HomeMy WebLinkAboutSurety - Bond Quantity Worksheet Final.pdfPlanning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date Prepared:
Name:
PE Registration No:
Firm Name:
Firm Address:
Phone No.
Email Address:
Project Name: Project Owner:
CED Plan # (LUA):Phone:
CED Permit # (U):Address:
Site Address:
Street Intersection:Addt'l Project Owner:
Parcel #(s):Phone:
Address:
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No:NO Water Service Provided by:
If Yes, Provide Forest Practice Permit #:Sewer Service Provided by:
1 Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)
Clearing and Grading Utility Providers
N/A
Project Location and Description Project Owner Information
Swanson Gardner Meyer Office Remodel Todd and Polly Gardner
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
CITY OF RENTON
CITY OF RENTON
12/9/2021
Prepared by:
PROJECT CLOSEOUTProject Phase 1
Sheri Murata
41846
Core Design Inc.
12100 NE 195th St, Suite #300, Bothell, WA 98011
425.885.7877
Abbreviated Legal
Description:
3123059069
LUA19-000169
4512 Talbot Rd
425-226-7920
Renton, WA 980554512 Talbot Rd
Talbot Road S and S 45th Place
C190005266
Page 1 of 13
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Unit
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 6.50$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each
Catch Basin Protection ESC-3 35.50$ Each 2 71.00
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)95.00$ CY
Ditching ESC-5 9.00$ CY
Excavation-bulk ESC-6 2.00$ CY
Fence, silt ESC-7 SWDM 5.4.3.1 1.50$ LF 259 388.50
Fence, Temporary (NGPE)ESC-8 1.50$ LF
Geotextile Fabric ESC-9 2.50$ SY
Hay Bale Silt Trap ESC-10 0.50$ Each
Hydroseeding ESC-11 SWDM 5.4.2.4 0.80$ SY
Interceptor Swale / Dike ESC-12 1.00$ LF
Jute Mesh ESC-13 SWDM 5.4.2.2 3.50$ SY
Level Spreader ESC-14 1.75$ LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.50$ SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.00$ SY
Piping, temporary, CPP, 6"ESC-17 12.00$ LF
Piping, temporary, CPP, 8"ESC-18 14.00$ LF
Piping, temporary, CPP, 12"ESC-19 18.00$ LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.00$ SY
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)45.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 1,800.00$ Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,200.00$ Each
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,200.00$ Each
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 19.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 70.00$ LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.00$ SY
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 8.00$ SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 10.00$ SY
TESC Supervisor ESC-30 110.00$ HR 4 440.00
Water truck, dust control ESC-31 SWDM 5.4.7 140.00$ HR
Unit
Reference #Price Unit Quantity Cost
8.00$ LF 347 2,776.00
EROSION/SEDIMENT SUBTOTAL:3,675.50
SALES TAX @ 10%367.55
EROSION/SEDIMENT TOTAL:4,043.05
(A)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
Description No.
(A)
Tree Protection Fence
WRITE-IN-ITEMS
Page 2 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 6.00$ CY
Backfill & Compaction- trench GI-2 9.00$ CY
Clear/Remove Brush, by hand (SY)GI-3 1.00$ SY
Bollards - fixed GI-4 240.74$ Each
Bollards - removable GI-5 452.34$ Each
Clearing/Grubbing/Tree Removal GI-6 10,000.00$ Acre
Excavation - bulk GI-7 2.00$ CY
Excavation - Trench GI-8 5.00$ CY
Fencing, cedar, 6' high GI-9 20.00$ LF
Fencing, chain link, 4'GI-10 38.31$ LF
Fencing, chain link, vinyl coated, 6' high GI-11 20.00$ LF
Fencing, chain link, gate, vinyl coated, 20' GI-12 1,400.00$ Each
Fill & compact - common barrow GI-13 25.00$ CY
Fill & compact - gravel base GI-14 27.00$ CY
Fill & compact - screened topsoil GI-15 39.00$ CY
Gabion, 12" deep, stone filled mesh GI-16 65.00$ SY
Gabion, 18" deep, stone filled mesh GI-17 90.00$ SY
Gabion, 36" deep, stone filled mesh GI-18 150.00$ SY
Grading, fine, by hand GI-19 2.50$ SY
Grading, fine, with grader GI-20 2.00$ SY
Monuments, 3' Long GI-21 250.00$ Each
Sensitive Areas Sign GI-22 7.00$ Each
Sodding, 1" deep, sloped ground GI-23 8.00$ SY
Surveying, line & grade GI-24 850.00$ Day
Surveying, lot location/lines GI-25 1,800.00$ Acre
Topsoil Type A (imported)GI-26 28.50$ CY
Traffic control crew ( 2 flaggers )GI-27 120.00$ HR
Trail, 4" chipped wood GI-28 8.00$ SY
Trail, 4" crushed cinder GI-29 9.00$ SY
Trail, 4" top course GI-30 12.00$ SY
Conduit, 2"GI-31 5.00$ LF
Wall, retaining, concrete GI-32 55.00$ SF
Wall, rockery GI-33 15.00$ SF 440 6,600.00 440 6,600.00
SUBTOTAL THIS PAGE:6,600.00 6,600.00
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 3 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 30.00$ SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 16.00$ SY
AC Grinding, 4' wide machine > 2000sy RI-3 10.00$ SY
AC Removal/Disposal RI-4 35.00$ SY 40 1,400.00 40 1,400.00
Barricade, Type III ( Permanent )RI-5 56.00$ LF
Guard Rail RI-6 30.00$ LF
Curb & Gutter, rolled RI-7 17.00$ LF
Curb & Gutter, vertical RI-8 12.50$ LF 44 550.00 44 550.00
Curb and Gutter, demolition and disposal RI-9 18.00$ LF
Curb, extruded asphalt RI-10 5.50$ LF
Curb, extruded concrete RI-11 7.00$ LF
Sawcut, asphalt, 3" depth RI-12 1.85$ LF
Sawcut, concrete, per 1" depth RI-13 3.00$ LF
Sealant, asphalt RI-14 2.00$ LF
Shoulder, gravel, 4" thick RI-15 15.00$ SY
Sidewalk, 4" thick RI-16 38.00$ SY 155 5,890.00 155 5,890.00
Sidewalk, 4" thick, demolition and disposal RI-17 32.00$ SY 61 1,952.00 61 1,952.00
Sidewalk, 5" thick RI-18 41.00$ SY 22 902.00 22 902.00
Sidewalk, 5" thick, demolition and disposal RI-19 40.00$ SY 22 880.00 22 880.00
Sign, Handicap RI-20 85.00$ Each
Striping, per stall RI-21 7.00$ Each
Striping, thermoplastic, ( for crosswalk )RI-22 3.00$ SF
Striping, 4" reflectorized line RI-23 0.50$ LF
Additional 2.5" Crushed Surfacing RI-24 3.60$ SY
HMA 1/2" Overlay 1.5" RI-25 14.00$ SY
HMA 1/2" Overlay 2"RI-26 18.00$ SY
HMA Road, 2", 4" rock, First 2500 SY RI-27 28.00$ SY 40 1,120.00 40 1,120.00
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 21.00$ SY
HMA Road, 4", 6" rock, First 2500 SY RI-29 45.00$ SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 37.00$ SY
HMA Road, 4", 4.5" ATB RI-31 38.00$ SY
Gravel Road, 4" rock, First 2500 SY RI-32 15.00$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 10.00$ SY
Thickened Edge RI-34 8.60$ LF
SUBTOTAL THIS PAGE:12,694.00 12,694.00
