Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_181119_v1CONSTRUCTION MITIGATION DESCRIPTION: The NE 38th Street Short Plat proposes 8 single family homes with improvements to NE 38th Street, Lincoln Avenue NE and construction of a private access road to allow for emergency and road access into the development.Construction is anticipated to begin January 1,2019 and end by August 31,2020. The hours and days for construction shall within the City of Renton allowable noise ordinance codes from Monday to Saturday and generally from 7 am to 6pm during Monday to Friday and 8am to 6pm on Saturdays.Proposed hauling shall come from the north along NE 44th Street off of Interstate 405 Exit 7 and connect southward to Lincoln Avenue NE. Construction mitigation shall reduce dust during the construction period by employing water trucks and sweeping streets adjacent to the construction area.Traffic and transportation impacts shall minimize impacts to Lincoln Avenue NE by not constructing in the right of way during the weekday or weekends as much as possible.When construction is required along Lincoln or NE 38th Street,the trenching or other construction activities shall be outside of peak hour traffic periods.Erosion that may be transported from the site shall be minimized by employing silt fencing and other erosion control Best Management Practices acceptable to the City of Renton.These proposed BMPs shall be reviewed by the City during construction plans review.Mud shall not be transported offsite or will be reduced by construction a rock construction entrance and street sweeping.Noise shall be minimized and abide by the City of Renton noise ordinance code.There is not expected to be any special hours proposed for construction or hauling for this site since traffic is anticipated to be at most reduced down to a one lane road with certified flaggers controlling traffic flow thru the one lane road during limited in right of way utilities improvements.These improvements include construction of a sewer crossing to the existing sewer on the northbound side of Lincoln Avenue NE and connection to the existing water main located on the southbound side of Lincoln Avenue NE.A preliminary traffic control plan shall be submitted for review and approval through the City of Renton Development Services prior to construction activities starting.