HomeMy WebLinkAboutMFP20004798.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20004798
IVR Number: 20004798
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:10/19/2020Application Date:0823059197Parcel Number: 480 HOUSER WAY N
Permit Type:12/15/2021Issue Date:Franchise
Permit Work Class:12/15/2022Expiration Date:Minor Utility
Job Number: 593224519
Description: Puget Sound Energy Electric CREW TO INSTALL MID SPAN SPACERS FROM P01 P07. WILL REQUIRE (2)
SEPARATE CLOSURES OF SOUTHBOUND CLOSURE OF HOUSER WAY N FROM P01 P02 & P06 AND
NORTHBOUND CLOSURE OF HOUSER WAY N AT P07 W/ FLAGGERS. CREW WILL INSTALL MID SPAN SPACERS
FROM P02 P06 IN KENWORTH RENTON PLANT PARKING LOT W/ SAFETY CONES AROUND WORK AREA. NO
DISTURBANCE OF HARD SURFACE REQUIRED.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
P01
P02 RRRRRRRR
N 8TH ST HOUSER WAY
N
H
O
U
S
E
R
W
A
Y
B
Y
PHOUSER WAY
NHOUSER WAY N1818 13 121213 12 12
19 12 12
18
12
18
10 11 19
10101010EXISTING GATE
STOP
FLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'STOP
FLAGGER
RIGHT
KEEP
R4-7B
W20-7AROAD
WORK
AHEAD W20-1BE
PREPA
R
E
D
TO
STOP W3-4200
'20
0
'
200
'
THE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
POLICEUPO
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
SET SIGNAL
TO FLASH
DRIVEWAY CLOSED.
ENTER/EXIT TO PARKING LOT
THROUGH NEXT DRIVEWAY.
N
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
PSE PUGETSOUNDENERGY
-OB593224519
480 HOUSER WAY N, RENTON
10/08/2020
FLAVIANA.NUNES@PSE.COM
425-424-7809
SHEET 1 of 3
Notes:
1. All signs and spacing to conform to the
MUTCD and Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 30" x 30" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
P06
P07 HOUSER WAY NHOUSER WAY N18
18
1818
EXISTING GATE M6-2RIGHT
KEEP
R4-7B maintain (2) 11' lanesROADWORKAHEADW20-1RIGHTSHOULDERCLOSEDW21-5aRW1-4L100'100'100'ROA
D
WOR
K
AHE
A
D W20-1W1-4R100'100'THE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
N
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
PSE PUGETSOUNDENERGY
-OB593224519
480 HOUSER WAY N, RENTON
10/08/2020
FLAVIANA.NUNES@PSE.COM
425-424-7809
SHEET 2 of 3
Notes:
1. All signs and spacing to conform to the
MUTCD and Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 30" x 30" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
P06
P07 HOUSER WAY NHOUSER WAY N18
18
1818
EXISTING GATE M6-2RIGHTKEEPR4-7Bmaintain (2) 11' lanesROADWORKAHEADW20-1W1-4R100'100'ROA
D
WOR
K
AHE
A
D W20-1RIGH
TSHO
U
L
D
E
R
CLO
S
E
D
W21-5aRW1-4L100'100'100'N
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
PSE PUGETSOUNDENERGY
-OB593224519
480 HOUSER WAY N, RENTON
10/08/2020
FLAVIANA.NUNES@PSE.COM
425-424-7809
SHEET 3 of 3
Notes:
1. All signs and spacing to conform to the
MUTCD and Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 30" x 30" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
R
O
W
ROWROW318359-166366 318379-166357
25kVA 120/240v
318337-166381
T11 ROWROWROWROWROWROWR
O
W
ROWROWROWROW
HOUSER WAY NR
O
W
R
O
W
RO
W
RO
W
318367-166380
T12
X9973
X5435
??