(B)(C)(D)(E)
Page 4 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 21.00$ SY
2" AC, 1.5" top course & 2.5" base course PL-2 28.00$ SY
4" select borrow PL-3 5.00$ SY
1.5" top course rock & 2.5" base course PL-4 14.00$ SY
SUBTOTAL PARKING LOT SURFACING:
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1
Median Landscaping LA-2
Right-of-Way Landscaping LA-3
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1
Street Light System ( # of Poles)TR-2
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:
(B)(C)(D)(E)
WRITE-IN-ITEMS
SUBTOTAL WRITE-IN ITEMS:
STREET AND SITE IMPROVEMENTS SUBTOTAL:12,694.00 6,600.00 19,294.00
SALES TAX @ 10%1,269.40 660.00 1,929.40
STREET AND SITE IMPROVEMENTS TOTAL:13,963.40 7,260.00 21,223.40
(B)(C)(D)(E)
Page 5 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 26.00$ SY
* (CBs include frame and lid)
Beehive D-2 90.00$ Each
Through-curb Inlet Framework D-3 400.00$ Each
CB Type I D-4 1,500.00$ Each 1 1,500.00 1 1,500.00
CB Type IL D-5 1,750.00$ Each
CB Type II, 48" diameter D-6 2,300.00$ Each 1 2,300.00 1 2,300.00
for additional depth over 4' D-7 480.00$ FT 3.58 1,718.40 3.58 1,718.40
CB Type II, 54" diameter D-8 2,500.00$ Each
for additional depth over 4'D-9 495.00$ FT
CB Type II, 60" diameter D-10 2,800.00$ Each
for additional depth over 4'D-11 600.00$ FT
CB Type II, 72" diameter D-12 6,000.00$ Each
for additional depth over 4'D-13 850.00$ FT
CB Type II, 96" diameter D-14 14,000.00$ Each
for additional depth over 4'D-15 925.00$ FT
Trash Rack, 12"D-16 350.00$ Each
Trash Rack, 15"D-17 410.00$ Each
Trash Rack, 18"D-18 480.00$ Each
Trash Rack, 21"D-19 550.00$ Each
Cleanout, PVC, 4"D-20 150.00$ Each 3 450.00 3 450.00
Cleanout, PVC, 6"D-21 170.00$ Each 1 170.00 1 170.00
Cleanout, PVC, 8"D-22 200.00$ Each
Culvert, PVC, 4" D-23 10.00$ LF
Culvert, PVC, 6" D-24 13.00$ LF 49 637.00 56 728.00 105 1,365.00
Culvert, PVC, 8" D-25 15.00$ LF
Culvert, PVC, 12" D-26 23.00$ LF
Culvert, PVC, 15" D-27 35.00$ LF
Culvert, PVC, 18" D-28 41.00$ LF
Culvert, PVC, 24"D-29 56.00$ LF
Culvert, PVC, 30" D-30 78.00$ LF
Culvert, PVC, 36" D-31 130.00$ LF
Culvert, CMP, 8"D-32 19.00$ LF
Culvert, CMP, 12"D-33 29.00$ LF
SUBTOTAL THIS PAGE:4,655.40 2,848.00 7,503.40
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 6 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 35.00$ LF
Culvert, CMP, 18"D-35 41.00$ LF
Culvert, CMP, 24"D-36 56.00$ LF
Culvert, CMP, 30"D-37 78.00$ LF
Culvert, CMP, 36"D-38 130.00$ LF
Culvert, CMP, 48"D-39 190.00$ LF
Culvert, CMP, 60"D-40 270.00$ LF
Culvert, CMP, 72"D-41 350.00$ LF
Culvert, Concrete, 8"D-42 42.00$ LF
Culvert, Concrete, 12"D-43 48.00$ LF
Culvert, Concrete, 15"D-44 78.00$ LF
Culvert, Concrete, 18"D-45 48.00$ LF
Culvert, Concrete, 24"D-46 78.00$ LF
Culvert, Concrete, 30"D-47 125.00$ LF
Culvert, Concrete, 36"D-48 150.00$ LF
Culvert, Concrete, 42"D-49 175.00$ LF
Culvert, Concrete, 48"D-50 205.00$ LF
Culvert, CPE Triple Wall, 6" D-51 14.00$ LF
Culvert, CPE Triple Wall, 8" D-52 16.00$ LF
Culvert, CPE Triple Wall, 12" D-53 24.00$ LF
Culvert, CPE Triple Wall, 15" D-54 35.00$ LF
Culvert, CPE Triple Wall, 18" D-55 41.00$ LF
Culvert, CPE Triple Wall, 24" D-56 56.00$ LF
Culvert, CPE Triple Wall, 30" D-57 78.00$ LF
Culvert, CPE Triple Wall, 36" D-58 130.00$ LF
Culvert, LCPE, 6"D-59 60.00$ LF
Culvert, LCPE, 8"D-60 72.00$ LF
Culvert, LCPE, 12"D-61 84.00$ LF
Culvert, LCPE, 15"D-62 96.00$ LF
Culvert, LCPE, 18"D-63 108.00$ LF
Culvert, LCPE, 24"D-64 120.00$ LF
Culvert, LCPE, 30"D-65 132.00$ LF
Culvert, LCPE, 36"D-66 144.00$ LF
Culvert, LCPE, 48"D-67 156.00$ LF
Culvert, LCPE, 54"D-68 168.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 7 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 180.00$ LF
Culvert, LCPE, 72"D-70 192.00$ LF
Culvert, HDPE, 6"D-71 42.00$ LF
Culvert, HDPE, 8"D-72 42.00$ LF
Culvert, HDPE, 12"D-73 74.00$ LF
Culvert, HDPE, 15"D-74 106.00$ LF
Culvert, HDPE, 18"D-75 138.00$ LF
Culvert, HDPE, 24"D-76 221.00$ LF
Culvert, HDPE, 30"D-77 276.00$ LF
Culvert, HDPE, 36"D-78 331.00$ LF
Culvert, HDPE, 48"D-79 386.00$ LF
Culvert, HDPE, 54"D-80 441.00$ LF
Culvert, HDPE, 60"D-81 496.00$ LF
Culvert, HDPE, 72"D-82 551.00$ LF
Pipe, Polypropylene, 6"D-83 84.00$ LF
Pipe, Polypropylene, 8"D-84 89.00$ LF
Pipe, Polypropylene, 12"D-85 95.00$ LF
Pipe, Polypropylene, 15"D-86 100.00$ LF
Pipe, Polypropylene, 18"D-87 106.00$ LF
Pipe, Polypropylene, 24"D-88 111.00$ LF
Pipe, Polypropylene, 30"D-89 119.00$ LF
Pipe, Polypropylene, 36"D-90 154.00$ LF
Pipe, Polypropylene, 48"D-91 226.00$ LF
Pipe, Polypropylene, 54"D-92 332.00$ LF
Pipe, Polypropylene, 60"D-93 439.00$ LF
Pipe, Polypropylene, 72"D-94 545.00$ LF
Culvert, DI, 6"D-95 61.00$ LF
Culvert, DI, 8"D-96 84.00$ LF
Culvert, DI, 12"D-97 106.00$ LF
Culvert, DI, 15"D-98 129.00$ LF
Culvert, DI, 18"D-99 152.00$ LF
Culvert, DI, 24"D-100 175.00$ LF
Culvert, DI, 30"D-101 198.00$ LF
Culvert, DI, 36"D-102 220.00$ LF
Culvert, DI, 48"D-103 243.00$ LF
Culvert, DI, 54"D-104 266.00$ LF
Culvert, DI, 60"D-105 289.00$ LF
Culvert, DI, 72"D-106 311.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 8 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
Specialty Drainage Items
Ditching SD-1 9.50$ CY
Flow Dispersal Trench (1,436 base+)SD-3 28.00$ LF
French Drain (3' depth)SD-4 26.00$ LF
Geotextile, laid in trench, polypropylene SD-5 3.00$ SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,000.00$ Each
Pond Overflow Spillway SD-7 16.00$ SY
Restrictor/Oil Separator, 12"SD-8 1,150.00$ Each
Restrictor/Oil Separator, 15"SD-9 1,350.00$ Each
Restrictor/Oil Separator, 18"SD-10 1,700.00$ Each
Riprap, placed SD-11 42.00$ CY
Tank End Reducer (36" diameter)SD-12 1,200.00$ Each
Infiltration pond testing SD-13 125.00$ HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:
(B)(C)(D)(E)
STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 Each
Detention Vault SF-3 Each
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:
(B)(C)(D)(E)
Page 9 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
Splash Block WI-1 150.00$ each 2 300.00 2 300.00
WI-2
WI-3
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:300.00 300.00
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:4,655.40 3,148.00 7,803.40
SALES TAX @ 10%465.54 314.80 780.34
DRAINAGE AND STORMWATER FACILITIES TOTAL:5,120.94 3,462.80 8,583.74
(B) (C) (D) (E)
Page 10 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 2,000.00$ Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 50.00$ LF 26 1,300.00 26 1,300.00
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 56.00$ LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 60.00$ LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 70.00$ LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 80.00$ LF
