Loading...
HomeMy WebLinkAboutDOE_Receipt_2021-NW-5838_SPU STATE OF WASHINGTON DEPARTMENT OF ECOLOGY Northwest Regional Office  3190 160th Avenue SE  Bellevue, Washington 98008-5452  (425) 649-7000 711 for Washington Relay Service  Persons with a speech disability can call (877) 833-6341 January 24, 2022 Seattle Public Utilities Attn: Clay Antieau 700 5th Ave Seattle, WA 98104 Re: City of Renton Permit No. LUA21-00259 Seattle Public Utilities - Applicant Simultaneous Filing of Ecology Permit #2022-NW-5838 Shoreline Substantial Development Permit (SDP), Conditional Use Permit (CUP), and Variance Permit (VAR) Dear Ms. Tessa: On December 6, 2021, the Department of Ecology (Ecology) received the City of Renton decision on your SDP to allow the replacement of the existing Adult Sockeye Salmon Broodstock Collection Facility, your CUP to allow a “natural resource extraction/recovery” use in the High Intensity shoreline environment, and your VAR to allow the removal of a tree from a Class 1 Fish Habitat Conservation Area. Your project is within the Aquatic and Urban Conservancy shoreline environmental designations of the Cedar River, a shoreline of the state. Local governments, after reviewing SDPs for compliance, are required to submit them to Ecology. We have received and filed your approved SDP. By law, Ecology must review CUP and VAR permits for compliance with:  The Shoreline Management Act (Chapter 90.58 RCW).  Ecology’s CUP permit approval criteria (Chapter 173-27-160 WAC)  Ecology’s variance permit approval criteria (Chapter 173-27-170 WAC).  The Renton Shoreline Master Program. After review for compliance with the above provisions, Ecology must decide whether to approve, approve with conditions, or disapprove shoreline CUP and VAR permits. Ecology’s Decision Ecology approves your shoreline CUP and VAR permits subject to compliance with the conditions required by the City of Renton. Seattle Public Utilities January 24, 2022 Page 2 Please note, however, that other federal, state, and local permits may be required in addition to this shoreline variance permit. All required conditions must also be met. Next Steps Prior to any development authorized by this shoreline variance permit, the law requires you wait at least 21 days from the date we mail this letter, the “date of filing.” This waiting period allows anyone (including you) who disagrees with any aspect of the permit to appeal the decision to the state Shorelines Hearings Board (SHB). You must wait for the conclusion of an appeal before you can begin the activities authorized by this permit. The SHB will notify you by letter if they receive an appeal. Ecology recommends you contact the SHB before starting development to ensure they have not received an appeal. You may reach them at (360) 664-9160 or http://www.eluho.wa.gov. If you want to appeal this decision, you can find appeal instructions (Chapter 461-08 WAC) at the SHB website referenced above or on the following Washington State Legislature website: http://apps.leg.wa.gov/wac/default.aspx?cite=461-08. If you have any questions, please contact Maria Sandercock, Regional Shoreline Planner at (425) 256-1372 or maria.sandercock@ecy.wa.gov. Sincerely, Joe Burcar, Section Manager Shorelands and Environmental Assistance Program By electronic mail: clayton.antieau@seattle.gov E-cc: Alex Morganroth, City of Renton Tessa Gardner-Brown, Floyd|Snider, Applicant’s Representative