UNK
NEW SW# 84622
T
R
A
I
N
R
A
I
L
R
O
W
ROW318229-166381
T8
318201-166381
T7
T76249
318166-166380
T6ROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROW
RO
W
R
O
W
ROW
RO
W
ROWROWROWROWROWJ
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWHOUSER WAY NROWR
O
W
R
OW
318184-166368
ROW
ROWROWTRAIN RAIL480
HOUSER WAY N318304-166381
T10
318263-166381
T9
15kVA 120/240v ROWROWROWROWROWROWROWROWROWROW502
232412131425
15
U0127
318378-166362
318379-166357
25kVA 120/240v
318359-166366
AØ51990
BØ51991
CØ51992
N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
TUT Retirement
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)593224519Owner / Developer Contact Info
officeATTN:
N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E040
UNDERGROUND CIRCUIT MAP - B
SCALE: 1" = 50' MAP#: 2305E032
11714048 593224519
SITE MAP - A
SCALE: 1" = 50'
THOMAS GUIDE
656-D1
SITE SPECIFIC NOTES
P01 (318367-166380)
-INST NEW SW# X84622
P01 - P02
-INST (2) SETS (2 SPACERS PER SET) OF 48" MID-SPAN SPACER ON 336.4MCM ASCR BETWEEN AØ, BØ & CØ FOR BOTH
PCR-14 & PCR-22 AT 100', SPAN= ±310', (ACTUAL= ±_____') [MID# 9997644]
P02 - P03
-INST (2) SETS (2 SPACERS PER SET) OF 48" MID-SPAN SPACER ON 336.4MCM ASCR BETWEEN AØ, BØ & CØ FOR BOTH
PCR-14 & PCR-22 AT 100', SPAN= ±335', (ACTUAL= ±_____') [MID# 9997644]
P03 - P04
-INST (2) SETS (2 SPACERS PER SET) OF 48" MID-SPAN SPACER ON 336.4MCM ASCR BETWEEN AØ, BØ & CØ FOR BOTH
PCR-14 & PCR-22 AT 100', SPAN= ±350', (ACTUAL= ±_____') [MID# 9997644]
P04 - P05
-INST (2) SETS (2 SPACERS PER SET) OF 48" MID-SPAN SPACER ON 336.4MCM ASCR BETWEEN AØ, BØ & CØ FOR BOTH
PCR-14 & PCR-22 AT 100', SPAN= ±310', (ACTUAL= ±_____') [MID# 9997644]
P05 - P06
-INST (2) SETS (2 SPACERS PER SET) OF 48" MID-SPAN SPACER ON 336.4MCM ASCR BETWEEN AØ, BØ & CØ FOR BOTH
PCR-14 & PCR-22 AT 100', SPAN= ±315', (ACTUAL= ±_____') [MID# 9997644]
P06 - P07
-INST (2) SETS (2 SPACERS PER SET) OF 48" MID-SPAN SPACER ON 336.4MCM ASCR BETWEEN AØ, BØ & CØ FOR BOTH
PCR-14 & PCR-22 AT 100', SPAN= ±395', (ACTUAL= ±_____') [MID# 9997644]
**SWITCHING REQUIRED
**RETURN NORMAL PER SYSTEM OPERATOR
CIRCUIT FEET ADDED: NONE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T. LOPRESTO 425-748-6374 10/5/20
J. WARNER 714-893-2405 10/5/20
H. HUYNH 714-893-2405 10/5/20
N/A RENTON
PCR-14 / CREW2 / 480 HOUSER WAY N
INST MID-SPAN SPACER
480 HOUSER WAY N, RENTON, WA. 98057
ASPLUNDH CONSTRUCTION CORP.
O-629757
593224519
AS NOTED 1/1
KING FAC-SVC
SE 8-23N-05E
2305E032 2305E040 PCR-142305E032
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
XX
WORKSITE
POWER GENERAL NOTES - RESIDENTIAL PROJECT
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
SITE MAP - B
SCALE: 1" = 50'
SITE MAP - C
SCALE: 1" = 50'
N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:TIMOTHY LOPRESTO
425-393-4185
TIMOTHY.LOPRESTO@PSE.COM
UNDERGROUND CIRCUIT MAP - A
SCALE: 1" = 50' MAP#: 2305E032
BREAK LINE ±330'
BREAK LINE ±310'
BREAK LINE ±1,600'
BREAK LINE ±310'