Loading...
HomeMy WebLinkAboutAddendum No. 2 Page 1 of 1 Addendum No. 1 LIFT STATION AND FORCE MAIN REHAB PHASE 2 (GROUP 1B) PROJECT NO. WWP-27-04059 ADDENDUM NO. 2 Date of Addendum Issue: January 10, 2022 Due Date for Bids: 2:00 pm on January 11, 2022 Date of Bid Opening: 3:00 pm on January 11, 2022 To: ALL PLAN HOLDERS AND/OR PROSPECTIVE BIDDERS The following changes, additions, and/or deletions are hereby made a part of the project bid documents for the Lift Station and Force Main Rehab Phase 2 (Group 1B) project and shall have the same effect as if set forth therein. Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 by signing in the space provided below and submitting the signed addendum with the bid package. Failure to acknowledge receipt of this Addendum may result in your bid proposal being disqualified. SCHEDULE OF PRICES • DELETE & REPLACE: Delete the SCHEDULE OF PRICES and replace with the attached SCHEDULE OF PRICES. The units for Item 15 have been changed from Square Foot to Linear Foot. All other bid items remain unchanged. This Addendum consists of one (1) page and has one (1) attachment. ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT Sincerely, Joe Stowell Wastewater Utility Manager City of Renton Wastewater Utility All Bidders must sign this Addendum No. 2 in the space provided below and attach the signed Addendum No. 2 to the Formal Bid Proposal. Signature: ______________________________ Title: ________________________________ Company: _____________________________________ Date: ___________________________ CITY OF RENTON PUBLIC WORKS DEPARTMENT SCHEDULE OF PRICES LIFT STATION AND FORCE MAIN REHAB PHASE 2 (GROUP 1B) *Note: Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents. SEE SECTION 1-09.14 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS. ITEM ITEM WITH UNIT PRICED BID APPROX. UNIT PRICE TOTAL AMOUNT NO. QUANTITY Dollars Cents Dollars Cents 11 Lump Sum Per Lump Sum 21 Lump Sum Per Lump Sum 31 Lump Sum Per Lump Sum 41 Lump Sum Per Lump Sum 51 Lump Sum Per Lump Sum 69 Each Per Each 71 Lump Sum Per Lump Sum 81 Lump Sum Per Lump Sum 925 Square Foot Per Square Foot 10 150 Square Foot Per Square Foot 11 350 Square Foot Per Square Foot 12 1 Lump Sum Per Lump Sum 13 1 Lump Sum Per Lump Sum 14 800 Linear Foot Per Linear Foot 15 30 Linear Foot Per Linear Foot Traffic Control Mobilization, Demobilization, Site Preparation & Clean- up May not be more than ten percent (10%) of the total amount of the bid. COVID-19 Health and Safety Plan (CHSP) Trench Safety and Shoring Temporary Sedimentation and Erosion Control Magnetic Markers Vactor Piping Improvements Temporary Pump System at Devil's Elbow & Baxter LS Landscape Restoration Asphalt Restoration Devil's Elbow Access Road, Shoulder Ditch Stabilization Concrete Restoration Baxter Lift Station Mechanical Baxter Lift Station Electrical Devil's Elbow Access Road, Asphalt Drainage Berm CITY OF RENTON PUBLIC WORKS DEPARTMENT SCHEDULE OF PRICES LIFT STATION AND FORCE MAIN REHAB PHASE 2 (GROUP 1B) *Note: Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents. SEE SECTION 1-09.14 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS. ITEM ITEM WITH UNIT PRICED BID APPROX. UNIT PRICE TOTAL AMOUNT NO. QUANTITY Dollars Cents Dollars Cents 16 450 Square Foot Per Square Foot 17 1 Lump Sum Per Lump Sum 18 1 Lump Sum Per Lump Sum 19 1 Lump Sum Per Lump Sum 20 1 $3,000 $3,000 Lump Sum Per Lump Sum 21 1 $50,000 $50,000 Lump Sum Per Lump Sum 22 1 $5,000 $5,000 Lump Sum Per Lump Sum Subtotal 10.1% Sales Tax Total Minor Change Prepare Construction Records Devil's Elbow Lift Station Coating Removal East Valley Lift Station Site Work East Valley Lift Station Electrical Operations and Maintenance (O&M) Manuals and On- site Owner Training Devil's Elbow Lift Station Mechanical