, land use is mostly residential with some commercial areas. Significant surface water features include Panther Lake and Springbrook Creek (P‐1 Channel) and four of its tributaries: Panther Creek, Rolling Hills Creek and Upper Springbrook and Mill Creeks, which join with Springbrook Creek just south of the city limits. Although the industrial, commercial, and residential areas contain piped surface water collection facilities, they all discharge to natural or modified channels. The South Renton subbasin, however, is drained almost entirely by a closed pipe system that discharges directly to the forebay for the BRPS. Upland areas in the plateau of the basin are underlain by geologic deposits that force groundwater horizontally and produce seeps in the shallow aquifer that support summer baseflow in Springbrook Creek. The high amount of impervious surface area limits infiltration potential and redirects water overland, causing high peak flow rates. Springbrook Creek (with a mean annual flow of 10 cfs) contributes to water quality impairment, as proportionate to flow, in the mainstem Green/Duwamish River (with a mean annual flow of 1,530 cfs). 2.4.5.1 Basin Water Quality Black River is included in the state’s 2016 303(d) list for dissolved oxygen, bioassessment, and fecal coliform bacteria at the confluence with Green River and Duwamish River. Water quality samples were taken for the Black River Basin Water Quality Management Plan (Herrera, 1993b) and for the Comprehensive Fisheries Assessment of the Mill Creek, Garrison Creek and Springbrook System (Harza, 1995). Copper and lead were found to be below detrimental levels, but zinc measurements ranged from 32 to 154 micrograms per liter in Springbrook Creek (Harza, 1995). Zinc levels at 10, 9, and 103 micrograms per liter adversely impact 7 gram rainbow trout, cutthroat trout, and chinook fry, respectively (Harza, 1995). Water quality conditions in Springbrook Creek are poor with a Water Quality Index (WQI) score of 36 out of 100 in water year 2018 (King County, 2020). Springbrook Creek is listed on the state’s 2016 303(d) list for bioassessment, dissolved oxygen and fecal coliform, and it is listed as “impaired” for temperature. Dissolved oxygen is usually highly correlated with temperature and has become a major limiting factor for salmonids in this watershed. Temperature increases can be attributed to impaired hydrologic and hydraulic functions of the basin, reduced flows to baseflow, reduced flows from lack of summer snowmelt, and decreased forest shading, as well as increased climate temperatures. Water quality testing of Mill, Garrison, and Springbrook Creeks was conducted by Abbey Road Group in the fall (September) and spring (April) from fall 2014 through spring 2019. Results of this testing indicate increased temperatures, decreasing levels of dissolved oxygen, decreasing pH, and elevated levels of fecal coliform bacteria at different sampling locations within all three creeks. Measurements of turbidity decreased slightly and all TSS and biochemical oxygen demand (BOD) samples were within the acceptable range. 2.4.5.2 Basin Fish Habitat Juvenile coho, chum, winter steelhead, and cutthroat have been captured at numerous locations throughout the subbasin (Harza, 1995) and utilize habitat primarily for migration. Although Springbrook Creek has poor fish habitat, there are upper reaches of some of the tributaries to Springbrook Creek that do provide good fish habitat. As recently as 2011, adult chinook have been observed spawning in Upper Springbrook Creek. The creek has been highly modified and is choked with invasive reed canary grass and has little instream habitat structures and no large woody debris. The BRPS is a partial fish passage barrier, but the combination of a fish ladder and a fishway chute aids salmonids in upstream passage. Fish migrating downstream are diverted around the pumps using an air‐lift pump to raise them to the AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐31 downstream water levels (King County, 2000). The Black River Water Quality Management Plan (Herrera, 1993b) notes that the existing conditions of Springbrook Creek lack suitable spawning habitat capacity due to degraded water quality during summer months. The low gradient of the creek results in reduced flow velocities that allow fine sediment to settle out in the creek bed, reducing potential spawning habitat. There are tributaries to Springbrook Creek that have good fish habitat. Upper Springbrook Creek, whose headwaters originate in Renton’s Springbrook Springs Watershed located on the eastern plateau, has excellent water quality. The drainage basin land use consists mostly of low density residential (R‐1 and R‐4) and resource conservation (RC). A significant tree canopy along the creek corridor in combination with cool spring water helps to lower water temperatures in the creek. In addition, the creek’s steep gradient facilitates the recruitment and deposition of gravel along the creek channel as it meanders down to the valley floor, which provides good spawning habitat. 2.4.5.3 Basin Planning Status Ecology, King County and the Municipality of Metropolitan Seattle (Metro) coordinated the Green‐Duwamish Watershed Nonpoint Action Plan in January 1991. The goal of this plan was to minimize nonpoint source water pollution, protect beneficial uses, and enhance water quality in this watershed. This plan was last updated in 2002 (King County). The area studied in the Green‐Duwamish Watershed Nonpoint Action Plan extends from Howard Hanson Dam to Elliott Bay, an area of nearly 250 square miles (King County, 2002). Portions of the City lying in this area have undergone urbanization since the early 1990s. A number of priority concerns were addressed in the plan. Stream channel erosion from construction practices due to rapid urbanization appears to be one of the biggest concerns in this portion of the basin. The Black River Basin Water Quality Management Plan (Herrera, 1993b) was prepared for the City to identify existing (as of 1993) and future water quality problems within the basin. The study area for this plan includes areas of Renton and unincorporated portions of King County east of Renton. The project was partially funded by an Ecology Centennial Clean Water Fund grant. A parallel and related process to the Black River Basin Water Quality Management Plan is the development of the East Side Green River Watershed Project Plan and Environmental Impact Statement (ESGRWP) (R. W. Beck, 1997a). This plan was developed through the cooperation and involvement of the jurisdictions in the basin, including the City of Kent and King County. The plan was updated in 2007 (R. W. Beck). The hydrologic analysis was performed using the HSPF computer program. Results of the hydrologic analysis are shown in Table 2‐9. The Green/Duwamish Ecosystem Restoration Program (ERP) is a collaboration between WRIA 9 jurisdictions in the valley including Renton, Tukwila, Kent, Auburn, King County and USACE to improve salmon habitat in the basin. The program has resulted in several habitat projects that have been completed in Kent and King County. The City and USACE recently completed an ERP project that restored approximately 1,000 feet of spawning habitat along Upper Springbrook Creek. The Flood Insurance Rate Map (FIRM) for the area upstream of the Black River Pump Station, including tributary areas to Springbrook, Mill, Rolling Hills, and Panther Creek, was remapped to show a revised preliminary floodplain delineation (i.e., not made effective by the Federal Emergency Management Agency [FEMA]) (NHC, 2005; R. W. Beck, 2006). Subsequently, in 2007, FEMA issued preliminary DFIRMs for King County. These new draft maps were based on levees that could demonstrate meeting the criteria for certification. Because a significant number of the levees on the Green River could not be certified (non‐accredited), FEMA would not consider the levees as providing flood protection and issued revised maps to show the Renton Valley entirely within the 100‐year regulated floodplain. Some areas AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐32 were mapped with flood depths up to 12 feet. FEMA developed the revised maps without conducting any detailed hydraulic analysis and simply extended the elevation of the floodplain within the main channel of the Green River across the valley floor. King County and Green River valley cities including Renton, Kent, Tukwila and Auburn disagreed with the methodology that FEMA used to develop the updated maps. In response, the County retained Northwest Hydraulic Consultants, Inc. to develop a model to predict flooding in the Green River valley based on multiple levee failure scenarios. The resulting maps show significantly less area in the floodplain. Areas flooded to a depth of 12 feet based on the revised FEMA maps were shown flooded to a depth of 6 feet in the maps. The County maps became available to the public for review and comment in November 2010 in preparation for FEMA approval and subsequent adoption in 2011. However, in the spring of 2011, FEMA announced a policy change regarding non‐certified levees, which has put the adoption of the revised DFIRM for the Green River Valley on hold. In December 2011, FEMA developed a proposed revised policy that included new methodologies to better reflect the true flood risk of non‐accredited levees on the floodplain. FEMA completed the public review/comment processes in 2013 and as a result, developed analysis and mapping procedures for non‐accredited Levee Systems also known as Levee Analysis and Mapping Procedure (LAMP). Non‐accredited levee systems are those “that do not meet the National Flood Insurance Program (NFIP) regulatory requirements of 44 CFR 65.10… and that are not shown on a FIRM as reducing the base flood hazard” (FEMA, 2018). Many non‐accredited levee systems on the Green River are located in the City of Kent. Some of these levees also provide flood protection for parts of Renton. In 2010, Kent began an effort to certify and/or reconstruct up to 12 miles of levees at a cost of approximately $100M. Once the levees are certified, the intent is for FEMA to issue new DFIRM that show the Cities of Kent and Renton as protected by levees and outside the 100‐year floodplain. In addition to the various levee projects occurring in Kent, the KCFCD finalized the scoping summary report for the Lower Green River Corridor Flood Hazard Management Plan as a part of the Environmental Impact Study (EIS) associated with the plan in June of 2019. The purpose of this plan is to implement an integrated long‐term approach to reduce flood risk within the Lower Green River Corridor, which extends into the southwestern portion of Renton. The plan is intended to reduce flood risk while balancing other important basin objectives such as improving fish habitat and supporting the economic prosperity of the region. Communication and coordination between the City of Renton and the KCFCD has been ongoing throughout the preliminary stages of formulating the Flood Hazard Management Plan. 2.4.5.4 Howard Hanson Dam and Potential Flooding from Green River Although now operating at full capacity, concerns over reduced storage capacity due to seepage problems at the Howard Hanson Dam and potential flooding of the Green River Valley caused the City to expend significant resources in flood preparedness between 2009 and 2011. In 2009, USACE notified the City of Renton and other Green River Valley cities of several sinkholes that had formed in the right embankment of the Howard Hanson Dam after a significant rain event in January 2009. During the event, USACE decided to hold back water in the dam to prevent downstream flooding of the Green River Valley. The formation of the sink holes as well as sediment laden water that was observed flowing from the dam’s drainage tunnels, indicating seepage through the material in the right embankment, led USACE engineers to believe the right embankment could fail. To minimize risk of failure after this event, USACE decided they would need to reduce storage capacity, which could result in the release of more water than usual from the dam during extreme rain events and result in a higher risk of flooding in parts of the City in the Green River valley. In coordination with the Corps, King County, and other valley cities, the City implemented pre‐disaster preparations and AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐33 preventative measures in anticipation of higher than usual flows in the Green River and continued these measures through 2010. To make the dam fully operational, USACE completed the installation of a seepage barrier or grout curtain and other improvements to the drainage in the abutment in the fall of 2011. Prior to completing this work, engineers and geologists ran a series of tests in the summer to gather data to evaluate the effectiveness of the repairs. Based on the analysis of the data, USACE concluded that the dam can now operate at the full design pool elevation (1,206 feet) with low risk to the dam. Although the dam is fully operational, it does not eliminate the risk of flooding in the Green River Valley. The dam, in conjunction with downstream levees serve only to reduce the risk of flooding and as such the Corps is working with local communities including the City to prepare for the risk of flooding by using the best available information (USACE, 2019). 2.4.5.5 Basin Hydrology Because it has such a large percentage of impervious area, the Black River Basin has high peak flows and short‐duration hydrologic response to precipitation. Hydrology for individual subbasins is detailed in the sections that follow. TABLE 2‐9: PREDICTED PEAK FLOWS AT SELECTED LOCATIONS (CFS) FOR THE BLACK RIVER BASIN Subbasin Name Source (& basis for existing land use) 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows1 100-Year Peak Flows1 2003 / 2007 Future 2003 / 2007 Future 2003 / 2007 Future 2003 / 2007 Future South Renton (SW 7th System) Gray & Osborne (2003) N/A2 122 N/A2 165 N/A2 1856 N/A2 213 Springbrook Creek (at BRPS) 3 ESGRWP (2007) 457 756 931 1053 12764 1251 1197 1343 Panther (at SW 23rd St.) 3 ESGRWP (2007) 67 119 130 149 152 174 197 226 Rolling Hills (at I-405) 3 ESGRWP (2007) N/A5 N/A5 148 1974 1994 186 261 330 Valley Subbasin (Springbrook Creek at SW 23rd St.) ESGRWP (2007) 365 612 769 845 900 1003 1013 1139 1. These flows reflect a future “conveyance” event. There is also a “storage” event that reflects pumping limitations on the BRPS. For more information, see ESGRWP Supplement (R. W. Beck, 2007). 2. Flows were estimated for future conditions only. 3. Flows are based on frequency analysis performed on Springbrook Creek at the BRPS. Individual frequency analyses have not been done. 4. Flows are higher because this event coincides with high flows in the Green, forcing BRPS to operate at a reduced rate, and thus affecting the peak rate. 5. Peak flows for the 2-year recurrence interval were not available. 6. A subsequent report prepared by GHD modeled the 25-year future condition flow at 175.0 (Scenario 2A). Source: ESGRWP Supplement (R. W. Beck, 2007) and SW 7th Street Storm Drainage Improvement Project (Gray & Osborne, 2003) AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐34 2.4.5.6 South Renton/SW 7th Subbasin The South Renton subbasin, also called the “SW 7th Basin,” is located in the former floodplain of the Black River. This subbasin is generally flat and includes much of the southern portion of the core area of Renton, a small residential sector, and a large area of commercial and industrial facilities. Surface water in the basin is generally collected and conveyed in a south and west direction to reach a major trunk storm drain along SW 7th Street that discharges to Springbrook Creek. Limited pipe capacity has caused significant flooding along SW 7th Street. The City has begun a phased approach for solving these problems. To date, pipe improvements have included two projects. First, a new 60‐inch‐diameter pipe was installed between Lind Ave SW and a new outfall at Naches Ave SW along with a header vault approximately 550 feet east of Lind Ave SW. The 60‐inch‐diameter pipe was put in as a parallel system to increase system capacity (parallel to a 54‐inch‐diameter pipe). The header vault was installed to facilitate connection of another pipe extension under the second project. The second project included a new 60‐inch pipe extension from the header vault to Shattuck Ave SW. This system parallels an existing 24‐inch pipe (with the exception of a 150‐foot gap at Hardie Avenue, which only contains the 60‐inch pipe). Hydrology ‐ 2003 Conditions: This subbasin is approximately 538 acres. Current condition predicted flows for this subbasin were not estimated as part of the most recent modeling (Gray & Osborne, 2003). Hydrology ‐ Future Conditions: Future condition predicted flows are presented in Table 2‐9. A subsequent study by GHD included additional modeling for the 25‐year storm, which provided similar results to the 2003 study. Note that this subbasin is already highly developed; therefore, current condition flows are likely very similar to future condition flows. 2.4.5.7 Springbrook Creek Subbasin Springbrook Creek is a long creek within the East Side Green River watershed, draining much of the area of south Renton. The Black River/Springbrook Creek is located at river‐mile 11 of the Green River. Much of the Black River/Springbrook Creek land is urbanized. Development generally extends to the streambank that limits the width of the riparian corridor. Much of the subbasin known as the Springbrook subbasin within the City of Renton is drained by a fork known as “Upper Springbrook Creek” in the ESGRWP (R. W. Beck, 1997a). This fork flows northwesterly underneath SR‐167 and then joins the mainstem of Springbrook Creek just south of the city limits. Springbrook Creek then flows northward through Renton in the Valley subbasin where it eventually joins the Black River. The majority of the Springbrook Creek subbasin lies in between Highway 167 and Panther Lake. Less than a sixth of this is within the current Renton city limits. The portion of the Black River Basin known as the Springbrook Creek subbasin has a portion within the city limits that consists of open forested land known as the City of Renton watershed. Existing riparian vegetation is typically herbs, shrubs, and deciduous trees with much of the ecological function highly impaired. The area beyond the city boundaries, which drains into the City, has been partially developed into single‐family residential neighborhoods. However, the portion of the Springbrook Creek subbasin within the City’s watershed will remain forested. Hydrology ‐ 2007 Conditions: This subbasin is approximately 574 acres, with 86 acres of effective impervious area (EIA) (R. W. Beck, 2007). Table 2‐9 presents 2007 conditions and future peak flows expected as a result of changing land use for the Springbrook Creek subbasin. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐35 Hydrology ‐ Future Conditions: In the future, this subbasin is expected to continue to be developed as a residential area, with some areas being developed as commercial development and multifamily housing. The estimated future EIA is 23%, an increase of 46 acres, with most of the conversion occurring outside the City (R. W. Beck, 2007). 2.4.5.8 Panther Creek Subbasin The Panther Creek subbasin straddles the Renton city limits. Only a small, lower portion of the subbasin is within the city limits, between the Valley and Rolling Hills subbasins. This portion of the subbasin contains a long, narrow wetland area that parallels SR 167, known as the Panther Creek Wetland. This wetland extends along the east side of SR 167 from near I‐405 at the north to Panther Creek (near S 37th Street) at the south. The SW 23rd Street drainage channel originates at the Panther Creek Wetland. Most of the Renton portion of the subbasin is downstream, within the “P3” and “P4” subbasins, as analyzed by the ESGRWP (R. W. Beck, 1997a). Hydrology ‐ 2007 Conditions: This subbasin is approximately 1,700 acres, with 372 acres of EIA (R. W. Beck, 2007). The peak flows for 2007 conditions from this subbasin are presented in Table 2‐9. Hydrology ‐ Future Conditions: Most of the future development will include converting open space to single‐family residences. The City of Renton Comprehensive Plan (2015) has zoned the entire area as residential, except for commercial mixed used and areas designated as environmentally sensitive. It is estimated that an additional 249 acres of EIA will exist in the future, reflecting a 67% increase in impervious area (R. W. Beck, 2007). This growth is expected to be evenly distributed between the City portion of the basin and the upper plateau in Kent. The future predicted peak flows for the basin, presented in Table 2‐9, show large increases for frequent storm events and smaller increases for rare events. The increases would be larger, but the flows pass through the large Panther Creek Wetland, which helps attenuate storm peaks. 2.4.5.9 Rolling Hills Subbasin The Rolling Hills subbasin is similar geographically to the adjacent Tiffany/Ginger Creek subbasin, although flows from this subbasin go west to Panther Creek and the BRPS rather than north to the Cedar River. The Rolling Hills subbasin contains a small stretch of low‐lying areas in the Green River valley floor, a moderate to steeply sloping region above the valley, with two incised canyons, and a gentler sloping plateau area at the top of the basin. The lower flat area has been developed into a commercial‐industrial belt and I‐405 transportation corridor. The slopes above most of this area have been developed into multifamily housing units and single‐family homes except for the steeply sloping canyons. Much of the upper portion of the basin has also been developed into single‐family homes. Rolling Hills Creek is routed under I‐405 via a parallel pipe system and discharges into the Panther Creek Wetland and a channel that flows south along the east side of SR‐167. The channel enters a box culvert that conveys flows west under SR‐167. This culvert connects to a pipe system along SW 19th Street, which conveys flow west until it discharges into Springbrook Creek. During high‐flow periods, the channel upstream from the SR‐167 box culvert can overtop and spill out into the Panther Creek Wetland. Hydrology ‐ 2007 Conditions: This subbasin is approximately 926 acres, with 293 acres of EIA (R. W. Beck, 2007). Predicted 2007 condition peak flows are presented in Table 2‐9. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 2-36 Hydrology - Future Conditions: The Rolling Hills subbasin will remain in a similar land use pattern to what existed in 2006 according to the City of Renton Comprehensive Plan (2006). The estimated future EIA is 50%. This reflects an additional 167 acres of EIA (R. W. Beck, 2007). Table 2-9 presents the expected changes in peak flows. 2.4.5.10 Valley Subbasin The Valley subbasin is a flat part of the Green River Valley. Its dominant drainage feature is Springbrook Creek, which flows south to north and discharges into the BRPS forebay. While flowing through this subbasin, Springbrook Creek joins with Panther Creek, at SW 23rd Street; Rolling Hills Creek, at SW 19th Street; and the SW 7th system. Water surface elevations in Valley subbasin are impacted by peak flows, storage capacity of the adjacent wetlands; the conveyance capacity of the stream channels, culvert crossings, and bridges; and the operation of BRPS, which depends on the flow in the Green River. Most of the open land is cleared flat lowland, with scattered wetland areas. The developed area is over 90 percent commercial or industrial, with much of development large warehouse type structures. Hydrology - 2007 Conditions: Flows in this subbasin include flows from Garrison Creek, Mill Creek, Panther Creek, Springbrook Creek, and the Rolling Hills subbasin, which all converge within the Valley subbasin. Table 2-9 presents estimated peak flows at various locations in the valley. Hydrology - Future Conditions: The dominant system in this subbasin, Springbrook Creek, will be subject to higher peak flows in the future due to upstream development in both Renton and Kent. Peak flow increases are greater for the smaller events such as the 2-year compared to projected flow increases for the more rare events. This is due to the significant storage attenuation for the more severe flood events provided by the valley wetlands. 2.4.6 SOOS CREEK BASIN The Soos Creek Basin is a large basin that lies between the Cedar River and Black River basins and is tributary to the Green River, which places it in WRIA 9. A portion of the basin which includes Big Soos Creek is located in the very southeast edge of the present Renton city limits, as shown in Figure 2-1, and only 17 acres of the basin are actually within the City. A larger portion of the basin is located within the UGB; however, the Big Soos Creek flows in a southerly direction, away from the current city boundaries, and therefore, flow changes within Big Soos Creek are not likely to impact the City. Development in the upper portion of the basin is almost entirely single-family and multifamily residential with a fairly large area of the basin identified as wetlands and related habitat. In addition, floodplains are found in the Soos Creek Basin. 2.4.6.1 Basin Water Quality No water quality data was available within the city limits in the uppermost portion of the basin. River-mile 10.5 is as far upstream as monitoring has been conducted. According to a Habitat Limiting Factors and Reconnaissance Assessment Report prepared for WRIA 9 (King County, 2000), dissolved oxygen in Big Soos Creek was observed to be below rearing and incubation standards in some measurements; many of the excursions occurred during defined salmon incubation periods. Big Soos Creek, downstream of the City jurisdictional limits, is on the state’s 2016 303(d) list for dissolved oxygen and bacteria. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐37 2.4.6.2 Basin Fish Habitat As mentioned in the WRIA 9 Limiting Factors report (King County, 2000), there is a general lack of habitat information for the Soos Creek Basin, especially since the mid‐1980s. Despite the lack of information, the technical advisory group for the WRIA 9 Limiting Factors report was able to conclude: There is a lack of large woody debris throughout the streams in the Soos Creek basin. The increased frequency of peak flows attributed to increased impervious surfaces has been at least partially responsible for degrading salmon habitat through channel incision and excessive sedimentation. This degradation limits successful incubation by scouring and smothering redds and limits rearing by reducing channel complexity. 2.4.6.3 Basin Planning Status The Soos Creek Basin Plan, adopted in January 1992 (King County), recommended a combination of tools for basin management aimed at correcting surface water problems and providing protection for the basin's water resources. Among the recommended tools were various land use controls, the Basin Steward Program, capital improvement projects, and a basin management evaluation program. Ecology, in collaboration with local partners, is developing a plan to control pollutants in the Soos Creek watershed. The plan will set two TMDLs for pollutants of concern: a multi‐parameter TMDL addressing dissolved oxygen, temperature, and bioassessment, and another TMDL for fecal coliform. Studies were initiated in 2006 for temperature and dissolved oxygen, in 2011 for bioassessment, and in 2012 for fecal coliform; and the TMDLs are expected to be complete in 2022 (Ecology, 2020d; Ecology 2020e). A detailed discussion of these TMDL standards is provided in Section 4.4.6. 2.4.6.4 Basin Hydrology Hydrology ‐ 1992 Conditions: Development in the upper portion of the Soos Creek basin is almost entirely single‐family residential. The Soos Creek Basin Plan estimates 1992 condition and future peak flows at the point where Big Soos Creek crosses Lake Youngs Way at the edge of the urban growth boundary. These flows are presented in Table 2‐10. TABLE 2‐10: PREDICTED PEAK FLOWS (CFS) FOR THE SOOS CREEK BASIN Subbasin Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1992 Future 1992 Future 1992 Future 1992 Future Big Soos Creek 50 78 81 120 N/A N/A 124 178 Source: Soos Creek Basin Plan (King County, 1992) Hydrology ‐ Future Conditions: As shown in Table 2‐10, full buildout in the upper Soos Creek subbasin will cause about a 50% increase in peak flows. Land use is expected to remain similar to the present (1992), primarily residential. It is noted however, that the increases may be overstated, because the prior modeling effort did not consider stormwater runoff controls such as retention/detention and infiltration systems for new development and redevelopment. AGENDA ITEM # 9. a) DRAINAGE BASIN AND SERVICE AREAS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 2‐38 2.4.7 DUWAMISH RIVER BASIN The Duwamish River Basin is located in the northwest portion of the City. It is a small basin that discharges directly to the Duwamish/Green River. The Duwamish River Basin is part of the Green River Watershed. Impacts of river channelization are apparent in the estuary. Estuaries are extremely important to habitat rearing and outmigration of juvenile salmonids. River channelization in this area, including ditching, draining, dredging, and filling, has destroyed the estuary area. The entire basin consists of approximately 61 acres. The portion of the basin in the City includes a large quarry/gravel pit. Most of the area outside of the City is residential and is bisected by Martin Luther King Jr Way S. There is no hydrologic flow or water quality information for this subbasin. AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 3-1 SECTION 3 CURRENT SURFACE WATER MANAGEMENT PROGRAM 3.1 GENERAL DESCRIPTION Utility resides within the Utility Systems Division of the Public Works Department. Figure 3-1 presents the organization of Utility in relation to other entities within the City that provide support to Utility. The City is governed with a Mayor-Council form of government that is elected by and accountable to its citizens. FIGURE 3-1. SURFACE WATER UTILITY SUPPORT ORGANIZATION CHART The Mayor is the head of the executive branch of government and provides general supervision over the various City departments. The Chief Administrative Officer is appointed by the Mayor to supervise the departments and assist with day-to-day operations. The City Council forms the legislative branch and is principally responsible for making policy. Not all City departments that provide support to Utility are shown on the chart. For example, Human Resources and Risk Management provide hiring, benefits, insurance, and other support to the utility, but are not included. The support they provide is not directly related to surface water management activities. Figures 3-2 and 3-3 show more detail about the groups within Public Works and Community and Economic Development that are directly and indirectly involved in Utility program support. AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐2 FIGURE 3‐2. SURFACE WATER STAFF WITHIN PUBLIC WORKS DEPARTMENT AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐3 FIGURE 3‐3. COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT ORGANIZATIONAL DETAIL Table 3‐1 shows the surface water program elements implemented by Utility. Many of these services are also coordinated with different work groups within the City organizational structure and are discussed in more detail below. TABLE 3‐1: UTILITY SURFACE WATER PROGRAM ELEMENTS Category Program Elements Description Engineering, Planning, Compliance, and Coordination Planning Participate in long-range planning (i.e., Comprehensive Planning) and assist with development of annexations and area plans. Plan Review Review surface and stormwater components of new development plans as needed. Coordination with Other Jurisdictions/Agencies Participate in regional and local forums to plan and implement cross-jurisdictional initiatives such as flood control, salmon recovery, and water quality improvements. Technical Assistance and Coordination Provide surface and stormwater technical assistance and coordination with other City departments and outside groups such as the Cedar River Council and WRIA 8 and WRIA 9. Regulatory Compliance Responsible for compliance with local, state and federal codes, laws and permits related to surface and stormwater. Public Education and Involvement Develop and provide public education and outreach on surface and stormwater related topics. AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐4 TABLE 3‐1: UTILITY SURFACE WATER PROGRAM ELEMENTS Category Program Elements Description Storm System Inventory Maintain and update stormwater system inventory. Drainage Problem Inventory Investigate and track drainage complaints. Capital Projects Develop and implement surface and stormwater capital projects. Flood Hazard Monitoring and Response Conduct pre-event monitoring and preparation, post- flooding recovery and assistance during flood emergencies. Community Rating System Implement City’s community rating system to reduce flood risk and flood insurance premiums for property owners. Inspection, Operations and Maintenance Illicit Discharge Detection and Elimination Respond to spills. Identify, track and coordinate removal of illicit discharges. Inspection Inspect new construction, conduct CCTV on pipes, conduct public and private drainage system and facility inspections. Cleaning Conduct drainage system cleaning (i.e., pipes, ditches, catch basins, facilities, etc.) Repairs Conduct drainage system repairs (i.e., pipes, ditches, catch basins, facilities, etc.) Construction Construct new drainage system elements (i.e., pipes and catch basins). Vegetation Maintenance Conduct vegetation maintenance on City rights-of-way, easements, and at City-owned water, wastewater and surface water facilities. Emergency Response/customer service Respond to emergencies such as flood events, drainage pipe breaks, etc. and customer complaints. Administration Utility Billing Prepares and mails utility bills and processes payment collection. Information Technology Telecommunications, computer equipment, and information services operations. This section includes a description of Utility program elements, including the 2015‐2019 expenditures, staffing levels, and the specific City organizations that perform each service. Utility services are provided by the following departments, divisions, and sections: Public Works Department, Utility Systems Division, Surface Water Utility Engineering Section. Public Works Department, Maintenance Services Division. Community & Economic Development Department, Development Engineering and Planning Divisions. AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 3-5 Administrative Services Department. As shown in Table 3-1, there is significant coordination between Utility and these departments. These interactions are further described below. Some examples include: Utility supporting the Community & Economic Development Department to address surface water issues relating to large master planning areas or annexations, assisting with plan review on large projects, assisting in public education and involvement associated with stormwater, coordinating with the Maintenance Service Division to ensure that maintenance programs and frequencies are meeting regulatory requirements, and coordinating with the Finance and Information Services Department associated with utility billing. There are a total of 25.15 full-time employee (FTE) surface water positions as of December 2020. Sections 3.2 through 3.4 describe the surface water program elements performed within various Utility programs. Section 3.5 describes management activities of the Utility. Section 3.6 provides a summary including a cost breakdown between the various programs and the number of hours within each. The hours are based on the 2015-2019 actual timesheet data and do not include the unfilled positions or time off work. 3.2 ENGINEERING, PLANNING, COMPLIANCE, AND COORDINATION Utility conducts several work activities related to engineering, planning, compliance, and coordination. These work elements are often done in collaboration with other City Departments or work groups and sometimes with outside organizations. The following work elements comprise the engineering, planning, compliance, and coordination category: Capital Projects Planning Plan review Technical assistance and coordination Coordination with other jurisdictions/agencies Regulatory compliance Public education and involvement Storm system inventory Drainage problem inventory Flood hazard monitoring and response Community Rating System (CRS) 3.2.1 CAPITAL PROJECTS A significant amount of the Utility Engineering Section’s time is spent in the design and construction management of capital improvements. Engineering staff are responsible for contract management for engineering design and construction, and development of capital project solutions to surface and stormwater system problems. Additionally, small engineering projects are sometimes designed in-house AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 3-6 by engineering staff depending on the size and complexity of the project. Additional capital projects activities are construction inspection on the surface water component of City projects completed by the Development Services Department, and capital purchases funded from the Maintenance Services Division. 3.2.2 PLANNING Planning activities include CIP planning and stormwater grant applications. Utility also provides assistance with long-range plans such as the City Comprehensive Plan, area plans, master plans, large annexations, and providing solutions to existing and future surface water management problems. Planning expenses are incurred in the Utility Engineering Section when staff time is charged to planning activities. 3.2.3 PLAN REVIEW Plan review for surface and stormwater-related components of new development within the city limits is completed by staff in the Planning Division, with assistance on an as-needed basis from the Utility Engineering Section. Plan review may include technical assistance related to compliance with City surface water codes and drainage manual. 3.2.4 TECHNICAL ASSISTANCE AND COORDINATION Internal technical assistance is provided by the Utility Engineering Section to assist and coordinate with other City departments. The assistance may include technical support related to surface water management in other City Departments, Divisions, and Sections. Transportation Services and Community Services (Parks Division) also often request surface water technical assistance to remedy problems. Assistance includes internal meetings to discuss WSDOT Coordination, FEMA disaster assistance related to surface water issues, and regional disaster preparation. External technical assistance is also provided to public-private forums such as the Cedar River Council and WRIA 8 and WRIA 9 Forums and associated committees, and the governmental organization, King County Drainage District No. 1. This type of assistance is limited to as-needed customer service efforts completed by the Utility Engineering Section and the Maintenance Services Division. 3.2.5 COORDINATION WITH OTHER JURISDICTIONS/A GENCIES Utility Engineering Section staff routinely coordinate with outside jurisdictions on activities including, WRIA 8 and 9 planning, coordination with King County for Flood Hazard Management and the KCFCD, and support related to WSDOT activities. Staff also coordinate with FEMA and USACE on emergency response, post-flood events to repair facilities, and flood hazard reduction associated with the Green and Cedar Rivers. Because of shared borders with the cities of Kent, Tukwila, and Newcastle, the City routinely works with these neighboring jurisdictions to address flooding, water quality, and habitat issues. A more detailed discussion of City coordination efforts with WSDOT and the KCFCD is included in Section 5. The City also collaborates with local organizations including the Cedar River Council (CRC) and special purpose districts, such as King County Drainage District No. 1 (District). The CRC is a group of stakeholders who participate in monthly discussions to share opinions and concerns about issues regarding the health of the Cedar River. CRC membership cultivates collaboration AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 3-7 among a variety of citizens, including basin residents and representatives of community groups, businesses, and local, state, federal, and tribal governments. The District was formed in the early 1900s for the specific purpose of maintaining drainage ditches and canals that were created to support the farming community located in the Green River Valley primarily within the jurisdictions of Kent and Renton. Within Renton, the District maintains a 40-foot right-of-way along Springbrook Creek between SW 43rd Street and the Black River Pump Station. The District collects an ad valorem tax on properties in the valley and uses the revenue to provide maintenance of the Springbrook Creek right-of-way and provide grant money for local jurisdictions to use for flood control improvements along the creek. 3.2.6 REGULATORY COMPLIANCE Utility regulatory activities include development of new city surface water codes and/or design guidelines (e.g., Surface Water Design Manual), and compliance with the municipal NPDES permitting requirements, and city, state, and federal laws and ordinances. Section 4 of this Plan describes surface and stormwater regulatory requirements. 3.2.7 PUBLIC EDUCATION AND INVOLVEMENT Public education and involvement includes providing surface water public education literature through the Customer Services counter, discussing runoff codes with developers, and meeting with the public at Council Utilities Committees. Utility also maintains website information related to NPDES Permit requirements, illicit discharges and spill reporting, surface water maintenance recommendations, flooding emergencies information, watersheds, car washing, storm drain marking, and salmon recovery activities. Utility provides an education and outreach program and public involvement and participation program to meet the NPDES Permit requirements. Utility staff also occasionally present to students when engaged by schools or teachers. 3.2.8 STORM SYSTEM INVENTORY The Utility continually updates its storm system inventory to ensure accurate GIS mapping to improve customer service to the public, developers, engineers, and other City departments. Updating the storm system inventory mapping is an activity conducted within the Utility Engineering and Maintenance Services Surface Water Section. Maintenance staff provides GPS coordinates and redlines maps for Utility Engineering staff to update in GIS. 3.2.9 DRAINAGE PROBLEM INVENTORY Drainage complaints are jointly addressed by Utility Engineering Section staff and Surface Water Maintenance staff. Complaints originate from a variety of sources, including city residents, businesses, Maintenance Services, and other City departments. Usually, complaints are investigated, and an action item, such as a work order, may be initiated as a result of the complaint. Otherwise, the complaint is tracked and logged with a description of how it was handled. 3.2.10 FLOOD HAZARD MONITORING AND RESPONSE This activity involves flood monitoring, pre-flood preparation, post-flooding recovery and repairs, communicating with internal and external groups, and assisting in emergency response during floods. AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 3-8 Flood hazard response varies depending on the severity of storm events from year to year and the potential to result in flooding, particularly on the City’s large rivers: the Cedar and the Green. Notable flood events occurred in January 2009, December 2015, December 2019, and February 2020. Potential flooding of the Green River due to problems with the Howard Hanson Dam is discussed in Section 2.4.5.4. Part of this activity involves coordinating with other agencies such as the KCFCD, as discussed above in Section 3.2.5. 3.2.11 COMMUNITY RATING SYSTEM (CRS) The Community Rating System (CRS) is a program within FEMA’s NFIP. NFIP provides property owners access to federally backed flood insurance. Any property that is financed through a federal loan is required to have flood insurance if the property is located in the FEMA regulated floodplain. NFIP provides property owners flood insurance that may not be otherwise available through the private insurance market. Additionally, where private insurance is available, it is generally very expensive, and NFIP provides flood insurance at a discounted rate compared to private insurance. Currently, the City has a rating of 5 out of 10, which allows for a 25% discount in federal flood insurance. CRS is a voluntary incentive program that recognizes communities that implement floodplain management practices that exceed the federal minimum requirements of the NFIP to provide protection from flooding. By implementing policies and practices that reduce flood risk, the City receives credits the can be used to reduce flood insurance premiums for property owners. These reduced premiums reflect the reduced flood risk resulting from the City’s efforts toward reducing flood damage to insurable properties. Utility Engineering Section staff are responsible for implementing the CRS program in Renton. 3.3 INSPECTION, OPERATIONS, AND MAINTENANCE Inspection, operations, and maintenance is generally completed by the Maintenance Services Division in Public Works in coordination with Utility Engineering Section staff. Current Maintenance Services Division staffing for surface water O&M is 16.24 FTEs, including the Surface Water Maintenance Manager and Supervisor. The following are surface water work activities in the inspection, operations and maintenance category: Illicit discharge and detection elimination Inspection Cleaning Repairs Construction Emergency response/customer service Vegetation Control for water, surface water, and wastewater facilities and street rights-of way Table 3-2 summarizes the surface water infrastructure that the Maintenance Services Division is responsible for inspecting and/or maintaining. AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐9 Table 3‐2. Surface Water Management Inventory Data Type of Facility Quantity1 Unit Catch Basins/manholes 17,043 Each Drainage Pipe 277 Miles Ditches 24 Miles Culverts 8.5 Miles Detention Facilities3 – City Maintained Water Quality Facilities2 – City Maintained 264 171 Each Each Detention Facilities3 – Privately Maintained4 437 Each Water Quality Facilities- Privately Maintained4 350 Each 1 Quantities were estimated in 2020 using information available from the City's GIS. 2 Facilities include wetponds, bioswales, Filterras, etc. 3 Facilities include ponds, vaults, and tanks. 4 The quantity for private facilities includes residential subdivisions and commercial and industrial sites. The City has a maintenance management system where Maintenance Service Division activities are recorded. Table 3‐3 lists these activities, along with the activity numbers and the categories into which they are grouped. Maintenance Services Division staff record all hours worked in these categories. AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐10 Table 3‐ 3. Maintenance Program Activities Category Activity Activity No. Cleaning Manhole Cleaning 60002 Line Cleaning 60010 Root Cutting 60015 Brush Ctg/Ease/RDS/DT 60016 Facility Cleaning 60009 CB Cleaning 60072 Drain Patrol 60075 Retention Cleaning 60081 Ditch Cleaning 60091 Repair/Replace MH Repair/Replace 60001 MH Lid and Ring Replace 60006 Line Repairs 60012 CB Repairs 60172 Retention System Repairs 60173 Ditch Repair 60174 Inspection Inspect New Construction 60019 TV Inspection 60020 Misc/Inspections 60024 Public/Private Drainage Inspections 60194 NPDES WQ Facility Inspection 60007 Construction Line Construction 60112 CB Construction 60113 Vegetation Control Rights-of-way 60333 Domestic Water Facilities 60331 Surface Water Facilities 60300 Surface Water Easements 60005 Wastewater Easements 60334 Other Customer Service/Info 60100 IDDE and IC 60700 Equipment and Shop Service 60800 Emergency Response 60911 Work for Other Sections 60999 Field Supervision 60901 Professional Training 60902 AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐11 3.3.1 ILLICIT DISCHARGE DETECTION AND ELIMINATION Illicit discharge detection and elimination (IDDE) is the responsibility of the Maintenance Services Division with support from the Utility Division to respond to spills, report, and keep records per the NPDES permit requirements. Coordination is sometimes needed with the City airport, Planning Division, Parks Division, Renton Regional Fire Authority and other city departments. 3.3.2 INSPECTION Inspection activities for compliance with the Controlling Runoff and Operations and Maintenance programs of the NPDES Permit are shared by Public Works staff in the Maintenance Services Division and Utility Division, and by the Planning Division of the Community and Economic Development Department. Private stormwater facility inspections are conducted by the Utility Division while public stormwater facility inspections are conducted by the Maintenance Services Division. Construction inspection of City projects is provided by the Maintenance Services Division and Planning Division, and construction inspection for private development is completed by staff in the Planning Division. Inspections may lead to follow‐up maintenance work for the Maintenance Services Division for stormwater facilities for which the City has assumed maintenance responsibilities, or for which private owners have not cooperated to fulfill their maintenance obligations if the lack of maintenance is impacting the City’s system. Table 3‐2 shows the number of City‐maintained and privately maintained facilities. 3.3.3 CLEANING The Maintenance Division is responsible for cleaning the stormwater system, including ditches, pipes, culverts, catch basins, and inlets. There are three eductor truck crews that are dedicated to the Utility with the following functions: NPDES‐related services throughout the City, primarily pipe and catch basin cleaning. Ongoing maintenance in the Benson Hill area. After the April 1, 2008, annexation of the Benson Hill area, City crews noted that surface water management facilities required more maintenance than anticipated. Some of this maintenance includes minor/major repairs/replacement to catch basins, driveway culverts, and pipes to maintain functionality of the drainage system. Other necessary work throughout the City and assistance with the eductor truck crews. This includes NPDES‐related services and includes remaining activities requiring an educator truck crew, regardless of location within the City. The NPDES permit specifies catch basin inspection requirements and the conditions under which catch basins must be cleaned. The City has opted for an alternative compliance approach according to Section S5.C.7.c.iii.c. of the NPDES Permit, as described in Section 4. Pipes, ditches, catch basins, and inlets with a circuit are cleaned once during the permit term. 3.3.4 REPAIRS Repairs are made on surface and stormwater infrastructure as needed by the Maintenance Division. These include ditch regrading, catch basin and catch basin lid repair and replacement, spot repairs on pipes, and other small repairs to keep the system functioning. The NPDES permit dictates a schedule for maintenance activities. For stormwater system components that do not meet maintenance standards, AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐12 problems related to the component’s function must be addressed within one year for stormwater facilities, within six months for catch basins, and within two years for maintenance requiring capital construction costs of less than $25,000. 3.3.5 CONSTRUCTION New construction consists of installation of new stormwater infrastructure in areas where none previously existed or to solve existing drainage problems. The Maintenance Division also inspects and repairs CMP pipe as part of the asset management program further described in Section 5.7. 3.3.6 EMERGENCY RESPONSE/CUSTOMER SERVICE Maintenance Division staff respond to emergencies such as flooding, surcharging catch basins, pipe breaks, and other problems for which they have the skills and equipment to rapidly deploy. Additionally, they routinely provide customer as the first responders to drainage complaints and other calls that come to the customer service counter. 3.3.7 VEGETATION CONTROL Maintenance Division staff control vegetation in the right‐of‐way, easements and at public facilities. Six FTEs are dedicated to mowing, brush removal, noxious weed elimination and herbicide application mostly from May through October. Vegetation control equipment consists of six types of mowers, three flatbeds, three trailers and hand tools. 3.4 ADMINISTRATION Utility administration requires staffing in the Public Works Department as well as support from the Administrative Services Division. Utility pays for a portion of the Public Works Department administrative staff. In addition, a portion of the Utility Engineering Section’s expenditures is administrative, as are certain Maintenance Services Division administrative costs. Administrative services provided outside the Surface Water Utility include: Information Technology Utility Billing Also considered administrative are insurance costs and Utility’s share of technical services costs for monument control, survey services, and appraisal services. Taxes, debt service, and general fund allocation account for a percentage of the overall Utility budget and are described below. 3.4.1 INFORMATION TECHNOLOGY Expenses included under this program element are interfund payments for telecommunications, computer replacement, and information services operation. 3.4.2 UTILITY BILLING Utility pays a portion of the Administrative Services Department staff to process surface water utility bills. This effort includes preparing and mailing utility bills, utility bill payment collection, assisting the public with billing inquires, and enforcement of delinquent payments. AGENDA ITEM # 9. a) CURRENT SURFACE WATER MANAGEMENT PROGRAM O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 3‐13 Utility billing activities include the costs that the Finance & Information Services Department charges Utility. In addition, a percentage of Utility Engineering Staff time is spent estimating the billing characteristics of new non‐residential development. Utility billing activities include account set‐up, responding to customer billing complaints, and researching surface water utility billing. 3.4.3 GENERAL FUND COST ALLOCATION Utility’s share of the 2020 General Fund Cost Allocation is $363,000, which is 4.3% of the program’s total expenditures. 3.4.4 TAXES Taxes include the 1.5% state B&O tax and the 6.8% city utility tax. 3.4.5 DEBT SERVICE The debt service expense for Utility projects was $641,000 in 2020, which is 7.6% of the program total. 3.5 MANAGEMENT Internal management activities include response to public records requests, budgeting, staff meetings, performance appraisals, and day‐to‐day administration of the Utility’s Engineering Section. External management activities include response to lawsuits, preparation of latecomer’s agreements, and formation of special assessment districts. These activities are infrequently provided by the Utility’s Engineering Section. 3.6 SUMMARY OF EXISTING PROGRAM The 2015‐2019 expenditures for each program element are shown in Table 3‐4. This data was compiled by reviewing staffing cost data from the Utility’s budget and the amount of time spent on different broad program elements, as categorized in Table 3‐1. Based on this information, budget was allocated to the programs that the Utility delivers to ratepayers. Table 3‐ 4. Average 2015‐2019 Staffing Expenditures for Program Elements1 Program Element Hours Cost Engineering, Planning, Compliance, and Coordination 5,467 $322,297 Inspection, Operations and Maintenance2,3 33,779 1,641,063 Administration3 1,933 100,797 Management 2,626 162,806 Capital Improvement Projects 6,569 395,041 TOTAL Staff Hours and Costs 50,374 2,622,004 1 Hours and costs are based on 5-year average between 2015 and 2019. 2 Current Surface Water maintenance crew staffing (2020) is 16 FTEs at an approximate cost of $126,545 per FTE per year. This is subject to change. 3 A portion of Administration and all Inspection, Operations and Maintenance Hours are based on budgeted hours instead of actual hours. AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐1 SECTION 4 REGULATORY REQUIREMENTS AND CITY POLICIES 4.1 INTRODUCTION This section provides background for the regulatory framework by which Utility must operate and how the City carries out policy direction, which is mostly driven by federal, state, and local regulations and the City’s Land Use Comprehensive Plan. 4.2 REGULATORY REQUIREMENTS Through the process of owning, operating, maintaining, and constructing the City’s surface water management system, Utility has been designated as the responsible entity for ensuring compliance with a number of local, state, and federal regulations. These regulations govern the quality of surface water discharged, construction or other activities that affect aquatic habitat and endangered species, development within critical areas, and participation in flood insurance programs. In some cases these rules apply because of construction activities that Utility conducts to solve flooding, water quality, or fish habitat problems. In other cases these regulations apply because Utility serves as the owner and operator of the City’s Municipal Separate Storm Sewer System (MS4) and must comply with Federal and State laws such as the City’s NPDES permit. The City of Renton coordinates with jurisdictions at the local, county, state, and federal levels. A brief discussion of this coordination is provided below. There are portions of several major drainage basins that lie within the city limits and the UGB. As the City of Renton lies at the downstream end of most of those basins, the City coordinates with neighboring jurisdictions who share those basins to work together to alleviate flooding and improve water quality in Renton and the surrounding area. Jurisdictions with shared basins include the cities of Kent and Tukwila in the Black River Basin, Tukwila in the Duwamish River Basin, City of Seattle for Duwamish River Basin, West Lake Washington Basin and the Cedar River Basin, the City of Newcastle in the May Creek Basin and Gypsy subbasins, and unincorporated King County in the Cedar River Basin and Soos Creek Basin. The City coordinates with agencies at the state level, including Ecology on activities related to WRIAs 8 and 9 and NPDES permitting; WSDOT on transportation‐related activities and stormwater mitigation for highway projects within the City limits (see Section 5.10.1.1); WDFW, particularly for Hydraulic Project Approval Permits (HPAs), which are required for work in streams such as culvert replacements and channel restoration; and KCFCD for flood prevention (see Section 5.10.2). The City also coordinates with agencies at the federal level on activities requiring USACE permits, specifically for work in wetlands, lakes, and streams that require a CWA Section 404 permit, as well as flood prevention and emergency response (see Section 5.10.3). There are additional federal regulations within the CWA and the NFIP that the City is required to follow, but Ecology has permitting authority under the CWA and the Revised Code of Washington (RCW). As a result, the City coordinates directly with Ecology for several of these regulations. This section summarizes the regulations, as well as the related agency coordination required for the City of Renton’s Surface Water Program. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐2 4.3 CITY ORDINANCES AND REGULATIONS This section provides an overview of the City of Renton’s ordinances and regulations relevant to surface and stormwater management. The City’s regulations are set forth in the Renton Municipal Code (RMC). Stormwater related ordinances and regulations are in Title IV Development Regulations of the RMC. Chapter 4, Environmental Regulations and Overlay Districts, includes the Critical Areas Ordinance and Shoreline Master Program. Chapter 4 includes Development Guidelines and Regulations and Grading, Excavation and Mining Regulations. Chapter 6 is where Drainage (Surface Water) Standards are found. Below is a summary of each of these chapters and relevance to the Utility. 4.3.1 RMC 4‐3‐050 CRITICAL AREAS REGULATIONS The purposes of RMC 4‐3‐050 as outlined in Section A are to: 1. Manage development activities to protect environmental quality and promote diversity of species and habitat within the City. 2. Ensure that activities in or affecting critical areas do not threaten public safety, cause nuisances, or destroy or degrade critical area functions and values. 3. Prevent the loss of critical area acreage and functions and strive for a net gain over present conditions through restoration where feasible. 4. Assist or further the implementation of the policies of the Growth Management Act, the State Environmental Policy Act, and the City Comprehensive Plan. 5. Provide City officials with information to evaluate, approve, condition, or deny public or private development proposals with regard to critical area impacts. 6. Protect the public life, health, safety, welfare, and property by minimizing and managing the adverse environmental impacts of development within and abutting critical areas. 7. Protect the public from: Avoidable monetary losses due to maintenance and replacement of public facilities and utilities, property damage, public mitigation of avoidable impacts, and public emergency rescue and relief operations. Potential litigation on improper construction practices occurring in critical areas. 8. Reduce the potential for damage to life and property from abandoned coal mines and return the land to productive uses. 9. Maintain, to the extent practicable, a stable tax base by providing for the sound use and development of areas of flood hazard areas to minimize future flood blight areas. 10. Protect riparian habitat to provide for bank and channel stability, sustained water supply, flood storage, recruitment of woody debris, leaf litter, nutrients, sediment and pollutant filtering, shade, shelter, and other functions that are important to both fish and wildlife. This section of the RMC includes regulations that apply to wellhead protection, flood hazards, geologic hazards, habitat conservation, wetlands, streams, and lakes. Management of stormwater requires understanding potential impacts adjacent to or within critical areas because of the connection of stormwater runoff to lakes, streams, groundwater, and wetlands, and linear infrastructure that AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐3 intersects with critical areas features. Stormwater‐related projects and activities in these areas may require a review, unless exempt. 4.3.2 RMC 4‐3‐090 SHORELINE MASTER PROGRAM REGULATIONS RMC 4‐3‐090 adopts the Shoreline Master Program (SMP). The City’s SMP regulations are in accordance with the Washington State Shoreline Management Act (SMA), as governed by RCW 90.58. and Washington Administrative Code (WAC) WAC 173‐26. The purpose of the SMA is to manage the shoreline for long‐term benefit by preserving ecology and natural character and increasing recreational opportunities and public access. Uses that alter natural character, but are dependent upon the shoreline are also recognized as an important part of the SMP. The City has several shorelines subject to the SMP: the Cedar River, Lake Washington, Springbrook Creek, Black River, and May Creek. Shoreline planning and regulations include the water body as well as the lands within 200 feet of the ordinary high water mark (OHWM) or within 200 feet of floodways, whichever is greater. Additionally, contiguous floodplain areas and all marshes, bogs, swamps, and river deltas associated with streams, lakes, and tidal waters that are subject to the provisions of the State Shoreline Management Act are included in the jurisdictional areas. The City conducts a periodic review of its SMP every eight years, in accordance with the SMA, to ensure that the SMP is consistent and up‐to‐date with applicable laws and regulations, City goals and policies, and addresses changed or unique circumstances in the City. Each shoreline has unique qualities that make it valuable, and Shorelines of Statewide Significance are of particular importance. For the City, this includes Lake Washington and the Green River Shoreline. Although the Green River is not within City limits, portions of the two hundred foot shoreline jurisdiction are within the City Limits. The shorelines for these two water bodies comprise approximately 5.8 miles of the shorelines of the state that are regulated by the City. Preference is, therefore, given to the following uses in descending order of priority for Shorelines of Statewide Significance as established by RCW 90.58.020: 1. Recognize and protect the statewide interest over local interest; 2. Preserve the natural character of the shoreline; 3. Result in long‐term over short‐term benefit; 4. Protect the resources and ecology of the shoreline; 5. Increase public access to publicly owned areas of the shorelines; 6. Increase recreational opportunities for the public in the shoreline; 7. Provide for any other element as defined in RCW 90.58.100, deemed appropriate or necessary. Approximately 18 miles of shoreline in the City fall under the jurisdiction of the SMA. These shorelines are considered an extremely valuable resource not only to the City, but also to the region: Cedar River Green River (Portions of the 200‐ft shoreline jurisdiction within City limits) Lake Washington AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐4 May Creek from the intersection of May Creek and NE 31st Street in the southeast quarter of the southeast quarter of Section 32‐24‐5E WM. Springbrook Creek from the Black River on the north to SW 43rd Street on the south. Black River The SMP and SMA are typical considerations when stormwater infrastructure projects have the potential to affect shoreline uses. 4.3.3 RMC 4‐4‐030 DEVELOPMENT GUIDELINES AND REGULATIONS – GENERAL RMC 4‐4‐030 provides guidance to the Development Services Division and the Hearing Examiner for various land use recommendations and decisions. Stormwater‐related provisions include requirements for temporary erosion and sediment control, hydroseeding of graded areas, and the adoption by reference of this Plan and other City Plans and Regulations. 4.3.4 RMC 4‐4‐060 GRADING, EXCAVATION, AND MINING REGULATIONS The purposes of RMC 4‐4‐060 as outlined in the RMC in Section A are to: 1. Provide a means of regulating mining, excavation, and grading to promote the health, safety, morals, general welfare, and aesthetics in the City. 2. Promote the progressive rehabilitation of mining, excavation, and grading sites to a suitable new use. 3. Protect those areas and uses in the vicinity of mining, excavation, and grading activities against detrimental effects. 4. Promote safe, economic, systematic, and uninterrupted mining, excavation, and grading activities within the City. 5. Minimize adverse stormwater impacts generated by the removal of vegetation and alteration of landform to comply with the requirements of the NPDES Phase II Municipal Stormwater Permit. 6. Protect water quality from the adverse impact associated with erosion and sedimentation in order to comply with the requirements of the NPDES Phase II Municipal Stormwater Permit. (Ord. 5526, 2‐1‐2010). This code is intended to reduce potential deleterious effects of grading, excavation, and mining on surface water quality and provides City staff with tools for review, inspection, and enforcement of code violations. Staff in the Community and Economic Development Division are primarily responsible for activities related to grading, excavation, and mining. Utility staff review soil and geotechnical reports for compliance with this regulation. 4.3.5 RMC 4‐6‐030 DRAINAGE (SURFACE WATER ) STANDARDS RMC 4‐6‐030 contains the City’s Drainage Standards. The following is the language from the RMC, Section A. Purpose: 1. The purpose of this Section is to preserve the City’s watercourses by minimizing water quality degradation from siltation, sedimentation and pollution of creeks, streams, rivers, AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-5 lakes and other bodies of water, protect property from increased runoff rates, and to ensure public safety. 2. It shall also be the purpose of this Section to reduce flooding, erosion, and sedimentation; prevent and mitigate habitat loss; enhance groundwater recharge; and prevent water quality degradation through permit review, construction inspection, enforcement, and maintenance of drainage facilities/systems. 3. It shall also be the purpose of this Section to regulate the Municipal Separate Storm Sewer System (MS4) regarding the contribution of pollutants, consisting of any material other than stormwater, including but not limited to illicit discharges, illicit connections and/or dumping into any storm drain system, including surface and/or groundwater throughout the City that would adversely impact surface and groundwater quality of the City and the State of Washington, in order to comply with requirements of the NPDES Phase II Municipal Stormwater Permit. 4. It shall also be the purpose of this Section to create attractive and functional drainage facilities that do not reduce public safety. (Ord. 5526, 2-1-2010; Ord. 5749, 1-12-2015) The Administrator of the Public Works Department is responsible for the general administration and coordination of this RMC section. This includes responsibility for reviewing drainage plans submitted in accordance with this RMC section. This Section of the RMC adopts the 2016 King County Surface Water Design Manual (KCSWDM) as amended by the City of Renton Amendments by reference. In February 2010, the City adopted the 2009 KCSWDM with City Amendments. These amendments to the 2009 KCSWDM are carried over to the current 2016 KCSWDM. The amendments were tailored to meet the specific needs of the City of Renton by providing the exceptions, modifications and additions to the King County Manual. One important change to the 2009 KCSWDM was the inclusion of a modified Flow Control Map that shows a significant area of the City, including the Renton valley, downtown, and areas east of I-405 mapped as a Peak Rate Flow Control standard matching existing site conditions. This is a significant deviation from the County’s 2009 flow control map which shows all areas mapped as Flow Control Duration Standard matching forested conditions. 4.3.6 CITY OF RENTON COMPREHENSIVE PLAN The first City of Renton Comprehensive Plan was developed in 1990 to meet the requirements of the State Growth Management Act (GMA). Pursuant to Engrossed Substitute House Bill (ESHB) 2342, Renton is required to review and, if needed, revise its comprehensive plan and development regulations by June 30, 2024, and every eight years thereafter. The most recent version was adopted in 2015. The City’s Comprehensive Plan incorporates a number of objectives and policies relevant to surface water resources, which are described in Section 4.7 of this Plan. In addition to these objectives and policies, the greatest impact of the City’s Comprehensive Plan on surface water systems and resources comes from its land use element, which establishes the level of development density throughout the City. Greater development densities result in higher percentages of impervious area, which impact water quality, fish habitat, and the rate and volume of runoff. 4.4 STATE REGULATIONS State regulations that govern activities conducted by Utility are described in this Section. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐6 4.4.1 RCW 43.21C STATE ENVIRONMENTAL POLICY ACT Modeled after the National Environmental Policy Act (NEPA), the State Environmental Policy Act (SEPA) requires the identification and evaluation of probable impacts of activities for all elements of the environment. The SEPA rules (Chapter 197.11 WAC) became effective in April 1984. SEPA review occurs in tandem with other agency processes. Whereas, other regulations focus on specific parts of a project proposal, SEPA requires identification and evaluation of all probable environmental impacts (Ecology, 2020c). SEPA addresses nonexempt construction, demolition, comprehensive plans, zoning, and development regulations that are licensed, funded, or approved by a government agency. Any nonexempt governmental action—at any level—may be conditioned or denied pursuant to SEPA (RCW 43.21C.060). SEPA review occurs for almost all Utility projects. 4.4.2 RCW 77.55 HYDRAULIC CODE WDFW requires a Hydraulic Project Approval (HPA) for construction activities that use, divert, obstruct, or change the natural flow or bed of any waters of the state. The purpose of the requirements, which are administered through the HPA permit process, is to ensure that construction or performance of work is done in a manner that protects fish life (WAC 220‐660‐010). The types of construction activity that typically require an HPA include bridge painting, channel improvements, stream restoration, or culvert replacements within the OHWM of freshwater. Flood‐damage repair and prevention activities such as bank stabilization, bridge repair, removal of sandbars and debris, channel maintenance and other approved activities may be permitted as a five‐year plan, avoiding the need to permit each individual activity. Fish habitat enhancement projects involve elimination of fish passage barriers through culvert repair and replacement as well as stream bank restoration and/or placement of instream structures. An HPA is applied for by either submitting online through WDFW’s Aquatic Protection Permitting System (APPS) or by submitting a Joint Aquatic Resource Permit Application (JARPA) (http://www.epermitting.wa.gov/site/alias__resourcecenter/9978/default.aspx). This is the same form that can be submitted for permits from Ecology, USACE, and DNR. After a 45‐day review period, WDFW will approve, deny, or condition the permit. WDFW may require modifications to plans and specifications and work timing to avoid or compensate for project impacts on fish ecology. Project activities and possible modifications include, but are not limited to: Making a culvert fish passable (includes consideration of 95 and 10% exceedance flows, minimum flow depth, and maximum hydraulic drop). Providing large woody debris in a stream channel. Moving grading limits outside the ordinary high water line. Specifying construction practices that prevent entry of construction equipment and/or materials into the watercourse. Specifying bed material, construction methods, construction period, riparian vegetation, and any required mitigation. If it is more cost‐effective, the applicant may be permitted to perform off‐site mitigation, provided it would generate equal or greater biological functions and values compared to on‐site mitigation. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-7 4.4.3 RCW 86.16 FLOOD PLAIN MANAGEMENT Chapter 86.16 RCW Flood Plain Management establishes statewide authority through regulations promulgated by Ecology for coordinating the floodplain management regulation elements of the NFIP. Under Chapter 173-158 WAC, Ecology requires local governments to adopt and administer regulatory programs compliant with the minimum standards of the NFIP. Ecology provides technical assistance to local governments for both identifying the location of the 100-year (base) floodplain and in administering their floodplain management ordinances. Ecology also establishes land management criteria in the base floodplain area by adopting the federal standards and definitions contained in 44 CFR, Parts 59 and 60, as minimum state standards. Ecology has approval authority over local floodplain management ordinances. Federal regulations allow residential and nonresidential development in the floodplain if the proponent demonstrates that the project is constructed to be one foot above the 100-year base flood elevation as determined by a flood insurance study. Ecology will disapprove an ordinance if minimum federal criteria for enrollment in NFIP or state regulations on development in the floodplain are not met. State regulations allow only for repair, reconstruction, or improvements of existing residential structures within the floodplain that do not increase the ground floor area and that cost less than 50% of the market value of the existing structure. The City’s first Flood Insurance Study and FIRMs were published in May 1981 and have been updated in May 1995 and again in 2020. The City participates in the Community Rating System (CRS), and as a result it receives discounts on flood insurance. Engaging in the following activities gives the City CRS credits: • Maintaining elevation certificates on all new and substantially improved buildings in the Special Flood Hazard Area. • Maintaining elevation certificate data in computer format. • Making copies of elevation certificates on newer properties available at the CRS Coordinator’s office. • Providing information on FIRMs and the flood insurance purchase requirement to inquirers and publishing a document that tells lenders, insurance agents, and real estate agents. • Informing insurance agents about the availability of flood certificates. • Keeping a log of FIRM requests and responses. • Keeping the City’s FIRM updated and maintaining old copies of the FIRM. • Maintaining flood risk reduction materials in the public library. • Enforcing the floodplain management provisions of municipal zoning, subdivision, and building code ordinances. • Enforcing the current municipal building code. • Using and updating the City’s digital mapping system. • Maintaining the City’s elevation reference marks. • Enforcing the stormwater management provisions of municipal zoning, subdivision, and building code ordinances for new developments in the watershed. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐8 Enforcing the requirement that all new buildings must be elevated above the street or otherwise protected from drainage problems. Implementing the City’s drainage system maintenance program. Performing inspections and subsequent maintenance if warranted. Enforcing the City’s stream dumping regulations. 4.4.4 RCW 36.70A GROWTH MANAGEMENT ACT Enacted in 1990, the GMA is intended to manage growth in Washington’s fastest‐growing counties through the adoption of local comprehensive land use plans and development regulations. A 1995 GMA amendment requires all counties and cities in Washington to include the best available science in developing policies and development regulations to protect the functions and values of critical areas. The standard for all plans consists of 13 advisory goals aimed solely at guiding the development of local comprehensive plans and development regulations. These advisory goals include encouraging urban growth where reasonable, reducing urban sprawl, encouraging efficient transportation systems based on regional priorities, encouraging the availability and variety of affordable housing, encouraging the retention of open space and recreational opportunities, and protecting the environment. 4.4.5 RCW 90.48.260 AND STATE IMPLEMENTATION OF CLEAN WATER ACT The CWA was passed in 1972 “to restore the chemical, physical, and biological integrity of the Nation’s water” (33 USC 1251 [a]). There are four sections of this legislation that affect the City’s surface water program. They are: Section 303(d) Section 401 Section 402 – NPDES Section 404 The CWA is a federal regulation, but it establishes statewide authority for those states that the EPA grants NPDES permitting authority. Washington state has been granted this authority and administers the CWA through regulations promulgated by Ecology for Sections 303(d), 401, and 402 (RCW 90.48.260). These three sections, which the state administers using the same designations as the federal government, are described in further detail below. Section 404 is administered federally and is described in Section 4.5.3. 4.4.6 SECTION 303(D) – WATER QUALITY STANDARDS Section 303(d) of the CWA requires states to periodically compose a list of water quality‐limited water bodies. Waters on this list require a TMDL study, which determines the allowable pollutant loading for the receiving waters for the water quality parameter causing the water quality impairment. It is the responsibility of the state to perform the TMDL studies. Waters on the 303(d) list are prioritized for TMDL studies. The TMDL is issued upon completion of the study. Several waters within the City are on the 2016 303(d) list. The waters in Table 4‐1 are still on the waiting list for TMDL studies to be performed. Although not within the City, there is a portion of the Soos Creek watershed within unincorporated King County that is on the 303(d) list for low dissolved oxygen, temperature, AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐9 bioassessment, and bacteria. Because of the critical salmon habitat provided by the Soos Creek system, Ecology in coordination with the EPA and King County is conducting studies and developing a plan to control a range of pollutants, including low dissolved oxygen and high temperature. This multiparameter TMDL will identify problem pollutants and how much pollution reduction needs to occur to achieve clean water (Ecology, 2020d). Additionally, a parallel process is being conducted to develop a TMDL for fecal coliform in Soos Creek (Ecology, 2020e). Because some of the upper portion of the watershed is in Renton, the City is actively participating in various stakeholder meetings to discuss development of the TMDLs. TABLE 4‐1: CATEGORY 5 ASSESSED WATERS IN RENTON1 Water Body Segment Parameter(s) Unnamed Tributary to Springbrook Creek Reach near 108th Ave SE and SE 196th St Bioassessment Unnamed Tributary to Springbrook Creek Reach near intersection of 103rd SE and SE Carr Rd Bioassessment Unnamed Tributary to Springbrook Creek Upstream and east of Hwy 167 Bioassessment Springbrook Creek (Mill Creek) Near intersection of Talbot Rd. S Bioassessment Johns Creek Lake Washington to I-405 Temperature, dissolved oxygen, fecal coliform bacteria May Creek East of May Creek Park Temperature May Creek Near mouth at Lake Washington Temperature, fecal coliform bacteria, bioassessment Maplewood Creek Confluence with Cedar River Temperature Molasses Creek Confluence with Cedar River to SE Fairwood Blvd. Bioassessment Rolling Hills Creek South of I-405 Bioassessment Black River Near Confluence with Green River and Duwamish River to Longacres Industrial Park Dissolved oxygen, fecal coliform bacteria, Bioassessment Lake Washington Gene Coulon Park Fecal coliform bacteria Lake Washington North of May Creek mouth Sediment bioassay Unnamed Tributary to Lake Washington South of Renton Municipal Airport Bioassessment Unnamed Tributary to Lake Washington North of Gene Coulon Park Temperature, fecal coliform bacteria Cedar River Lake Washington to Molasses Creek confluence Temperature, Dissolved oxygen, pH Unnamed Tributary to Cedar River Maplewood Golf Course Bioassessment 1. Category 5 assessed waters are per 2016 Washington Water Quality Atlas 303(d) listings (https://fortress.wa.gov/ecy/waterqualityatlas/map.aspx Webpage accessed 8/10/20) 4.4.7 SECTION 401 – CERTIFICATION Section 401 of the CWA requires that applicants receiving a Section 404 permit from USACE first receive certification from the state that the proposed project will meet state water quality standards and other aquatic protection regulations. In Washington, applicants are required to obtain the Section 401 water quality certification from Ecology. The 401 Certification can cover both the construction and operation AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-10 of the proposed project. Any conditions of Ecology’s certification become conditions of the federal Section 404 permit. The federal agency cannot issue its permit until the certification is approved, conditioned, or waived by the state. If the state denies a certification, an individual Section 401 certification is required for activities covered by a nationwide permit (ORIA, 2020). 4.4.8 SECTION 402 – NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Section 402 of the CWA states that pollutants may not be discharged directly to surface waters unless this is done under a NPDES permit. In Washington, authority to issue permits and oversee compliance has been delegated to Ecology by the EPA. Ecology asserts requirements and a schedule for compliance. The compliance schedule is never longer than the term of the permit. Permits are required to be renewed at least every five years, and Ecology is responsible for writing new permits. The NPDES program, as it relates to precipitation-induced runoff (considered a point source), provides permits for multiple activities that could impact water quality. These include but are not limited to: Industrial Activities Operating an MS4 Construction Activities Utility operates its stormwater program under its NPDES Permit. The most recent permit was issued on July 1, 2019 and became effective on August 1, 2019. The City has been operating under the NPDES Permit since 2007. Continued City NPDES Permit coverage requires compliance with special and general conditions outlined in the 2019 permit. These include the continuation of conditions familiar to Renton from the 2013 Permit and new conditions that must be implemented by the prescribed permit schedule. A summary of Renton’s activities to meet permit compliance is available in the City’s current Stormwater Management Program Plan. New regulatory requirements and resource needs are described in a regulatory memorandum (Appendix D) and in Section 5. Key changes, from the previous permit to new permit beginning in August 2019, are described below. A summary of resource needs and deadlines for these NPDES changes is provided in Section 5, Table 5-1. 4.4.8.1 Long-Range Planning The new permit requires a review of how stormwater management needs and protection/improvement of receiving water health are informing long-term plans. 4.4.8.2 Low Impact Development The permit requires continuation of previous permit requirements to make Low Impact Development (LID) the preferred and commonly-used approach to site development and require LID Principles and BMPs in local development codes, rules, standards, or other enforceable documents. The permit requires an annual assessment and documentation of newly identified barriers to implementation of LID Principles or BMPs and measures developed to address the barriers. 4.4.8.3 Watershed Planning The new permit requires the City to evaluate watershed conditions and prioritize its watersheds based on receiving water conditions and ability to affect change with stormwater management actions. A stormwater management action plan must be developed for a high priority catchment that outlines strategies and projects to improve watershed conditions. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-11 4.4.8.4 MS4 Mapping The permit requires continued documentation of MS4 features, and new requirements to collect and update outfall size and material data, and complete mapping of all known connections from privately owned stormwater systems. 4.4.8.5 Source Control and Business Inspection Program The new permit requires development and implementation of a source control program for existing land uses. It requires enforceable documents or ordinances to require source control BMPs for pollutant generating surfaces, an inventory of potential pollutant generating sites, an inspection program, enforcement policy, and staff training. 4.5 FEDERAL REGULATIONS 4.5.1 NATIONAL ENVIRONMENTAL POLICY ACT The goals of NEPA are to protect, restore, and enhance the environment. NEPA documentation requirements apply to all activities with a federal nexus, (i.e., generally either federally funded or needing federal permits). NEPA requirements are: adequately describe the environmental ramifications of proposed actions, fully disclose to the public proposed federal actions and provide a mechanism for public input to federal decision-making, prepare environmental impact statements, and consider alternatives and mitigation for every major action (usually construction projects) that would significantly affect the quality of the human environment. The provisions for ensuring that agencies follow NEPA are in the Council for Environmental Quality (CEQ) provisions for implementation (43 CFR 1500-1508). 4.5.2 CLEAN WATER ACT The CWA includes four sections that affect the City’s surface water program. They are: • Section 303(d) • Section 401 • Section 402 – NPDES • Section 404 As described previously in Section 4.4.5, the Clean Water Act is a federal regulation that establishes statewide authority through regulations promulgated by Ecology for Sections 303(d), 401 and 402 (RCW 90.48.260). These three sections are described in Sections 4.4.6 through 4.4.8. Section 404 is not administered by the state, and is described as follows. 4.5.3 SECTION 404 Section 404 pertains to activities involved with filling waters of the United States. The water in question is usually a wetland or classified stream. A wetland is defined as “areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil” (33 CFR 328.3 [c][16]). USACE has regulatory authority to administer a permit program that results in no net loss of these waters of the United States. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-12 When evaluating activities that are regulated by Section 404, the emphasis is to look at alternatives that avoid, then minimize, then compensate for any wetland impacts. Unavoidable impacts are compensated for by a system of replacement ratios that vary depending on the quality of wetlands being impacted. 4.5.4 ENDANGERED SPECIES ACT Puget Sound and its tributary streams in the vicinity of the City provide habitat, or may provide habitat, for aquatic species listed as threatened or endangered under ESA. The ESA prohibits killing or harming an endangered species in any way, including significant modification of critical habitat for that species. Section 7 of the Act is the interagency cooperation mechanism by which Federal agencies ensure that the actions they take or fund do not jeopardize the existence of any listed species. National Oceanic and Atmospheric Administration (NOAA) Fisheries is responsible for marine species. The U.S. Fish and Wildlife Service (USFWS) is responsible for resident aquatic species. In June 2000, NOAA Fisheries adopted a rule prohibiting the “take” (which includes harassing, harming, pursuing, hunting, shooting, wounding, killing, trapping, or collecting; or attempting any of these things) of 14 groups of salmon and steelhead listed as threatened under the ESA. Chinook salmon in Puget Sound and its tributaries (including the Green River) were federally listed as threatened species by the NOAA Fisheries in May 1999 (NOAA, 1999). Bull trout in Lake Washington and the Green River were listed as threatened species by USFWS in December 1999 (USFWS, 1999). NOAA federally listed steelhead as a threatened species in June 2007 (NOAA, 2007). Coho salmon are currently a species of concern in the Puget Sound (NOAA, 2006). These listings directly affect City practices. For instance, the City’s routine road maintenance program must be approved by NOAA Fisheries as being consistent with the conservation of listed salmonids’ habitat by contributing to the attainment and maintenance of properly functioning condition. If a project has a federal nexus (i.e., federal permit or federal funding), a Biological Assessment (BA), also known as a Biological Evaluation (BE),must be performed to determine what, if any, effects the project or action may have on a listed species (50 CFR 402.12). The purpose of a BA/BE is to review the biological requirements of a listed species to determine potential effects of the project or action on those species (50 CFR 402.12). After the consultation process is complete, the USFWS or NOAA Fisheries will issue a Biological Opinion (BO) (50 CFR 402.15). Formal consultation may last up to 90 days with the Services having 45 days after consultation to write the opinion. The BO will determine if the project or action would result in “jeopardy” or the destruction or modification of critical habitat (50 CFR 402.14[h][3]). If a project or action is determined to affect a species that has been proposed for listing, the federal lead agency must complete an informal consultation with either the USFWS or NOAA Fisheries, but the results of the subsequent conference are non-binding. NOAA Fisheries requires the City to participate in recovery activities for listed species. Regional (Puget Sound area) recovery activities are supplemented by proactive interlocal agreements, such as WRIA-level habitat conservation planning. The City facilitates ESA compliance at the local level by incorporating it into its critical areas ordinance (CAO). For example: The presence of a listed species is sufficient to classify a wetland as Category 1 (RMC 4-3-050[G][9][c][i]). The presence of listed species may be used as justification to enact enlarged wetland buffers on a case-by-case basis (RMC 4-3-050[G][9][d][iv]). AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-13 4.5.5 NATIONAL FLOOD INSURANCE PROGRAM As stated in Section 4.4.3, Chapter 86.16 RCW Floodplain Management establishes statewide authority through regulations promulgated by Ecology for coordinating the floodplain management regulation elements of NFIP. Under Chapter 173 158 WAC, Ecology requires local governments to adopt and administer regulatory programs compliant with the minimum standards of NFIP, which is administered through the Federal Emergency Management Agency (FEMA). Ecology provides technical assistance to local governments for identifying the location of the 100-year (base) floodplain. By enacting restrictions and requirements on development in the floodplain, residents of Renton get reduced flood insurance rates in return. Renton’s participation in the NFIP allows residents and businesses to obtain flood insurance through the NFIP against potential flooding losses. 4.6 SUMMARY OF PERMITS REQUIRED Permits needed for construction projects are summarized in Table 4-2. The most common permits have been discussed in Sections 4.2 through 4.4. TABLE 4-2: PERMITS NEEDED FOR PROJECTS Trigger Permit or Approval Agency Processing Time Comment Report Section Federal nexus NEPA NOAA Fisheries or USFWS Depends on whether an EIS, EA, or categorical exclusion is required. If an EIS is required, it usually takes 3-7 years. Independent of SEPA, but a joint review can be arranged on a case-by-case basis 4.5.1 ESA Consultation or Take exemption Varies widely, but 6 months is typical. Does not apply if project will have no impact on listed species 4.5.4 Discharge or fill to waters of the U.S. CWA Section 404 Army Corps of Engineers 30-180 days total “Waters” includes rivers, streams, lakes, wetlands, swamps, marshes, and bogs. Apply using JARPA. Processed concurrently. Submit a pre-filing meeting request 30 days in advance for 401 certification 4.5.3 Work in navigable waters CWA Section 10 -- Federal nexus and discharge to navigable waters CWA Section 401 Washington State Department of Ecology 4.4.7 AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐14 TABLE 4‐2: PERMITS NEEDED FOR PROJECTS Trigger Permit or Approval Agency Processing Time Comment Report Section Nonexempt construction, comprehensive plans, zoning, and development regulations that are licensed, funded, or approved by a government agency SEPA Local agency approving authority (usually Renton), licensing or funding agency 6-8 weeks for projects undergoing Administrative Review. 4.4.1 Disturbance of at least one acre of soil and disturbance on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or sale will ultimately disturb one acre or more. NPDES Construction Stormwater Permit Washington State Department of Ecology 30 days after submitting NOI An Individual Permit will take considerably longer to process than a General Permit. 4.4.8 Activity that could cause pollution to an isolated wetland Isolated Wetlands Administrative Order About 90 days Wetlands that aren’t connected to recognized water bodies are regulated here, instead of under CWA Section 404 -- Activity that temporarily produces air pollution above allowed levels Air Quality Permit At least 30 days Common trigger activities include land-clearing burns and demolition of asbestos-containing structures. -- Drilling Soil Boring NOI No review delay--just send in the form Includes monitoring wells and geotech borings. -- Shoreline or in-water work that temporarily increases turbidity Temporary Exceedance of Water Quality Standards -- Activity that could use, divert, obstruct, or change the flow of state waters Hydraulic Project Approval Washington Department of fish and Wildlife Up to 45 days Common trigger activities are pipeline crossings, culvert installations, and outfall placements. 4.4.2 AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 4‐15 TABLE 4‐2: PERMITS NEEDED FOR PROJECTS Trigger Permit or Approval Agency Processing Time Comment Report Section Construction or staging on state-owned land Easement on Public Lands Washington Department of Natural Resources -- Shoreline development valued at $5000 or greater Shoreline Substantial Development Permit Renton Community and Economic Development Department 6-8 weeks for projects undergoing Administrative Review. Up to 16 weeks for projects undergoing Shoreline Hearing Board Review and DOE Review. Several exemptions apply 4.3.2 Tree-cutting or grading Building and Grading Permit Renton Community and Economic Development Department 4.3.4 Any development Site Plan Review, SEPA and Civil Construction Permit 4.4.1 4.3.3 Development activity not allowed under the CAO Variance Variances are generally granted when necessary to use a property reasonably, provided the variance would not be detrimental to public welfare or land in the project vicinity. 4.3.1 Development activity not allowed within Shoreline Jurisdiction Shoreline Variance and SEPA Community and Economic Development Department, Shoreline Hearings Board 16 weeks When an activity or development is proposed that does not comply with the bulk, dimensional, and/or performance standards of the program, such development or use shall only be authorized by approval of a shoreline variance even if the development or use does not require a substantial development permit. 4.4.1, 4.3.2 CAO: Critical Areas Ordinance Corps: U.S. Army Corps of Engineers CWA: Clean Water Act EA: Environmental Assessment EIS: Environmental Impact Statement Ecology: Washington State Department of Ecology ESA: Endangered Species Act HPA: Hydraulic Project Approval JARPA: Joint Aquatic Resource Permit Application NEPA: National Environmental Policy Act NOAA Fisheries: National Oceanic and Atmospheric Administration, Department of Fisheries NOI: Notice of Intent NPDES: National Pollutant Discharge Elimination System SEPA: State Environmental Policy Act WDFW: Washington Department of Fish and Wildlife DNR: Department of Natural Resources AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-16 4.7 PROGRAM POLICIES This section addresses how the Utility meets the sustainability objective set in the City’s business plan. It also summarizes program policies, which are generally set forth by the City’s Comprehensive Plan. This section also discusses new policy directions evaluated during the development of this Plan. 4.7.1 SUSTAINABILITY The basic definition of sustainability is the ability to meet the needs of the present without compromising the ability of future generations to meet their needs. A more complex view of sustainability revolves around what is commonly referred to as the triple bottom line: the economy, society, and the environment. The latter representation would define sustainability as the ability for a project or a program, to continuously provide, to the most extent possible, economic, social and environmental benefits. The triple bottom line is generally used to define corporate or institutional level sustainability. Because the Surface Water program is institutional in nature, this section evaluates how sustainable this program is from the lens of institutional sustainability, not just from an environmental perspective. 4.7.1.1 Economic Benefits The Surface Water program provides various economic benefits to the City and the public. This financial sustainability component also relates to resiliency, or the ability of the Surface Water program to absorb, address and recover from challenges and unforeseen events. Economic benefits include: a. Structuring surface water fees to fund Surface Water operations and the Capital Improvement Program and maintaining a Surface Water fund balance which acts as a reserve to cover emerging priorities or unforeseen emergencies. b. Securing grants from the Department of Ecology, King County Flood Control Zone District, and FEMA, when necessary and as opportunities arise, to provide supplemental funding for the Surface Water Utility projects and programs, which reduces the need to increase utility rates to customers. c. Preservation of jobs through flood control projects that protect the facilities of major employers and large industries such as The Boeing Company, Renton Municipal Airport, commercial businesses, and the Renton School District. d. Improvement of property values along corridors in the City where drainage improvement and ‘Green Streets’ projects are constructed. Green streets couple water quality treatment with the addition of trees and vegetation to create safer, greener, and more inviting neighborhoods. e. Reduction of flood risk to private property through the implementation of drainage improvement and flood risk reduction projects. Flood Control projects and feasibility studies account for climate change in alternatives analyses and decision making to order to increase system resiliency against changing precipitation patterns. f. Instituting an asset management program and prioritizing the repair and replacement of pipes and structures in critical condition to avoid catastrophic failure and significant costly damages. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-17 g. Enabling properties in Renton to obtain discounted federal flood insurance by participation in the Community Rating System and implementation of policies and practices that exceed the minimum requirements of the National Flood Insurance Program. Currently, Renton has achieved a class rating of 5 which allows for a 25% discount. 4.7.1.2 Social Benefits The Surface Water program provides various social benefits to the public. This component of sustainability encompasses an equity or social justice subcomponent. Examples of social benefits provided by the Surface Water program include: a. Increasing motorist and pedestrian safety through drainage improvement and flood risk reduction projects. b. Maintaining ability to safely recreate in local waterbodies by treating and controlling surface water runoff from public streets and private developments. c. Constructing projects in historically underserved and underinvested communities (for example, the Sunset Area in the Renton Highlands) and accounting for equity and social justice when evaluating alternatives as part of flood risk reduction projects. d. Offering reduced Surface Water fees to low-income senior citizens (61 years of age and over) and low-income disabled customers. e. Offering visitors of the Surface Water Utility website the ability to display content in multiple languages using a website translation feature, and fostering inclusion by leveraging the Language Line interpreters, a service that the City subscribes to, and using translators to better communicate with and serve customers who not fluent in English. f. Engaging communities affected by projects built in their neighborhoods, using public input to inform programs and design priorities, and educating the public about stormwater and the protection of water resources. g. Maintaining a highly skilled workforce trained in equity and engagement and capable of offering exemplary customer service to all Renton residents. 4.7.1.3 Environmental Benefits The Surface Water program provides numerous environmental benefits. This third component of corporate sustainability is commonly termed as environmental sustainability. In certain contexts, sustainability is only defined through this environmental component. However, at the institutional level, a Surface Water program cannot be sustainable if it prioritizes environmental benefits at the expense of social and economic benefits. For example, if a Surface Water utility created a program that consists of projects that condemn and buy out properties in the floodplain of a river to promote off-channel flood storage and fish habitat, that program would have a high environmental score. However, it would likely have high costs, and would forcefully displace families from their homes, which would create severe opposition by the public. Thus, such a program would not be socially acceptable and therefore unsustainable. Nonetheless, the environmental component of sustainability mainly revolves around the protection of the environment and maintaining balance between human activity and environmental resources. There are numerous ways the Surface Water program protects environmental resources, water AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-18 quality and fish habitat. The policies and programs that serve this purpose are listed in Tables 4-3 to 4-8 in 4.7.2 and will not be restated in this section. Additional environmental benefits of the Surface Water program, not explicitly stated in 4.7.2 include: a. Administration of the NPDES permit and Clean Water Act regulations to protect Surface Water from pollution and mitigate the effects of urbanization. b. The development, adoption, and implementation of surface water design standards for new developments, redevelopment projects and other civil projects to minimize environmental impacts to surface water quantity and quality and impacts to natural resources. c. Mitigating for environmental impacts of projects that affect fish habitat in compliance with state and federal permits. Currently, the City maintains two habitat channels along the Cedar River. d. Water quality retrofit projects that treat runoff from pollution generating surfaces (i.e., roads). The Utility has implemented four retrofit projects between 2010 and 2020, and at the time of writing has five retrofit projects in progress or being constructed. e. Watershed or ecosystem restoration plans in coordination with other jurisdictions such as the Green/Duwamish Ecosystem Restoration Program and the Panther Creek Watershed restoration. f. Springbrook Creek Wetland and Habitat Mitigation bank (see description in 5.10.1.1). g. Participation in the regional WRIA 8 Salmon Recovery Council and the WRIA 9 Watershed Ecosystem Restoration Forum to collaborate with other jurisdictions on fish habitat protection and restoration and implement projects in coordination with them. Habitat and water quality deficiencies identified are shown in tables 6-5 and 6-6. In conclusion, the Surface Water program provides adequate balance between economic, social, and environmental benefits to achieve institutional sustainability and contribute to the City Business Plan mission and goals. 4.7.2 CITY OF RENTON COMPREHENSIVE PLAN GOALS AND POLICIES The City’s SWM Program carries out the policy direction set in the City’s Comprehensive Plan, as well as directions expressed by elected officials, and the public. The City’s 2015 Comprehensive Plan (City of Renton, 2015) and subsequent amendments adopted goals and policies that expressed the community’s desires related to surface water management. The Land Use Protecting the Natural Environment and Ensuring Natural Resources for the Future and Utility Elements describes goals and policies that are directly relevant to the SWM Program and provides direction, along with meeting regulatory requirements that have resulted in the services that the City currently provides to ratepayers. The goal of Utility is to implement a SWM Program that provides a high level of service for flood risk reduction, water quality compliance, and habitat preservation in accordance with the needs of the City and in a manner that is sustainable as explained in Section 4.7.1. To provide background on how 2015 Comprehensive Plan goals and policies have provided direction to the City’s current program, Tables 4-3 AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-19 through 4-8 summarize relevant goals and policies found in the different comprehensive plan elements that intersect with surface water management. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-20 TABLE 4-3: 2015 COMPREHENSIVE PLAN LAND USE ELEMENT – PROTECTING THE NATURAL ENVIRONMENT AND ENSURING NATURAL RESOURCES FOR THE FUTURE GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Goals Protecting the Environment. Goal L-P Minimize adverse impacts to natural systems, and address impacts of past practice where feasible, through leadership, policy, regulation, and regional coordination. X X X a. b. c. e. Goal L-R Maintain extractive industries where their continued operation does not impact adjacent residential areas, the City’s aquifer, or critical areas. X X c Goal L-S Maintain Urban Separators to provide visual and physical distinction to the edges of Renton, protect critical areas, and provide a transition to the rural area. X X Goal L-U Preserve, protect, and enhance the quality and functions of the City’s sensitive areas including: lakes, rivers, major and minor creeks, intermittent stream courses and their floodplains, wetlands, ground water resources, wildlife habitats, and areas of seismic and geological hazards. X X X c Goal L-V Protect the natural functions of 100 year floodplains and floodways to prevent threats to life, property, and public safety associated with flooding hazards. X Goal L-X Support and sustain educational, informational, and public involvement programs in the City over the long term in order to encourage effective use, preservation, and protection of Renton’s resources. X X X a. b. Policies Protecting the Environment Policy L-21 Apply conditional use permits, or other approvals as appropriate, for extractive industries including timber, sand, gravel, or other mining to ensure that potential impacts are confined, limited, or mitigated. X X X Policy L-24 Manage urban forests to maximize ecosystem services such as stormwater management, air quality, aquifer recharge, other ecosystem services, and wildlife habitat. X X c Policy L-27 Manage water resources for multiple uses including recreation, fish and wildlife, flood protection, erosion control, water supply, energy production, and open space. X X X a Policy L-28 Minimize erosion and sedimentation in and near sensitive areas by requiring appropriate construction techniques and resource practices, such as low impact development. X AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-21 TABLE 4-3: 2015 COMPREHENSIVE PLAN LAND USE ELEMENT – PROTECTING THE NATURAL ENVIRONMENT AND ENSURING NATURAL RESOURCES FOR THE FUTURE GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Policy L-29 Protect the integrity of natural drainage systems and existing land forms, and maintain wildlife habitat values by preserving and enhancing existing vegetation and tree canopy coverage to the maximum extent possible and by restoring hydrological flows and improving the condition of shorelines. X X X Policy L-30 Maintain or increase the quantity and quality of wetlands. Development activities shall not decrease the net acreage of existing wetlands. X X X Policy L-31 Protect buffers along wetlands and surface waters to facilitate infiltration and maintain stable water temperatures, provide for biological diversity, reduce amount and velocity of run-off, and provide for wildlife habitat. X X X Policy L-32 Emphasize the use of open ponding and detention, vegetated swales, rain gardens, clean roof run-off, right-of-way landscape strips, open space, and stormwater management techniques that mimic natural systems, maximize water quality and infiltration where appropriate, and which will not endanger groundwater quality. X X X c Policy L-33 Acquire the most sensitive areas such as wetlands, flood plains, and wildlife habitat for conversion to parks and greenbelts. Pursue an overall net gain of natural functions and values by enhancing sensitive areas and providing incentives. X X X Policy L-35 Re-establish self-sustaining fisheries resources in appropriate rivers and creeks through habitat improvement projects that encourage and enhance salmonid use. X Policy L-36 Land uses in areas subject to flooding, seismic, geologic, and coal mine hazards should be designed to prevent property damage and environmental degradation before, during, and after construction. X Policy L-37 Emphasize non-structural methods in planning for flood prevention and damage reduction. X Policy L-38 Dredge the Cedar River bed within the existing engineered channel as one method of flood control. X Policy L-39 Provide information for and participate in informing and educating individuals, groups, businesses, industry, and government in the protection and enhancement of the quality and quantity of the City’s natural resources and to promote conservation. X X X b. c. AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-22 TABLE 4-3: 2015 COMPREHENSIVE PLAN LAND USE ELEMENT – PROTECTING THE NATURAL ENVIRONMENT AND ENSURING NATURAL RESOURCES FOR THE FUTURE GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Policy L-41 Conduct all City operations to minimize adverse environmental impacts by reducing consumption and waste of energy and materials; minimizing use of toxic and polluting substances; reusing, reducing, and recycling; and disposing of waste in a safe and responsible manner. X Policy L-42 Encourage environmentally friendly construction practices, such as Leadership in Energy and Environmental Design, Built Green, Salmon Safe, and Living Building Challenge. X Policy L-43 Support and implement the Mayor’s Climate Protection Agreement, climate pledges and commitments undertaken by the City, and other multi-jurisdictional efforts to reduce greenhouse gases, address climate change, sea-level rise, ocean acidification, and other impacts to global conditions. e. 1 Other falls into the following categories: a Public use/recreation b Public education c Groundwater protection, recharge for water supply, to minimize flooding, and/or to maintain stream flow during the dry season d Funding sources e Coordination with public agencies and neighboring jurisdictions AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-23 TABLE 4-4: 2015 COMPREHENSIVE PLAN TRANSPORTATION ELEMENT - GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Goals General Goal T-B Balance transportation needs with other community values and needs by providing facilities that promote vibrant commerce, clean air and water, and health and recreation. X X Policies General Policy T-3 Develop a transportation system that preserves and protects natural resources and complies with regional, state, and federal air and water quality standards. X TABLE 4-5: 2015 COMPREHENSIVE PLAN ECONOMIC DEVELOPMENT ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Policies General Policy ED-17 Promote the efficient use of services and resources, including conserving water and energy, reducing waste, and protecting resource lands. Work cooperatively with local businesses to help protect the natural environment in a manner that is efficient and predictable. X X X 1 Other falls into the following categories: a Public use/recreation b Public education c Groundwater protection, recharge for water supply, to minimize flooding, and/or to maintain stream flow during the dry season d Funding sources e Coordination with public agencies and neighboring jurisdictions AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-24 TABLE 4-6: 2015 COMPREHENSIVE PLAN PARKS, RECREATION, NATURAL AREAS, AND TRAILS ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Policies General Policy P-5 Ensure long-term economic and environmental sustainability in system planning, design, operation, maintenance, and decision making. X X Policy P-7 Protect, conserve, and enhance the area’s diverse natural resources for the long-term health of ecosystems, and for the benefit and enjoyment of future generations. X X a. 1 Other falls into the following categories: a Public use/recreation b Public education c Groundwater protection, recharge for water supply, to minimize flooding, and/or to maintain stream flow during the dry season d Funding sources e Coordination with public agencies and neighboring jurisdictions TABLE 4-7: 2015 COMPREHENSIVE PLAN UTILITIES ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Goals General Goal U-G Provide and maintain surface water management systems to minimize impacts of land use development and storm water runoff on natural systems, fish and wildlife habitat, water supply, public health, and safety. X X X Goal U-H Implement a stormwater management program that optimizes Renton’s water resources and promotes low impact development that combines engineering with the preservation of natural systems. X X Goal U-I Preserve and protect fish and wildlife habitat, riparian corridors, and wetlands for overall surface water system functioning. X X X AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-25 TABLE 4-7: 2015 COMPREHENSIVE PLAN UTILITIES ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Goal U-J Protect the natural functions of 100 year floodplains and floodways to prevent threats to life, property, and public safety associated with flooding hazards. X Goal U-K Increase the participation by the City of Renton in resolution of regional surface water and ecological issues that may impact Renton residents. X X X e. Policies Stormwater Management System Policy U-28 Design storm drainage systems to minimize potential erosion and sedimentation problems, and to preserve natural drainage, watercourses, and ravines. X X X Policy U-29 Control runoff from new development, redevelopment, and construction sites through the implementation of development design standards and construction techniques that promote the use of best management practices to maintain and improve storm water quality and manage stormwater flow. X X X Policy U-30 Provide incentives and regulations appropriate to an urban environment that reduce impervious surfaces, promote natural and distributed stormwater techniques, and incorporate native and naturalized vegetation. X X Policy U-31 Maintain, protect, and enhance natural drainage systems and natural surface water storage sites to protect water quality, reduce public costs, and prevent environmental degradation. X X X Policy U-32 Work to protect surface and groundwater resources from pollutants entering the storm drainage system. X c. Policies Natural System Protection Policy U-33 Manage water resources for multiple uses including recreation, fish and wildlife, flood protection, erosion control, water supply, recreation, and open space. X X X a. c. Policy U-34 Through public programs and new development, naturalize degraded channels, streams, creeks, and banks. X X Policy U-35 Prohibit filling, culverting, and piping of natural watercourses that are classified as streams, except as needed for a public works project where no other option is feasible and mitigation is provided to replace lost functions. X X X AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-26 TABLE 4-7: 2015 COMPREHENSIVE PLAN UTILITIES ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Policy U-36 Where feasible, promote the return of precipitation to the soil at natural rates near where it falls through development design that minimizes impermeable surface coverage and maximizes infiltration, through the exposure of natural surfaces, tree retention, and the use of LID techniques (such as flow dispersion, bioretention facilities, and permeable pavements). X X Policy U-37 Preserve and protect wetlands for overall system functioning. X X X Policy U-38 Protect buffers along wetlands, streams, rivers, and other water bodies to facilitate infiltration and maintain stable water temperatures, provide for biological diversity, reduce amount and velocity of run-off, and provide for fish and wildlife habitat. X X X Policy U-39 Ensure water level fluctuations in wetlands used as part of storm water detention systems are similar to the fluctuations under natural conditions. The utilization, maintenance, and storage capacity provided in existing wetlands should be encouraged. X X X Policy U-40 Minimize erosion and sedimentation by requiring appropriate construction techniques and resource practices. X Policy U-41 Limit discharges of pollutants such as chemicals, insecticides, pesticides, and other hazardous wastes to surface waters. X Policy U-42 Reduce the impact of new development on the environment by encouraging sustainable design techniques in public and private development, through LID and other sustainable development methods. X X Policies Public Health and Safety Policy U-43 Prohibit permanent structures from developing in floodways and manage development within the 100 year floodplain. Where development is permitted in the floodplain, ensure compliance with FEMA floodplain development regulations and the National Marine Fisheries Biological Opinion regarding the National Flood Insurance Program. X Policy U-44 Emphasize non-structural methods in planning for flood prevention and damages reduction. X Policy U-45 Continue to maintain levees and floodwalls and perform maintenance dredging of the Army Corps of Engineers constructed Lower Cedar River Flood Hazard Reduction Project to protect the Renton Municipal Airport, other essential public facilities, industrial, and residential areas in the urban center, educational and recreation investments, and other facilities. X AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-27 TABLE 4-7: 2015 COMPREHENSIVE PLAN UTILITIES ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Policies Regional Coordination Policy U-46 Actively participate in regional efforts to improve fish habitat and water quality that also contribute to the recovery of Endangered Species Act listed salmon in WRIA 8 and WRIA 9, which include May Creek, Cedar River, and Green River Basins. X X e. Policy U-47 Actively participate in the King County Flood Control District regional efforts to implement flood hazard reduction projects and programs on the major river basins in King County, including the Green River and Cedar River basins. X e. Policy U-48 Coordinate with adjacent cities, counties, state, and federal agencies in the development and implementation of NPDES Phase II Stormwater Permit, flood hazard management plans, and storm and surface water management programs. X X X e. Policies Utility Management Policy U-49 Provide high quality surface water utility services. Continue to develop policies, design standards, basin plans, and capital projects to maintain and restore the quality of Renton’s waterbodies, improve drainage, protect fish and wildlife habitat, and reduce flood hazards to protect people and property. X X X Policy U-50 Protect, restore, and enhance environmental quality through land use plans, surface water management programs, park master programs, urban forestry programs, transportation planning, development review, and incentive programs; work with citizens, land owners, and public and private agencies. X X X e. Policy U-51 Establish regulatory standards for sustainably developed public and private projects, to include standards for site design and layout, construction, and on-going maintenance and operation. X Policy U-52 Continue to assume maintenance of stormwater facilities in subdivisions that manage runoff from public streets. X X Policy U-53 Continue to implement a program to detect and remove illicit connections and contaminated discharges. X AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-28 TABLE 4-7: 2015 COMPREHENSIVE PLAN UTILITIES ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Policy U-54 Continue to implement public education and outreach activities to inform residents, businesses, and developers about ways they can prevent stormwater pollution. X b. 1 Other falls into the following categories: a Public use/recreation b Public education c Groundwater protection, recharge for water supply, to minimize flooding, and/or to maintain stream flow during the dry season d Funding sources e Coordination with public agencies and neighboring jurisdictions AGENDA ITEM # 9. a) REGULATORY REQUIREMENTS AND CITY POLICIES OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 4-29 TABLE 4-8: 2015 COMPREHENSIVE PLAN CAPITAL FACILITIES ELEMENT – GENERAL GOALS AND POLICIES Goals and Policies Direction Given to Surface Water Program Flood Risk Reduction Water Quality Habitat Other1 Goals General Goal CF-A Establish policies that enable the development and implementation of the Capital Investment Program in order to provide high-quality, well-maintained facilities and services that support the social, economic, cultural, safety, transportation, environmental, communication and other needs of the community, that are available at the time of development to serve new growth, and are equitably distributed. X X X Policies General Policy CF-7 Protect public health, enhance environmental quality and promote conservation of man-made and natural resources through appropriate design and installation of public facilities. X X X Policy CF-10 Coordinate with federal, state, regional and local jurisdictions, private industry, businesses and citizens in the planning, design and development of facilities serving and affecting the community. X X X d. e. 1 Other falls into the following categories: a Public use/recreation b Public education c Groundwater protection, recharge for water supply, to minimize flooding, and/or to maintain stream flow during the dry season d Funding sources e Coordination with public agencies and neighboring jurisdictions AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 4-30 4.7.3 POLICY AND RECOMMENDED GUIDELINES As a part of development of this Plan, City staff evaluated a policy for maintaining stormwater facilities and recommended guidelines for hiring additional staff. The policy involved taking over maintenance responsibilities for some residential plat stormwater facilities. This policy was specifically reviewed by the City Council in October 2010, adopted, and is being implemented. More information about the policy and its implications is presented in Section 5. The recommended guidelines included adding staff resources in the future when annexations occur and adding staff resources as infill development occurs. Annexations place new demands on Utility and the capital improvement program and require additional staff and equipment resources to maintain the level of service currently provided by Utility. Likewise, infill development results in additional Utility infrastructure to be maintained. These recommended guidelines are discussed in Section 5.4. The policy issue paper and recommended guidelines contained within are in Appendix A. AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S E ATTLE • S POKANE 5-1 SECTION 5 FUTURE PROGRAM NEEDS 5.1 INTRODUCTION The City’s SWM Program has undergone significant changes in the past several years due to: New responsibilities to comply with NPDES permit requirements. City policy to assume maintenance responsibility for some private stormwater facilities. Increased workload associated with large annexations and vegetation maintenance for water, surface water, and wastewater facilities easements and streets ROW. Additional O&M staff have been added to address these needs. Other future needs to address urban growth, Utility processes, and potential regulatory issues over the next six year planning period are described in the sections below and include: Additional staff and resources to address infill development, which expands stormwater infrastructure (i.e., conveyance and flow and water quality facilities) that is inspected and maintained by the City. Implementation of an asset management and system reinvestment program. Inventory of culverts and streams with fish passage issues to prioritize for repair and/or replacement in preparation for the possibility that Cities and Counties are included in future court cases that require repair of fish passage barriers in Washington State. Update of this Surface Water Utility System Plan. This section also describes ongoing activities that are recommended for continuation, including Utility coordination with outside agencies for major projects associated with transportation corridors or the major rivers in the City and other surface water initiatives and that are important to City residents. 5.2 NPDES PERMIT COMPLIANCE The City is on its third NPDES Phase II MS4 permit cycle. The most current permit became effective on August 1, 2019 and expires on July 31, 2024. Each successive permit includes modifications designed to improve water quality in the MS4 and results in additional City requirements. New NPDES requirements have created the following needs for the City: resources to develop and implement a source control program, additional MS4 mapping and documentation, and stormwater planning, including development of a Stormwater Management Action Plan for a high priority watershed (see Programmatic Fact Sheet, Appendix E). Implementation of projects and strategies identified in the Stormwater Management Action Plan will not be expected to occur before the 2024 permit expiration, but will be expected in future years. Once set-up, the source control program will be an ongoing program that will require staffing and resources of up to one additional FTE. Table 5-1 presents a summary of NPDES permit elements and estimates of existing budget for continuing programs and a range of potential increases, if any, in resource needs. The result is that new NPDES permit requirements could increase resource demands from between 3.7 to 5.7 FTEs. No new equipment and materials impacts are assumed except for the addition of an eductor truck for the cleaning and inspection of catch basins and inlets. AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐2 TABLE 5‐1: SUMMARY OF KEY NPDES PERMIT ELEMENTS AND BUDGET REQUIREMENTS (BASED ON PERMIT EFFECTIVE 8/19)1 Range of Resource Needs Range of Costs2 Low Range High Range Low Range4 High Range4 Item Permit Section No. Brief Description Increase in FTE Resources3 Equipment & Materials Increase in FTE Resources3 Equipment & Materials Stormwater Management Program (SWMP) S5.A. 1 through 4 On-going implementation and annual documentation of planned activities and actions taken to comply with applicable TMDLs, permit conditions, and monitoring requirements. Continuation of existing program Coordination Among Permittees S5.A.5 In an effort to eliminate barriers to compliance with the terms of the permit, the City will need to coordinate among departments and document internal compliance in the Annual Report no later than March 31,2021 Minimal Coordination with Long-Range Plan Updates S5.C.1.b City must describe how stormwater management needs and protection/improvement of receiving water health are (or are not) information the planning update processes. Documentation is included in the Stormwater Annual Report. Minimal Low Impact Develop Code S5.C.1.c Ongoing program to require LID BMPs and LID principles and to make LID the preferred and commonly used approach for site development. City must provide an annual update on progress and/or barriers. Minimal Stormwater Management Action Planning/Watershed Planning S5.C.1.d. City must develop a Stormwater Management Action Plan for one high priority watershed no later than March 31, 2023. Interim permit deliverables in support of the Stormwater Management Plan include a watershed inventory and receiving water assessment by March 31, 2022, receiving water prioritization by June 30, 2022. Minimal 0.5 $125,000 $300,0005,6 AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐3 TABLE 5‐1: SUMMARY OF KEY NPDES PERMIT ELEMENTS AND BUDGET REQUIREMENTS (BASED ON PERMIT EFFECTIVE 8/19)1 Range of Resource Needs Range of Costs2 Low Range High Range Low Range4 High Range4 Item Permit Section No. Brief Description Increase in FTE Resources3 Equipment & Materials Increase in FTE Resources3 Equipment & Materials Public Education and Outreach S5.C.2 Ongoing education program aimed at the general public, businesses, engineers, contractors, developers, land use planners, residents, landscapers, property managers/owners, and school age children to build general awareness about stormwater impacts and affect behavior change to reduce or eliminate behaviors that contribute to adverse stormwater impacts. Conduct an evaluation of effectiveness of ongoing behavior change campaign no later than July 1, 2020. Develop a strategy to implement actions to address lessons learned from effectiveness study no later than February 1, 2021 and begin to implement outreach strategy based on lessons learned no later than April 1, 2021. Public education and outreach results must be documented no later than March 31, 2024. Minimal Creating Stewardship Opportunities S5.C.2 Ongoing program to provide and advertise stewardship opportunities and/or partner with other organizations to encourage residents to engage in surface and stormwater activities, storm drain marking and other events. Continuation of existing program MS4 Mapping and Documentation S5.C.4.b.ii Ongoing program to map and document MS4. No later than August 1, 2023, complete mapping of all known connections from the MS4 to a privately owned stormwater system. Minimal 0.2 $10,000 $29,0006 Detect and Identify Illicit Discharges and Illicit Connections S5.C.5.d. City must conduct field screening of at least 12% of the MS4 annually and track total percentage of MS4 screened beginning August 1, 2019. Train municipal field staff. Continuation of existing program AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐4 TABLE 5‐1: SUMMARY OF KEY NPDES PERMIT ELEMENTS AND BUDGET REQUIREMENTS (BASED ON PERMIT EFFECTIVE 8/19)1 Range of Resource Needs Range of Costs2 Low Range High Range Low Range4 High Range4 Item Permit Section No. Brief Description Increase in FTE Resources3 Equipment & Materials Increase in FTE Resources3 Equipment & Materials Address Illicit Discharges and Illicit Connections S5.C.5.e Implement procedures to characterize, trace sources, and eliminate illicit discharges and connections within specified deadlines. Continuation of existing program Ordinance Addressing Runoff from New Development, Redevelopment and Construction Sites S5.C.6.b Adopt and make effective a local program, no later than June 30, 2022 that addresses runoff from new development, redevelopment and construction site projects consistent with a Phase I program approved by Ecology and amended to include Appendix 10. Minimal Site Plan Review, Inspection and Enforcement S5.C.6.c Review of stormwater site plans and inspection of development sites before, during and after construction per the permit conditions. Process also includes inspection of BMPs and facilities in new residential developments every 6 months until 90% of the lots are constructed, recordkeeping and enforcement. Minimal Annual Inspection of Stormwater Treatment and Flow Control BMPs/Facilities that discharge to MS4 S5.C.7.b.i.b Ongoing program to annually inspect all stormwater treatment and flow control BMPs that discharge to the MS4, unless otherwise exempted from this permit condition. Continuation of existing program AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐5 TABLE 5‐1: SUMMARY OF KEY NPDES PERMIT ELEMENTS AND BUDGET REQUIREMENTS (BASED ON PERMIT EFFECTIVE 8/19)1 Range of Resource Needs Range of Costs2 Low Range High Range Low Range4 High Range4 Item Permit Section No. Brief Description Increase in FTE Resources3 Equipment & Materials Increase in FTE Resources3 Equipment & Materials Annual Inspection of Municipally Owned Stormwater Treatment and Flow Control BMPs/Facilities S5.C.7.c.i Ongoing program to annually inspect all municipally owned or operated stormwater treatment and flow control BMPs/facilities and conduct maintenance activities. 1.0 2.0 $126,500 $253,000 Inspect and clean catch basins S5.C.7.c.iii Inspection of catch basins and inlets is required once every two years. This requirement may be changed based on maintenance records of double the length of time of the proposed inspection frequency. The City meets this requirement through an alternative of cleaning all pipes, ditches, and catch basins and inlets in a circuit once during the permit cycle. Additional staff will be evaluated during the 2023-2024 budget cycle based on ability to meet permit requirements. 2.0 $400,000 2.0 $600,000 $653,000 $853,000 Pollution Prevention and O&M S5.C.7.d. and f Ongoing program to document and implement an operations and maintenance program to prevent or reduce pollutants in runoff on lands owned by the City. Implement a Stormwater Pollution Prevention Plan (SWPPP) for all heavy equipment maintenance or storage yards, and material storage facilities owned by the City that do not have coverage under the Industrial Stormwater General Permit. Update the SWPPP(s) no later than December 31, 2022. Minimal AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐6 TABLE 5‐1: SUMMARY OF KEY NPDES PERMIT ELEMENTS AND BUDGET REQUIREMENTS (BASED ON PERMIT EFFECTIVE 8/19)1 Range of Resource Needs Range of Costs2 Low Range High Range Low Range4 High Range4 Item Permit Section No. Brief Description Increase in FTE Resources3 Equipment & Materials Increase in FTE Resources3 Equipment & Materials Source Control and Business Inspection Program S5.C.8 Adopt and make effective an ordinance or enforceable document to require source control BMPs for pollutant generating sources associated with existing land uses no later than August 1, 2022. Develop an inventory of sites that have potential to generate pollutants to the MS4 no later than August 1, 2022. No later than January 1, 2023, implement an inspection program to annually inspect 20% of sites in the City’s inventory of pollution generating sites. No later than January 1, 2023, implement a progressive enforcement policy that requires sites to comply with stormwater requirements. 0.7 1.0 $88,200 $126,500 Reporting and Staff Training S5.C.5, S5.C.6, S5.C.7, S5.C.8 Submit annual reports and report on inspections, adaptive management response, stormwater planning, and behavior change programs. Implement staff training for illicit discharge, controlling runoff, operations and maintenance, and source control programs. Continuation of existing program Monitoring and Assessment S8.A and S8.B The City participates in regional status and trends monitoring and stormwater management program effectiveness and source identification studies. Continuation of existing program $240,160 $240,160 Totals 3.7 $400,000 5.7 $600,000 $1,242,860 $1,801,660 Notes: 1. This estimate includes only significant changes in the resource needs and is not intended to capture all changes that have cost impacts. 2. Assumes $126,500k per Maintenance Worker 3 FTE (Salary and Benefits). Costs include existing costs for continuation of existing programs based on actual budgets, and new costs that show increases in FTE resources. Unless noted, resources are assumed to be maintenance staff. 3. FTE resources assume increases in staff resources only. 4. Totals are annual costs and do not include one-time costs, except where noted. 5. Cost includes staff time and consultant costs to develop SMAP. 6. Engineering staff assumed at $145k per year. AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐7 5.3 CITY MAINTENANCE OF RESIDENTIAL FACILITIES The City began assuming maintenance responsibility for private residential stormwater management facilities adjacent to public streets in 2012. A policy decision was made on October 18, 2010 to assume maintenance responsibility of these facilities to be consistent with King County policy, from which many of these facilities were being transferred to the City during annexation, and to improve equity among residents that pay SWM fees. Additionally, the City determined that City maintenance would improve system reliability and reduce enforcement staff time spent on enforcement actions for facilities that are not adequately maintained. The City has assumed maintenance of up to 115 residential facilities, and there are another 37 facilities that meet the City’s standards to assume maintenance responsibilities. Some of these facilities are pending transfer. Between the residential facilities and City‐owned facilities, the City maintains 435 stormwater facilities. There are 787 private stormwater facilities in Renton; 209 are residential facilities. Besides the facilities that are pending transfer, it is not anticipated that many of these facilities will be transferred to the City for maintenance, because they were either (1) constructed prior to the NPDES permit requirement for inspection and maintenance and therefore exempt, or (2) are not under management of an HOA and have no entity with which to negotiate a transfer agreement. 5.4 ANNEXATIONS Over the years, numerous small annexations have occurred that have increased the size of the City, and the amount of stormwater management infrastructure that the City owns and operates. In general, most annexations were accommodated without any specific increase in Utility staffing, equipment purchases, or rate increases. Individually, the small annexations did not require hiring any new staff to accommodate the new infrastructure. Cumulatively, however, the effect is large. Figure 5‐1 shows the per capita Utility engineering and maintenance staffing from 1990 through 2019. From 1990 through 2007, staffing generally remained constant, and the effect of infill development and annexations reduced staffing on a per‐resident basis by nearly 20%. The increase in staffing that accompanied the Benson Hill annexation in 2008 helped bring staffing back near 1990 levels. Since then, staffing ratios have generally kept pace with population growth to the current levels in 2019‐ 2020, with slight dips during the recession years (2009–2010). AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐8 1. FTE data is from Adopted Budgets and does not reflect position vacancies. Population data from City of Renton Community and Economic Development Department, Economic Development Division. Figure 5‐1. SWM Maintenance and Engineering FTEs per 1000 Residents by Year and Population In response to trends of annexations that result in significant growth in City population and additional Utility responsibilities, the City evaluated potential policies that describe thresholds for adding new staff, capital improvement needs, and equipment when annexations occur. A draft recommended guideline paper developed in 2012 is included in Appendix A and discusses options for meeting Utility demand that results from annexations. The recommended thresholds, on a per‐square‐mile basis are shown below, updated to 2020 cost estimates: $117,600 per year for maintenance staff (MWIII, Step C, 1 FTE including benefits). $94,250 per year for 0.65 FTE engineering division staff (CEII, Step C, 0.65 FTE including benefits). One‐time cost for equipment and/or vehicle purchases (to be evaluated on an as needed basis). Ongoing annual cost for equipment and vehicle maintenance (to be evaluated on an as needed basis). Ongoing annual capital improvement needs of $150,000 per square‐mile of annexation increase. No additional large annexations are anticipated during the next six‐year planning horizon; however, staff and budget increases may be warranted because of system expansion and population growth pressures that result in additional workloads for Utility engineering and maintenance staff. Some of these conditions, such as infill development and vegetation maintenance, are discussed below. 5.4.1 BENSON HILL ANNEXATION The Benson Hill area was annexed on April 1, 2008. The 4.2‐square‐mile annexation increased the City’s area by approximately 24% to 21.5 square miles. Upon annexation, the City increased its maintenance staff and dedicated an eductor truck crew to address the needs of this area. After annexation, the City observed a lot of deferred maintenance of 0 20000 40000 60000 80000 100000 120000 0.15 0.17 0.19 0.21 0.23 0.25 0.27 1990 1995 2000 2005 2010 2015 2020 Population (number of Residents)Engineering and Maintenance FTEs per 1000 ResidentsYears FTE/1000 Population AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐9 Utility infrastructure due to the poor condition and extensive maintenance needs of the annexation area. After 12 years, the Benson Hill annexation area still requires more maintenance than other areas of the City. Future annexations should consider potential Utility rate increases to offset maintenance needs if revenue generated from the annexation is not sufficient to manage asset conditions in newly annexed areas. The draft issue paper in Appendix A suggests potential Utility resource needs for annexations. 5.5 VEGETATION MAINTENANCE In 2018, a policy decision was made by the Maintenance Services Director to have the Utility Maintenance Section conduct vegetation management for all right‐of‐way, Public Works facilities (water, wastewater, and surface water), and easements. Previous to the policy decision, each maintenance section (e.g., water, wastewater/surface water, streets) had their own part‐time seasonal staff. This shift to City‐wide vegetation maintenance, along with the addition of new facilities through infill development (discussed in Section 5.6), has increased workload for Utility maintenance staff. Another consequence of the increased vegetation maintenance is the crew is not able to continually operate one of the eductor trucks during the growing season due to staff demands for vegetation maintenance. 5.6 INFILL DEVELOPMENT The City prepared a draft recommended guideline to add maintenance staff, because infill development results in additional Utility infrastructure (included in Appendix A). Infill development generally refers to development or redevelopment within the City limits to currently established zoning and often results in expansion of roads or road improvements. New Utility infrastructure resulting from infill development can include new storm drain pipes, catch basins, and detention and water quality treatment facilities. The City’s infill development analysis uses miles of storm drain pipe to characterize all types of infrastructure, because storm drain pipe is thought to be a reasonable metric to describe the storm drainage system. Several land development projects are anticipated in the six year time frame. ST3 Transit Center: The former Sound Ford site at 750 Rainier Ave S is planned for development with a 700 stall parking garage and new transit center by Sound Transit. There is potential for a mixed use multi‐story Transit Oriented Development (TOD) onsite. Sam’s Club: The former Sam’s Club at 901 S Grady Way has an interested party discussing redevelopment for single story retail. There was previous interest for a mixed use or multi‐ story development that is now not currently planned. TOD subarea: The City hired a consultant to develop a TOD subarea plan with the purpose of setting up improvements and development regulations, creating a multimodal center that evolves into a pedestrian‐oriented neighborhood, and leveraging and identifying public investments for private investments to follow. Southport area near the Landing/Gene Coulon Park: The office buildings are currently vacant. The location will be easier to access with the extension of Park Ave. Top Golf in partnership with a hotel that is moving forward with a development on vacant commercial land at 745 Park Ave N. AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐10 Bryant Motors property: The former Bryant Motors property at 1300 Bronson Way N is planning for a one‐story redevelopment project. Sunset Terrace: Two mixed use projects ‐ 400 units next to the Renton Highlands Library and 800 units on the Highland Shopping Center site ‐ will add housing to the Sunset neighborhood. Old City Hall: A mixed use development with two market‐rate apartment buildings, underground parking and a hotel is planned at the 200 Mill Ave S. Redevelopment near the VMAC: There is interest to develop assisted living facilities in this area. Analysis conducted in 2012 indicated the need to add one new maintenance worker for every 27 miles of added storm pipe and one engineer for every 41 miles of storm pipe that is added to the system via infill development. The current ratio of maintenance workers to miles of storm pipe is one worker per 15 miles of storm pipe. The City estimates that the cost to add one maintenance worker is approximately $126,000 per year, which would cover wages, benefits, necessary equipment, and necessary vehicle expenses. To maintain its maintenance level of service as infill development occurs, the City will need to track the amount of new drain pipe resulting from infill development. It is not possible to predict how much infill development will occur, especially with recent housing boom and recession periods, but long‐term running average historical data can be used to provide some context. For example, between 1987 to 2006, the City reported that 55 miles of drain pipe were added to the system. At this rate, one additional maintenance worker would be added every 9 years, and one additional engineer would be added every 14 years to manage stormwater system growth due to infill development. 5.7 ASSET MANAGEMENT Managers of municipal infrastructure assets must make technical decisions regarding when and how to maintain, repair, or renew their assets. Examples of these technical decisions include: How much annual maintenance is required? Is it more cost‐effective to maintain, repair, or replace a certain component of the system? How can the remaining service life of a component or system meet the calculated? Will the maintained, repaired or replaced component meet the desired performance requirements? What are the probabilities of failure for individual components and what are the consequences of failure? How can an asset manager make a logical, cost‐effective and objective decision with many unknowns? Investing in long‐term decision making has historically been difficult for the City due to competing resource needs (e.g., solving flooding problems) and lack of physical data about the system. As a consequence, system replacements have tended to be reactive (e.g., replacing a system after it has failed) or opportunistic (e.g., replacing a system at the same time that another City project is working in the area). This is an increasing concern for the City. For example, the City has many older corrugated AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 5-11 metal pipe (CMP) systems that are subject to rusting out over time, already resulting in some system failures. Asset management is a body of management practices that maximizes the cost-effective use of capital assets over the life of the asset (Sivalingam, 2001). Its purpose is to get the most use out of each asset over the life of the asset for the least long-term cost. For pipeline management, asset management can be defined as managing infrastructure capital assets to minimize the total cost of owning and operating them, while delivering the City’s target level of service. Several large municipalities have implemented asset management planning using sophisticated information systems and extensive personnel resources. Such municipalities are responsible for making sure that its system stays in good working order, regardless of the age of components or the availability of additional funds. Asset management programs with long-range planning, life-cycle costing, proactive operations and maintenance, and capital replacement plans based on cost-benefit analyses can be the most efficient method of meeting this challenge. Use of asset management will help protect the system integrity by (GASB, 1999): • Making sure components are protected from premature failure through proper operations and maintenance. • Facilitating proactive capital improvement planning and implementation over longer cycles to reduce annual and overall costs. • Reducing the cost of new or planned investments through economic evaluation of options using life-cycle costing and value engineering. • Focusing attention on results by clearly defining responsibility, accountability, and reporting requirements. • Key elements of more sophisticated asset management programs include (USEPA, 2002): • Level of service definition • Selection of performance goals • Information system • Asset identification and valuation • Failure Impact evaluation and risk management • Condition assessment • Rehabilitation and replacement planning • Capacity assessment and assurance • Maintenance analysis and planning • Financial management • Continuous improvement The City is currently using a combination of CityWorks, GIS, and GraniteNet for its asset management strategy. CityWorks is used to track maintenance work orders. GraniteNet is used for condition assessment data and prioritization of asset replacement or rehabilitation. GIS, integrated with CityWorks and GraniteNet, is used to display information and track projects and maintenance activity. One of the key elements of asset management is understanding asset condition. The City has an existing program to assess CMP pipes and prioritize maintenance, repair, and replacement. This program should AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐12 be enhanced to include condition assessment of all pipes, starting with those deemed high priority (see Programmatic Fact Sheet, Appendix E). 5.8 CULVERT INVENTORY On March 29, 2013, the US District Court for the Western District of Washington issued a permanent injunction requiring state roads owned WSDOT, DNR, WDFW, or the Washington State Parks and Recreation Commission to operate culvert crossings that are suitable for fish passage. The decision reinforces treaty fishing rights granted by the federal government to Native American tribes in Washington State dating back to the 1860s. The permanent injunction required the State to prepare a list of all culverts in Western Washington with barriers to fish passage within 6 months of the ruling. By October 31, 2016, WDFW, DNR, and State Parks were required provide for fish passage at each culvert listed as a barrier. WSDOT must also provide fish passage for culverts with barriers by 2030. Although the court ruling focused on State‐owned culverts, it is possible that it could be broadened in the future to include other governmental entities, such as counties and cities. In an effort to proactively address the potential liability that the City may face in the future, Utility will begin the process of conducting a stream inventory of all culvert crossings. This information will be used to field survey each culvert crossing in an effort to identify fish passage issues and develop solutions with priority rankings to be incorporated in the utility’s CIP program (see Programmatic Fact Sheet, Appendix E). 5.9 SURFACE WATER UTILITY SYSTEM PLAN UPDATE This Surface Water Utility System Plan will need to be updated in the next 6–10 years to document and identify new surface water program issues, strategies, resource needs, and implementation schedules. 5.10 SURFACE WATER UTILITY COORDINATION The Utility often coordinates with outside agencies, including the WSDOT, KCFCD, Ecology, and neighboring jurisdictions on issues of common concern such as discharges to streams, rivers, and Lake Washington, or geographic overlap, such as transportation corridors, and large rivers. 5.10.1 WSDOT PROJECTS AND COORDINATION The City frequently partners with WSDOT to administer and implement mutual benefit projects, including habitat and surface water management improvements involving WSDOT highways that lie within the City. The Utility reviews WSDOT projects that may impact the downstream drainage system in the City of Renton. Impacts may involve downstream ditches, basin land use and flows, water quality and detention requirements, or pipe capacities. Utility reviews also focus on whether proposed WSDOT improvements would create problems in the future. The City reviews WSDOT documentation including drainage reports and environmental reports. The City reviews WSDOT projects for environmental protection consistent with City polices related to wetlands, floodplain, stream buffer, and shorelines and works with WSDOT to modify plans, easements, or maintenance in order to achieve mutually beneficial goals for the City and WSDOT. AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐13 5.10.1.1 WSDOT Projects The Utility has a long history of collaboration with WSDOT and expects to maintain this collaboration on future projects. Such collaboration may include technical reviews, cost‐sharing or both. Within the last decade, several major WSDOT construction projects were completed in the City. These projects are highlighted below: The Stage 1 Widening Project was completed in 2010 and includes the removal of the Springbrook Creek box culvert under I‐405 and the construction of several flow control ponds and media filter drains for water quality treatment. The Stage 2 Widening Project was completed in 2011 and includes renovation (slip‐lining) of the Renton coal mine drainage culvert under I‐405. Prior to the Stage 2 project, WSDOT also installed a new culvert under I‐405 to replace the failed Thunder Hills Creek culvert. The Thunder Hills Creek Mitigation Fish Barrier Retrofit Project was completed in 2012 and provides mitigation for the Thunder Hills Creek culvert under I‐405 that was damaged and subsequently replaced in 2008. Mitigation included the replacement of the SW 23rd Street culvert under SR 167 and the plugging of cross culverts across SR‐167 to direct Panther Creek to the north in a new channel. The subsequent 5‐year monitoring period ended in 2017, meeting all performance standards. The following are current and future mutually beneficial projects where Surface Water and WSDOT are collaborating or coordinating on: The Springbrook Creek Wetland & Habitat Mitigation Bank Project: This project enhances 110 acres of wetlands and buffer and restores/creates a larger connected 20 acres of wetland; totaling approximately 130 acres of wetlands. The project is a collaboration between the City and WSDOT to create wetland credits that can be used for project the require wetland mitigation. Once all performance standards are met, a total of 45.12 mitigation credits are expected to be available and shared equally between the City and WSDOT. One credit compensates for one acre of Category II wetland. All credits have been released from Units A, B, D, and E. All credits are anticipated to be released from Unit C by the end of 2020. Following the 10‐year monitoring period and release of all credits, the bank will enter its Long‐term Management Phase. Long‐term management will include annual inspections, monitoring of hydrologic conditions and targeted wooded species, weed control, trash removal, and repair of signage and structures due to vandalism and natural wear. The City is in the process of determining credit value and what type of projects (e.g., commercial, residential, etc.) would be eligible to use the credits. Sale of credits will be used to establish an interest‐bearing account to fund long‐term management indefinitely. I‐405/SR 167 Express Toll Lane and Direct Connector was completed in 2019 and provides dedicated HOV/HOT direct access between SR167 and I‐405. I‐405 Renton to Bellevue Widening and Express Toll Lanes began construction in 2020 and is anticipated to end construction in 2024. This project will add a dual express toll lane system from SR 167 in Renton to NE 6th St in Bellevue, improvements at the N Southport Drive and NE 44th St interchanges, construction of portions of the Eastrail, and a new direct access ramp and inline transit station at NE 44th St to help support Bus Rapid Transit operations. Panther Creek Watershed Restoration Plan: Panther Creek Wetlands are a 58.5‐acre category II wetland that encompasses an area east of SR 167 that parallels SR 167 from I‐405 (toe of Talbot Hill) to just south of Panther Creek. This potential future project between the City and WSDOT is the Panther AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐14 Creek Watershed Restoration Plan that provides benefits to Panther Creek and its wetlands. The Panther Creek Watershed Restoration plan jointly collaborates and achieves the goals set within the City’s East Side Green River Watershed Plan. The mutual environmental benefits between WSDOT and the City are that the project establishes off‐channel fish refuge and rearing habitat in the wetland, promotes water aeration, provides enhanced water quality treatment of highway runoff, enhances 33 acres of floodplain habitat, provides riparian plantings to increase shade and reduce water temperatures, and removes three fish passage barriers in Panther Creek. This potential project provides a unique opportunity to improve surface water management and reduces flooding along the East Valley Road and the SW 34th Street drainage system in the City. Several elements of this project have been already addressed as part of the Thunder Hills Creek Mitigation Fish Barrier Retrofit Project including the construction a fish passable culvert across SR‐167 at the SW 23rd Street channel and the realignment of Panther Creek south of SW 34th St. The Panther Creek partnership provides an unconventional focus on stream mitigation and stormwater management by providing potential economic efficiencies with the partnership, improves environmental mitigation beyond the immediate project site, and provides the greatest environmental benefit without compromising project and Utility goals. The most pressing segment of this project involves connecting fish‐passability from Rolling Hills Creek to Springbrook Creek through Panther Creek. At SW 19th St where Rolling Hills Creek enters a culvert under SR 167, there is a berm preventing flow south into the adjacent Panther Creek wetland area. By creating a new fish‐passable channel across this berm and through the Panther Creek wetland area, Rolling Hills Creek can continue south then west to enter the fish‐passable culvert under SR 167 at SW 23rd St. In order to ensure fish‐passability and prevent flooding to adjacent and influent areas, capacity improvements will be made to the existing Panther Creek channel along SE 23rd. The existing culvert under SR 167 at SW 19th St will be retained for overflow during major storm events. The level of collaboration on this effort consists of executing a cost‐sharing agreement and likely forming an inter‐ agency design team. Johns Creek Outfall: This project includes WSDOT’s proposed stormwater treatment facility north of N Southport Drive and east of Lake Washington Boulevard N. WSDOT has conducted early coordination with Utility engineering staff in the N 8th HOV project area. The Johns Creek system is near full capacity and no additional storm flows can be allowed through the creek system. A Letter of Understanding between WSDOT and the City was developed for the Johns Creek system, which stated that an outfall pipeline must be built to directly discharge into Johns Creek with proposed improvements. Johns Creek is known as a remnant backwater of Lake Washington, so hydraulic and hydrologic analyses must consider summer water elevations from Lake Washington that might affect all hydraulic systems upstream of Johns Creek. Specific design objectives have been established between the City and WSDOT, which include: Providing adequate outfall treatment for runoff from the I‐405 Corridor Project from MP 4.59 to MP 6.09 near N 8th Street HOV, portion of North Renton segment in the N Southport Drive interchange area, and the Sunset Boulevard underpass area. Providing adequate culverts for off‐site drainage from the east side to the west side of I‐405 from MP 4.59 to MP 6.09. Designing outfall and culverts assuming ultimate development conditions for off‐site areas. Culverts at 08.LW‐7.7 and 08.LW‐7.8 crossings: (the numbers 7.7 and 7.8 refer to the designated milepost of I 405) New fish‐friendly culverts (or other structure) are proposed by WSDOT with the ultimate discharge into the small stream located at the northernmost area of the City that drains through a residential area north of the Misty Cove Condominiums. The collaboration level consists of AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING , I N C . B ELLEVUE • S EATTLE • S POKANE 5-15 providing technical review as needed to make sure that the City’s drainage system downstream is not impacted. 5.10.2 KING COUNTY FLOOD CONTROL DISTRICT COORDINATION KCFCD was established in April 2007 by the King County Council to protect public health and safety, regional economic centers, public and private properties, and transportation corridors. KCFCD is instrumental in addressing the backlog of maintenance and repairs to levees and revetments, acquiring repetitive loss properties and other at-risk floodplain properties, and improving countywide flood warning and flood prediction capacity. Overarching countywide strategies and objectives include: • Improving levee protection through major commercial, industrial, and residential areas. • Improving flood water conveyance and capacity. • Reducing hazards by removing flood-, erosion-, and landslide-prone residential structures. • Providing safe access to homes and businesses by protecting key transportation routes. • Minimizing creation of new risks to public safety from development pressure. • Providing grant funding to local jurisdictions for flood control projects. The King County Council governs KCFCD as a “District Board of Supervisors.” An advisory committee advises the Board of Supervisors on regional flood risk reduction issues by providing recommendations on the district’s work program and budget, including CIP projects. The advisory committee is compo sed of both permanent and rotating (two-year) members. The 10 permanent seats on the committee are held by each mayor (or council member alternate designated by the mayor) of Tukwila, Auburn, Kent, Renton, Snoqualmie, North Bend, Carnation, Seattle, and Bellevue. The King County Executive is also a permanent member of the committee. Basin technical committees, which are responsible for ensuring that basin-scale issues and technical information are factored into countywide district decision-making processes, are comprised of city staff from jurisdictions within each basin. This includes the Green/Duwamish and Cedar River basins, which the City of Renton lies within. These committees have the following objectives: • Provide input to KCFCD staff regarding annual and longer term capital improvement project priorities. • Share relevant information across areas of the KCFCD that would influence implementation of the district’s work program. • Review and help guide project implementation, as appropriate. • Develop policies and issues papers as required. • Coordinate jointly with state and federal partners on relevant issues. King County employees are responsible for implementing flood hazard management programs and projects, staffing the advisory and basin technical committees, providing technical and engineering assistance to cities, and reporting progress back to the KCFCD’s Board of Supervisors, advisory committees, and basin technical committees. AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐16 5.10.3 OTHER COORDINATION ASSOCIATED WITH MAJOR RIVERS In addition to KCFCD coordination, the City also coordinates with FEMA and USACE with respect to emergency response and flood hazard reduction on the Green and Cedar rivers. Most of the work with FEMA either involves pre‐disaster coordination or post‐disaster assistance. Post‐disaster assistance may include emergency coordination during an event (as well as with the City’s internal emergency management group), documentation of flood events and damage assessments, and assistance with cost estimates for repairs. Coordination with USACE is most often associated with projects that were designed by USACE and that need to be coordinated with the City as a local sponsor and to provide input into the design and possibly provide assistance to the project. 5.10.4 FUTURE TMDL IMPLEMENTATION There are currently twelve listed water bodies within Renton that could be potential candidates for TMDL implementation. In addition, as described in Section 4.4.6, Ecology has begun the process of developing a multi‐parameter TMDL to address water temperature, dissolved oxygen, and aquatic organisms for the Soos Creek watershed, which may affect parts of Renton within the watershed (Ecology, 2020d). This effort will require City staff to attend meetings, review studies, and be involved in decisions and provide input during the development of the TMDL. Although it is uncertain what the TMDL requirements will be, it is likely that City will require additional resources to implement TMDL strategies that will reduce targeted pollutants to within state water quality standards. Some possible TMDL strategies may include structural controls such as regional detention and water quality treatment facilities or changes in development regulations that increase stream buffer widths. 5.11 CONTINUATION OF EXISTING SURFACE WATER INITIATIVES Existing surface water initiatives or programs that take resources, but are important to the health of residents or functionality of the surface and stormwater system include the following: Mosquito Abatement Program – This program involves treating the uplands east of Panther Creek Wetland and stormwater ponds during the spring and summer to control mosquito infestations. Stormwater Facility Fencing Program – This program involves bringing existing stormwater facilities up to current standards and alleviating potential safety issues from public access to drowning hazards. City‐Wide Drainage Maintenance Program – This program involves conducting routine maintenance such as vegetation and sediment removal at culverts discharging to streams and creeks under programmatic permit authorizations. Stream flow/Water Quality Monitoring Program – This program involves collection of stream gage data at the Black River pump station. 5.12 SUMMARY A summary of on‐going and future program needs, including estimated costs and FTE resource needs associated with NPDES Permit Conditions is provided in Table 5‐2. Annexations are not expected to be a resource driver for the Utility in the coming years as potential annexation areas have voted against AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 5‐17 annexation and those areas will continue to be outside of the City boundary. Infill development is continuing and will add infrastructure and burden to the Utility and maintenance staff; however, current staffing levels are keeping pace with the rate of infill development and no additional resources are expected specifically for infill development over the next 6 years. The City should continue to monitor the increased resources relative to maintenance staff levels and make adjustments as needed. Additional maintenance staffing resources are needed to meet new NPDES requirements as noted in Table 5‐1. With additional staff resources for NPDES surface water facility inspection and maintenance the ability to meet the demands of vegetation management during the growing season will be improved for Utility staff. As discussed previously, the City is, and will continue, coordinating with WSDOT and other jurisdictions associated with the KCFCD. The amount of effort spent on these coordination efforts has increased in recent years and may continue to do so. The City should monitor these coordination activities and associated efforts and determine if additional budget is necessary in the coming years. AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐18 Table 5‐2: Summary of On‐Going and Future Program Needs Program Need Description/Potential Program Changes Conceptual Solution New FTEs Estimated Cost (2020) NPDES Compliance Details of compliance elements described in Table 5-1 Continue with existing NPDES program and enhance program with new permit requirements. 4 (high end) $1,801,660 (high end) Residential Plat Stormwater Management Facility Maintenance and Operation- continuation The City assumed operation and maintenance of 115 existing stormwater facilities on residential plats following a policy decision on October 18, 2010. Continue maintenance of 115 residential stormwater facilities. Transfer up to 18 additional facilities to Renton. 0.0 $685,000 annually Mosquito Abatement Program (Talbot Hill Area)- continuation The Panther Creek wetlands east of SR-167 and between I-405 and Valley Medical Hospital, are a large breeding ground for mosquitoes. Adult mosquitoes emerge from the wetlands in the late spring to feed in the residential neighborhoods in and around Talbot Hill. In addition to controlling adult mosquitoes, the City also treats for mosquito larvae in all City owned stormwater facilities including ponds and vaults. These mosquito abatement efforts help to reduce mosquito bites and subsequent risk of West Nile virus infection. The City implements an annual contract with pest control contractor to control mosquito populations through adulticiding of upland areas adjacent to the wetlands and treatment of City maintained stormwater ponds using larvicide during the spring and summer months. The budget may need to be adjusted annually to account for additional ponds that are acquired by the City through new construction. 0.0 $90,000 annually AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5-19 Table 5-2: Summary of On-Going and Future Program Needs Program Need Description/Potential Program Changes Conceptual Solution New FTEs Estimated Cost (2020) Stormwater Facility Fencing Project- continuation Past and current design standards (taken largely from King County Surface Water Design Manual) require stormwater ponds to have a perimeter fence only when interior side slopes are greater than 3 horizontal to 1 vertical. However, some existing ponds with flatter interior side slopes (i.e., that did not require perimeter fencing) and having standing water several feet or more deep can create a potential safety hazard, particularly for small children. The City has adopt a new policy of requiring all current and future ponds to be fenced which required changes to the City’s stormwater code and stormwater design manual. The City is currently responsible for the maintenance of 28 residential facilities and 6 non-residential facilities that either do not have perimeter fencing or do not have a perimeter fence that meets the design standards. There are an additional 17 privately maintained stormwater facilities that will be eventually transferred to the City and will need to be fenced. 0.0 $100,000 annually Asset Management- enhancement Prioritize non-CMP pipes for condition assessment Develop protocols for using condition assessment data to identify maintenance, repair and replacement needs. The Surface Water utility has developed an asset management program that helps the utility with short, medium and long term planning of pipe replacement and repair, proactive inspection and maintenance of the City’s storm system and prioritizing replacement projects based on cost-benefit analysis and severity of defects. The program relies on a CCTV Truck with two operators, GraniteNet for viewing CCTV inspections, NASSCO PACP standards, and coordination between Surface Water Engineering and Maintenance sections. The utility will continue to advance this program to include non-CMP pipes. 0.0 $100,000 annually AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐20 Table 5‐2: Summary of On‐Going and Future Program Needs Program Need Description/Potential Program Changes Conceptual Solution New FTEs Estimated Cost (2020) Culvert/Stream Inventory Identify all stream crossings with culverts Field inventory fish barrier culverts Prioritize fish barrier culverts and program into 6-yr CIP The Surface Water Utility began the process of conducting a stream inventory of all culvert crossings. This information was used to eventually field survey each culvert crossing in an effort to identify fish passage issues and develop solutions with priority rankings which can be incorporated in the utility’s CIP program. The establishment of a fish passage improvement program is currently under consideration. 0.0 $95,000 annually Surface Water Utility Plan The Surface Water Utility’s last comprehensive planning effort was conducted almost 20 years ago. A new surface water utility management plan is needed to reflect current capital needs and programs. Develop a comprehensive city-wide surface water planning document to provide guidance for programmatic and capital needs for the next 6 years and for future years. Update every 6 years. Last update as of the writing of this system plan was in 2020. 0.0 $120,000 Citywide Drainage Maintenance Program The City has many culverts discharging to streams and creeks that require routine maintenance including vegetation and sediment removal. The City has completed SEPA review and was issued a critical areas and shoreline exemption for vegetation and sediment removal at culverts within in the City. Fisheries has also issued an HPA that authorizes routine maintenance of 25 culverts and channels. City staff will still be required to obtain individual state and federal permits for each culvert. 0.0 $66,000 annually Surface Water Utility GIS The City’s infrastructure mapping needs continual updates as new storm water facilities, pipes and structures are taken into plats or acquired through annexations. Surface water utility GIS mapping to include new storm water systems, as-built information, recently annexed areas, and continual maintenance of GIS mapping. 0.0 $115,000 annually Stream Flow/WQ Monitoring Program Stream flow and water quality monitoring program. Currently collecting stream gage date at the Black River pump station. 0.0 $13,000 annually AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐21 Table 5‐2: Summary of On‐Going and Future Program Needs Program Need Description/Potential Program Changes Conceptual Solution New FTEs Estimated Cost (2020) CMP Storm System Replacement Program This program consists of assessing the condition of all corrugated metal pipes (CMP) whose diameter is 18 inches or larger, located in high risk areas (i.e. under major roads). This program was driven by a failure of a CMP pipe along Rainier Ave S in 2018, which caused a major cavity to form underneath the road, and required an emergency repair project. This program is intended to address deficiencies in CMPs, which are more susceptible to deterioration than plastic and concrete pipes, before a catastrophic failure becomes imminent. Minor deficiencies are typically repaired through coordination with the surface water maintenance section, while replacement projects resulting from significant structural issues (e.g. deterioration of the pipe wall, pipe collapse) require the replacement or rehabilitation of the pipe and may require hiring a contractor. This program repairs and replaces corrugated metal pipes showing signs of deterioration in high risk areas to avoid catastrophic failures and emergency repairs. This project supports the city's goal of protecting public safety. 