Loading...
HomeMy WebLinkAboutMFP21005949.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21005949 IVR Number: 21005949 Permit Information Permit Name: Zayo Bandwidth Northwest, Inc Address/Location:12/13/2021Application Date:1352301086Parcel Number: 310 FACTORY PL N Permit Type:01/06/2022Issue Date:Franchise Permit Work Class:01/06/2023Expiration Date:Minor Utility Job Number: ISO-0471757Franchise Type:Cable Description: Zayo Bandwidth Northwest (Ord 5497) On Houser Way trench 8' from Zayo vault to borepit. Directional bore 67' across Houser Way. Then directional bore south 92' across Factory Pl N to existing 360 vault. Install (3) 1 1/4 HDPE conduits. Pull (1) 144ct fiber through. From 360 vault pull (1) 144ct fiber 150' through existing conduit to Zayo vault on N 3rd St. Pothole all existing utilities. Restoration per City of Renton standard. Contacts Name Address PhoneTypeBilling Zayo Bandwidth Northwest B: (206) 988-8600Applicant Stephen Neumann Fibe Solutions 604 W Meeker St., Suite 103 KENT, WA 98032 C: ((42) 5) -753-x1916 Applicant Dan Caruso Zayo Group LLC 242 Rangeline Rd Longwood, FL 32750 B: (407) 260-1011 C: (303) 381-4683 Contractor Business License Number: 36469Construction Contractor: ZAYOGGL898PJ Cassen Thurston Southwestern Construction Inc 1882 E Joe Cir George, UT 84790 B: (435) 703-1131 C: (435) 538-7261 Contractor Business License Number: BL.039827 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ZAYO - Billing 4772 Walnut St, Suite 100 Boulder, CO 80301 B: (253) 655-1100Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 2/1/2018 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Zayo Group (Authorized Agent: Fibe Solutions) ISO-0471757 360-771-7377 Bob Thoman (Auth: Stephen Neumann)robert.thoman@zayo.com 310 Factory Pl N. Renton, WA 98057 Google Van to Sea On Houser Way trench 8' from Zayo vault to borepit. Directional bore 67' across Houser Way. Then directional bore south 92' across Factory Pl N to existing 360 vault. Install (3) 1-1/4 HDPE conduits. Pull (1) 144ct fiber through. From 360 vault pull (1) 144ct fiber 150'through existing conduit to Zayo vault on N 3rd St 4 4 4 4 4 317 Southwestern Construction 425-615-1457 SOUTHCI864QL 12/1/21 MFP21005949 Scott Warlick POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS 1/5/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 3/18/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 3/18/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: ▪ Include map(s) showing the location of the project and work area. ▪ Be legible lettering and clear, contrasting, symbols of viewing or printing. ▪ Must indicate street names, and north arrow and scale. ▪ Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering ISO-0471757 - Google Van to Sea 310 Factory Pl N Monday Friday 8am 3pm Zayo Group (Southwestern Contractor) Bob Thoman 360-771-7377 4905 Pacific Hwy E. Fife, WA. Trench and directional bore from vault on Houser Way to vault on Factory Pl N. Install conduit and pull fiber. Pull fiber through existing conduit from vault to vault on N 3rd St. X X 98424 MFP21005949 Scott Warlick CED 1/5/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 3/18/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: • Must have approved Traffic Control Plan (TCP) prior to commencing the work. • Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. • WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • All permit conditions shall be met. NOTES: • Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. • Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. • In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 3/18/2021 • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Stephen Neumann/Fibe Solutions / Auth. Agent 12/1/2021 DETOURM4-9RSTREETCLOSEDSTREET CLOSUREXXWORK AREAW20-3DETOURM4-9RN 3RD STFACTORY PL NN 3RD STW20-5RHO U S E R W A Y N N MARION STXAHEADWORKROADW20-1HO U S E R W A Y N X W20-1XW20-1TRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKTERRY CROMWELLTRAFFIC CONTROL SUPERVISORTCS#010558EXPIRES 01/31/2021APPROVED 01/09/2017206.793.0637TCROMWELL@FIBESOLUTIONS.COMTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMLONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 36" x 36" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETPPEDESTRIANSPOTTERPPEDESTRIANSPOTTERMFP21005949Houser way N shall beopen at end of work day.street closure allowedfor working hours only. DETOURM4-9RSTREETCLOSEDSTREET CLOSUREXXWORK AREAW20-3DETOURM4-9RN 3RD STFACTORY PL NN 3RD STW20-5RHO U S E R W A Y N N MARION STXAHEADWORKROADW20-1HO U S E R W A Y N X W20-1XW20-1TRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKTERRY CROMWELLTRAFFIC CONTROL SUPERVISORTCS#010558EXPIRES 01/31/2021APPROVED 01/09/2017206.793.0637TCROMWELL@FIBESOLUTIONS.COMTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMLONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 36" x 36" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETMFP21005949Houser way N shall beopen at end of work day.street closure allowedfor working hours only. XXWORK AREAN 3RD STFACTORY PL NN 3RD STHO U S E R W A Y N N MARION STXAHEADWORKROADW20-1HO U S E R W A Y N X W20-1XW20-1TRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKTERRY CROMWELLTRAFFIC CONTROL SUPERVISORTCS#010558EXPIRES 01/31/2021APPROVED 01/09/2017206.793.0637TCROMWELL@FIBESOLUTIONS.COMTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMLONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 36" x 36" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETW1-4RMFP21005949 XXWORK AREAN 3RD STFACTORY PL NN 3RD STW20-5LHO U S E R W A Y N N MARION STXAHEADWORKROADW20-1HO U S E R W A Y N X W20-1XW20-1TRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKTERRY CROMWELLTRAFFIC CONTROL SUPERVISORTCS#010558EXPIRES 01/31/2021APPROVED 01/09/2017206.793.0637TCROMWELL@FIBESOLUTIONS.COMTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMLONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 36" x 36" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETW1-4RMFP21005949 XWORK AREAN 3RD STFACTORY PL NN 3RD STW20-1HO U S E R W A Y N N MARION STAHEADWORKROADW20-1HO U S E R W A Y N X W20-1XW20-1TRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKTERRY CROMWELLTRAFFIC CONTROL SUPERVISORTCS#010558EXPIRES 01/31/2021APPROVED 01/09/2017206.793.0637TCROMWELL@FIBESOLUTIONS.COMTYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMLONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 36" x 36" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETPPEDESTRIANSPOTTERXXXAHEADCLOSEDRIGHT LANEW20-5RW4-2RWORK AREAMFP21005949 MFP21005949POTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS MFP21005949 SYMBOL LEGEND:BOREPITLINE TYPE LEGEND1200'R‘100 SCALE LINE TYPE LEGENDSPLICEMFP21005949 MFP21005949Maintain 5' ofseparation from firehydrantRESTORATION PER CITY OF RENTON STANDARDS