HomeMy WebLinkAboutMFP21005451 Rev 1DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21005451
IVR Number: 21005451
Permit Information
Permit Name: JB 532561
Address/Location:11/10/2021Application Date:8645500310Parcel Number: 2614 SE 16TH ST
Permit Type:12/06/2021Issue Date:Franchise
Permit Work Class:12/06/2022Expiration Date:Minor Utility
Job Number: JB 532561Franchise Type:Cable
Description: Revision1: Existing conduit failed. Bore new 2" conduit in ROW between splice points, approximately 300 LF.
Restoration per City of Renton standard.
Original scope: Work at existing vaults on SE 16th St to pull new cable through existing conduit.
Contacts
Name Address PhoneTypeBilling
Michele Moore
Prince Telecom LLC
13701 24th St E, 24th St E
Sumner, WA 98390
H: (206) 388-4316ApplicantX
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Applicant
Akisha Brown
Prince Telecom Inc
551A Mews Dr
New Castle, DE 19720
B: (302) 482-8893
C: (302) 482-8892
Contractor
Business License Number: 29850Electrical Contractor: PRINCTL834BF
Construction Contractor: PRINCTL862PS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Comcat JB 532516 MFP21005451
2614 SE 16TH ST RENTON WA
Monday Friday 8AM 3PM
300'ROW BORE FROM CORNER OF FERNDALE AVE SE,EAST TO 2704
Prince Telecom LLC 253 278 7520
Michele Moore -Lead Permit Coordinator .Michele.moore@princetelecom.com .
13701 24th ST E Bldg G .Sumner 98390
12/22/2021Nathan Janders CED
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
Michele Moore -Lead Permit Coordinator .12/21/2021Michele L Moore
RENTON WA 98058
JOB ID: JB 532561
2614 SE 16TH ST
MFP21005451
PRINCE TELECOM LLC Construction Manager:Jim Buckley Engineer Bill Walker 253-208-8108
13701 24TH ST E BLD G Permit Coordinator Michele Moore 253-278-7520
michele.moore@princetelecom.com Site Contact #2 Bill Walker 253-208-8108
SUMNER WA 98390 Comcast Permit Contact:Rhonda Resnik
•
•
•
•
•
•
•
PROJECT ID:
PROJECT DISCRIPTION
TIE IN AT EXISTING SPLICE POINT.
JB 532561
LEGEND
Total UG:300
Total Aerial:0
TIE IN AT EXISTING SPLICE POINT.
PULL COAX CABLE THROUGH.
Water Storm
Communication Sewer
Ped/ Vault CATV Pole
New UG New Aerial
Existing UG Existing Aerial
FROM TIE IN POINT, BORE IN AND INSTALL NEW 2"
PVC
Work Area
EXISTING UTILITIES
Power Gas
RENTON WA 98058
SITE PLAN CONTRACTOR INFORMATION PERMIT INFORMATION JOB ADDRESS:
2614 SE 16TH ST
------W-----W-----
-----P-----P-----
-----SS-----
-----SD-----
-----T-----T-
----G----G--
GENERAL NOTE:
•ALL SUBSTRUCTURE TO HAVE 36" COVER.
•RESTORATION SHALL COMPLY TO JURISDICTION STANDARD.
•CONTRACTOR TO COMPLY WITH ALL PROVISIONS OF LAW AND
ORDINANCES GOVERNING THIS WORK AND WITH ALL STATE AND
LOCAL LAWS AND ORDINANCES.
UTILITY DISCLAIMER
ALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF
ALL UTILITIESTO BE VERIFIED PRIOR TO CONSTRUCTION.CALL UTILITY
UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
PROPOSED PATH DISCALIMERS
1. PROPOSED PATH MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS
AND INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN
300' ROW
BORE PATH
EXISTING
CATV SPLICE
POINT
EXISTING
CATV SPLICE
POINT
VICINITY MAP
MFP21005451
restoration per city of renton standard
pothole all existing utilities
PRINCE TELECOM LLC Construction Manager:Jim Buckley Engineer Bill Walker 253-208-8108
13701 24TH ST E BLD G Permit Coordinator Michele Moore 253-278-7520
michele.moore@princetelecom.com Site Contact #2 Bill Walker 253-208-8108
SUMNER WA 98390 Comcast Permit Contact:Rhonda Resnik
•
•
•
•
•
•
•
Water Storm
Communication
PROJECT DISCRIPTION
TIE IN AT EXISTING SPLICE POINT.
TIE IN AT EXISTING SPLICE POINT.
PULL COAX CABLE THROUGH.
0
0
Total UG:300
Total Aerial:0
0
Sewer
JB 532561
LEGEND
Ped/ Vault CATV Ped / Pole
New UG New Aerial
Existing UG Existing Aerial
FROM TIE IN POINT, BORE IN AND INSTALL NEW 2"
PVC
Work Area
EXISTING UTILITIES
Power Gas
RENTON WA 98058
STREET VIEW/ PHOTOS CONTRACTOR INFORMATION PERMIT INFORMATION JOB ADDRESS:
PROJECT ID:
2614 SE 16TH ST
------W-----W-----
-----P-----P-----
-----SS-----
-----SD-----
-----T-----T-
----G----G--
GENERAL NOTE:
•ALL SUBSTRUCTURE TO HAVE 36" COVER.
•RESTORATION SHALL COMPLY TO JURISDICTION STANDARD.
•CONTRACTOR TO COMPLY WITH ALL PROVISIONS OF LAW AND
ORDINANCES GOVERNING THIS WORK AND WITH ALL STATE AND
LOCAL LAWS AND ORDINANCES.
UTILITY DISCLAIMER
ALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF
ALL UTILITIESTO BE VERIFIED PRIOR TO CONSTRUCTION.CALL UTILITY
UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
PROPOSED PATH DISCALIMERS
1. PROPOSED PATH MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS
AND INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTHS TO BE VERIFIED IN
N NARROWS DRIVE
SPLICE POINT
SPLICE
POINT
BORE PATH
BORE PATH
SPLICE
POINT
MFP21005451