0.0 $580,000 Cedar River Flood Risk Reduction Feasibility Study The Lower Cedar River Flood Risk Reduction Feasibility Study intends to assess the feasibility of improving the level of flood protection and evaluate future flood risk mitigation projects along the Cedar River from River Mile 0 to River Mile 2.7. This feasibility study would identify potential measures or construction projects that would increase resiliency to floods greater than the 100-year event and identify the most feasible level of flood protection that could be achieved along this reach of the Cedar River, a critical area of development and economic activity within King County. The King County Flood Control Zone District (KCFCZD) placed the Feasibility Study on its 6-year Capital Improvement Project funding plan in 2018 and a funding agreement was executed with the City in April 2020. This study is expected to begin in 2020 and be completed by 2023. This study evaluates the feasibility of increasing the level of flood protection along the Lower Cedar River, and reducing the risk of flooding to the surrounding area in Renton. It supports the city's goal of protecting public safety. 0.0 $485,000 AGENDA ITEM # 9. a) FUTURE PROGRAM NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 5‐22 Table 5‐2: Summary of On‐Going and Future Program Needs Program Need Description/Potential Program Changes Conceptual Solution New FTEs Estimated Cost (2020) WSDOT Limited Access ROW Runoff Impact Mitigation Program The city currently charges surface water fees to WSDOT for the SR-167 and I-405 right of way within Renton city limits. RCW 90.03.525 allows local municipalities to charge stormwater fees for state limited access highways and was modified when Senate bill 5505 was passed in 2019. The bill clarified the objectives of the Stormwater Management Funding and Implementation Program for highway related runoff problems and required charges paid by the state to local jurisdictions to be used solely for stormwater control facilities that directly reduce state highway runoff impacts or implementation of best management practices that will reduce the need for such facilities. A plan and progress report are required to be submitted annually so that WSDOT pays their stormwater fee to the City. This program consists of studies and improvements to city facilities downstream of limited access right-of-way implemented to remain in compliance with RCW 90.03.525. This program enables the city to keep collecting surface water fees from WSDOT for limited access right of way, and prioritizes improvements beneficial to both the City and WSDOT. It supports the city's goals of public safety and quality of life. 0.0 $96,000 AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 6 -1 SECTION 6 CAPITAL IMPROVEMENT PROJECT NEEDS 6.1 GENERAL This section includes a summary of the drainage system flooding, water quality, and habitat problems along with proposed project solutions for Utility. This section also describes the process that was used to identify the problems. Most of the information on solutions to these problems and associated costs was obtained from previous studies and documented in this Plan without further analysis. Conceptual project solutions and planning-level cost estimates were developed for a few additional problems identified during the 2007 planning effort. No additional conceptual project solutions or planning level cost estimates were identified or developed for the 2020 update. A prioritization scheme for implementation of capital improvement projects is also discussed. This section also includes a summary of the capital projects that have been identified by Utility as being needed on an annual basis. 6.2 FLOOD RISK REDUCTION The stormwater system in the City includes pipe systems, ditches, culverts, creeks, and detention facilities. Over the years, the Utility has addressed many flooding problems through solutions ranging from simple system maintenance to design and construction of complex capital projects. However, several flooding problems still exist. The Utility’s policy typically has been to address major trunk drainage system problems first, and then address localized problems that affect fewer people and cause less property damage. In addition, activities to reduce flood risk are focused on improving public safety, preventing damage to structures (including commercial buildings and private homes), and reducing the frequency of flooding. Several steps were completed during the 2007 planning effort to identify flooding problems in the City. Available drainage studies, basin plans, and other related reports were reviewed along with the list of drainage complaints downloaded from the City’s GIS database. City staff interviewed maintenance personnel and King County maintenance staff in areas that had been annexed. A preliminary list of flooding problems was compiled and reviewed to confirm which of the problems still exist and to add other problems that had not been previously included. Most of the problems within the City involve localized flooding due to the lack of a collection system, old age of the system, or an undersized conveyance system. Flooding solutions were developed to different levels of detail. For flooding problems identified from drainage complaints or by City staff that were not documented in a previous report or study, or for those that did not have a previously developed recommended solution, field reconnaissance was conducted to better evaluate the problem so that a planning-level conceptual solution and cost estimate could be developed. In these cases, the conceptual solution and cost estimate are considered very preliminary, because the solution was developed without detailed analysis (such as hydraulic analysis or survey). For flooding problems that had been documented in previous studies, project solutions were also developed and documented in most cases. The problems that were identified through the data review and collection process became projects within Utility’s CIP and are summarized in Tables 6-4a through 6-4f and organized by basin. In 2020, AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6 ‐2 these tables were reviewed and updated by City Staff, and completed projects were removed. These tables give the project number, project name, approximate location, a description of the problem, a description of the conceptual solution, and cost estimate. The approximate location of each problem is shown in Figure 6‐2. For projects where a planning‐level cost estimate was available, or if project costs were previously developed in an earlier study or design project, those costs were escalated to 2020 dollars1. Detailed cost breakdowns for some of the projects are included in Appendix C. The cost estimates that were developed from the field reconnaissance work include allowances for the following items as appropriate (see Appendix C for details): dewatering and bypass, erosion and sedimentation control during construction, construction management, surveying, permitting, engineering, administration, traffic control, mobilization, and contingencies. Some cost estimates also include allowances for land acquisition, easements, and state sales tax, if appropriate. Note that state sales tax would apply to drainage projects that are not within a road right‐of‐way or do not convey public road runoff (known as “Rule 171,” WAC 458‐20‐171). Overall, a total of 48 flooding problems were identified (see Table 6‐1 for locations). TABLE 6‐1: LOCATIONS OF FLOODING PROBLEMS Basin No. of Flooding Problems Identified May Creek Basin 4 East Lake Washington Basin 10 West Lake Washington Basin 1 Cedar River Basin 11 Black River Basin 21 Soos Creek Basin 1 Total 48 In addition, two smaller categories of flood problems shown in Table 6‐4g were added to the list of flooding problems at specific locations. One is associated with small drainage projects to account for correcting small problems like small system replacements. These projects are generally under $500,000 in construction costs and do not require extensive permitting such as Section 401, 404 permitting, and WDFW HPA. Project locations for this category are shown in Figure 6‐2. The other category which is general in nature and does not include specific projects is associated with miscellaneous storm and emergency projects that are also small and relate to various emergency storm duties such as flood response work during the wet season or responding to spills. This category is shown as a single line item that includes a description and an estimated 6‐year budget. In addition to the flooding problems identified above, the City’s GIS Drainage Complaint data was reviewed. As of July 1, 2020, there are 299 drainage complaints logged in the system, primarily on 1 Cost escalation was based on 2.5% per year through 2007, 0% in 2008, 2009, 2010, 2011, and 2012 and 3.5% per year from 2012 to 2020. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6 ‐3 private property. Of the 299 drainage complaints in the City’s database, 33 drainage complaints have an “open” status and have not been resolved, 3 drainage complaints have a “closed” status but are missing a closed date, and 7 drainage complaints have a blank status and no closed date. A list of these drainage complaints and their locations are summarized in Appendix F. 6.3 WATER QUALITY Utility includes a program to maintain or improve water quality of the surface water bodies within the City to the extent needed to protect existing or proposed beneficial uses. Utility’s efforts to improve surface water quality are prioritized with NPDES Permit compliance being the highest priority. Utility’s highest priority strategy to protect water quality is to use source control BMPs and stormwater development and redevelopment requirements to prevent untreated stormwater from entering the City’s groundwater aquifer. Numerous basins in the City are at the downstream end of upstream tributary areas that lie outside the City’s boundary and jurisdiction. Some of these upstream areas have water quality that is already impaired before it reaches the City. Therefore, water quality in these basins is difficult to control due to background water quality standards being poor. Table 6‐2 lists the beneficial uses of the more significant water bodies in the City based on a questionnaire mailed out to all utility customers in 1995 (HDR, 1995). Highest priority is given to water bodies with swimming, given the potential health implications. These water bodies are: Johns Creek, which flows through Coulon Park; the Cedar River; and the near shore of Lake Washington. TABLE 6‐2: EXISTING BENEFICIAL USES Water Body Viewing Boating Swimming Fishery Wildlife Johns Creek Yes No No1 No No Lake Washington Yes Yes Yes Yes Yes Cedar River Yes Yes Yes Yes Yes Maplewood Creek Yes No No Yes Yes Tiffany Creek No No No No Yes May Creek Yes No No Yes Yes Honey Creek Yes No No Yes Yes Springbrook Creek2 Yes No No Yes Yes Panther Creek Wetland Yes No No Yes Yes Panther Creek Yes No No Yes Yes Black River PS Pond Yes No No Yes Yes Soos Creek Yes No No Yes Yes 1. Although swimming does not occur in Johns Creek, its quality can affect conditions of the swimming beaches in Coulon Park located at the mouth of Johns Creek. 2. A spring at the headwaters of Upper Springbrook Creek, which is tributary to Springbrook Creek provides 17% of the City’s water supply. The existing water quality conditions for these water bodies and other basins and subbasins are presented in Section 2. This section summarizes existing water quality problems. Some of these AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6 ‐4 problems are also recognized on Ecology’s 303(d) list of impaired water bodies (see Table 4‐1). As noted previously in Section 4, waters on this list require a TMDL study, which determines the allowable pollutant loading for the receiving waters for the water quality parameter causing the water quality impairment. It is the responsibility of the state to perform the TMDL studies. Waters on the 303(d) list are prioritized for TMDL studies, but the state has limited resources and the timing for implementation of TMDL studies is likely several years off. The following section summarizes water quality problems within the City by basin (generally summarizing information contained in Section 2). 6.4 EXISTING WATER QUALITY AND ITS EFFECTS ON BENEFICIAL USES The following paragraphs give a brief summary of the existing water quality in each of the City’s significant water bodies and its possible effect on existing beneficial uses. 6.4.1 JOHNS CREEK Johns Creek is a small tributary of Lake Washington located in WRIA 8. The Johns Creek basin covers approximately 1,236 acres and is located east of Cedar River, in the northeastern portion of Renton. The upper subbasins are dominated by residential and commercial land use, and the lower sub‐basins are dominated by industrial and commercial uses. Summer is the period of most interest, because of swimming and other water activities at Coulon Park. Water quality during dry weather is generally good with some exceptions due to fecal coliform bacteria. The ten‐state standard, used to determine whether fecal coliform poses a risk to public health, has been exceeded at the swimming area of Gene Coulon Park in Lake Washington in the past (Herrera, 2006). It is known that waterfowl and other wildlife are the primary source of high fecal coliforms in the Johns Creek system via the bacteroides PCR testing method as stated in the Gene Coulon Park Microbial Source Tracking Study conducted in 2006 (Herrera, 2006). A small portion of the problem may be caused by discharges of sewage into the storm drains by older exfiltrating and/or improperly connected sanitary sewers. If they exist, sewage discharges should be eliminated, given the importance of Coulon Park. 6.4.2 LAKE WASHINGTON Ecological function in Lake Washington is facilitated primarily by water quality alterations in tributary basins and water quality and physical alterations along the shoreline (Parametrix, 2008). Most Lake Washington tributaries are highly developed, which limits restoration potential. May Creek and the Cedar River are the least developed basins draining to Lake Washington and also support a high degree of watershed function. These watersheds have the greatest potential for management actions to protect and restore ecological functions in the lake. These are discussed in greater detail below. Lake sediments are a sink for pathogens and toxins, and sediment quality can influence lake ecology. As noted in Section 2, due to the limited transport and mixing of sediments, poor sediment quality is usually localized in stream deltas and at old industrial sites (Parametrix, 2008). 6.4.3 CEDAR RIVER The Cedar River is approximately 45 miles long and originates in the Cascade Range. It generally flows west and northwest, eventually emptying into the southern end of Lake Washington. The Cedar River is AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 6 -5 on Ecology’s 2016 303(d) list for violation of temperature, dissolved oxygen, and pH water quality standards. The lower Cedar River has good water quality with the highest quality water in the upper reaches and decreasing water quality as the river flows through developed urban and suburban areas. Ecology has two water quality monitoring stations along the Cedar River, one near Landsburg and the other in Renton at Logan Street. The WQI score at these locations for water years 2016, 2017, and 2018 were above 85 for the Logan Street station and above 93 for the Landsburg station (Freshwater Information Network, 2020). Both scores are above the threshold value of 80 for “good” water quality, per the Washington DOE river and stream water quality index, indicating that the water quality at these locations meet expectations and these areas are of lowest concern for water quality issues. As noted previously, the upper portions of the watershed are largely undeveloped and provide more pristine runoff to the Cedar River. The upper watershed is a protected area of about 90,000 acres and is owned by the City of Seattle. The upper watershed is called the Cedar River Watershed and provides drinking water to the greater Seattle area at the Landsburg diversion. The lower Cedar River watershed has been extensively altered and was re-routed in 1912 from draining into the Black River to draining into Lake Washington. By 2001, approximately 64% of the lower Cedar River was modified on at least one bank, which, coupled with decreased flows, had narrowed the river from a historic average of 250 feet in width to 110 feet (Kerwin, 2001). The loss of floodplain and riparian connectivity in the lower Cedar River has affected storage, sediment, and contaminants, and it has simplified in-stream habitat. 6.4.4 MAPLEWOOD CREEK AND TIFFANY (GINGER) CREEKS There is limited recent data available for Maplewood and Tiffany creeks, but they likely have good water quality during dry weather. Limited data indicate that pollutant concentrations become elevated during storms, in particular metals and nutrients and probably petroleum products. It is likely that the water quality standards for some metals are exceeded during storms. The Cedar River Basin Current and Future Conditions Report (King County, 1993) documented a septic failure rate of approximately 13% within the Maplewood Creek subbasin, but it is believed that many of these failures have been corrected since 1993. 6.4.5 MAY CREEK The May Creek watershed covers about 8,960 acres in Renton, Newcastle, and unincorporated King County and includes 26 miles of mapped streams, two small lakes, and over 400 acres of wetlands. Headwaters are mostly forested ravines and include a significant portion of the undeveloped parkland on Cougar Mountain. The lower, western portion of the basin is inside the UGA and is a fairly dense urban residential development area with some undeveloped forested areas. Trend results (discussed in Section 2) indicated that water temperature, conductivity, and ammonia-nitrogen have increased significantly, while pH, TSS, and nutrient concentration (ortho-phosphorus, nitrate, and total nitrogen) have decreased. May Creek’s 2018 water year WQI score was 70 out of 100. May Creek is listed as impaired for temperature, fecal coliform bacteria, and bioassessment on Ecology’s 2016 303(d) list. Input of waste to the creek from livestock and septic systems on the upland plateau likely contribute to the presence of fecal coliform within the creek. 6.4.6 HONEY CREEK Honey Creek drains approximately 962 acres of mixed commercial and residential land. Limited data on Honey Creek indicates that water quality is good during dry weather and that turbidity and metals AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6 ‐6 conditions worsen during storms. The fishery is degraded, but most likely due to excessive stormwater flows and the lack of habitat structure rather than the temporary degradation of water quality during storms. Part of the reason for the lack of habitat structure is a sanitary sewer line running down portions of the creek, which affected the creek bed and some of the banks many years ago. 6.4.7 SPRINGBROOK CREEK Springbrook Creek is the largest subbasin in the lower Green River Basin with a watershed of about 24.6 square miles. Springbrook Creek is 12 miles long, with about 3.5 miles located in the City. Within the City, the creek was extensively modified and straightened for agricultural drainage in the 1920s by King County Drainage District No. 1. Springbrook Creek has the most degraded water quality in the City. Water quality is degraded during both dry and wet weather, which is unique compared with other streams in the City, except possibly May Creek. In contrast, the water quality of other water bodies in Renton appears to be degraded only during storms. It is likely that poor water quality during the summer has severely degraded rearing conditions for salmonids. Water quality is severely degraded as Springbrook Creek enters Renton from Kent. Water and sediment quality do not appear to change significantly as Springbrook Creek flows through the City. Contaminated sediment was removed in the early 1990s from 1,600 feet of creek bottom in Kent. A comparison to stream sediment in Renton indicates that its quality is similar to that removed in Kent, suggesting the possibility that some sediment in Springbrook Creek within Renton could be contaminated enough to require removal. The Springbrook Springs Watershed is of one of the City’s water supply sources, and is a point of concern for contamination. The watershed is located at the headwaters of one of the Springbrook Creek tributaries, called Upper Springbrook Creek. This watershed, however, is above the areas experiencing sediment contamination and the more highly degraded water quality of Mill Creek (Kent) and Springbrook Creek (Kent). Nevertheless, appropriate BMPs should be implemented within the vicinity of this watershed to protect the quality of the spring water. The extent of development in the Black River/Springbrook Creek watershed severely limits the potential for restoration. In addition, the stream gradient is virtually flat and morphologic complexity is lacking due to straight channels, no large woody debris (LWD), and loss of forested riparian features. There exists restoration potential for the stream buffer in any existing undeveloped open space along the mainstem with wetland restoration and re‐creation. On‐going wetland enhancement and restoration is currently occurring as part of a joint effort by WSDOT and the City to create a wetland mitigation bank. WSDOT and the City implemented a joint, multi‐site wetland mitigation bank that includes 130 acres of wetland restoration, rehabilitation, and enhancement. Three of the wetland mitigation sites are contiguous to Springbrook Creek, and two other sites may be associated with the City shoreline planning jurisdiction. The mitigation bank sites are located in the Renton valley between SW 27th Street and the city limits at SW 43rd Street. 6.4.8 BLACK RIVER PUMP STATION Most of the pollutant loading carried by Springbrook Creek is probably deposited in the pond that acts as the forebay for the BRPS. Further, the Naches Avenue drain, which discharges directly into the pond, drains a large commercial area, much of which was developed prior to when the City required water quality treatment. Therefore, this drain likely carries a substantial pollutant load during wet weather AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6 ‐7 conditions. The data are too limited to allow firm conclusions on the risks to beneficial uses in the pond. Of particular concern is the health of the heron rookery and the biological community upon which it depends. 6.4.9 PANTHER CREEK WETLAND There are no data for the Panther Creek Wetland. The wetland likely removes a significant fraction of the stormwater pollutant loading coming from the Panther Creek watershed and from Rolling Hills Creek during high flows when the creek backs up into the wetland. During low flows, Rolling Hills Creek does not back up into the wetland. 6.4.10 PANTHER CREEK There is no available information for Panther Creek. However, the watershed for this creek is less developed and the creek generally has a good riparian corridor that could provide shade and filter sediments. Based on this, it is anticipated that the water quality is good. 6.4.11 BIG SOOS CREEK There is no available data for Big Soos Creek within the city limits; however, just south and within unincorporated King County, Big Soos Creek is listed on Ecology’s 2016 303(d) list for dissolved oxygen and bacteria. Ecology is in the process of developing two TMDLs for the Soos Creek watershed including Big Soos Creek in coordination with other jurisdictions with the watershed, including the City. 6.4.12 OTHER WATER BODIES Gypsy Sub‐Basin (unnamed creek): There is no water quality data for this creek. The creek has little or no flow during the summer. It is likely that the water quality is very good during dry weather. Because of development, pollutant concentrations during storms are elevated in some metals, nutrients, and petroleum products. It is possible that the standards for some metals are exceeded during storms. Kennydale Creek: Kennydale Creek and several storm drains discharge to Lake Washington in the vicinity of Kennydale Beach Park, where swimming occurs. This area is sewered and is therefore unlikely to contaminate the beach along the park with fecal coliform bacteria from humans. Given the importance of the park, some testing during and immediately following summer storms may be appropriate in the future. Rolling Hills Creek: Water quality during dry weather is probably fair to good. Limited data collected during storms indicate high concentrations of metals and nutrients. It is likely that the standards for some metals are exceeded during storms. 6.4.13 WATER QUALITY SOLUTIONS Water quality problems are being addressed primarily by water quality programs described in Section 3 to meet compliance with the NPDES Permit. The City does not generally construct stand‐alone water quality projects; however, three water quality retrofit capital projects and a retrofit study are proposed that would significantly improve water quality within the City. Because these projects are considered retrofit projects, they are eligible for water quality grants from Ecology. The City applied for and AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6 ‐8 received approximately $2.74 million in grants from Ecology to fund at least 75% of the eligible design and construction costs. Project name, descriptions, number, approximate location, and cost estimates for these projects can be found in Table 6‐5 (located at the end of this section). Figure 6‐3 shows the project locations. 6.5 HABITAT RESTORATION AND PROTECTION The City is interested in habitat restoration and protection, and there have been numerous efforts both locally by the City and regionally with WRIA planning efforts. The WRIA planning efforts have focused on local and regional efforts to identify habitat and resource problems and needs. As previously mentioned, the May Creek, Cedar River, and East and West Lake Washington Basins are all part of WRIA 8. The Springbrook/Black River and Soos Creek Basins are part of WRIA 9. The following paragraphs provide a brief background of these WRIA planning efforts. Section 2 provides a general description of the habitat resources and conditions within the City. WRIA planning is in response to the State Salmon Recovery Planning Act, which in turn was in response to the ESA listings. The Washington State Legislature established the Salmon Recovery Act (RCW 77.85) through House Bill 2496 for the improvement and recovery of salmonid fish runs throughout the state. This act established a Salmon Recovery Office within the Office of the Governor to coordinate a state strategy for salmon recovery to healthy sustainable population levels with the purpose of coordinating and assisting the development of salmon recovery plans. The Salmon Recovery Act authorizes a lead entity (e.g., county, city) in a WRIA to establish a steering committee to develop local watershed projects that address habitat concerns. The role of the committee is to compile a list of projects, prioritize project implementation, establish priorities for individual projects, and submit the list to the Salmon Recovery Funding Board (SRFB) for funding. Salmon conservation plans for WRIAs 8 and 9 were completed in 2005. These plans, together with other plans prepared throughout the Puget Sound region, became part of the official Puget Sound Salmon Recovery Plan, which was approved by NOAA Fisheries in 2007. The WRIA 8 plan was updated in 2017. These plans contain recommendations for protecting and restoring salmon habitat, from general land‐ use recommendations applicable throughout the watershed to small and large, site‐specific habitat restoration projects. FIGURE 6‐1. SOCKEYE IN CEDAR RIVER (YR. 2010) The responsibilities of the WRIA steering committees, which operated generally from the late 1990s to 2008, was passed on to the Watershed Ecosystem Forum, which began operating at the beginning of AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6 ‐9 2009. The Watershed Ecosystem Forum combined the membership of different WRIA steering committees and the membership of the forum of local governments. The City committed to help implement the recommendations of these plans through a variety of methods: partial funding, local sponsorship, expedited permitting, and engineering/planning coordination. The level of local support varies between projects. Based on the WRIA planning information and other local habitat studies and prior investigations, the City identified a total of 26 potential habitat projects, which are summarized in Table 6‐6. No cost estimates are included in the table at this time because detailed costs have not been developed and the City’s potential contribution to the cost of each project could vary significantly. For planning purposes, a preliminary range of cumulative costs for all habitat projects was assumed to be $4 million to $8 million. The locations of these potential habitat projects are shown in Figure 6‐3. 6.6 MISCELLANEOUS PROGRAMS AND REGULATORY PROJECTS Table 6‐7 lists miscellaneous programs and regulatory compliance projects that have been identified by the City as being needed on an annual basis (through the six‐year CIP planning period). These reflect a wide range of activities such as NPDES permit compliance, mosquito abatement, facility fencing, system mapping, inventory and monitoring, and the City‐wide drainage maintenance program, and asset management program. The total cost for these programs is approximately $18.2 million, to be spread out over the six‐year planning period. Note that in this table, the costs included for the various NPDES compliance elements is consistent with the high range from Table 5‐1. 6.7 CAPITAL PROJECT PRIORITIZATION Many of the capital projects identified in Tables 6‐4 through 6‐7 will take many years to implement. As such, a prioritization scheme was developed with City staff to help guide when projects should be implemented. The prioritization scheme focused on flooding‐type problems within the City and includes three levels of priority. A prioritization scheme for habitat projects was not developed, because these projects will often be driven by factors outside the City’s control, including input from WRIA planning activities, resource agencies, and joint funding agreements. The prioritization scheme for flooding projects is as follows: Priority 1 Projects: Highest priority projects considering public safety; flooding of arterials that potentially close emergency vehicle access; the number of buildings flooded (numerous buildings vs. one or a few) and the extent of flooding and potential cost of flood damage; and the recurrence of flooding (how often an area gets flooded). Priority 2 Project: Projects that may include many of the same factors as the Priority 1, but are not considered a significant safety hazard. They may flood one or a few buildings compared to several, or may be subject to flooding on very rare occasions. Priority 3 Projects: Third priority projects temporarily flood local streets or public/private yards, but do not result in significant safety hazards or property damage. Additionally, a fourth category of flooding projects was identified. This category involved flooding projects with emphasis on habitat benefit. These projects did not fit well within the priority ranking scheme, and their implementation will often be driven by multi‐jurisdictional involvement. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 6 -10 In general, it is the City’s goal to implement the Priority 1 projects during the next 6-year CIP planning period, or as funding allows. The specific order and timing of project implementation for the currently 6- year CIP developed as a part of this plan is discussed in Section 7. However, it is noted that the order in which the projects will be implemented within both the 6-year CIP and the priority groups will be updated annually as part of Utility’s annual CIP planning process. Priority 2 and 3 projects could be funded in later years as funding becomes available and other projects get completed. Other factors also are considered on a case-by-case for projects across the three priorities. On occasion, this may change the relative position between projects. One important consideration is whether a project could be implemented early to take advantage of “opportunistic” factors such as funding or scheduling opportunities. Funding opportunities periodically arise when a grant becomes available. Grant programs often target different types of projects. For example, if a particular grant program targets salmon recovery, projects with habitat elements may be bumped ahead of flooding projects in an effort to obtain grant funding to offset the project costs. Scheduling opportunities become available when surface water projects can be combined with other City projects to reduce construction costs. An example is when a conveyance system upgrade is implemented at the same time that a street, water, or sewer improvement project is being built, so that a portion of the project’s cost, such as the costly roadway restoration, mobilization, and demobilization, is shared between Utility and the other City department. Another factor in prioritizing projects is the fact that some projects may provide additional habitat benefits or may be counted as mitigation for another project. For example, when comparing two flooding projects that may otherwise provide equivalent flood risk reduction benefit, but one also benefits habitat, the priority should be given to the latter. Using these prioritization considerations, the City developed a priority ranking as presented in Table 6-8. The Priority 1 projects total $46.6 million. The total costs of Priority 2 and 3 projects are approximately $12.3 million and $9.2 million, respectively. The total cost of the flooding projects with habitat emphasis is approximately $922,000. Table 6-3 provides an overall summary of the CIP and program cost breakdown over the 6-yr CIP planning period, including the flooding projects by priority category, as well as annual projects, habitat projects, and water quality projects. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 6 -11 TABLE 6-3: 6-YEAR CIP SUMMARY Projects Cost (2020 Dollars) Programs and Regulatory Compliance (estimated cost during 6-year CIP period) (from Table 6-7) $18,174,960 Water Quality Retrofit Projects1 (from Table 6-5) $4,421,000 Priority 1 Projects for Flood Control (from Table 6-8) $46,581,000 Priority 2 Projects for Flood Control (from Table 6-8) $12,287,000 Priority 3 Projects for Flood Control (from Table 6-8) $9,249,000 Projects for Flood Control with Habitat Emphasis (from Table 6-8) $922,000 Annual Capital Projects for Flood Risk Reduction2 $176,000 Habitat Projects (from Table 6-6) $4 million to $8 million3 1. Several flood control projects and habitat projects will have elements that improve water quality. 2. Average annual maintenance costs of Projects 303 and 302 (from Table 6-8). Total project costs for 303 and 302 are included in Priority 1 Project Costs. 3. Cost for Habitat Projects provided is a range. Many projects will be partially funded from other sources and City's participation will vary between projects. AGENDA ITEM # 9. a) !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(""§¨¦405§¨¦405UV900UV900UV900UV169UV515UV181UV515UV167UV167UV167Lake BorenLake YoungsPanther LakeLakeWashingtonBlack RiverForbay221263531571206121111256281215416526566541279251271237211213101521146156456302303261411421546551431506516217151231234240179180285621275116511265269187282246245560259268238185160555543615102287273242218218999998Figure 6-2: Flooding Problems and Annual Maintenance Project LocationsProject Types!(Priority One Flooding Project!(Priority Two Flooding Project!(Priority Three Flooding Project!(Flooding Projects with Habitat Emphasis "Annual Maintenance ProjectRenton City LimitsμSurface Water Utility - GIS | Printed Date: 12/10/202000.510.25 MilesAGENDA ITEM # 9. a) ###########################XWXWXWXW§¨¦405§¨¦405UV900UV900UV900UV169UV515UV181UV515UV167UV167UV167Lake BorenLake YoungsPanther LakeLakeWashingtonBlack RiverForbayC208C212C214129C204C203C268C269C267C270C270C266C206C207C209214C201C205C210C211C213C264C265C288S19C202L101W803W800W801W802Figure 6-3: Water Quality Retrofit and Habitat Project LocationsμSurface Water Utility - GIS | Printed Date: 12/11/202000.510.25 MilesProject Types#Habitat ProjectXWWater Quality Retrofit ProjectRenton City LimitsAGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐14 TABLE 6‐4A: FLOODING PROBLEMS: MAY CREEK BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 411 May Creek Outfall @ NE 36th Street NE 36th Street Outfall to May Creek (near Lincoln Avenue NE) Runoff from the upstream basin drains down‐slope via NE 36th Street and discharges at the top of the steep slope at Lincoln Avenue NE and NE 36th Street. Continued erosion into May Creek results and may cause future steep slope failures. Historical runoff from this development should have split development flow with a project that directs half of the upper development flows down toward May Creek (from East to West direction) on NE 36th Street. A conceptual solution that is part of the May Creek Outfalls Master Plan is needed. $658,000 421 May Creek Outfall @ NE 30th Street Outfall at NE 30th Street into May Creek The NE 30th Street outfall pipe draining into May Creek is undersized and cannot pass future condition flows. No upstream complaints from nearby residents have been noted, but future upstream condition flows has a high potential to exceed discharge capabilities of the outfall pipe. The pipe is approximately 320 feet in length and would need to be upsized and modified to HDPE and anchored into the slope to accommodate future conditions runoff from the upstream basin. The existing outlet into the riprap outfall pad (the riprap pad was upgraded as part of the May Creek Site #1 Project) shows an existing 12‐inch to 18‐inch CMP discharge pipe size. One conceptual solution would be to replace it with an above ground, heat fused, HDPE helical anchored pipe. The existing outfall does not need to be improved because it was modified as part of the May Creek Bank Stabilization Project (Site #2) in 2006. This project would be outside of the OHWM, therefore an HPA may not be needed. $658,000 431 Honey Creek Outfalls Plan Honey Creek Slope Outfalls (Various Locations) Various outfalls discharge to unarmored steep slopes that drain into Honey Creek and cause erosion and downstream sedimentation problems. Develop a Honey Creek Master Plan that would address stormwater runoff on top of steep slopes. If the problems are allowed to continue, a potential for slope failure can develop due to increased runoff rates and volumes on steep slopes. $263,000 456 NE Sunset Blvd at Union Avenue NE NE Sunset Boulevard (Union Avenue NE to Duvall) Honey Creek runs in a series of ditches and pipe systems that flow under parking lots, under buildings, and in public rights‐of‐way. Much of the system is poorly mapped, and the sections on private property may not have easements. Development has increased runoff into the drainage system. The drainage system may be near full capacity, and portions of the pipe system may be deteriorating. Honey Creek also flows under a shopping center, Sunset Blvd, and Union Ave NE in two old CMP arch culverts. The capacity of the CMP arch culverts and sections of open channel needs to be evaluated since they appear to be near full capacity during large storm events. Identify and survey the location and elevation of the existing storm system that conveys Honey Creek. Inspect various sections of the storm system for problems, structural integrity, and estimated service life. Identify existing ownership, easements, and maintenance responsibility of various sections of the system. Perform a Hydrologic and Hydraulic Report for the storm system to determine the peak runoff from the basin and flow capacity of the existing system. Phase 1 would involve developing a planning report to identify deficiencies in the drainage system, identify conceptual solutions, and plan for future design projects. High risk problem areas should be identified in the Phase 1 report. Phase 2 would involve design and construction of selected improvements. Potential improvements may include bypassing the existing system and/or obtaining easements to correct and upgrade the existing storm system with new pipe or pipe liner. Phase 3 of the project would involve design and construction of any remaining improvement, as needed. $2,250,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐15 TABLE 6‐4B: FLOODING PROBLEMS: EAST LAKE WASHINGTON BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 506 John’s Creek Culverts Sediment Cleaning John’s Creek Sediment (Park Avenue / Lake Washington Boulevard) Sediment has accumulated within a series of detention ponds and inside the creek culverts (the ponds look like wide swales). Increased development runoff from public and private properties drain into the John’s Creek stormwater system and may cause flooding in this area. The John’s Creek culverts are either full or partially full of sediments decreasing conveyance flow capacity and may cause upstream flooding. This system is connected to the upstream Landing’s storm system. Reduction of capacity on the John’s Creek facilities will result in backwater and flooding issues. The total tributary area that currently drains to the Johns Creek outfall is approximately 1200 acres. Some of the culverts are privately owned. The proposed solution includes excavation of the sediment deposits in the ponds upstream of the culverts. Permitting for work in stream and possibly wetlands may be required. The following are some additional considerations/options associated with the private culverts: 1. City cleans the culverts and bills the property owner who owns the culverts. 2. City cleans the culverts and does not bill the property owner. However, this may establish a precedence that the City will maintain the culverts. 3. Work with the property owner to clean the culverts jointly via a cost share and future agreements. $165,000 511 John’s Creek Culvert Crossings Located near entrance to Gene Coulon Park The culverts located at the entrance of the park are at or near full capacity even after cleaning of the sediments in the ponds and culverts. Additional upstream development may cause future problems that would require the culverts to be upgraded to a box culvert system. The culverts are a mix of public and private facilities. The public culverts located under BNSF and Lake Washington Blvd N. may need to be improved and the private culvert system was improved in 2016 by a private development. Any new developments upstream will require this system to be evaluated and improved. $1,200,000 516 South Lake Washington Roadway Improvement Discharge to John’s Creek Pipe Replacement Project from the Landing Project to John’s Creek Outfall 400 feet of an existing 48‐inch CMP pipe needs to be replaced with 60‐inch pipe. This pipe was not replaced as part of the South Lake Washington Road Improvement Project due to the late timing of the road project and inability to secure an HPA in time for construction during the summer construction months. The existing 48‐inch pipe does not have enough capacity and its capacity may be further reduced due to sediment buildup from recent upstream construction. The project includes replacing an existing 48‐inch CMP with 60‐inch pipe. The Transportation Department will provide funding on this project due to its being part of the South Lake Washington Roadway Improvement (SLWRI) Project that was not included within SLWRI construction because of project’s timing and permitting issues. $988,000 521 Johns Creek Outfall ‐ NE 8th Street to Houser Way N. NE 8th Street to Houser Way N. (I‐405 to Johns Creek Outfall) Frequent localized flooding of streets and private properties occurs on Houser Way North with ponding occurring during large storm events near the I‐405/Park Avenue/Houser area. The Houser Way N. street storm system lacks adequate capacity to convey storm runoff due to flat grades. The lack of downstream capacity may exacerbate the problem in this system along with increased upstream runoff from new developments and WSDOT. The proposed Houser Way North storm system improvements include replacement of 2,500 linear feet of storm drain. As part of the WSDOT improvements along this area there is future interest from WSDOT to expand the I‐405 limits and upgrade this downstream system in order to prevent flooding and backwater on Houser Way. The John’s Creek H&H report, by WSDOT, has analyzed this system and suggests improvements if the I‐405 expansion project is approved for construction. $1,450,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐16 TABLE 6‐4B: FLOODING PROBLEMS: EAST LAKE WASHINGTON BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 531 Kennydale Master Drainage Plan Kennydale Master Drainage Plan (Example: N 30th Street and Burnett Avenue N.) The North/Lower Kennydale area (west of I‐405) has sheet‐flow runoff that crosses private properties due to lack of a defined street collection and conveyance system. This lack of a defined street and conveyance system will result in more frequent future flooding as increased upstream development occurs. In addition, no major storm conveyance ‘trunk‐lines’ exists to convey runoff to Lake Washington. With increasing development, this problem is increasing downstream flooding onto private properties and has a potential to flood Lake Washington Boulevard in the future. For example, new home construction with footing drains and large impervious roof structures now discharge runoff onto the streets. An identified problem is at Burnett Avenue N. that has a history of garage flooding due to lack of a defined drainage system to convey flow around the property. Develop a Kennydale Master Drainage Plan to address all problems in the North/Lower Kennydale area, develop a risk assessed project priority list, and potential alternatives for each project. The Plan would suggest storm system improvements for the problem area, provide a high level cost estimate for each project, coordinate with the Transportation and other City departments on sidewalk, street, utilities, and other future composite improvements with known asphalting schedules. In addition, all outfalls and Lake Washington Boulevard storm crossings should be analyzed for this area and include recommendations for a trunk‐line collection system that crosses Lake Washington Blvd at certain areas. Development of a neighborhood local improvement district is a potential option for this project area. $395,000 541 East Lake Washington Blvd and NE 28th Street Drainage East Lake Washington Blvd and NE 28th Street This local flooding issue is related to the Lower Kennydale problem description (see also ID 531). City street runoff and other upstream areas contribute runoff onto this lower private property due to lack of street curb and gutter system and storm system trunk‐line. This problem, that is typical for the Kennydale area, should be addressed as part of the Kennydale Master Drainage Plan (KMDP). Design and construction should evaluate alternatives and suggest feasible recommendations via the KMDP study. $329,000 546 Meadow Avenue North Culvert on Kennydale Creek Kennydale Creek Culvert Crossings (at Meadow Avenue N. & N. 28th Street and Jones Avenue NE Culvert Crossing) The Meadow Avenue North culvert needs to be replaced due to capacity issues associated with increased upstream development runoff. As part of the I‐405 expansion and increased impervious surface runoff, WSDOT may design and construct this replacement project as part of the I‐405 expansion work. $2,630,000 551 Jones Avenue NE and NE 20th Street Old Blueberry Farm at NE 20th Street and west of Aberdeen Ditches, culverts, and pipe system have had problems in the past with capacity issues that cause flooding of roadway and private properties. Upstream runoff is a mixture of public and private runoff. Much of the existing ditch system has inadequate capacities to convey upstream runoff. Additional development upstream will cause future downstream flooding problems in this area. The existing ditch system north of NE 20th Street is on private property. Develop a storm‐water collection and conveyance system to direct runoff within the existing City right‐of‐ways from NE 19th Place to Jones Avenue NE. The proposed system along Jones Avenue NE and NE 20th Street should be evaluated for existing and future land use conditions for the contributing upstream basin. $336,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐17 TABLE 6‐4B: FLOODING PROBLEMS: EAST LAKE WASHINGTON BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 566 Jones Avenue NE/ NE 43rd Street Culvert and Storm System Improvements Jones Avenue NE and NE 43rd Street Flooding of the culvert system occurs across NE 43rd Street due to flat grades in the area, sediment accrual at the inlet, backwater, and the undersized ditch system along NE 43rd Street. Flooding of street occurs during higher rainfall events and limits access into Presbyterian Church and Jones Avenue NE residents. Overflow of existing ditch, due to lack of culvert and downstream system capacity, results in ponding across the street and at the Church during higher rainfall events. Preliminary study needed of this problem that includes hydrologic and hydraulic analyses to define solutions. Recommendations and alternatives should include replacing existing 24‐inch CMP at NE 43rd Place with a 4‐foot wide by 6‐foot high concrete box culvert. In addition, the NE 43rd Street ditch needs to be analyzed and recommendations developed to alleviate flooding problems. One potential solution is described below. Ditches carrying sediments from a steep uphill area backs water up and floods area due to flat grades downstream, undersized culvert crossing at NE 43rd Street. Potential solution is to reroute to May Creek system 1400 feet to the south which may need to 'buck' road grades 13 feet to drain to May Creek ($700,000 for this option). Cost of solution provided in estimate is for this option. $922,000 571 Lincoln Avenue NE Culvert Improvements Lincoln Avenue NE and NE 43rd Place The Lincoln Avenue NE culvert, at NE 43rd Place, has runoff overtopping across the road during high rainfall events. Flooding causes traffic safety issues on Lincoln Avenue NE. The upstream culvert inlet debris cage needs to be cleaned out each year and after each large storm event. The adjacent property to the south of the culvert has had erosion and flooding problems from culvert overflow that was redirected. High sediment loadings from the upstream tributary area, located in the City of Newcastle, plug the culvert inlet frequently and greatly reduce the inlet capacity. Lincoln Avenue NE and NE 43rd Place Culvert Improvements – Some conceptual solutions include re‐grading the existing ditch, installing log weirs upstream of the culvert (along with a maintenance access road adjacent to the log weirs), replacing the existing grate with a new trash rack type, and installing a new overflow manhole at the culvert inlet. A Tt/KCM report stated that the ditch and pipe conveyance system improvements or other alternatives need to be designed to ensure the system is not subject to constant maintenance issue during high rainfall events. $198,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐18 TABLE 6‐4C: FLOODING PROBLEMS: WEST LAKE WASHINGTON BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020 costs) 621 Black River Box Culvert Maintenance Black River Box Culvert – Major Maintenance This box culvert receives runoff from Renton Avenue and the airport area. Its capacity is limited due to years of sediment buildup within the culvert. Potential for contaminated sediment exists in this box culvert. This project should be coordinated with funding from the City Airport due to potential hazardous waste material generation and Airport drainage runoff being sent to this culvert. Runoff for this box culvert is carried directly to Lake Washington. $1,320,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6-19 TABLE 6-4D: FLOODING PROBLEMS: CEDAR RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 101 Cedar River Gravel Removal Project (From Williams Avenue Bridge to N. Boeing Bridge) The project is a continuation of the Cedar River Section 205 Flood Damage Reduction Project. The regionally significant project solved major river flooding from Williams Avenue to Lake Washington that resulted in flooding of the Renton Municipal Airport, Boeing facilities and the north Renton. River flooding has caused extensive damages in the past. Additionally, natural sediment transport and deposition in the Cedar River, a highly aggradational river, gradually buildups sediment in the lower Cedar River from avulsed upstream basin areas. Sediment accumulation in Lower Cedar River from Lake Washington to Williams Ave S (Section 205) causes the reduction in flood protection level of the floodwalls and levees in that reach which flows through Boeing and the Renton Municipal airport. Programmed funding is for the design, permitting, and completion of the gravel removal from Section 205 river bed, as well as required project mitigation activities, monitoring of spawning channel fish use, and yearly monitoring of sediment accumulations in the lower 1.25 miles of the Cedar River. $14,966,000 (Funds to be provided by the King County Flood Control Zone District) 111 Monroe Avenue NE and NE 2nd Street 301 Monroe Avenue NE The 245-acre subbasin influent to the existing storm system currently drains untreated runoff to a 670-foot-long 36-inch perforated infiltration pipe along NE 2nd street and a 200-foot-long 48-inch perforated infiltration pipe along the King County Access Road, both with insufficient capacity. Therefore, during large storm events, stormwater currently overflows via two outfalls from the trunkline on Monroe Ave NE to 301 Monroe Ave NE, a property commonly referred to as the Upper Balch Pit. Here, stormwater ponds and infiltrates into the native soil. Before the construction of the temporary outfalls to the Upper Balch Pit in 1996, there were several incidences of flooding at the intersection of NE 4th St and Monroe Ave NE. As the property owner of the Upper Balch Pit, Segale Properties, LLC, is in the process of filling the pit for future development of multifamily residential lots, termination of the easement that allows for the City’s existing stormwater overflow system is expected by 2023. Therefore, the City must construct a new drainage outlet for the subbasin. This project will design and construct a permanent drainage and water quality treatment solution to replace the expiring temporary stormwater overflow from Monroe Ave NE into a private property at 301 Monroe Ave NE. In the proposed design, stormwater runoff from the Monroe Ave NE Basin will enter the Upper Balch Pit site from the storm system along Monroe Ave NE. Runoff will be conveyed via storm pipe to the northwest corner of the site to a hydrodynamic separator and flow splitter, which then outlets the stormwater to open channels via a level spreader. Stormwater will then pass through a surficial facility for enhanced basic water quality treatment, before entering a Stormtech Chamber gallery for infiltration into the native soil. Newly treated and infiltrated stormwater will recharge the groundwater table, and feed the Cedar River approximately 3,800 feet southwest of the Upper Balch Pit site. $6,350,000 116 Ginger Creek/Cascade Park Basin Plan SE 162nd Street to Cedar River Pipeline (Cascade Park) (Tiffany Park Culvert) Cascade Park drains north through a neighborhood via an old concrete pipe and open channels. The runoff eventually reaches the Cedar River Pipeline ROW, via an old steel pipe, and is routed under the Tiffany Park area. The existing pipe system surcharges during moderate events flooding Cascade Park. House #12512 located at SE 164th Pl. also experiences flooding from backwatering from the Cascade Park storm system. Based on a cursory site visit, it appears that sediment buildup in the open channel section between SE 160th Street and the Cedar River Pipeline ROW as well as storm pipe grade issues downstream maybe contributing to the backwater conditions and consequential flooding in the park and neighborhood to the south. A study is proposed to determine the primary cause of the problem, evaluate alternative solutions and develop a design of the preferred solution. The proposed solution should include an HPA due to work within potential wetlands and ditches. $350,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6-20 TABLE 6-4D: FLOODING PROBLEMS: CEDAR RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 121 Lower Maplewood Conveyance Improvements Lower Maplewood Creek (Behind Maplewood Glen, north of Maple Valley Highway) Flooding of homes and property in the plat of Maplewood Glen during extreme rain events. Existing culverts may be undersized and pipe conveyance capacity to the Cedar River may be inadequate. Erosion and sediment deposited into the ditch is also an issue during high flow events downstream of the Sunnydale Outfall structure. Lower Maplewood Conveyance Improvements – Ditch, culvert, and storm drain system improvements from the Maplewood plat to the discharge at the Cedar River is needed. $557,000 146 NE 4th Street Crossing at Maplewood Creek Study NE 4th Street Culvert Crossings (at Union Avenue NE, East of Duvall, 5400 Block of NE 4th Street) – (Headwaters of Maplewood Creek) Concerns with capacity of several culverts under NE 4th Street between Union and Duvall due to increasing upstream development. Upstream developments north of NE 4th Street floods private properties during significant storm events. Downstream storm systems need to be analyzed along NE 4th between Union and Duvall, near Union, east of Duvall, at the 5400 Block of NE 4th Street and at 5400 NE 3rd Place. These locations have had flooding in the past. A preliminary study to identify extent of storm drainage pipe upgrades and anticipated crossing improvements is needed. $336,000 151 East Fork Maplewood Creek at NE 2nd Street Along NE 2nd and between 10th Place SE and 142nd Avenue SE Flooding of yards and homes that could impact septic systems due to an inadequate localized storm drainage system. The culvert under NE 2nd Place appears to be undersized, which causes flooding along the ditch that runs along the east side of 142nd Avenue SE. East Fork Maplewood Creek – Preliminary Study, Design and Construction – Culvert replacement at NE 2nd Place and clearing the existing channel of overgrown vegetation and debris. $421,000 156 Maplewood Creek Basin Improvements Maplewood Creek Basin Improvements (From Heather Downs to the Maplewood Sediment Basin) SE 136th Street & 138th Avenue SE Erosion occurs in the Maplewood Creek ravine where three outfalls discharge near the top of the ravine and into Maplewood Creek to cause erosion on the slope and eventual sediment deposition into the Maplewood Sediment Basin Facility. City surface water staff investigated the pipe outfalls in February of 2012 and discovered that there was significant undercutting of the slope beneath the outfalls resulting in broken and separated sections of pipe. Washout is evident at a pipe outfall. Pipe length may be lacking as well as an energy dissipater. Maplewood Creek Basin Storm System Improvements to improve outfalls and erosion problems to Maplewood Creek. This project is identified in the Cedar River Basin Plan to solve existing and future surface water management problems (flooding, water quality, and habitat). The project will help reduce and solve existing sediment problems and future flooding and erosion issues, as well as improve water quality and habitat in the Cedar River Basin. The project includes improving the storm systems that conveys Maplewood Creek drainage across roadways, and storm system outfalls that discharge near the top of the ravine and cause erosion in the Maplewood Creek ravine. This will also reduce sediment input into Maplewood Creek and the Maplewood Creek Sedimentation Basin, and may reduce the maintenance frequency of the basin. Specific improvements to the outfalls include replacing the three outfalls from the manholes in Chelan Ave SE and SE 4th Pl to the bottom of the slope with energy dissipater structures at their outlets. So far two outfalls were replaced in 2016, and one outfall remains. The remaining outfall is located in private property which makes the project more challenging, The City attempted to engage King County on this project due to the outfalls discharging into their jurisdiction. Extend pipe to bottom of slope and build a rock outfall to prevent further erosion of materials from being transported downstream. City maintenance crews will replace the in-street CBs and pipe system at the corner. $1,030,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐21 TABLE 6‐4D: FLOODING PROBLEMS: CEDAR RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 302 (and 187) Madsen Creek Sedimentation Basin Cleaning Madsen Creek (upstream of Renton‐Maple Valley Road) The Madsen Creek Sediment Basin located south of the Maple Valley highway requires yearly sediment removal. Part of the solution also includes annual maintenance to remove sediment. Removal of sediment buildup is needed in the creek and culvert to prevent flooding in King County properties. Every one‐to‐two years several truckloads of sediment need to be removed to prevent flooding upstream of the culvert. The City’s current nationwide permit (NWP) allows for the maintenance of the basin till 2023. $926,000 (Annual Maintenance Cost = $75,000 to $84,000) 187 (and 302) Madsen Creek Improvement Project Lower Madsen Creek Reach (Madsen Creek Sedimentation Basin to the Cedar River) In 2008, the New Life Church and Aquabarn was annexed into the City of Renton and included the responsibility of maintaining the Madsen Creek Sedimentation Basin. Subsequently in 2011, an agreement between King County and the City transferred maintenance of the Madsen Creek facilities, within City of Renton limits, to the City. The agreement requires constant maintenance of the facilities, else there is a high potential for flooding. The existing site deficiencies include: inadequate pond design, loss of fish spawning and habitat due to silt accumulation in the low flow channel and culverts, sediment buildup within the high flow bypass channel causing flood waters to overtop the banks and inundate the low flow channel, and loss of a defined channel through the Ron Regis Park wetland area to the Cedar River. Flooding complaints within King County properties have been reported; specifically properties located on the east side of 149th Ave SE and just north of Maple Valley Highway. The flooding has been a result of channel capacity loss due to: sediment buildup, shallow slopes, beaver damming within the Ron Regis Park wetland area, a loss of a defined channel due to rerouting of the Cedar River from the Nisqually earthquake landslide, an increase in flow from upstream development, and inadequate drainage along 149th Avenue. The Madsen Creek high flow bypass channel will require periodic dredging and vegetative maintenance put in place, and the low flow channel from 149th Avenue SE to the Cedar River will need to be reestablished and made sustainable. The channel through Ron Regis Park was originally constructed in 1989 with higher capacity than existing. The 1989 channel design was not sustainable and perpetuated sediment deposition. The existing Ron Regis channel has one‐fourth of the 1989 channel capacity. A consultant, Watershed Science & Engineering (WSE), was hired to investigate the cause of flooding through a hydrologic and hydraulic analysis of the lower Madsen Creek network. The consultant identified multiple feasible improvements, both short term and long term, to help prevent flooding along the reach and adjacent properties. The investigation, design, and construction are funded by the King County Flood Control Zone District grants. The improvements are summarized as follows: Short term solutions: Raising the banks of a portion of the upper high flow bypass channel to prevent specific floods from overtopping the banks and inundating to the low flow channel; constructing a berm along the left bank of the low flow channel to the south of SR 169 (Renton‐Maple Valley Hwy) to provide further flood protection to the adjacent properties to the south; Improve and raise the existing ecoblock wall between SR 169 and 149th Avenue SE to provide further flood protection for the properties to the north along 149th Avenue SE; and restoring and maintaining the high flow bypass channel through periodic dredging and vegetation removal to maintain capacity. These improvements are currently under design and construction is proposed to start in fall 2020. $1,221,000 Long term solutions: The Madsen Creek channel through Ron Regis Park will need to be redefined to maintain sustainability and connectivity from the 149th Avenue SE culvert to the Cedar River. Potential solutions are currently being analyzed by the consultant, WSE. Improvements along this reach would be within regulated shoreline, floodway, floodplain, wetlands, and a Type F stream. This would require extensive permitting and comprehensive coordination with local, state, private, and federal agencies including: WDFW, Muckleshoot Indian Tribe, and USACE. 303 Maplewood Creek Sediment Facility Maintenance Maplewood Creek Sedimentation Facility Maintenance The Maplewood Creek Sedimentation Facility is located behind the Maplewood Golf Course and traps sediment that is transported downstream via upper Maplewood Creek. This pond facility prevents sediment from being deposited on the golf course or downstream channel during larger storm events and reduces flooding of the golf course and SR‐169. Frequent cleanout of the sedimentation pond is needed to maintain the facility. The funding is programmed for project management, permitting and construction to routinely remove the accumulated sediment from the facility. The facility was constructed in 1996 in conjunction with a fish passage channel across the Maplewood Golf Course to the Cedar River. The accumulated sediment in the facility needs to be removed once every 2‐3 years, depending upon flood events and how fast sediment accumulates in the facility. The City plans to obtain 5 year HPA and Army Corps Nationwide Permits to address maintenance activities needed for these annual projects and plan out projects for future major maintenance. $1,233,000 (Annual Maintenance Cost = $95,000 to $100,000) AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐22 TABLE 6‐4D: FLOODING PROBLEMS: CEDAR RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 299 Downtown Storm System Improvements Along S 2nd Street, S 3rd Street and their cross streets between Rainier Ave S and Mills Ave S. This area is currently serviced by undersized and aging stormwater pipes that cannot support the re‐development and new development in the Downtown core. These utility improvements are needed to support re‐development and new development in the Downtown core and will provide better service for existing and future development. These projects are the first steps to support coordinated efforts by the City to improve intersections, add signals, and convert S 2nd St and S 3rd St to two‐way operations, as guided by the Civic Core Vision and Action Plan. Construction of these utility improvements is expected to start in 2021 and continue through spring 2023. $6,917,000 TABLE 6‐4E: FLOODING PROBLEMS: BLACK RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 211 (and 215) Hardie Avenue S Underpass and SW 7th Storm System Improvements SW 7th Street from Lind Ave. SW to Naches Avenue SW Lack of capacity in storm drain system on SW 7th Street results in surcharging and subsequent flooding of tributary systems upstream including flooding of the Hardie Ave. underpass. The proposed solution includes a new 72‐‐inch‐84‐inch diameter parallel pipe from Lind Ave SW to Naches Ave SW and a new 72‐inch pipe between Hardie Avenue SW and SW 7th Street. A new outfall will be constructed between Naches Ave SW and the Black River forebay. The project will be constructed in three phases. Phase I will install a new pipe in SW 7th Street between Naches Ave SW and Powell Ave SW. Phase II will continue east from Powell Ave SW and terminate at Lind Ave SW. Phase III will construct a new pipe between Hardie Ave. and SW 7th Street. The SW 7th Street Stormwater Retrofit Project includes installation of approximately 38 Filterra treatment units. $1,735,000 213 SW 4th Place and Maple Avenue SW Drainage Analysis SW 4th Place and Maple Avenue SW A combination of inadequate drainage system in this area and excessive flows has resulted in flooding of a home. The drainage system upstream has excessive runoff during large storm events. Upstream properties are a mix of street runoff and private properties without a defined pipe conveyance system. There is potential that some SW Sunset Boulevard runoff may be draining towards this problem area. A drainage system analysis is needed to determine the cause of the problem and recommend a solution. A potential tight‐lined collection system may be needed with connection to the Maple Avenue SW drainage system. The cost estimate includes both the study and construction. $395,000 217 Rainier Pump Station Upgrades. Rainier Avenue South ‐ just south of BNSF Railroad Trestle Flooding at the low elevation on Rainier Avenue S below the railroad trestle underpass causes access problems into the pump station. The existing Chicago vertical shaft drive pumps (2x) were last refurbished in 1992 and 2010. The existing wet well vault is very small and causes constant ‘on/off’ cycling of the pumps. Access lift hatches for the station top are difficult to use during flooding conditions and require two people to operate safely. The pump station is difficult to access when flooded and a generator needs to be carried into the station. The biggest problem is the vault is neither deep enough nor large enough to accommodate the pumps. The City has planned a two phased project approach to this problem. Phase 1 (which has been completed): Temporarily refurbish the existing Chicago pumps to ensure system does not fail during a larger storm event; Phase 2: The complete system should be modified to include; better access for maintenance parking; modify the vault underneath the station by increasing Rainier street drainage pipe sizes by potentially using a larger pipe size to store runoff in street as well as the vault storage if possible; provide generator upgrade and means for a generator to be hauled into the station or lowered from above to reduce electrocution hazard; deepen vault bottom to better utilize the pumps and reduce cavitation; and, improve ceiling access hatches and revise wet well setup to accommodate more storage and reduce pump startup/stop cycling. Completed (Phase 1) $700,000 (Phase 2) AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐23 TABLE 6‐4E: FLOODING PROBLEMS: BLACK RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 231 North Talbot Hill Drainage Improvements North Talbot Hill Drainage System (Lake Avenue S, S 19th Street, Davis Avenue S and Shattuck Avenue S.) Erosion of private property occurs in this vicinity with no defined outfall. This problem area receives runoff from Lake Avenue S, Davis Avenue S and Shattuck Avenue S. Shattuck Avenue South street and upstream runoff discharges onto private properties. Further study of this problem is needed to define a proposed solution. The study, including hydrologic and hydraulic analysis is needed to perform future land use conditions to characterize the problems and develop appropriate improvement recommendations. This cost estimate includes the study and a planning level construction cost assumes upsizing and adding new storm drains along Davis Avenue S and Lake Avenue S. with a main truck system originating from Shattuck. A steep slope discharge outfall is needed to reduce erosion westward down the steep slope. A potential solution is to work with WSDOT to address outfall impacts as well as coordinating with their future I‐167 plans. $1,210,000 234 Puget Drive South and Benson Road Outfalls Study Puget Drive South and Benson Road: Various Outfalls This problem includes overland discharges from the top of slope along Puget Drive South. This system handles runoff with very high energies discharging into a very steep ditch system with a downstream culvert that crosses the intersection of Benson Road South and Puget Drive South. There is a system of five Puget Drive South road discharges onto overland surfaces that cause erosion and other problems to be transported downstream towards the Talbot Road South and Puget Drive South intersection culvert. The receiving culvert at Talbot and Puget Drive is a major concern due to high potential for sediment and other debris clogging that could eventually undermine the roadway and/or cause flooding at the intersection. A study needs to be developed to evaluate problems and solutions at this location. Some considerations are to redesign the culvert across Benson Road South to address runoff from Puget Drive South and Benson Road south; the system needs to be upgraded with headwalls and its pipe conveyance capacity checked; and, the project should evaluate the five outfalls to the bottom of swale and provide energy dissipation structures. $198,000 237 Talbot Road Culvert Improvements Talbot Road between Grady Way and I‐405 near southwest corner of Sam’s Club A 48‐inch CMP culvert under Talbot Road is failing as a result of corroded bottom. The culvert is located on the southwest corner of Sam’s Club and conveys Thunder Hills Creek under the road before discharging into a pipe system located in the parking lot of the Triton Tower complex. From the parking lot, Thunder Hills Creek continues in a pipe system in S. Renton Village Place prior to discharging into Rolling Hills Creek adjacent to I‐405. Replacement of this damaged culvert is proposed. Preliminary engineering and analysis will be needed to evaluate alternative culvert replacement designs. Because a portion of culvert is located in WSDOT limited access, City and WSDOT will need to work together to design, permit and construct the project. Depending on WDFW permit requirements, culvert may need to be fish passable. $527,000 240 Puget Drive SE at Rolling Hills Avenue Culvert Crossing Puget Drive SE (between SE 19th St. and Jones PL SE) A culvert crossing at Puget Drive SE (low elevation of roadway) that collects runoff via ditches is at full capacity. The proposed solution is to replace the existing aged culvert system. Easements need to be acquired. Currently the runoff drains thru private properties. Also, the downstream system needs to be analyzed to fully understand the problem. $388,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6-24 TABLE 6-4E: FLOODING PROBLEMS: BLACK RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 245 SW 23rd Street Drainage and Fish Passage Improvements SW 23rd Street between SR-167 and Springbrook Creek Panther Creek flows into the SW 23rd St channel prior to connecting into Springbrook Creek. The outlet elevation of two 48-inch CMP at East Valley Road culverts were set 4 feet below the grade of the Panther Creek channel creating a submerged condition which impairs fish passage and creates undesirable hydraulic conditions. Additionally, two - 9’ by 14’ CMP arch culverts that convey the Panther Creek channel across Lind Ave SW are reaching the end of their useful life and are set below grade. Also of concern is the increase in vegetation in the 23rd St channel between Lind Ave and East Valley Road which has reduced its hydraulic capacity. It is likely that channel improvements are needed along with culvert replacements to ensure adequate hydraulic connectivity along Panther Creek from SR-167 to Springbrook Creek. Furthermore, WSDOT approached the City in 2020 with a proposal to connect Rolling Hills Creek to the Panther Creek channel at SW 23rd St, to meet their fish passage injunction obligation by 2030. WSDOT had connected Rolling Hills Creek to the SW 19th St storm system which is not fish passable. Connecting Rolling Hills Creek into the SW 23rd St channel would require further upsizing of the culverts and further channel improvements. The proposed solution is to replace the culverts at East Valley Road and Lind Ave SW with new fish passable culverts. The new culverts will probably be single cell three sided box culverts lined with spawning gravel. Channel improvements would consist of excavating the channel bottom and widening the cross section. Such improvements may be comparable to those identified in the P9 channel report. Since these improvements are also beneficial to WSDOT due to their obligation to provide fish passage from Springbrook Creek to Rolling Hills Creek, the Surface Water Utility will evaluate the possibility of partnering with WSDOT. Connecting Rolling Hills Creek to the SW 23rd St channel would require breaching a berm that separates Rolling Hills Creek from the Panther Creek Wetland, relocation of a City water line, and resolution of multiple utility conflicts. Improvements to the SW 23rd St channel would also need to accommodate flows from Rolling Hills Creek, and that may have a significant effect on the scope and size of these improvements. $1,780,000 251 Springbrook Creek Old Bridge Removal at SW 27th Street Springbrook Creek North of SW 27th Street A private old bridge (not used as a bridge any more) north of SW 27th Street on Springbrook Creek creates backwater condition that results in higher creek water surface elevations that contribute to upstream flooding (e.g., at SW 43rd Street). The proposed solution is to remove the bridge and replant the stream channel side slopes. $105,000 256 East Valley Road Storm System Improvements East Valley Road Between SW 30th Street and SW 23rd Street Localized areas of flooding along East Valley Road between approximately SW 30th Street and SW 23rd Street resulting from insufficient capacity in the existing storm system during large rainfall events. The project includes replacing 3400 LF of existing storm system along the East Valley Road between approximately SW 30th St. and SW 23rd St. with a new 60/54-inch storm system. The new storm system will discharge into the SW 23rd St. culvert on E. Valley Road, which discharges to Springbrook Creek. WSDOT is responsible for partial or all funding due to mitigation for the P9 channel as was documented in the P9 Report. $550,000 263 Shattuck Avenue South and S 37th Street Outfall Shattuck Avenue S and S 37th Street Outfall (Runoff from Talbot Road S.) Drainage facilities in Shattuck Avenue are lacking or insufficient. Sub-surface seepage is causing deterioration of road pavement and sidewalks. The problem is related to increased flows from upstream development and erosion of the steep slopes due to lack of defined outfall westward. The proposed solution includes conveyance improvements that are coordinated with a future street repair project (10+ years per the existing City TIP) and include anchoring the outfall, installation of new storm drain piping, new outfall, and ensuring all future flows to this system can be adequately managed. In addition, a trunk collection system is proposed to collect surface runoff that is draining onto private properties to the west via Talbot Road South. $101,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐25 TABLE 6‐4E: FLOODING PROBLEMS: BLACK RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 265 Talbot Road South Drainage Study Talbot Road South (at S. 37th Street and Talbot Creek Drive South) Parallel to Talbot Road South is an existing steep slope drainage system that has capacity issues at the Talbot Road South culvert entrance, South 38th Street, and along the length of the channel along Talbot Road South due to erosion. Also runoff from the top of slope (via Talbot Road South) at Talbot Crest Drive South, South 37th Street, and north of S. 177th St. drains to this location and may cause additional erosion at the downhill portion of the slope. Talbot Road South Master Drainage Plan: Outfalls and pipe systems along this problem area need to be upgraded with outfall piping, outfall energy dissipation structures, and culvert upgrades at the Talbot Road S. and north of S. 177th St. area. Other outfalls south of the Talbot Road South & north of S. 177th St. area may need to be included as part of the Talbot Road South Master Drainage Plan to identify all problems. $198,000 269 Talbot Road South @ Panther Creek Outfall Talbot Road S. (Panther Creek Culverts) Between Carr Road and Talbot Road South, there is a series of culverts that drain onto the top of the Panther Creek steep slopes and causes erosion and debris to be transported downhill. Culverts and outfalls need to be inventoried, replaced with new outfalls to reduce runoff impacts/erosion downstream. Culvert and pipe system capacities need to be analyzed. The Panther Creek Watershed Plan should assist with this project with recommendations, hydrology/hydraulics, additional problem descriptions, etc. $790,000 271 Springbrook Creek Wetland and Habitat Mitigation Bank Adjacent to Springbrook Creek south of SW 34th Street This project consisted of developing a plan, creating, restoring, and enhancing wetlands in partnership with WSDOT, on approximately 130 total acres in the valley adjacent to Springbrook Creek. The project allows an alternative to on‐site mitigation for private and public projects (City or WSDOT) with wetland impacts that require mitigation per City Code to achieve a no‐net loss of wetland functions and values. The project also improves flood storage capacity along Springbrook Creek, improves water quality, fish and wildlife habitat, and provides economic benefits by allowing private development to fill low quality wetlands on their property in exchange for purchasing credits from the Wetland Bank. These credits would cost developers less when compared with on‐site mitigation, allowing private properties to develop more area, create higher valued developments, increase property values, and create more jobs, thereby increasing the City's general fund revenues. The funding is for the City's share to manage the Bank as defined in the Wetland Mitigation Bank Agreements. This project was constructed in 2007‐2008, but has require a 10‐year monitoring period to verify whether performance standards have been met to allow for the release of wetland mitigation credits that can be used by the City and WSDOT. Once all performance standards are met, a total of 45.12 mitigation credits are expected to be available and shared equally between the City and WSDOT. One credit compensates for one acre of Category II wetland. All credits have been released from Units A, B, D, and E. All credits are anticipated to be released from Unit C by the end of 2020. Following the 10‐year monitoring period and release of all credits, the Bank will enter its Long‐term Management Phase. Long‐term management will include annual inspections, monitoring of hydrologic conditions and targeted wooded species, weed control, trash removal, and repair of signage and structures due to vandalism and natural wear. The City is in the process of determining credit value and what type of projects (i.e. commercial, residential, etc.) would be eligible to use the credits. Sale of credits will be used to establish an interest‐bearing account to fund long‐term management indefinitely. $922,000 (Total for 6‐year CIP) 275 Oakesdale Avenue / SW 41st Street Culvert Replacement Oakesdale Avenue SW and SW 41st Street Flooding of roadway and adjacent properties due to insufficient culvert capacity at the Oakesdale Business Park, located immediately upstream of the SW 41st Street culvert. Oakesdale Avenue Culvert Improvements – This is a project identified in the adopted East Side Green River Watershed Plan and the East Side Green River Watershed Technical Memorandum‐2007. The project will solve existing and future flooding problems, improve water quality and fish habitat. The project includes installing a new 30‐ft wide by 8.5‐ft high box culvert. The project will increase capacity and prevent flooding of Oakesdale at the crossing and it will improve fish passage. A King County Metro sewer underneath Oakesdale Ave presents a challenge to increasing the size of the culvert. $1,710,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐26 TABLE 6‐4E: FLOODING PROBLEMS: BLACK RIVER BASIN GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) 279 and 281 SW 43rd Street/Lind Ave SW Storm System Improvements SW 43rd Street and Lind Ave Ponding of the intersection and portions of SW 43rd Street and Lind Avenue at high flow events caused by backwater created by the undersized downstream system that extends west from SW 43rd Street towards Springbrook Creek, and possibly made worse due to overflows from Upper Springbrook Creek that get into the SW 43rd system near Lind Avenue. Flooding along SW 39th St. occurs during larger storm events that prevent access into business parking lots. SW 43rd Street System Improvements include proposed installation of 60‐inch parallel pipe system between the intersection of Lind Ave./SW 43rd St. and Springbrook Creek. More specifically, the project includes constructing approximately 3,400 feet of a new, parallel 60‐inch diameter storm system along Lind Ave. SW, from SW 43rd St. to SW 39th St., and then along SW 39th St. from Lind Ave. SW to a new outfall into Springbrook Creek. $4,000,000 282 S 178th Street Drainage Connection S 178th Street storm drain system north of S Carr Road The existing system is not functioning or has failed. Runoff from South 178th Street drains to the south of the cul‐de‐sac and discharges into the failed pipe or flows overland. Eventually the private storm system to the south receives the runoff and drains toward the Talbot Road South storm system that ultimately discharges to Panther Creek. If the pipe has not been crushed, utilize either slip lining or pipe bursting to remedy the problem in order to minimize business disruptions. Easements should be obtained as part of the project if no easements exist. TV inspection is highly recommended prior to developing construction plans. $362,000 285 SE 190th Street Drainage Improvement SE 190th Street (near 103rd Place SE) Flooding and backwater occurs along an 82‐foot dispersal trench and pond system in this area. Backwater is occurring in the system upstream of this facility and overflows onto the street system. A drainage system analysis is needed to determine cause of problem and recommend a solution at SE 190th Street and 104th Place SE. The solution may include upsizing the system to handle increased storm‐water conveyance capacities. $108,000 287 S. 55th Street and Talbot Rd. S. Drainage Improvement Project S. 55th Street and Talbot Rd. S. Runoff from S. 55th Street enters roadside ditch and flows downhill where it makes a sharp bend to the south along Talbot Rd. S. While making the turn, the flow overtops the ditch and floods the roadway. Replace ditch with a new storm drain system along S. 55th Street and Talbot Rd. South to convey ditch flow around south east corner of intersection. $120,000 998 Wells Ave S Drainage Improvement Project Mid block of Wells Ave S between Houser Way S and S 4th St The 8‐inch concrete stormwater main with Facility ID No. 106222 outfall could not be located and appears to be plugged. Also, the type II catch basin with Facility ID 113701 that outlets to the type II catch basin with Facility ID 113700 has had the outlet pipe mudded over in structure 113700 blocking any flow from the north. Also, the concrete stormwater conveyance pipes are in poor condition. Replace the storm drain system along Wells Ave S from Houser Way S to S 4th St. $300,000 299 Downtown Storm System Improvements Along S 2nd Street, S 3rd Street and their cross streets between Rainier Ave S and Mills Ave S. This area is currently serviced by undersized and aging stormwater pipes that cannot support the re‐development and new development in the Downtown core. These utility improvements are needed to support re‐development and new development in the Downtown core and will provide better service for existing and future development. These projects are the first steps to support coordinated efforts by the City to improve intersections, add signals, and convert S 2nd St and S 3rd St to two‐way operations, as guided by the Civic Core Vision and Action Plan. Construction of these utility improvements is expected to start in 2021 and continue through spring 2023. See project cost in Table 6‐3D. