HomeMy WebLinkAboutP_Erosion_Control_Plan_Lot9_ForestTerrace3885
FLAT
µ
ΡΒ≅Κ∆9 0! <
0
2/&
15 30
SCALE: 1" = 30'
DATE: DECEMBER 10, 2021
(425) 297-9900(253) 838-6113
www.esmcivil.com
Κ Κ Β
Εδχδθκ ςξ+ ς≅ 87//2
223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4
Β Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ Ρ
FEDERAL WAY
EVERETT
ADDRESS: 2611 UNION AVE NE
SEC.04, T.23N., R.5E., W.M.
ADDRESS: 3535 FACTORIA BLVD SE STE 600
EXHIBIT "B"ΕΝΘ∆ΡΣ Σ∆ΘΘ≅Β∆
LOT 9
LEGEND
{\W0.7;CONCRETE}
DESCRIPTION
{\W0.7;CONSTRUCTION OF NEW SINGLE-FAMILY RESIDENCE}
LEGAL NAME: LOT 1 OF FOREST TERRACE PLAT
MKTG. NAME: XXX
NOTES
{1. THE LIMITS OF CLEARING ANDGRADING ARE THE LOT LINES.2. TIGHTLINE FOOTING AND ROOFDRAINS TO PERFORATED PIPECONNECTION TO PLAT DRAINAGESYSTEM PER APPROVED PLAT DRAINAGESYSTEM.3. FROM OCTOBER 1 THROUGH APRIL 30,NO SOILS SHALL REMAIN EXPOSED ANDUNWORKED FOR MORE THAN 2 DAYS.FROM MAY 1 TO SEPTEMBER 30, NOSOILS SHALL REMAIN EXPOSED ANDUNWORKED FOR MORE THAN 7 DAYS.THIS CONDITION APPLIES TO ALL SOILSON SITE, WHETHER AT FINAL GRADE ORNOT. EXPOSED SOILS THAT WILL REMAINWORKED FOR MORE THAN 7 DAYS SHALLBE STABILIZED IMMEDIATELY PER CITYSTD. PLAN 213.30.4. WHEN A STABILIZED CONSTRUCTIONENTRANCE IS NOT PREVENTINGSEDIMENT FROM BEING TRACKED ONTOPAVEMENT, INSTALL A WHEEL WASH ONSITE PER INCLUDED DETAIL 215.005. ALL ELEVATION DATA IS BASED ON AVERTICAL DATUM OF NAVD 88.6. DRIVEWAY IS 16' WIDE, AND WALKWAY IS 3' WIDE. }
PARCEL NO.: 0423059142
CONTACT: SANDY KEY
PHONE: 425-216-3468
9
PLAN: 3885 (C)
LOT SIZE: 10,293 S.F.TRACT C8
NE 27
T
H
P
L
30' FRONTBSBL\A1;58.1'\A1;58.13'25'BSBL\A1;10' BSBL
\A1;10' BSBL
1.CONDITIONS OF USE
1.1.PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS.
1.2.PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES.
1.3.CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY-SEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH.
CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS.
1.4.THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF. SUCH AREAS INCLUDE STEEP AND
UNSTABLE SLOPES.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS.
2.2.IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE
OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF.
2.3.TIRES, SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC.
2.4.SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12 INCHES AND BE WEIGHTED OR TAPED.
3.MAINTENANCE STANDARDS
3.1.TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED.
3.2.IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST BE COMPLETELY REMOVED AND REPLACED.
3.3.WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED.
NOTES:
10' MAX..
10' MAX.
TOE IN SHEETING IN
4" x4" MIN. TRENCH
PROVIDE ENERGY DISSIPATION
AT TOE IF EROSION IS LIKELY
SANDBAG (TYP.)
PLASTIC COVERING
STD. PLAN - 213.30
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGreggZimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
1.CONDITIONS OF USE
1.1.SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
1.2.SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED
FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE.
2.2.STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED
FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3.WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V
2.4.IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND
SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE.
2.5.FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE.
3.MAINTENANCE STANDARDS
3.1.ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.
3.2.IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3.IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING
CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT.
3.4.SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5.IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
NOTES:
JOINTS IN FILTER FABRIC SHALL BE SPLICED AT
POSTS. USE STAPLES, WIRE RINGS, OR
EQUIVALENT TO ATTACH FABRIC TO POSTS
2"x2" 14 GAUGE WIRE, OR
EQUIVALENT, IF STANDARD
STRENGTH FABRIC USED
FILTER FABRIC
2' MIN.
12" MIN.
4"x4" MIN. TRENCH
BACKFILL TRENCH WITH NATIVE SOIL
OR 3/4" TO 1-1/2" WASHED GRAVEL
2"x4" WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.)
6' MAX.
POST SPACING MAY BE INCREASED
TO 8' IF WIRE BACKING IS USED
AOS (ASTM D4751)30-100 SIEVE SIZE (0.60-0.15mm) FOR SILT FILM
50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS
WATER PERMITTIVITY (ASTM D4491)0.02 SEC-1MINIMUM
GRAB TENSILE STRENGTH (ASTM D4632)180 LBS. MIN. FOR EXTRA STRENGTH FABRIC
100 LBS. MIN. FOR STANDARD STRENGTH FABRIC
GRAB TENSILE ELONGATION (ASTM D4632)30% MAX. (WOVEN)
ULTRAVIOLET RESISTANCE (ASTM D4355)70% MIN.
SILT FENCE
STD. PLAN - 214.00
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGreggZimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
EXIST ING R OA D
1.CONDITION OF USE
1.1.CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER
PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
1.2.FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION
ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE
SHALL MEET THE FOLLOWING STANDARDS:
2.2.DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH
LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED.
2.3.HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS.
HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS
IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.4.FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.5.WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE
EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3.MAINTENANCE STANDARDS
3.1.QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2.IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF
SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL
WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3.ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE
REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND
THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE
WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND
CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS.
3.4.ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5.IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL
TRAFFIC.
NOTES:
CONSTRUCTION ENTRANCE NOTES:
1.DRIVEWAYS SHALL BE PAVED TO
THE EDGE OF THE RIGHT-OF-WAY
PRIOR TO INSTALLATION OF THE
CONSTRUCTION ENTRANCE TO
AVOID DAMAGING OF THE
ROADWAY.
2.IT IS RECOMMENDED THAT THE
ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
INSTALL DRIVEWAY CULVERT
IF THERE IS A ROADSIDE
DITCH PRESENT, AS PER CITY
ROAD STANDARDS
GEOTEXTILE
4"-8" QUARRY SPALLS
12" MIN. THICKNESS
15' MIN.
PROVIDE FULL WIDTH OF
INGRESS/EGRESS AREA
100' MIN.
GRAB TENSILE STRENGTH (ASTM D4632)200 LBS. MIN.
GRAB TENSILE ELONGATION (ASTM D4632)30% MAX. (WOVEN)
CBR PUNCTURE STRENGTH (ASTM D6241)495 LBS. MIN.
AOS (ASTM D4751)20-45 (U.S. STANDARD SIEVE SIZE)
R = 25' MIN.
STABILIZED CONSTRUCTION ENTRANCE
STD. PLAN - 215.10
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGreggZimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT