Loading...
HomeMy WebLinkAboutC_Grimit Response1 Jill Ding From:Jill Ding Sent:Tuesday, January 4, 2022 11:35 AM To:'kari.gri@gmail.com' Subject:NE 6th St Short Plat Thank you for your comments. I apologize for the delay in responding, however we had been working with the applicant to revise their plans to comply with City requirements. You have been added as a party of record for this project, as a party of record you will receive copies of City correspondence and any decisions issued on this project. I have included your comments in the official file for consideration by the decision maker. Your comments included concerns with regards to drainage, retaining wall stability, and property maintenance: 1. The short plat improvements would be reviewed by a City engineer for compliance with the City of Renton Surface Water Design Manual for drainage improvements. 2. With regards to the existing retaining walls, the applicant would be required to demonstrate that the existing retaining walls would be sufficient to accommodate the new sidewalk improvements and driveway access along NE 6th St. 3. Any concerns regarding existing property maintenance should be forwarded to our code compliance department at codecompliance@rentonwa.gov for their review. Thanks, JILL DING, Senior Planner City of Renton | CED | [Planning/Building/Economic Development] Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6598 | jding@rentonwa.gov