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐27 TABLE 6‐4F: FLOODING PROBLEMS: SOOS CREEK BASIN 185 SE 172nd St & 125th Ave SE Green Stormwater Infrastructure Design Project Half a block of 122nd Ave SE, 123rd Ave SE, 124th Ave SE and 125th Ave SE, north of SE 172nd St, and two blocks of SE 172nd St. Surface water overtops the centerline of the road in a low area due to backwater condition of outfall to wetland which may also contribute to flooding of House at 12215 SE 172nd Street and House at 17003 125th Ave SE. Insufficient conveyance capacity of existing drainage systems along 125th Ave SE. and SE 172nd St. may also be contributing to localized flooding. In order to improve existing conveyance capacities and mitigate for flooding concerns due to large drainage areas flowing through aging stormwater pipes crossing private parcels, the existing stormwater systems in the north‐south streets (122nd Ave SE, 123rd Ave SE, 124th Ave SE, 125th Ave SE) that flow easterly toward 125th Ave SE will be disconnected from the system and plugged at the upstream end. The existing upstream flows from outside the project limits are rerouted and conveyed southerly along the north‐south streets through proposed 18‐inch bypass systems, that connect to a new 18‐inch bypass system, which flows easterly, along SE 172nd St. These flows from the large upstream areas bypass the proposed water quality treatment systems. Additionally, permeable pavement is used throughout the project for the proposed sidewalks to provide mitigation and infiltration of stormwater runoff. $3,476,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐28 TABLE 6‐4G: FLOODING PROBLEMS: CITYWIDE SMALL DRAINAGE PROBLEM PROJECTS GIS ID # Project Name Approximate Location Problem Description Conceptual Solution Estimated Cost (2020) Various Locations Miscellaneous and Emergency Storm Projects Various emergency storm duties are completed within this program task including flooding response work during the wet season, spills, etc. $527,000 (Total 6‐Year CIP) 238 16501 Benson Rd S 16501 Benson Rd S Customer complaint about street runoff from Benson Rd S flowing down driveway onto private property. Condition has existing for very long time. Nothing has changed to increase runoff. Low priority at this point. Install new catch basins and storm pipe to intercept road runoff. $66,000 268 Talbot Rd S and S 34th Pl Stormline Repair Project 3400 block of Talbot Rd. S. A existing storm line that conveys runoff from the Cherie Lane subdivision to Talbot Rd. S. has root problems and poor access for maintenance. Replace with new storm line and construct an access road. $204,000 555 Sunset Blvd N/Aberdeen Ave NE /NE 10th St. Storm Repair Project Sunset Blvd NE and NE 10th St intersection with NE 10th St. A majority of storm system along Aberdeen Ave NE and NE 10th St consists of aging clay and CMP pipe and brick manholes. A portion of the storm system runs under homes and is in poor condition with no access for maintenance. Solutions includes replacing the existing clay and CMP pipe as well as designing a new system to bypass flows around the failing storm pipe under homes. $198,000 999 SE 182nd St Storm System From 114th Ave SE to 112th Ave SE The City’s storm system that collects runoff at the intersection of SE 182nd St and 114th Ave SE outfalls to a ditch at 18223 114th Ave SE. The ditch has been historically difficult to maintain and gradually lost capacity over time. This has led to multiple incidences of overtopping and flooding along the said property. During the major storm event of December 2019, the property owner reported flooding in his basement and filed a claim against the City. Construct a new storm system along SE 182nd St from 114th Ave SE to 112th Ave SE. Redirect drainage along 114th Ave SE from the existing outfall at 18223 114th Ave SE to the City’s drainage system along SE 182nd St. $300,000 AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐29 TABLE 6‐5: WATER QUALITY RETROFIT: EAST LAKE WASHINGTON, BLACK RIVER, CEDAR RIVER AND MAY CREEK BASINS GIS ID # Project Name Problem Description Conceptual Solution Estimated Cost (2020) W800 Burnett Ave S and Williams Ave S Water Quality Retrofit Project The Burnett Avenue S and Williams Avenue S drainage area consists of approximately 14‐acres of mixed urbanized land use with an estimated 90% impervious area. The system directly discharges into the Cedar River with no water quality treatment. The Cedar River at this location is listed in the Department of Ecology 303(d) impaired water bodies as a Category 5 for pH, temperature, and dissolved oxygen (DO) and a Category 2 for mercury. The area also completely lies within the City of Renton’s Wellhead Protection Area Zone 1 for one‐year capture. The existing storm water system also requires upsizing; as the 8‐inch storm water trunk lines running north and south through Burnett Avenue S and Williams Avenue S, just north of 2nd Street, are shown to have issues conveying the 10‐year storm. A storm in May of 2017 caused the 8‐inch main trunk line to become surcharged and flood a residential apartment complex along Burnett Avenue S. The finish floor elevation of the apartment building is lower than the catch basin rim elevation within the adjacent street (Burnett). A water quality (WQ) grant was obtained through the Department of Ecology for evaluating and designing the runoff treatment best management practice (BMP) options for the project area. The City of Renton Downtown Utility Improvement Project Conceptual Design Report identified several deficiencies within the Burnett and Williams storm water system and feasible solutions. The Conceptual Design Report stipulated multiple alternatives requiring the trunk lines within Burnett and Williams be through the outfall at the Cedar River. The existing 8‐inch pipes and 12‐inch pipe would be upsized to a minimum of 18‐inch and potentially up to 36‐inch pipe This is also supported in a separate study prepared by the apartment complex development company; where a hydrologic and hydraulic assessment was completed for the system to determine the cause of the May 2017 flood. The Burnett and Williams Water Quality Retrofit Project is currently finalizing the grant agreement with the DOE and will then initiate consultant requests for qualifications to design the water quality treatment and upsizing the system. Design DOE WQ Grant: $370,000 DOE Share: $277,500 COR Share: $92,500 Construction $2,000,000 W801 Heather Downs Detention Pond Water Quality Retrofit The project will convert the Heather Downs detention pond to a combined detention pond/wetpond to provide water quality treatment. The stormwater runoff contains hydrocarbons, oils, and other pollutants from residential areas. This project will treat pollutants from a 29.8‐acre tributary basin area and reduce water quality concerns in Maplewood Creek and Cedar River. The Cedar River is on Ecology’s 303(d) list for violations in water temperature, dissolved oxygen, and pH standards. The proposed project will convert the detention pond to a combined wetpond/detention pond. The new wetpond volume will be developed by excavating below the current pond bottom. A geotechnical investigation assessed the underlying soils and based on the analysis a low permeable liner will be provided. One‐cell and two‐cell wetpond configurations were evaluated. $264,000 ($198,000 in grant funds; $66,000 City funds). Project will be completed by 12/31/2021 W802 Stormwater Facility Retrofit Study This project will improve water quality for flow control facilities in the Black River, Cedar River, May Creek, Johns Creek, Maplewood Creek, Panther Creek, Springbrook Creek, Big Soos Creek and Rolling Hills Creek subbasins in the City of Renton, which drain to Lake Washington and the Green River. The study will identify existing City of Renton owned flow control facilities and inform decisions for future treatments. The most beneficial water quality improvement projects will be identified, and conceptual designs and cost estimates will be developed. The study will provide a conceptual design for the three highest‐priority potential future projects using Ecology’s 2014 Stormwater Management Manual for Western Washington (or approved equivalent, as listed in Appendix 10 of the 2014 revision to the Phase I Municipal NPDES Stormwater Permit). Runoff treatment facilities such as bioretention, combined detention and wetponds, and TAPE GULD devices will be evaluated. The treatment option(s) selected will be catered specifically to each retrofit location, dependent on existing site criteria (available space, pollutants of concern, existing facility type, aquifer protection area, etc.). $250,000 ($187,500 in grant funds; $62,500, City funds). Project will be completed by 12/31/2022 W803 Jefferson Ave NE Green Connection Project This project was identified in the Sunset Area Surface Water Master Plan that was developed and approved as part of the Sunset Community Investment Strategy and Planned Action EIS to improve water quality in the surrounding area. This project supports the city’s goals of economic development, public safety and quality of life. This project will design flow reduction and stormwater quality treatment for approximately 1,300 linear feet of roadway to include bioretention facilities, a storm conveyance system and permeable concrete sidewalks on Jefferson Avenue NE (between NE 16th Street and NE 12th Street) in the Sunset Area community along the existing roadway where most feasible. $2,506,000 (Partially funded by an Ecology Stormwater Financial Assistance Program grant of $2,075,095 awarded in 2018) AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6-30 TABLE 6-6: HABITAT PROBLEMS: CEDAR RIVER, MAY CREEK, LAKE WASHINGTON, AND BLACK RIVER BASINS GIS ID # Project Name Problem Description Conceptual Solution 129 West Fork of Madsen Creek General habitat concerns and a culvert within the Fairwood golf course blocks fish passage. Fairwood Golf Course culvert replacement. 214 Culvert removal at Raymond Avenue (along SW 19th Street) The project improvement involves removing an existing culvert that carries Rolling Hills Creek between Springbrook Creek and Raymond Ave (along SW 19th St.) and restoring this section as an open channel. The culvert crossing was previously used for access over the creek, but it is no longer needed. This improvement is habitat related only and not required to solve a flooding problem. This project is described within the East Side Green River Plan that provides recommendations and improvements to the Springbrook Creek system. The project is identified as element PS2-3 (Rolling Hills Culvert) in the City’s East Side Green River Watershed Project. L101 Port Quendall Site Cleanup (LW-S2-6) Hazardous material on site. Clean up hazardous material on site. C201 WRIA 8 – ID C201 (CR-0-1.1-RB) Extensive areas of industrial land use exist in Reach 1 from the mouth to Logan Street bridge (RM1). If redevelopment occurs in the area, the Army Corps of Engineers will need to be consulted on any habitat restoration in this area. Alternatives include reducing channel confinement and increasing riparian function including the use of LWD. The WRIA 8 projects list includes a conceptual project for focus on knotweed control throughout the reach, as well as riparian restoration where possible, especially along the right bank. Explore additional opportunities to reduce the effect of artificial nighttime lighting beyond the mitigation requirements for the 2016 dredging project. C202 WRIA 8 – ID C202 (CR-0-1.1-RB) Dredging of this reach is anticipated in the future. Plantings will need to consider flood control requirements, airport safety issues, park and trail management and public access to the river. Recreational uses need to be balanced with an assortment of other uses. Revegetate right and left bank of Reach 1 where possible. Overhanging vegetation in this area of the river that experiences inundation by the lake is beneficial. Plants will also need to be flood tolerant to flourish in the future. Plant selection will also need to consider that the airport has a clear zone over the park that affects type of vegetation that can be planted. The WRIA 8 projects list includes a conceptual project for focus on knotweed control throughout the reach, as well as riparian restoration where possible, especially along the right bank. Explore additional opportunities to reduce the effect of artificial nighttime lighting beyond the mitigation requirements for the 2016 dredging project. C203 WRIA 8- ID C203 (CR-1.1-1.6-LB) (CR-1.1-RB) Reach 2 re-vegetation projects. Any planting in this area needs to consider park and trail management as well as access to the river. Limited riparian plantings are possible due to the Cedar River trail. Re-vegetate riparian areas where possible in Reach 2 at Logan Street Bridge (RM 1) to I-405 (RM 1.6). Explore options to add native riparian vegetation on the left and right bank of the river. Remove invasive vegetation and plant native riparian vegetation on left bank in areas where mature trees do not exist between Houser Way N and Logan Ave N. Potential for large wood placement at tow of bank in selected locations. Create a shallow alcove with LWD in the lawn area between the Renton Senior Center and the existing river bank (right bank). Plant the lawn with riparian vegetation. C204 WRIA 8- IDs C204 Cedar River Reach 2 and Reach 3 improvements that include exploring re-development options and restoration. Land use issues would exist for any restoration project proposed in this area. There exists a high number of landowners, so feasibility of restoration is diminished. Explore redevelopment and restoration projects in Reach 2 and 3, particularly in areas of industrial use in Reach 3 that are likely to be redeveloped in the near future. Reach 3, as defined in the WRIA 8 Plan, is within the City of Renton. The WRIA plan suggests that the City offers regulatory flexibility or other incentives to encourage buffer and floodplain improvements during redevelopment. This is part of the ‘explore re-development’ option. Habitat improvement in the reach could be encouraged through incentive programs such as offering density exchanges. Exploring the possibility of setting back levees and riparian buffer restoration is a challenge in this area. The WRIA 8 project list includes a conceptual project that seeks ways to improve riparian habitat on site such as purchasing easement for buffer, removing bank hardening and restoring riparian buffer. There is a conceptual design for approximately 1,000 linear feet of bank enhancements developed, which includes regrading the bank to provide shallow edge habitat, large wood installation, and riparian revegetation. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6-31 TABLE 6-6: HABITAT PROBLEMS: CEDAR RIVER, MAY CREEK, LAKE WASHINGTON, AND BLACK RIVER BASINS GIS ID # Project Name Problem Description Conceptual Solution C205 WRIA 8 – ID C205 Existing cottonwoods near the library area are nearing the end of their lifespan and replanting options will need to be explored. Possibly underplant with conifer now and replant area when trees are removed in five to ten years. Permits to remove and manage trees would be required. Where possible, protection and maintenance of existing tree cover in this reach is highly recommended. C206 WRIA 8- ID C206 (CR-2.1-2.4-RB) Improve riparian habitat in area of industrial use. A bulkhead in this area is very large and removal is highly recommended. Examples of these ‘industrial’ areas that could be restored include the areas adjacent to the old Stoneway site and the Riviera Apartments. Remove invasive vegetation and restore riparian buffer adjacent to Riviera Apartments. Explore opportunities to remove impervious surface area and bank hardening on site. Explore opportunities to remove impervious surface areas and bank hardening, and restore riparian buffer in areas of multifamily residential use in Reach 3. This includes areas like the multifamily redevelopment of Riviera Apartments. Explore opportunities to purchase easements for buffer, removing bank hardening and restoring riparian buffer. Bulkhead removal of a structure 16 feet high x 1,150 feet along river is needed. C207 WRIA 8- ID C207 Bank sloughing along Cedar River in riparian corridor within areas of multifamily residential use in Reach 3. Apartment complex in this area has extensive impervious surface area. Partial buyout would be necessary to achieve high benefits. Explore opportunities to remove impervious surface area and bank hardening on site, and restore riparian buffer. The WRIA 8 project list includes a conceptual project that seeks ways to improve riparian habitat on site such as purchasing easement for buffer, removing bank hardening and restoring riparian buffer. There is a conceptual design for approximately 1,000 linear feet of bank enhancements developed, which includes regrading the bank to provide shallow edge habitat, large wood installation, and riparian revegetation. C208 WRIA 8- ID C208 (CR-3.4-4.3-RB) Maplewood neighborhood flood buyouts and floodplain restoration. Restoration of floodplain is needed in this area. Buyouts of various homes affected by flooding during high river events. These include, but are not limited to, the Lyon’s home and two other neighboring parcels along the Cedar River affected by the flooding in the Wasmita Park area. Explore opportunities to restore riparian corridor by removing impervious surfaces and restoring riparian buffers with vegetation. Explore options for bioengineering and softening bank hardening (See recommendations for Maplewood Flood Hazard Reduction in Cedar River Basin Plan). The cost is high for this reach due to buyouts. Benefits would depend on scale of effort but at a minimum would need to reduce flood hazards. Buyouts alone do not usually provide significant fish benefits, but does allow for future floodplain restoration. For the greatest benefit, flood buyouts should be pursued in concert with comprehensive habitat restoration efforts. C209 WRIA 8 – ID C209 (CR-1.6-5.2-BB) The reach 3 area (between I-405 RM 1 to SR169 Bridge RM 4.2) is well vegetated. However, noxious weed control, underplanting, and exploring diversity of plants is needed. Restore riparian areas in city owned parks upstream of I-405 bridge, particularly the left bank. C210 WRIA 8 – ID C210 (CR-1.6-5.2-BB) Protect the existing forested, riparian habitat in the City of Renton’s parkland upstream of I-405 bridge on the left bank. Renton’s three riverside parks (Liberty, Cedar River Park, and Narco property) are going through new master planning process. Opportunities may exist to move some of the more active recreation uses of these parks to the former Narco site and protect habitat with more passive recreational uses at the other areas of the parks and restore existing riparian areas. A potential alternative for this region is to look at lowering the river to provide recreational uses in order to protect upstream habitat. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐32 TABLE 6‐6: HABITAT PROBLEMS: CEDAR RIVER, MAY CREEK, LAKE WASHINGTON, AND BLACK RIVER BASINS GIS ID # Project Name Problem Description Conceptual Solution C211 WRIA 8 – ID C211 (CR‐4.6‐4.9‐RB) Restoration of side channel may be possible as part of the Cedar River Basin Plan. This is for the right bank of the river on the property owned by Maplewood Heights Homeowners Association and the City of Renton across from the golf course and downstream of a landslide area. Channel restoration should be a flow through channel to reconnect to the river at the upper end for juvenile Chinook benefit rather than a groundwater fed spawning channel that primarily benefits sockeye. A UW study was done on this potential restoration project. Due to the landslide having changed the area extensively, this location may no longer be a viable opportunity for side channel restoration. The landslide area is a source of fine soils and lacks access so restoration may be difficult. Control invasive plants and replant native vegetation and conifers in vicinity of side channel on the right bank on property owned by Maplewood Heights Homeowners Association and City of Renton, across from golf course an downstream of landslide. Benefits could be gained by the upstream end of the side channel being reconnected; investigate whether to reconnect or allow the river to reconnect it on its own. C212 WRIA 8‐ ID C212 Cedar River Reach 4 improvements needed to prevent future bank sloughing in the riparian corridor. A concern was raised that conifer underplantings may not be appropriate in riparian areas along Cedar River. Historic conditions analysis indicates that forested riparian areas in lower Cedar River used to be deciduous. Other plant species or a mix of coniferous and deciduous species may be more in keeping with historic conditions. Reach 4 restoration includes considering conifer underplanting in forested riparian areas within the reach, particularly in Ron Regis park, near a slide area. This project is on the WRIA 8 project list with a status of dormant. C213 WRIA 8 – ID C213 Protect habitat in Reach 4 between SR 169 Bridge (RM 4.2) and Upstream of Landslide (RM 4.7) Protect existing riparian habitat, instream habitat conditions and extensive LWD in reach. Most of reach is already in public ownership or protected by regulations (i.e. steep slopes). C214 WRIA 8‐ ID C214 (CR‐4.9‐5.2‐LB) Protect habitat in Reach 4 and explore ways to reduce flooding and erosion in Ron Regis Park such as adding LWD and exploring a levee setback concept. It is unclear how much further the river is going to erode the bank and migrate into the Ron Regis Park in the landslide area. There may eventually be a conflict with park uses in the future. Reconnect and enhance small creek mouths as rearing areas. Opening up new spawning and rearing habitat is key to enhancing spatial distribution and diversity that leads to increased productivity. Studying options to protect habitat in Reach 4 and reduce flooding and erosion in Ron Regis Park is recommended. Explore using LWD and levee setback to prevent excessive erosion and flood damage to the public lands associated with Ron Regis Park while protecting natural habitat forming processes in the reach. Explore ways to restore habitat forming processes to the left bank adjacent to Ron Regis Park. Project elements could include removing bank armoring and installing large wood. Restoration options should include lower Madsen Creek. An alternative may be to let the river find its own equilibrium in the area. C264 WRIA 8 – ID C264 (Enhance Mouth and Lower Johns Creek) (LW‐S1‐1) Predator habitat is present here. Water quality and flows are a problem as well as siltation within the lower John’s Creek. Enhance lower channel to reduce predator habitat, restore riparian vegetation, and protect water quality from stormwater flows. Past studies have identified water quality issues, primarily from avian sources. In the future, WSDOT has Ecology approval for a direct discharge of stormwater into Johns Creek for the I‐405 expansion project. The I‐405 project expansion should consider habitat issues related to water quality, and enhancement aimed to reduce predator habitat. Recreational usage of the site is important and needs to be considered when enhancement projects are proposed in this area. C265 WRIA 8 – ID C265 (Enhance mouth of Kennydale Creek) (LW‐S2‐1) Located in Gene Coulon Park, this area has seen juvenile Chinook at the mouth, but not in the stream. The mouth has a good delta with good gradient. Planting was done in the past by the City. Park and recreational usage for the City needs to be considered when habitat enhancement projects are proposed. Removal of silt is recommended, and recruitment of gravels and sand is proposed. Protection of the shallow water delta is needed as part of the restoration. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐33 TABLE 6‐6: HABITAT PROBLEMS: CEDAR RIVER, MAY CREEK, LAKE WASHINGTON, AND BLACK RIVER BASINS GIS ID # Project Name Problem Description Conceptual Solution C266 WRIA 8 – ID C266 (South Lake Washington DNR Shoreline Restoration Project) Shoreline restoration is needed on the Washington Department of Natural Resources Property. This project is called the South Lake Washington DNR Shoreline Restoration Project and is proposed separately from the Sam Chastain Park Shoreline Restoration. Removal of a flume is also needed along the lakeside. Remove a portion of the flume along the lakeside, create a shallow water habitat, protect existing cove, and plant overhanging riparian vegetation along the shore. The Sam Chastain Trail is a project to connect the Cedar River trail to Gene Coulon Park. Mitigation with shoreline restoration should be done in concert with the trail project. C267 WRIA 8‐ID C267 (LW‐S1‐4) Reconnect and enhance small creek mouths as rearing areas for Gene Coulon and Cedar River. This is for the private property owner areas where it is desirable to remove bulkheads. Restoration of shallow water habitat and riparian vegetation is needed. Possible opportunities to work with Boeing and private property owners to remove bulkheads and restore shallow water habitat and riparian vegetation may exist in the future. C268 WRIA 8‐ ID C268 (Cedar River Delta) Predation at the mouth of Cedar River and backwater area in lower Cedar River is a problem. This lowering project would require regular maintenance. This is an area where high bird predation on Chinook fry exists. Explore lowering/modifying the delta to create more shallow water habitat and reduce predation for juvenile Chinook by cutting trees lower. Address predation effects at the mouth of the Cedar River and backwater area in lower Cedar River. Any potential projects should consider the City of Renton’s Shoreline Plan, ACOE, and the City of Renton Airport management requirements. [note there have been questions raised about the benefits of this habitat project because it is possible that creating more shallow water habitat may increase Chinook presence and consequently increase predation]. The project was cancelled in 2012 and the granting agencies were notified and the funds returned. C269 WRIA 8‐ID C269 (Shoreline restoration west of Cedar) Overhanging riparian vegetation has been lost due to erosion of stream bank. Restoration would be for shoreline west of Cedar’s mouth. Homeowner bulkheads are a concern and conversion of nearshore habitat to shallow beach and restoration of vegetation is desirable. Incentive programs are needed such as PBRS to encourage participation on reducing number of docks used. Using community docks would be better for habitat. Conversion of nearshore habitat to shallow beach and restoration of riparian vegetation is desirable. Develop community docks as a replacement and restore mouths of small creeks at the same time. As of July 2010, this project required the reuse of clean sediments to be dredged from the Seaplane Base. Sediments to be used to build 1) a habitat island along the western edge of the growing Cedar River delta, and 2) a habitat bench in front of the vertical sheet pile wall located along the western half of the Airport’s Lake Washington shoreline. New habitat is designed to incorporate large woody debris and to provide overhanging riparian vegetation to create high quality shallow water habitat for outmigrating juvenile Chinook. These habitat improvements depend upon the supply of clean sediments from the dredging project and are designed to complement previously negotiated mitigation work. This project was cancelled in 2012; granting agency notified and funds returned. C270 WRIA 8‐ID C270 (Explore opportunities to restore small creek mouths) (LW‐S2‐5) Limited shoreline habitat has resulted in increased salmon predation at the mouths of creeks discharging into south Lake Washington. Restore mouths of small creeks such as Kennydale and Johns Creek and remove bulkheads and construct community docks in place of individual docks along the shoreline between Kennydale Creek and west of the mouth of the Cedar River. Restore mouth and lower reach of May Creek. Increase beach, set back banks, plant riparian buffers, and add large wood to improve habitat for juvenile Chinook. C288 WRIA8 – ID C288 (Sam Chastain Park Shoreline Restoration) An existing bulkhead in the vicinity of Chastain Park limits near shore habitat. The proposed Chastain Park Shoreline Restoration includes removing the bulkhead and placing gravels from Beaux Arts on 1100 feet of shoreline restoration, setback armoring, and improving vegetation. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐34 TABLE 6‐6: HABITAT PROBLEMS: CEDAR RIVER, MAY CREEK, LAKE WASHINGTON, AND BLACK RIVER BASINS GIS ID # Project Name Problem Description Conceptual Solution S19 Green River Ecosystem Restoration Projects (Lower Springbrook Reach Rehabilitation – LG‐19 in WRIA 9 Plan/Site No. 7 in the Green/Duwamish River Basin Ecosystem Restoration Study Final Feasibility Report) Lower Springbrook Creek Reach is characterized by poor water quality and limited riparian vegetation. This project would rehabilitate habitat for rearing and off channel refuge on Springbrook Creek. Springbrook Creek cuts through the Renton Valley from the border with Kent at SW 43rd Street to the Black River Pump Station. The project would improve approximately 2.8 miles of habitat with riparian plantings, large woody debris, pool construction, channel branch excavation (dendrites), and channel modifications to create a two stage (low and high) flow channel. Although Springbrook Creek is spring fed, water quality is very poor and characterized by high temperatures and low dissolved oxygen. The Green River Ecosystem Restoration projects are part of a large effort (cost shared by jurisdictions within the WRIA 9 Forum) to restore habitat in the Green/Duwamish River Watershed. The projects will help in the City’s response to the Endangered Species Act. The utility funds shown will be used to match Army Corps of Engineer’s federal funds (65% federal, 35% local) to allow the design and construction of the projects. The City may consider submitting a project deviation to the Corps during the design phase to include replacement of the SW 43rd Street culvert. The project schedule is dependent upon priority relative to other projects and Congress appropriating the federal funds needed for the construction of the projects. AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐35 TABLE 6‐7: PROGRAMS AND REGULATORY COMPLIANCE Project Name Problem Description/Permit Reference Solution/Compliance Approach Estimated Cost (2020) Coordination with Long‐Range Plan Updates NPDES Permit Condition S5.C.1.b City must describe how stormwater management needs and protection/improvement of receiving water health are (or are not) information the planning update processes. Documentation is included in the Stormwater Annual Report. Minimal Low Impact Develop Code NPDES Permit Condition S5.C.1.c Ongoing program to require LID BMPs and LID principles and to make LID the preferred and commonly used approach for site development. City must provide an annual update on progress and/or barriers. Minimal Stormwater Management Action Planning/Watershed Planning NPDES Permit Condition S5.C.1.d. City must develop a Stormwater Management Action Plan for one high priority watershed no later than March 31, 2023. Interim permit deliverables in support of the Stormwater Management Plan include a watershed inventory and receiving water assessment by March 31, 2022, receiving water prioritization by June 30, 2022. $300,000 (6‐year CIP Cost) Public Education and Outreach NPDES Permit Condition S5.C.2 Ongoing education program aimed at the general public, businesses, engineers, contractors, developers, land use planners, residents, landscapes, property managers/owners, and school age children to build general awareness about stormwater impacts and affect behavior change to reduce or eliminate behaviors that contribute to adverse stormwater impacts. Conduct an evaluation of effectiveness of ongoing behavior change campaign no later than July 1, 2020. Develop a strategy to implement actions to address lessons learned from effectiveness study no later than February 1, 2021 and begin to implement outreach strategy based on lessons learned no later than April 1, 2021. Public education and outreach results must be documented no later than March 31, 2024. Minimal Stewardship NPDES Permit Condition S5.C.2 Ongoing program to provide and advertise stewardship opportunities and/or partner with other organizations to encourage residents to engage in surface and stormwater activities storm drain marking and other events. Continuation of Existing Program MS4 Mapping and Documentation NPDES Permit Condition S5.C.4.b.ii Ongoing program to map and document MS4. No later than August 1, 2023, complete mapping of all known connections from the MS4 to a privately owned stormwater system. $29,000 Annually Detect and Identify Illicit Discharges and Illicit Connections NPDES Permit Condition S5.C.5.d City must conduct field screening of at least 12% of the MS4 annually and track total percentage of MS4 screened beginning August 1, 2019. Train municipal field staff. Continuation of Existing Program Address Illicit Discharges and Illicit Connections NPDES Permit Condition S5.C.5.e Implement procedures to characterize, trace sources, and eliminate illicit discharges and connections within specified deadlines. Continuation of Existing Program Ordinance Addressing Runoff from New Development, Redevelopment and Construction Sites NPDES Permit Condition S5.C.6.b Adopt and make effective a local program, no later than June 30, 2022 that addresses runoff from new development, redevelopment and construction site projects consistent with a Phase I program approved by Ecology and amended to include Appendix 10. Minimal AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐36 TABLE 6‐7: PROGRAMS AND REGULATORY COMPLIANCE Site Plan Review, Inspections and Enforcement NPDES Permit Condition S5.C.6.c Review of stormwater site plans and inspection of development sites before, during and after construction per the permit conditions. Process also includes inspection of BMPs and facilities in new residential developments every 6 months until 90% of the lots are constructed, recordkeeping, and enforcement. Minimal Annual Inspection of Stormwater Treatment and Flow Control BMPs/Facilities that discharge to MS4 NPDES Permit Condition S5.C.7.b.i.b Ongoing program to annually inspect all stormwater treatment and flow control BMPs that discharge to the MS4, unless otherwise exempted from this permit condition. Continuation of Existing Program Annual Inspection of Municipally Owned Stormwater Treatment and Flow Control BMPs/Facilities NPDES Permit Condition S5.C.7.c.i Ongoing program to annually inspect all municipally owned or operated stormwater treatment and flow control BMPs/facilities and conduct maintenance activities. $253,000 Annually Inspect and clean catch basins NPDES Permit Condition S5.C.7.c.iii Inspection of catch basins and inlets is required once every two years. This requirement may be changed based on maintenance records of double the length of time of the proposed inspection frequency. The City meets this requirement through an alternative of cleaning all pipes, ditches, and catch basins and inlets in a circuit once during the permit cycle. $853,000 Annually Pollution Prevention and O&M ‐ NPDES Permit Condition S5.C.7.d. and f Ongoing program to document and implement an operations and maintenance program to prevent or reduce pollutants in runoff on lands owned by the City. Implement a Stormwater Pollution Prevention Plan (SWPPP) for all heavy equipment maintenance or storage yards, and material storage facilities owned by the City that do not have coverage under the Industrial Stormwater General Permit. Update the SWPPP(s) no later than December 31, 2022. Minimal Source Control and Business Inspection Program NPDES Permit Condition S5.C.8 Adopt and make effective an ordinance or enforceable document to require source control BMPs for pollutant generating sources associated with existing land uses no later than August 1, 2022. Develop an inventory of site that have potential to generate pollutants to the MS4 no later than August 1, 2022. No later than January 1, 2023, implement an inspection program to annually inspect 20% of sites in the City’s inventory of pollution generating sites. No later than January 1, 2023, implement a progressive enforcement policy that requires sites to comply with stormwater requirements. $126,500 annually Reporting and Staff Training NPDES Permit Conditions S5.C.5.d.iii; S5.C.5.f; S5.C.6.e; S5.C.7.e; and S5.C.8.b.v On‐going program to develop and implement procedures for keeping records of inspection and enforcement action by staff as well as a training program for employees whose construction, operation and maintenance job functions may impact stormwater quality. Continuation of Existing Program Monitoring and Assessment NPDES Permit Condition S8.A Regional Status and Trends Monitoring and S8.B Stormwater Management Program Effectiveness and Source Identification Studies The City participates in regional status and trends monitoring and stormwater management program effectiveness and source identification studies. $240,160 Annually Residential Plat Stormwater Management Facility Maintenance and Operation Program The City assumed operation and maintenance of approximately 213 existing stormwater facilities on residential plats following a policy decision on October 18, 2010. Ongoing program to maintain stormwater facilities for which the City has assumed maintenance responsibilities. $685,000 Annually AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6-37 TABLE 6-7: PROGRAMS AND REGULATORY COMPLIANCE Mosquito Abatement Program (Talbot Hill Area) The Panther Creek wetlands east of SR-167 and between I-405 and Valley Medical Hospital, are a large breeding ground for mosquitoes. Adult mosquitoes emerge from the wetlands in the late spring to feed in the residential neighborhoods in and around Talbot Hills. In addition to controlling adult mosquitoes, the City also treats for mosquito larvae in all City owned stormwater facilities including ponds and vaults. These mosquito abatement efforts help to reduce mosquito bites and subsequent risk of West Nile virus infection. The City implements an annual contract with pest control contractor to control mosquito populations through adulticiding of upland areas adjacent to the wetlands and treatment of City maintained stormwater ponds using larvicide during the spring and summer months. The budget will need to be adjusted annually to account for additional ponds that are acquired by the City through new construction and future annexations. $90,000 Annually Stormwater Facility Fencing Project Past and current design standards (taken largely from King County Surface Water Design Manual) require stormwater ponds to have a perimeter fence only when interior side slopes are greater than 3 horizontal to 1 vertical. However, some existing ponds with flatter interior side slopes (i.e., that did not require perimeter fencing) and having standing water several feet or more deep can create a potential safety hazard, particularly for small children. The City has adopt a new policy of requiring all current and future ponds to be fenced which required changes to the City’s stormwater code and stormwater design manual The City is currently responsible for the maintenance of 28 residential facilities and 6 non-residential facilities that either do not have perimeter fencing or do not have a perimeter fence that meets the design standards. There are an additional 17 privately maintained stormwater facilities that will be eventually transferred to the City and will need to be fenced. $100,000 Annually Asset Management Enhancement As the City’s infrastructure ages, storm pipes and structures tend to perform poorly or fail, potentially causing flooding and endangering the public. Deciding when to maintain, repair and replace stormwater infrastructure is difficult without an asset management program that will manage infrastructure capital assets that will minimize the total cost of owning and operating them while providing the City’s target level of service. The Surface Water utility has developed an asset management program that helps the utility with short, medium and long term planning of pipe replacement and repair, proactive inspection and maintenance of the City’s storm system and prioritizing replacement projects based on cost-benefit analysis and severity of defects. The program relies on a CCTV Truck with two operators, GraniteNet for viewing CCTV inspections, NASSCO PACP standards, and coordination between Surface Water Engineering and Maintenance sections. The utility will continue to advance this program to include non-CMP pipes. $100,000 Annually City Wide Drainage Maintenance Program The City has many culverts discharging to streams and creeks that require routine maintenance including vegetation and sediment removal. The City has completed SEPA review and was issued a critical areas and shoreline exemption for vegetation and sediment removal at culverts within in the City. Fisheries has also issued an HPA that authorizes routine maintenance of 25 culverts and channels. City staff will still be required to obtain individual state and federal permits for each culvert. $66,000 Annually Surface Water Utility GIS The City’s infrastructure mapping needs continual updates as new storm water facilities, pipes and structures are taken into plats or acquired through annexations. Surface water utility GIS mapping to include new storm water systems, as-built information, recently annexed areas, and continual maintenance of GIS mapping. $115,000 Annually Stream Flow/WQ Monitoring Program Stream flow and water quality monitoring program. Currently collecting stream gage date at the Black River pump station. $13,000 Annually Culvert/Stream Inventory As a result of a permanent injunction issued by the US District Court reinforcing treaty rights, WSDOT and WDFW must replace culvert crossings that are fish barriers with fish passable culverts. With this ruling, it opens up the possibility that other government entities may also have to replace fish barriers within their jurisdiction The Surface Water Utility began the process of conducting a stream inventory of all culvert crossings. This information was used to eventually field survey each culvert crossing in an effort to identify fish passage issues and develop solutions with priority rankings which can be incorporated in the utility’s CIP program. The establishment of a fish passage improvement program is currently under consideration. $95,000 Annually Surface Water Utility Plan The Surface Water Utility’s last comprehensive planning effort was conducted almost 25 years ago. A new surface water utility management plan is needed to reflect current capital needs and programs. Develop a comprehensive city-wide surface water planning document to provide guidance for programmatic and capital needs for the next 6 years and for future years. Update every 6 years. Last update as of the writing of this system plan was in 2020. $120,000 (6-year CIP Cost) AGENDA ITEM # 9. a) CAPITAL IMPROVEMENT PROJECT NEEDS OSBORN CONSULTING, INC. BELLEVUE • SEATTLE • SPOKANE 6‐38 TABLE 6‐7: PROGRAMS AND REGULATORY COMPLIANCE CMP Storm System Replacement Program This program consists of assessing the condition of all corrugated metal pipes (CMP) whose diameter is 18 inches or larger, located in high risk areas (i.e. under major roads). This program was driven by a failure of a CMP pipe along Rainier Ave S in 2018, which caused a major cavity to form underneath the road, and required an emergency repair project. This program is intended to address deficiencies in CMPs, which are more susceptible to deterioration than plastic and concrete pipes, before a catastrophic failure becomes imminent. Minor deficiencies are typically repaired through coordination with the surface water maintenance section, while replacement projects resulting from significant structural issues (e.g. deterioration of the pipe wall, pipe collapse) require the replacement or rehabilitation of the pipe and may require hiring a contractor. This program repairs and replaces corrugated metal pipes showing signs of deterioration in high risk areas to avoid catastrophic failures and emergency repairs. This project supports the city's goal of protecting public safety. $580,000 (6‐year CIP Cost) Cedar River Flood Risk Reduction Feasibility Study The Lower Cedar River Flood Risk Reduction Feasibility Study intends to assess the feasibility of improving the level of flood protection and evaluate future flood risk mitigation projects along the Cedar River from River Mile 0 to River Mile 2.7. This feasibility study would identify potential measures or construction projects that would increase resiliency to floods greater than the 100‐year event and identify the most feasible level of flood protection that could be achieved along this reach of the Cedar River, a critical area of development and economic activity within King County. The King County Flood Control Zone District (KCFCZD) placed the Feasibility Study on its 6‐year Capital Improvement Project funding plan in 2018 and a funding agreement was executed with the City in April 2020. This study is expected to begin in 2020 and be completed by 2023. This study evaluates the feasibility of increasing the level of flood protection along the Lower Cedar River, and reducing the risk of flooding to the surrounding area in Renton. It supports the city's goal of protecting public safety. $485,000 (6‐year CIP Cost) WSDOT Limited Access ROW Runoff Impact Mitigation Program The city currently charges surface water fees to WSDOT for the SR‐167 and I‐405 right of way within Renton city limits. RCW 90.03.525 allows local municipalities to charge stormwater fees for state limited access highways and was modified when Senate bill 5505 was passed in 2019. The bill clarified the objectives of the Stormwater Management Funding and Implementation Program for highway related runoff problems and required charges paid by the state to local jurisdictions to be used solely for stormwater control facilities that directly reduce state highway runoff impacts or implementation of best management practices that will reduce the need for such facilities. A plan and progress report are required to be submitted annually so that WSDOT pays their stormwater fee to the City. This program consists of studies and improvements to city facilities downstream of limited access right‐of‐way implemented to remain in compliance with RCW 90.03.525. This program enables the city to keep collecting surface water fees from WSDOT for limited access right of way, and prioritizes improvements beneficial to both the City and WSDOT. It supports the city's goals of public safety and quality of life. $96,000 (6‐year CIP Cost) AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 6-39 TABLE 6-8: PRIORITIZED CAPITAL IMPROVEMENT PROJECTS FOR FLOOD RISK REDUCTION/WATER QUALITY TREATMENT GIS Project No. (See Figures 6-2 and 6-3) Project Name Total CIP Cost Estimate (2020 dollars) Annual Maintenance Cost (cost/year) PRIORITY ONE PROJECTS 111 Monroe Avenue NE and NE 2nd Street Infiltration System Improvements $6,350,000 299 Downtown Storm System Improvements $6,917,000 187 and 302 Madsen Creek Improvement Project $1,221,000 101 Cedar River Gravel Removal Project $14,966,000 185 SE 172nd Street and 125th Ave SE Storm System Replacement Project $3,476,000 245 SW 23rd Street and East Valley Road Culvert Replacement $1,780,000 303 Maplewood Creek Sediment Facility Maintenance $1,233,000 $95,000 - $100,000 302 and 187 Madsen Creek Sedimentation Basin Cleaning $926,000 $75,000 - $84,000 211 and 215 Hardie Avenue S Underpass and SW 7th Storm System Improvements (All Phases) $1,735,000 456 NE Sunset Blvd at Union Avenue NE $2,250,000 279 and 281 SW 43rd Street Storm Improvements $4,000,000 256 East Valley Road Storm System Improvements $550,000 116 Ginger Creek/Cascade Park Basin Plan $350,000 Various Locations Miscellaneous and Emergency Storm Projects $527,000 999 SE 182nd St Storm System $300,000 TOTAL PRIORITY ONE PROJECTS $46,581,000 PRIORITY TWO PROJECTS 121 Lower Maplewood Conveyance Improvements $557,000 146 NE 4th Street Crossing at Maplewood Creek $336,000 151 East Fork Maplewood Creek at NE 2nd Street $421,000 156 Maplewood Creek Basin Improvements $1,030,000 213 SW 4th Place and Maple Avenue SW Drainage Analysis $395,000 217 Rainier Pump Station $700,000 237 Talbot Road Drainage Improvements $527,000 240 Puget Drive SE at Rolling Hills Avenue Culvert Crossing $388,000 251 Springbrook Creek Old Bridge Removal at SW 27th Street $105,000 AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6‐40 PRIORITY TWO PROJECTS 268 Talbot Road S and S 34th Pl Stormline Repair Project $204,000 275 Oakesdale Avenue/SW 41st Street Culvert Replacement $1,710,000 285 SE 190th Street Drainage Improvement $108,000 287 S. 55th Street and Talbot Rd. S Drainage Improvement Project $120,000 421 May Creek Outfall @ NE 30th Street $658,000 511 John’s Creek Outfall Culvert Crossings $1,200,000 521 John's Creek Outfall ‐ NE 8th to Houser $1,450,000 531 Kennydale Master Drainage Plan $395,000 541 East Lake Washington Blvd and NE 28th Street Drainage $329,000 551 Blueberry Farm at Jones Avenue NE and NE 20th Street $336,000 555 Sunset Blvd N/Aberdeen Ave NE/NE 10th St Storm Repair Project $198,000 566 Jones Avenue NE/NE 43rd Street Culvert and Storm System Improvements $922,000 571 Lincoln Avenue NE Culvert Improvements $198,000 TOTAL PRIORITY TWO PROJECTS: $12,287,000 PRIORITY THREE PROJECTS 231 North Talbot Hill Drainage Improvements $1,210,000 234 Puget Drive South and Benson Road Outfalls Study $198,000 238 16501 Benson Rd South $66,000 263 Shattuck Avenue South and S 37th Street Outfall $101,000 265 Talbot Road South Drainage Study $198,000 269 Talbot Road South @ Panther Creek Outfall $790,000 282 S 178th Street Drainage Connection $362,000 411 May Creek Outfall @ NE 36th Street $658,000 431 Honey Creek Outfalls Plan $263,000 506 John's Creek Culverts Sediment Cleaning $165,000 516 South Lake Washington Roadway Improvement Discharge to John's Creek $988,000 546 Meadow Avenue North Culvert on Kennydale Creek $2,630,000 621 Black River Box Culvert Maintenance $1,320,000 998 Wells Ave S Drainage Improvement Project $300,000 TOTAL PRIORITY THREE PROJECTS $9,249,000 AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE 6‐41 FLOODING PROJECTS WITH HABITAT EMPHASIS 271 Springbrook Creek Wetland and Habitat Mitigation Bank $922,000 TOTAL FLOODING PROJECTS WITH HABITAT EMPHASIS $922,000 WATER QUALITY TREATMENT PROJECTS W800 Burnett and Williams Water Quality Retrofit Project $470,000 W801 Heather Downs Detention Pond Water Quality Retrofit $1,145,000 W802 Stormwater Facility Retrofit Study $300,000 W803 Jefferson Ave NE Green Connection Project $2,506,000 TOTAL WATER QUALITY TREATMENT PROJECTS $4,421,000 AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 7 -1 SECTION 7 RECOMMENDATIONS AND PLANNED ACTIONS This section contains a summary of the recommendations developed through the planning process that are new or different from the current surface water program. The two main areas of recommendations include surface water management program elements and capital improvement program. 7.1 SUMMARY OF RECOMMENDED SURFACE WATER MANAGEMENT PROGRAM CHANGES The recommended program changes are summarized below within two broad categories, Regulatory Compliance and Other Future Program Needs and Policy Considerations. Recommendations in the area of Regulatory Compliance primarily relate to compliance with the NPDES permit. Fact Sheets developed for new programs identified in Section 5 are included in Appendix E. 7.1.1 REGULATORY COMPLIANCE As discussed in Section 3, Utility has taken major steps from 2008 to present day in order to meet the requirements of the NPDES permit. Starting in August 2019, Utility also began to phase in new and/or increased programs to meet the new permit compliance requirements as part of the next NDPES permit cycle. The following paragraphs list some of the major recommendations regarding NPDES and regulatory compliance, the majority of which relates to the new NPDES permit. • Anticipate need for program increases as the new NPDES permit is phased in. Table 5-1 presents a list of the main changes from the current permit and provides an estimated range of cost implications of between $223,200 and $455,500 for implementation of a new source control program, additional mapping and watershed planning, and development of a Stormwater Management Action Plan. Overall costs to implement the permit, including implementation of on-going permit conditions range from $1,242,860 to $1,801,660. These estimates are based on current City staffing costs and estimated staffing levels to complete the work. Details are provided in Section 5. Some of the major NPDES permit changes in the 2019 permit (summarizing from Table 5-1) are: o Develop and implement a source control program for existing land uses. o Evaluate receiving water conditions in City watersheds and select high priority watershed for which to develop a Stormwater Management Action Plan. o Map private stormwater systems connected to the MS4. 7.1.2 OTHER FUTURE PROGRAM NEEDS AND POLICY CONSIDERATIONS Section 5 discusses ongoing activities and the future needs of Utility to address permit requirements, city policies, and increased workloads, as well as land use, Utility processes, and potential regulatory issues. These ongoing and future program needs are summarized in Table 5-2, and include: AGENDA ITEM # 9. a) RECOMMENDATIONS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 7 -2 • Continue to monitor the increased resources from infill development relative to maintenance staff levels and make adjustments as needed. • Continuation of Residential Plat Stormwater Management Facility and Maintenance and Operation • Continuation of existing surface water initiatives, including the Mosquito Abatement Program, Stormwater Facility Fencing Program, City-Wide Drainage Maintenance Program, and Stream Flow/Water Quality Monitoring Program. • Enhance the current Asset Management Program to include all Utility assets. • Update the Surface Water Utility System Plan every 6 years. • Continue with agency coordination such as WSDOT, KCFCD, FEMA, USACE, and Ecology on issues related to surface water management within the City. 7.2 PLANNED CAPITAL IMPROVEMENT PROGRAM Table 7-1 presents Utility’s 2021 to 2026 CIP. The CIP includes flood hazard reduction projects, water quality projects, and habitat projects. Fact Sheets developed by the City for the Utility CIP for 2021 to 2026 are included in Appendix G. The fact sheets describe each project, summarize the scope, and illustrate estimated expenditures and funding resources spread out over the six-year planning period. They also indicate a planned year of implementation for each CIP, noting however that project priorities change in any given year. Section 6 provides a discussion of several factors that can influence the schedule for CIP implementation. TABLE 7-1: SURFACE WATER UTILITY 2021-2026 CAPITAL IMPROVEMENT PROGRAM (CIP) Priority Capital Projects Project GIS # (See Figures 6-2 and 6- 3 for Locations) 1 Monroe Ave NE & NE 2nd St Infiltration System Improvements 111 2 Downtown Storm System Improvements 299 3 Madsen Creek Improvement Project 187 and 302 4 Jefferson Ave NE Green Connections Project W803 5 Cedar River Gravel Removal Project 101 6 Cedar River 205 Project Levee Recertification Project N/A 7 Heather Downs Detention Pond Retrofit W801 8 Stormwater Facility Retrofit Study W802 9 Burnett Ave S and Williams Ave S Water Quality Retrofit Project W800 10 SE 172nd and 125th Ave SE Storm System Improvement Project 185 AGENDA ITEM # 9. a) RECOMMENDATIONS O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE 7 -3 TABLE 7-1: SURFACE WATER UTILITY 2021-2026 CAPITAL IMPROVEMENT PROGRAM (CIP) Priority Capital Projects Project GIS # (See Figures 6-2 and 6- 3 for Locations) 11 SW 23rd Street Drainage and Fish Passage Improvements 245 12 Maplewood Creek Sedimentation Facility Maintenance 303 13 Madsen Creek Sedimentation Cleaning 302 and 187 14 Rainier Ave and Oaksdale Ave Pump Station Upgrades N/A 15 Springbrook Creek Wetland and Habitat Mitigation Bank 271 16 Stormwater Facility Fencing Project N/A 17 Small Drainage Projects Program N/A 18 Surface Water Utility GIS N/A 19 Talbot Hill Area Mosquito Abatement Program N/A 20 CMP Storm System Replacement Program N/A 21 Hardie Ave SW-SW 7th St Storm System Improvements 211 and 215 22 NE Sunset Blvd & Union Ave NE Storm System Improvements 456 23 SW 43rd Street/Lind Ave SE Storm System Improvements N/A 24 East Valley Road Storm System Improvements 256 25 Surface Water Utility System Plan N/A 26 Ginger Creek/Cascade Park Basin Plan 116 27 Cedar River Flood Risk Reduction Feasibility Study N/A 28 WSDOT Limited Access ROW Runoff Impact Mitigation Program N/A 29 Miscellaneous/Emergency Storm Projects N/A AGENDA ITEM # 9. a) O SBORN C ONSULTING , I NC. B ELLEVUE • S EATTLE • S POKANE R-1 REFERENCES Abbey Road Group. 2019. King County Drainage District #1 Semi Annual Water Quality Testing Results (September 11,2019). Memo received December 2, 2019. BergerABAM. 2011. Final Hydraulic Report, Strander Boulevard Extension Project for the Cities of Renton and Tukwila. July 2011. http://edocs.rentonwa.gov/Documents/DocView.aspx?id=31126&dbid=0&repo=CityofRenton Accessed November 2020. BHC. 2007. South Lake Washington Roadway Improvement Report. Black, Alan. 2006. E-mail from Alan Black, P.E., HNTB, to Allen Quynn, City of Renton. Fwd:Re: RTB Project – Gypsy Creek Flows. October 20, 2006. (Cited in Parametrix 2007.) Brooks, P., Geoghegan K., Farah, J. 2019. Post-Dredge Monitoring of Channel Adjustment in a Gravel- Bedded River. Submitted for the 2019 Federal Interagency Sedimentation and Hydrologic Modeling Conference. Reno, Nevada. ENTRANCO. 1995. Gypsy Subbasin Analyses, Technical Memorandum No. 2. Draft analysis. Prepared for City of Renton, Washington. April 1995. City of Renton. 2012. Construction of: Oakesdale Pump Station Repair Project Project No. SWP 27- 3637. Contract CAG-12-131. August 2012. http://edocs.rentonwa.gov/Documents/DocView.aspx?id=31126&dbid=0&repo=CityofRenton Accessed November 2020. City of Renton. 2015. City of Renton Comprehensive Plan. City of Renton, Washington. Adopted June 22, 2015. Amended December 10, 2018. City of Renton Public Works Department Surface Water Utility. 2017. Surface Water Design Manual. Department of Ecology (Ecology). 2020a. Web page. Accessed June 2020. Washington State Water Quality Atlas. http://fortress.wa.gov/ecy/waterqualityatlas/map.aspx?CustomMap=y&RT=1&Layers=30&Fil ters=n,y,n,n&F2.1=0&F2.2=0&BBox=-14338616,5395963,-12562831,6503994 Department of Ecology (Ecology). 2020b. Web Page. Accessed August 2020. Freshwater Information Network (FIN). Site ID 08C070 Cedar River at Logan Street/Renton. http://ecology.wa.gov/Research-Data/Monitoring-assessment/River-stream- monitoring/Water-quality-monitoring/River-stream-water-quality-index. Department of Ecology (Ecology). 2020c. Accessed June 2020. Overview of Washington State Environmental Policy Act (SEPA). http://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA- guidance/Basic-overview Department of Ecology (Ecology). 2020d. Web Page. Accessed August 2020. Soos Creek watershed multi-parameter TMDL. http://ecology.wa.gov/Water-Shorelines/Water-quality/Water-improvement/Total- Maximum-Daily-Load-process/Directory-of-improvement-projects/Soos-Creek-multi- parameter-TMDL AGENDA ITEM # 9. a) REFERENCES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE R‐2 Department of Ecology (Ecology). 2020e. Web Page. Accessed August 2020. Soos Creek watershed fecal coliform TMDL. http://ecology.wa.gov/Water‐Shorelines/Water‐quality/Water‐improvement/Total‐ Maximum‐Daily‐Load‐process/Directory‐of‐improvement‐projects/Soos‐Creek‐bacteria‐TMDL Federal Emergency Management Agency (FEMA). 2019. Web page. Last Updated September 9, 2019. Accessed June 2020 The National Flood Insurance Program Community Status Book. http://www.fema.gov/national‐flood‐insurance‐program‐community‐status‐book. Federal Emergency Management Agency (FEMA). Guidance for Flood Risk Analysis and Mapping ‐ Levees. February 2018. David Hartley, King County DNR‐WLRD. March 13, 2000. Flood Frequency Curve for the Year 2000 Floodplain Mapping on the Cedar River. Geoengineers. 2017. As‐Built Record: Elliot Channel Repair – Cedar River Maintenance Dredging Project, Renton, WA. Prepared for the City of Renton. Gray & Osborne, Inc. 2003. SW 7th Street Storm Drainage Improvement Project. Pre‐design analysis report. Prepared for City of Renton, Washington. February 2003. Hallock, David. 2002. A Water Quality Index for Ecology’s Stream Monitoring Program. Washington State Department of Ecology. Harza. 1995. Final Report: Comprehensive fisheries assessment of the Mill Creek, Garrison Creek and Springbrook system. Prepared for City of Kent, Environmental Engineering. HDR Engineering, Inc. 1995. Draft Surface Water Utility Comprehensive Plan (not adopted). Prepared for City of Renton, Washington. November 1995. Herrera Environmental Consultants. 1993a. Renton/Lake Washington Pollution Abatement Program: Pollutant Source Characterization. Prepared by Herrera Environmental Consultants and R. W. Beck and Associates. December 1993. Herrera Environmental Consultants. 1993b. “Appendix A: Water Quality Assessment.” In: R. W. Beck and Associates, Herrera Environmental Consultants, and Jones & Stokes Associates. Black River Basin Water Quality Management Plan. Vol. 2. Prepared for City of Renton, Washington. May 1993. Herrera Environmental Consultants. 1994. Renton/Lake Washington Pollution Abatement Program: Implementation Plan. May 1994. Herrera Environmental Consultants. 2006. Monitoring Report—Gene Coulon Park Microbial Source Tracking Study. Kerwin. 2001. Salmon and Steelhead Habitat Limiting Factors Report. For Cedar‐Sammamish Basin (Water Resource Inventory Area 8). http://www.govlink.org/watersheds/8/pdf/wria_8_lfa_FINAL.pdf King County. 1992. Soos Creek Basin Plan. King County Surface Water Management Division. AGENDA ITEM # 9. a) REFERENCES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE R‐3 King County. 1993. Cedar River Current and Future Conditions Report. King County Surface Water Management Division. April 1993. King County. 1995a. May Creek Current and Future Conditions Report. Prepared by Foster Wheeler Corporation for King County Surface Water Management Division and Renton Surface Water Utility. August 1995. King County. 1995b. Cedar River Draft Basin and Nonpoint Pollution Action Plan. King County Department of Public Works, Surface Water Management Division; and Cedar River Watershed Management Committee. February 1995. King County. 1999. West Hill Drainage Study: Southwest Lake Washington Basin. King County Department of Natural Resources. January 1999. King County. 2000. Habitat Limiting Factors and Reconnaissance Assessment Report: Green/Duwamish and Central Puget Sound Watersheds (Water Resource Inventory Area 9 and Vashon Island. King County Department of Natural Resources and Washington State Conservation Commission. December 2000. King County. 2001. May Creek Basin Action Plan. King County Surface Water Management Division and Renton Department of Public Works. April 2001. King County. 2002. Green‐Duwamish Watershed Nonpoint Action Plan: Final Plan. King County. 2005. Swimming Beach Closure Summaries Web page. King County Department of Natural Resources and Parks, Water and Land Resources Division. July 29, 2005. http://www.kingcounty.gov/services/environment/water‐and‐land/lakes/swimming‐ beaches/ClosureSummary.aspx King County. Web page. Last Updated November 2, 2016. Stream Report for May Creek (Site 0440). http://green2.kingcounty.gov/streamsdata/watershedinfo.aspx?Locator=0440 King County. Web page. 2020. King County DNRP Water Quality Index. Station 317. Water Year 2018. http://green2.kingcounty.gov/streamsdata/WQIReport.aspx?Locator=0317) Accessed July 2020. King County Flood Control District (KCFCD). 2019. Lower Green River Corridor Flood Hazard Management Plan – Final Scoping Summary Report. Mauger, G.S., J.S. Won, K. Hegewisch, C. Lynch, R. Lorente Plazas, E. P. Salathé Jr., 2018. New Projections of Changing Heavy Precipitation in King County. Report prepared for the King County Department of Natural Resources. Climate Impacts Group, University of Washington, Seattle. AGENDA ITEM # 9. a) REFERENCES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE R‐4 National Oceanic and Atmospheric Administration (NOAA). 2006. Accessed August 2020. 64 FR 14308 ‐ Endangered and Threatened Species; Revision of Species of Concern List, Candidate Species Definition, and Candidate Species List. Federal Register Volume 71, Issue 200 (October 17, 2006). Office of the Federal Register, National Archives and Records Administration. http://www.govinfo.gov/content/pkg/FR‐2006‐10‐17/pdf/E6‐17249.pdf. National Oceanic and Atmospheric Administration (NOAA). 2007. Accessed August 2020. 72 FR 26722‐ Endangered and Threatened Species: Final Listing Determination for Puget Sound Steelhead. Federal Register Volume 72, Issue 91 (May 11, 2007). Office of the Federal Register, National Archives and Records Administration. http://www.govinfo.gov/content/pkg/FR‐2007‐05‐ 11/pdf/E7‐9089.pdf. Northwest Hydraulic Consultants, Inc. (NHC). 2005. Hydrologic Analysis for Floodplain Mapping Study for Springbrook Creek, King County, Washington. Technical memorandum. Prepared for City of Renton, Washington. October 25, 2005. Parametrix. 1989. Comprehensive Storm Water Plan, Maplewood Creek Basin Plan. Prepared for City of Renton, Washington. October 1989. Parametrix. 2007. Ripley Lane Drainage Improvement Project: Hydrologic Analysis. Technical memorandum. June 15, 2007. Parametrix. 2008. Preliminary Draft Shoreline Inventory and Analysis. Prepared for City of Renton. August 2008. R. W. Beck, Inc. 1997b. NE 27th Street/Aberdeen Avenue NE Storm System Improvement Project. Prepared for City of Renton, Washington. September 1997. R. W. Beck, Inc. 1993. Hydrologic Analysis: Lake Washington Pollution Abatement Project. Prepared for Herrera Environmental Consultants and City of Renton. October 1993. R. W. Beck, Inc. 1997a. East Side Green River Watershed Project Plan and Environmental Impact Statement. Prepared for City of Renton, Washington. September 1997. R. W. Beck, Inc. 1998. SW 7th Street/Hardie Avenue SW/Lake Avenue S Drainage Investigations. Prepared for City of Renton, Washington. November 1998. R. W. Beck, Inc. 2006. Hydraulic Analysis of Springbrook Creek FEMA Remapping Study. Prepared for City of Renton, Washington. June 2006. R. W. Beck, Inc. 2007. East Side Green River Watershed Plan, Technical Memorandum Supplement – Final. Technical memorandum. Prepared for City of Renton, Washington. February 21, 2007. Renton. 2005. City of Renton Comprehensive Plan. City of Renton, Washington. December 12, 2005 amendment. Renton. 2006. City of Renton Comprehensive Plan. City of Renton, Washington. November 27, 2006 amendment. AGENDA ITEM # 9. a) REFERENCES O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE R‐5 SSOE, Inc. 1992. South Garden Avenue Storm Drain Extension. Prepared for City of Renton, Washington and PACCAR. February 1992. SvR Design Company. 1993. Hydraulic Report N.E. 5th Place Storm System Replacement Project. Prepared for City of Renton and Renton Technical College. November 1993. USEPA. 2002. http://www3.epa.gov/npdes/pubs/assetmanagement.pdf. U.S. Army Corps of Engineers (USACE). 2019. FACT SHEET – Howard Hanson Dam. United States Army Corps of Engineers, Seattle District. http://www.nws.usace.army.mil/Media/Fact‐Sheets/Fact‐ Sheet‐Article‐View/Article/483489/fact‐sheet‐howard‐hanson‐dam/ U.S. Army Corps of Engineers (USACE). 2020. Environmental assessment: Elliot rearing/spawning channel, mitigation for overdredging associated with the Cedar River 205 Flood Control Project, King County, Washington. United States Army Corps of Engineers, Seattle District. US Fish and Wildlife Service (USFWS). 1999. 64 FR 58910‐ Endangered and Threatened Wildlife and Plants; Determination of Threatened Status for Bull Trout in the Coterminous United States. Federal Register Volume 64, Issue 210 (November 1, 1999). Office of the Federal Register, National Archives and Records Administration. http://www.govinfo.gov/content/pkg/FR‐ 1999‐11‐01/pdf/99‐28295.pdf. Accessed August 2020. Washington State Department of Ecology (Ecology). 2019. Stormwater Management Manual for Western Washington. 5 vols. Washington State Department of Ecology. Washington State Highway Commission. 1960. Primary State Highway No. 5, Renton Vicinity, Jct. PSH No. 1 to Jct. PSH No. 2, Pumping Station. Layout and Pumphouse Details. Rainier Avenue Stormwater Pump Station. Drawing Set. http://edocs.rentonwa.gov/Documents/ElectronicFile.aspx?docid=577682&dbid=0&repo=City ofRenton. Accessed November 2020. Washington State Office for Regulatory Innovation and Assistance (ORIA). Web page. 2020. Regulatory Handbook. http://apps.oria.wa.gov/permithandbook/ Accessed June 2020. WRIA 8 Steering Committee. 2002. Lake Washington/Cedar/Sammamish Watershed Near‐Term Action Agenda for Salmon Conservation. August 2002. WRIA 8 Steering Committee. 2005. Proposed Lake Washington/Cedar/Sammamish Watershed Chinook Salmon Conservation Plan. February 25, 2005. WRIA 8 Steering Committee. 2017. Proposed Lake Washington/Cedar/Sammamish Watershed Chinook Salmon Conservation Plan Update. September 2017. AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE APPENDIX A ISSUE PAPERS AGENDA ITEM # 9. a) CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Residential Plat Stormwater Management Facility Maintenance and Operation Policy Meeting: Regular Council - 20 Sep 2010 Exhibits: Issue Paper Submitting Data: Dept/Div/Board: Public Works Staff Contact: Ron Straka,Surface Water Utility Supervisor, x7248, Steve Lee, Surface Water Engineer, x7205 Recommended Action: Refer to Committee of the Whole Fiscal Impact: Expenditure Required: $ 715,950/year Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ City Share Total Project: $ SUMMARY OF ACTION: The City needs to establish a uniform and equitable policy for maintaining stormwater management facilities in single-family residential plats with public streets. The City currently requires homeowner associations to own and maintain stormwater flow control and water quality treatment facilities in single-family residential plats, even though these facilities manage runoff from public streets. However, when the City annexes areas from King County, the City is required to assume maintenance of stormwater management facilities in the newly annexed areas because King County owns and maintains stormwater facilities in plats with public streets. The Surface Water Utility currently maintains 100 stormwater facilities in plats. There are an additional 213 facilities that are privately maintained by homeowner associations in single-family residential plats that manage runoff from public streets. Because these facilities manage runoff from public right-of-way, the City should maintain these facilities. The proper maintenance of these facilities is also needed to minimize maintenance and capital improvements costs to the City, to meet regulatory requirements related to the National Pollution Discharge Elimination System Phase II Municipal Stormwater Permit, to protect public safety, to prevent damage to property, and to protect environmental resources. Prior to the City assuming maintenance of existing stormwater facilities, the facilities would need to meet City maintenance standards. The total additional revenue increase needed to fund the program would be about $13 per year for a typical homeowner, based upon 2010 Surface Water Utility revenues. That amount could be reduced if proposed revenue increases are approved as part of the 2011-2012 budget process and if the Fairwood Annexation is approved. The hiring of the maintenance staff and budgeting for the purchase and rental of equipment would be phased in between 2012 and 2013, depending upon how rapidly facilities are transferred from homeowner associations to the City. STAFF RECOMMENDATION: Assume maintenance and operation of all stormwater facilities in single-family residential plats with public streets. AGENDA ITEM # 9. a) PUBLIC WORKS DEPARTMENT M E M O R A N D U M DATE: September 8, 2010 TO: Don Persson, Council President Members of the Renton City Council VIA: Denis Law, Mayor FROM: Gregg Zimmerman, Administrator STAFF CONTACT: Ron Straka, Surface Water Utility Supervisor, x7248 Steve Lee, Surface Water Utility Engineer, x7205 SUBJECT: Residential Plat Stormwater Management Facility Maintenance and Operation Policy ISSUE: Should the City implement a policy to take over maintenance and operation of stormwater management facilities in single-family residential plats with public streets? RECOMMENDATION: The City assumes maintenance and operation of existing and future stormwater management facilities constructed in plats with public streets. This includes assuming maintenance of approximately 213 existing stormwater facilities. Prior to the City assuming maintenance of the existing stormwater management facilities in plats from homeowner associations, the facility will have to be maintained by them to meet City stormwater facility maintenance standards. The hiring of the maintenance staff and budgeting for the purchase and rental of equipment would be phased in over time starting in 2012, depending upon how rapidly facilities are transferred from homeowner associations to the City. It is recommended that the 2012 budget include funding to hire two full-time Maintenance Worker III positions and budget to hire four part-time non-regular employees (summer help), funding to purchase a slope mower with trailer, a one-ton flatbed truck and a dewatering pump. The 2013 budget would include funding to hire two additional full-time Maintenance Worker III positions , the purchase of another slope mower with trailer and a one-ton flatbed truck, along with the funding for rental of equipment, material disposal, AGENDA ITEM # 9. a) Mr. Don Persson, Council President Page 2 of 6 September 8, 2010 H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-9999 SSWM Plan\1116 SWUMP IssuePapers\Pond Maintenance Takeover\1003 City Correspondence\100809 Util_Cmttee_Pond_Maint_Policy_Issue_Paper_STLver1.doc\STLtp and the purchase of materials associated with the facility cleaning and repairs (see attached Single-Family Residential Plat Facility Maintenance Cost Summary). The total revenue increase needed to assume maintenance of the 213 stormwater facilities is estimated to be 14.67%, which would add an average of $1.09 per month to a typical single-family residential customer’s Surface Water Utility bill. This is based upon 2010 Surface Water Utility revenues. BACKGROUND SUMMARY: On October 20, 2008, the Surface Water Utility (SWU) presented a Utility Committee Briefing concerning the establishment of a uniform and equitable policy regarding maintenance of stormwater management facilities in single-family residential plats with public streets draining into these facilities. Information presented during the briefing included various types of flow control and water quality treatment facilities the City manages, their intended use in mitigating water quality from roadways, reducing flooding impacts, preventing damage to properties, protecting public safety, protecting environmental resources and me eting regulatory requirements. The briefing provided reasons for assuming maintenance of stormwater management facilities in plats with contributing runoff from public streets. These reasons are summarized in the following list: 1. The City should take responsibility for stormwater management facilities maintenance in plats since they control runoff from public streets and serve multiple property owners. 2. In unincorporated King County, the policy is to require new plats to dedicate a tract for stormwater management facilities with King County assuming ownership and maintenance responsibility. These King County areas that are annexed into the City require that the City assume ownership and maintenance responsibility. 3. Current City residents who live in plats that maintain their own stormwater management facilities pay the same SWU rates as residents who live in areas with publicly maintained stormwater facilities. The City assuming maintenance of the facilities would provide greater equity of City services to all customers. 4. Taking over all privately maintained residential plat stormwater facilities with public area runoff ensures compliance with the National Pollution Discharge Elimination System Phase II Municipal Stormwater Permit (NPDES) requirements and provides the same level of service to all single-family residential customers in plats with public streets. It also eliminates the difficulties of legally enforcing maintenance of these facilities by residential homeowner associations, reduces flooding, reduces maintenance of downstream City systems, and protects water quality and habitat. 5. Problems associated with current City policy would be reduced or eliminated due to the City permitting new projects that have runoff that contribute flows to the downstream stormwater facility that is privately owned and maintained by a AGENDA ITEM # 9. a) Mr. Don Persson, Council President Page 3 of 6 September 8, 2010 H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-9999 SSWM Plan\1116 SWUMP IssuePapers\Pond Maintenance Takeover\1003 City Correspondence\100809 Util_Cmttee_Pond_Maint_Policy_Issue_Paper_STLver1.doc\STLtp homeowners association. With the City providing maintenance for these facilities, this concern will be resolved. 6. Legal difficulties with enforcing maintenance, collecting fines and staff time allocated to NPDES permit inspections and enforcement would be eliminated. 7. Concerns about safety and liability to the City associated with the current requirement that homeowner associations maintain their stormwater facilities would be reduced. Trained City personnel would properly maintain vaults (confined space entry), catch basins, ponds, and various facilities in a safe manner especially in newer systems that require more technical knowledge. 8. Prior to the transfer of all privately maintained water quality and flow control facilities, the homeowner associations need to have the facility maintained to City standards so that it functions as it was originally designed. If non-maintained facilities are turned over to the City, more City funding would be needed to bring the facility up to City standards and would require the program be implemented (hire staff and purchase equipment) faster, resulting in a larger rate increase. 9. Takeover of stormwater management facilities in plats with public streets increases the City’s ability to properly operate, maintain, and make future improvements to the facilities if needed. Stormwater facilities in potential annexation areas: King County currently owns and maintains stormwater flow control and water quality facilities in the City’s potential annexation areas. When these areas are annexed into the City, the City assumes ownership and maintenance responsibilities of these facilities. The cost to maintain these facilities is funded by the Surface Water Utility rate, which is paid by all customers in the City, even those customers who live in plats that have homeowner associations that are required to maintain the stormwater management facility in their plat. The proposed Fairwood Annexation area contains approximately 77 stormwater facilities and the proposed West Hill Annexation area contains approximately 16 stormwater facilities. Within the Preserve Our Plateau Potential Annexation Area (PAA) there are approximately 21 stormwater facilities. The number of facilities maintained by King County within the City’s PAA will increase as new single-family residential plats are approved, constructed, and released from bonding by King County. Assumptions: The following assumptions were used in analyzing the pond maintenance policy: The turnover of maintenance responsibilities to the City assumes the facilities are in single-family plats with public right-of-way. This evaluation of the City taking over stormwater maintenance facilities does not include plats that only serve private roads AGENDA ITEM # 9. a) Mr. Don Persson, Council President Page 4 of 6 September 8, 2010 H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-9999 SSWM Plan\1116 SWUMP IssuePapers\Pond Maintenance Takeover\1003 City Correspondence\100809 Util_Cmttee_Pond_Maint_Policy_Issue_Paper_STLver1.doc\STLtp and private residential structures, or stormwater facilities on commercial and industrial properties. There are 213 facilities in plats that are currently owned and maintained by homeowner associations with public streets that the City would over time assume responsibility to maintain. The total number of stormwater management facilities in single-family residential plats with public streets is 313. The City maintains 100 residential stormwater management facilities. The City had previously assumed maintenance of 33 facilities prior to implementing the current policy and 48 facilities recently turned over to the City from the Benson Hill annexation, seven facilities in the Aqua Barn-New Life annexation, 10 facilities in the Liberty annexation, and two facilities from the Springbrook annexation. This analysis assumes that the private facility inspection program will inspect all private stormwater management facilities, record inspections, quantify deficiencies and maintenance requirements, and enforce maintenance of deficient facilities. The private facility inspection program would initially focus on inspecting the stormwater management facilities in plats to document any required maintenance needed prior to the transfer of maintenance responsibilities to the City. Prior to the private facilities being turned over to the City for maintenance, any one-time ‘catch-up’ maintenance, repairs, access issues, and other deficiencies will be the responsibility of the homeowner associations. This will minimize the City’s maintenance costs and have less impact on Surface Water Utility rates. The homeowner associations have the option of bringing the facilities up to City maintenance standards by hiring a private contractor or they can do the work themselves. It is not recommended that the City take over the facilities without having the homeowner associations first bring the facility up to City maintenance standards, since it would result in significantly higher costs and require immediate implementation of the program. By having the homeowner associations bring the facilities up to City maintenance standards prior to the City assuming maintenance of the facility, the City’s cost to assume maintenance of the facilities can be spread out over several years. In 2011, the process of legally transferring the facilities to the City for maintenance would be started by the Surface Water Utility Engineering Section. The cost of hiring of maintenance staff and budgeting for the purchase and rental of equipment would be phased in over time starting in 2012, depending upon how rapidly facilities are transferred from homeowner associations to the City. In order to implement the program, it is recommended that the 2012 budget include funding to hire two full-time Maintenance Worker III positions and budget to hire four part-time non-regular employees (summer help), funding to purchase a slope mower with trailer, a one-ton flatbed truck and a dewatering pump. The 2013 budget would include funding to hire another two full-time Maintenance Worker III positions, the purchase of another slope mower with trailer, and a one-ton flatbed AGENDA ITEM # 9. a) Mr. Don Persson, Council President Page 5 of 6 September 8, 2010 H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-9999 SSWM Plan\1116 SWUMP IssuePapers\Pond Maintenance Takeover\1003 City Correspondence\100809 Util_Cmttee_Pond_Maint_Policy_Issue_Paper_STLver1.doc\STLtp truck, along with the funding for rental of equipment, material disposal, and the purchase of materials associated with the facility cleaning and repairs (see attached Single-family Residential Plat Facility Maintenance Cost Summary). Costs to takeover maintenance of facilities will be further refined during each program budget request period due to variability in yearly equipment rental, labor, materials and quantities, and disposal costs. Newly constructed stormwater facilities in plats with public streets would also be taken over by the City for maintenance upon completion of the two-year maintenance and defect period following construction. Additional City maintenance staff and equipment would be added over time as new facilities are constructed. Summary of required program resources: The following is a summary of the additional staff, equipment purchases, and other costs associated with the City assuming maintenance of the 213 stormwater facilities in the City that are currently in plats with public streets and are being maintained by homeowner associations (see attached Single-family Residential Plat Facility Maintenance Cost Summary): The annual additional staff needed for maintenance of these facilities in plats is estimated to be four new FTEs and four seasonal laborers in the Surface Water Utility Maintenance Section assuming little or no export of materials is needed. The estimated annual staff cost is $376,000. New equipment needed includes two Harper slope mowers with trailers, two dewatering pumps, and two one-ton flat bed trucks. The estimated initial purchase cost of the equipment is $192,000. The estimated annual equipment purchase, O&M, and replacement cost is $64,600. The annual rental of equipment is estimated to be needed for two months, which includes a dozer, a 10-yard dump truck, and a skid steer track machine. The estimated cost for the temporary rental of equipment is $28,600. The estimated annual disposal and repair cost of facilities is $24,750. This total assumes little or no extra disposal is needed for each facility that is assumed. The annual material deposition rate in these facilities is variable and difficult to estimate. A budget of $30,000 is estimated to purchase materials needed to make repairs to the facilities. The cost summary does not include newly constructed stormwater management facilities in plats that would be turned over to the City to maintain after final plat approval. As new facilities in single-family residential plats are constructed or become the Surface Water Utility’s responsibility to maintain due to future annexations, they would be funded by the future revenues based upon the Surface Water Utility rate needed to implement the program and would be included in the normal City’s budget process or as part of the budget adjustment associated with an annexation. AGENDA ITEM # 9. a) Mr. Don Persson, Council President Page 6 of 6 September 8, 2010 H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-9999 SSWM Plan\1116 SWUMP IssuePapers\Pond Maintenance Takeover\1003 City Correspondence\100809 Util_Cmttee_Pond_Maint_Policy_Issue_Paper_STLver1.doc\STLtp Summary of total cost and estimated rate increase: The approximate cost to inspect and maintain each additional facility is estimated to be $3,361 annually. The total annual cost to assume maintenance of an additional 213 stormwater management facilities to the current 100 facilities within single-family residential plats with public streets is estimated to be $715,950. The total revenue increase needed to assume maintenance of the 213 stormwater facilities is estimated to be 14.67%, which would add an average of $1.09 per month to a typical single-family residential customer’s Surface Water Utility bill. This is based upon 2010 Surface Water Utility revenues. If the 2011 and 2012 Surface Water Utility revenue increases are approved as currently proposed, the additional revenue increase required to fund the program to assume maintenance of the stormwater facilities in plats will be reduced. If the Fairwood Annexation is approved, the additional revenue requirements to fund this program would be further reduced due to the additional revenue that would be collected from the new customers. CONCLUSION: The City should assume maintenance of stormwater facilities in single-family residential plats that are currently owned and maintained by homeowner associations. Prior to the City assuming maintenance of the existing stormwater management facilities in plats from homeowner associations, the facility will have to be maintained to meet City stormwater facility maintenance standards. The hiring of the maintenance staff and budgeting for the purchase and rental of equipment and other costs would be phased in starting in 2012, depending upon how rapidly facilities are transferred from homeowner associations to the City. Attachment cc: Lys Hornsby, Utility Systems Director Mike Stenhouse, Maintenance Director Richard Marshall, Surface Water/Wastewater Maintenance Manager File AGENDA ITEM # 9. a) Annual Staff Cost: Position Number of FTE's Assumed Grade and Level Annual Salary & Benefit Cost Total Annual Cost Maintenance Worker III 4 A12, C $88,000 $352,000 Part Time Non Regular Employees 4 NA $6,000 $24,000 TOTAL $376,000 Equipment Cost: Type of Equipment Initial Purchase Cost Equipment Replacement Life (years) Annualized Purchase Cost Annual Replacement Cost Annual O&M Cost Total Annual Cost 2 Harper Mower: Dew EZ mower $90,000 5 $18,000 $18,000 $3,000 $39,000 2 Mower Trailer $12,000 10 $1,200 $1,200 $600 $3,000 2- Dewatering Pumps $10,000 10 $1,000 $1,000 $600 $2,600 2-One Ton Flat Bed $80,000 10 $8,000 $8,000 $4,000 $20,000 TOTAL:$192,000 $28,200 $28,200 $8,200 $64,600 Annual Equipment Rental Cost: Type of Equipment Duration of Rental (Months) Monthly Rental Rate Total Annual Cost: Dozer 2 $4,500 $9,000 10-yd Dump Truck 2 $2,200 $4,400 Skid Steer Track Machine 2 $2,800 $5,600 Excavator Rental (with tracks)2 $4,800 $9,600 TOTAL:$28,600 Annual Disposal Cost: Type of Cost Estimated Disposal Quantity (Tons) Disposal Cost per Ton Estimated Testing Cost Total Cost Disposal Cost (3 regional facilities only)500 $43.50 $3,000 $24,750 $30,000 IE: Fences, CB structure repairs, trash racks, bollards, signs, grates, rock material, soil, tank repairs, plant replacement, etc. SUB TOTAL:$715,950 (for 213 addt'l facilities) PER FACILITY COST : $3,361 /facility/year Annual Misc. Facility Repair and Material Cost: (Assumed) Single Family Residential Plat Facility Maintenance Cost H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-9999 SSWM Plan\1116 SWUMP IssuePapers\Pond Maintenance Task\1104 Reports Calculations\2010 SF Plat Facility Maintenance Cost Est.xls AGENDA ITEM # 9. a) New Annexation Staffing and Resources Recommended Guideline ISSUE: How should the Surface Water Utility Engineering and Maintenance Staff and equipment resources be increased to maintain service levels as a result of new service area annexations into the City? BACKGROUND: The Surface Water Utility was created in 1987 as an entity within the Public Works Department to implement the City’s Surface Water Management (SWM) Program. At that time, one of the main tasks of the Utility was to improve maintenance of existing drainage facilities and solve flooding problems in Renton. Over the years the City has annexed additional area into the City, but the number of maintenance workers and engineering staff dedicated to maintaining that system has not necessarily increased proportionately resulting in declining levels of service. Additional drainage infrastructure and problems gets added to the system as a result of these annexations that needs to be maintained and solved. The newly annexed areas increase engineering needs including the following: customer service for drainage problem response, utility billing, storm system mapping, capital improvement projects, storm system planning, NPDES permitting requirements, technical assistance with other city programs, jurisdictions, and agencies, and compliance with other regulatory requirements in newly annexed areas. The Maintenance Section is responsible for the following: cleaning storm systems, maintaining facilities, repairing facilities, inspecting public systems, and emergency response to newly annexed areas. Historically this additional volume of engineering and maintenance work was absorbed by the City’s existing staff from roughly 1990 to 2007 without significant changes in full time employees (FTEs). During this time there were a number of small annexations that increased the City population. The following table shows the history of the City’s population and FTEs history from 1990 to 2019. AGENDA ITEM # 9. a) Surface Water Utility (Year) City Population1 # Engineering FTEs2 # Maintenance FTEs2 1990 42,888 4.5 6.2 1991 43,199 4.5 6.2 1992 44,039 4.0 6.2 1993 44,303 5.0 6.2 1994 44,064 5.0 5.2 1995 44,332 5.3 5.2 1996 44,705 5.3 5.2 1997 45,264 5.3 4.7 1998 46,477 5.3 4.7 1999 47,540 5.3 4.7 2000 51,485 5.3 4.7 2001 51,140 5.3 4.7 2002 53,840 5.3 4.7 2003 54,900 5.3 4.7 2004 55,360 5.3 4.7 2005 56,840 5.3 4.7 2006 58,360 5.3 4.7 2007 60,290 5.3 4.7 2008 80,708 8.0 10.2 2009 83,650 8.0 11.2 2010 90,927 8.0 11.2 2011 92,590 8.0 11.2 2012 93,905 10.0 11.2 2013 95,332 8.0 13.2 2014 96,052 8.0 15.2 2015 102,567 9.0 15.2 2016 101,823 9.0 15.2 2017 103,026 9.0 15.91 2018 102,869 9.0 15.91 2019 103,074 9.0 16.24 Notes: 1. Based on US Census supplemented by data from City of Renton for years 1990‐2011; Renton Community and Economic Development Department, Economic Development Division data for years 2012‐2019. 2. Provided by City of Renton, based on a review of annual reports for 1990‐2011 and based on adopted budgets for 2012‐2019. FTEs do not reflect position vacancies. AGENDA ITEM # 9. a) 1$166,218 in 2020 dollars Consequently, the overall level of service provided by the Utility declined from 1990 to 2007. Because the amount of maintenance and engineering work that can be performed each year is relatively constant while the volume of infrastructure and stormwater services needs are increasing, the result is a decreasing level of service for maintaining the drainage system over time. In 2008 the City annexed the 4.2 square mile Benson Hill area. At that time the City performed an analysis to determine the drainage system maintenance requirements for bringing this area into the City from King County including maintenance of stormwater facilities in plats that were previously maintained by King County prior to annexation. This analysis considered the differences in historical maintenance practices between the City of Renton and King County as well as new maintenance standards needs of the Department of Ecology’s NPDES Phase II Municipal Stormwater Permit. This analysis determined that 4 FTE maintenance workers would be needed to perform the required drainage system maintenance of the 4.2 square mile area, or 0.95 FTEs per square mile. An analysis for all of the Engineering Section Services to be provided to the Benson Hill Annexation area was also performed. A total of 2.7 FTEs in the Surface Water Utility Engineering Section was determined to be needed to serve the Benson Hill Annexation area or 0.65 FTE per square mile. Note that even though FTEs were increased for the Benson Hill area, there was no additional increase in the SWU capital spending plan to fix any aging infrastructure in this newly annexed area. In addition, to maintain the current level of service FTEs for each one square mile of newly annexed area, an increase of $110,0001 per square mile is needed to be included in the capital improvement budget to maintain the current level of service. To maintain a level of service consistent with what was required for the Benson Hill annexation it takes approximately 1 new maintenance worker, 0.65 new engineering worker and $110,0001 included in the capital improvement budget per one square mile of newly annexed area. This guideline is intended to be applicable to annexed areas and not to the increase in infrastructure and service needs due to new construction within existing City limits or changes in policy regarding assumption of maintenance of facilities in single family plats. The addition of new infrastructure and increased service needs to new construction typically requires a different amount of maintenance work than annexed areas with aging infrastructure. A recommendation to adjust staffing and equipment need to the growth of infrastructure and service needs due to new construction within existing City limits is being developed separately. ASSUMPTIONS: The primary assumption used in analyzing the proposed New Service Area Maintenance guideline was using the number of FTE(s) per area of annexation for the Benson Hill annexation as a basis for measuring the Utility’s FTE level of service. In addition, the Benson Hill area has had previous equipment evaluations that are used as average cost AGENDA ITEM # 9. a) 1$166,218 in 2020 dollars needs per square miles. Equipment needs evaluations should be analyzed separately for each proposed annexation area. ESTIMATED COST: The approximate cost to add each new maintenance worker varies due to type of work, classification grade levels, and employee’s family dependence. Using the July 2020 Union and City agreement rates for maintenance worker MWI to maintenance worker MWIII the average annual mid level cost per employee ranges from $53,172 to $64,824. Assuming an average benefit multiple of 1.5 for each employee, this would equate to $79,758 to $97,236 respectively or an average of about $88,500 for 1 FTE per year. The approximate cost to add each new engineering employee varies due to type of work, classification grade levels, and employee’s family dependence. Using July 2020 Union and City agreement rates for engineering specialist ES1 to civil engineering CEIII the average annual mid level cost per employee ranges from $64,128 to $95,232. Assuming an average benefit multiple of 1.5 for each employee, this would equate to $96,192 to $142,848 respectively or an average about $121,000. At 0.65 FTE, this cost would equal $78,700 per year. Annexation of the Benson Hill area into the City required an additional equipment maintenance cost of $242,000 per square mile annexed. RECOMMENDATION: The recommended guideline is to increase full time employees (FTEs) and estimated equipment needs (in dollars per square mile) to the Surface Water Utility when a certain amount of new area is added to the City through annexations. Based on the analysis described above, it is recommended that 1.0 FTE be added to the Surface Water Utility Maintenance Section and 0.65 FTE be added to the Engineering Section, plus and $110,0001 to the capital improvement budget as resources to the Utility for each square mile of new area annexed into the City. The FTE needs per square mile is consistent with previous calculations for the Benson Hill Annexation. Each newly annexed area will also require equipment needs to be evaluated separately depending on infrastructure problems in that area. The request for new FTEs and equipment should be approved as part of the annexation approval if the annexation is sufficiently large enough to warrant the additional staff (>1.0 FTE) and equipment. Otherwise the smaller annexations will be added cumulatively and a request for additional staff and equipment will be made as part of the normal City budget process based upon this guideline. A financial analysis to evaluate costs to serve and revenues generated from the annexed area would also need review during annexation. This guidance will be used by the Surface Water Utility to determine staffing and equipment resources needed to serve new areas annexed into the City. Actual equipment needs may vary depending on the equipment and drainage problems in the annexed area. AGENDA ITEM # 9. a) New Construction Infrastructure Staffing Recommended Guideline ISSUE: How should the Surface Water Utility Engineering and Maintenance Staff be increased after a certain amount of new storm system infrastructure is constructed as a result of new development, re-development, and new construction? BACKGROUND: The Surface Water Utility was created in 1987 to assist in implementing the City’s Surface Water Management Program (SWM Program). One of the main tasks of the Utility was to improve maintenance of existing drainage facilities and solve flooding problems in Renton. Other services the Surface Water Utility Engineering and Maintenance Service Sections provide are keeping the storm system clean, maintaining records, mapping, planning, responding to complaints, completing repairs and inspections, detecting and eliminating spills, managing contracts and programs, designing, permitting, constructing both minor and major system improvements, technical assistance to internal and external customers, coordinating with regional partners, and providing emergency response. During 1992 the City had approximately 165 miles of storm drain pipe. At that time there were 6.2 maintenance workers and 4.0 engineering workers providing Surface Water Utility services. Although these workers maintained a number of different types of drainage facilities, the miles of storm drain pipe is a simple and reasonable metric that is representative of the size of the storm system as a whole. Based upon the 1992 data, the level of service provided by the utility was 3.75 maintenance workers per 100 miles of pipe and 2.4 engineering workers per 100 miles of pipe. Between 1992 and 2007, the construction of new infrastructure has grown, yet the number of full time Surface Water Utility Engineering and Maintenance employees remained the same and did not keep pace with the growing infrastructure. In 2007, the City had staffing levels of 4.7 maintenance workers and 5.3 engineering workers dedicated to the Surface Water Utility. By the end of 2007, the City’s system had grown to 233 miles of storm drain pipe. As a result, the level of service provided by the utility had dropped to 2.0 maintenance and 2.3 engineering workers per 100 miles of pipe. This means that the Utility was no longer able to achieve the same level of service that was provided in 1992. New storm drainage system infrastructure is added to the City’s system within its current City limits each year. This infill of drainage infrastructure is a result of new development, redevelopment, street improvement projects, and drainage system improvement projects. Over time, a significant amount of drainage infrastructure is added to the system that must be managed by the Utility. Historically this additional volume of infrastructure and service requirements has been absorbed by a fixed number of existing maintenance and engineering staff and resources. Therefore the level of service that could be provided was fixed while the volume of infrastructure increased over time resulting in a decreased level of service. AGENDA ITEM # 9. a) In 2007, the City obtained coverage under the Department of Ecology’s NPDES Phase II Municipal Stormwater Permit for discharging stormwater from its system to waters of the State. To be in compliance with this Permit, the City must implement multiple programs to manage and control stormwater. The program requirements include: • Reporting and Recordkeeping • Stormwater Planning (new in 2019 permit) • Public Education and Outreach • Public Involvement and Participation • Mapping and Documentation • Illicit Discharge Detection and Elimination • Controlling Runoff from New Development, Redevelopment and Construction Sites • Operations and Maintenance including private facility inspections; and catch basin or storm system cleaning • Source Control for Existing Development (new in 2019 permit) • And other NPDES requirements as the permit is revised In order for the City to maintain the level of service that was established in 1992, it is necessary for the Utility to maintain the minimum level of service of one new maintenance worker for every 27 miles of storm pipe added and one new engineering worker when 41 miles of storm pipe are added to the system. It should be understood that this metric will change over time and will need to be revised periodically depending on new stormwater regulations. In addition, while the lineal foot of pipe was selected as the basis for consideration, the City will also need to assess other stormwater infrastructure increases. For example, there may be a large increase in water quality treatment facilities as a result of new regulations. These water quality facilities typically require more intensive maintenance. It is also recommended that while the City focus on the length of pipe for this guideline, it should also track the maintenance demands of other facilities such as water quality facilities. This guideline is intended to be used to maintain the level of service provided by the Surface Water Utility as the City grows due to new developments and redevelopments within the existing City limits only. Surface Water Utility staffing and resource needs due to annexation are being developed separately. RECOMMENDATION: It is recommended that the Surface Water Utility staffing level be increased by one new maintenance FTE for 27 miles of added storm water pipe and one new engineering FTE for 41 miles of new storm water pipe added to the system inventory. The request for the additional staffing due to additional new construction infrastructure would be proposed and approved as part of the City’s budget process. AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE APPENDIX B BASIN REPORT CARDS AGENDA ITEM # 9. a) Surface Water Utility Plan Update Basin Report Card Basin: Black River Total Basin Size (sq. mi): 20.2 Total Area in Renton and UGB (sq. mi): 8.1 WRIA 9 Green/Duwamish River Sub-basins in the City of Renton: • Springbrook Creek (Mill Creek) • Panther Creek • South Renton/SW 7th • Rolling Hills Creek • Thunder Hills Creek • Valley Basin Planning Status: • Green Duwamish Watershed Nonpoint Action Plan (King County 1991, updated in 2002) • Black River Water Quality Management Plan (Herrera 1993b) • East Side Green River Watershed Project Plan and Environmental Impact Statement (RW Beck 1997a) • Planned development of ST3 Transit Center (750 Rainier Ave S) • Plan for Transit Oriented Development (TOD) subarea Water Quality Summary: • Water Quality Index (WQI) in Springbrook Creek system scored 2 out of 100 (2006). • 303(d) list for water quality impairments for bioassessment, temperature, bacteria, and dissolved oxygen. Fish Habitat Status: • Juvenile coho, chum, winter steelhead, and cutthroat have been noted through the basin (Harza 1995). • Adult chinook were observed spawning in Upper Springbrook Creek in 2011. Black River Basin (close-up within Renton) Black River Basin Renton City Limit Renton City Limit AGENDA ITEM # 9. a) Beneficial Uses: Viewing Wildlife Fisheries Basin Issues/Concerns: System capacity issues, low gradient, and upstream erosion and subsequent downstream sedimentation has resulted in flooding in multiple locations. System upgrades needed to replace deteriorating pipes in some locations. Rainier Pump Station/Oakesdale Pump Station upgrades are needed to ensure systems function during flood events. Historically poor water quality conditions in Springbrook Creek. Basin Hydrology (RW Beck 2007 and Gray & Osborne 2003)): Subbasin Name Source (& basis for existing land use) 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows1 100-Year Peak Flows1 2003 / 2007 Future 2003 / 2007 Future 2003 / 2007 Future 2003 / 2007 Future South Renton (SW 7th System) Gray & Osborne (2003) N/A2 122 N/A2 165 N/A2 1856 N/A2 213 Springbrook Creek (at BRPS) 3 ESGRWP (2007) 457 756 931 1053 12764 1251 1197 1343 Panther (at SW 23rd St.) 3 ESGRWP (2007) 67 119 130 149 152 174 197 226 Rolling Hills (at I-405) 3 ESGRWP (2007) N/A5 N/A5 148 1974 1994 186 261 330 Valley Subbasin (Springbrook Creek at SW 23rd St.) ESGRWP (2007) 365 612 769 845 900 1003 1013 1139 1. These flows reflect a future “conveyance” event. There is also a “storage” event that reflects pumping limitations on the BRP S. For more information, see ESGRWP Supplement (R. W. Beck, 2007). 2. Flows were estimated for future conditions only. 3. Flows are based on frequency analysis performed on Springbrook Creek at the BRPS. Individual frequency analyses have not been done. 4. Flows are higher because this event coincides with high flows in the Green, forcing BRPS to operate at a reduced rate, and thus affecting the peak rate. 5. Peak flows for the 2-year recurrence interval were not available. 6. A subsequent report prepared by GHD modeled the 25-year future condition flow at 175.0 (Scenario 2A). Source: ESGRWP Supplement (R. W. Beck, 2007) and SW 7th Street Storm Drainage Improvement Project (Gray & Osborne, 2003) AGENDA ITEM # 9. a) Surface Water Utility Plan Update Basin Report Card Basin: Lower Cedar River Total Basin Size (sq. mi): 25.3 Total Area in Renton and UGB (sq. mi): 7.52 WRIA 8 Cedar River/Lake Washington Sub-basins in the City of Renton: • Tiffany/Ginger Creek • Maplewood Creek • Molasses Creek • Madsen Creek • Orting Hills • Summerfield Creek Basin Planning Status: • Lake WA/Cedar/Sammamish Watershed Chinook Samon Conservation Plan (WRIA 8 Steering Committee 2005) • Cedar River Basin Plan (King County 1995b) • Cedar River Current and Future Conditions Report (King County 1993) • Maplewood Creek Basin Plan (Parametrix 1989) • Future one-story redevelopment project at former Bryant Motors property (1300 Bronson Way N) • Future mixed use development at the Old City Hall (200 Mill Ave S.) Water Quality Summary: • Water Quality Index (WQI) near mouth scored 75 out of 100 (2006) • 303(d) list for water quality impairments for temperature, pH, and dissolved oxygen. Fish Habitat Status: • Lower Cedar River mainstem provides spawning habitat for chinook, coho, kokanee, and sockeye salmon and steelhead, bull, and cutthroat trout. Lower Cedar River Basin (close-up within Lower Cedar River Basin Renton City Limit Renton City Limit AGENDA ITEM # 9. a) Beneficial Uses: Viewing Boating Swimming Fisheries Wildlife Basin Issues/Concerns: Major flooding in lower Cedar River, partly due to sediment accumulation. System capacity, flooding, and erosion issues in Maplewood Creek. Sedimentation, erosion, and flooding in Madsen Creek. Fish passage in vicinity of Fairwood golf course on Madsen creek tributary. Habitat protection and restoration along lower Cedar River. Basin Hydrology (King County 1993, Parametrix 1989, HDR 1995): Subbasin Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1993 Future1 1993 Future1 1993 Future1 1993 Future1 Lower Basin (Outfall)2 N/A 5,940 N/A N/A N/A 12,000 N/A Tiffany/Ginger Creek3 63 69 101 111 121 134 152 172 Maplewood4 59 132 104 207 135 257 197 349 Molasses3 96 130 153 200 180 238 220 299 Summerfield3 4 7 7 10 8 13 9 16 Orting Hill3 54 88 93 136 114 160 147 195 Madsen3 132 156 217 251 262 302 331 382 1. Future condition flows were predicted in 1993 assuming no regulatory stormwater runoff controls such as retention/detention a nd infiltration systems for new development. 2. Flows calculated by King County in March 2000 with HEC-RAS 3. Flows calculated using HSPF 4. 1993 flows reviewed and updates by King County in 1995. Future Flows calculated using HEC 1 by Parametrix Sources: Cedar River Current and Future Conditions Report (King County, 1993). Comprehensive Storm Water Plan, Maplewood Creek Basin Plan (Parametrix, 1989). City of Renton Surface Water Utility Comprehensive Plan (HDR, 199 5). AGENDA ITEM # 9. a) Surface Water Utility Plan Update Basin Report Card Basin: East Lake Washington Total Basin Size (sq. mi): 4.4 Total Area in Renton and UGB (sq. mi): 2.9 WRIA 8 Cedar River/Lake Washington Sub-basins in the City of Renton: • John’s Creek • Kennydale Creek Basin Planning Status: • Lake WA/Cedar/Sammamish Watershed Chinook Samon Conservation Plan (WRIA 8 Steering Committee 2005) • Renton/Lake Washington Pollution Abatement Program (RW Beck, 1993, Herrera 1993, and Herrera 1994). • Cedar River Current and Future Conditions Report (King County 1993) • Maplewood Creek Basin Plan (Parametrix 1989) • Planned development on vacant commercial land at 745 Park Ave N. • Two future mixed-use projects at Sunset Terrace • Potential development of assisted living facilities near the VMAC Water Quality Summary: • 303(d) list for bacteria at Gene Coulon Park on Lake Washington. Fish Habitat Status: • Reduction in natural shoreline vegetation, woody debris, and cover for fish. • Docks, piers, and other floating structures provide habitat for non- native predatory species that put pressure on juvenile salmonid populations. East Lake Washington Basin Renton City Limit AGENDA ITEM # 9. a) Beneficial Uses: • Viewing • Boating • Swimming • Fisheries • Wildlife Basin Issues/Concerns: • Bank armoring along shoreline has reduced shallow water habitat in Lake. • Poor sediment quality due to legacy pollutants and transported material from upstream to Lake Washington influences lake ecology. • Sedimentation, erosion, and flooding in John’s Creek surface and stormwater system. • Flooding, capacity, and system layout issues in Kennydale area. • Localized flooding in multiple locations due to culvert, ditch, and pipe capacity issues and sedimentation. Basin Hydrology (HDR 1995 [South Kennydale], Parametrix 2007 [Gypsy/SE 44thStreet Exit], and BHC 2007 [John’s Creek]): Subbasin Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1995 Future1 1995 Future1 1995 Future1 1995 Future1 South Kennydale 1 0.3 1.2 .9 2 1.2 2.5 1.7 3 South Kennydale 2 3.7 4.1 6.6 7.2 8.4 9 10.2 10.8 South Kennydale 3 5.0 8.6 9.9 14.5 13 17.9 16.2 21.4 South Kennydale 4 6.4 15.5 14.6 27.7 20.3 35.2 26.5 43.1 West Kennydale 29.8 Same 60.6 Same 79.0 Same 97.8 Same 1. Future condition flows were predicted in 1995 assuming no regulatory stormwater runoff controls such as retention/ detention and infiltration systems for new development. Therefore, these future condition predictions are likely overstated. Source: (HDR 1995) Subbasin Name 25-Year Peak Flows 100-Year Peak Flows Existing (2005) Future Existing (2005) Future Gypsy (SE 44th St Exit)1 — 159.5 145.4 198.2 1. From Ripley Lane Drainage Improvement Project (Parametrix, 2007); values determined using Stormshed. Outfall Name 25-Year Peak Flows 100-Year Peak Flows Johns Creek (at upstream Outfall) 4.0 4.3 North 6th Street Outfall to Cedar River 5.0 5.0 Logan Ave Outfall to Cedar River 24.4 28.2 Cedar River Park Outfall to Lake Washington 75.2 86.6 Source: South Lake Washington Roadway Improvement Drainage Report (BHC, 2007) AGENDA ITEM # 9. a) Surface Water Utility Plan Update Basin Report Card Basin: West Lake Washington Total Basin Size (sq. mi): 16.5 Total Area in Renton and UGB (sq. mi): 0.5 WRIA 8 Cedar River/Lake Washington Sub-basins in the City of Renton: • West Hill Basin Planning Status: • Renton/Lake Washington Pollution Abatement Program (RW Beck, 1993, Herrera 1993, and Herrera 1994). Water Quality Summary: • No data. Fish Habitat Status: • No data. Beneficial Uses: • Viewing • Boating • Swimming • Fisheries • Wildlife Basin Issues/Concerns: • Highly urbanized, water quality concerns. Basin Hydrology (HDR 1995): Subbasin Name 1993 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows West Hill 84 155 196 240 West Lake Washington Basin Renton City Limit AGENDA ITEM # 9. a) Surface Water Utility Plan Update Basin Report Card Basin: May Creek Total Basin Size (sq. mi): 13.8 Total Area in Renton and UGB (sq. mi): 3.71 WRIA 8 Cedar River/Lake Washington Sub-basins in the City of Renton: • Honey Creek • Gypsy Creek • Greenes Creek Basin Planning Status: • May Creek Current and Future Conditions Report (King County 1995a) • May Creek Basin Action Plan (King County 2001) Water Quality Summary: • Water Quality Index (WQI) score 61 out of 100 (2017) • 1979 – 2004 Trend Analysis (King County 2014) Temperature, conductivity, ammonia nitrogen increased. Total suspended solids (TSS), nutrients, pH decreased. Fish Habitat Status: • Habitat elements that support coho and sockeye salmon, sea-run cutthroat trout, steelhead, and rainbow trout. • Spawning habitat at confluences between tributaries and mainstem. • Habitat complexity lacking large woody debris (King County 2001). May Creek Basin (close-up within Renton) May Creek Basin Renton City Limit Renton City Limit AGENDA ITEM # 9. a) Beneficial Uses: • Viewing • Fisheries • Wildlife Basin Issues: • Erosion from outfalls entering May Creek (NE 36th Street) and Honey Creek (various locations). • System capacity (ditches and pipes) in vicinity of NE Sunset Boulevard. • Landslides and localized erosion along May and Honey creeks in several locations (King County, 2001) Basin Hydrology (King County 1995a): Tributary Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1995 Future1 1995 Future1 1995 Future1 1995 Future1 Lower May Creek 341 452 556 706 666 845 835 1069 Honey Creek 63 81 85 101 95 110 109 123 Gypsy Creek 16 25 25 39 30 47 38 60 1. Future condition flows were predicted in 1995 assuming no regulatory stormwater runoff controls such as retention/detention and infiltration systems for new development. Therefore, these future condition predictions are likely overstated. Source: May Creek Current and Future Conditions Report (King County 1995a) AGENDA ITEM # 9. a) Surface Water Utility Plan Update Basin Report Card Basin: Soos Creek Total Basin Size (sq. mi): 12.3 Total Area in Renton and UGB (sq. mi): 1.5 WRIA 9 Green/Duwamish River Sub-basins in the City of Renton: None Basin Planning Status: Habitat Limiting Factors and Reconnaissance Assessment Report (King County 2000) Soos Creek Basin Plan (King County 1992) Water Quality Summary: 303(d) list for water quality impairments for bacteria and dissolved oxygen downstream of Renton. Fish Habitat Status: Lack of large woody debris in Soos Creek basin system. Degraded salmon habitat due to channel incision and excessive sedimentation. Beneficial Uses: Viewing Wildlife Fisheries Basin Issues/Concerns: Water quality issues in the watershed. Unknown water quality problems in Renton portion. Habitat degradation in downstream watershed outside City limits. Basin Hydrology (King County 1992): Subbasin Name 2-Year Peak Flows 10-Year Peak Flows 25-Year Peak Flows 100-Year Peak Flows 1992 Future 1992 Future 1992 Future 1992 Future Big Soos Creek 50 78 81 120 N/A N/A 124 178 Soos Creek Basin (close-up within Renton) Soos Creek Basin Renton City Limit Renton City Limit AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE APPENDIX C COST ESTIMATES AGENDA ITEM # 9. a) Appendix C Cost Estimates Cost estimates were developed a number of ways including; prior studies, City input, and previous cost estimates developed for the 2009 plan based on field reconnaissance of problem areas. For the projects where planning-level cost estimates were available in 2007, or if project costs were previously developed in an earlier study or design project, those costs were escalated to 2007 dollars using a yearly inflation factor of 2.5 percent. Because of the economic downturn, the cost using 2007 dollars was not changed and assumed to be equivalent to 2012 dollars. Costs were escalated from 2012 to 2020 dollars using a yearly inflation factor of 3.5%. This appendix is organized as follows: Appendix C-1 lists all flooding problems and identifies whether the project has cost backup and whether the backup is in Appendix C-2 or Appendix C-3. Projects are organized by basin. In some cases, cost estimates were provided by the City and there is no backup available. Appendix C-2 includes the projects where project costs were developed in prior studies. This table lists the study or report that contains the estimate, the year of the estimate, and the inflated cost. Appendix C-3 includes projects where there is detailed backup. Note that although detailed spreadsheets were prepared for these projects, several project estimates were based upon field reconnaissance only without any engineering analysis and therefore costs should be considered conceptual. Projects that have been removed by the City for the 2020 update have been crossed out, and costs for the remaining projects have been escalated to 2020 dollars. AGENDA ITEM # 9. a) Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) 42 411 May Creek Outfall @ NE 36th Street NE 36th Street Outfall to May Creek (near Lincoln Avenue NE) $658,000 (No Backup) No backup needed; cost estimate provided by City and based on comparable outfall project by city. 40 421 May Creek Outfall @ NE 30th Street Outfall at NE 30th Street into May Creek $658,000 (No Backup) No backup needed; cost estimate provided by City and based on comparable outfall project by city. 41 431 Honey Creek Outfalls Plan Honey Creek Slope Outfalls (Various Locations) $263,000 (No Backup) No backup needed; cost estimate provided by City and based on comparable outfall project by city. 103 456 NE Sunset Blvd at Union Avenue NE NE Sunset Boulevard (Union Avenue NE to Duvall) $2,250,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) 1 506 John's Creek Culverts Sediment Cleaning John's Creek Sediment (Park Avenue / Lake Washington Boulevard) $165,000 Appendix C-2 - 152 511 John’s Creek Outfall Culvert Crossings Located at entrance to Gene Coulon Park $1,200,000 (No Backup) Cost estimate provided by City via July 22, 2009 Steve Lee email. 2 516 South Lake Washington Roadway Improvement Outfall to John's Creek Pipe Replacement Project from the Landing Project to John's Creek Outfall $988,000 Appendix C-3 - 151 521 Johns Creek Outfall - NE 8th Street to Houser Way N. NE 8th Street to Houser Way N. (I-405 to Johns Creek Outfall) $1,450,000 Appendix C-3 - 74 531 Kennydale Master Drainage Plan Kennydale Master Drainage Plan (Example: N 30th Street and Burnett Avenue N.) $395,000 Appendix C-3 - 155 541 East Lake Washington Blvd and NE 28th Street Drainage East Lake Washington Blvd and NE 28th Street $329,000 Appendix C-3 - 157 546 Meadow Avenue North Culvert on Kennydale Creek Kennydale Creek Culvert Crossings (at Meadow Avenue N. & N. 28th Street), (Jones Avenue NE Culvert Crossing) $2,630,000 Appendix C-3 - 158 551 Jones Avenue NE and NE 20th Street Blueberry Farm at NE 20th Street and west of Aberdeen $336,000 Appendix C-3 - 156 566 Jones Ave NE/ NE 43rd Street Culvert and Storm System Improvements Jones Avenue NE and NE 43rd Street $922,000 (No Backup) Cost estimate provided by City via July 22, 2009 Steve Lee email. 70 571 Lincoln Avenue NE Culvert Improvements Lincoln Avenue NE and NE 43rd Place $198,000 (No Backup) Cost estimate provided by City via July 22, 2009 Steve Lee email. Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) 94 621 Black River Box Culvert Maintenance Black River Box Culvert - Major Maintenance $1,320,000 (No Backup) No backup needed; cost estimate is provided by City, and based upon possibility of contaminated soils. Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) 202 101 Cedar River Gravel Removal Project Lower Cedar River Sediment Management Project - (From Williams Avenue Bridge to N. Boeing Bridge) $14,966,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 132 111 Monroe Avenue NE and NE 2nd Street 301 Monroe Avenue NE $6,350,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 55 116 Ginger Creek/Cascade Park Basin Plan SE 162nd Street to Cedar River Pipeline (Cascade Park) (Tiffany Park Culvert) $350,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 117 121 Lower Maplewood Conveyance Improvements Lower Maplewood Creek (Behind Maplewood Glen and north of Maple Valley Highway) $557,000 Appendix C-2 - 105 146 NE 4th Street Crossing at Maplewood Creek Study NE 4th Street Culvert Crossings (@ Union Avenue NE, East of Duvall, 5400 Block of NE 4th Street) - (Headwaters of Maplewood Creek) $336,000 Appendix C-3 - 118 151 East Fork Maplewood Creek at NE 2nd Street Along NE 2nd and between 10th Place SE and 142nd Avenue SE $421,000 (No Backup) City Estimate Provided 100K 156 Maplewood Creek Basin Improvements Maplewood Creek Basin Improvements (From Heather Downs to Sediment Basin) $1,030,000 Appendix C-2 - 302 & 187 302 and 187 Madsen Creek Sedimentation Basin Cleaning Madsen Creek (upstream of Renton-Maple Valley Road) $926,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 210 187 and 302 Madsen Creek Improvement Project Lower Madsen Creek Reach (Madsen Creek Sedimentation Basin to the Cedar River) $1,221,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 303 303 Maplewood Creek Sediment Facility Maintenance Maplewood Creek Sedimentation Facility Maintenance $1,233,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 299 Downtown Storm System Improvements Along S 2nd Street, S 3rd Street and their cross streets between Rainier Ave S and Mills Ave S. $6,917,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) 207 &138 211 and 215 Hardie Avenue S Underpass and SW 7th Storm System Improvements SW 7th Street (from Powell to Naches Ave SW, or along Naches Avenue via SW 7th Street) $1,735,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 208 213 SW 4th Place and Maple Avenue SW Drainage Analysis SW 4th Place and Maple Avenue SW $395,000 Appendix C-3 - 50 217 Rainier Pump Station Pump Station Upgrades. Rainier Pump Station $700,000 (No Backup) No backup needed; cost estimate provided by City, done in-house with manufacturer. 139 231 North Talbot Hill Drainage Improvements North Talbot Hill Drainage System (Lake Avenue S, S 19th Street, Davis Avenue S and Shattuck Avenue S.) $1,210,000 Appendix C-3 - 64 234 Puget Drive South and Benson Road Outfalls Study Puget Drive South and Benson Road: Various Outfalls $198,000 (No Backup) No backup needed; cost estimate provided by City, based on historical experience - 237 Talbot Road Culvert Improvements Talbot Road between Grady Way and I-405 near southwest corner of Sam’s Club $527,000 (No Backup) Estimate Provided by City of Renton 65 240 Puget Drive SE at Rolling Hills Avenue Culvert Crossing Puget Drive SE (between Rolling Hills Ave SE) $388,000 Appendix C-3 - - 245 SW 23rd Street Drainage and Fish Passage Improvements SW 23rd Street between SR-167 and Springbrook Creek $1,780,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 204 251 Springbrook Creek Old Bridge Removal at SW 27th Street Springbrook Creek and Removal of Old Bridge North of SW 27th Street $105,000 Appendix C-3 - APPENDIX C-1 FLOODING COST ESTIMATES BACKUP SOURCE SUMMARY Table 6‐3a MAY CREEK BASIN : FLOODING PROBLEMS Table 6‐3b EAST LAKE WASHINGTON BASIN : FLOODING PROBLEMS Table 6‐3c West LAKE WASHINGTON BASIN : FLOODING PROBLEMS Table 6‐3d CEDAR RIVER BASIN: FLOODING PROBLEMS Table 6‐3e BLACK RIVER: FLOODING PROBLEMS AGENDA ITEM # 9. a) 134 256 East Valley Road Storm System Improvements East Valley Road Between SW 29th Street and SW 23rd Street $550,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) 99 263 Shattuck Avenue South and S 37th Street Outfall Shattuck Avenue S and S 37th Street Outfall (Runoff from Talbot Road S.) $101,000 Appendix C-3 - 62 265 Talbot Road South Drainage Study Talbot Road South drainage problems (at S. 37th Street and Talbot Creek Drive South) $198,000 (No Backup) No backup needed; cost estimate provided by City, based on historical experience 187 269 Talbot Road South @ Panther Creek Outfall Talbot Road S. (Panther Creek Culverts) $790,000 Appendix C-3 - 205 271 Springbrook Creek Wetland and Habitat Mitigation Bank Springbrook Creek Wetland (Springbrook Creek Wetland and Habitat Mitigation Bank) $922,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. 92 275 Oakesdale Avenue / SW 41st Street Culvert Replacement Oakesdale Avenue SW and SW 41st Street (Culvert Replacement) $1,710,000 Appendix C-2 - 135 and 209 279 and 281 SW 43rd Street Storm Improvements SW 43rd Street and Lind Ave $4,000,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. - 282 S 178th Street Drainage Connection S 178th Street storm drain system north of S Carr Road $362,000 (No Backup) Estimate Provided by City of Renton 213 285 SE 190th Street Drainage Improvement SE 190th Street (near 103rd Place SE) $108,000 Appendix C-3 - - 287 S. 55th Street and Talbot Rd. S. Drainage Improvement Project S. 55th Street and Talbot Rd. S. $120,000 (No Backup) Estimate Provided by City of Renton TBD 998 Wells Ave S Drainage Improvement Project Mid block of Wells Ave S between Houser Way S and S 4th St $300,000 (No Backup) Estimate Provided by City of Renton 299 Downtown Storm System Improvements Along S 2nd Street, S 3rd Street and their cross streets between Rainier Ave S and Mills Ave S. See Cost in Cedar River Basin (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) - 185 SE 172nd St & 125th Ave SE Green Stormwater Infrastructure Design Project Half a block of 122nd Ave SE, 123rd Ave SE, 124th Ave SE and 125th Ave SE, north of SE 172nd St, and two blocks of SE 172nd st.Mid block of 125th Ave SE between SE 168th St. and SE 172nd St. $3,476,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020) PROJECT NAME APPROXIMATE LOCATION ESTIMATED COST (2020 escalated costs) Backup Source Explanation (if No Backup) Various Locations Various Locations Miscellaneous and Emergency Storm Projects $527,000 (No Backup) No backup needed; cost estimate provided by City in 6-year CIP. - 238 16501 Benson Rd S 16501 Benson Rd S $66,000 (No Backup) Estimate Provided by City of Renton - 268 Talbot Rd S and S 34th Pl Stormline Repair Project 3400 block of Talbot Rd. S. $204,000 (No Backup) Estimate Provided by City of Renton - 555 Sunset Blvd N/Aberdeen Ave NE /NE 10th St. Storm Repair Project Sunset Blvd NE and NE 10th St intersection with NE 10th St. $198,000 (No Backup) Estimate Provided by City of Renton - 999 SE 182nd St Storm System From 114th Ave SE to 112th Ave SE $300,000 (No Backup) Estimate Provided by City of Renton Assumption $53,773,000 Table 6‐3f Soos Creek: FLOODING PROBLEMS Table 6‐3g CITYWIDE SMALL DRAINAGE PROBLEM PROJECTS: FLOODING PROBLEMS Assumes cost escalate equals to 3.5% per year from 2009 to 2020 AGENDA ITEM # 9. a) Previous GIS ID # (2009 Appendix) Current GIS ID # (in Word Ch6, 2012 & 2020)Project Name LOCATION BASIN NAME 1995 PS-# 1995 Project ID or other Data Source Cost from Previous Source Year of Previous Cost 2020 Escalated Cost 1 506 John's Creek Culverts Sediment Cleaning John's Creek Sediment (Park Avenue / Lake Washington Boulevard)EAST LAKE WASH (South)2007 City CIP $ 125,000 2007 CIP $165,000 117 121 Lower Maplewood Conveyance Improvements Lower Maplewood Creek (Behind Maplewood Glen and north of Maple Valley Highway)CEDAR RIVER PS-15 City 1995 Comprehensive Plan $ 325,000 1995 $557,000 100K 156 Maplewood Creek Basin Improvements Maplewood Creek Basin Improvements (From Heather Downs to Sediment Basin)CEDAR RIVER City 2007 CIP $ 850,000 2007-2012 CIP $1,030,000 92 275 Oakesdale Avenue / SW 41st Street Culvert Replacement Oakesdale Avenue SW and SW 41st Street (Culvert Replacement)BLACK RIVER PS-36 EGRWP, 1997 $ 1,035,000 1997 $1,710,000 APPENDIX C-2 FLOOD PROTECTION PROJECTS AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:BASIN:East Lake WashingtonBY: John Featherstone CHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit2008 Unit cost Quantity Amount Comment48" DIA. HDPE PIPE; CB TYPE 2 72" PER 150 LF LF $159 500 80,000$ 48" DIA. HDPE PIPE; BORING; CB TYPE 2 72" PER 150 LF LF $1,543 500 770,000$ JACKING AND RECEIVING PITS EA $45,795 2 92,000$ INCIDENTALS LS 83,000$ 1 83,000$ SUBTOTAL1,025,000$ OTHER ITEMS AND CONTINGENCY50% 512,500$ Construction Subtotal 1,537,500$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30% 461,250$ Project Subtotal 1,998,750$ Project Subtotal (Rounded)2,000,000$ Total Estimated Project Cost (Rounded)Estimate based on 6/3/09 conference call with Steve Lee2008 Dollars2,000,000$ #157 Kennydale Creek at Meadow Avenue North Culvert - Preliminary Study, Design, & Construction3 Detailed Cost Estimates.xls [#157]Page 1 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#158 Blueberry Farm at Jones Ave NE and NE 20th StreetBASIN:East Lake WashingtonBY: John Featherstone CHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit2008 Unit cost Quantity Amount Comment24" DIA. HDPE PIPE; CB TYPE 2 48" PER 150 LF; PVMT RESTOR LF $145 900 130,000$ SUBTOTAL130,000$ OTHER ITEMS AND CONTINGENCY50% 65,000$ Construction Subtotal 195,000$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30% 58,500$ Project Subtotal 253,500$ Project Subtotal (Rounded)253,500$ Total Estimated Project Cost (Rounded)Estimate based on 6/3/09 conference call with Steve Lee2008 Dollars255,000$ 3 Detailed Cost Estimates.xls [#158]Page 2 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#74 Kennydale Master Drainage Plan (MDP)BASIN:East Lake WashingtonBY: Brian BlacketerCHECKED BY: D. PacanovskyDATE:2/12/2007DATE:2/15/2007Material Description Unit2007 Unit cost Quantity Amount CommentEnlarge Existing BioswaleENGINEERING LS $270,0001270,000$ Step 1SURVEY LS $30,000130,000$ Subtotal 300,000$ Project Subtotal (Rounded)300,000$ Total Estimated Project Cost (Rounded)2007 Dollars300,000$ 3 Detailed Cost Estimates.xls [#74]Page 3 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#155 East Lake Washington Blvd and NE 28th Street Drainage Master Drainage PlanBASIN:East Lake WashingtonBY: John FeatherstoneCHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit2007 Unit cost Quantity Amount CommentENGINEERING/OTHER LS $250,0001250,000$ Subtotal 250,000$ Project Subtotal (Rounded)250,000$ Total Estimated Project Cost (Rounded)2007 Dollars250,000$ 3 Detailed Cost Estimates.xls [#155]Page 4 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#151 John's Creek Outfall - NE 8th to HouserBASIN:East Lake WashingtonBY: John FeatherstoneCHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit2007 Unit cost Quantity Amount Comment48" DIA. CMP PIPE; CB TYPE 2 54" PER 300 LF; PVMT RESTOR LF $184 2500 460,000$ REINF CONC BOX CULVERT 22' SPAN x 4' RISE LF $1,740 60 100,000$ SUBTOTAL560,000$ OTHER ITEMS AND CONTINGENCY50% 280,000$ Construction Subtotal 840,000$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30% 252,000$ Project Subtotal 1,092,000$ Project Subtotal (Rounded)1,092,000$ Total Estimated Project Cost (Rounded)Estimate based on 6/3/09 conference call with Steve Lee2008 Dollars1,100,000$ 3 Detailed Cost Estimates.xls [#151]Page 5 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#2 South Lake Washington Roadway Improvement Outfall to John's CreekBASIN:East Lake WashingtonBY: John Featherstone CHECKED BY: M. GiseburtDATE:6/19/2009DATE:Material Description Unit2008 Unit cost Quantity Amount Comment60" DIA. CMP PIPE LF $181 100 18,000$ 84" DIA CB EA $10,320 2 21,000$ 48" DIA. CMP PIPE; BORING AND JACKING LF $1,400 50 70,000$ EX 60" DIA CULVERT SEDIMENT REMOVAL CY $500.00 400 200,000$ SUBTOTAL309,000$ Easement Re-linquish and Acquisition EA 20,000.00$ 1 20,000$ Contaminated excavation contingency30% 92,700$ OTHER ITEMS AND CONTINGENCY50% $154,500.00Construction Subtotal 576,200$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30% 172,860$ Project Subtotal 749,060$ Project Subtotal (Rounded)750,000$ Total Estimated Project Cost (Rounded)Estimate based on 6/17/09 conf call with Steve Lee2008 Dollars750,000$ 3 Detailed Cost Estimates.xls [#2]Page 6 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#105 NE 4th St - Preliminary StudyBASIN:Cedar RiverBY: Brian BlacketerCHECKED BY: D. PacanovskyDATE:2/12/2007DATE:2/15/2007Material Description Unit2007 Unit cost Quantity Amount CommentEstimate based on field reconnaissance andENGINEERING LS $200,0001200,000$ no available storm drain system informationSURVEY LS $20,000120,000$ Subtotal 220,000$ CONTINGENCY 10% 22,000$ Construction Subtotal 242,000$ PERMITTING5% 12,100$ Project Subtotal (Rounded)254,100$ Total Estimated Project Cost (Rounded)2007 Dollars255,000$ 3 Detailed Cost Estimates.xls [#105]Page 7 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) APPENDIX C-3City of Renton CIP Cost EstimatePLANNING LEVEL COST OPINIONPROJECT (2020):BASIN:Soos CreekMaterial DescriptionUnitUnit costQuantity Amount CommentBasin Plan Development350,000$ Total Project Cost Provided by City in 6-Year CIP2020 Dollars350,000$ #116 Ginger Creek/Cascade Park Basin Plan3 Detailed Cost Estimates.xls [#116]Page 8 of 16Printed: 12/3/2020AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#99 Shattuck AveBASIN:Black RiverBY: Brian Blacketer CHECKED BY: D. PacanovskyDATE:2/12/2007DATE:2/15/2007Material Description Unit 2007 Unit costQuantity Amount CommentCLEARING AND GRUBBING SF $2 500 1,200$ For slope around pipe.RIPRAP, 2 IN TO 6 IN QUARRY SPALLS TN $35 0.25 9$ For outfallQUARRY SPALLS TN $55 0.25 14$ For outfallCATCH BASIN TYPE 1 EA $1,600 1 1,600$ Structure to tie existing pipe and new HDPE together12" DIA. HDPE PIPE LF $100 90 9,000$ Cost taken from Idlewood Creek designSUBTOTAL12,000$ OTHER ITEMSDEWATERING/BYPASS FLOWS 10.0% 1,200$ EROSION & SEDIMENTATION CONTROL 20.0% 2,400$ SURVEY2.0% 240$ CONTINGENCY 30% 3,600$ Subtotal 28,440$ MOBILIZATION (GENERAL REQUIREMENT) 10% 2,844$ Construction Subtotal 31,284$ 3 Detailed Cost Estimates.xls [# 99] Page Printed: 11/3/2009STATE SALES TAX 8.8% 2,753$ ENGINEERING LS $20,000 1 20,000$ CONSTRUCTION MANAGEMENT 20.0% 6,257$ PERMITTING 20.0% 6,257$ Possible wetland issues by creekProject Subtotal 44,000$ Project Subtotal (Rounded)44,000$ LAND ACQUISITION/EASEMENT LS $20,000 1 20,000$ ADMINISTRATIVE COSTS PARCEL $7,000 1 7,000CONTINGENCY 30% 6,000$ Total Estimated Project Cost (Rounded)77,000$ 2007 DollarsFor easement or possible replacement to property that has been eroded already3 Detailed Cost Estimates.xls [# 99] Page Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:BASIN:Black RiverBY: John FeatherstoneCHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit2007 Unit cost Quantity Amount CommentPRELIMINARY ENGINEERING ANALYSIS LS $250,000 1 250,000$ SURVEY LS $20,000 1 20,000$ PRELIMINARY ENGINEERING SUBTOTAL 270,000$ 18" DIA. SMOOTH INTERIOR WALL CORRUGATED POLYETHYLENLF $561800101,237.76$ CATCH BASIN TYPE 2 48" EA $3,307619,842.60$ CRUSHED SURFACE BASE COURSE TN $28 330 9,200$ RIPRAP, 2 IN TO 6 IN QUARRY SPALLS TN $35 0.25 9$ QUARRY SPALLS TN $55 0.25 14$ PAVEMENT, ASPHALT CONCRETE CL A {QTY < 500} TN $130 400 52,000$ 12" DIA. HDPE PIPE LF $100 280 28,000$ Cost taken from Idlewood Creek designCATCH BASIN TYPE 1 EA $1,600 1 1,600$ Structure to tie pipe and new HDPE togetherENERGY DISSIPATOR STRUCTURE EA $75,000.00 1 75,000$ *24" DIA. HDPE PIPE; CB TYPE 2 48" PER 300 LF; PVMT RESTOR LF $133.00 300 40,000$ *SUBTOTAL326,903$ OTHER ITEMSDEWATERING/BYPASS FLOWS 2.0% 6,538$ EROSION & SEDIMENTATION CONTROL 5.0% 16,345$ SURVEY2.0% 6,538$ TRAFFIC CONTROL 3.0% 9,807$ CONTINGENCY 30% 98,071$ Subtotal 464,202$ MOBILIZATION (GENERAL REQUIREMENT) 10% 46,420$ Construction Subtotal 510,623$ STATE SALES TAX 8.8% 44,935$ ENGINEERING DESIGN LS $80,000 1 80,000$ CONSTRUCTION MANAGEMENT 2.0% 10,212$ Project Subtotal (Rounded) 915,770$ Total Estimated Project Cost (Rounded)#139 North Talbot Hill Drainage ImprovementsUpsize existing 12" system and add conveyance systems along Davis Ave and Lake Ave*Added 6/8/09 to 2007 cost estimate per conf call with Steve Lee2007 Dollars916,000$ 3 Detailed Cost Estimates.xls [#139]Page 10 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:BASIN:Black RiverBY: John FeatherstoneCHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit Unit cost Quantity Amount CommentCONSTRUCTION SUBTOTAL500,000$ Estimate based upon 2008 Carr Road projecENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING100,000$ Total Estimated Project Cost (Rounded)#187 Talbot Road South at Panther Creek Outfall2008 Dollars600,000$ 3 Detailed Cost Estimates.xls [#187]Page 11 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost Estimate PLANNING LEVEL CONSTRUCTION COST OPINION PROJECT: #65-Puget Drive SE at Rolling Hills Avenue Culvert Crossing BASIN:Black River BY: John Featherstone CHECKED BY: M. Giseburt DATE:6/8/2009 DATE: Material Description Unit 2007 Unit cost Quantity Amount Comment ROCK OUTFALL: 300LF 24" DIA HDPE, TYPE 2 48" CB, 2 TN QUAR EA $29,109 5 150,000$ SUBTOTAL 150,000$ OTHER ITEMS AND CONTINGENCY 50% 75,000$ Construction Subtotal 225,000$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING 30% 67,500$ Project Subtotal 292,500$ Project Subtotal (Rounded)292,500$ Total Estimated Project Cost (Rounded) Estimate based on 6/3/09 conference call with Steve Lee 2008 Dollars 295,000$ 3 Detailed Cost Estimates.xls [#65]Page 12 of 16 Printed: 11/3/2009 APPENDIX C-3 AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:#204-Springbrook Creek Old Bridge Removal at SW 27th StreetBASIN:Black RiverBY: John FeatherstoneCHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit Unit cost Quantity Amount CommentCONSTRUCTION SUBTOTAL41,026$ OTHER ITEMS AND CONTINGENCY50% 20,513$ Construction Subtotal 61,538$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30% 18,462$ Project Subtotal 80,000$ Total Estimated Project Cost (Rounded)2008 Dollars80,000$ 3 Detailed Cost Estimates.xls [#204]Page 13 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) APPENDIX C-3City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT (2020):BASIN:Black RiverMaterial DescriptionUnit2020 Unit costQuantity Amount Comments36" - 48" DIA PIPE, STRUCTURES, RESTORATION, TRAFFIC CONTROLLF$1,5897001,112,300$ SUBTOTAL1,112,300$ OTHER ITEMS AND CONTINGENCY20%222,500$ Construction Subtotal 1,334,800$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30%400,400$ Project Subtotal 1,735,200$ Project Subtotal (Rounded)1,735,200$ Total Project Cost in City Provided 6-Year CIP#211 (and #215) Hardie Ave S Underpass to SW 7th Storm System Improvements2020 Dollars1,735,000$ 3 - Detailed Cost Estimates.xls [#211 & #215]Page 14 of 16Printed 12/3/2020AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:BASIN:Black RiverBY: John FeatherstoneCHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit Unit cost Quantity Amount CommentCONSTRUCTION SUBTOTAL153,846$ OTHER ITEMS AND CONTINGENCY50% 76,923$ Construction Subtotal 230,769$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30% 69,231$ Project Subtotal 300,000$ Total Estimated Project Cost (Rounded)2008 Dollars300,000$ #208 SW 4th Place and Maple Avenue SW Drainage AnalysisEstimate based on 6/3/09 conference call with Steve Lee3 Detailed Cost Estimates.xls [#208]Page 15 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) City of Renton CIP Cost EstimatePLANNING LEVEL CONSTRUCTION COST OPINIONPROJECT:BASIN:Black RiverBY: John FeatherstoneCHECKED BY: M. GiseburtDATE:6/8/2009DATE:Material Description Unit2008 Unit cost Quantity Amount Comment12" DIA. HDPE PIPE; CB TYPE 2 48" PER 300 LF; PVMT RESTOR LF $106 400 42,000$ SUBTOTAL42,000$ OTHER ITEMS AND CONTINGENCY50% 21,000$ EASEMENTTRAFFIC CONTROLConstruction Subtotal 63,000$ ENGINEERING/CONSTRUCTION MANAGEMENT/PERMITTING30% 18,900$ Project Subtotal 81,900$ Project Subtotal (Rounded)81,900$ Total Estimated Project Cost (Rounded)#213 SE 190th Street Drainage ImprovementsEstimate based on 6/3/09 conference call with Steve Lee2008 Dollars82,000$ 3 Detailed Cost Estimates.xls [#213]Page 16 of 16Printed: 11/3/2009APPENDIX C-3AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE APPENDIX D SUMMARY OF REGULATORY COMPLIANCE RECOMMENDATIONS MEMO AGENDA ITEM # 9. a) 12/1 7/2020 Memorandum Summary of Regulatory Compliance Recommendations in Support of Surface Water Utility System Plan Update Prepared By: Erin Nelson, PE, AltaTerra Consulting & Ann Bryant, PE, Osborn Consulting Inc. AGENDA ITEM # 9. a) Table of Contents 1. Introduction and Background .......................................................................................................... 1 2. Methodology and Data Sources ....................................................................................................... 1 3. Regulatory Compliance Needs ......................................................................................................... 2 3.1 NPDES Stormwater Planning Program ...................................................................................... 3 3.2 NPDES MS4 Mapping and Documentation ................................................................................ 4 3.3 NPDES Source Control Program for Existing Development ........................................................ 5 3.4 Coordination with Regional Partners ........................................................................................ 7 3.5 Coordination with Planning Staff for 2023 City Comprehensive Plan......................................... 7 List of Tables Table 1. List of Regulations ...................................................................................................................... 2 Table 2. Stormwater Planning Tasks and Level of Effort ........................................................................... 4 Table 3. Source Control Program Tasks and Level of Effort ....................................................................... 6 AGENDA ITEM # 9. a) 1 12/17/2020 1. Introduction and Background The update of the City’s draft Surface Water Utility Management Plan includes an assessment of current regulations and resources needed to comply with those regulations. Federal, state, and local regulations, permits, and codes that guide stormwater management have continually evolved since the early 1990s as stormwater impacts on natural resources, water quality, and ecological health have received greater attention. As a result, local jurisdictions must adapt their programs to meet current standards and permit requirements. This memorandum documents Renton’s current regulatory status and provides recommended program modifications to meet regulatory requirements now and the near future. 2. Methodology and Data Sources The draft 2012 Surface Water Utility Management Plan (draft Plan) provided a comprehensive list and description of federal, state, and local regulations that provides the regulatory framework under which the Utility operates. Regulations listed in the draft Plan were reviewed to identify updates or changes since 2012 that impact how the Utility operates. If no significant updates or changes were identified, it was assumed that the Utility is complying with current regulations and there is no additional resources or actions necessary for compliance. The most significant change since the draft Plan is the new NPDES Phase II MS4 Permit. Since the draft Plan, the Utility has gone through an entire NPDES Phase II Permit cycle; a new cycle with new conditions began on August 1, 2019. It was assumed that the Utility is meeting all conditions that were in the preceding permit and only new conditions in the new permit require additional resources or actions. Table 1 lists the regulations reviewed and whether Utility resources or actions are needed for compliance. AGENDA ITEM # 9. a) 2 12/17/2020 Table 1. List of Regulations Regulation Resources or Actions Needed for Compliance Renton Municipal Code (RMC) 4-3-050 Critical Areas Ordinance No additional resources or actions necessary. RMC 4-3-090 Shoreline Master Program No additional resources or actions necessary. RMC 4-4-030 Development Guidelines and Regulations No additional resources or actions necessary. RMC 4-4-060 Grading, Excavation, and Mining Regulations No additional resources or actions necessary. RMC 4-6-030 Drainage (Surface Water) Standards No additional resources or actions necessary. Revised Code of Washington (RCW) 36.70 Growth Management Act- City Comprehensive Plan Coordinate with Planning Staff for 2023 City Comprehensive Plan Utility and Environmental Goals and Policies RCW 43.21 State Environmental Policy Act No additional resources or actions necessary. RCW 77.55 Hydraulic Code No additional resources or actions necessary. RCW 86.16 Floodplain Management (establishes authority for implementation of National Flood Insurance Program [NFIP]) No additional resources or actions necessary. 33 United States Code (USC) 1251 Clean Water Act- Section 303(d)- Total Maximum Daily Loads (TMDLs) Participate and coordinate with Ecology and regional partners in implementation of the Green River and Soos Creek TMDLs. 33 USC 1251 Clean Water Act- Section 404 No additional resources or actions necessary. 33 USC 1251 Clean Water Act- Section 401 Water Quality Certification No additional resources or actions necessary. 33 USC 1251 Clean Water Act- Section 402 National Pollutant Discharge Elimination System (NPDES) Develop and implement stormwater planning program, including watershed prioritization and Stormwater Management Action Plan (SMAP). Map size and material of all known outfalls and map all known connections from the Municipal Separate Storm Sewer (MS4) to privately owned stormwater systems. Develop and implement source control program for existing development. 42 USC 4321 National Environmental Policy Act (NEPA) No additional resources or actions necessary. 16 USC 1531 Endandered Species Act (ESA) No additional resources or actions necessary. 3. Regulatory Compliance Needs Based on a review of the current regulations under which the Utility operates, additional staff resources will be needed to (1) comply with the current City’s NPDES Phase II permit, (2) coordinate with regional partners on TMDLS, flood plain management and ESA-listed salmon recovery, and (3) coordinate internally for the City’s next update of the Comprehensive Plan. The latter two items will require significantly less time commitment than the first; an additional staff person will likely be necessary to AGENDA ITEM # 9. a) 3 12/17/2020 assist with development and implementation of NPDES-related programs. A discussion of the specific compliance needs and recommendations is provided below. 3.1 NPDES Stormwater Planning Program The NPDES Phase II Permit Condition S5.C.1 outlines components of what is expected for a stormwater planning program. Some of the elements are a continuation of the previous permit, including continued review and update of LID codes, rules and standards to encourage use of LID, as well as remove barriers in the development code that prevent use of LID principles and LID BMPs. Additionally, Condition S5.C.1.b involves coordination with long-range plan updates. The Utility is coordinating with the Planning department for the update of the City Comprehensive Plan, which will be adopted in 2023. This coordination effort would likely occur whether or not required by the permit, however, the permit requires a response to a series of questions in the Stormwater Planning Annual Report about how the Utility addressed stormwater impacts on water quality in the Comprehensive Plan or equivalent long- term plans by March 31, 2021. A follow-up report responding to the same questions related to water quality, land-use and growth is due on or before January 1, 2023. The most significant change is the addition of watershed prioritization and development of a Stormwater Management Action Plan for a priority catchment area. The steps needed to comply with this condition include the following: 1. Develop a watershed inventory and conduct a receiving water assessment including expected stormwater management influence for each watershed. 2. Prioritize watersheds based on receiving water conditions and expected potential stormwater management influences (i.e., which watersheds would most benefit from stormwater actions) and select high priority watershed to develop a Stormwater Management Action Plan. 3. Identify actions in the high priority watershed, including capital (i.e., stormwater retrofits), operational (i.e. enhanced maintenance, source control investigations, etc.), policy or code- related (i.e., land management), or public education and outreach strategies and projects to improve water quality in the watershed, including a budget and implementation schedule. Table 2 lists some recommended strategies for complying with this condition, including anticipated resource needs on a low, medium, high scale by level of effort. It is anticipated that existing City NPDES staff can accomplish most of this requirement, but consultant support may be needed for the Stormwater Management Action Plan development. The receiving water assessment must be done by March 2022, the receiving water prioritization deadline is June 2022, and the SMAP is due in March 2023. AGENDA ITEM # 9. a) 4 12/17/2020 Table 2. Stormwater Planning Tasks and Level of Effort Task Level of Effort Description Result Watershed Inventory, Receiving Water Assessment and Influence Medium (500 hours) Use data that is already available. Watershed boundaries are delineated, use available water quality data and beneficial uses, conduct GIS analysis of potential influence using existing stormwater facilities, potential redevelopment, open space, and natural resources layers. Table of Watershed Inventory Prioritize Watersheds Medium- High (700 hours) Develop criteria for prioritization, use data in watershed inventory table to prioritize. Identify high priority watershed for which to develop SMAP. Choose watershed where projects can be expected to be completed and fit within other City goals. Sorted Table of Watershed Inventory by Priority and Selected High Priority Watershed Stormwater Management Action Plan High (800 hours) Develop a plan to address issues in selected watershed, including range of projects. The level of effort will depend on whether new projects are developed, or if projects are already ready to go for the watershed selected. A consultant is likely to be needed for this effort due to the large number of estimated hours. Plan with Projects, Strategies, Budget, and Schedule for Implementation 3.2 NPDES MS4 Mapping and Documentation The NPDES Phase II Permit Condition S5.C.4 outlines new components for stormwater system mapping, including the following: Size and material for all known MS4 outfalls, to be collected during the normal course of business (e.g. during field screening, inspection, or maintenance) and records update beginning no later than January 1, 2020. Complete mapping of all known connections from the MS4 to a privately owned stormwater system by August 1, 2023. The City continually updates its stormwater system inventory as new infrastructure comes on-line, modifications are made in the field, or systems are abandoned. This condition will likely not require additional resources because it can be accomplished by field crews and the GIS specialist in the normal course of business. However, coordination is necessary to ensure that this team is aware of the type of data that needs to be collected, including methodology for recording the data, or what to do if the information is unclear (i.e., material type, ownership, etc.). AGENDA ITEM # 9. a) 5 12/17/2020 Below are options for accomplishing this requirement include the following: 1. Instead of having all field personnel take on the duty of collecting data on MS4 outfalls, assign this task to crews that inspect and clean the system to meet NPDES condition S5.C.7 Operations and Maintenance. The City cleans all pipes, ditches, and catch basins and inlets within a circuit once during the permit term. Part of the system will be completely mapped during this permit term, and eventually the entire system will be mapped as all circuits are inspected and cleaned. 2. Assign private facility inspection staff and source control program staff to identify connections from the MS4 to privately owned stormwater system. This will be one way to systematically identify and map privately owned systems. 3. Alert maintenance crews and inspection and cleaning crews to inform stormwater management staff if privately owned systems are identified during CCTV inspection or other methods. 3.3 NPDES Source Control Program for Existing Development The NPDES Phase II Permit Condition S5.C.8 outlines components for implementing a source control program that targets pollution-generating public and private properties for the inspection, implementation of source control measures, and enforcement if necessary. The steps needed to comply with this condition include the following: 1. Develop an ordinance or other enforceable document to require the application of source control BMPs for pollutant generating sources. The City’s code already has language that requires source control BMPs and references the RMC 4-6-030. Section I adopts the April 2016 King County Stormwater Pollution Prevention Manual by reference and Section J.4. Elimination of Illicit Connection and/or Illicit Discharge requires implementation of source control or treatment BMPs. The City may want to review the code and determine if the language is adequate to meet City and permit goals. 2. Establish inventory of public and private institutional, commercial and industrial sites that have the potential to generate pollutants to the MS4. 3. Develop and implement an inspection program for sites identified in the inventory. 4. Develop and implement a progressive enforcement policy that requires sites to comply with stormwater requirements. 5. Develop and implement a staff source control training program. Table 3 lists some recommended strategies for complying with this condition, including anticipated resource needs on a low, medium, high scale by level of effort. It is anticipated that additional City NPDES staff will be needed for this requirement. Ordinance adoption and site inventory must be completed by August 2022, and inspection program and enforcement implementation must begin by January 2023. AGENDA ITEM # 9. a) 6 12/17/2020 Table 3. Source Control Program Tasks and Level of Effort Task Level of Effort Description Result Develop an Ordinance or Other Enforceable Document Low - High (~20 -100 hours) Review existing code language and determine if it needs revision. Level of effort will depend on whether a new ordinance is developed. New Ordinance or Keep Existing Establish Inventory of Public and Private Sites High (~200 hours) Use SIC and NAICS codes to identify sites that have potential to generate pollutants to MS4. Include sites with water quality complaints. Use GIS to develop map and database of sites. Database of Sites Develop and Implement a Source Control Inspection Program Very High (~1,000 hours) Develop inspection protocol, including but not limited to forms, tracking, communications, and educational materials for business owners. Implement program for 20% of site inventory. Level of effort depends on the number of sites for inspection. Program development is expected to take ~200 hours. Program Implementation and Documentation Develop progressive enforcement policy Med- High (~300 hours) Develop and/or implement existing enforcement policies. Evaluate options for new enforcement methods if existing policies aren’t working. Reach out to other jurisdictions to find out what works for them. Updated or New Enforcement Policy Staff source control training program Low- Med (~40 hours) The level of effort for this task depends on the number of staff assigned to the source control program. Some of the most effective source control programs are ones where fewer staff are responsible for implementation and enforcement. Personal connections can be made with business owners to encourage best practices, with the understanding that the inspectors also have authority for enforcement if violations occur. Staff Training and Outreach to Source Control Inspectors from Other Cities AGENDA ITEM # 9. a) 7 12/17/2020 There may be overlap with types of City inspections conducted at the sites developed for the inventory. It would be useful to find out what types of inspections are required or routinely done in other City departments, including fats, oil and grease inspections for the wastewater system, private stormwater facility inspections, solid waste outreach to multi-family sites, and outreach from water department staff for pollution prevention in aquifer protection areas. Sites that overlap with multiple inspections, could be flagged for a combined visit by one staff person, staggered visits on opposite schedules for efficiency, or a coordinated site visit by multiple inspectors. A matrix to determine which sites overlap could be helpful. 3.4 Coordination with Regional Partners The City of Renton overlaps the watershed boundary for the Green River and Soos Creek, both of which have approved or developing TMDLs. Renton will be expected to participate in these TMDLS, even though participation may be more limited than other jurisdictions due to the City’s location and land area in each watershed. While there is a regulatory need to be addressed, the resources needed to address participation in TMDLs is expected to be low and existing City staff should be able to manage the workload. If Ecology were to require the City to take action and develop a monitoring plan to track water quality in Soos Creek for the TMDL, the City may be expected to collect monthly water quality samples and conduct flow monitoring at one or two locations in the portion of Soos Creek within the City’s jurisdiction. This would require staff or consultant time to collect water quality samples and installation of flow meters. The annual costs for the City of Kenmore to analyze data from 5 locations for the Swamp Creek TMDL ranges from $4,000 to $18,000 based on a review of their budget data from 2017 through 2019. Kenmore’s 2020 budget allocates $6,000 for Swamp Creek TMDL monitoring and $30,000 for stream telemetry, which collects stream flow data on Swamp Creek and other locations. Staff time is not included in this budget, although a reasonable estimate for Renton would be approximately 60 – 70 hours annually (3 hours per month for sample collection and 30 – 40 hours to write and submit a report documenting results to Ecology). An additional 80 hours would be required to write the Quality Assurance Project Plan (QAPP) describing the sampling and analysis protocol. The City currently has an interlocal agreement (ILA) to improve salmon habitat in Watershed Resource Inventory Areas (WRIAs) 8 and 9 (Cedar River and Green River watersheds, respectively). Through its work with these WRIAs, the City addresses issues around the “threatened” ESA listing of Chinook salmon and coordinates with other jurisdictions on salmon recovery. Additional workload is not expected. Floodplain management and coordination with King County and FEMA already occurs with the City of Renton, so additional efforts needed to address existing flood plain maps and issues with depictions of flood hazard areas is likely an on-going discussion and will not need additional City resources. 3.5 Coordination with Planning Staff for 2023 City Comprehensive Plan City Utility staff will need to coordinate with planning staff for the 2023 City Comprehensive Plan to ensure that goals and policies reflect the direction of the Utility. This effort is not expected to require additional resources. AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE APPENDIX E PROGRAMMATIC AND OPERATIONAL FACT SHEETS AGENDA ITEM # 9. a) Surface Water Utility System Plan Update Project ID: 2020-01 Culvert Assessment Preliminary Level of Effort: 570 hrs. Project Description: The objective of this program is to conduct an inventory of the City’s culverts to assess fish passage and develop a prioritization scheme to proactively improve fish passage and identify opportunities for habitat improvements in association with other agencies. The scope of this project includes (1) developing an inventory of stream culverts, (2) assessing the City’s stream culverts for fish passage and potential access to fish habitat (i.e., availability of fish habitat upstream of the culvert), and (3) prioritization and ranking of the culvert inventory. Benefits: • Proactive strategy for culvert improvement before the City is required to meet fish passage obligations Improved fish passage and habitat accessibility as opportunities for culvert improvements arise. Challenges: • Assessment of fish use and presence in the absence of data. • Staff and budget for new program • Improving fish passage may need to be coupled with water quality improvement to promote fish utilization. Assumptions and Considerations: The following are assumptions and considerations for the City to develop an inventory of its stream culverts, assess the culverts for fish passage, and prioritize for replacement and/or improvement. • The City does not have a fish passage improvement program to fund fish passage projects. Culverts have not been assessed for fish passage. Fish passage improvement projects implemented so far were completed either by with other agencies, or due to permitting requirements. • The State of Washington is required to resolve fish passage issues on its culverts due to a U.S. District Court Decision regarding Native Treaty rights; it is anticipated that future rulings may require Counties and Cities to do the same. • A brief review of the Washington Department of Fish and Wildlife SalmonScape application (https://apps.wdfw.wa.gov/salmonscape/map.html) indicates the City has several stream culverts that are full or partial fish passage barriers. • The City’s GIS system does not appear to differentiate the types of culverts (i.e., stream culverts vs. ditch culverts). • The field evaluation will be conducted by a fish biologist and an ecologist. For estimating purposes, it is assumed that up to 4 culverts can be assessed in a day. • Based on the review of SalmonScape, it is estimated that 60 to 70 stream culverts will require field review and inventory. AGENDA ITEM # 9. a) • Prioritization criteria may include categories of culverts (high, medium, and low priority) or ranking from highest to lowest, depending on what is most useful to the City. Prioritization criteria is likely to include type of barrier (full, partial, unknown, etc.), type of fish usage (anadromous, resident), life histories of fish using stream reach (i.e., is barrier present when fish use would occur? Is culvert a barrier to adults, juveniles, etc.?), habitat availability upstream of the barrier, and habitat quality. Other factors may also be considered. Recommendations: The following tasks are recommended for this programmatic action: 1. Develop inventory of City stream culverts by intersecting culvert GIS layer with stream GIS layer. Compare culvert inventory to culverts shown on WDFW SalmonScape. 2. Conduct a field evaluation of the City’s culverts located on fish-bearing streams (starting with verification of the WDFW list). The evaluation will include a general condition of the stream, condition of the culvert including conditions that would render it impassable to fish all the time or during flow certain conditions, and general habitat availability upstream of the culvert. 3. Develop prioritization criteria and prioritize culverts for replacement or improvement based on the potential to improve habitat availability to salmonids or other fish species. Planning Level Effort: Task Description Deliverable Level of Effort (hrs) 1. Develop culvert inventory. Use GIS to select all City culverts located on streams. GIS layer of stream culverts and list of culverts including attributes such as diameter, material, location, and stream name. 50 2. Culvert assessment for fish passage. Assess up to 70 culverts to evaluate fish passage and habitat conditions. Up to 17.5 field days (4 culverts per day) will be needed, with the assumption that two field staff conduct the assessment. Technical memorandum describing methodology, culvert assessment field notes describing conditions and photo documentation, table ranking culverts for replacement or improvements. 380 (280 field, 100 documentation) 3. Prioritize culverts. Develop prioritization criteria and prioritize culverts (high, medium, low) or rank from highest to lowest priority. Documentation describing prioritization criteria and methodology. List of culverts showing priority. 100 4. Develop individual projects Develop project worksheets for the prioritized culvert replacements and add to the Surface Water CIP. Project worksheet 40 AGENDA ITEM # 9. a) Surface Water Utility System Plan Update Project ID: 2020‐02 Evaluation of Enforcement Strategies Preliminary Level of Effort: 150 hrs. Project Description and Background: The objective of this project is to evaluate enforcement strategies for maintenance of private facilities, illicit discharges, and other stormwater management elements that require action by private entities. The City’s MS4 system consists of public and private components. Currently there are multiple tiers of inspection and maintenance of the public and private components, depending on the ownership and age of the system. City‐owned infrastructure and facilities are inspected and maintained by city maintenance crews. Additionally, city staff inspect and maintain private facilities that were transferred to the City following a policy decision on October 18, 2010. These facilities receive runoff from public roads and were generally under the management of homeowner’s associations (HOAs) prior to city transfer. Other private facilities that are owned and maintained by developments without HOAs or by private businesses are inspected by City maintenance crews as required by the City’s NPDES Phase II MS4 permit. Whereas inspection is completed by the City, maintenance and repairs are the responsibility of the owner, and the City follows up to ensure maintenance has been completed. Maintenance and repairs are not always completed, and the City has difficulty compelling owners to complete them. The City faces this challenge particularly in communities where there was no HOA formed and where all owners have equal and undivided interest in the stormwater flow control system. Other situations where City inspection requires private stormwater management action, including removal of illicit discharges and connections, implementation of source control measures, or any other type of stormwater code violation the Utility might receive, requires methods to compel private entities to take corrective action. Benefits: Identification of range of methods to compel correction actions. Consistency for all stormwater management infractions. Challenges: Politically unpopular. Integration with City‐wide code enforcement policies and database. Assumptions and Considerations: The following are assumptions and considerations for the Utility to evaluate stormwater code enforcement methods to achieve desired compliance results. The City enforces code compliance through its Community and Economic Development Department. Methods and procedures used to evaluate and issue code violations by Community and Economic Development will be assessed during this project to determine whether stormwater code compliance could be integrated with existing processes or if existing processes used by this department would be applicable to the Utility. City code describing enforcement procedures and consequences for violations of stormwater code will be evaluated relative to how the enforcement procedures are currently being applied to stormwater code violations. Alternative compliance methods will be researched from other jurisdictions to evaluate methods of success, including educational outreach, financial seed money for repairs, incentives for businesses that do the right thing, etc. AGENDA ITEM # 9. a) This project will identify tools necessary to develop a successful enforcement strategy, including consistent and easy to understand enforcement methods, tracking system, integration with other City code enforcement strategies, and staff needed to implement the program. This programmatic fact sheet does not include the level of effort to implement the enforcement strategy, only to evaluate and develop an enforcement strategy. Recommendations: The following tasks are recommended for this programmatic action: 1. Review existing Utility enforcement strategy relative to stormwater code, including records of enforcement actions, compliance rate, and types of enforcements. 2. Review City’s code compliance enforcement strategy for comparison to Utility’s stormwater code enforcement strategy. Evaluate whether there are opportunities for merging code enforcement duties or if there are differences worth exploring. 3. Research stormwater code enforcement strategies used by other jurisdictions to identify successful techniques that could be applied by the Utility. 4. Develop stormwater code enforcement policy utilizing data, techniques, potential inter‐departmental efficiencies, and alternatives gathered in Tasks 1 through 3. Planning Level Effort: Task Description Deliverable Level of Effort (hrs) 1. Review existing Utility enforcement strategy. Review existing stormwater code, including violations and consequences, Utility enforcement actions taken in the previous 5 years, compliance rate in the previous 5 years, and general enforcement strategy and protocols. Summary table documenting results of review. 40 2. Review City’s code compliance enforcement strategy. Consult with City Community and Economic Development staff on code compliance and enforcement strategies. Compare strategies, tracking, staffing, and success rates with practices used in Utility. Summary table documenting comparison of different code enforcement strategies within the City of Renton. 40 3. Research alternative code enforcement strategies used by other jurisdictions. Conduct research and interviews with up to three other regional or national jurisdictions to identify successful code enforcement strategies and alternatives to code enforcement that could be adopted by the Utility. Summary table of code enforcement strategies and alternatives used by other jurisdictions. 20 4. Develop stormwater code enforcement policy. Use data gathered during tasks 1 through 3 to develop a strategy to enforce stormwater codes, including maintenance of private stormwater facilities, removal of illicit discharges, implementation of source control BMPs and other stormwater management actions necessary to limit pollutants from entering the City’s MS4 and to improve water quality in the City’s receiving waters. Fact sheet detailing strategy for obtaining compliance with stormwater codes. 50 AGENDA ITEM # 9. a) Surface Water Utility System Plan Update Project ID: 2020‐03 Pipe and Culvert Asset Management Enhancement Preliminary Level of Effort: 80 hrs. Project Description: The objective of this project is to enhance the City’s existing asset management program to extend condition assessment of pipes beyond CMP pipes and prioritize pipes for repair and/or replacement based on risk. The scope of this project includes (1) prioritize pipes for condition assessment that are not being assessed, and (2) develop a repair and replacement strategy. Benefits: Strategy for pipe maintenance, repair, and replacement. Investment in long‐term decision making. Proactive system management. Challenges: Compliance with schedule for maintenance specified in the NPDES Phase II MS4 Permit Assumptions and Considerations: The following are assumptions and considerations for the City to augment its existing pipe condition assessment program, and develop a pipe maintenance, repair, and replacement program based on condition assessment. The City cleans all pipes, ditches, and catch basins and inlets within a circuit once during a permit term. The City has a dedicated CCTV truck to inspect stormwater pipes and uses a combination of tools to assess condition and maintain the system. and score their condition. GIS is used to determine consequence of failure based on location of the pipe (i.e., pipes under major arterials and over 18 inches diameter are the primary criteria), and CityWorks is used to track work orders. The pipes that are currently being assessed by the City are constructed of corrugated metal (CMP). This project will develop a prioritization scheme to assess non‐CMP pipes and prioritize maintenance, repair and replacement based on results. Use of the City’s existing electronic tools will be emphasized for efficiency and cost considerations. This programmatic fact sheet does not include the level of effort to implement a condition assessment or asset management program, only to develop the plan to do so. AGENDA ITEM # 9. a) Recommendations: The following tasks are recommended for this programmatic action: 1. Review existing condition assessment data and CMP management program to evaluate number of pipes assessed each year, frequency of assessment for individual pipes (i.e., once every 5 years? Every 10 years?), protocols used for data collection, storage, review and work prioritization, staffing, etc. The existing condition assessment program will be used as a basis for prioritization of non‐CMP pipes for condition assessment. 2. Develop protocols for using condition assessment data to inform the City’s pipe maintenance, repair and replacement program. Planning Level Effort: Task Description Deliverable Level of Effort (hrs) 1. Prioritize non‐CMP pipes for condition assessment. Evaluate existing CMP condition assessment program to inform and apply program to non‐CMP pipes. Map and list of prioritized pipes for condition assessment. 40 2. Develop protocols for pipe maintenance, repair and replacement program. Identify condition assessment and other criticality criteria (i.e. consequence of failure) for prioritizing pipe repair and replacement. Excel spreadsheet of criticality criteria. 40 AGENDA ITEM # 9. a) Surface Water Utility System Plan Update Project ID: 2020-04 Stormwater Management Action Plan (NPDES Phase II Permit S5.C.1.d) Preliminary Level of Effort: 2000 hrs. Project Description: The objective of this project is to meet the August 2019 NPDES Phase II MS4 Permit condition S5.C.1.d which requires the City to develop a Stormwater Management Action Plan for a high priority watershed. The scope of this project includes (1) developing an inventory of the watersheds within the City’s jurisdiction assess beneficial uses and stormwater management influences, (2) watershed and receiving water prioritization, and (3) development of a Stormwater Management Action Plan for the high priority watershed. Benefits: • Compliance with state and federal regulations • Strategic planning for water quality management • Protection of receiving waters within the City’s jurisdiction. • Development of CIP projects that are good candidates for Ecology funding Challenges: • Coordinating City land management and development strategies to improve water quality. • Differentiating beneficial uses and stormwater management influences to select high priority watersheds. Assumptions and Considerations: The following are assumptions and considerations for the City to develop and implement development of a Stormwater Management Action Plan to meet Condition S5.C.1.d in the NPDES Phase II MS4 Permit. • The City has an existing inventory of its watersheds including GIS mapping and basic characteristics including size and area within the City of Renton that discharges to the waterbody. • Ecology’s guidance document, “Stormwater Management Action Planning Guidance- Phase I and Western Washington Phase II Municipal Stormwater Permits,” Publication 19-10-010, dated August 2019 will be used by the City for reference on how to develop and implement the Stormwater Management Action Plan. • No new data will be collected to conduct the analysis to support development of a Stormwater Management Action Plan. Existing water quality and designated use data may include water quality data collected from previous studies, basin analyses, and publicly available electronic data such as Ecology’s Water Quality Assessment (https://ecology.wa.gov/Water-Shorelines/Water-quality/Water- improvement/Assessment-of-state-waters-303d and Washington Department of Fish and Wildlife’s SalmonScape application (http://apps.wdfw.wa.gov/salmonscape/ ). • Watershed inventory will include basic land cover data available from City GIS data, including but not limited to the distribution of current zoning types (i.e., commercial, single-family, multi-family, open space, etc.), predicted growth areas, impervious surface coverage, road length or right-of-way area, length of stormwater pipes or conveyance network in the watershed, critical areas or otherwise protected areas, and number and type of stormwater flow control and/or water quality treatment facilities in the watershed. AGENDA ITEM # 9. a) Recommendations: The following tasks are needed to develop and implement the Stormwater Management Action Plan: 1. Using the City’s existing watershed inventory on GIS as a starting point, augment the watershed inventory with data required by Condition S5.C .1.d.i. of the Permit. This task will include a map of the watersheds and a table of data indicating the watershed name, area, percent of the area within Renton’s jurisdiction, and description of existing conditions (water quality, habitat, stormwater treatment, etc.), and potential stormwater management influence (i.e., response to protection, restoration or stormwater investments). The inventory and brief description of the relative conditions of the receiving waters and contributing areas must be submitted by March 31, 2022. 