Gate Valve, 4 inch Diameter W-7 500.00$ Each
Gate Valve, 6 inch Diameter W-8 700.00$ Each
Gate Valve, 8 Inch Diameter W-9 800.00$ Each
Gate Valve, 10 Inch Diameter W-10 1,000.00$ Each
Gate Valve, 12 Inch Diameter W-11 1,200.00$ Each
Fire Hydrant Assembly W-12 4,000.00$ Each
Permanent Blow-Off Assembly W-13 1,800.00$ Each
Air-Vac Assembly, 2-Inch Diameter W-14 2,000.00$ Each
Air-Vac Assembly, 1-Inch Diameter W-15 1,500.00$ Each
Compound Meter Assembly 3-inch Diameter W-16 8,000.00$ Each
Compound Meter Assembly 4-inch Diameter W-17 9,000.00$ Each
Compound Meter Assembly 6-inch Diameter W-18 10,000.00$ Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 20,000.00$ Each
WATER SUBTOTAL:1,300.00 1,300.00
SALES TAX @ 10%130.00 130.00
WATER TOTAL:1,430.00 1,430.00
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 11 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
CED Permit #:C190005266
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 1,000.00$ Each
Grease Interceptor, 500 gallon SS-2 8,000.00$ Each
Grease Interceptor, 1000 gallon SS-3 10,000.00$ Each
Grease Interceptor, 1500 gallon SS-4 15,000.00$ Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 80.00$ LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 95.00$ LF
Sewer Pipe, PVC, 8 inch Diameter SS-7 105.00$ LF
Sewer Pipe, PVC, 12 Inch Diameter SS-8 120.00$ LF
Sewer Pipe, DI, 8 inch Diameter SS-9 115.00$ LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 130.00$ LF
Manhole, 48 Inch Diameter SS-11 6,000.00$ Each
Manhole, 54 Inch Diameter SS-13 6,500.00$ Each
Manhole, 60 Inch Diameter SS-15 7,500.00$ Each
Manhole, 72 Inch Diameter SS-17 8,500.00$ Each
Manhole, 96 Inch Diameter SS-19 14,000.00$ Each
Pipe, C-900, 12 Inch Diameter SS-21 180.00$ LF
Outside Drop SS-24 1,500.00$ LS
Inside Drop SS-25 1,000.00$ LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:
SALES TAX @ 10%
SANITARY SEWER TOTAL:
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 12 of 13
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200
Date:
Name:Project Name:
PE Registration No:CED Plan # (LUA):
Firm Name:CED Permit # (U):
Firm Address:Site Address:
Phone No.Parcel #(s):
Email Address:Project Phase:
Site Restoration/Erosion Sediment Control Subtotal (a)
Existing Right-of-Way Improvements Subtotal (b)(b)13,963.40$
Future Public Improvements Subtotal (c)-$
Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)8,583.74$
(e)
(f)
Site Restoration
Civil Construction Permit
Maintenance Bond 4,509.43$
Bond Reduction 2
Construction Permit Bond Amount 3
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead and profit.
425.885.7877
Swanson Gardner Meyer Office Remodel
LUA19-000169
4512 Talbot Rd
3123059069
PROJECT CLOSEOUT
C190005266
12100 NE 195th St, Suite #300, Bothell, WA 98011
10,000.00$
P
(a) x 100%
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
12/9/2021
Sheri Murata
41846
Core Design Inc.
R
((b x 150%) + (d x 100%))
S
(e) x 150% + (f) x 100%
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2
T
(P +R - S)
Prepared by:Project Information
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
EST1
((b) + (c) + (d)) x 20%
33,980.10$
MAINTENANCE BOND */**
(after final acceptance of construction)
4,043.05$
13,963.40$
38,112.58$
4,043.05$
22,653.40$
17,167.48$
-$
Page 13 of 13
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 12/9/2021