Loading...
HomeMy WebLinkAboutAddendum No. 1 - Drawing M101BAXTER LIFT STATION EXISTING PLAN BAXTER LIFT STATION PROPOSED PLAN SECTION OBLIQUE EXISTING VALVE VAULT A A A EXISTING 48"x72" ACCESS HATCH BT1 BT1EXISTING 810-LA VAULT EXISTING 6" CHECK VALVE (FLxFL), TYP. OF 2 EXISTING 6" FCA, TYP. OF 2 EXISTING 6" SPOOL (PExFL), TYP. OF 2, VERIFY LENGTH IN FIELD EXISTING 6" PLUG VALVE WITH OPERATION NUT (FLxFL), TYP. OF 2 EXISTING 6" 45° BEND (FLxFL), TYP. OF 2 EXISTING 6" PIPE (FLxFL), TYP. OF 2, VERIFY LENGTH IN FIELD EXISTING 6"x6"x6" TRUE WYE (FLxFLxFL) REMOVE EXISTING 6" 90° BEND EXISTING 6" PIPE (FLxFL), LENGTH 3'-0" EXISTING 6" MAGNETIC FLOW METER (FLxFL) EXISTING 6" MAGNETIC FLOW METER (FLxFL) EXISTING 6" PIPE (FLxFL), TYP. OF 2, VERIFY LENGTH IN FIELD 2" BRASS NIPPLE AS REQUIRED, TYP. OF 2 2" BRASS BALL VALVE DI BLIND FLANGE WITH THREADED TAP PLUG VALVE 6" DI 90° BEND (FLxFL) DI TEE PIPE SUPPORT, TYP.REMOVE EXISTING BEND CITY OF RENTONLIFT STATION AND FORCE MAINIMPROVEMENTS - PHASE 2 (GR. 1B)CITY OF RENTONLIFT STATION AND FORCE MAINIMPROVEMENTS - PHASE 2 (GR. 1B)MCCBEHJan 4, 2022Jan 4, 2022REN117-037RENLS2-D-BXT-M01.DWGSHOWN M101 7 20 DWG NO.:DATEDESCRIPTIONREVISIONSBYREVIEWENGINEER:SAVE DATE:REVIEWED:PLOT DATE:CLIENT:FILENAME:SHEET NO.:JOB NO.:NO.0"1"2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" SCALE:BAXTER LIFT STATION MECHANICALPLAN6" DI TEE (FLxFL) 6" DI ECCENTRIC PLUG VALVE W/ QUARTER ( 1 4 ) TURN OPERATION NUT (FLxFL) 6" DI 90° BEND (FLxFL) 6" DI BLIND FLANGE W/ 2" THREADED TAP (FL) BRASS BALL VALVE AND NIPPLES FOR PIGGING PORT DI TEE PIGGING PORT PIPE SUPPORT CONSTRUCTION NOTES ·PREPARE THE PIGGING PORT ASSEMBLY ABOVE GRADE PRIOR TO REMOVING THE EXISTING 6" 90 DEGREE BEND. ·PROVIDE A VACTOR TRUCK TO TEMPORARILY PUMP SEWAGE FROM THE WETWELL DURING PIGGING PORT INSTALLATION. 6" DI SPOOL (FLxFL), LENGTH 1'-4"101/04/2022ADDENDUM 1LJBEH