2. The watershed inventory developed in the Task 1 will be used to prioritize receiving waters based on the potential benefit from implementation of stormwater facility retrofits, stormwater management program actions, land/development management actions or other actions designed to improve receiving water conditions in Renton. This task will involve developing criteria and a ranking process to prioritize the watersheds in the inventory. The receiving water prioritization and documentation must be complete by June 30, 2022. 3. This task involves development of the Stormwater Management Action Plan for the highest priority watershed where the City has determined the greatest improvement and receiving water benefit may be possible with stormwater management and/or land management actions. The Stormwater Management Action Plan must be submitted by March 31, 2023. The Stormwater Management Action Plan must include an integrated short‐ and long‐term strategy for improving water quality and designated uses in the selected watershed including operational (i.e., IDDE field screening, source control, operations and maintenance inspections or enhanced maintenance), educational (i.e., targeted public education and outreach), capital (i.e., stormwater retrofit or new stormwater facilities), and/or policy/regulatory (i.e., land management and development strategies). Planning Level Effort: Task Description Deliverable Level of Effort (hrs) 1. Develop a watershed inventory, receiving water assessment and influence Augment existing watershed inventory with available data, assess receiving water influence based on analysis of existing data. Table with watershed inventory, receiving water conditions and influence, and map. 500 2. Prioritize watersheds Develop prioritization criteria and ranking process and prioritize the watersheds in the inventory. Select high priority watershed for Stormwater Management Action Plan. Document describing ranking process and rationale for selecting high priority watershed for SMAP. 700 3. Develop Stormwater Management Action Plan Develop a plan describing operational, capital, educational, policy, and regulatory stormwater management action strategies and implementation schedule and budget for improving water quality in the high priority watershed. Stormwater Management Action Plan 800 AGENDA ITEM # 9. a) Surface Water Utility System Plan Update Project ID: 2020‐05 Source Control Program for Existing Development (NPDES Phase II Permit S5.C.8) Preliminary Level of Effort: 1900 hrs. Project Description: The objective of this project is to meet the August 2019 NPDES Phase II MS4 Permit condition S5.C.8 which requires the City to implement a source control program that targets pollution‐generating public and private properties for inspection, implements source control measures, and enforces source control BMP regulations if necessary. The scope of this project includes (1) review of the City's existing code to determine if current code language is adequate to meet the permit requirement and/or development of an ordinance or other enforceable document that requires source control BMPs, (2) an inventory of public and private sites that have the potential to generate pollutants to the City's MS4, (3) an inspection program for sites identified in the inventory, (4) a progressive enforcement policy to require site compliance with stormwater requirements, and (5) a source control staff training program. Benefits: Compliance with state and federal regulations Reduction in pollutants discharged to the City’s MS4 system. Community building with local businesses to reach City goal of providing high quality customer service while meeting service demands. Challenges: Coordination with existing business inspection programs within the Utility and in other City departments to avoid burdening businesses with multiple inspections. Enforcing site compliance with stormwater requirements. Staffing new program. Widespread community belief that their businesses are grandfathered into the regulations effective at the time they were permitted Assumptions and Considerations: The following are assumptions and considerations for the City to implement a Source Control program to meet the requirements of S5.C.8 in the NPDES Phase II MS4 Permit. This is a new program for the City; an additional staff person in the surface water engineering or maintenance section will be needed to implement the program. Renton Municipal Code (RMC) 4‐6‐030. Section I adopts the 2016 King County Stormwater Pollution Prevention Manual. This manual describes required best management practices (BMPs) and maintenance activities for different types of business activities. RMC 4‐6‐030. Section J. Discharge Prohibition describes illicit and allowable discharges to the MS4 and procedures that must occur after a business or other entity is found in violation of this code section, including implementation of source control or treatment BMPs. This section describes enforcement procedures. Several jurisdictions in the region are implementing successful source control programs; those programs can be used as a model or template for Renton’s incipient program. Examples include City of Kirkland, City of Seattle, City of Shoreline, and Snohomish County. AGENDA ITEM # 9. a) o The City of Kirkland includes an informative page on the City’s website that has links to references and documents to assist businesses in implementation of source control measures on their properties. It also describes what businesses can expect during a City site inspection. Kirkland encourages good business practices by highlighting businesses that are implementing excellent stormwater management BMPs or have made significant improvements. o The City of Seattle links to a short informational video showing how to implement simple BMPs for a typical automotive facility, for which the video spokesperson is the shop owner. o The City of Shoreline offers assistance for business owners to implement BMPs at their sites, providing small incentives for participation. o Snohomish County Code Chapter 7.53 Water Pollution Control outlines escalating monetary penalties for violations depending on the public health and environmental impacts of the violation, willfulness or knowledge of the violation, responsiveness of the violator, and economic benefit accrued by the person(s) responsible for the violation. City GIS and business license tracking systems will be used to map businesses included in the business source control inspection inventory and track data. Data collection may occur using existing electronic applications already used by the City in IDDE inspections or other field data collection efforts (e.g. Cityworks). Alternatively, data could be collected with ArcGIS Collector, Survey123, or NPDES Pro. It is recommended that a standardized electronic collection method is used that link to the database or system where inspections are stored. Recommendations: The following tasks are needed to develop and implement a source control program: 1. Review existing code language and determine if revisions are needed or desired. Renton has an existing code that adopts the 2016 King County Stormwater Pollution Prevention Manual and prohibits illicit discharges to the MS4. The City may wish to enhance the code with additional enforcement language, including monetary penalties, but the existing code provides for enforcement of violations. An ordinance must be adopted and made effective by August 1, 2022. 2. An inventory of public and private sites will need to be developed based on the potential for site activities to generate and discharge pollutants to the MS4. North American Industry Classification System (NAICS) or Standard Industrial Code (SIC) business codes are useful to identify businesses that fit the categories that align with activities in the 2016 King County Stormwater Pollution Prevention Manual (i.e., vehicle repair and maintenance, woodcraft, landscaping, manufacturing, etc.). Additionally, sites that are pollutant generating sources based on complaints must be included in the inventory (Appendix 8 of Permit). The inventory should be geo‐referenced and an ArcGIS coverage should be developed that can be used in the collection of business inspection data by field personnel, either electronically or on paper maps. Once developed the inventory will need to be updated as necessary to ensure that the list is accurate and complete. The inventory must be done by August 1, 2022. 3. Develop and implement procedures for business inspection, data collection, data storage, communications, business education, and tracking by January 1, 2023. a. Send communication to all site owners/tenants/operators listed in the inventory to provide information about the source control program including requirements for pollution prevention, available resources, and City business inspections. b. Create schedule for inspections. The permit requires a 20% inspection rate annually including 100% of sites identified through credible complaints. The businesses should be prioritized for inspection based on criteria determined during program set up. AGENDA ITEM # 9. a) c. Determine who is going to complete the inspections. Can this be done in conjunction with other inspection duties? Does the site inventory align with site inventories for other purposes (i.e., stormwater facility inspection, IDDE program, FOG, aquifer protection, etc.)? d. Develop standard operating procedures for business inspections, including pre-visit research, communication protocols, standard educational materials and resources to provide, data collection methods (electronic or paper checklists), number and types of photographs, and post-visit completion and or follow-up if necessary. Ecology has an MS4 Source Control Business Inspection Template available for use and the Business Inspection Group (BIG) will be developing a guidance manual and training resources in the future (https://www.wastormwatercenter.org/big-business- inspection-group/). e. Determine how the business inspection data will be stored and tracked, in CityWorks, GIS, Access database, or other database systems? 4. Implement existing enforcement policy or develop a new progressive enforcement policy if the existing policies aren’t working. The City’s existing code for prohibiting and eliminating illicit discharges and connections to the MS4 relies on education and outreach, and written notice of violation first. Any violation can also be declared a nuisance under RMC 1 -3-3, which leads to escalating enforcement measures. The City should review its current code and enforcement policies and evaluate whether updates are necessary. Enforcement must be implemented by January 1, 2023. 5. Develop a training program for staff responsible for implementing the source control program, including mentoring, on-line videos, ride-along opportunities with other jurisdictions, and other off-site training specific to implementation of best management practices and inspection protocols. Planning Level Effort: Task Description Deliverable Level of Effort (hrs) 1. Develop an ordinance or other enforceable document Review existing code language; revise, if necessary. Keep existing code, or New ordinance 100 2. Establish inventory of public and private sites Use SIC/NAICS codes and complaint database to develop site inventory and database. Use GIS to map sites. Database and map of sites. 200 (initial effort) 40 per year, maintenance 3. Develop and implement source control program Send initial communications to site inventory list, develop standard operating procedures, implement initial program (20% of sites). Educational materials, standard operating procedures, tools for inspections and tracking. 1,200 + depending on number of sites in inventory (Program set up and 1st year) 4. Develop progressive enforcement policy Review existing enforcement policy; evaluate different enforcement options to determine if updates are needed. Updated or new enforcement policy 300 5. Staff source control training Identify training materials and methods, including on-line, off-site, and mentoring or partnership opportunities. On-going staff training and outreach to inspectors from other Cities 40 – 100 Depends on number of staff AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE APPENDIX F DRAINAGE COMPLAINTS AGENDA ITEM # 9. a) City of Renton Surface Water Utility System Plan Drainage Complaint Data From City of Renton Online GIS Database July 1, 2020 Reference Number Request Type Description Location Parcel ID Status Category Closed Date 2015091701 Flooding New property owner objects to discharge from neighboring detention vault onto his property. Ref Claim #CL‐15‐053 12420 SE Petrovitsky Rd 07393000035 Open Maintenance 2015101201 Flooding Paving for SFR remodel causes sheet flow to miss cb in ROW 1326 Beacon Way S 7221400001 Open 2015120801 Flooding Localized flooding of yard due to overtopping of Madsen Creek channel.14937 Maple Valley Hwy 2323059118 Open Other 2016102001 Flooding Street runoff from S 19th crosses Morris runs down drive during heavy rain events 1823 Morris Ave S 7222000352 Open 2016102002 Flooding InvestigateFlooding/Channel obstruction under SR169, DS Wonderland Est.SR169/150th Ave SE Open Maintenance 2016103101 Flooding KC Resident Referred to City ‐ Flooding of street ditch. Madsen Creek ds flow obstruct.15202 149th Ave SE 2323059010 Open Maintenance 2017020903 Flooding Overtopping of cross property conveyance flooded street 8024 S 132nd St 2144800476 Open Maintenance 2017031501 Flooding Benson Woods wetland facility overtopping, runoff across Village Gate Condos 111th Pl SE / SE 189th St 07433000090 Open Maintenance 2017020902 Flooding Resident states water bubbles from storm system during heavy events, crosses yard floods basement 10814 SE 166th St 0088000740 Open Maintenance 2017042601 Flooding Per Maintenance, onsite flooding due to upstream facility #111357 18504 112th Ave SE 3223059287 Open Maintenance 2017041801 Flooding Street runoff flowing to backyard, no structure flooding 16404 SE 143rd Pl 7695500320 Open Maintenance Renton Mainte Flooding Four catch basins on the road (two on each side). 1105 N 28th Pl Open Known Drainage Issue Renton Mainte Flooding Beehive left of lower fire entrance of condos 1800 NE 40th St 3345700035 Open Known Drainage Issue Renton Mainte Flooding Inlet to 48" CMP 4242 Jones Ave NE (on NE 43rd St)Open Known Drainage Issue Renton Mainte Flooding Inlet ‐ Check grate for dirt and vegetation 4348 Lincoln Ave NE 3345700005 Open Known Drainage Issue Renton Mainte Flooding Four inlet pipes to a vault under the roadway (RW3 key required for access to the pond)12 Seahawks Way Open Known Drainage Issue Renton Mainte Flooding Trash rack inlet for a stream 201 Taylor Ave NW 2144800876 Open Known Drainage Issue Renton Mainte Flooding Off pipeline road directly next to tiffany park. It is a trash rack inlet for a stream.15657 123rd Ave Se Open Known Drainage Issue Renton Mainte Flooding Trash rack to the east of jack in the box. 4810 NE 4th Open Known Drainage Issue Renton Mainte Flooding Clean cross tubes and ditches 14111 SE May Valley Rd Open Known Drainage Issue Renton Mainte Flooding Storm pond inlets. Inlets are behind the pond to the left. There is a trail leading directly to them. NE 2nd Pl and Field Ave NE. 1523059227 Open Known Drainage Issue Renton Mainte Flooding Wetland outfall. Watch for big debris.Across from 483 Duvall Ave NE 086970TR‐A Open Known Drainage Issue Renton Mainte Flooding Inlet to honey creek system on Duvall Ave NE. SW corner of parking lot.4715 Sunset Blvd NE Open Known Drainage Issue Renton Mainte Flooding Wetland/ 3 Chambers. Chamber one inlet and outfall (shore gate control in manhole)682 Vashon PL NE 6403500650 Open Known Drainage Issue Renton Mainte Flooding Trash rack directly behind sidewalk and mailboxes. Between 15619 & 15705 SE 157th St Open Known Drainage Issue Renton Mainte Flooding Trash rack inlet surrounded by chain link fencing. 1235 S 36th St Open Known Drainage Issue Renton Mainte Flooding Inlet pipe line is directly to the north of the clarion hotel. Be extremely cautious during heavy rain, heavy flow and will suck anything into the pipe. 3700 East Valley Rd 3023059117 Open Known Drainage Issue Renton Mainte Flooding When entering eagle ridge stay to the right. Follow gravel road past the gate to the end. Follow trail at the end of the road.1300 S Eagle Ridge Dr.Open Known Drainage Issue Renton Mainte Flooding Six inch bee hive on the south side of the road, directly to the east of the bus turn around. Royal Hills Dr Open Known Drainage Issue 2018112801 Flooding Driveway/Garage flooding from street runoff during heavy rain events 515 S 38th Ct 8558600195 Open 0914201801 Flooding 13928 156th ave SE Renton,WA 98059 0914201801 Open Private 11272018 Flooding flooded their garage , caused by leaves 1749 Jones Dr 7399000020 Open Private 2019012401 Flooding Runoff from site ponding reported to flow to ROW 198240106th Ave SE 0087000250 Open Private 2016092201 Flooding Resident approached volunteer and described flooding at street cb during heavy events Jones AVE NE ROW at NE 23rd Closed Maintenance 2017031301 Flooding Citizen reported overtopping of private street cb running crx sidewalk.NE 23rd St / Jones Ave NE Closed Private 2017020904 Flooding Properties flooded by runoff from Toalson Prop: 2017020903 8225, 8231 S 132nd St 2144800535, 525 Closed Private 2010090801 Flooding 421 UnionSystem 0923059050 2010010401 Flooding 3108SE6th_WardDC 5126400150 2013082001 Flooding 1326 Beacon Way S 7221400001 2013110401 Flooding Victora Hills/Montclaire 889870TR‐C Page 1 of 6 AGENDA ITEM # 9. a) City of Renton Surface Water Utility System Plan Drainage Complaint Data From City of Renton Online GIS Database July 1, 2020 Reference Number Request Type Description Location Parcel ID Status Category Closed Date 2012010501 Flooding Bank of America Drive Thru 7231502271 KC‐1996‐1662 Flooding SEE 96‐0438 17418 108TH AVE SE 2923059072 King County 2019012401 Flooding Flashwater and debris running into the road 17013 106th Ave SE 2019031501 Flooding Flow accumulated next the property 2104 Wells Ct S 5/3/2019 1127291801 Flooding flooding into a living room, caused by leaves. The apartment is lower than the road and the water topped the curb.200 Maple ave S 1127291801 11/28/2018 2018013101 Flooding Followup to earlier drainage issue. Flooding of parking lot due to overtopping or RR ditch. Houser Way Bypass 0823059026 Closed Maintenance 6/8/2018 2018021301 Flooding Groundwater surcharging at crack in driveway, running over walk.14055 SE 159th Pl 5104451070 Closed Private 5/1/2018 2018040501 Flooding Site drainage flowing to neighboring property at 2219 NE 6th Ct 601 Bronson Pl NE, Renton 7227502505 Closed Private 4/27/2018 2018041001 Flooding New resident inquired about tree removal in ROW. Water pooling in yard.11050 SE 186th St 9117100300 Closed Private 4/26/2018 2018041801 Flooding Resident stated that the sidewalk and driveway filll up with water 645 Shattuck Ave S, Renton 1823059134 Closed Other 4/18/2018 2018032601 Flooding Water in backyard, concerns of runoff from neighboring apartments 564 S 51st CT 8083350200 Closed Private 3/26/2018 Flooding Surface Water Drainage 140th way SE 2314301060 2/6/2018 2018020501 Flooding Resident observed water running across sidewalk to roadway.140th Way SE / north of SE 154th Pl Closed Maintenance 2/5/2018 2018012401 Flooding Resident has water in crawlspace and adjacent yard. 1500 S 18th St, N101 7988500000 Closed Private 2/5/2018 2017122901 Flooding Res. describes backyard flooding, possibly due to neighbor 15823 130th Ave SE 2460700200 Closed Private 1/8/2018 2017071901 Flooding Stormwater missing CB per customer 8805 S 132nd St 2144800885 Closed Maintenance 7/27/2017 2017050501 Flooding Building flooding during 100yr rain event 95 Burnett Ave S 0007200072,0148 Closed Capital Improment Project 6/15/2017 2017052301 Flooding Runoff from 156th Ave SE runs down driveway during heavy events.13615 156th Ave SE 1463400047 Closed Private 6/9/2017 2017051901 Flooding Possible street runoff flooding at base of driveway during heavy events 16522 108th Ave SE 0088000721 Closed Maintenance 6/1/2017 2017050901 Flooding Res. inquired about connection to public storm system 4611 NE 17th Pl 5169700136 Closed Private 5/22/2017 2017050401 Flooding Debris blocking culvert end 9403 s 192nd St 0622059051 Closed Maintenance 5/4/2017 2017050402 Flooding Debris blocking culvert end.16404 111th Ave SE 0088000442 Closed Maintenance 5/4/2017 2017050403 Flooding Water ran down NE 14th onto property during 100yr event 1401 Jones Ave Ne 3344500045 Closed Maintenance 5/4/2017 2017050404 Flooding debris covered grate causing water/debris to run down NE 43rd 4348 Lincoln Ave NE 3345700005 Closed Maintenance 5/4/2017 2017050405 Flooding Flooding over road at RR underpass Hardie Ave Underpass Closed Maintenance 5/4/2017 2017050406 Flooding Flooding intersection ‐ 100yr event Park Ave N Closed Maintenance 5/4/2017 2017050407 Flooding Standing Water in street ‐ 100yr event ROW at 706 Shelton Ave NE Closed Maintenance 5/4/2017 2017050408 Flooding Flooding at intersections Wells/Williams & Grady Way Closed Maintenance 5/4/2017 2017033101 Flooding Flooding of private roadway, visited site ‐ private drain issue 122nd Pl SE Private Drive 3323059079 Closed Private 5/3/2017 2017041901 Flooding FYI Only, Property OCL ‐ Owner concerned of access due to flooding of Soos Creek 3323059053 Closed Private 4/20/2017 2017040601 Flooding Res submitted ERTS re: backyard flooding 522 Pasco Pl NE 9477940040 Closed Private 4/6/2017 2017020901 Flooding Water Ponding in SW corner of lawn. Ongoing problem, appears larger since new construction to east.11323 SE 180th Pl 0511700070 Closed Maintenance 3/31/2017 2017030201 Flooding Backyard Flooding, resident requested visit to investigate drainage options 12762 SE 164th St 1432900150 Closed Private 3/3/2017 2015073101 Flooding Resident stated that drainage system at RR overflows during heavy events, flooding garage 3223 Mountain View Ave N 3342103775 Closed Private 12/1/2016 2016101401 Flooding System surcharged at structure, flowed to residential property.Victoria Hills/Montclaire 3376750000 Closed Maintenance 10/21/2016 2016080201 Flooding Storm System Surcharge in heavy rain placing sand/silt 15711 SE 157th St / Summerfield 8856920170 Closed Maintenance 8/4/2016 2016070601 Flooding Owner was contacted by attorney re: 3318 LWB property receiving runoff.3315 Burnett Ave N 3342100032 Closed Other 7/13/2016 2016041901 Flooding Resident is concerned about high runoff in driveway during rain events.6704 SE 8th St 1423059030 Closed Private 5/1/2016 2016032401 Flooding Water under home, customer concerned of ROW runoff.375 Union Ave SE #198 1623059022 Closed Private 3/31/2016 2015120802 Flooding Flooding in ROW during heavy rain events, NE of intersection and South side of Sunset NE Sunset / Anacortes Ave NE Closed Maintenance 3/8/2016 2016012201 Flooding Onsite flooding, owner feels adjacent construction is issue.1101 Lake Washington Blvd N (920?) 0823059178 Closed Private 1/29/2016 2016012601 Flooding Flooding of daylight basement during heavy rain events.4434 NE 23rd Ct 2787720140 Closed Private 1/27/2016 2015121601 Flooding Email ‐ res. describes recurring drainage issues from street runoff, basement drain surcharge 1603 Davis Ave S 3340401265 Closed Private 1/7/2016 2015123001 Flooding Resident has recurring water accum. in crawlspace. Asked for tech. assistance 10311 SE 185th Pl 9476000070 Closed Private 1/6/2016 Page 2 of 6 AGENDA ITEM # 9. a) City of Renton Surface Water Utility System Plan Drainage Complaint Data From City of Renton Online GIS Database July 1, 2020 Reference Number Request Type Description Location Parcel ID Status Category Closed Date 2015120901 Flooding On site structure overtopping, investigate structure and drainage 1610/1614 Lake Youngs Way SE 8645510500 Closed Private 12/30/2015 2015121401 Flooding Site flooding during heavy events. Contractor hired, questions outfall to wetland.12000 SE Petrovitsky 0739000066 Closed Private 12/21/2015 2014121501 Flooding Ref. DC 2013112601_Site/Structure flooding during heavy rain events 15509 116th Ave SE 2023059067 Closed Private 9/1/2015 2015020901 Flooding Site Runoff, Sewer Issues ‐ Source of downhill flooding on Neimi property 10817 SE 170th St 2923059144 Closed Private 7/15/2015 2014103101 Flooding EMail to CED ‐ Water Pooling in backyard of residence. Res says old KC drainage project a factor.17020 108th Ave SE 2923059052 Closed Other 6/1/2015 2014120501 Flooding Duvall Place ditchline overtopping, sedimentation. 723 Duvall Pl 6649500170 Closed Maintenance 6/1/2015 2015030401 Flooding Resident call to investigate increased water level in backyard 2012 Shattuck Ave S 7222000184 Closed Private 4/1/2015 2015031901 Flooding Pond on adjacent property overtops, floods neighbors and roadway 17616 116th Ave SE 6196600040 Closed Private 3/23/2015 2015012901 Flooding Flooding on north property line, concerns of neighboring property runoff/grading issues 2202 Jones Ave NE 334903611 Closed Private 2/4/2015 2015012902 Flooding No Immed. flooding issues ‐ Resident requested information on system in street. Concern of potential flooding from street system.19721 92nd Ave S 0622059047 Closed Maintenance 1/30/2015 2014112601 Flooding Catch basin surcharges in heavy rain events. Onsite roof & area drain tied into cb, site flooding.95 Burnett Ave S 0007200148 Closed Private 12/15/2014 2014102001 Flooding Resubmitttal of 2013 DC, Resident requesting CB north of driveway to attach site drain system. 19250 106th Ave SE 0522059312 Closed Maintenance 10/23/2014 2013120201 Flooding Alley runoff flooding back yard of residenct. Conveyance condition and path not known. 1110 N 27th Pl 1644500390 Closed Maintenance 10/22/2014 2013080501 Flooding Discharge from unknown source flooding property 15805 140th Ct SE 5104450820 Closed Maintenance 8/1/2014 2014062501 Flooding Plugged drain line from property running into street 5024 Lake Washington Blvd NE 3343300862 Closed Private 7/15/2014 2013112601 Flooding Church school building flooded during heavy events, concern that Water facility runoff a factor. 15509 116th Ave SE 2023059067 Closed Private 11/27/2013 2013100101 Flooding Ditch and front yard flooding during recent events 10833 SE 173rd St 1626800055 Closed Maintenance 10/4/2013 2013093001 Flooding Runoff from alley & adj construction site flooding back yard 3318 Lake Washington Blvd N 3342100036 Closed Other 10/2/2013 2013083001 Flooding Street Runoff flooded property during Aug 29 event 900 Kirkland Ave NE 8074400115 Closed Capital Improment Project 10/1/2013 2013090301 Flooding CB surcharged flooding front yard in 8/29 event 1741 Jones Dr SE 7399000020 Closed Maintenance 10/1/2013 2013090601 Flooding Street Runoff flooding driveway during heavy rain events 10810 SE 182nd St 0741100020 Closed Other 9/13/2013 2013061201 Flooding Sheet flow from street runs onto property ‐ no curb/gutter 19251 106th Ave SE 0522059312 Closed Private 6/17/2013 2013041201 Flooding Street Runoff flooding driveway during heavy rain events 9215 S 198th St 7941000200 Closed Maintenance 5/1/2013 KC‐2000‐0013 Flooding PVT PROPERTY FLOODING NEW SFR CONTRIBUT 18851 103RD CT SE 3223059314 King County 12/11/2002 KC‐2000‐0013 Flooding PVT PROPERTY FLOODING NEW SFR CONTRIBUTE. OWNER DECLINED OPTIONS TO REPLACE HIS PUMP SYSTEM.18851 103RD CT SE 3223059314 King County 12/11/2002 KC‐2000‐0094 Flooding GROUNDWATER SURFACING ON PVT PROP 7855 S 130TH ST 2144800334 King County 7/24/2001 KC‐2000‐0094 Flooding GROUNDWATER SURFACING ON PVT PROP 7855 S 130TH ST 2144800334 King County 7/24/2001 KC‐1999‐0657 Flooding ROADS CAUSING FLOODING SEE99‐0608 17314 116TH AVE SE 7938400060 King County 9/20/1999 KC‐1999‐0602 Flooding APPARENT OVERFLOW OF ROAD DRNG 10426 SE 196TH ST 6388000040 King County 9/3/1999 KC‐1999‐0230 Flooding 17811 97TH AVE S 7616800150 King County 6/30/1999 KC‐1998‐0546 Flooding SHEET FLOW FROM ROAD HIGH INTENSITY ST 10810 SE 182ND ST 0741100020 King County 8/26/1998 KC‐1996‐0438 Flooding OFFSITE FLOW IMPACTING CHURCH PROPERTY 17418 108TH AVE SE 2923059072 King County 7/14/1998 KC‐1996‐0540 Flooding INADEQUATE PVT DRNG SYS IMPACT PVT PROP 16308 126TH AVE SE 1433100200 King County 12/31/1997 KC‐1997‐0423 Flooding ROADSIDE DITCH OVERFLOW‐160TH AVE SE 14028 160TH AVE SE 1457500105 King County 12/18/1997 KC‐1996‐0282 Flooding STORM EVENT COMMERCIAL PROP FLOODING 11626 SE 168TH ST 1423700941 King County 12/17/1997 KC‐1997‐0206 Flooding OFFSITE FLOW IMPACTING PRIVATE PROP 16046 SE 142ND PL 7253700110 King County 10/29/1997 KC‐1996‐0438 Flooding OFFSITE FLOW IMPACTING CHURCH PROPERTY 17418 108TH AVE SE 2923059072 King County 10/2/1997 KC‐1997‐0206 Flooding OFFSITE FLOW IMPACTING PRIVATE PROP 16046 SE 142ND PL 7253700110 King County 9/10/1997 KC‐1997‐1081 Flooding NEIGHBORHOOD DRNG PROB COST PROHIBITIVE 16316 127TH AVE SE 1433100320 King County 7/3/1997 KC‐1997‐0055 Flooding PUGET COLONY HOMES 14105 SE 133RD ST 6928000210 King County 5/8/1997 KC‐1996‐2050 Flooding NAT CHAL SEDIMENT IMPACT CIP PROJ???12601 SE PETROVITSKY RD 0739000105 King County 2/14/1997 KC‐1997‐0194 Flooding SUMP PMP DISCHARGE WATER ON ROAD 11924 SE 161ST ST 1423400070 King County 2/14/1997 KC‐1997‐0203 Flooding OVERFLOW FROM D/W CULV IMPACT PVT PROP 14028 160TH AVE SE 1457500105 King County 2/11/1997 KC‐1997‐0206 Flooding OFFSITE FLOW IMPACTING PRIVATE PROP 16046 SE 142ND PL 7253700110 King County 2/11/1997 KC‐1997‐0349 Flooding PONDING IN ROAD RIGHT‐OF‐WAY 138DD SE 156TH 5104450400 King County 2/7/1997 KC‐1996‐2071 Flooding INADEQUATE CONVEYANCE OFFSITE FLOW 11828 SE 180TH ST 6196600543 King County 2/7/1997 Page 3 of 6 AGENDA ITEM # 9. a) City of Renton Surface Water Utility System Plan Drainage Complaint Data From City of Renton Online GIS Database July 1, 2020 Reference Number Request Type Description Location Parcel ID Status Category Closed Date KC‐1997‐0084 Flooding UNDER CONST R/D POND 18504 112TH AVE SE 3223059287 King County 2/5/1997 KC‐1996‐2061 Flooding 14615 SE RENTON‐MAPLE VALLEY HWY 2223059018 King County 2/4/1997 KC‐1997‐0055 Flooding PUGET COLONY HOMES 14105 SE 133RD ST 6928000210 King County 1/30/1997 KC‐1997‐0173 Flooding RUDELLS FLOODING D90914 18304 108TH PL SE 5089700480 King County 1/28/1997 KC‐1997‐0263 Flooding HIGH GROUNDWATER TABLE BASEMENT FLOODED 16117 131ST PL SE 2473380310 King County 1/27/1997 KC‐1996‐2071 Flooding INADEQUATE CONVEYANCE OFFSITE FLOW 11828 SE 180TH ST 6196600543 King County 1/24/1997 KC‐1997‐0085 Flooding RUDDELLS STUDY PROBLEM, CIP TO BE DONE 11202 SE 186TH ST 9117000160 King County 1/23/1997 KC‐1997‐0054 Flooding GROUNDWATER FROM NEIGHBOR 13660 143RD AVE SE 0593400070 King County 1/13/1997 KC‐1997‐0053 Flooding GNDWATER FROM NEIGHBOR 16425 128TH AVE SE 1423910570 King County 1/13/1997 KC‐1997‐0055 Flooding PUGET COLONY HOMES 14105 SE 133RD ST 6928000210 King County 1/13/1997 KC‐1996‐2042 Flooding GROUND WATER IMPACT PVT PROP 16134 128TH AVE SE 1432900310 King County 1/3/1997 KC‐1996‐1236 Flooding APPARENT IMPACT TO PVT PROP OPEN NDAP?? 17023 113TH AVE SE 2892700120 King County 12/13/1996 KC‐1996‐1724 Flooding OFFSITE FLOW IMPACTING PVT PROP 14206 164TH AVE SE 7695500360 King County 10/18/1996 KC‐1996‐1662 Flooding SEE 96‐0438: COMPLAINANT WITHDREW CMPLT 17418 108TH AVE SE 2923059072 King County 10/17/1996 KC‐1996‐1662 Flooding SHEET FLOW FROM PARKING SEE 960438 17418 108TH AVE SE 2923059072 King County 9/26/1996 KC‐1996‐1236 Flooding APPARENT IMPACT TO PVT PROP OPEN NDAP?? 17023 113TH AVE SE 2892700120 King County 8/8/1996 KC‐1996‐0714 Flooding RUDDELL ADD 11044 SE 186TH ST 9117100290 King County 6/7/1996 KC‐1996‐0540 Flooding INADEQUATE PVT DRNG SYS IMPACT PVT PROP 16308 126TH AVE SE 1433100200 King County 5/20/1996 KC‐1996‐0094 Flooding WATER OVERSIDEWALK FROM PVT PROP 12103 SE 164TH ST 1423801090 King County 4/18/1996 KC‐1996‐0552 Flooding FLOODING FROM VANDALIZED FIRE HYDRANT 11615 148TH AVE SE 1023059353 King County 4/9/1996 KC‐1996‐0713 Flooding PVT PROP FLOODING FROM INADEQUATE DRNG 16316 127TH AVE SE 1433100320 King County 3/26/1996 KC‐1996‐0540 Flooding INADEQUATE PVT DRNG SYS IMPACT PVT PROP 16308 126TH AVE SE 1433100200 King County 3/21/1996 KC‐1996‐0218 Flooding ADJ PROPERTY IMPROV IMPACT PVT PROP 16131 120TH AVE SE 1423400175 King County 3/15/1996 KC‐1996‐0094 Flooding WATER OVERSIDEWALK FROM PVT PROP 12103 SE 164TH ST 1423801090 King County 3/15/1996 KC‐1996‐0679 Flooding IMPACT TO PVT PROPERTY FROM UNMAINT DRG 12031 SE 170TH PL 1432401095 King County 3/15/1996 KC‐1996‐0438 Flooding OFFSITE FLOW IMPACTING CHURCH PROPERTY 17418 108TH AVE SE 2923059072 King County 3/15/1996 KC‐1996‐0221 Flooding STORM EVENT FLOODING DUE TO STORM 16316 127TH AVE SE 1433100320 King County 3/7/1996 KC‐1996‐0185 Flooding WATER MISSES CB, PIPE DAMAGE 11625 148TH AVE SE 1023059354 King County 2/27/1996 KC‐1995‐1116 Flooding APPARENT GROUND WATER PROBLEM.16128 128TH AVE SE 1432900300 King County 1/12/1996 KC‐1994‐1000 Flooding LACK OF CONVEYANCE THROUGH PVT PROP 11615 148TH AVE SE 1023059390 King County 12/7/1995 KC‐1995‐0855 Flooding BUILDING FLOODED FROM BLOCKED D/S 17418 108TH AVE SE 2923059072 King County 10/27/1995 KC‐1995‐0649 Flooding BRODKA/WORELY DISPUTE 12602 SE PETROVISKY RD 0739000025 King County 8/14/1995 KC‐1995‐0179 Flooding GRNDWTR IMP TO S/W; WILL TIE TO DWNSPTS 18618 106TH PL SE 8956500190 King County 5/9/1995 KC‐1995‐0214 Flooding ROAD RUNOFF DOWN DRIVEWAY FLOODS BSMT 7601+ S 135TH ST 2988800121 King County 5/1/1995 KC‐1995‐0214 Flooding ROAD RUNOFF DOWN DRIVEWAY FLOODS BSMT 7601+ S 135TH ST 2988800121 King County 5/1/1995 KC‐1994‐1000 Flooding LACK OF CONVEYANCE THROUGH PVT PROP 11615 148TH AVE SE 1023059390 King County 3/22/1995 KC‐1994‐0995 Flooding OBSTRUCTED FLOW BY FREDRICK'S PLACE ?? 18616 102ND AVE SE 3223059085 King County 3/13/1995 KC‐1995‐0214 Flooding 7601+ S 135TH ST 2988800121 King County 3/7/1995 KC‐1995‐0179 Flooding UNCONTROLLED FLOW OVER SIDEWALK 18618 106TH PL SE 8956500190 King County 3/1/1995 KC‐1993‐0724 Flooding FLOODING IN WETLAND ON PROPERTY 13516 164TH AVE SE 7229700006 King County 1/18/1995 KC‐1994‐0933 Flooding OPEN CHANNEL PVT PROP NO EASEMENTS 10406 SE 174TH ST 2923059151 King County 1/13/1995 KC‐1994‐1000 Flooding LACK OF CONVEYANCE THROUGH PVT PROP 11615 148TH AVE SE 1023059390 King County 1/10/1995 KC‐1994‐0447 Flooding VALLEY FAIRE 3 TIGHTLINE 15705 SE 157TH ST 8856920180 King County 12/16/1994 KC‐1994‐0447 Flooding VALLEY FAIRE III SYSTEM NOT WORKING 15705 SE 157TH ST 8856920180 King County 12/15/1994 KC‐1994‐0447 Flooding VALLEY FAIRE III SYSTEM NOT WORKING 15705 SE 157TH ST 8856920180 King County 7/29/1994 KC‐1993‐0109 Flooding YARD PONDING NOT NDA SINGLE PROP SOURCE 15533 156TH CT SE 8856920330 King County 4/2/1994 KC‐1993‐0724 Flooding FLOODING 13516 164TH AVE SE 7229700006 King County 10/25/1993 KC‐1993‐0109 Flooding VALLEY FAIRE CRAWL SPACE 15533 156TH CT SE 8856920330 King County 2/25/1993 KC‐1990‐1511 Flooding CAPACITY OF PLAT DRNG 14105 SE 133RD ST 6928000210 King County 1/23/1993 KC‐1991‐0929 Flooding TO CIP 17024 SPRINGBROOK RD S 3023059041 King County 12/24/1992 KC‐1991‐0196 Flooding NOT NDAP 18425 112TH AVE SE 3223059195 King County 12/8/1992 KC‐1991‐0777 Flooding CCF# 591‐39 NOT NDA PUGET COLONY 14103 SE 132ND ST 6928000050 King County 11/24/1992 KC‐1992‐0078 Flooding TO CIP 11208 SE 182ND ST 8906100070 King County 11/23/1992 KC‐1991‐0852 Flooding WATER FROM BANK 12615 SE PETROVISKY RD 0739000115 King County 11/19/1992 KC‐1990‐1186 Flooding MEMO/RUDDELLS STUDY TO PA 11044 SE 186TH ST 9117100290 King County 9/11/1992 KC‐1991‐0080 Flooding RETAINING WALL /PONDING WATER 14037 SE 159TH PL 5104451030 King County 8/28/1992 KC‐1992‐0078 Flooding 11208 SE 182ND ST 8906100070 King County 2/26/1992 KC‐1991‐1100 Flooding IN YARD AND PLAYGROUND 12512 SE 164TH PL 1433200040 King County 11/1/1991 KC‐1991‐1087 Flooding LACK OF DRNG/NEW HOUSES 18216 124TH AVE SE 3323059069 King County 10/29/1991 KC‐1990‐1128 Flooding MUDSLIDE CL#13375 16126 SE 156TH ST 8856890310 King County 10/4/1991 KC‐1991‐1028 Flooding CROSS PIPE SIZE OK 9623 S 175TH ST 8558600195 King County 10/1/1991 KC‐1991‐0996 Flooding RUDDEL'S FIRST ADD STUDY 11056 SE 186TH ST 9117100310 King County 9/18/1991 KC‐1991‐0929 Flooding DITCH BY PRIVATE DRIVEWAY 17024 SPRINGBROOK RD S 3023059041 King County 8/28/1991 KC‐1991‐0885 Flooding CCF# SWM‐0854/DRAINAGE IMPROVEMENTS 13405 142ND AVE SE 6928000400 King County 8/20/1991 KC‐1991‐0099 Flooding MEMO TO PA 12602 SE PETROVITSKY 0739000020 King County 8/15/1991 KC‐1991‐0852 Flooding WATER FROM BANK 12615 SE PETROVISKY RD 0739000115 King County 8/14/1991 KC‐1991‐0817 Flooding R/D POND BACKUP 18851 103RD CT SE 3223059314 King County 7/26/1991 KC‐1991‐0290 Flooding DITCH MAINTENANCE/NEW DEVELOPEMENT 17023 106TH AV SE 0087000203 King County 6/22/1991 KC‐1990‐1623 Flooding @ R/D FACILITY SEEPING WATER 13611 SE 116TH ST 1437650230 King County 6/21/1991 KC‐1991‐0031 Flooding STORM EVENT/NO DITCH PONDING 18217 124TH AVE SE 3323059094 King County 6/18/1991 KC‐1990‐1187 Flooding CL#13430 FLOODED HOUSE 13932 SE 155TH PL 5104450160 King County 6/6/1991 KC‐1991‐0777 Flooding CCF# 591‐39 14103 SE 132ND ST 6928000050 King County 6/5/1991 Page 4 of 6 AGENDA ITEM # 9. a) City of Renton Surface Water Utility System Plan Drainage Complaint Data From City of Renton Online GIS Database July 1, 2020 Reference Number Request Type Description Location Parcel ID Status Category Closed Date KC‐1991‐0315 Flooding DIVERSION/CULVERT OVERFLOW 14011 SE 132ND 6928000020 King County 6/4/1991 KC‐1991‐0196 Flooding 18425 112TH AVE SE 3223059195 King County 4/6/1991 KC‐1991‐0339 Flooding PIPE OF PRIVATE DITCH 11212 137TH AVE SE 1023059173 King County 3/29/1991 KC‐1991‐0170 Flooding WATER IN BASEMENT 12109 SE 164TH ST 1423900010 King County 3/16/1991 KC‐1991‐0080 Flooding WATER AND ICE ON SIDEWALK 14037 SE 159TH PL 5104451030 King County 3/9/1991 KC‐1990‐1602 Flooding MUD & WATER IN STREET FROM CONST 15805 140TH CT SE 5104450820 King County 1/25/1991 KC‐1990‐1539 Flooding RAVINE ERODING/FULL 14231 SE 138TH ST 1523059059 King County 1/19/1991 KC‐1990‐0709 Flooding CL#12959 SEE CL#13224 DUE DECEMBER 18504 112TH AVE SE 3223059287 King County 12/26/1990 KC‐1990‐1061 Flooding CL#13224 SEE CL#12959 GARAGE FLOODED 11202 SE 186TH ST 9117000160 King County 12/26/1990 KC‐1990‐0692 Flooding CL#12942 WONDERLAND MOBILE PK DUE OCT 15277 BIRCH DR 2323059029 King County 12/11/1990 KC‐1990‐1552 Flooding STORM EVENT /GIBBONS 15018 132ND AVE SE 9189700175 King County 12/8/1990 KC‐1990‐1530 Flooding 18427 112TH AVE SE 3223059196 King County 11/27/1990 KC‐1990‐1531 Flooding 18427 112TH AVE SE 3223059196 King County 11/27/1990 KC‐1990‐0804 Flooding COMPLETION OF STUDY 14105 SE 133RD ST 6928000210 King County 9/18/1990 KC‐1990‐0776 Flooding SUMMERFIELD/CL#13011 15900 SE 156TH ST 8856890090 King County 7/19/1990 KC‐1990‐0869 Flooding CL#13063/SUMMERFIELD 15607 160TH CT SE 8856890180 King County 7/19/1990 KC‐1990‐0622 Flooding CL#12901 SUMMERFIELD 15613 160TH CT SE 8856890190 King County 7/19/1990 KC‐1990‐0708 Flooding SUMMERFIELD/CL#12952 15617 160TH CT SE 8856890200 King County 7/19/1990 KC‐1990‐0477 Flooding CL#12818 SUMMERFIELD 15621 160TH CT SE 8856890210 King County 7/19/1990 KC‐1990‐0476 Flooding CL#12816 SUMMERFIELD 15620 160TH CT SE 8856890220 King County 7/19/1990 KC‐1990‐0480 Flooding CL#12826 SUMMERFIELD 15610 160TH CT SE 8856890240 King County 7/19/1990 KC‐1990‐0654 Flooding CL#12920 /SUMMERFIELD 15604 160TH CT SE 8856890250 King County 7/19/1990 KC‐1990‐0598 Flooding CL#12874 & #12836 SUMMERFIELD 16104 SE 156TH ST 8856890350 King County 7/19/1990 KC‐1990‐0719 Flooding BACK UP FROM PIPES/90‐225,1077 5121 RIPLEY LN N 3343302870 King County 4/17/1990 KC‐1990‐0589 Flooding /CLEVENGER STORM EVENT 16405 SE MAPLE VALLEY HW 2323059029 King County 3/23/1990 KC‐1990‐0304 Flooding RAIN FROM HILLSIDE/STORM 16623 116TH PL SE 1423700910 King County 3/16/1990 KC‐1989‐0776 Flooding FILLING OF LOT BEHIND/FLOODED CRAWLSPAC 11644 142ND AVE SE 1023059060 King County 2/23/1990 KC‐1990‐0209 Flooding DITCH OVERFLOW/STORM EVENT 14639 SE 132ND ST 0847100060 King County 2/16/1990 KC‐1990‐0141 Flooding POND OVERFLOW/90‐0149,235,372/STORM EVE 18400 112TH AVE SE 9117000160 King County 2/5/1990 KC‐1990‐0149 Flooding R/D POND OVERFLOW/ROBERT/ STORM EVENT 11202 SE 186TH ST 9117000160 King County 2/5/1990 KC‐1990‐0235 Flooding WATER IN BASEMENT/STORM/90‐141,149,342 11202 SE 186TH ST 9117000160 King County 2/5/1990 KC‐1990‐0342 Flooding R/D POND/ROBERT/ STORM EVENT 11202 SE 186TH ST 9117000160 King County 2/5/1990 KC‐1990‐0274 Flooding R/D POND FLOODED/STORM 11022 SE 184TH PL 3223059302 King County 2/5/1990 KC‐1990‐0225 Flooding STORM 5121 RIPLEY LN N 3343302870 King County 1/28/1990 KC‐1989‐0563 Flooding NEW PLAT ROAD WATER FLOWING OVER ROAD 3211 TALBOT RD S 3023059019 King County 11/28/1989 KC‐1989‐0268 Flooding FLOODING OF FIELD/DITCH MAINT 16638 106TH AVE SE 0087000235 King County 5/25/1989 KC‐1989‐0051 Flooding PONDING IN BACKYARD 17121 125TH AVE SE 1432400090 King County 3/8/1989 KC‐1989‐0002 Flooding WET YARDAND DRIVEWAY 7601 S 135TH ST 2988800121 King County 1/20/1989 KC‐1988‐0238 Flooding NEW DRIVEWAY WILL IT FLOOD 18431 120TH AVE SE 6197800241 King County 6/18/1988 KC‐1988‐0220 Flooding R/D POND IS FLOODING PROPERTY 18862 103RD CT SE 3223059251 King County 6/9/1988 KC‐1988‐0193 Flooding SPRINGBROOK AREA 19030 102ND AVE SE 3223059327 King County 4/4/1988 KC‐1987‐1109 Flooding WATER FROM UPHILL LOTS 19264 98TH AVE S 7941200130 King County 3/7/1988 KC‐1987‐1026 Flooding KENNYDALE CLEARING OF LAND 11030 SE 76TH ST 3343300842 King County 10/25/1987 KC‐1987‐0445 Flooding SEE 86‐03A4 PENTON. 87‐0707 13837 SE 128TH ST 1523059112 King County 9/26/1987 KC‐1987‐0821 Flooding SKYWAY/RENTON AVE S WIDENING 8044 S 132ND ST 2144800466 King County 7/25/1987 KC‐1987‐0108 Flooding OH/TO PA FOR CM‐07/19/87‐MAPLEWOOD HTS 13419 SE 141ST ST 5127000200 King County 7/19/1987 KC‐1986‐1296 Flooding BASEMENT FLOODING 16623 BENSON RD SE 0087000332 King County 7/3/1987 KC‐1987‐0654 Flooding WATER UNDER HOUSE 17005 130TH AVE SE 7229200060 King County 6/20/1987 KC‐1987‐0641 Flooding IN BSMT 87‐0596 VAN MECHELEN 8054 S 132ND ST 2144800460 King County 6/7/1987 KC‐1987‐0518 Flooding SPRING GLEN/ROAD DRAINAGE 17223 98TH AVE S 8558600060 King County 6/7/1987 KC‐1987‐0409 Flooding INADEQUATE DRNG/PLUGGED 86‐1047 17665 111TH AVE SE 3276200230 King County 5/11/1987 KC‐1987‐0471 Flooding SPRING GLEN 86‐1166,1185 11202 SE 186TH ST 9117000160 King County 4/26/1987 KC‐1987‐0433 Flooding @ FAIRWOOD CRAWL SPACE WET 12716 SE 164TH ST 1432900210 King County 4/25/1987 KC‐1987‐0445 Flooding FILLING OF LOT 13837 SE 128TH ST 1523059112 King County 4/15/1987 KC‐1987‐0415 Flooding YARD 87‐0412 17224 98TH AVE S 8558600100 King County 4/15/1987 KC‐1987‐0255 Flooding STANDING WATER & MUD 14639 SE 132ND ST 0847100060 King County 4/14/1987 KC‐1987‐1145 Flooding PIPE TO HIGH FOR POND 18850 103RD CT SE 3223059231 King County 4/14/1987 KC‐1987‐0314 Flooding ROAD CULVERT DISCHARGE ON PROPERTY 10028 SE 190TH ST 3388320050 King County 3/18/1987 KC‐1986‐1166 Flooding STORM OVERFLOW 11202 SE 186TH ST 9117000160 King County 3/6/1987 KC‐1986‐1185 Flooding SEE: 86‐1166 BRYANT, BILL 11202 SE 186TH ST 9117000160 King County 3/6/1987 KC‐1986‐1190 Flooding BASEMENT GETTING WATER 11001 SE 186TH ST 9117100080 King County 3/6/1987 KC‐1986‐1047 Flooding TO SMALL OF PIPE 17665 111TH AVE SE 3276200230 King County 12/1/1986 KC‐1986‐0707 Flooding 13837 SE 128TH ST 1523059112 King County 8/7/1986 KC‐1986‐02B4 Flooding FLOODED LOT 12137 SE 172ND ST 1432401120 King County 4/29/1986 KC‐1986‐0105 Flooding TO RD COORD 2/11 8223 S 132ND ST 2144800525 King County 3/24/1986 KC‐1986‐0103 Flooding TO B.A.L.D.14220 164TH AVE SE 7695500330 King County 2/19/1986 KC‐1984‐0085 Flooding TO CODE ENF.10908 SE 164TH AVE 0088000870 King County 10/29/1984 KC‐1984‐0085 Flooding TO CODE ENF.10908 SE 164TH ST 0088000870 King County 8/8/1984 KC‐1984‐0247 Flooding FRONT YARD 11613 SE 164TH ST 1423700610 King County 6/21/1984 KC‐1984‐0094 Flooding 18814 110TH CT SE 2698200160 King County 6/6/1984 KC‐1984‐0088 Flooding CULVERTS BLOCKED 17041 104TH AVE SE 2923059161 King County 6/6/1984 KC‐1984‐0096 Flooding 16638 106TH AVE SE 0087000235 King County 6/4/1984 KC‐1984‐0302 Flooding 12129 SE 172ND ST 1432401115 King County 5/23/1984 KC‐1984‐0310 Flooding BENSON HILL AREA 18019 118TH AVE SE 6197200323 King County 4/9/1984 KC‐1984‐0104 Flooding 17420 98TH AVE S 8558600170 King County 3/23/1984 KC‐1984‐0013 Flooding 12864 SE 102ND ST 7788400185 King County 2/29/1984 KC‐1983‐0380 Flooding IN CRAWL SPACE 16618 127TH AVE SE 1423910310 King County 5/5/1983 KC‐1983‐0197 Flooding 17811 97TH AVE S 7616800150 King County 3/30/1983 Page 5 of 6 AGENDA ITEM # 9. a) City of Renton Surface Water Utility System Plan Drainage Complaint Data From City of Renton Online GIS Database July 1, 2020 Reference Number Request Type Description Location Parcel ID Status Category Closed Date KC‐1983‐0422 Flooding 12206 SE 167TH ST 1423900980 King County 3/8/1983 KC‐1983‐0353 Flooding 13224 144TH AVE SE 0847100073 King County 2/16/1983 KC‐1982‐0030 Flooding CO RD CULVERT 9630 138TH AVE SE 0323059164 King County 12/30/1982 KC‐1982‐0224 Flooding CASCADE VISTA 11325 SE 176TH ST 3223059005 King County 12/21/1982 KC‐1982‐0208 Flooding EROSION 11220 SE 186TH 9117000140 King County 9/27/1982 KC‐1982‐0341 Flooding 14005 SE 133RD ST 6928000170 King County 6/11/1982 KC‐1982‐0522 Flooding SEEPAGE/SUMP‐PUMP/DRNG DITCH 11702 SE 157TH ST 1432600670 King County 6/7/1982 KC‐1982‐0183 Flooding 10034 SE 190TH ST 3388320040 King County 4/26/1982 KC‐1982‐0204 Flooding 17210 SPRINGBROOK RD S 8558600010 King County 4/19/1982 KC‐1982‐0566 Flooding 17004 113TH AVE SE 2892700020 King County 3/22/1982 KC‐1982‐0520 Flooding 13612 160TH AVE SE 1457500085 King County 2/25/1982 KC‐1982‐0189 Flooding 10830 SE 173RD ST 1626800020 King County 2/18/1982 KC‐1982‐0342 Flooding CASCADE VISTA 15779 119TH PL SE 1432600335 King County 1/27/1982 KC‐1982‐0476 Flooding CASCADE VISTA #2 AREA 15779 119TH PL SE 1432600335 King County 1/27/1982 KC‐1981‐0096 Flooding YARD 10836 SE 190TH ST 6623400031 King County 12/15/1981 KC‐1981‐0217 Flooding CASCADE AREA 16743 126TH AVE SE 1423600170 King County 6/10/1981 KC‐1981‐0094 Flooding INADEQUATE RD DRNG 10404 SE 194TH PL 0522059006 King County 2/18/1981 KC‐1975‐0132 Flooding BASEMENT 11433 SE 164TH ST 0088000341 King County 11/12/1975 KC‐1975‐0150 Flooding 111TH AVE SE/168TH ST 16650 111TH AVE SE 0088000426 King County 2/12/1975 Page 6 of 6 AGENDA ITEM # 9. a) O SBORN C ONSULTING, I NC. B ELLEVUE • S EATTLE • S POKANE APPENDIX G CIP FACT SHEETS AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Projects Priority Type* Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Monroe Ave NE NE 2nd St Infiltration System Improvements 1 ED 25 225 650 5,450 6,350 Downtown Storm System Improvements 2 ED 886 750 3,050 2,230 6,917 Madsen Creek Improvement Project 3 M,SP 475 140 450 156 1,221 Jefferson Ave NE Green Connections Project 4 D 314 415 1,777 2,506 Cedar River Gravel Removal Maintenance Dredge)Project 5 M,SP 10,564 1,000 1,000 902 500 500 500 14,966 Cedar River 205 Project Levee Recertification Project 6 R 822 370 320 2,570 1,020 580 70 70 5,822 Heather Downs Detention Pond Retrofit 7 M,SP 137 208 800 1,145 Stormwater Facility Retrofit Study 8 P 75 225 300 Burnett Ave S and Williams Ave S Water Quality Retrofit Project 9D 2 30 225 213 470 SE 172nd St and 125th Ave N Storm System Improvement Project 10 D 207 233 20 1,500 1,500 3,460 SW 23rd Street Drainage and Fish Passage Improvements 11 M,SP 350 250 150 20 510 500 1,780 Maplewood Creek Sedimentation Facility Maintenance 12 M,SP 553 95 95 95 95 100 100 100 1,233 Madsen Creek Sedimentation Cleaning 13 M,SP 377 84 75 75 75 80 80 80 926 Rainier Ave and Oakesdale Ave Pump Station Upgrades 14 M,SP 125 80 142 375 723 Springbrook Creek Wetland and Habitat Mitigation Bank 15 D 762 70 40 50 922 Stormwater Facility Fencing Project 16 M,SP 485 5 140 140 100 100 100 100 1,170 Small Drainage Projects Program 17 M,SP 2,024 100 584 200 400 400 400 400 4,508 Surface Water Utility GIS 18 R 928 125 110 110 115 115 115 115 1,734 Talbot Hill Area Mosquito Abatement Program 19 R 532 90 85 85 85 90 90 90 1,147 CMP Storm System Replacement Program 20 ED 10 10 210 370 600 Hardie Ave SW SW 7th St Storm System Improvements 21 ED 7,471 2 450 1,150 135 9,208 NE Sunset Blvd Union Ave NE Storm System Improvements 22 ED 350 250 1,650 2,250 SW 43rd Street/Lind Ave SW Storm System Improvements 23 ED 300 500 3,200 4,000 East Valley Road Storm System Improvements 24 ED 400 150 550 Surface Water Utility System Plan 25 R 298 172 120 590 Ginger Creek/Cascade Park Basin Plan 26 P 350 350 Cedar River Flood Risk Reduction Feasibility Study 27 P 15 210 210 65 500 WSDOT Limited Access ROW Runoff Impact Mitigation Program 28 R 96 96 96 289 Miscellaneous/Emergency Storm Projects 29 M,SP 177 50 50 50 50 50 50 50 527 Total Expenditures 27,176 4,440 10,705 14,077 3,305 4,670 4,785 7,005 76,163 Project Types:A Acquisition,C Cross Category,D Development,M Maintenance,P Planning,R Regulatory,ED Correcting Existing Deficiencies;SP System Preservation;N New Facilities to Accommodate Growth Projects Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Grants/Contributions 12,124 2,105 4,127 3,946 1,085 1,080 570 570 25,606 System Development Charges 177 177 Surfacewater Collection Fees 14,875 2,335 6,578 10,131 2,220 3,590 4,215 6,435 50,378 Total Resources 27,176 4,440 10,705 14,077 3,305 4,670 4,785 7,005 76,161 Project Funding Status: Secured 27,176 4,440 10,705 14,077 1,085 580 70 70 58,203 Anticipated**2,220 4,090 4,715 6,935 17,960 Total Project Funding 27,176 4,440 10,705 14,077 3,305 4,670 4,785 7,005 76,163 Expenditures utilizing anticipated funding are not included in the adopted budget. Reconciliation to Adopted Budget: Project Funding Secured 58,203 Appropriations To Date 49,111 Additional Appropriations Needed 9,092 Additional Appropriations: 2021 Adopted Budget 1,326 2022 Adopted Budget 7,766 Total Additional Appropriations 9,092 SUMMARY BY COUNCIL PRIORITY SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 163 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:1 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 25 200 600 400 1,225 Project Management 25 50 50 125 Major Maintenance Land Acquisitions Construction 5,000 5,000 Total Expenditures 25 225 650 5,450 6,350 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 17 108 125 Special Assessment District System Development Charges Surfacewater Collection Fees 8 117 650 5,450 6,225 Interest Total Resources 25 225 650 5,450 6,350 Project Funding Status: Secured 25 225 650 5,450 6,350 Anticipated* Total Project Funding 25 225 650 5,450 6,350 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The project includes the design and construction of an additional infiltration system to provide increased drainage capacity to a 245 acre basin in the Renton Highlands.This basin does not have an adequate connection to a downstream conveyance system or waterbody and solely relied on infiltration through perforated pipes near the city's Maintenance Shops prior to the construction of temporary overflow outfalls to the gravel pit at 301 Monroe Ave N owned by Segale Properties.The city has a temporary easement,last renewed in 2018,to discharge stormwater to the Segale gravel pit through two overflow pipes installed in 1996 and 2007.The city anticipates that the easement agreement will be terminated in the near future as Segale is in the process of filling the pit,to redevelop the property to multi family dwellings or mixed use commercial.The city is in the process of evaluating alternatives for a permanent drainage solution that replaces the temporary overflow pipes,and is identifying grant opportunities to help fund this project.Planning level efforts will conclude in 2020, and design efforts will start in 2021.Construction will need to be completed prior to the filling of the site. Rationale The project will help protect businesses and residential areas from flooding with a permanent solution in lieu of a temporary easement granted to the city by a business owner.This project supports the city's goal of promoting public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Monroe Ave NE NE 2nd St Infiltration System Improvements Correcting Existing Deficiencies Previously Approved Capital Investment Program Surface Water 5 - 164 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:2 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 886 500 1,386 Project Management 50 50 50 150 Major Maintenance Land Acquisitions Construction 200 3,000 2,180 5,380 Total Expenditures 886 750 3,050 2,230 6,917 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 886 750 3,050 2,230 6,917 Interest Total Resources 886 750 3,050 2,230 6,917 Project Funding Status: Secured 886 750 3,050 2,230 6,917 Anticipated* Total Project Funding 886 750 3,050 2,230 6,917 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Downtown Storm System Improvements Correcting Existing Deficiencies Previously Approved Downtown Storm System Improvements consist of replacing undersized and aging stormwater pipes along S 2nd St,S 3rd St and their cross streets between Rainier Ave S and Mills Ave S.These improvements are part of the Downtown Utilities Improvement Project managed by the Utilities Division and the Wells Ave S and Williams Ave S conversion project managed by the Transportation Division.These utility improvements are needed to support re development and new development in the downtown core and will provide better service for existing and future development.These projects are the first steps to support coordinated efforts by the city to improve intersections,add signals,and convert S 2nd St and S 3rd St to two way operations,as guided by the 2018 Downtown Civic Core Vision and Action Plan.Construction of these utility improvements started in 2020 and is expected to continue through spring 2022. Rationale This project replaced undersized and aging drainage systems in the Downtown core in support of the City's 2018 Civic Core Vision and Action Plan and future transportation improvements.This project supports the city's goals of economic development,public safety and quality of life. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 165 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:3 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 475 120 30 141 766 Project Management 20 20 15 55 Major Maintenance Land Acquisitions Construction 400 400 Total Expenditures 475 140 450 156 1,221 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 361 140 450 156 1,107 Special Assessment District System Development Charges Surfacewater Collection Fees 114 114 Interest Total Resources 475 140 450 156 1,221 Project Funding Status: Secured 475 140 450 156 1,221 Anticipated* Total Project Funding 475 140 450 156 1,221 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts This project will address flooding problems associated with Madsen Creek,where it crosses SR 169 and discharges to the Cedar River.Flooding has occurred along SR 169 near Wonderland Estates Manufactured Home Park,along 149th Avenue SE and in Ron Regis Park.The King County Flood Control District awarded the city a 472,000 flood reduction grant for hydrologic and hydraulic analysis,surveying,environmental analysis and preliminary design to solve the flooding problems.The planning level effort was completed in March 2020.The design and construction of alternative solution elements identified in the planning effort will be funded through a Capital Improvement Plan grant from the District in the amount of 615,000. Rationale This project will construct near term and long term improvements to reduce the risk of flooding from Madsen Creek onto adjacent properties.This project supports the city's goal of promoting public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Madsen Creek Improvement Project Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 166 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:4 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 314 100 414 Project Management 15 15 Major Maintenance Land Acquisitions Construction 300 1,777 2,077 Total Expenditures 314 415 1,777 2,506 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 298 182 1,777 2,258 Special Assessment District System Development Charges Surfacewater Collection Fees 16 233 249 Interest Total Resources 314 415 1,777 2,506 Project Funding Status: Secured 314 415 1,777 2,506 Anticipated* Total Project Funding 314 415 1,777 2,506 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts This project will design flow reduction and stormwater quality treatment facilities for approximately 1,300 linear feet of roadway to include bio retention facilities,a storm conveyance system and permeable concrete sidewalks on Jefferson Avenue NE between NE 16th Street and NE 12th Street)and on NE 16th Street between Jefferson Avenue NE and Harrington Ave NE)in the Sunset Area community along the existing roadway where most feasible.The project is partially funded by an Ecology Stormwater Financial Assistance Program grant of 2,075,095 that was awarded in 2018.Project design and permitting is anticipated to be completed in 2020 with construction in 2021. Rationale This project was identified in the Sunset Area Surface Water Master Plan that was developed and approved as part of the Sunset Community Investment Strategy and Planned Action EIS.This project supports the city's goals of economic development,public safety and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Jefferson Ave NE Green Connections Project Development Previously Approved Capital Investment Program Surface Water 5 - 167 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:5 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 480 480 480 1,440 Project Management 20 20 20 60 Major Maintenance 10,564 1,000 1,000 902 13,466 Land Acquisitions Construction Total Expenditures 10,564 1,000 1,000 902 500 500 500 14,966 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 10,564 1,000 1,000 902 500 500 500 14,966 Special Assessment District System Development Charges Surfacewater Collection Fees Interest Total Resources 10,564 1,000 1,000 902 500 500 500 14,966 Project Funding Status: Secured 10,564 1,000 1,000 902 13,466 Anticipated*500 500 500 1,500 Total Project Funding 10,564 1,000 1,000 902 500 500 500 14,966 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts TOTAL SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Periodic maintenance dredging along the lower 1.23 mile of the Cedar River is necessary due to ongoing sediment transport and deposition.This project is a critical component of the Lower Cedar River Section 205 Flood Hazard Reduction project which consisted of dredging and adding levees and floodwalls to the lower 1.23 miles of the river.This project was completed in 1998 in cooperation with the US Army Corps of Engineers USACE). Gravel removal from the lower 1.23 miles of the Cedar River maintains the 100 year level of protection offered by the levees and floodwalls and is a requirement of the Project Cooperation Agreement with the USACE. The project is entirely funded by the King County Flood Control District.The project design,permitting and construction of the second dredging project was completed in 2016.The city is currently in the post construction mitigation phase through 2026,during which the city is required to maintain mitigation plantings,monitor habitat parameters and fish counts in the Elliot and Royal Hills habitat channels,and submit yearly reports to the permitting agencies.The planning and design effort for the next maintenance dredge is anticipated to begin in 2024. Rationale This will provide funding for completing permitting,design,construction and mitigation work associated with the project and performing long term monitoring,maintenance and reporting as required by the project permits.This project supports the city's goals of economic development,public safety and quality of life. Cedar River Gravel Removal Maintenance Dredge)Project Maintenance and Preservation Previously Approved Description and Scope ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 168 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:6 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 822 350 300 50 1,522 Project Management 20 20 20 20 20 20 20 140 Major Maintenance 50 50 50 150 Land Acquisitions Construction 2,500 1,000 510 4,010 Total Expenditures 822 370 320 2,570 1,020 580 70 70 5,822 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 343 370 320 2,570 1,020 580 70 70 5,343 Special Assessment District System Development Charges Surfacewater Collection Fees 479 479 Interest Total Resources 822 370 320 2,570 1,020 580 70 70 5,822 Project Funding Status: Secured 822 370 320 2,570 1,020 580 70 70 5,822 Anticipated* Total Project Funding 822 370 320 2,570 1,020 580 70 70 5,822 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts ESTIMATED ESTIMATED SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Cedar River 205 Project Levee Recertification Project Regulatory Previously Approved The U.S.Army Corps of Engineers originally certified the levees and floodwalls that were constructed as part of the Lower Cedar River Flood Hazard Reduction project in 1998.The U.S.Army Corps of Engineers has since determined that their certification is no longer valid and that the city of Renton would need to re certify the levees and floodwalls,if they are to be accredited by FEMA as providing 100 year flood protection for floodplain mapping purposes.If the levees are not re certified and accredited by FEMA,the properties behind the levees would have to be remapped to show they are in a floodplain.Phase 1 of the project was completed in 2016. Phase 2 of the project to complete the re certification documentation was completed in 2018.Phase 3 of the project is currently in progress and it consists of the permitting,design and construction of the levee improvements required for accreditation.Phase 3 is expected to be completed in 2023.Phase 4 will consist of any post construction mitigation measures and monitoring effort,if any is imposed onto the project. Rationale The city has to prepare the re certification information for approval by FEMA in order to have the levees and floodwall re certified and accredited by FEMA.This project is in coordination with the city's goals of economic development,public safety and quality of life. TOTAL Description and Scope Capital Investment Program Surface Water 5 - 169 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:7 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 137 175 312 Project Management 33 50 83 Major Maintenance Land Acquisitions Construction 750 750 Total Expenditures 137 208 800 1,145 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 78 15 70 163 Special Assessment District System Development Charges Surfacewater Collection Fees 59 193 730 982 Interest Total Resources 137 208 800 1,145 Project Funding Status: Secured 137 208 800 1,145 Anticipated* Total Project Funding 137 208 800 1,145 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The project will retrofit a city owned detention facility in the Heather Downs residential development to be a combined detention and wet pond stormwater facility.This stormwater facility will provide flow control and additional basic water quality treatment to remove pollutants from streets and other pollution generating surfaces within a 30 acre drainage basin.The existing detention pond is located at the intersection of Union Avenue SE and SE 4th Street and is in the Maplewood Creek sub basin to the Cedar River.The design of this project was partially funded by an Ecology Stormwater Financial Assistance Program grant in the amount of 93,000 that was awarded in 2018.Construction will be partially funded by a King County Waterworks Grant that was awarded in 2017 in the amount of 70,000 and another Ecology Stormwater Financial Assistance Program grant in the amount of 230,250.Project planning and design was completed in 2020 with construction planned for 2021. Rationale The improved facility will remove stormwater runoff pollutants to improve water quality in the Maplewood Creek Sub basin and the Cedar River.This project supports the city's goals of promoting public safety and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Heather Downs Detention Pond Retrofit Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 170 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:8 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 50 200 250 Project Management 25 25 50 Major Maintenance Land Acquisitions Construction Total Expenditures 75 225 300 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 38 150 188 Special Assessment District System Development Charges Surfacewater Collection Fees 38 75 113 Interest Total Resources 75 225 300 Project Funding Status: Secured 75 225 300 Anticipated* Total Project Funding 75 225 300 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Stormwater Facility Retrofit Study Planning Previously Approved The purpose of the Stormwater Facility Retrofit Study is to identify,rank,and prioritize water quality treatment retrofits that can be feasibly made to the city’s publicly maintained flow control facilities,mainly detention ponds,vaults and tanks.These facilities reduce peak stormwater flows from impervious surfaces,but do not provide any runoff treatment in areas that were developed prior to implementation of water quality standards. This study will assess all forty nine 49)flow control facilities with no treatment component that discharge untreated runoff to the nearest waterbody.The identified projects will then be evaluated,ranked and prioritized as potential projects for future water quality treatment grants.Conceptual designs and cost estimates of the three highest priority potential future projects will be developed for incorporation into the Surface Water Utility’s Capital Improvement Plan.This study will begin in 2020 and conclude in 2021. Rationale This study identifies opportunities to retrofit flow control facilities with water quality treatment and hence,it ultimately aims to protect and restore water quality in the waters of the state by reducing the discharge of untreated stormwater from existing infrastructure and development.It supports the city's goal of increasing quality of life. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 171 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:9 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 2 20 215 203 440 Project Management 10 10 10 30 Major Maintenance Land Acquisitions Construction Total Expenditures 2 30 225 213 470 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 20 150 108 278 Special Assessment District System Development Charges Surfacewater Collection Fees 2 10 75 105 192 Interest Total Resources 2 30 225 213 470 Project Funding Status: Secured 2 30 225 213 470 Anticipated* Total Project Funding 2 30 225 213 470 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Burnett Ave S and Williams Ave S Water Quality Retrofit Project Development Previoulsy Approved This projects adds drainage improvements and water quality retrofits to the Burnett Avenue S and Williams Avenue S storm water system which discharges directly to the Cedar River,a waterbody listed on the Department of Ecology's 303(d)under multiple categories of impairment.The need,to upsize the storm system,was identified through the Downtown Utilities Improvement Project.Water quality retrofits,paired with the drainage improvements,will provide treatment to runoff from Williams Ave S and Burnett Ave S north of S 2nd St.The design of the water quality treatment retrofits in this project is funded by a Department of Ecology Storm Water Quality Grant.The design effort will start in 2020 and will be completed by January 2023.Subsequently,a construction grant application will be submitted to Ecology in fall 2023 and construction will take place in 2025 if the grant application is successful. Rationale This project includes drainage improvements to reduce the risk of flooding and water quality retrofits to treat stormwater runoff along Williams Ave S and Wells Ave S.It supports the city's goal of protecting public safety and increasing quality of life. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 172 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:10 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 207 213 420 Project Management 20 20 40 Major Maintenance Land Acquisitions Construction 1,500 1,500 3,000 Total Expenditures 207 233 20 1,500 1,500 3,460 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 141 217 359 Special Assessment District System Development Charges Surfacewater Collection Fees 66 15 20 1,500 1,500 3,101 Interest Total Resources 207 233 20 1,500 1,500 3,460 Project Funding Status: Secured 207 233 20 460 Anticipated*1,500 1,500 3,000 Total Project Funding 207 233 20 1,500 1,500 3,460 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The project includes the design and permitting of storm system improvements that include green stormwater infrastructure improvements of bio retention facilities and pervious sidewalks to provide water quality treatment for the street stormwater runoff and flow reduction.The project is funded by a 250,000 Ecology Stormwater Financial Assistance Program grant that was awarded in 2018.The project design started in 2019 and will be completed in 2020.The city is applying for another Ecology grant to fund the construction of the proposed improvements in fall 2020.Construction will be planned once the city is notified of the outcome of the construction grant application,but it is estimated to take place in 2024. Rationale The project will address a street flooding problem and improve storm system conveyance capacity of existing drainage systems along 125th Avenue SE,124th Avenue SE,123rd Avenue SE,122nd Avenue SE,and SE 172nd Street.This project supports the city's goals of economic development,public safety and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) SE 172nd St and 125th Ave N Storm System Improvement Project Development Previously Approved Capital Investment Program Surface Water 5 - 173 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:11 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 300 200 100 600 Project Management 50 50 50 20 10 180 Major Maintenance Land Acquisitions Construction 500 500 1,000 Total Expenditures 350 250 150 20 510 500 1,780 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 350 250 150 20 510 500 1,780 Interest Total Resources 350 250 150 20 510 500 1,780 Project Funding Status: Secured 350 250 600 Anticipated*150 20 510 500 1,180 Total Project Funding 350 250 150 20 510 500 1,780 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) SW 23rd Street Drainage and Fish Passage Improvements Maintenance and Preservatiion New Request Panther Creek flows into the SW 23rd St channel prior to connecting into Springbrook Creek.The hydraulic capacity of this channel is reduced due to vegetation growth and due to culverts set below the grade of the channel at East Valley Road and Lind Ave SW.The invert elevations of the culverts create a submerged condition which impairs both flow and fish passage.Channel improvements are needed along with culvert replacements to ensure adequate hydraulic connectivity along Panther Creek from SR 167 to Springbrook Creek.Furthermore,WSDOT approached the City in 2020 with a proposal to connect Rolling Hills Creek to the Panther Creek channel at SW 23rd St,to meet their fish passage injunction obligation by 2030.Connecting Rolling Hills Creek into the SW 23rd St channel would require further upsizing of the culverts and further channel improvements.The Utility will collaborate with WSDOT on this project.Planning and hydraulic modeling would be completed by 2023,and design would be completed by 2025,with construction to follow in 2026.The funding programmed for the project is only the Utility's estimated share of the overall project cost. Rationale This project presents an opportunity to partner with WSDOT and share the cost of hydraulic and fish passage improvements to Panther Creek,which would benefit both the City and the State of Washington.It supports the city's goals of protecting public safety and increasing quality of life,and it promotes interagency cooperation. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 174 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:12 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management 20 10 10 10 10 10 10 80 Major Maintenance 553 553 Land Acquisitions Construction 75 85 85 85 90 90 90 600 Total Expenditures 553 95 95 95 95 100 100 100 1,233 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 21 21 Special Assessment District System Development Charges Surfacewater Collection Fees 532 95 95 95 95 100 100 100 1,212 Interest Total Resources 553 95 95 95 95 100 100 100 1,233 Project Funding Status: Secured 553 95 95 95 838 Anticipated*95 100 100 100 395 Total Project Funding 553 95 95 95 95 100 100 100 1,233 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The Maplewood Creek Sedimentation Facility is located on the Maplewood Golf Course and traps sediment that is transported downstream by Maplewood Creek.The facility prevents the sediment from being deposited on the golf course during large storms and reduces flooding of the golf course and SR 169.The funding is programmed for project management,permitting,and construction to routinely remove the accumulated sediment from the facility.The facility was constructed in 1996 in conjunction with a fish passage channel across the Maplewood Golf Course to the Cedar River.A fish ladder was constructed as part of the facility to allow upstream fish passage.The accumulated sediment in the facility needs to be removed on a yearly basis,depending upon flood events and the rate of sediment accumulation in the facility. Rationale The sediment will be removed from the facility in the summer of 2020 and annually thereafter,as needed.This project supports the city's goals of promoting public safety and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Maplewood Creek Sedimentation Facility Maintenance Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 175 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:13 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management 10 10 10 10 10 10 10 70 Major Maintenance 377 377 Land Acquisitions Construction 74 65 65 65 70 70 70 479 Total Expenditures 377 84 75 75 75 80 80 80 926 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 377 84 75 75 75 80 80 80 926 Interest Total Resources 377 84 75 75 75 80 80 80 926 Project Funding Status: Secured 377 84 75 75 611 Anticipated*75 80 80 80 315 Total Project Funding 377 84 75 75 75 80 80 80 926 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The Madsen Creek Sedimentation Facility was originally constructed by King County to control sediment resulting from erosion of steep slopes in the Madsen Creek ravine due to increased upstream stormwater runoff from new development projects.The facility is located on the New Life Church property that was annexed into the city as part of the New Life Aqua Barn annexation A 07 001)in June of 2008.Approximately 800 cubic yards of sediment has to be removed from the facility annually to control the sediment that is being deposited from the upstream area into the facility in order to maintain its proper operation.The accumulated sediment in the facility needs to be removed on a yearly basis,depending upon flood events and the rate of sediment accumulation in the facility. Rationale The maintenance of the facility is planned to be completed in the summer of 2020 and annually thereafter,as needed.This project supports the city's goals of promoting public safety and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Madsen Creek Sedimentation Cleaning Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 176 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:14 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 125 65 127 318 Project Management 15 15 25 55 Major Maintenance Land Acquisitions Construction 350 350 Total Expenditures 125 80 142 375 723 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 125 80 142 375 723 Interest Total Resources 125 80 142 375 723 Project Funding Status: Secured 125 80 142 375 723 Anticipated* Total Project Funding 125 80 142 375 723 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts This project consists of increasing the level of flood protection of the Rainier and Oakesdale pump stations through the addition of on site permanent emergency generators.The Rainier Ave pump station is 50 years old and was inherited from WSDOT but it serves a critical role of protecting Rainier Ave S from flooding along the sag point underneath the BNSF railroad crossing.Permanent emergency generators would increase the level of protection from flooding along Rainier Ave N and Oaksdale Avenue during thunderstorm events or disasters that result in loss of power supply.This project started with site assessments and evaluation of alternatives to site the generators and provide new control panels.Site constraints at both pump stations will likely require the city to obtain permanent easements from adjacent properties.This phase is expected to be completed in 2020.The design of the improvements is expected to be completed in 2021,and construction is anticipated in 2022. Rationale This program provides us with funding to upgrade critical pump stations and reduce the risk of flooding on major city arterials in a disaster event or thunderstorm.This project supports the city's goals of promoting public safety and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Rainier Ave and Oakesdale Ave Pump Station Upgrades Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 177 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:15 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management 70 20 25 115 Major Maintenance 308 20 25 353 Land Acquisitions Construction 454 454 Total Expenditures 762 70 40 50 922 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 22 22 Special Assessment District System Development Charges Surfacewater Collection Fees 739 70 40 50 900 Interest Total Resources 762 70 40 50 922 Project Funding Status: Secured 762 70 40 50 922 Anticipated* Total Project Funding 762 70 40 50 922 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The project consisted of developing a wetland mitigation bank,in partnership with WSDOT,on approximately 130 total acres in the valley adjacent to Springbrook Creek.The wetland mitigation bank is an alternative to onsite mitigation imposed onto private and public projects city of Renton or WSDOT)for wetland impacts that require mitigation.The newly created wetlands and the enhanced existing wetlands accomplished by the project increased flood storage,improves water quality and enhance fish and wildlife habitat associated with Springbrook Creek.A total of 43.61 wetland mitigation bank credits have been released to date out of the total of 45 credits possible.The city’s share of wetland credits in is 20.55 credits.Projects that have wetland impacts can purchase credits rather than constructing onsite mitigation.This will help streamline the local,state and federal permitting process associated with filling wetlands,reduces project costs and allows private developers to develop more area on their property,if it contains wetlands.This will result in higher assess property values and create more jobs,which will benefit the city overall financially.The project construction was completed in 2009 with a following 10 year monitoring period to verify whether performance standards have been met to allow for the release of wetland mitigation credits.Funds programmed in the budget will be used for long term maintenance to meet and maintain performance metrics. Rationale This provides funding for the city's share of plant establishment and monitoring costs necessary to meet performance standards to allow the release of mitigation credits.This project supports the city's goals of economic development and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Springbrook Creek Wetland and Habitat Mitigation Bank Development Previously Approved Capital Investment Program Surface Water 5 - 178 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:16 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management 5 10 10 10 10 10 10 65 Major Maintenance Land Acquisitions Construction 485 130 130 90 90 90 90 1,105 Total Expenditures 485 5 140 140 100 100 100 100 1,170 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 485 5 140 140 100 100 100 100 1,170 Interest Total Resources 485 5 140 140 100 100 100 100 1,170 Project Funding Status: Secured 485 5 140 140 770 Anticipated*100 100 100 100 400 Total Project Funding 485 5 140 140 100 100 100 100 1,170 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts This project consists of constructing fences around existing stormwater detention/retention and water quality treatment facilities that the Surface Water Utility owns and maintains.Stormwater facilities that were constructed with side slopes that were not steep 3:1 or flatter side slopes),were not required to have fences by previous surface water design standards.The city's surface water design standards have been updated to require all future constructed stormwater facilities to be fenced.Many of the stormwater facilities that are not fenced were constructed in unincorporated King County and were previously owned and maintained by the county.When the city annexed these areas,the Surface Water Utility assumed ownership and maintenance of the facilities.A total of 23 stormwater facilities have been fenced since the start of this project.There are currently 22 stormwater facilities that still need fencing and the City expects to complete this effort within six years.This number may increase due to annexations and as the Utility takes over maintenance of stormwater facilities from homeowners associations as part of the stormwater facility transfer program. Rationale This project will provide funding to install fences over time on stormwater facilities to protect residents and to limit liability associated with these facilities being unfenced.This project supports the city's goal of promoting public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Stormwater Facility Fencing Project Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 179 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:17 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management 20 50 50 50 50 50 50 320 Major Maintenance 1,589 1,589 Land Acquisitions Construction 436 80 534 150 350 350 350 350 2,600 Total Expenditures 2,024 100 584 200 400 400 400 400 4,508 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 2,024 100 584 200 400 400 400 400 4,508 Interest Total Resources 2,024 100 584 200 400 400 400 400 4,508 Project Funding Status: Secured 2,024 100 584 200 2,908 Anticipated*400 400 400 400 1,600 Total Project Funding 2,024 100 584 200 400 400 400 400 4,508 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts This project consists of designing and constructing solutions to local flooding problems,minor storm system maintenance,and replacements that are relatively simple to construct by the city’s maintenance crews or contractors.The Surface Water Utility identifies these projects on an annual basis through problem identification,citizen complaints,and input from the maintenance section.In 2021,this program will fund the replacement of culverts along Talbot Road S. Rationale To provide funding for small drainage projects that will replace failing corrugated metal pipes and other storm systems,as needed.The projects selected will be in support of the city’s goal of promoting public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Small Drainage Projects Program Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 180 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:18 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management 928 125 110 110 115 115 115 115 1,734 Major Maintenance Land Acquisitions Construction Total Expenditures 928 125 110 110 115 115 115 115 1,734 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 928 125 110 110 115 115 115 115 1,734 Interest Total Resources 928 125 110 110 115 115 115 115 1,734 Project Funding Status: Secured 928 125 110 110 1,274 Anticipated*115 115 115 115 460 Total Project Funding 928 125 110 110 115 115 115 115 1,734 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts This annual program is to update our storm system inventory maps and database with new storm system infrastructure that is constructed or added by private development projects,public projects,and annexations.The information is integrated into the city’s Geographic Information System GIS).The GIS data is used to track maintenance and inspection of public and private stormwater management systems and facilities for operation and maintenance purposes.The data is also used to update long range asset management programs.The updating and adding newly constructed storm systems to the Surface Water Utility GIS is a requirement of the NPDES Phase II Municipal Stormwater permit. Rationale This annual program provides funding to maintain an accurate inventory of the city’s storm systems for use by the Surface Water Utility for maintenance,planning and engineering functions,other city departments,and the public.This program meets regulatory requirements and supports the city’s goals of economic development and public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Surface Water Utility GIS Regulatory Previously Approved Capital Investment Program Surface Water 5 - 181 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:19 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management 10 5 5 5 5 5 5 40 Major Maintenance 532 532 Land Acquisitions Construction 80 80 80 80 85 85 85 575 Total Expenditures 532 90 85 85 85 90 90 90 1,147 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 532 90 85 85 85 90 90 90 1,147 Interest Total Resources 532 90 85 85 85 90 90 90 1,147 Project Funding Status: Secured 532 90 85 85 792 Anticipated*85 90 90 90 355 Total Project Funding 532 90 85 85 85 90 90 90 1,147 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The program consists of annually treating upland areas around the Panther Creek Wetlands to control mosquitoes from the wetlands in response to citizen complaints in the Talbot Hill area.This program also funds the annual treatment of city owned stormwater water quality/flow control facilities in response to the West Nile Virus.It also provides additional funding in the event of a West Nile Virus outbreak occurs and more treatments are advised by the Department of Health. Rationale This program provides funding for mosquito abatement in the Talbot Hill area and helps to protect the city against a West Nile Virus outbreak.This program meets regulatory requirements and supports the city's goal of promoting public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Talbot Hill Area Mosquito Abatement Program Regulatory Previously Approved Capital Investment Program Surface Water 5 - 182 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:20 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 10 200 50 260 Project Management 10 10 10 30 Major Maintenance Land Acquisitions Construction 310 310 Total Expenditures 10 10 210 370 600 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 10 10 210 370 600 Interest Total Resources 10 10 210 370 600 Project Funding Status: Secured 10 10 210 370 600 Anticipated* Total Project Funding 10 10 210 370 600 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) CMP Storm System Replacement Program Correcting Existing Deficiencies Previously Approved This program consists of assessing the condition of all corrugated metal pipes CMP)whose diameter is 18 inches or larger,located in high risk areas i.e.under major roads).Minor deficiencies are typically repaired through coordination with the surface water maintenance section,while replacement projects resulting from significant structural issues e.g.deterioration of the pipe wall,pipe collapse)require the replacement or rehabilitation of the pipe and may require hiring a contractor.This program was driven by a failure of a CMP along Rainier Ave S in 2018,which caused a major cavity to form underneath the road,and required an emergency repair project.This program is intended to address deficiencies in CMPs,which are more susceptible to deterioration than plastic and concrete pipes,before a catastrophic failure becomes imminent.The Surface Water Utility is currently identifying deficiencies across its CMPs.Expenditures beyond 2023 will be estimated once the required pipe rehabilitation and replacement projects are determined and prioritized. Rationale This program repairs and replaces corrugated metal pipes showing signs of deterioration in high risk areas to avoid catastrophic failures and emergency repairs.This project supports the city's goal of protecting public safety. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 183 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:21 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 400 400 Project Management 2 50 50 25 127 Major Maintenance Land Acquisitions Construction 7,471 1,100 110 8,681 Total Expenditures 7,471 2 450 1,150 135 9,208 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 278 278 Special Assessment District System Development Charges Surfacewater Collection Fees 7,193 2 450 1,150 135 8,930 Interest Total Resources 7,471 2 450 1,150 135 9,208 Project Funding Status: Secured 7,471 2 450 7,923 Anticipated*1,150 135 1,285 Total Project Funding 7,471 2 450 1,150 135 9,208 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts The planning,design and permitting of the first two phases of the project,which included installing approximately 3,600 linear feet of new 60 inch storm system in SW 7th Street between Lind Avenue NE and Naches Avenue SW has been completed.The third phase of the project includes the replacement of approximately 700 linear feet of 36 inch to 48 inch storm system,between Hardie Avenue SW to SW 7th Street,with a new 60 inch storm system.Phase 3 project design will start in 2022 and will carry the 30%design completed in 2012 to final design.Construction is planned for 2024. Rationale This project supports the city's goals of economic development,public safety and quality of life. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Hardie Ave SW SW 7th St Storm System Improvements Correcting Existing Deficiencies Previously Approved Capital Investment Program Surface Water 5 - 184 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:22 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 300 200 500 Project Management 50 50 50 150 Major Maintenance Land Acquisitions Construction 1,600 1,600 Total Expenditures 350 250 1,650 2,250 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 350 250 1,650 2,250 Interest Total Resources 350 250 1,650 2,250 Project Funding Status: Secured Anticipated*350 250 1,650 2,250 Total Project Funding 350 250 1,650 2,250 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Sections of Honey Creek between Union Avenue NE and Duvall Avenue NE contains an old,closed pipe system that has insufficient capacity and is located in parking lots,under buildings,and across public right of ways. Land use changes in the upstream basin area have increased surface water runoff and could cause flooding due to the lack of capacity in the piped sections.Due to the age of the piped section,the structural condition of the storm system is unknown.This project will consist of developing an accurate base map of the storm system location;inspecting its structural condition;developing a basin hydrologic and hydraulic model to perform capacity analysis of the existing system;and developing conceptual design solutions.The selected conceptual design solution will be used for the final design,permitting,and construction of the storm system improvements.The improved conveyance system will have sufficient capacity to convey future land use condition runoff and meet city capacity design standards to help prevent flooding and the structural failure of the storm system. Rationale The project will help protect businesses,residential areas and important transportation corridors SR 900)from flooding.This project is in coordination with the city's goals of economic development and promoting public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) NE Sunset Blvd Union Ave NE Storm System Improvements Correcting Existing Deficiencies Previously Approved Capital Investment Program Surface Water 5 - 185 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:23 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 250 450 700 Project Management 50 50 50 150 Major Maintenance Land Acquisitions Construction 3,150 3,150 Total Expenditures 300 500 3,200 4,000 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 300 500 3,200 4,000 Interest Total Resources 300 500 3,200 4,000 Project Funding Status: Secured Anticipated*300 500 3,200 4,000 Total Project Funding 300 500 3,200 4,000 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) SW 43rd Street/Lind Ave SW Storm System Improvements Correcting Existing Deficiencies Previously Approved The project includes constructing approximately 3,500 feet of a new 84 inch diameter storm system along Lind Avenue SW,from SW 43rd Street to SW 39th Street,and then along SW 39th Street from Lind Avenue to a new outfall into Springbrook Creek.The estimated total project cost is 4 million.Project design and permitting is programmed to start in 2024 with construction planned for 2026. Rationale This project is in coordination with the city's goals of economic development,public safety and quality of life. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 186 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:24 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 350 100 450 Project Management 50 50 100 Major Maintenance Land Acquisitions Construction Total Expenditures 400 150 550 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 400 150 550 Interest Total Resources 400 150 550 Project Funding Status: Secured Anticipated*400 150 550 Total Project Funding 400 150 550 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) East Valley Road Storm System Improvements Correcting Existing Deficiencies Previously Approved The project includes replacing the existing storm system along the East Valley Road between SW 29th Street and SW 23rd Street with a new 48 inch storm system.The new storm system will discharge into the SW 23rd Street channel,which flows to Springbrook Creek.The project schedule and improvements may change depending upon the schedule and scope of improvements planned by WSDOT and the city as part of the SW 23rd Street Drainage and Fish Passage Improvements. Rationale This project is in coordination with the city's goals of economic development and promoting public safety. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 187 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:25 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 298 100 120 518 Project Management 72 72 Major Maintenance Land Acquisitions Construction Total Expenditures 298 172 120 590 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 298 172 120 590 Interest Total Resources 298 172 120 590 Project Funding Status: Secured 298 172 470 Anticipated*120 120 Total Project Funding 298 172 120 590 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Surface Water Utility System Plan Regulatory Previously Approved The Surface Water Utility System Master Plan is a comprehensive management plan of the city’s natural and constructed surface water systems.The plan identifies current and future resource requirements,policies, regulatory requirements,and design criteria associated with the management of surface water runoff within the city.The plan defines maintenance and operational programs along with future capital investment programs needed to solve flooding,water quality,and fish habitat problems in response to existing problems,future growth,and regulatory requirements related to the NPDES Phase II Permit and the Endangered Species Act.A draft Surface Water Utility System Master Plan is being prepared for review and approval by Renton City Council in 2020.Future funding is anticipated in 2025 to update this plan after the issuance of the 2024 National Pollutant Discharge Elimination System NPDES)permit which is expected to create a new set of challenges for the Surface Water Utility. Rationale This plan update is a regulatory requirement as well as a guiding document for the Surface Water Utility This plan supports the city's goals of economic development,public safety,and quality of life. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 188 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:26 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 300 300 Project Management 50 50 Major Maintenance Land Acquisitions Construction Total Expenditures 350 350 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 350 350 Interest Total Resources 350 350 Project Funding Status: Secured Anticipated*350 350 Total Project Funding 350 350 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Ginger Creek/Cascade Park Basin Plan Planning Previously Approved Ginger Creek is a tributary to the Cedar River,but sections of the stream have been placed in large pipes sections 72 inch CMP)that are old and located in Tiffany Park,Cascade Park and residential neighborhoods.The existing pipe system has surcharged during significant storm events causing flooding in Cascade Park.After the city annexed the Benson Hill area,the pipe systems and open channel were maintained to reduce sediment buildup between SE 160th Street and the Cedar River Pipeline ROW,which has reduced the occurrence of flooding.However,the project is needed to evaluate conditions of the existing pipes sections due to their age and the capacity of the existing conveyance system.The basin plan will involve a complete hydrologic and hydraulic analysis of the basin for future land use runoff conditions and the evaluation of the conveyance system conditions to identify long term capital investment needs to prevent future flooding and to protect public safety.In addition,the basin plan will evaluate opportunities for incorporating environmental and other multi purpose benefits. Rationale This provides funding for a study to determine the primary cause of the problem,evaluate alternative solutions and develop a design of the preferred solution.This project supports the city's goal of promoting public safety. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 189 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:27 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 10 200 200 60 470 Project Management 5 10 10 5 30 Major Maintenance Land Acquisitions Construction Total Expenditures 15 210 210 65 500 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions 15 210 210 65 500 Special Assessment District System Development Charges Surfacewater Collection Fees Interest Total Resources 15 210 210 65 500 Project Funding Status: Secured 15 210 210 65 500 Anticipated* Total Project Funding 15 210 210 65 500 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Cedar River Flood Risk Reduction Feasibility Study Planning Previously Funded The Lower Cedar River Flood Risk Reduction Feasibility Study intends to assess the feasibility of improving the level of flood protection and evaluate future flood risk mitigation projects along the Cedar River from River Mile 0 to River Mile 2.7.This feasibility study would identify potential measures or construction projects that would increase resiliency to floods greater than the 100 year event and identify the most feasible level of flood protection that could be achieved along this reach of the Cedar River,a critical area of development and economic activity within King County.The King County Flood Control Zone District KCFCZD)placed the Feasibility Study on its 6 year Capital Improvement Project funding plan in 2018 and a funding agreement was executed with the City in April 2020.This study is expected to begin in 2020 and be completed by 2023. Rationale This study evaluates the feasibility of increasing the level of flood protection along the Lower Cedar River,and reducing the risk of flooding to the surrounding area in Renton.It supports the city's goal of protecting public safety. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 190 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:28 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design 85 85 85 255 Project Management 11 11 11 34 Major Maintenance Land Acquisitions Construction Total Expenditures 96 96 96 289 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges Surfacewater Collection Fees 96 96 96 289 Interest Total Resources 96 96 96 289 Project Funding Status: Secured 96 96 96 289 Anticipated* Total Project Funding 96 96 96 289 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) WSDOT Limited Access ROW Runoff Impact Mitigation Program Regulatory Previously Approved The city currently charges surface water fees to WSDOT for the SR 167 and I 405 right of way within Renton city limits.RCW 90.03.525 allows local municipalities to charge stormwater fees for state limited access highways and was modified when Senate bill 5505 was passed in 2019.The bill clarified the objectives of the Stormwater Management Funding and Implementation Program for highway related runoff problems and required charges paid by the state to local jurisdictions to be used solely for stormwater control facilities that directly reduce state highway runoff impacts or implementation of best management practices that will reduce the need for such facilities.A plan and progress report are required to be submitted annually so that WSDOT pays their stormwater fee to the City.This program consists of studies and improvements to city facilities downstream of limited access right of way implemented to remain in compliance with RCW 90.03.525. Rationale This program enables the city to keep collecting surface water fees from WSDOT for limited access right of way,and prioritizes improvements beneficial to both the City and WSDOT.It supports the city's goals of public safety and quality of life. TOTAL ESTIMATED ESTIMATED Capital Investment Program Surface Water 5 - 191 AGENDA ITEM # 9. a) 2021/2022 Preliminary Budget City of Renton,Washington Project Title:Priority Number:29 Project Category: Status: Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Expenditures Expenditures: Planning/Design Project Management Major Maintenance Land Acquisitions Construction 177 50 50 50 50 50 50 50 527 Total Expenditures 177 50 50 50 50 50 50 50 527 Actual through 12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter Total Project Resources Resources: Mitigation Fees Bond Proceeds RePmt Funding Src Only) Grants/Contributions Special Assessment District System Development Charges 177 177 Surfacewater Collection Fees 50 50 50 50 50 50 50 350 Interest Total Resources 177 50 50 50 50 50 50 50 527 Project Funding Status: Secured 177 50 50 50 327 Anticipated*50 50 50 50 200 Total Project Funding 177 50 50 50 50 50 50 50 527 Expenditures utilizing anticipated funding are not included in the adopted budget. Operating Fund Impacts This fund is for unplanned or miscellaneous storm system improvements needed to keep the existing system functional or in response to an opportunity to fix identified system deficiencies in coordination with another project.The funding is also available to respond to system failures structure failure,pipeline failure,pump station failure)or other emergency response needs during storm events. Rationale These funds are used for unplanned projects in response to system failures that need immediate repair or other unplanned storm system improvements,as needed.The projects selected will be in support of the city's goal of promoting public safety. TOTAL ESTIMATED ESTIMATED Description and Scope SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM 2021 through 2026 in thousands of dollars) Miscellaneous/Emergency Storm Projects Maintenance and Preservation Previously Approved Capital Investment Program Surface Water 5 - 192 AGENDA ITEM # 9. a) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, ADOPTING THE 2022 CITY OF RENTON SALARY TABLE FOR NON‐REPRESENTED CITY EMPLOYEES, AFSCME LOCAL 2170 CITY EMPLOYEES, RENTON POLICE DEPARTMENT – COMMISSIONED OFFICERS, AND RENTON POLICE DEPARTMENT – NON‐ COMMISSIONED OFFICERS. WHEREAS, the City Council has approved changes in compensation that impact the City of Renton Salary Table for 2022; and WHEREAS, the City Council desires to formally adopt the 2022 City of Renton Salary Table; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. The City Council hereby adopts the 2022 City of Renton Salary Table, attached hereto and incorporated by this reference as Exhibit A. SECTION II. The Salary Table is intended to be consistent with all applicable collective bargaining agreements. In the event of conflicts, applicable collective bargaining agreements control. SECTION III. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The updated Salary Table shall be effective starting on January 1, 2022, and remain in effect until changes are authorized by the City Council. The summary of this ordinance shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk AGENDA ITEM # 9. b) ORDINANCE NO. ________ 2 APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2296:12/1/21 AGENDA ITEM # 9. b) ORDINANCE NO. ________ 3 EXHIBIT A 2022 CITY OF RENTON SALARY TABLE AGENDA ITEM # 9. b) 4% Grade Code Position Title Monthly Annual Monthly Annual e10 1030 Mayor (1)15,661 187,932 15,661 187,932 e09 1005 City Council President (2)(7)2,050 24,600 e09 1000 City Council Members (2)1,750 21,000 e08 10,813 129,756 11,362 136,344 11,935 143,220 12,539 150,468 13,172 158,064 e11 1020 Municipal Court Judge (6)15,051 180,614 15,051 180,614 Salary effective July 2020 ‐ June 30, 2022 Salary is 95% of District Court Judge Salary m53 1035 Chief Administrative Officer (3)14,187 170,244 14,909 178,908 15,661 187,932 16,452 197,424 17,276 207,312 m52 13,839 166,068 14,539 174,468 15,282 183,384 16,056 192,672 16,857 202,284 m51 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 16,452 197,424 m50 13,172 158,064 13,839 166,068 14,539 174,468 15,282 183,384 16,056 192,672 m49 1400 City Attorney (3)12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1102 Parks & Recreation Administrator (3)12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1105 Community & Economic Development Administrato 12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1036 Deputy Chief Administrative Officer (3)12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1101 Finance Administrator (3)12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1107 Equity, Housing & Human Services Administrator (3)12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1104 Human Resources & Risk Mgmt Administrator (3) 12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 Judicial Administrative Officer 12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1103 Public Works Administrator (3)12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m49 1201 Police Chief (3)12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 15,661 187,932 m48 12,539 150,468 13,172 158,064 13,839 166,068 14,539 174,468 15,282 183,384 m47 12,235 146,820 12,854 154,248 13,502 162,024 14,187 170,244 14,909 178,908 m46 1535 Police Deputy Chief (4)11,935 143,220 12,539 150,468 13,172 158,064 13,839 166,068 14,539 174,468 m46 Prosecution Division Director 11,935 143,220 12,539 150,468 13,172 158,064 13,839 166,068 14,539 174,468 m45 11,645 139,740 12,235 146,820 12,854 154,248 13,502 162,024 14,187 170,244 m44 11,362 136,344 11,935 143,220 12,539 150,468 13,172 158,064 13,839 166,068 m43 11,082 132,984 11,645 139,740 12,235 146,820 12,854 154,248 13,502 162,024 m42 1401 Sr Assistant City Attorney 10,813 129,756 11,362 136,344 11,935 143,220 12,539 150,468 13,172 158,064 m41 1212 Information Technology Director 10,551 126,612 11,082 132,984 11,645 139,740 12,235 146,820 12,854 154,248 m40 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 12,539 150,468 m39 10,043 120,516 10,551 126,612 11,082 132,984 11,645 139,740 12,235 146,820 m38 2178 Airport Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 2011 City Clerk/Public Records Officer 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1204 Communications & Engagement Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1575 Development Services Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1501 Economic Development Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 2044 Emergency Management Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1207 Facilities Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1210 Fiscal Services Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 2463 HR Labor Relations & Compensation Manager 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 Lead Prosecutor 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1571 Maintenance Services Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 8084 Parks and Trails Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1208 Parks Planning and Natural Resources Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1502 Planning Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 2031 Police Commander (5)9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 2022 CITY OF RENTON SALARY TABLE NON‐REPRESENTED Effective January 1, 2022 STEP A STEP B STEP C STEP D STEP E ELECTED OFFICIALS MANAGEMENT & SUPERVISORY (NON‐UNION) AGENDA ITEM # 9. b) 4% Grade Code Position Title Monthly Annual Monthly Annual 2022 CITY OF RENTON SALARY TABLE NON‐REPRESENTED Effective January 1, 2022 STEP A STEP B STEP C STEP D STEP E m38 1214 Recreation Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1570 Utility Systems Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m38 1572 Transportation Systems Director 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 11,935 143,220 m37 Application Support Manager 9,562 114,744 10,043 120,516 10,551 126,612 11,082 132,984 11,645 139,740 m37 ITS and Maintenance Manager 9,562 114,744 10,043 120,516 10,551 126,612 11,082 132,984 11,645 139,740 m37 2176 Transportation Design Manager 9,562 114,744 10,043 120,516 10,551 126,612 11,082 132,984 11,645 139,740 m37 2075 Transportation Operations Manager 9,562 114,744 10,043 120,516 10,551 126,612 11,082 132,984 11,645 139,740 m37 2177 Transportation Planning Manager 9,562 114,744 10,043 120,516 10,551 126,612 11,082 132,984 11,645 139,740 m37 2172 Utility Engineering Manager 9,562 114,744 10,043 120,516 10,551 126,612 11,082 132,984 11,645 139,740 m36 2074 Building Official 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 m36 2021 Current Planning Manager 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 m36 2073 Development Engineering Manager 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 m36 2020 Long Range Planning Manager 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 11,362 136,344 m35 1402 Assistant City Attorney 9,097 109,164 9,562 114,744 10,043 120,516 10,551 126,612 11,082 132,984 m34 2462 Human Resources Benefits Manager 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 m34 2460 Organizational Development Manager 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 m34 Construction Manager 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 m34 2409 Risk Manager 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 10,813 129,756 m33 5015 Budget & Accounting Manager 8,658 103,896 9,097 109,164 9,562 114,744 10,043 120,516 10,551 126,612 m33 1578 Community Development & Housing Manager 8,658 103,896 9,097 109,164 9,562 114,744 10,043 120,516 10,551 126,612 m33 2174 Property & Technical Services Manager 8,658 103,896 9,097 109,164 9,562 114,744 10,043 120,516 10,551 126,612 m33 3072 Water Maintenance Manager 8,658 103,896 9,097 109,164 9,562 114,744 10,043 120,516 10,551 126,612 m32 4480 Capital Projects Manager 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 m32 1577 Economic Development Manager 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 m32 3073 Fleet Manager 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 m32 4470 Parks Planning Manager 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 m32 3071 Street Maintenance Manager 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 m32 3083 Urban Forestry and Natural Resources Manager 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 m32 3070 Waste Water/Special Operations Manager 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 10,295 123,540 m31 3086 Facilities Manager 8,242 98,904 8,658 103,896 9,097 109,164 9,562 114,744 10,043 120,516 m31 8010 Parks Maintenance Manager 8,242 98,904 8,658 103,896 9,097 109,164 9,562 114,744 10,043 120,516 m30 2407 GIS Manager 8,041 96,492 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 m30 2033 Police Manager 8,041 96,492 8,447 101,364 8,871 106,452 9,327 111,924 9,799 117,588 m29 2202 Communications Manager 7,840 94,080 8,242 98,904 8,658 103,896 9,097 109,164 9,562 114,744 m29 3084 Golf Course Manager 7,840 94,080 8,242 98,904 8,658 103,896 9,097 109,164 9,562 114,744 m29 1522 Human Services Manager 7,840 94,080 8,242 98,904 8,658 103,896 9,097 109,164 9,562 114,744 m29 1404 Prosecuting Attorney 7,840 94,080 8,242 98,904 8,658 103,896 9,097 109,164 9,562 114,744 m29 2087 Recreation Manager 7,840 94,080 8,242 98,904 8,658 103,896 9,097 109,164 9,562 114,744 m28 6031 Financial Operations Manager 7,655 91,860 8,041 96,492 8,447 101,364 8,871 106,452 9,327 111,924 m28 5254 Permit Services Manager 7,655 91,860 8,041 96,492 8,447 101,364 8,871 106,452 9,327 111,924 m28 1116 Tax & Licensing Manager 7,655 91,860 8,041 96,492 8,447 101,364 8,871 106,452 9,327 111,924 m27 3011 Enterprise Content Manager 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 9,097 109,164 m27 2578 Housing Programs Manager 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 9,097 109,164 m26 7,285 87,420 7,655 91,860 8,041 96,492 8,447 101,364 8,871 106,452 m25 2086 Head Golf Professional 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 m25 2562 Senior Benefits Analyst 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 m25 2563 Senior Employee Relations Analyst 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 m25 2410 Senior Finance Analyst 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 m25 2561 Senior Risk Analyst 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 m25 2479 Solid Waste Coordinator 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 8,658 103,896 m24 5112 Deputy City Clerk/Public Records Officer 6,938 83,256 7,285 87,420 7,655 91,860 8,041 96,492 8,447 101,364 m23 3562 Benefits Analyst 6,761 81,132 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 m23 3563 Employee Relations Analyst 6,761 81,132 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 m23 2080 Recreation Supervisor 6,761 81,132 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 m23 2461 Risk Analyst 6,761 81,132 7,107 85,284 7,467 89,604 7,840 94,080 8,242 98,904 AGENDA ITEM # 9. b) 4% Grade Code Position Title Monthly Annual Monthly Annual 2022 CITY OF RENTON SALARY TABLE NON‐REPRESENTED Effective January 1, 2022 STEP A STEP B STEP C STEP D STEP E m22 2404 Community Events Coordinator 6,602 79,224 6,938 83,256 7,285 87,420 7,655 91,860 8,041 96,492 m22 1510 Court Services Supervisor 6,602 79,224 6,938 83,256 7,285 87,420 7,655 91,860 8,041 96,492 m22 8007 Golf Course Supervisor 6,602 79,224 6,938 83,256 7,285 87,420 7,655 91,860 8,041 96,492 m22 2091 Museum Manager 6,602 79,224 6,938 83,256 7,285 87,420 7,655 91,860 8,041 96,492 m21 2218 Tax & Licensing Auditor, Senior 6,439 77,268 6,761 81,132 7,107 85,284 7,467 89,604 7,840 94,080 m20 6,282 75,384 6,602 79,224 6,938 83,256 7,285 87,420 7,655 91,860 m19 6150 City Council Liaison 6,131 73,572 6,439 77,268 6,761 81,132 7,107 85,284 7,467 89,604 m19 6103 Executive Assistant 6,131 73,572 6,439 77,268 6,761 81,132 7,107 85,284 7,467 89,604 m18 5416 Payroll Technician 3 5,977 71,724 6,282 75,384 6,602 79,224 6,938 83,256 7,285 87,420 m17 Legal Analyst 5,834 70,008 6,131 73,572 6,439 77,268 6,761 81,132 7,107 85,284 n16 multiple Administrative Assistants (All Depts)5,669 68,028 5,955 71,460 6,247 74,964 6,569 78,828 6,896 82,752 n16 5118 Finance Analyst 3 5,669 68,028 5,955 71,460 6,247 74,964 6,569 78,828 6,896 82,752 n16 2217 Tax & Licensing Auditor 2 5,669 68,028 5,955 71,460 6,247 74,964 6,569 78,828 6,896 82,752 n15 5,521 66,252 5,807 69,684 6,099 73,188 6,408 76,896 6,736 80,832 n14 5,392 64,704 5,669 68,028 5,955 71,460 6,247 74,964 6,569 78,828 n13 5115 Finance Analyst 2 5,259 63,108 5,521 66,252 5,807 69,684 6,099 73,188 6,408 76,896 n13 2662 Human Resources Specialist 5,259 63,108 5,521 66,252 5,807 69,684 6,099 73,188 6,408 76,896 n13 5316 Payroll Technician 2 5,259 63,108 5,521 66,252 5,807 69,684 6,099 73,188 6,408 76,896 n13 2216 Tax & Licensing Auditor 1 5,259 63,108 5,521 66,252 5,807 69,684 6,099 73,188 6,408 76,896 n12 5,136 61,632 5,392 64,704 5,669 68,028 5,955 71,460 6,247 74,964 n11 2488 Assistant Golf Professional 5,006 60,072 5,259 63,108 5,521 66,252 5,807 69,684 6,099 73,188 n10 5114 Finance Analyst 1 4,886 58,632 5,136 61,632 5,392 64,704 5,669 68,028 5,955 71,460 n10 5216 Payroll Technician 1 4,886 58,632 5,136 61,632 5,392 64,704 5,669 68,028 5,955 71,460 n09 4,769 57,228 5,006 60,072 5,259 63,108 5,521 66,252 5,807 69,684 n08 4,650 55,800 4,886 58,632 5,136 61,632 5,392 64,704 5,669 68,028 n07 4,538 54,456 4,769 57,228 5,006 60,072 5,259 63,108 5,521 66,252 n06 4,425 53,100 4,650 55,800 4,886 58,632 5,136 61,632 5,392 64,704 n05 4,318 51,816 4,538 54,456 4,769 57,228 5,006 60,072 5,259 63,108 n04 4,215 50,580 4,425 53,100 4,650 55,800 4,886 58,632 5,136 61,632 n03 4,116 49,392 4,318 51,816 4,538 54,456 4,769 57,228 5,006 60,072 n02 4,015 48,180 4,215 50,580 4,425 53,100 4,650 55,800 4,886 58,632 n01 5138 Office Specialist 3,923 47,076 4,116 49,392 4,318 51,816 4,538 54,456 4,769 57,228 $6,262 Completion of 5 Yrs Completion of 10 Yrs Completion of 15 Yrs Completion of 20 Yrs Completion of 25 Yrs Completion of 30 Yrs (1) In addition to salary receives annual car allowance of $4800 or use of a city vehicle. 2% Step a14E $125 per month NON‐UNION (CLERICAL, OTHER) NON‐REPRESENTED LONGEVITY PAY as of 1/1/2021 Step a14, E = 3% Step a14E $188 per month 4% Step a14E $250 per month 5% Step a14E $313 per month 6% Step a14E $376 per month 7% Step a14E $438 per month AGENDA ITEM # 9. b) 4% Grade Code Position Title Monthly Annual Monthly Annual 2022 CITY OF RENTON SALARY TABLE NON‐REPRESENTED Effective January 1, 2022 STEP A STEP B STEP C STEP D STEP E (2) (3) Not eligible for Longevity/Education or Uniform Allowance (4) Not eligible for Longevity/Education or Uniform Allowance Eligible for 3% cash premium or 3% into deferred compensation per employee's discretion for passing physical fitness. (5)Receive Education/Longevity & Uniform Allowance based on Union Contract. Eligible for 3% deferred compensation for passing physical fitness. Eligible for P2 paid job injury leave based on Union Contract. (6)4 year term (7) Council president to be paid $300/month above council members salary. Council members salary set per Salary Commission effective 4/1/20. Council receives 2% of salary for deferred comp. If members are not participating in PERS, they receive an extra 1.4 % of salary for deferred compensation. The City contributes 4% of employee's base wage per year to a deferred compensation account for Management and Non‐Represented employees; except for CAO receives 11% per year. AGENDA ITEM # 9. b) Grade Code Position Title Monthly Annual Monthly Annual a40 9,746 116,952 10,233 122,796 10,752 129,024 11,298 135,576 11,868 142,416 a39 9,525 114,300 9,998 119,976 10,489 125,868 11,022 132,264 11,580 138,960 ‐ a38 9,282 111,384 9,746 116,952 10,233 122,796 10,752 129,024 11,298 135,576 a37 9,069 108,828 9,525 114,300 9,998 119,976 10,489 125,868 11,022 132,264 a36 2428 Principal Civil Engineer 8,839 106,068 9,282 111,384 9,746 116,952 10,233 122,796 10,752 129,024 a35 8,627 103,524 9,069 108,828 9,525 114,300 9,998 119,976 10,489 125,868 a34 2413 Network Systems Manager 8,417 101,004 8,839 106,068 9,282 111,384 9,746 116,952 10,233 122,796 a33 2475 Civil Engineer 3 8,214 98,568 8,627 103,524 9,069 108,828 9,525 114,300 9,998 119,976 a32 2425 Utility/GIS Engineer 8,015 96,180 8,417 101,004 8,839 106,068 9,282 111,384 9,746 116,952 a31 2078 Assistant Airport Manager 7,813 93,756 8,214 98,568 8,627 103,524 9,069 108,828 9,525 114,300 a30 2512 Client Technology Sys & Support Super. 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068 9,282 111,384 a30 2474 Civil Engineer 2 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068 9,282 111,384 a29 2570 Program Development Coordinator 2 7,441 89,292 7,813 93,756 8,214 98,568 8,627 103,524 9,069 108,828 a29 2451 Senior Systems Analyst 7,441 89,292 7,813 93,756 8,214 98,568 8,627 103,524 9,069 108,828 a28 2422 Senior Planner 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068 a28 2480 Capital Project Coordinator 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068 a28 2416 Senior Network Systems Specialist 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068 a27 2452 Senior Business Systems Analyst 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568 8,627 103,524 a26 2473 Civil Engineer I 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 a26 GIS Analyst 3 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 a26 2417 Systems Analyst 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 a26 3473 Water Utilities Maintenance Supervisor 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 a25 2481 Facilities Coordinator 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568 a25 3484 Lead Electrical/Ctrl Systems Technician 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568 a25 2470 Program Development Coordinator 1 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568 a25 2170 Property Services Agent 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568 a25 8179 Signal/Electronic Systems Supervisor 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568 a24 2420 Database Technician 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 a24 3450 Lead Building Inspector 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 a24 3469 Lead Construction Inspector 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 a24 2403 Senior Economic Development Specialis 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 a24 2419 Network Systems Specialist 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 a24 2476 Transportation Planner 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 a23 8475 Airport Ops & Maintenance Supervisor 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 2429 Building Plan Reviewer 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 2421 Business Systems Analyst 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 2472 Engineering Specialist 3 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 2505 GIS Analyst 2 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 8175 Pavement Management Technician 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 2450 Plan Reviewer 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 2484 Property Services Specialist 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 8001 Street Maintenance Services Supervisor 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a23 8002 Waste Water Maint. Services Supervisor 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 2022 CITY OF RENTON SALARY TABLE AFSCME, Local 2170 In Negotiations STEP A STEP B STEP C STEP D STEP E AGENDA ITEM # 9. b) Grade Code Position Title Monthly Annual Monthly Annual 2022 CITY OF RENTON SALARY TABLE AFSCME, Local 2170 In Negotiations STEP A STEP B STEP C STEP D STEP E a23 8000 Water Maintenance Services Supervisor 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 a22 2430 Lead Code Compliance Inspector 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 a22 5197 Neighborhood Program Coordinator 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 a22 Senior Paralegal 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 a22 Utility Accounts Supervisor 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 a21 2424 Associate Planner 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 3452 Building Inspector/Combination 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 3451 Building Inspector/Electrical 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 Case Manager 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 2200 Communications Specialist 2 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 3472 Construction Inspector 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 8008 Custodial Maintenance Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 5130 Emergency Management Coordinator 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 3089 Facilities Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 5111 GIS Analyst 1 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 8006 Parks Maintenance Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 3483 Signal/Electronics Systems Technician 3 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 8004 Traffic Signage & Marking Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a21 8011 Water Meter Technician Services Superv 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 a20 2079 Business Coordinator ‐ Airport 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 a20 2402 Economic Development Specialist 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 a20 2487 Housing Repair Coordinator 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 a20 2489 Human Services Coordinator 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 a19 6128 Accounting Supervisor 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 Client Technology Services Specialist 2 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 2427 Code Compliance Inspector 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 7182 Electrical Technician 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 3453 Energy Plans Reviewer 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 2471 Engineering Specialist 2 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 3485 HVAC Systems Technician 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 7172 Lead Vehicle & Equipment Mechanic 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a19 8178 Water Utility Instr./SCADA Technician 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 a18 3456 Development Services Representative 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 a18 5195 Farmers Market Coordinator 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 a18 2015 Probation Officer 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 a18 2083 Recreation Program Coordinator 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 a17 2423 Assistant Planner 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 a17 8374 Maintenance Buyer 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 a17 5001 Paralegal 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 a17 5012 Public Records Specialist 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 a17 3482 Signal/Electronics Systems Technician 2 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 a17 3470 Water Quality/Treatment Plant Operato 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 a17 2205 Digital Communications Specialist 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 a16 8284 Lead Golf Course Maintenance Worker 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 a16 8074 Lead Maintenance Services Worker 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 a16 8080 Lead Parks Maintenance Worker 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 a16 5194 Program Assistant 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 a15 4014 City Clerk Specialist 2 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 Client Technology Services Specialist 1 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 6167 Court Operations Specialist 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 7181 Facilities Technician 2 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 7184 Grounds Equipment Mechanic 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 8174 Lift Station Technician 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 AGENDA ITEM # 9. b) Grade Code Position Title Monthly Annual Monthly Annual 2022 CITY OF RENTON SALARY TABLE AFSCME, Local 2170 In Negotiations STEP A STEP B STEP C STEP D STEP E a15 5122 Planning Technician 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 5180 Senior Program Specialist 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 8574 Senior Traffic Maintenance Worker 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 7170 Vehicle & Equipment Mechanic 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a15 3474 Water Utility Maintenance Technician 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 a14 5161 Asset Management Systems Technician 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 a14 5160 Recreation Systems Technician 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 a13 8474 Airport Operations Specialist 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a13 3471 Engineering Specialist 1 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a13 7180 Facilities Technician 1 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a13 3487 Housing Maintenance Technician 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a13 6263 Permit Services Specialist 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a13 7110 Print & Mail Supervisor 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a13 5179 Program Specialist 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a13 3481 Signal/Electronics Systems Technician 1 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 a12 2201 Communications Specialist 1 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 a12 8283 Golf Course Maintenance Worker 3 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 a12 6166 Judicial Specialist 2 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 a12 8173 Maintenance Services Worker 3 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 a12 8083 Parks Maintenance Worker 3 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 a12 8573 Traffic Maintenance Worker 2 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 a11 8473 Airport Maintenance Worker 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a11 5014 City Clerk Specialist 1 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a11 7173 Fleet Management Technician 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a11 8183 Lead Maintenance Custodian 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a11 6265 Payroll Analyst 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a11 5007 Public Records Specialist 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a11 2486 Recreation Specialist 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a11 Water Meter System Specialist 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 a10 6164 Judicial Specialist/Trainer 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 a10 6165 Legal Assistant 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 a10 6263 Permit Technician 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 a10 6163 Probation Clerk 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 a09 6131 Accounting Assistant 4 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 a09 6151 Administrative Secretary 1 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 a09 8286 Golf Course Operations Assistant 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 a09 8070 Mechanic's Assistant 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 a09 2085 Recreation Assistant 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 a08 8282 Golf Course Maintenance Worker 2 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a08 7126 Housing Repair Technician 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a08 6162 Judicial Specialist 1 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a08 6109 Lead Office Assistant 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a08 8172 Maintenance Services Worker 2 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a08 8082 Parks Maintenance Worker 2 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a08 8375 Purchasing Assistant 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a08 8572 Traffic Maintenance Worker 1 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 a07 6132 Accounting Assistant 3 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 a07 8184 Maintenance Custodian 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 a07 7112 Print & Mail Operator 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 a07 6142 Secretary 2 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 a07 8110 Water Meter Technician 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 a06 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 AGENDA ITEM # 9. b) Grade Code Position Title Monthly Annual Monthly Annual 2022 CITY OF RENTON SALARY TABLE AFSCME, Local 2170 In Negotiations STEP A STEP B STEP C STEP D STEP E a05 6134 Accounting Assistant 3 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 a05 6130 Office Assistant 3 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 a05 6141 Secretary 1 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 a04 6160 Court Security Officer 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 a04 8281 Golf Course Maintenance Worker 1 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 a04 8181 Lead Custodian 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 a04 8171 Maintenance Services Worker 1 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 a04 8081 Parks Maintenance Worker 1 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 a04 6282 Pro Shop Assistant 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 a04 8576 Solid Waste Maintenance Worker 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 a03 6136 Accounting Assistant 1 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 a03 6120 Office Assistant 2 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 a03 8079 Parks Maintenance Assistant 2 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 a03 7111 Print & Mail Assistant 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 a02 3,831 45,972 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 a01 8182 Custodian 3,731 44,772 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 a01 6281 Golf Course Associate 3,731 44,772 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 a01 6111 Office Assistant 1 3,731 44,772 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 a01 7079 Parks Maintenance Assistant 1 3,731 44,772 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 $6,262 Completion of 5 Yrs Completion of 10 Yrs Completion of 15 Yrs Completion of 20 Yrs Completion of 25 Yrs Completion of 30 Yrs The City contributes 4% of employee's base wage per year to a deferred compensation account. (Article 14) 6% Step a14E $376 per month 7% Step a14E $438 per month 4% Step a14E $250 per month 5% Step a14E $313 per month 3% Step a14E $188 per month LONGEVITY PAY Step a14, E = 2% Step a14E $125 per month AGENDA ITEM # 9. b) Grade Code Monthly Annual Monthly Annual Police Chief See Management & Supervisory Matrix, Grade m49 Police Deputy Chief See Management & Supervisory Matrix, Grade m46 Police Commander See Management & Supervisory Matrix, Grade m38 pc61 3035 Sergeant*9,384 112,609 9,853 118,240 (15% over Police Officer)*Step increase at 24 months pc60 4131 Patrol Officer II 6,097 73,165 6,614 79,363 7,134 85,613 7,646 91,747 8,161 97,932 pc59 4130 Patrol Officer I 5,738 68,861 6,225 74,699 6,715 80,575 7,196 86,347 7,681 92,172 Percent Interpreters ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐3% Detectives ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4% Traffic Assignment‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4% Motorcycle Assignment‐‐‐‐‐‐‐‐‐‐‐‐‐ 2% Canine Officer ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐3% Corporal Assignment ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐7.5% Field Training Officer ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4% Training Officer‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4% SWAT Assignment ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4% SRO Assignment‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4% Civil Disturbance Unit ‐‐‐‐‐‐‐‐‐‐‐‐‐‐Paid at rate of double time with 3 hrs minimum when called to emergency. Crisis Communication Unit‐‐‐‐‐‐‐‐‐Paid at rate of double time with 3 hrs minimum when called to emergency. Percentage (of base wage) Percentage (of base wage) ‐ ‐ ‐ ‐ ‐ Patrol Officer II: Effective 1‐1‐18 Patrol Officer II and Sergeant had 6.25% added to their base pay to reflect the additional 109 hours worked in a calendar year. This is reflected in the ranges above. Effective January 1, 2008, Sergeants assigned to Investigation and Traffic Unit will not receive the 3% premium if they have been in the position of Sergeant for 24 months. NOTE: Please refer to the current labor agreement for specific information. AA Degree (90 credits)4% BA Degree/Masters Degree 6% The City contributes 2.0% of employee's wage base toward deferred compensation. (Appendix A.2.3) The City will contribute 3.0% of employee's wage base toward deferred compensation for passing physical fitness. (Article 6.8.4, and Appendix A.2.4) Beginning 1‐1‐2020 the City will contribute 1% of employee's wage base to a VEBA plan. (Article 14.11) Completion of 10 Yrs 4% Completion of 15 Yrs 6% Completion of 20 Yrs 10% Completion of 25 Yrs 12% Completion of 30 Yrs 14% MONTHLY EDUCATIONAL INCENTIVE PAY (Appendix B) Position Title HAZARD DUTY AND PREMIUM PAY (Article 6.7 and 6.8) MONTHLY LONGEVITY PAY (Appendix B) Years of Service Completion of 5 Yrs 2% 2022 CITY OF RENTON SALARY TABLE POLICE DEPARTMENT ‐ Commissioned Officers In Negotiations STEP ASTEP BSTEP CSTEP DSTEP E AGENDA ITEM # 9. b) Grade Code Position Title Monthly Annual Monthly Annual pn70 6,008 72,096 6,495 77,940 7,137 85,644 7,843 94,116 8,256 99,072 pn69 5,861 70,332 6,337 76,044 6,963 83,556 7,652 91,824 8,055 96,660 pn68 5,718 68,616 6,182 74,184 6,793 81,516 7,465 89,580 7,858 94,296 pn67 Community Engagement Coord. 5,579 66,948 6,031 72,372 6,628 79,536 7,283 87,396 7,667 92,004 pn66 5,443 65,316 5,884 70,608 6,466 77,592 7,106 85,272 7,480 89,760 pn65 5,310 63,720 5,741 68,892 6,308 75,696 6,932 83,184 7,297 87,564 pn64 5,181 62,172 5,601 67,212 6,155 73,860 6,763 81,156 7,119 85,428 pn63 5,054 60,648 5,464 65,568 6,004 72,048 6,598 79,176 6,946 83,352 pn58 6178 Police Service Specialist Supv 6,454 77,448 6,776 81,312 Step A(15% above Specialist, Step E) Step E (5% above Supervisor, Step A) pn57 6182 Police Service Specialist Lead 6,032 72,384 6,032 72,384 (7.5% above Specialist, Step E) pn54 4138 Police Community Prgm Coord 4,993 59,916 5,396 64,752 5,928 71,136 6,390 76,680 6,710 80,520 pn54 4120 Crime Analyst 4,993 59,916 5,396 64,752 5,928 71,136 6,390 76,680 6,710 80,520 pn56 4133 Electronic Home Detention Coord 4,926 59,112 5,316 63,792 5,854 70,248 6,436 77,232 6,756 81,072 pn53 3432 Evidence Technician 4,700 56,400 5,073 60,876 5,583 66,996 6,142 73,704 6,458 77,496 pn61 4121 Domestic Violence Victim Advocate 4,661 55,932 5,063 60,756 5,627 67,524 6,186 74,232 6,513 78,156 pn60 4,445 53,340 4,828 57,936 5,364 64,368 5,898 70,776 6,205 74,460 pn52 4135 Animal Control Officer 4,433 53,196 4,793 57,516 5,270 63,240 5,795 69,540 6,086 73,032 pn62 6181 Police Service Specialist 4,088 49,056 4,416 52,992 4,860 58,320 5,346 64,152 5,612 67,344 pn51 6183 Police Secretary 3,829 45,948 4,133 49,596 4,550 54,600 5,008 60,096 5,254 63,048 pn51 4137 Parking Enforcement Officer 3,829 45,948 4,133 49,596 4,550 54,600 5,008 60,096 5,254 63,048 Interpreter Premium………………………………..………………….……………. 3% of base pay (Article 6.5.2) 2.5% of base pay (Article 6.5.3) 4% of base pay (Article 6.5.1) Double time with 3 hrs min (Article 6.4 NON‐ COMMISSIONED PREMIUM PAY (Articles 6.4 and 6.5) Public Records Act Premium…………………………………………………………… Field Training Officer, FTO (Police Service Specialist)…………........… Crisis Communication Unit………………………………………..…...……… 2022 CITY OF RENTON SALARY TABLE POLICE DEPARTMENT ‐ Non‐Commissioned Officers In Negotiations STEP ASTEP BSTEP CSTEP DSTEP E AGENDA ITEM # 9. b) ‐ Beginning 1/1/2020 the City will contribute 1% of the employee's base wage to a VEBA plan. (Article 14.10) ‐ The City will contribute an additional 3.0% of employee's wage base toward deferred comp for passing physical fitness prior to beginning of each calendar year. (Article 6.8.3) Completion of 25 Yrs 12% Completion of 30 Yrs 14% MONTHLY EDUCATIONAL INCENTIVE PAY SCHEDULE (Appendix B.2) Percentage (of base wage) AA Degree (90 credits) 4% BA/BS Degree or Masters Degree 6% ‐ The City contributes 4.5% of the employee's base wage to a deferred comp account. (Appendix A.3) Completion of 10 Yrs 4% Completion of 15 Yrs 6% Completion of 20 Yrs 10% Completion of 5 Yrs 2% POLICE NON‐COMMISSIONED‐ MONTHLY LONGEVITY INCENTIVE PAY SCHEDULE (Article 12, Appendix B.1) Years of Service Percentage (of base wage) AGENDA ITEM # 9. b) Grade STEP A STEP B STEP C STEP D STEP E h07 14.50 14.75 h08 15.00 15.25 15.50 15.75 16.00 h09 16.25 16.50 16.75 17.00 17.25 h10 17.50 17.75 18.00 18.25 18.50 h11 18.75 19.00 19.25 19.50 19.75 h12 20.00 20.50 21.00 21.50 22.00 h13 22.50 23.00 23.50 24.00 24.50 h14 25.00 25.50 26.00 26.50 27.00 h15 27.50 28.00 28.50 29.00 29.50 h16 30.00 30.50 31.00 31.50 32.00 h17 32.50 33.00 33.50 34.00 34.50 h18 35.00 35.50 36.00 36.50 37.00 h19 37.50 38.00 38.50 39.00 39.50 h20 40.00 40.50 41.00 41.50 42.00 h21 42.25 42.50 42.75 43.00 43.25 h22 43.50 43.75 44.00 44.25 44.50 h23 45.00 45.50 46.00 46.50 47.00 h24 47.50 48.00 48.50 49.00 49.50 h25 50.00 51.00 52.00 53.00 54.00 h26 55.00 60.00 65.00 70.00 75.00 h27 80.00 85.00 90.00 95.00 100.00 h28 105.00 110.00 115.00 120.00 125.00 2022 CITY OF RENTON SALARY TABLE SUPPLEMENTAL EMPLOYEE WAGE TABLE AGENDA ITEM # 9. b) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SUBSECTIONS 4‐8‐120.C AND 4‐9‐065.D.1 OF THE RENTON MUNICIPAL CODE, AMENDING BONUS DENSITY ANNUAL REPORTING REQUIREMENTS, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, the Planning Commission held a public hearing on February 17, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; and WHEREAS, pursuant to RCW 36.70A.106, on April 27, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. 4‐8‐120.C of the Renton Municipal Code is amended to add a new row in alphabetical order titled, “Documentation of Affordable Housing Experience & 3rd Party Reporting,” with the title followed by a superscript “12,” all as shown in the excerpt of RMC 4‐8‐ 120.C in Attachment A. In such new row, an “X” shall be placed in the columns associated with “Master Site Plan (Overall),” Master Site Plan (Individual Phases),” “Plat, Preliminary/Binding Site Plan,” “PUD, Preliminary,” “Short Plat, Preliminary,” and “Site Plan Review.” Additionally, a new footnote numbered 12 is added in sequential order to Table 4‐8‐120.C Legend, as shown in the AGENDA ITEM # 9. c) ORDINANCE NO. ________ 2 excerpt of 4‐8‐120.C in Attachment A. All other provisions in 4‐8‐120.C including all existing rows remain in full force and effect. SECTION II. Subsection 4‐9‐065.D.1 of the Renton Municipal Code is amended as shown below. All other provisions in 4‐9‐065.D remain in effect and unchanged. D. BONUS ALLOWANCES AND REVIEW CRITERIA: 1. Affordable Housing: At a ratio of Oone bonus market‐rate dwelling unit may be granted for each affordable dwelling unit constructed on site, bonus market‐rate dwelling units may be granted, up to the maximum bonus density allowed pursuant to subsection D3 of this Section, Maximum Bonus Units, provided the minimum number required has been satisfied. Affordable dwelling units shall conform to the following standards: a. Minimum Number: All projects must construct at least two (2) affordable dwelling units. Projects that are 30 units or greater shall construct at least ten percent (10%) of the total units in the project as affordable. ab. Duration: An agreement in a form approved by the City must be recorded with the King County Recorder’s Office requiring affordable housing units provided under this Section remain affordable housing for fifty (50) years or the life of the development, whichever is less. This agreement shall be a covenant running with the land, binding on the assigns, heirs and successors of the applicant to the satisfaction of the City Attorney. AGENDA ITEM # 9. c) ORDINANCE NO. ________ 3 bc. Affordable Housing Income Levels: Dwelling units conditioned as affordable under this Section shall conform to the definition of “affordable housing” pursuant to RMC 4‐11‐010, Definitions A. cd. Affordable Unit Conditions: Affordable housing units shall be provided in a range of sizes and with features comparable to market‐rate units. The low‐income units shall be distributed throughout the development and have substantially the same functionality as the other units in the development. e. Annual Reporting: Within thirty (30) days after the first anniversary of issuance of the project’s Certificate of Occupancy and each year thereafter for fifty (50) years, the applicant/owner shall file an annual report with the Administrator. The report shall contain such information as the Administrator may deem necessary or useful, and shall at a minimum include the following information: i. A certification that the project has been in compliance with the affordable housing requirements of this Section since the date the City issued the project’s Certificate of Occupancy and that the project continues to be in compliance with the requirements of this Section; ii. A breakdown of the number and specific housing units sold or rented during the twelve (12) months ending with the anniversary date, as applicable, to meet the affordable housing requirements of this Section; AGENDA ITEM # 9. c) ORDINANCE NO. ________ 4 iii. The total sale or rental amount of each affordable housing unit for households sold or rented during the twelve (12) months ending with the anniversary date, as applicable; iv. The income of each purchaser or renter (at the time of purchase or rental) of an affordable housing unit, as applicable; and v. Documentation that a third‐party entity has monitored the project’s compliance with the affordable housing requirements of this Section, as applicable. 2. Assisted Living Facilities: The development shall satisfy the definition of “assisted living facility” pursuant to RMC 4‐11‐010, Definitions A. 3. Maximum Bonus Units: The following table provides the maximum density that may be granted in applicable zones for conformance with either the affordable housing or assisted living facility provisions: a. Affordable Housing Subject Zones Maximum Density CD, UC, CV, CO, COR, R‐ 14, and RMF 30% above maximum density or density allowed via conditional use permit b. Assisted Living Facilities Subject Zones Maximum Density RMF, CV, CD, CO, COR, and UC 50% above maximum density R‐1, R‐10, and R‐14 Up to 18 dwelling units per net acre AGENDA ITEM # 9. c) ORDINANCE NO. ________ 5 SECTION IV. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION V. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2164:7/16/21 AGENDA ITEM # 9. c) ORDINANCE NO. ________ 6 ATTACHMENT A RMC 4‐8‐120.C (EXCERPT) Table 4‐8‐120C Legend: 1. This information is required only for those home occupations that will have customer visits, more than six (6) business deliveries per week, or external indication of commercial activity. 2. Level of detail limited to scope listed in RMC 4‐9‐210A. 3. Level of detail required may be reduced by Administrator. 4. Not required for amateur radio antennas. 5. Deleted. 6. Deleted. 7. Only required for projects requiring review in the Urban Center Design Overlay District. SUBMITTAL REQUIREMENTS TYPE OF APPLICATION/PERMIT Master Site Plan (Overall) Master Site Plan (Individual Phases) Plat, Preliminary /Binding Site Plan PUD, Preliminary Short Plat, Preliminary Site Plan Review Construction Mitigation Description X X X X X X Documentation of Affordable Housing Experience & 3rd Party Reporting12 X X X X X X Draft Deed for Any Proposed Dedication of Land for Public Purposes X AGENDA ITEM # 9. c) ORDINANCE NO. ________ 7 8. A standard stream or lake study is required for any application proposal; provided, that an individual single family residence on a parcel less than twenty thousand (20,000) square feet shall not be subject to this requirement. A supplemental stream or lake study is also required if an unclassified stream is involved, or if there are proposed alterations of the water body or buffer, as identified in the standard stream or lake study. If substantial impacts to the existing vegetation within the buffer required by RMC 4‐3‐ 090D7a, Shoreline Bulk Standards, or as modified under RMC 4‐3‐090F1, Vegetation Conservation, are identified in the standard stream or lake study, a supplemental stream or lake study may be required by the Community and Economic Development Administrator. A stream or lake mitigation plan will be required prior to final approval for any plans or permits that result in mitigation identified in the supplemental stream or lake study. 9. The only submittal requirements required for Tier I Temporary Use Permit are Master Application, Site Plan, and King County Health Department Approval. 10. Only that portion of the agreement relating to removal upon discontinuation of use is required for amateur radio antennas. 11. Submission of an affidavit and photograph of an installed public outreach sign and/or neighborhood meeting materials is only required for site plan review if the sign and/or neighborhood meeting is required per RMC 4‐8‐090, Public Notice Requirements. 12. For applicants seeking Bonus Density under the provisions of 4‐9‐065. AGENDA ITEM # 9. c) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SECTIONS 4‐2‐110 AND 4‐2‐115, SUBSECTIONS 4‐4‐080.F.10.d, 4‐4‐090.A, AND 4‐4‐090.B, SECTION 4‐7‐090, SUBSECTIONS 4‐9‐065.A, 4‐9‐065.B, 4‐5‐065.D, 4‐9‐200.B, AND 4‐9‐200.D, AND SECTION 4‐11‐030 OF THE RENTON MUNICIPAL CODE, ADDING COTTAGE HOUSE DEVELOPMENT REGULATIONS, INCLUDING ADDING A DEFINITION OF “COTTAGE HOUSE DEVELOPMENT” TO SECTION 4‐11‐030, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, the Planning Commission held a public hearing on February 17, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; and WHEREAS, pursuant to RCW 36.70A.106, on April 27, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. Section 4‐2‐110 of the Renton Municipal Code is amended to add a new subsection 4‐2‐110.G, to read as shown below. All other provisions in 4‐2‐110 remain in effect and unchanged. 4‐2‐110.G DEVELOPMENT STANDARDS FOR RESIDENTIAL DEVELOPMENT (COTTAGE HOUSE DEVELOPMENT): AGENDA ITEM # 9. d) ORDINANCE NO. ________ 2 1. Purpose: The provisions of this subsection are available as alternatives to the development of typical detached single‐family homes with the intention of generating housing types that are responsive to changing household demographics and homeownership opportunities in single‐family neighborhoods. 2. Applicability: This subsection applies to proposed cottage house developments in residential zones R‐4, R‐6, R‐8, R‐10, and R‐14. An existing single‐family home incorporated into a cottage house development that does not meet the requirements of this subsection is allowed to remain onsite. Proposed modifications or additions to the structure not consistent with the provisions of this subsection shall not be permitted. 3. Limitations: No more than one hundred (100) cottage houses shall be permitted citywide in a calendar year. 4. DEVELOPMENT REGULATIONS: Maximum Unit Size 1,500 sq. ft. At least 50% of all cottages in a development shall be less than 1,000 sq. ft. Minimum Number of Cottages per Cluster 3 Maximum Number of Cottages per Cluster 12 Minimum Distance Between Structures All units must be detached, with a minimum separation of 8 ft. Maximum Wall Plate Height 18 ft. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 3 Roofs with a pitch equal to or greater than 4:12 may project an additional 6’ vertically from the maximum wall plate height. Maximum Number of Stories 2 Separation Between Clusters Individual clusters shall be separated by landscaping, common open space, critical areas, or a community building. SECTION III. Subsection 4‐2‐115.B of the Renton Municipal Code is amended as follows: B. APPLICABILITY: 1. This Section shall apply to all new primary and attached dwelling units in the following zones: Resource Conservation (RC), Residential‐1 (R‐1), Residential‐4 (R‐4), Residential‐6 (R‐6), Residential‐8 (R‐8), Residential‐10 (R‐10), and Residential‐14 (R‐14), and unit lot subdivisions within the RMF and CV zones. The standards of the Site Design subsection are required to be addressed at the time of subdivision application. The standards of the Residential Design subsection are required to be addressed at the time of application for building permits. The standards of Residential Design are required to be addressed for the building for which the building permit is being issued. 2. Additions and/or expansions to detached or attached dwellings that are valued at fifty thousand dollars ($50,000.00) or more, or at fifty percent (50%) or greater of the most recent assessment or appraisal shall require that the entire dwelling or structure comply with the standards of the Residential Design subsection. 3. When new dwelling units are created in the Residential Ten Dwelling Units per Acre (R‐10) and Residential Fourteen Dwelling Units per Acre (R‐14) AGENDA ITEM # 9. d) ORDINANCE NO. ________ 4 zones, any retained dwelling units included in the development shall comply with the standards of this Section. 4. For cottage house developments in the R‐4, R‐6, R‐8, R‐10, and R‐14 zones, the project is required to demonstrate compliance with the applicable Residential Design and Open Space Standards at the time of subdivision application. When there is an existing dwelling on the parent site that is proposed to remain in the cottage development, it shall be required to comply with the standards of this Section. SECTION IV. Section 4‐2‐115 of the Renton Municipal Code is amended to add a new subsection 4‐2‐115.F, to read as follows: F. COTTAGE HOUSE REQUIREMENTS: 1. Site Design: UNIT LOT CONFIGURATION: The parent site and unit lot configuration should be designed to encourage neighbor‐to‐neighbor interaction, community building, and balance the need for privacy. Guidelines: Developments shall create pedestrian oriented environments and amplify the mutual relationship between housing units, open space, and pedestrian amenities, while also protecting the privacy of individuals. Standards: All zones Unit lots should be oriented toward common open space area or community building; when not achievable, unit lots should be oriented toward a right‐of‐way. PARKING AND GARAGES: The minimization of the visual impact of parking and garages contributes to creating communities that are oriented to people and pedestrians, as opposed to automobiles. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 5 Guidelines: The visual impact of parking areas and garages shall be minimized. All forms of parking shall be located in a manner that minimizes the presence of the parking area and associated structures and shall not be located at the end of view corridors unless appropriately screened. When possible, alley access is encouraged. All zones All of the following apply: 1. Parking shall be provided in designated areas within the parent site but not at individual unit lots; 2. Shared garages on the parent site are allowed, provided the regulations of RMC 4‐4‐080 are met; 3. Parking structures, i.e., garages and carports, shall be detached and set back from the private yard space by at least six feet (6’); 4. Shared garages and carports shall not exceed forty‐four feet (44’) in width, and shall maintain an eight‐foot (8’) separation from any cottages; 5. Parking design shall be of similar design and character to the cottages. Carports are permitted when a solar panel is incorporated into the design; 6. Architectural detail that is consistent with the architectural character of the cottage house development shall be incorporated in the garage design, including but not limited to trim, columns, and/or corner boards. 7. Shared garages shall not be located further than one hundred sixty feet (160’) from any of the housing units to which it is assigned; 8. When shared garages are proposed, each unit must have garage space assigned to it; 9. Surface parking of more than two (2) spaces, visible from a public right‐of‐ way (not including alleys) or adjacent to single‐family uses or zones, shall be screened; and 10. Parking structures and surface parking shall not be located between the common open space and the cottage units. 2. Open Space: OPEN SPACE: Open space is a significant element in the design and livability of a cottage house development and should create opportunities for social interaction, community building, good physical health, and personal reflection. Common open areas and semi‐private space are favored and prioritized over purely private space. Landscaping: AGENDA ITEM # 9. d) ORDINANCE NO. ________ 6 All zones See RMC 4‐4‐070, Landscaping. Individual unit lots are exempt from RMC 4‐4‐070.F.3, Front Yard Trees Required When Street Trees Are Not Located Within the Right‐of‐Way Abutting a Front Yard. Standards for Common Open Space: All zones Above ground drainage facilities (i.e., ponds, swales, ditches, rain gardens, etc.) shall not be counted towards the common open space requirement. Required to provide common open space as follows: 1. Open space shall be designed as a common green located within the development and shall include picnic areas, and spaces for passive recreational activities such as outdoor cooking, picnicking, walking, biking, observing nature, and/or active recreational activities, such as playgrounds, bocce ball, and pickle ball; 2. Open space(s) shall be accessible to all cottages. For sites one acre or smaller in size, open space(s) shall be no less than thirty feet (30') in any dimension. For sites larger than one acre in size, open space(s) shall be no less than forty feet (40') in any dimension. For all sites, to allow for variation, open space(s) of less than the minimum dimensions (thirty feet (30') or forty feet (40'), as applicable) are allowed; provided, that no dimension is less than eight feet (8’) in width and when all open spaces are averaged, the applicable dimension requirement is met; 3. Grass‐crete or other pervious surfaces may be used in the common open space for the purpose of meeting the one hundred fifty feet (150') distance requirement for emergency vehicle access but shall not be used for personal vehicle access or to meet off‐street parking requirements; and 4. Common open space areas shall have a maximum slope of five percent (5%); and 5. Obstructions, such as retaining walls and fences, shall be strategically placed so as not to reduce usable open space. Standards for Private Yards: All zones Each individual cottage shall have a private yard that is at minimum two hundred fifty (250) square feet in size with no dimension less than eight feet (8’) in width. Front yard porches and backyard patios and reciprocal use easements may be included in the calculation of private yard. Community Buildings: AGENDA ITEM # 9. d) ORDINANCE NO. ________ 7 All zones Developments with twenty‐four (24) or more cottages are required to provide at least one community building for indoor gatherings. Design elements, such as roof pitch, architecture, materials, and colors, shall be similar to that of the cottages within the development. Sidewalks and Pedestrian Easements: All Zones All of the following are required: 1. Sidewalks shall be provided throughout the cottage house development. The sidewalk may disconnect from the road, provided it continues in a logical route throughout the development. 2. Front yards shall have entry walks that are a minimum width of four feet (4’); and 3. Sidewalks shall be used to connect common open space, common buildings, and to provide access to cottages. They shall be a minimum of four feet (4’) in width and made of concrete, or porous material such as: porous paving stones, crushed gravel with soil stabilizers, or paving blocks with planted joints. When possible, sidewalks connecting to parks and green spaces shall be located at the edge of the common open space to allow a larger usable green and easy access to cottages. 3. Residential Design: PRIMARY ENTRY: Cottages with a visually prominent front entry, including architectural character and landscape design, foster the sense that the community is oriented to pedestrians. Features like porches and stoops at the front entry provide opportunity for social interaction and can contribute to a sense of place for residents. Additionally, porches work to minimize the appearance of bulk by breaking up the facade. Guidelines: Entrances to cottages shall be a focal point and allow space for social interaction. Front doors shall face the common open area or a street and be on the facade closest to the street. Standards: All zones All of the following are required: 1. The primary front entry should be abutting and oriented toward a common open space; when not achievable, the cottage shall have a primary entry and covered porch oriented toward a right‐of‐way; 2. The entry shall include a porch or stoop with a minimum depth of five feet (5') and minimum height twelve inches (12") above grade; and AGENDA ITEM # 9. d) ORDINANCE NO. ________ 8 3. Unit lots should be oriented toward common open space area; when not achievable, unit lots should be oriented toward a right‐of‐way. FACADE MODULATION: The modulation of facades creates an appearance of variety, as well as visual breaks that help to create visual interest. Guidelines: Buildings shall not have monotonous facades along public areas. Cottages shall include articulation along public frontages; the articulation may include the connection of an open porch to the building, a dormer facing the street, or a well‐defined entry element. All zones Both of the following are required: 1. The primary building elevation oriented toward common open space or right‐of‐way shall have at least one articulation or change in plane of at least two feet (2') in depth; and 2. A minimum of one side articulation that measures at least one foot (1') in depth shall occur for all facades facing streets or common open spaces. WINDOWS AND DOORS: Windows and front doors are an integral part of the architectural character of a cottage and when they incorporate architectural elements of the cottage and they contribute to the overall balance and integration of the building form. Additionally, when they represent a significant amount of the facade of a cottage, they amplify the sense that the community is oriented to people. Guidelines: Windows and front doors shall serve as an integral part of cottage character. Primary windows shall be proportioned vertically rather than horizontally. Vertical windows may be combined to create a larger window area. Front doors shall be a focal point of the cottage and be in scale with the home. All doors shall be of the same character as the home. Standards: All zones All of the following are required: 1. Primary windows shall be proportioned vertically, rather than horizontally; 2. Vertical windows may be combined to create a larger window area; 3. All doors shall be made of wood, fiberglass, metal, or glass and trimmed with three and one‐half inches (3 1/2”) minimum head and jamb trim around the door; 4. Screen doors shall be allowed in combination with any door type listed above are above; 5. Primary entry doors shall face a common open area or street, and shall be paneled or have inset windows; and 6. Sliding glass doors shall not be permitted along a frontage elevation or an elevation facing a pedestrian easement. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 9 SCALE, BULK, AND CHARACTER: Residential communities are intended for people and cottages that have appropriate scale and bulk contribute to the sense of orientation to people. Variety in the character of cottages helps to minimize visual monotony while helping to foster a perception of uniqueness of place. Guidelines: A diverse yet complementary streetscape shall be provided by using elevations and models that demonstrate a variety of floor plans, home sizes, and character. All zones All of the following are required: 1. The primary building form shall be the dominating form and elements such as porches, principal dormers, or other significant features shall not dominate; 2. Primary porch plate heights shall be one story. Stacked porches are allowed; and 3. To differentiate the same models and elevations, different colors shall be used; and 4. No more than two (2) of the same model and elevation shall be built within the same cluster and the same model and elevation shall not be abutting, adjacent, or diagonal. ROOFS: Roof forms and profiles are an important component in the architectural character of cottages and contribute to the massing, scale, and proportion of the home. Roofs also provide opportunity to create variety, especially for cottages of the same model. Guidelines: Roofs shall represent a variety of forms and profiles that add character and relief to the landscape of the neighborhood. The use of bright colors, as well as roofing that is made of material like gravel and/or a reflective material, is discouraged. Standards: All zones Both of the following are required: 1. A variety of roofing colors shall be used within the development and all roof material shall be fire retardant; and 2. Cottage developments shall use a variety of roof forms appropriate to the style of the home. EAVES: The design of eaves and overhangs act as unifying elements in the architectural character of a home. When sized adequately and used consistently, they work to create desirable shadows that help to create visual interest especially from blank, unbroken wall planes. Guidelines: Eaves should be detailed and proportioned to complement the architectural style of the home. Standards: All zones Both of the following are required: 1. Eaves shall be at least twelve inches (12") with horizontal fascia or fascia gutter at least five inches (5") deep on the face of all eaves. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 10 2. Rakes on gable ends must extend a minimum of two inches (2") from the surface of exterior siding materials. ARCHITECTURAL DETAILING: Architectural detailing contributes to the visual appeal of a cottage and the community. It helps to create a desirable human scale and a perception of a quality, well‐designed home. Guidelines: Architectural detail shall be provided that is appropriate to the architectural character of the house, including but not limited to detailing like trim, columns, and/or corner boards. Standards: All zones All of the following are required: 1. Three and one‐half inches (3 1/2") minimum trim surrounds all windows and details all doors; 2. At least one of the following architectural details shall be provided on each home: shutters, knee braces, flower boxes, or columns; 3. Where siding is used, metal corner clips or corner boards shall be used and shall be at minimum two and one‐half inches (2 1/2") in width and painted. If shutters are used, they shall be proportioned to the window size to simulate the ability to cover them; 4. If columns are used, they shall be round, fluted, or strongly related to the home's architectural style. Six inches by six inches (6" x 6") posts may be allowed if chamfered and/or banded. Exposed four inches by four inches (4" x 4") and six inches by six inches (6" x 6") posts are prohibited; and 5. If one siding material is used on any side of the cottage that is at least two (2) stories, a horizontal band that measures at least eight inches (8") is required between the first and second story. MATERIALS AND COLOR: The use of a variety of materials and color contributes to the sense of diversity of housing stock in the cottage community. Guidelines: A diversity of materials and color shall be used throughout the community. A variety of materials that are appropriate to the architectural character of the neighborhood shall be used. A diverse palette of colors shall be used to reduce monotony of color or tone. All zones All of the following are required: 1. Acceptable exterior wall materials are: wood, cement fiberboard, stucco, stone, and standard sized brick three and one‐half inches by seven and one‐half inches (3 1/2" x 7 1/2") or three and five‐eighths inches by seven and five‐eighths inches (3 5/8" x 7 5/8"). Simulated stone, wood, stone, or brick may be used to detail cottages; 2. When more than one material is used, changes in a vertical wall, such as from wood to brick, shall wrap the corners no less than twenty‐four inches (24"). The material change shall occur at an internal corner or a logical AGENDA ITEM # 9. d) ORDINANCE NO. ________ 11 transition such as aligning with a window edge or chimney. Material transition shall not occur at an exterior corner; 3. Multiple colors on buildings shall be provided. Color palettes for all new structures, coded to the home elevations, shall be submitted for approval; 4. Abutting, adjacent, and diagonal cottages shall be of differing color. Color palettes for all new cottages, coded to the home elevations, shall be submitted for approval; and 5. Gutters and downspouts shall be integrated into the color scheme of the home and be painted, or of an integral color, to match the trim color. MAIL AND NEWSPAPERS: Guidelines: Mailboxes shall be located so that they are easily accessible to residents. They shall also be architecturally compatible with the cottages. All zones All of the following are required: 1. Mailboxes shall be clustered and located so as to serve the needs of USPS while not adversely affecting the privacy of residents; 2. Mailboxes shall be lockable consistent with USPS standards; and 3. Mailboxes shall be architecturally enhanced with materials and details typical of the home's architecture. MECHANICAL EQUIPMENT: Guidelines: Mechanical equipment shall be placed so as to not negatively impact neighbors. All zones Mechanical equipment shall only be located in the rear and side yards. UTILITIES All zones All surface and roof‐top equipment shall be screened or enclosed from public view. DUMPSTER/TRASH/RECYCLING COLLECTION AREA: All zones Both of the following are required: 1. Trash and recycling containers shall be located so that they have minimal impact on residents and their neighbors and so that they are not visible to the general public; and 2. A screened enclosure in which to keep containers shall be provided or garages shall be built with adequate space to keep containers. Screened enclosures shall not be located within front yards. In addition, see RMC 4‐4‐ 090, Refuse and Recyclables Standards, for additional requirements. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 12 SECTION V: Residential Uses Outside of Center Downtown Zone in subsection 4‐4‐ 080.F.10.d of the Renton Municipal Code is amended to add a new row entitled "Cottage House Developments” in between the rows entitled “Detached dwellings and townhouses” and “Manufactured homes within a manufactured home park,” to read as shown in the excerpt of 4‐ 4‐080.F.10.d, below. All other provisions in 4‐4‐080.F.10.d remain in effect and unchanged. USE NUMBER OF REQUIRED SPACES RESIDENTIAL USES OUTSIDE OF CENTER DOWNTOWN ZONE Cottage House Developments: A minimum and maximum of 1.6 per cottage house of 3 bedrooms or greater; 1.4 per 2‐bedroom cottage house; 1.0 per 1 bedroom cottage house or studio. In addition to the minimum parking stalls required, a minimum 20% of the total number of required parking spaces in the cottage house development shall be provided for guest parking and located in a common area accessible by guests. SECTION VI. Subsections 4‐4‐090.A and 4‐4‐090.B of the Renton Municipal Code are amended as shown below. All other provisions in 4‐4‐090 remain in effect and unchanged. A. APPLICABILITY: All new developments for cottage housing, multi‐family residences, commercial, industrial, and other nonresidential uses shall provide on‐site refuse and recyclables deposit areas and collection points for collection of refuse and recyclables in compliance with this Section. B. EXEMPTION FOR SINGLE FAMILY AND TWO (2) ATTACHED RESIDENCES (DUPLEXES): Single‐family and two (2) attached residences (duplexes) shall be exempt from these requirements for refuse and recyclables deposit areas. Single‐family AGENDA ITEM # 9. d) ORDINANCE NO. ________ 13 residences that comprise a cottage house development do not qualify for the exemption. SECTION VII. Section 4‐7‐090 of the Renton Municipal Code is amended as follows: RMC 4‐7‐090 UNIT LOT SUBDIVISIONS: A. PURPOSE: This Section is intended to allow the creation of unit lots for townhouse and cottage house development through established subdivision procedures while generally only applying development standards to the parent site as a whole rather than to individual unit lots, as discussed in subsection E of this Section, Exceptions. B. APPLICABILITY: The provisions of this Section shall only apply to subdivisions in the R‐10, R‐14, RMF, and CV zones in the following cases: 1. New Townhouse Development: Subdivisions in the R‐10, R‐14, RMF, and CV Zones intended for the purpose of new townhouse development. 2. Existing Townhouse Development: Subdivisions in the R‐10, R‐14, RMF, and CV Zones when the existing townhouse developments have received a Certificate of Occupancy before October 17, 2016. 3. Cottage House Developments: Subdivisions in the R‐4, R‐6, R‐8, R‐10, and R‐14 Zones intended for the purpose of new single‐family development, including existing single‐family dwellings when integrated into proposed cottage house developments. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 14 C. PRINCIPLES OF ACCEPTABILITY: 1. Parent Site: The whole parent site shall comply with all development standards as though it were a stand alone lot. 2. Access: The parent site shall have direct vehicular access to a public street. Each unit lot shall have direct vehicular access to either a public or private roadway (see RMC 4‐6‐060.K, Unit Lot Drives). 3. Physical Characteristics: A proposed subdivision may be denied because of the presence of flood, inundation, wetland conditions, steep slopes, unstable soils, mineshafts, or other unsuitable site characteristics. Construction of protective improvements may be required as a condition of approval, and such improvements shall be noted on the final plat. 4. Drainage: Make adequate provision for drainage ways, streets, alleys, other public ways, water supplies and sanitary wastes. D. SCOPE AND PROCESS: 1. Short Subdivision: Unit lot subdivisions of nine (9) or fewer unit lots shall be processed as short subdivisions, and subject to all provisions of RMC 4‐7‐070, Detailed Procedures for Short Subdivisions, unless otherwise specified by this Section. 2. Subdivision: Unit lot subdivisions of ten (10) or more unit lots shall be processed as subdivisions, and subject to all provisions of RMC 4‐7‐080, Detailed Procedures for Subdivision, unless otherwise specified by this Section. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 15 3. Site Plan Review: Unit lot subdivisions shall be subject to RMC 4‐9‐200, Master Plan and Site Plan Review; however, RMC 4‐9‐200.C.2.b, SEPA Exempt Development, shall not apply. E. EXCEPTIONS: 1. Residential Development Standards: Individual unit lots created for townhouses and cottage house developments are exempt from the following standards of RMC 4‐2‐110.A, Development Standards for Residential Zoning Designations (Primary and Attached Accessory Structures): maximum net density, minimum lot size, minimum lot width, minimum lot depth, yard setbacks, maximum building coverage, and maximum impervious surface area. Individual unit lots created for cottage house development are subject to the provisions of RMC 4‐2‐110.G, Development Standards for Residential Development (Cottage House Development). 2. Landscaping: a. Townhouse Development: Individual unit lots are exempt from the following subsections of Section 4‐4‐070, Landscaping: i.a. RMC 4‐4‐070.F.1, Street Frontage Landscaping Required; ii.b. RMC 4‐4‐070.F.2, Street Trees and Landscaping Required Within the Right‐of‐Way on Public Streets; and iii.c. RMC 4‐4‐070.F.3, Front Yard Trees Required When Street Trees Are Not Located Within the Right‐of‐Way Abutting a Front Yard. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 16 b. Cottage House Development: Individual unit lots are exempt from the RMC 4‐4‐070.F.3, Front Yard Trees Required When Street Trees Are Not Located Within the Right‐of‐Way Abutting a Front Yard. 3. Parking: a. Townhouse Development: The number of parking spaces required for attached dwellings pursuant to RMC 4‐4‐080.F.10.d, Parking Spaces Required Based on Land Use, may be averaged and dispersed among unit lots or within the parent site; however, at least one parking space shall be provided within each unit lot. b. Cottage House Development: The number of parking spaces required for cottage house development pursuant to RMC 4‐4‐080.F.10.d, Parking Spaces Required Based on Land Use, may be averaged and dispersed within the parent site, provided that at least one parking space is provided for each unit lot. 4. Access: a. Townhouse Development: Primary access for individual unit lots may be from a public alley. b. Cottage House Development: Vehicle access is only required for the parent site and not individual unit lots. 5. Existing Nonconforming Townhouse Developments: Legally established existing townhouse and single‐family housing intended for cottage house developments that are nonconforming with respect to development standards (e.g., maximum net density) shall be considered conforming for the AGENDA ITEM # 9. d) ORDINANCE NO. ________ 17 purpose of this Section and may be subdivided pursuant to this Section; provided, that as conditions of a unit lot subdivision approval the City may require that any nonconforming development standard be brought into compliance to the extent feasible, as determined by the Administrator. F. UNIT LOT SUBDIVISION REQUIREMENTS: 1. Unit Lots: Parent sites developed or proposed to be developed with attached townhouse dwellings or cottage houses may be subdivided into unit lots and the remainder of the parent site shall be platted as one or more tracts. The whole parent site shall meet applicable development standards. Any private open space or private amenities for a dwelling unit shall be provided on the same unit lot as the dwelling unit. 2. Siting of Unit Lots: Unit lot subdivisions that propose to incorporate one or more unit lot drives (refer to RMC 4‐6‐060K, Unit Lot Drives) shall site unit lots as follows: a. For unit lot drives serving six (6) unit lots or less: At least one unit lot shall be situated towards a public street with nothing other than open space between the public right‐of‐way and the unit lot. b. For unit lot drives serving seven (7) unit lots or more: At least two (2) unit lots shall be situated towards a public street with nothing other than open space between the public right‐of‐way and the unit lots. 3. Parent Site: Prior to a unit lot subdivision or any subsequent platting actions, additions or modifications to the structure(s), the applicant shall AGENDA ITEM # 9. d) ORDINANCE NO. ________ 18 demonstrate that the whole parent site will comply with applicable standards and requirements of this Title (i.e., the parent site shall be reviewed as though it is a single lot without any unit lots or tracts within). For example, building coverage of the parent site shall include all qualifying structures within the development, including those located or proposed to be located upon individual unit lots. Portions of the parent site not subdivided for individual unit lots shall be platted as a tract and owned in common by the owners of the individual unit lots, or by a homeowners’ association comprised of the owners of the individual unit lots. 4. Density: The density of the parent site shall not exceed the maximum net density of the zone. Only one dwelling unit shall be located on a unit lot. 5. Design and Open Space Standards: a. Townhouse Development: RMC 4‐2‐115, Residential Design and Open Space Standards, as applied to the R‐10 and R‐14 zones shall apply to unit lot subdivisions within the RMF and CV zones. Unit lot subdivisions within the RMF and CV zones shall be exempt from RMC 4‐3‐100, Urban Design Regulations. b. Cottage House Development: See RMC 4‐2‐115, Residential Design and Open Space Standards. 6. Homeowners’ Association and Covenants: a. Covenants and Homeowners’ Association: Prior to the recording of the plat, the applicant shall provide final covenants, declarations and restrictions in a form satisfactory to the City Attorney, and shall record the document with the King County Recorder. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 19 b. Maintenance of Common Facilities: All common open space and facilities, private utility infrastructure, exterior building facades and roofs, and other physical improvements to the land, as determined by the Administrator, shall be maintained in perpetuity by the homeowners’ association, unless otherwise agreed to by the City. The covenants, declarations and restrictions shall provide authority for the City, after providing reasonable written notice to the homeowners’ association and opportunity to perform required maintenance, to recover any costs incurred by the City to maintain private infrastructure or common areas due to a failure of the homeowners’ association to adequately maintain privately owned improvements. In order to ensure that the City can recover its costs for performing required maintenance, the City may file a lien against the property or accept other appropriate security approved by the City. 7. Timing: Site development and building construction may commence upon approval of a site plan and issuance of a building permit(s) for such construction and prior to final subdivision approval and recording if all applicable permits and approvals have been obtained by the applicant. However, no dwelling unit or unit lot may be sold, transferred, occupied or conveyed prior to final subdivision approval and recording. 8. Recorded Plat: Notes shall be placed on the plat recorded with the King County Recorder to acknowledge the following: a. The title of the plat shall include the phrase “Unit Lot Subdivision”; AGENDA ITEM # 9. d) ORDINANCE NO. ________ 20 b. Subsequent platting actions, additions or modifications to the structure(s) may not create or increase any nonconformity of the parent site as a whole; and c. The individual unit lots are not separate building sites and additional development of the individual unit lots may be limited as a result of the application of development standards to the parent site. SECTION VIII. Subsections 4‐9‐065.A and 4‐9‐065.B of the Renton Municipal Code are amended as shown below. All other provisions in 4‐9‐065 remain in effect and unchanged, except as provided in SECTION IX of this ordinance. A. PURPOSE: The purpose of this Section is to offer increased residential density for developments that construct affordable dwelling units, or assisted living facilities, or cottage housing. Density bonuses are offered to meet the intent of the Comprehensive Plan policies, including but not limited to goals and policies of the land use element, and housing and human services element, as well as the purpose and intent of the zoning districts. It is expected that all density bonuses will be achieved with no variances. B. APPLICABILITY: Density bonuses are possible for applicants requesting bonus market‐rate dwelling units in exchange for the construction of affordable dwelling units. Bonus density is also offered for assisted living facilities where the use is allowed pursuant to chapter 4‐2 RMC. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 21 Density bonuses shall be considered when any of the following are proposed: 1. Bonus market‐rate dwelling units in exchange for the construction of affordable dwelling units. 2. Assisted living facilities where the use is allowed pursuant to chapter 4‐2 RMC. 3. Cottage house developments. SECTION IX. Subsection 4‐9‐065.D of the Renton Municipal Code is amended to add a new subsection 4‐9‐065.D.3 to read as shown below. Further, the currently codified subsection 4‐9‐065.D.3 shall be renumbered to 4‐9‐065.D.4 and amended as shown below. All other provisions in 4‐9‐065.D remain in effect and unchanged. 3. Cottage House Developments: Bonus market‐rate dwellings may be granted at a rate of two and one‐half (2.5) times the maximum density that could be achieved in a standard subdivision based on the development standards of the underlying residential zone. The applicant shall submit a pro forma subdivision plan for the proposed property showing the number of conventional lots that would be permitted by the underlying zone. This pro forma subdivision plan will be used to determine the maximum number unit lots allowed, by multiplying the number of lots in the pro forma subdivision plan by two and one‐half (2.5). 3. 4. Maximum Bonus Units: The following table provides the maximum density that may be granted in applicable zones for conformance with either the affordable housing, or assisted living facility, or cottage housing provisions: AGENDA ITEM # 9. d) ORDINANCE NO. ________ 22 a. Affordable Housing Subject Zones Maximum Density CD, UC, CV, CO, COR, R‐ 14, and RMF 30% above maximum density or density allowed via conditional use permit b. Assisted Living Facilities Subject Zones Maximum Density RMF, CV, CD, CO, COR, and UC 50% above maximum density R‐1, R‐10, and R‐14 Up to 18 dwelling units per net acre c. Cottage House Developments Cottage House Developments may be granted a bonus density of 2.5 the number of lots identified in the pro forma subdivision plan for the following zoning districts: R‐4, R‐6, R‐8, R‐10, and R‐14. SECTION X. Subsections 4‐9‐200.B and 4‐9‐200.D of the Renton Municipal Code are amended as shown below. All other provisions in 4‐9‐200 remain in effect and unchanged. B. APPLICABILITY AND AUTHORITY: 1. Master Plan Review: Master plan review is required for CA zoned sites two and one‐half (2.5) acres or greater in area upon which residential mixed‐use development is proposed, and master plan review is required for all phased development projects regardless of zone. When existing parcels are twenty‐five (25) acres or smaller, a master plan incorporating all abutting lots in common ownership as of December 1, 2003, is required. 2. Site Plan Review: AGENDA ITEM # 9. d) ORDINANCE NO. ________ 23 a. When Required: Site plan review is required for all development in the IL, CO, CN, CD, CA, CV, COR, UC‐1, UC‐2, R‐10, RMH, RM, and R‐14 Zones, all development within the Employment Area (EA) designation, and for the following types of development, regardless of zone: i. K‐12 educational institutions. ii. Parks. iii. Outdoor recreation facilities. iv. Rental services with outdoor storage. v. Hazardous Waste Facilities: All hazardous waste treatment and storage facilities. vi. Medical institutions, assisted living, and convalescent care facilities. vii. Cottage house developments. b. Optional: When specifically authorized by the development standards, site plan review may be used as a means to propose modifications to development standards for developments otherwise exempt from site plan review. 3. Authority: The Community and Economic Development Administrator shall have the authority to approve, approve with conditions, or deny proposals based on this Section when no other permit or approval requires Hearing Examiner review. D. CRITERIA TO DETERMINE IF PUBLIC HEARING IS REQUIRED: AGENDA ITEM # 9. d) ORDINANCE NO. ________ 24 A public hearing before the Hearing Examiner shall be required in the following cases: 1. All master plans except those covered by a planned action ordinance that included a public hearing that was determined by the Community and Economic Development Administrator to have provided the public and decision‐ makers with sufficient detail regarding the project’s scale, design, bulk and uses. Where a master plan is approved, subsequent site plans submitted for future phases may be submitted and approved administratively without a public hearing. 2. Site Plan Review: a. Significant Environmental Concerns Remain: The Environmental Review Committee determines, based on departmental comments or public input, that there are significant unresolved concerns raised by the proposal; or b. Large Project Scale: The proposed project is more than: i. One hundred (100) attached residential units; ii. One hundred thousand (100,000) square feet of gross floor area (nonresidential) in the IL or CO Zones or other zones in the Employment Area (EA) land use designation; iii. Twenty‐five thousand (25,000) square feet of gross floor area (nonresidential) in the CN, CD, CA, CV, or CO Zones outside the Employment Area (EA) land use designation; iv. Four (4) stories or sixty feet (60') in height; v. Three hundred (300) parking stalls; or AGENDA ITEM # 9. d) ORDINANCE NO. ________ 25 vi. Ten (10) acres in size of project area. c. All commercial or industrial projects adjacent to or abutting residentially zoned property, unless the Administrator determines that the presence of critical areas or other limiting factors on the residential property make development unlikely or unfeasible. SECTION XI. Section 4‐11‐030 of the Renton Municipal Code is amended to add a definition of “Cottage House Development,” in alphabetical order, to read as shown below. All other definitions in 4‐11‐030 remain in effect and unchanged. COTTAGE HOUSE DEVELOPMENT: A unit‐lot subdivision consisting of at least three (3) unit lots containing small scale (no more than 1,500 gross square foot) detached, single‐family dwelling units clustered around a shared common open space. SECTION XII. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION XIII. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. AGENDA ITEM # 9. d) ORDINANCE NO. ________ 26 PASSED BY THE CITY COUNCIL this _______ day of ___________________, 202____. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _____________________, 202____. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2181:11/5/21 AGENDA ITEM # 9. d) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SUBSECTIONS 4‐1‐190.G.4 AND 4‐1‐190.G.6 OF THE RENTON MUNICIPAL CODE, REVISING COLLECTION OF IMPACT FEES REGULATIONS, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the purpose of impact fees is to have new growth pay a proportional amount of the impact it has on the City in regards to transportation, parks, fire and emergency services, and schools; and WHEREAS, the impact fee code section allows for a credit to new users of vacant buildings upon which previous impact fees have been paid; and WHEREAS, at some point in time the use of a vacant building effectively becomes a new use for which no credit should be provided; and WHEREAS, in 2019 the City adopted a tiered approach to the credit for when the credit would expire; and WHEREAS, implementation and tracking the tiered approach was difficult; and WHEREAS, a simplified straightforward approach will facilitate improved implementation; and WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, pursuant to RCW 36.70A.106, on May 3, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; and AGENDA ITEM # 9. e) ORDINANCE NO. ________ 2 WHEREAS, the Planning Commission held a public hearing on May 19, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. Subsections 4‐1‐190.G.4 and 4‐1‐190.G.6 of the Renton Municipal Code are amended as shown below. All other provisions in 4‐1‐190.G remain in effect and unchanged. G. COLLECTION OF IMPACT FEES: 1. Transportation, Parks, and Fire Impact Fees: a. Applicability: The City shall collect impact fees, based on the rates in the Fee Schedule, from any applicant seeking development approval from the City for any development activity within the City, when such development activity requires the issuance of a building permit or a permit for a change in use, and creates a demand for additional public facilities. b. Transportation and Parks Basis and Amount: Maximum allowable impact fees for transportation and parks are established by the applicable Rate Study. The rates to be charged by the City are listed in the Fee Schedule. c. Fire Impact Fee Basis and Amount: The maximum allowable fees shall be based on the fire capital facilities plan and the rate study developed by the RRFA, approved by its Board, and adopted by the City as part of the capital AGENDA ITEM # 9. e) ORDINANCE NO. ________ 3 facilities element of the City’s Comprehensive Plan and as a fire impact fee Rate Study. The rates to be charged are listed in the Fee Schedule. 2. School Impact Fees: a. Applicability: The City shall collect impact fees, based on the rates in the Fee Schedule, from all applicants seeking development approval from the City for any residential development activity in that portion of the City located within each respective school district’s boundaries. b. Basis and Amount: The maximum allowable fees shall be based on a school capital facilities plan developed by the appropriate school district and approved by the School Board, and adopted by reference by the City as part of the capital facilities element of the City’s Comprehensive Plan. The rates to be charged are listed in the Fee Schedule. c. Adjustment by Council: The Council may adjust the fees, as it sees fit, to take into account local conditions such as, but not limited to, price differentials throughout each respective school district in the cost of new housing, school occupancy levels, and the percent of each school district’s capital facilities budget, which will be expended locally. d. Classification by Dwelling Type: Separate fees shall be calculated for single family and multi‐family dwellings, and separate student generation rates must be determined by each school district for each type of dwelling. For purposes of this Section, mobile homes shall be treated as single family dwellings; duplexes and accessory dwelling units shall be treated as multi‐family dwellings. AGENDA ITEM # 9. e) ORDINANCE NO. ________ 4 e. Credit for Tax Contributions: The formula in Attachment A to Ordinance 4808 provides a credit for the anticipated tax contributions that would be made by the development based on historical levels of voter support for bond issues in a school district. 3. Changes in Use or Tenancy: When an impact fee applies to a change of use permit, the impact fee shall be the applicable impact fee for the land use category of the new use, less any impact fee previously paid for the land use category of the prior use. If the prior use paid impact fees based on an Independent Fee Calculation that was approved by the City, the new use shall pay based on the new land use category, less the impact fee paid by the prior use identified in the Independent Fee Calculation. For purposes of this provision, a change of use should be reviewed based on the land use category provided in the Rate Study that best captures the broader use of the property under development. Changes in use or tenancy, if consistent with the general character of the building or building aggregations (i.e., “industrial park,” or “specialty retail”) should not be considered a change in use that is subject to an impact fee. Further, minor changes in tenancies that are consistent with the general character of the included structure, building, or previous use should not be considered changes in use subject to an impact fee. If no impact fee was paid for the prior use, the impact fee for the new use shall be reduced by an amount equal to the current impact fee rate for the prior use. Vacant buildings shall be assessed as if in the most recent AGENDA ITEM # 9. e) ORDINANCE NO. ________ 5 legally established use as shown on a locally owned business license or development permit documents. 4. Vacant Structures or Buildings: There is not a limit on the number of years a single family dwelling unit is vacant to be eligible to use an impact fee deduction. After December 31, 2020, the following applies: a. When an existing structure or building or portion thereof has been vacant for less than two three (23) years and six (6) months, the impact fee shall be the applicable impact fee for the land use category of the new use, less any impact fee previously paid for the land use category of the prior use. i. If no impact fee was paid for the prior use, the impact fee for the new use shall be reduced by an amount equal to the current impact fee rate for the prior use. b. When an existing structure or building or portion thereof has been vacant for more than two (2) years and six (6) months, but less than five (5) years, the impact fee shall be the applicable impact fee of the new use, less fifty percent (50%) of the amount paid for the land use category of the prior use. i. If no impact fee was paid for the prior use, the impact fee for the new use shall be reduced by an amount equal to fifty percent (50%) of the current impact fee rate for the prior use. c. When an existing structure or building or portion thereof has been vacant for a period of five three (53) years or more, the impact fee shall be the applicable impact fee for the land use of the new category; there shall not be a AGENDA ITEM # 9. e) ORDINANCE NO. ________ 6 deduction of the impact fee that was or was not previously paid for the land use category of the prior use. 5. Mixed Use: For mixed use developments, impact fees shall be imposed for the proportionate share of each land use, based on the applicable measurement in the impact fee rates in the City of Renton Fee Schedule. 6. Timing of Assessment and Collection: Impact fees shall be determined and paid at the time the complete application for a building permit or a permit for a change in use is submitted using the impact fees then in effect. Impact fees shall be due and payable before at the time of issuance of a building permit or permit for a change of use is issued by the City. 7. Documentation of Credit Required: Feepayers allowed credits prior to the submittal of the complete building permit application or an application for a permit for a change of use shall submit, along with the complete application, a copy of the letter prepared by the Administrator, school district superintendent, or RRFA official setting forth the dollar amount of the credit allowed. Impact fees, as determined after the application of any credits, shall be collected from the feepayer no later than the time a building permit or permit for a change of use is issued. 8. Deferral for Subdivisions, Short Subdivisions, and Planned Unit Developments: An applicant for residential subdivision, short subdivision, or planned unit development may defer payment of impact fees for all of the dwelling units to be created in the development until the earlier of the time of AGENDA ITEM # 9. e) ORDINANCE NO. ________ 7 closing of the first sale of a single detached dwelling unit, condominium unit, or a multi‐family residential building or eighteen (18) months after the issuance of the original building permit, but only if before recording the subdivision or short subdivision, the applicant: a. Submits to the Administrator a signed and notarized deferred impact fee application and acknowledgement form, which includes the legal description, tax account number, and address of each individual in the development; b. Records at the applicant’s expense a covenant and lien that complies with the requirements of subsections G9bi through vii of this Section; and c. Pays the applicable nonrefundable administrative fee. 9. Deferral for Single Family, Condominium, and Multi‐Family Dwellings: A building permit applicant may defer payment of impact fees for a single detached dwelling unit, condominium unit, or all of the dwelling units in a multi‐ family residential building until the earlier of the time of closing of the first sale of a single detached dwelling unit, a condominium unit or a multi‐family residential building or eighteen (18) months after issuance of the original building permit, but only if before issuance of the building permit, the applicant: a. Submits to the Administrator a signed and notarized deferred impact fee application and acknowledgement form for each single detached dwelling unit, condominium unit or all of the dwelling units in a multi‐family residential building for which the applicant wishes to defer payment of the impact fees; and AGENDA ITEM # 9. e) ORDINANCE NO. ________ 8 b. Records at the applicant’s expense a covenant and lien in the amount of the deferred impact fee(s) and that includes the legal description, tax account number, and address of the property that: i. Requires payment of the impact fees to the City at the earlier of the time of closing of the first sale or eighteen (18) months after issuance of the original building permit; and ii. Provides that if the impact fees are paid through escrow at closing of sale, in the absence of an agreement between the buyer and the seller to the contrary, the impact fees shall be paid from the seller’s proceeds; and iii. Provides that the seller bears strict liability for the payment of the impact fees; and iv. Requires the seller or seller’s agent of property subject to the covenant and lien to provide written disclosure of the covenant and lien to a purchaser or prospective purchaser. Disclosure of the covenant must include the amount of impact fees payable and that the fees are to be paid to the City no later than the closing date; and v. Makes the applicant legally liable for payment of the impact fees if the fees are not paid by the earlier of the time of closing of the first sale or eighteen (18) months after the building permit has been issued; and vi. Is signed by all owners of the property as listed on a current title report, with all signatures acknowledged as required for a deed; and AGENDA ITEM # 9. e) ORDINANCE NO. ________ 9 vii. Is junior and subordinate to one mortgage for the purpose of construction upon the same real property granted by the person who applied for the deferral of impact fees. 10. Payment Methods: Payment of impact fees deferred under this subsection shall be made by cash, escrow company check, cashier’s check or certified check. 11. Lien Release: Upon receipt of payment of impact fees deferred under this subsection, the City shall execute a lien release for each single detached dwelling unit, condominium unit, or multi‐family residential building for which the impact fees have been received. The property owner at the time of the release shall be responsible for recording the lien release. 12. Foreclosure by City: If impact fees are not paid, in accordance with the provisions of this subsection, the City may institute foreclosure proceedings in accordance with chapter 61.12 RCW. 13. Foreclosure by a School District: If the City does not institute foreclosure proceedings for unpaid school impact fees within forty five (45) days after receiving notice from a school district requesting that it do so, the district may institute foreclosure proceedings with respect to unpaid impact fees. 14. Required Prior to Building Permit Issuance: The Department shall not issue the required building permit or the permit for the change of use until the impact fees have been paid or the signed and notarized deferred impact fee AGENDA ITEM # 9. e) ORDINANCE NO. ________ 10 application and acknowledgement form and deferral fee have been received and accepted by the City. 15. Number of Deferrals Limited: Each applicant for a single family building permit, in accordance with his or her contractor registration number or other unique identification number, is entitled to annually receive deferrals under this subsection for the first twenty (20) single family building permits issued by the City to that applicant. SECTION III. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION IV. Complete land use applications that have been submitted between December 1 and December 31, 2021, shall be permitted to claim impact fee credits based on the time frames as they exist prior to the adoption of this ordinance and are not subject to the new three‐year time frame for credits as amended in this ordinance. SECTION V. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk AGENDA ITEM # 9. e) ORDINANCE NO. ________ 11 APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2174:12/1/21 AGENDA ITEM # 9. e) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SUBSECTIONS 4‐2‐120.A, 4‐2‐120.C.15, AND 4‐2‐120.C.16 OF THE RENTON MUNICIPAL CODE, CLARIFYING SETBACK REQUIREMENTS FOR FRONT YARDS AND SECONDARY FRONT YARDS WITHIN THE COMMERCIAL NEIGHBORHOOD (CN), CENTER VILLAGE (CV), AND COMMERCIAL ARTERIAL (CA) ZONES, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the purpose of the proposed code amendment is to revise RMC 4‐2‐120.A, Development Standards for Commercial Zoning Designations, to clarify the setback requirements for front yards and secondary front yards within the Commercial Neighborhood (CN), Center Village (CV), and Commercial Arterial (CA) zones; and WHEREAS, current regulations allow both the front yard and secondary front yard setbacks within the CN, CV, and CA zones to be reduced to zero feet (0’) through the site plan review process, provided blank walls are not located within the reduced setback; and WHEREAS, with this Ordinance, the City seeks to revise RMC 4‐2‐120.A, Development Standards for Commercial Zoning Designations, to revise the setback requirements for front yards and secondary front yards within the CN, CV, and CA zones by amending the provision that allows the setback to be reduced to zero feet (0’) through the site plan review process to include criteria for approval; and WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, pursuant to RCW 36.70A.106, on May 3, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; and AGENDA ITEM # 9. f) ORDINANCE NO. ________ 2 WHEREAS, the Planning Commission held a public hearing on May 19, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. Setbacks in subsection 4‐2‐120.A of the Renton Municipal Code is amended as shown on Attachment A. All other provisions in 4‐2‐120.A remain in effect and unchanged. SECTION III. Subsections 4‐2‐120.C.15 and 4‐2‐120.C.16 of the Renton Municipal Code are amended as shown below. All other provisions in 4‐2‐120.C shall remain in effect and unchanged. 15. Maximum Setback: a. The maximum setback may be modified through the site plan review process if the applicant can demonstrate that the proposed development meets the following criteria: i. Orients development to the pedestrian through measures such measures as providing pedestrian walkways beyond those required by the Renton Municipal Code (RMC), encouraging pedestrian amenities, and supporting alternatives to single‐occupant vehicle (SOV) transportation; and AGENDA ITEM # 9. f) ORDINANCE NO. ________ 3 ii. Creates a low‐scale streetscape through measures such measures as fostering distinctive architecture and mitigating the visual dominance of extensive and unbroken parking along the street front; and iii. Promotes safety and visibility through measures such measures as discouraging the creation of hidden spaces, minimizing conflict between pedestrian and vehicle traffic, and ensuring adequate setbacks to accommodate required parking and/or access that could not be provided otherwise. b. Alternatively, the maximum setback requirement may be modified if the applicant can demonstrate that the criteria in subsection 15.a the preceding criteria cannot be met by addressing the following criteria below. However, all those criteria from subsection 15.a that can be met shall be addressed in the site development plan. i. Due to factors including but not limited to the unique site design requirements or physical site constraints such as critical areas or utility easements, the maximum setback cannot be met; or ii. One or more of the above criteria would not be furthered or would be impaired by compliance with the maximum setback; or iii. Any function of the use which serves the public health, safety, or welfare would be materially impaired by the required setback. 16. Reserved. Minimum Setback: AGENDA ITEM # 9. f) ORDINANCE NO. ________ 4 a. The minimum setback may be modified through the site plan review process if it can be demonstrated to the Administrator’s satisfaction that the following criteria are met: i. The perceived scale of the proposed structure that is created by the reduced setback is compatible with the abutting structures and the surrounding neighborhood; and ii. The required street frontage landscaping identified in RMC 4‐4‐ 070F.1 is increased to fifteen feet (15') along all public street frontages with the exception of walkways, driveways, programmed pedestrian plazas, and the area of reduced setback; and iii. Enhanced landscaping, such as increased caliper size of trees, increased container size of shrubs, and/or increased quantity or diversity of plantings, is provided within the public right‐of‐way on the street frontage abutting the reduced setback; and iv. The project includes a public art installation, subject to review and approval, with a minimum monetary value of one percent (1%) of the assessed value of the proposed structure, or when the Administrator determines that it is impractical to install public art onsite, payment of a fee‐in‐lieu may be approved in an amount of money approximating one percent (1%) of the assessed value of the proposed structure; and v. The design of the proposed structure complies with all of the following requirements: AGENDA ITEM # 9. f) ORDINANCE NO. ________ 5 (a) Back of house facilities such as walk‐in freezers, bathrooms, breakrooms, storage rooms, or other rooms that do not contain windows, are not located along any building facade that fronts a public street; and (b) Floor to ceiling transparent windows are provided for at least fifty percent (50%) of the ground floor building facade that fronts a reduced setback; and (c) The proposed structure includes design features such as step‐backs of upper levels, changes in roof plane, and changes in roof form/slope in a manner that serves to reduce the apparent bulk of the proposed structure; and (d) Canopies or similar design features are provided along any building facade that fronts a public street, with emphasis provided to the primary entry; and (e) Structured parking is not located along any building facade that fronts a reduced setback. b. Alternatively, the minimum setback may be modified through the site plan review process if it can be demonstrated to the Administrator’s satisfaction that the reduced setback would result in the protection and preservation of Priority One trees, as identified in RMC 4‐4‐130.H.1.b, that would otherwise not practicably be retained without reduction of the minimum setback. SECTION IV. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, AGENDA ITEM # 9. f) ORDINANCE NO. ________ 6 such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION V. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2182:11/3/21 AGENDA ITEM # 9. f) ORDINANCE NO. ________ 7 ATTACHMENT A 4‐2‐120.A DEVELOPMENT STANDARDS FOR COMMERCIAL ZONING DESIGNATIONS (CN, CV, CA, & UC) CN CV CA UC‐1 and UC‐2 SETBACKS Minimum Front Yard14,18 15 ft.16 The minimum setback may be reduced to 0 ft. through the site plan review process, provided blank walls are not located within the reduced setback. 15 ft. 4,5,8 Maximum Front Yard18 20 ft.15 20 ft. 4,5,8 Minimum Secondary Front Yard14,18 15 ft.16 The minimum setback may be reduced to 0 ft. through the site plan review process, provided blank walls are not located within the reduced setback. 15 ft. 4,5,8 Maximum Secondary Front Yard18 20 ft. 20 ft. 4,5,8 Minimum Freeway Frontage Setback 10 ft. landscaped setback from the property line. n/a Minimum Rear Yard18 None, except 15 ft. if lot abuts a lot zoned residential. None, except 15 ft. if lot abuts a lot zoned residential. 4,5,8 Minimum Side Yard18 None, except 15 ft. if lot abuts or is adjacent to a lot zoned residential. None, except 15 ft. if lot abuts a lot zoned residential. 4,5,8 Clear Vision Area In no case shall a structure over 42 in. in height intrude into the 20 ft. clear vision area defined in RMC 4‐11‐030. AGENDA ITEM # 9. f) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SUBSECTION 4‐3‐100.B.1.a OF THE RENTON MUNICIPAL CODE, CLARIFYING THAT CONVERSION OF A NONRESIDENTIAL USE TO A RESIDENTIAL USE IS SUBJECT TO URBAN DESIGN REGULATIONS, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, pursuant to RCW 36.70A.106, on May 3, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; and WHEREAS, the Planning Commission held a public hearing on May 19, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. Subsection 4‐3‐100.B.1.a of the Renton Municipal Code is amended as shown below. All other provisions in 4‐3‐100.B remain in effect and unchanged. B. APPLICABILITY AND CONFLICTS: 1. Applicability: a. The following development activities shall be required to comply with the provisions of this Section: AGENDA ITEM # 9. g) ORDINANCE NO. ________ 2 i. All subdivisions including short plats; ii. All new structures; iii. Conversion of vacant land (e.g., to parking or storage lots); iv. Conversion of a residential use to a nonresidential use, or the conversion of a nonresidential use to a residential use; v. Alterations, enlargements, and/or restorations of nonconforming structures pursuant to RMC 4‐10‐050, Nonconforming Structures; vi. Exterior modifications such as facade changes, windows, awnings, signage, etc., shall comply with the design requirements for the new portion of the structure, sign, or site improvement. b. Any of the activities listed in subsection B1a of this Section and occurring in the following overlay areas or zones shall be required to comply with the provisions of this Section: i. District ‘A’: All areas zoned Center Downtown (CD). ii. District ‘B’: All areas zoned Residential Multi‐Family (RMF), and assisted living and convalescent centers within the Resource Conservation (RC), Residential‐1 (R‐1), Residential‐4 (R‐4), Residential‐6 (R‐6), Residential‐8 (R‐8), Residential‐10 (R‐10), Residential‐14 (R‐14), and Residential Manufactured Home Park (RMH) Zones. iii. District ‘C’: All areas zoned Urban Center (UC) or Commercial Office Residential (COR). AGENDA ITEM # 9. g) ORDINANCE NO. ________ 3 iv. District ‘D’: All areas zoned Center Village (CV), Commercial Arterial (CA), Commercial Neighborhood (CN), or Commercial Office (CO), except for those properties included in the Automall District and used for small vehicle sales or a secondary use identified in RMC 4‐3‐040C1, Uses Permitted in the Renton Automall District. 2. Conflicts: Where there are conflicts between the design requirements in subsection E of this Section and other sections of the Renton Municipal Code, the regulations of this Section shall prevail. SECTION III. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION IV. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor AGENDA ITEM # 9. g) ORDINANCE NO. ________ 4 Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2183:10/20/21 AGENDA ITEM # 9. g) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SUBSECTIONS 4‐4‐080.A.7 AND 4‐4‐080.F.10.d, SECTION 4‐9‐030, AND THE DEFINITION OF “DWELLING UNIT, ACCESSORY” IN SECTION 4‐11‐040 OF THE RENTON MUNICIPAL CODE, AMENDING ACCESSORY DWELLING UNIT (ADU) REGULATIONS, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, pursuant to RCW 36.70A.106, on July 30, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; and WHEREAS, the Planning Commission held a public hearing on August 18, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. Subsection 4‐2‐080.A.7 of the Renton Municipal Code is amended as follows: 7. Accessory dwelling units (ADUs) may be allowed as an accessory use to a detached single‐family dwelling or a principal building actively operated with a non‐residential use by a religious institution or social service organization. ADUs AGENDA ITEM # 9. h ORDINANCE NO. ________ 2 shall be consistent with the architectural character of the primary residential structure. Unless owner occupancy is not required as a result of the cConditional uUse pPermit process (see RMC 4‐9‐030.H), prior to the issuance of building permits the property owner shall (a) file an affidavit with the City affirming that the owner will live on site, occupying the primary dwelling or ADU; and (b) record a notice on the property title that the owner will occupy the site, and bearing the notarized signature of all property owners listed on the property title and including and which includes at a minimum: the legal description of the property, a copy of the approved site/floor plan, and the applicability of the restrictions and limitations regarding ADUs in RMC Title IV. When ADUs are proposed as accessory uses to non‐residential uses, the following shall apply: a. All proposals shall require a Conditional Use Permit (see RMC 4‐9‐ 030.J) prior to building permit issuance. b. The maximum number of ADUs accessory to an allowed non‐ residential use shall not exceed a maximum of three (3) units. Aggregate ADU size is limited to three thousand (3,000) square feet and one thousand (1,000) square feet per unit. c. Except for when an ADU location is proposed in the rear yard of the principal building, the setback requirement adopted for single‐family residential development shall apply. AGENDA ITEM # 9. h ORDINANCE NO. ________ 3 d. If a primary residential structure is present or proposed, ADU development shall adhere to RMC 4‐2‐110.C. SECTION III. The row entitled “Accessory dwelling unit” in Residential Uses Outside of Center Downtown Zone in subsection 4‐4‐080.F.10.d of the Renton Municipal Code is amended as shown in the excerpt of 4‐4‐080.F.10.d, below. All other provisions in 4‐4‐080.F.10.d remain in effect and unchanged. RESIDENTIAL USES OUTSIDE OF CENTER DOWNTOWN ZONE: Accessory dwelling unit: When accessory to a single‐family residence, 1 per unit is required. A maximum of 2 per unit is allowed. ADUs accessory to non‐residential uses are exempt from additional parking when current parking capacity exceeds the minimum parking requirement for the primary use, otherwise 1 per unit is required. ADUs located within 1/4 mile of a mass transit facility, as defined in RMC 4‐2‐ 080, shall be exempt from off‐street parking requirements. SECTION IV. Section 4‐9‐030 of the Renton Municipal Code is amended to add a new subsection 4‐9‐030.I, to read as shown below. The subsection currently codified as 4‐9‐030.I shall be re‐lettered as 4‐9‐030.J and the subsection currently codified as 4‐9‐030.J shall be re‐lettered as 4‐9‐030.K, respectively. All other provisions in 4‐9‐030 shall remain in effect and unchanged. I. DECISION CRITERIA – ACCESSORY DWELLING UNIT (ADU) AND NON‐ RESIDENTIAL USES In addition to the criteria in subsection D of this Section, Decision Criteria, the following criteria in subsections I.1 through I.2 of this Section apply to the use of ADUs when accessory to a principal building actively operated with a non‐ residential use by a religious institution or social service organization. AGENDA ITEM # 9. h ORDINANCE NO. ________ 4 If the property owner is unable or unwilling to fulfill the requirements below, or if a change of use is proposed that would result in nonconformity, then the owner will remove those features of the accessory dwelling unit that make it a dwelling unit; as determined by the Administrator. 1. Affordability: ADUs must be reserved for income‐restricted affordable housing, as defined by RMC 4‐11‐010, Definitions, A. The affordable housing development must be used exclusively for affordable housing purposes for at least fifty (50) years or the life of the development. 2. Notice(s) on Property Title: The applicant/property owner shall be required to record the following notices on the property title: a. Summary detailing the terms of the affordability requirement, as directed by the Administrator. b. Compliance with all applicable fair housing regulations and antidiscrimination laws, including but not limited to the federal Fair Housing Act and Washington State Human Rights Commission regulations, and tenant protection ordinances shall be followed. SECTION V. The definition of “Dwelling Unit, Accessory” in section 4‐11‐040 of the Renton Municipal Code is amended as shown below. All other definitions in 4‐11‐040 remain in effect and unchanged. DWELLING UNIT, ACCESSORY: An independent subordinate dwelling unit that is located on the same lot as, but not within, either a single‐family dwelling or a AGENDA ITEM # 9. h ORDINANCE NO. ________ 5 principal building actively operated with a non‐residential use by a religious institution or social service organization. This may include units over detached garages. SECTION VI. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION VII. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2199:11/30/21 AGENDA ITEM # 9. h 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SECTION 4‐4‐040 OF THE RENTON MUNICIPAL CODE, REVISING FENCE, HEDGE, AND RETAINING WALL REGULATIONS, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the subject code section, RMC 4‐4‐040, Fences, Hedges, And Retaining Walls, regulates fences, hedges, and retaining walls, particularly in front yards and in yards abutting public rights‐of‐way, in order to promote public safety, maintain or create pleasing aesthetics, encourage the feeling of spaciousness along streets, and reduce conflicting interests between abutting property owners; and WHEREAS, current regulations contain conflicts with regard to code application and do not provide sufficient standards to mitigate adverse impacts caused by fences, hedges, and retaining walls; and WHEREAS, with this Ordinance, the City primarily seeks to revise RMC 4‐4‐040 to clarify that fences, hedges, and retaining walls are regulated by zone, rather than by use, as well as ensure fences, hedges, and retaining walls within commercial and industrial zones are consistent with the aesthetic objectives intended by the code section; and WHEREAS, this Ordinance resolves and nullifies Code Interpretation, CI‐154; and WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, pursuant to RCW 36.70A.106, on May 3, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; and AGENDA ITEM # 9. i) ORDINANCE NO. ________ 2 WHEREAS, the Planning Commission held a public hearing on May 19, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. Section 4‐4‐040 of the Renton Municipal Code is amended as follows: 4‐4‐040 FENCES, HEDGES, AND RETAINING WALLS: A. PURPOSE: These regulations are primarily intended to regulate the material and height of fences, hedges, and retaining walls, particularly in front yards and in yards abutting public rights‐of‐way, in order to promote traffic and public safety and to maintain or create aesthetically pleasing neighborhoods. The regulations are also intended to provide and maintain adequate sight distances along public rights‐of‐ way at intersections, encourage safe ingress and egress from individual properties, encourage the feeling of spaciousness along neighborhood streets, promote crime prevention through environmental design, and reduce conflicting interests between abutting property owners. B. APPLICABILITY: AGENDA ITEM # 9. i) ORDINANCE NO. ________ 3 1. New or Replacement Fences, Hedges, and Retaining Walls: The standards contained in this Section shall apply to all proposals for new or replacement fences, hedges, and retaining walls. 12. Exceptions: The provisions and conditions of this Section regulating height and design of fences, retaining walls, or barriers to surround and enclose public safety installations, transportation facilities, waterways, storm drainage facilities, school grounds, public playgrounds, private or public swimming pools, and similar installations and improvements are not applicable if required by law. 23. Urban Separator Overlay: Fences, hedges, and retaining walls within the urban separator overlay are also subject to requirements of RMC 4‐3‐110, Urban Separator Overlay Regulations. 34. City May Require Modification: Where a traffic vision hazard is created or exists that endangers pedestrian and/or vehicular safety, the City may require a modification to the height limitations and location of fences, hedges or retaining walls to increase or enhance safety. 45. Permit Required: a. Fences: A fence taller than seven feet (7') shall require a building permit or a written exemption from the Building Official. b. Retaining Walls: A retaining wall that is four feet (4') or taller, as measured by the vertical distance from the bottom of the footing to the finish grade at the top of the wall (i.e., not measured by exposed retaining wall height), shall require a building permit. This determination does not account for other AGENDA ITEM # 9. i) ORDINANCE NO. ________ 4 factors that may cause a building permit to be required for a retaining wall (e.g., the addition of a surcharge or fence). C. GENERAL FENCE, HEDGE, AND RETAINING WALL STANDARDS: 1. Height – Method of Measurement: a. Fences: The height shall be measured from the top elevation of the top board rail or wire to the ground. In cases where a wall is used instead of a fence, height shall be measured from the top surface of the wall to the ground on the high side of the wall. i. Grade Differences: Where the finished grade is a different elevation on either side of a fence the height may be measured from the side having the highest elevation. ii. Fences on Berms: A berm shall not be constructed with a fence on it unless the total height of the berm plus the fence is less than the maximum height allowable for the fence if the berm were not present. b. Hedges: The height shall be measured from the topmost portion of vegetation to the ground. Hedges designed as part of stormwater low impact development best management practices shall be designed consistent with the Surface Water Design Manual, and the Clear Vision Area defined in RMC 4‐11‐030, and avoid blocking public views to public places. c. Retaining Walls: The standards of this Section refer to exposed retaining wall height, as defined in RMC 4‐11‐180, Definitions R, which is the AGENDA ITEM # 9. i) ORDINANCE NO. ________ 5 vertical distance measure from the finish grade at the bottom of the wall (i.e., lower soil grade) to the finish grade at the top of the wall (i.e., upper soil grade). 2. Retaining Wall Standards: a. Fences on Retaining Walls: A fence shall not be constructed on top of a retaining wall unless the total combined height of the retaining wall and the fence does not exceed the allowed height of a standalone fence. i. Exception – Guardrail: If the Building Official requires a guardrail, the combined height of the retaining wall and required guardrail shall not exceed nine feet (9') in residential zones, or twelve feet (12') in commercial and industrial zones. ii. Exception – Fifty Percent (50%) Transparent Fences: Fences that provide at least fifty percent (50%) transparency, as viewed perpendicularly to the face of the fence, may be allowed directly on top of a retaining wall. However, chain link fencing shall not be installed. This exception shall not be applied to front yard setbacks, or clear vision areas, as defined by RMC 4‐11‐030, Definitions C. b. Fences and Hedges Adjacent to Retaining Walls: Fences or hedges adjacent to retaining walls with a combined height that exceeds the allowed height of a standalone retaining wall shall be set back by a minimum of two feet (2'); this area shall be landscaped as if it were a terrace. If a fence is placed any distance within the property line, the property owner continues to be responsible for the property on both sides of the fence. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 6 c. Materials: Retaining walls shall be composed of brick, rock, textured or patterned concrete, or other masonry product that complements the proposed building and site development. Other materials may be used with the Administrator’s approval. d. Setback from Public Rights‐of‐Way: There shall be a minimum three‐foot (3') landscaped setback at the base of retaining walls abutting public rights‐of‐way. Landscaping shall include a mixture of shrubs and groundcover (trees are optional) in conformance with the standards of RMC 4‐4‐070H4, Perimeter Parking Lot Landscaping. e. Terracing: Terracing is the act of forming hillside into a number of level flat areas (terraces) between retaining walls, which is often used when the maximum height of a single retaining wall is insufficient. The following standards shall apply to terraced slopes: i. Terrace Width: No portion of a retaining wall shall be measured as part of the terrace width. The width of a terrace shall be equal to the height of the tallest abutting retaining wall; however, the minimum terrace width shall be two feet (2'). Terrace width shall be measured from the back edge of a lower retaining wall to the foremost edge of the immediately succeeding and higher retaining wall. ii. Terrace Landscaping: Terraces created between retaining walls shall be permanently landscaped with a mixture of shrubs and groundcover (trees are optional) in conformance with the standards of RMC 4‐4‐070F, Landscaping. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 7 Landscaping provided in front of retaining walls and within terraces shall contribute to any landscaping required by RMC 4‐4‐070F; the Administrator may grant exceptions for required trees based on land constraints. f. Grading: For land area that is not between two (2) retaining walls (i.e., not a terrace), the lower soil grade (i.e., ground at the bottom of a retaining wall’s exposed surface) and the upper soil grade (i.e., ground at the top a retaining wall) abutting a retaining wall shall be level for a horizontal distance (measured perpendicularly to the wall) equaling one foot (1') for every one foot (1') in height of the retaining wall. g. Modifications: Pursuant to RMC 4‐9‐250D, Modification Procedures, the Administrator may grant modifications to this Section’s retaining wall standards. Approval of a modifications permit may include conditions such as, but not limited to, increased setbacks, additional landscaping, a requirement to terrace or specific materials to be used. D. STANDARDS FOR RESIDENTIAL USES ZONES: 1. Maximum Height: In any residential district zone, the maximum height of any fence, hedge or retaining wall shall be seventy‐two inches (72"), subject to further height limitations as specified in this Ssubsection D.2. 2. Height Limitations for Interior Lots: a. Front Yard Setbacks: Fences, retaining walls or hedges shall not exceed forty eight inches (48") in height within the front yard setback. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 8 b. Side Yard Setbacks: Fences, retaining walls or hedges within both interior side yard setbacks and the front yard setback shall not exceed forty eight inches (48") in height. Fences, retaining walls or hedges within interior side yard setbacks and not within the front yard setback shall not exceed seventy two inches (72") in height. c. Rear Yard Setbacks: Fences, retaining walls or hedges shall not exceed seventy two inches (72") in height within the rear yard setback unless the rear yard abuts a public or private street, in which case it shall not exceed forty eight inches (48"). Fences within a rear yard setback abutting a street may be up to seventy two inches (72") in height if compliant with subsection D3e of this Section. 32. Height Limitations for Corner Lots within Setbacks: a. Front Yard Setbacks: Fences, hedges, or retaining walls shall not exceed forty‐eight inches (48") in height within any part of the front yard setback. In no case shall a fence, hedge, or retaining wall Fences, retaining walls or hedges AGENDA ITEM # 9. i) ORDINANCE NO. ________ 9 shall not exceed forty‐two inches (42") in height in any part of the clear vision area as defined by RMC 4‐11‐030, Definitions C. Fences, retaining walls, or hedges shall not exceed forty eight inches (48") in height within any part of the front yard setback when located outside of any clear vision area on said lot. b. Interior Side Yard Setbacks: Fences, hedges, or retaining walls Fences, retaining walls or hedges shall not exceed seventy‐two inches (72") in height within any part of the interior side yard setback to the point where they intersect the front yard setback or a secondary front yard setback, in which case they shall be governed by the applicable limitations of the front yard or secondary front yard setbacks. c. Secondary Front Yard Setbacks: Fences, hedges, or retaining walls shall not exceed forty‐eight inches (48") in height within any part of the secondary front yard setback. In no case shall a fence, hedge, or retaining wall exceed forty‐ two inches (42") in height in any part of the clear vision area as defined by RMC 4‐ 11‐030, Definitions C. Fences, retaining walls or hedges shall not exceed forty two inches (42") in height within any clear vision area, as defined by RMC 4‐11‐030, Definitions C, and forty eight inches (48") in height elsewhere in the secondary front yard setback. d. Rear Yard Setbacks: Fences, hedges, or retaining walls Fences, retaining walls, or hedges shall not exceed seventy‐two inches (72") in height within the rear yard setback except the fence, hedge, or retaining wall or hedge shall not exceed forty‐eight inches (48") in height where they intersect the width AGENDA ITEM # 9. i) ORDINANCE NO. ________ 10 of the secondary front yard or if the rear yard of the lot abuts a public or private street. e. Fence Height Exception for Secondary Front Yard Setbacks and Rear Yard Setbacks Abutting a Streetand Side Yards along a Street: Fences over forty‐ eight inches (48") and up to seventy‐two inches (72") in height may be installed within secondary front yard setbacks and rear yard setbacks that yards and side yards along abut a streetstreets, excepting any portion within a front yard setback or clear vision area, if all of the following criteria are met: i. Fencing materials such as wrought iron, cedar wood, or similar shall be used. Chain link fencing is prohibited. ii. The fence is set back at least eight feet (8') from the subject property line. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 11 iii. Within the minimum eight feet (8') fence setback, irrigated or drought‐ tolerant landscaping that complies with the standards of RMC 4‐4‐070.(I‐L.1)(P‐Q) shall be installed and continuously maintained so that plantings provide total coverage of the area within three (3) years based on the following standards: (a) Ground Cover: Eighteen (18) ground cover plants per five (5) linear feet of landscaping strip. (1) Minimum four‐inch (4") pots. (2) Mulch must be confined to areas underneath plants and is not a substitute for ground cover plants. (b) Shrubs: Eight (8) low shrubs per five (5) linear feet. Up to fifty percent (50%) of shrubs may be deciduous: (1) Required Low Shrub: Mature size under three feet (3') tall. Minimum size at planting: one or two (2) gallon pot or balled and burlapped equivalent. (2) Optional Medium Shrubs: Medium shrubs may be installed in place of required low shrubs. One medium shrub shall count as two (2) low shrubs. Mature size from three feet (3') to six feet (6') tall. Minimum size at planting: two (2) or three (3) gallon pot or balled and burlapped equivalent. iv. The plants shall be planted in a triangular pattern with approximately even spacing, depending on the plant material. v. Plants listed as a nuisance or prohibited by King County are prohibited in required landscaped areas. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 12 vi. Planting of a hedge or plantings that will grow to become a hedge are prohibited to be within the required landscaping area between the property line and fence. vii. The finished face of the fence shall be oriented to the street. viii. No fence, hedge, or retaining wall shall exceed forty‐two inches (42") within any clear vision area, as defined by RMC 4‐11‐030, Definitions C. ix. As an alternative to these standards, an applicant may apply for a special administrative fence permit per subsection G of this Section. 43. Gate Required: Residential fences, retaining walls or hedges along rear lot lines of interior lots abutting alleys shall have an access gate to the alley. 54. Electric and Barbed Wire Fences: Electric and/or barbed wire fences may be permitted by special administrative fence permit in all residential zones in cases where large domestic animals are being kept; provided, that additional fencing or an Administrator approved barrier is erected along the property lines. E. STANDARDS FOR COMMERCIAL, AND INDUSTRIAL AND OTHER USES ZONES: 1. Maximum Height: The maximum height of any fence, hedge or retaining wall shall be eight feet (8'), subject to further height limitations as specified in subsection E.2, provided the fence, hedge, or retaining wall Location and Maximum Height: A maximum of eight feet (8') anywhere on the lot provided the fence, retaining wall or hedge does not stand in or in front of any required landscaping or pose a traffic vision hazard. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 13 2. Additional Height Limitations in Commercial Zones: a. Front Yard: Fences, hedges, or retaining walls shall not exceed forty‐ eight inches (48") in height within fifteen feet (15’) of the front yard property line. In no case shall a fence, hedge, or retaining wall exceed forty‐two inches (42") in height in any part of the clear vision area as defined by RMC 4‐11‐030, Definitions C. b. Secondary Front Yard: Fences, hedges, or retaining walls shall not exceed forty‐eight inches (48") in height within fifteen feet (15’) of the secondary front yard property line. In no case shall a fence, hedge, or retaining wall exceed forty‐two inches (42") in height in any part of the clear vision area as defined by RMC 4‐11‐030, Definitions C. c. Rear Yard: Fences, hedges, or retaining walls shall not exceed forty‐ eight inches (48") in height within fifteen feet (15’) of a rear yard property line that abuts a public street. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 14 3. Material Limitations in Commercial Zones: Chain‐link fencing within the Center Downtown (CD) Zone is prohibited. Chain‐link fencing within all other commercial zones shall be coated with black, brown, grey, or green bonded vinyl. 4. Landscaping: Fences, hedges, and retaining walls shall not stand in or in front of any required landscaping. If a new or replaced fence is proposed within fifteen feet (15’) of a public street on a site that is nonconforming with regard to street frontage landscaping requirements per RMC 4‐4‐070F.1, the site shall be brought into compliance with street frontage landscaping requirements prior to fence installation. 25. Electric Fences: Electric fences are permitted in all industrial zones and may be permitted by special administrative fence permit in all commercial zones. All electric fences shall be posted with permanent signs a minimum of thirty‐six AGENDA ITEM # 9. i) ORDINANCE NO. ________ 15 (36) square inches in area at intervals of fifteen feet (15') stating that the fence is electrified. Electric fences and any related equipment and appliances must be installed in accordance with the manufacturer’s specifications and in compliance with the National Electrical Code. 36. Barbed Wire Fences: Barbed wire fences are permitted in all industrial zones and may be permitted by special administrative fence permit in all commercial zones. Barbed wire may only be used on top of fences at least six feet (6') high for commercial, industrial, utility and public uses. 47. Bulk Storage Fences: See RMC 4‐4‐110, Storage Facilities, Bulk. 5. Special Provisions: Fences for mobile home parks, subdivisions or planned urban development and for sites which are mined, graded or excavated may vary from these regulations as provided in the respective code sections. AGENDA ITEM # 9. i) ORDINANCE NO. ________ 16 F. ADMINISTRATIVE REVIEW OF VARIATION FROM FENCE OR HEDGE STANDARDS HEIGHT RESTRICTIONS: Unless otherwise determined through the site plan review or subdivision review process, a A property owner wishing to vary the height restrictions or placement of standards for a fence or hedge on a lot may make submit a written application to the Department Planning Division for an administrative review of the situation. The written application shall include a letter of justification, site plan, and typical elevation, together with the current permit fee. The Department’s staff shall review the application and prepare a written determination based upon criteria listed in subsection G of this Section, Special Administrative Fence Permits. No separate special fence permit is required for a development proposal which requires site plan review or subdivision review process, provided variations were permitted though these processes. G. SPECIAL ADMINISTRATIVE FENCE PERMITS: 1. Fences Eligible for Administrative Review Process: Persons wishing to have one of the following types of fences may submit a letter of justification, site plan and typical elevation together with the permit fee to the Department of Community and Economic Development: a. Fences exceeding forty eight inches (48") within front yard or side yards along a street setback but not within a clear vision area; b. Fences or hedges exceeding seventy two inches (72") and located outside of required yard setbacks; AGENDA ITEM # 9. i) ORDINANCE NO. ________ 17 c. Electric fences; and d. Barbed wire fences. 21. Evaluation Criteria: The Administrator may approve the issuance of special fence permits provided that the following objectives criteria can be met: a. The proposed fence improves the privacy and security of the adjoining yard space or hedge is not out of character with the surrounding neighborhood; b. The proposed fence or hedge does not detract from the quality of the residential environment by being out of scale or creating vast blank walls along public roadways; c. The proposed fence or hedge complements compliments the environment it serves in an aesthetically pleasing manner; and d. The proposed fence or hedge does not present a hazard to vehicular or pedestrian traffic. 32. Acceptable Measures to Meet Criteria: Fences located within the front or side and/or rear yard along a street setback may be a maximum of seventy two inches (72") in height, provided the evaluation criteria are met. Acceptable measures to achieve these criteria include, but are not limited to the following: a. Permanent landscaping along the front of the fence; b. Quality fence material, such as cedar fencing; c. Modulation of the fence; AGENDA ITEM # 9. i) ORDINANCE NO. ________ 18 d. Similar design and material as other fences in the surrounding neighborhood; e. Increased setbacks from the abutting sidewalk; f. Ornamental materials or construction treatment, such as wrought iron; g. Orientation of the finished face of the fence toward the street; h. The fence is at least fifty percent (50%) transparent; and i. Other comparable construction or design methods. 43. Clear Vision Area: The fence proposed for special permits shall have no portion in the clear vision area over forty‐two inches (42") in height. The location and height of the fence must not obstruct views of oncoming traffic, or views from driveways. SECTION III. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION IV. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk AGENDA ITEM # 9. i) ORDINANCE NO. ________ 19 APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2173:11/3/21 AGENDA ITEM # 9. i) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING SUBSECTIONS 4‐2‐110.A AND 4‐2‐110.E.20 OF THE RENTON MUNICIPAL CODE, AMENDING HEIGHT AND SETBACK REGULATIONS IN THE RMF (RESIDENTIAL MULTI‐FAMILY) ZONE, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the purpose of this ordinance is to ensure that the building setbacks and height permitted in the Residential Multi‐Family (RMF) Zone provide a logical and compatible transition of intensity between the other residential zones and the commercial zones; and WHEREAS, the City seeks to revise RMC 4‐2‐110.A, Development Standards for Residential Zoning Designations (Primary Structures), to increase the front and secondary front yard setback to fifteen feet (15’) for townhome developments in the RMF zone, with the option to reduce to ten feet (10’) provided all vehicle access is taken from an alley; and WHEREAS, the City seeks to revise RMC 4‐2‐110.A, Development Standards for Residential Zoning Designations (Primary Structures), and RMC 4‐2‐110.E, Conditions Associated with Development Standards Table for Residential Zoning Designations, to amend the code to allow review and decision of additional height in the RMF zone through the Conditional Use Permit (CUP) process, rather than through Site Plan Review, as well as limit the option of additional height requests to “other attached dwellings” only, excluding townhome structures; and WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and AGENDA ITEM # 9. j) ORDINANCE NO. ________ 2 WHEREAS, the Planning Commission held a public hearing on August 18, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; and WHEREAS, pursuant to RCW 36.70A.106, on September 29, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. The rows entitled “Minimum Front Yard,” “Minimum Secondary Front Yard,” and “Maximum Wall Plate Height” in subsection 4‐2‐110.A of the Renton Municipal Code are amended as shown in the excerpt of 4‐2‐110.A in Attachment A. All other provisions in 4‐2‐ 110.A remain in effect and unchanged. SECTION III. Subsection 4‐2‐110.E.20 of the Renton Municipal Code is amended as shown below. All other provisions in 4‐2‐110.E remain in effect and unchanged. 20. Reserved. An additional ten feet (10') of maximum wall plate height and an additional story for a residential dwelling structure may be obtained through the provision of addi‐ tional amenities such as additional recreation facilities, underground parking, and additional landscaped open space areas; as determined through the site development plan review process and depending on the compatibility of the proposed buildings with adjacent or abutting existing residential development. AGENDA ITEM # 9. j) ORDINANCE NO. ________ 3 The maximum wall plate height of a residential structure shall not exceed forty two feet (42'). SECTION IV. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION V. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2193:11/16/21 AGENDA ITEM # 9. j) ORDINANCE NO. ________ 4 ATTACHMENT A [EXCERPT OF 4‐2‐110.A] 4‐2‐110.A1 DEVELOPMENT STANDARDS FOR RESIDENTIAL ZONING DESIGNATIONS (PRIMARY STRUCTURES) RC R‐132 R‐410, 32 R‐6 R‐8 R‐10 R‐14 RMF Minimum Front Yard4, 5, 31 30 ft. 30 ft. 30 ft.33 25 ft. 20 ft. except when all vehicle access is taken from an alley, then 15 ft.39 15 ft.11, except when all vehicle access is taken from an alley, then 10 ft.39 Townhouses: 15 ft.11, except when all vehicle access is taken from an alley, then 10 ft.3910 ft.11 Other Attached Dwellings: 20 ft. Minimum Secondary Front Yard4, 5, 31 (applies to Corner Lots) 30 ft. 30 ft. 30 ft.33 25 ft. 15 ft.11 15 ft.11 15 ft.11 Townhouses: 1510 ft.11 Other Attached Dwellings: 20 ft. Maximum Wall Plate Height8, 9, 12, 18, 19 32 ft. 24 ft. 24 ft., increase up to 32 ft. possible subject to administrative conditional use permit approval. 32 ft.20 Townhouses: 32 ft. Other Attached Dwellings: 32 ft., increase up to 42 ft. possible subject to administrative conditional use permit approval. AGENDA ITEM # 9. j) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING RESIDENTIAL ACCESSORY STRUCTURES REGULATIONS IN SUBSECTIONS 4‐2‐ 110.A, 4‐2‐110.B, 4‐2‐110.E.4, 4‐2‐110.E.17, AND 4‐6‐030.C OF THE RENTON MUNICIPAL CODE, THE DEFINITION OF “BUILDING HEIGHT” IN SECTION 4‐11‐020 OF THE RENTON MUNICIPAL CODE, AND TABLE 1.2.9.A OF THE CITY OF RENTON’S SURFACE WATER DESIGN MANUAL, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, this matter was duly referred to the Planning Commission for investigation and study, and the matter was considered by the Planning Commission; and WHEREAS, pursuant to RCW 36.70A.106, on July 30, 2021, the City notified the State of Washington of its intent to adopt amendments to its development regulations; and WHEREAS, the Planning Commission held a public hearing on August 18, 2021, considered all relevant matters, and heard all parties in support or opposition, and subsequently forwarded a recommendation to the City Council; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in strikethrough and underline edits remain in effect and unchanged. SECTION II. The row entitled “Minimum Rear Yard” in subsection 4‐2‐110.A of the Renton Municipal Code is amended as shown in the excerpt of 4‐2‐110.A in Attachment A. All other provisions in 4‐2‐110.A remain in effect and unchanged. SECTION III. Subsection 4‐2‐110.B of the Renton Municipal Code is amended as follows: AGENDA ITEM # 9. k) ORDINANCE NO. ________ 2 4‐2‐110.B DEVELOPMENT STANDARDS FOR RESIDENTIAL DEVELOPMENT (DETACHED ACCESSORY BUILDINGS) MAXIMUM NUMBER AND SIZE General RC, R‐1, R‐4, R‐6, R‐8, R‐ 10, R‐14 and RMF Accessory structures shall only be allowed on lots in conjunction with a primary use. The total floor area of all accessory buildings shall not be greater than the floor area of the primary residential uses. The lot coverage of the primary residential structure combined with all accessory buildings shall not exceed the maximum lot coverage of the Zoning District.17 RC and R‐1 2 structures – max. 720 sq. ft. per structure, or 1 structure – max. 1,000 sq. ft. In addition, 1 barn or stable – max. 2,000 sq. ft., provided the lot is 5 acres or more. R‐4, R‐6, and R‐8 2 structures – max. 720 sq. ft. per structure, or 1 structure – max. 1,000 sq. ft. R‐10 and R‐ 14 1 structure per residential unit – max. 400 sq. ft.; provided, that they are architecturally consistent with the principal structure. Except greenhouses, sheds, or other similar accessory structures – max. 150 sq. ft. MAXIMUM WALL PLATE HEIGHT18, 19 RC 12 ft. R‐1, R‐4, R‐ 6, and R‐8 12 ft. Animal husbandry or agricultural related structures are subject to the maximum wall plate height of subsection A of this Section, and associated conditions. Additionally, the structure shall not be taller than the primary dwelling. R‐10 and R‐ 14 12 ft. AGENDA ITEM # 9. k) ORDINANCE NO. ________ 3 Agricultural related structures are subject to the maximum wall plate height of subsection A of this Section, and associated conditions, except that the structure shall not be taller than the primary dwelling. RMF 25 ft.20, except that the structure shall not be taller than the primary building(s). Maximum Height for Public Facilities shall be determined through site plan review. Maximum Height for Wireless Communication Facilities (Including Amateur Radio Antennas) RC, R‐1, R‐4, R‐6, R‐8, R‐ 10, R‐14, and RMF See RMC 4‐4‐140, Wireless Communication Facilities. Freestanding vertical monopole amateur radio antennas are allowed a maximum height of 45 ft. without a Conditional Use Permit. Taller structures will have maximum height determined pursuant to RMC 4‐9‐030, Conditional Use Permits. LOCATION General RC, R‐1, R‐4, R‐6, R‐8, R‐ 10, R‐14 and RMF 46 ft. from any residential structure. If sited closer than 46 ft., the structure will shall be considered to be attached. R‐14 For any lot that abuts an alley, vehicular access to garages or carports shall be through the alley. When lots do not abut an alley, all garages and carports shall be located in the rear yard or side yard. MINIMUM SETBACKS Front Yard RC, R‐1, R‐4, R‐6, R‐8, R‐ 10, R‐14 and RMF Setbacks applied to the primary structure also apply to accessory structures. Accessory structures shall not be located between the primary structure and a street.4 Side Yards for Accessory Buildings RC and R‐1 5 ft., unless located between the rear of the house and the rear property line, then 0 ft. side yard is allowed. AGENDA ITEM # 9. k) ORDINANCE NO. ________ 4 R‐4, R‐6, R‐ 8, R‐10, R‐14 and RMF 3 ft., unless located between the rear of the house and the rear property line, then 0 ft. side yard is allowed. Rear Yards for Accessory Buildings RC 5 ft. R‐1, R‐4, R‐ 6, R‐8, R‐10, R‐14 and RMF 3 ft., unless located between the rear of the house and the rear property line, then 0 ft. rear yard is allowed. When located within 10 ft. of the rear property line, at least 25% of the lineal length of the rear yard shall remain unoccupied from accessory structures, except when the rear property line abuts an alley. Except for garages/carports accessed through alleys: to ensure adequate vehicular maneuvering area, garages and carports that are accessed through alleys shall be set back as follows: 1. 9 ft. garage doors shall be at least 26 ft. from the back edge of the alley, or 2. 16 ft. garage doors shall be at least 24 ft. from the back edge of the alley. Special Setbacks for Animal Husbandry or Agricultural Related Structures RC, R‐1, R‐4, R‐6, R‐8, R‐ 10, and R‐14 Agricultural related structures – 50 ft. from any property line. Stables and other animal husbandry related structures, see RMC 4‐4‐010, Animal Keeping and Beekeeping Standards. RMF n/a Clear Vision Area RC, R‐1, R‐4, R‐6, R‐8, R‐ 10, R‐14 and RMF In no case shall a structure over 42 in. in height intrude into the 20 ft. clear vision area defined in RMC 4‐11‐030. CRITICAL AREAS General RC, R‐1, R‐4, R‐6, R‐8, R‐ 10, and R‐14 See RMC 4‐3‐050, Critical Areas Regulations, and 4‐3‐090, Shoreline Master Program Regulations. AGENDA ITEM # 9. k) ORDINANCE NO. ________ 5 SECTION IV. Subsections 4‐2‐110.E.4 and 4‐2‐110.E.17 of the Renton Municipal Code are amended as shown below. All other provisions in 4‐2‐110.E remain in effect and unchanged. 4. Allowed Projections into Setbacks: a. Fireplace Structures, Windows: Fireplace structures, bay or garden windows, enclosed stair landings, and similar structures as determined by the Community and Economic Development Administrator may project twenty‐four inches (24") into any setback; provided, such projections are: i. Limited to two (2) per facade. ii. Not wider than ten feet (10'). b. Fences, Rockeries, and Retaining Walls: See RMC 4‐4‐040, Fences, Hedges, and Retaining Walls. c. Steps and Decks: Uncovered steps and decks not exceeding eighteen inches (18") above the finished grade may project to any property line. Uncovered steps and decks having no roof covering and not exceeding forty two inches (42") high may be built within the front yard setback. d. Eaves: Eaves and cornices may project up to twenty four inches (24") into any required setback. e. Porches and Stoops: May project into front setbacks up to eight feet (8') and into side setbacks along a street up to five feet (5'). f. Overhead Weather Protection: AGENDA ITEM # 9. k) ORDINANCE NO. ________ 6 i. Roofs and awnings situated above pedestrian entryways may extend up to five feet (5') into a required setback and may extend no wider than three feet (3') on either side of the entryway. ii. Roofs or other structures providing relief from rain or sun (e.g., pergola) attached to the rear facade of the primary structure may intrude into rear yard setbacks provided such roofs shall be setback a minimum of five feet (5’) from rear lot lines and shall meet the side yard setback requirement for primary structures. The height and area of such roofs shall be regulated in the same manner as detached accessory structures. g. Accessibility Ramps: Ramps required for barrier‐free access, and meeting all Building Code requirements including slope and handrails, may intrude into required setbacks. This exemption will be limited to the extent necessary to meet the Building Code requirements. h. Cisterns and Rain Barrels: Rain barrels, cisterns, and other rainwater catchment systems may intrude into a required setback as follows: i. Elements are not permitted in the front setback. ii. Elements which are less than fifty‐four inches (54") above finished grade and contain up to six hundred (600) gallons may intrude into a side or rear setback a distance no greater than twenty percent (20%) of that setback, but must maintain at least three feet (3') of undisturbed setback. AGENDA ITEM # 9. k) ORDINANCE NO. ________ 7 iii. Elements which are greater than fifty‐four inches (54") above finished grade or contain over six hundred (600) gallons shall not intrude upon side and rear setback requirements. i. Arbor, Pergola or Trellis: Allowed in required yard setbacks if they meet the following provisions: i. The length of any side shall not exceed twelve feet (12') and the footprint shall not exceed eighty (80) square feet, inclusive of eaves; ii. A maximum height from finished grade to the top of the structure of ten feet (10'); iii. Both sides and roof shall be at least fifty percent (50%) open, or, if latticework is used, there shall be a minimum opening of two inches (2") between crosspieces. iv. Limited to two (2) such structures per lot. j. Heating, Ventilation, and Air Conditioning (HVAC) Systems: HVAC Systems may extend into any side or rear yard setback. 17. The lot coverage of accessory dwelling units shall not be calculated towards maximum building/lot coverage. Coverage attributed to detached accessory structures, and roofs attached to the facade of the primary structure may exceed the maximum building/lot coverage allowed by five percent (5%). SECTION V. Subsection 4‐6‐030.C of the Renton Municipal Code is amended as follows: C. ADOPTION OF SURFACE WATER DESIGN MANUAL: AGENDA ITEM # 9. k) ORDINANCE NO. ________ 8 The 2016 King County, Washington, Surface Water Design Manual as amended by the City of Renton Amendments to the King County Surface Water Design Manual, dated December 12, 2016, and further amended by the City on December 13, 2021, is adopted by reference and referred to hereafter as the Surface Water Design Manual. The Surface Water Design Manual shall be filed with the City Clerk and available for viewing on the City’s website. SECTION VI. The definition of “Building Height” in section 4‐11‐020 of the Renton Municipal Code is amended as shown below. All other definitions in 4‐11‐020 remain in effect and unchanged. BUILDING HEIGHT: The measurement of building height depends on the applicable zone, as follows: 1. Within the RC, R‐1, R‐4, R‐6, R‐8, R‐10, R‐14, and RMF Zones: Primary structures and accessory dwelling units shall be measured by Tthe vertical distance from grade plane to the highest wall plate combined with the height of any portion of the structure that extends above the wall plate (e.g., roof, deck, etc.), excluding chimneys, ventilation stacks, and similar elements as determined by the Administrator. Detached accessory structures shall be measured by the vertical distance from grade plane to the average height of the highest roof surface. 2. All Other Zones: The vertical distance from grade plane to the average height of the highest roof surface. AGENDA ITEM # 9. k) ORDINANCE NO. ________ 9 SECTION VII. Table 1.2.9.A, On‐site BMP Sizing Credits, on page 1‐84 of the City of Renton’s Surface Water Design Manual, is hereby amended as shown below. All other provisions in the City of Renton’s Surface Water Design Manual remain in effect and unchanged. TABLE ERROR! NO TEXT OF SPECIFIED STYLE IN DOCUMENT..A ON-SITE BMP SIZING CREDITS(1) On-Site BMP Type Sizing Credit Full dispersion Model fully dispersed surface as forest(2) Full infiltration(3) Subtract impervious area that is fully infiltrated Limited infiltration Model tributary impervious surface as 90% impervious, 10% grass Basic dispersion Model dispersed impervious surface as 90% impervious, 10% grass Bioretention Model tributary impervious surface as 90% impervious, 10% grass Permeable pavement (unlined with no underdrain) Model permeable pavement area as 50% impervious, 50% grass. Run-on from other impervious surfaces does not receive a credit. Grassed modular grid pavement Model modular grid pavement as all grass Rainwater harvesting Credit only allowed via, and as specified in, an approved drainage adjustment that details conditions of use Vegetated roof with 3 to 8 inches of growing medium Model vegetated roof area as 50% impervious, 50% grass Vegetated roof with greater than 8 inches of growing medium Model vegetated roof area as 50% impervious, 50% pasture Restricted footprint None Model footprint as restricted (Appendix C, Section C.2.9.2) Wheel strip driveways Model credited area as 50% impervious, 50% grass Minimum disturbance foundation Model foundation area as 50% impervious, 50% grass Open grid decking over pervious area Model deck area as 50% impervious, 50% grass Native growth retention credit Model mitigated impervious area as 50% impervious, 50% grass Perforated pipe connection None Notes: (1) These credits do not apply when determining eligibility for exemptions from Core Requirement #3, Core Requirement #8, or exceptions from the flow control or water quality facility requirements unless otherwise noted in the exemption or exception. When applying modeling credits for flow control facility sizing, infiltrative BMPs tributary to the facility that are included in the modeling scenario (including the permeable pavement element with area reduced to 50% impervious area fraction, or other BMPs (e.g., bioretention, trenches, drywells) treating upstream runoff) must have the infiltration option turned off during the flow routing analysis for facility sizing to avoid double-counting the BMP infiltration benefit. Alternatively, permeable pavement with infiltration turned off may be represented by an impervious area land use element of equivalent area. (2) Surface shall be modeled using the soil type found at that location on the site. (3) For any project subject to Simplified Drainage Review, and for any single family residential project subject to Directed, Full or Large Project Drainage Review, the design requirements and specifications in Appendix C, Section C.2.2 may be used for design of full infiltration on individual lots. For all other projects, including any project where full infiltration is proposed to serve more than one lot, full infiltration must be designed in accordance with infiltration facility standards in Section 5.2. AGENDA ITEM # 9. k) ORDINANCE NO. ________ 10 SECTION VIII. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION IX. This ordinance shall be in full force and effect five (5) days after publication of a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 202____. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this _______ day of _____________________, 202____. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2184:11/16/21 AGENDA ITEM # 9. k) ORDINANCE NO. _________ 11 ATTACHMENT A [EXCERPT OF 4‐2‐110.A] 4‐2‐110A1 DEVELOPMENT STANDARDS FOR RESIDENTIAL ZONING DESIGNATIONS (PRIMARY STRUCTURES) RC R‐132 R‐410, 32 R‐6 R‐8 R‐10 R‐14 RMF Minimum Rear Yard4, 22, 31 35 ft. 30 ft. 25 ft.33 25 ft. 2520 ft.39 15 ft.21, 39 10 ft.21, 39 Townhouses: 10 ft.13, 39 Other Attached Dwellings: 15 ft.39 AGENDA ITEM # 9. k) 1 CITY OF RENTON, WASHINGTON ORDINANCE NO. ________ AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, EXTENDING THE INTERIM ZONING CONTROLS ESTABLISHED BY ORDINANCE NO. 5974, EXTENDED AND AMENDED BY ORDINANCE 5997, AND EXTENDED BY ORDINANCE 6018; PROVIDING FOR SEVERABILITY; DECLARING AN EMERGENCY; AND ESTABLISHING AN IMMEDIATE EFFECTIVE DATE. WHEREAS, on July 13, 2020, in response to business‐related impacts due to the novel coronavirus (COVID‐19) pandemic, the City Council adopted interim zoning controls via Ordinance No. 5974, valid through December 31, 2020 or the date that the City enters Phase 4 of the Governor’s Safe Start plan, whichever occurred first; and WHEREAS, Ordinance No. 5974 established a new type of temporary right‐of‐way permit known as an “Economic Recovery Revocable Right‐of‐Way Permit” which is similar to existing right‐of‐way permits but does not carry a permit fee to assist businesses that are able to use public right‐of‐way and/or their private parking lot areas in order to expand the area within which customers could be served – in keeping with appropriate social distancing standards and other public health guidelines – in order to help struggling businesses including restaurants survive and help keep the employees who depend on the jobs that have been impacted and jeopardized by the coronavirus shut‐downs employed; and WHEREAS, parklets and prefabricated outdoor spaces meet the intended purpose of “expanding the area within which a business may provide goods or services to customers while keeping with public health guidelines” that served as the basis for establishing Economic Recovery Revocable Right‐of‐Way Permits, and, thus, the City Council wishes to allow for them as an element of encouraging economic recovery in the City; and AGENDA ITEM # 9. l) ORDINANCE NO. ________ 2 WHEREAS, Ordinance No. 5974 also established and temporarily allowed businesses to place signs known as “Economic Recovery Signs” in the form of A‐Frame Signs and Event Signs, through December 31, 2020; and WHEREAS, on December 7, 2020, the City Council passed Ordinance No. 5997 extending and amending Ordinance No. 5974, which was valid until June 7, 2021, in response to the continued impacts the COVID‐19 public health emergency has had on businesses; and WHEREAS, in order to assist the struggling downtown business community, Ordinance No. 5997 approved the designation of a limited number of existing public parking stalls within the area zoned Center Downtown (CD) as short‐term parking for curbside pick‐up or to go orders; and WHEREAS, in addition to extending and amending the interim zoning controls established in Ordinance No. 5974, Ordinance No. 5997 waived the requirement to obtain a Temporary Use Permit for the temporary expansion of a business into an adjacent vacant space in a multi‐tenant building in compliance with the Governor’s Safe Start plan and public heath guidelines for COVID‐ 19; and WHEREAS, in order to accommodate the anticipated increases in short‐term parking in the area zoned Center Downtown (CD) and to assist the struggling downtown business community, Ordinance No. 5997 temporarily waived hourly parking fees in the City’s City Center Parking Garage located at 655 S 2nd St. for parking periods of up to 10 hours; and WHEREAS, on June 7, 2021, the City Council passed Ordinance No. 6018 extending Ordinance No. 5997 in response to the ongoing impacts the COVID‐19 public health emergency has had on businesses through December 7, 2021; and AGENDA ITEM # 9. l) ORDINANCE NO. ________ 3 WHEREAS, since the adoption of Ordinance No. 6018 the “Safe Start Washington” and “Healthy Washington‐ Roadmap to Recovery” plans are no longer in effect and on June 30, 2021 Washington state reopened under the “Washington Ready” plan; and WHEREAS, the most recent Proclamation issued by the Governor, 20‐25.17, states that Proclamation 20‐25, et seq., will continue to be in effect until the state of emergency, issued on February 29, 2020 pursuant to Proclamation 20‐05, is rescinded; and WHEREAS, due to the continued state of emergency the City Council has determined that there is a need to extend beyond December 7, 2021 the interim zoning controls establishing the Economic Recovery Revocable Right‐of Way Permit, establishing and allowing Economic Recovery Signs, waiving the requirement to obtain a temporary use permit for temporary expansion of business into an adjacent vacant space in a multi‐tenant building, permitting the temporary designation of short term parking stalls within the Center Downtown (CD) zoning district for curbside pick‐up or to go orders, and waving parking fees for the City Center Parking garage; and WHEREAS, the City Council held a public hearing on December 6, 2021, to consider a six‐ month extension of the interim zoning controls established by Ordinance No. 5974, extended and amended by Ordinance No. 5997, and extended by Ordinance No. 6018; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN AS FOLLOWS: AGENDA ITEM # 9. l) ORDINANCE NO. ________ 4 SECTION I. The above recitals are adopted as findings of fact in support of the interim controls extended herein pursuant to RCW 35A.63.220 and RCW 36.70A.390, and are found to be true and correct in all respects. SECTION II. The interim zoning controls established by Ordinance No. 5974, extended and amended by Ordinance No. 5997, and extended again by Ordinance No. 6018 are hereby extended and shall remain in effect until June 6, 2022, unless ended earlier by subsequent City Council action, or unless subsequently extended by the City Council pursuant to state law. SECTION III. The Mayor or his designee is authorized to implement any and all administrative procedures necessary to carry out the directives of this legislation. SECTION IV. A public hearing was held on December 6, 2021. SECTION V. If any section, subsection, sentence, clause, phrase or work of this ordinance should be held to be invalid or unconstitutional by a court or competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. SECTION VI. The City Council declares an emergency for the protection of the public welfare and to enable the purpose and intent of this ordinance to be accomplished. This ordinance shall take effect immediately when passed by the City Council. The City Clerk shall cause to be published a summary of this ordinance in the City’s official newspaper. The summary shall consist of this ordinance’s title. PASSED BY THE CITY COUNCIL this _______ day of ___________________, 2021. Jason A. Seth, City Clerk AGENDA ITEM # 9. l) ORDINANCE NO. ________ 5 APPROVED BY THE MAYOR this _______ day of _____________________, 2021. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney Date of Publication: ORD:2198:11/8/21 AGENDA ITEM # 9. l)