Loading...
HomeMy WebLinkAboutTIR-4214 Draft October 2021 UTILITY MEMO 60% Draft Report King County Department of Transportation Communications King County Department of Transportation Rob Mattern, Project Manager Kale Chang Yuen, Project Engineer Ian Kowalski, Capital Projects HDR Inc. Michael Starling, Civil/Utility P.E., Kent Utility Lead Joe Griffin, Civil/Utility P.E. Joel Corlew, Civil/Utility E.I.T Jacobs Engineering, Inc. Scott Bareither, PMP, LEED AP BD+C, Civil/Utility, Renton & Auburn Utility Lead Mohammad Khan, Civil/Utility Chris Pylant, Civil/Utility INCE Luke Saladin, Civil/Utility 1 I Line 60% Draft Utility Memo Contents 1.0 Introduction ................................................................ 3 1.1 Project Background ................................................................ 3 1.2 Utility Elements ...................................................................... 3 2.0 Utility Ownership & Base Map ...................................... 3 2.1 Record Drawings within the City of Renton ............................. 3 2.1.1 Renton Base Map Verification ............................................ 3 2.2 Record Drawings within the City of Kent ................................. 4 2.2.1 Kent Base Map Verification ............................................... 4 2.3 Record Drawings within the City of Auburn ............................. 4 2.3.1 Auburn Base Map Verification ............................................ 4 2.4 Field Survey ........................................................................... 4 2.4.1 Potholes ........................................................................ 4 3.0 Potential Utility Conflicts .............................................. 5 4.0 Recommended Pothole Locations ............................... 18 5.0 Utility Contacts .......................................................... 19 Tables Table 3-1 Renton Potential Utility Conflicts .............................................................. 6 Table 3-2 Kent Potential Utility Conflicts ............................................................... 10 Table 3-3 Auburn Potential Utility Conflicts ............................................................ 16 Table 4-1 Renton Recommended Pothole Locations ................................................ 18 Table 4-2 Kent Recommended Pothole Locations .................................................... 18 Table 4-3 Auburn Recommended Pothole Locations ................................................ 19 Table 5-1 Utility Contact Information ................................................................... 19 2 I Line 60% Draft Utility Memo Appendix This Page Intentionally left Blank. 3 I Line 60% Draft Utility Memo 1.0 Introduction 1.1 Project Background King County Metro Transit (Metro) is planning to upgrade its existing Routes 169 and 180 to the RapidRide I Line (I Line) bus rapid transit service. The existing Routes 169 and 180 provide service between the cities of Renton, Kent, and Auburn, as well as portions of unincorporated King County. The I Line improvements would include additional service along the route, upgraded RapidRide branded buses, stops upgraded to stations, additional passenger amenities, and capital investments along the route to improve transit speed and reliability. 1.2 Utility Elements This Utility Memo discusses the creation of the utility base map, identifies utility conflicts with proposed improvements, and makes recommendations for future utility locate activities (potholing) that are needed for the next stage in design. 2.0 Utility Ownership & Base Map Utility record drawings and system maps have been requested from all franchise and public utility owners. The sections below describe information that has been received to date. 2.1 Record Drawings within the City of Renton The City of Renton provided record drawings and GIS data for water, sanitary sewer, and storm drain networks. CenturyLink provided schematics for their franchise utility aerial and underground telecommunications network. PSE provided gas and electric field schematics for their network that covers the entire Renton segment. 2.1.1 Renton Base Map Verification A field visit was conducted over 3 days on December 8th, 14th, and 15th, 2020 to verify the information on the existing utility base map. In January 2021, field notes, finalized base maps, and survey information was compared prior to finalization of this memo. 4 I Line 60% Draft Utility Memo 2.2 Record Drawings within the City of Kent Record drawings were provided by the City of Kent for their water, sanitary sewer, and storm drain network. Soos Creek Water and Sewer District provided network information for their services which cover part of the alignment in northeast Kent. CenturyLink provided schematics for their franchise utility aerial and underground telecommunications network. PSE provided gas and electric field schematics for their network that covers the entire Kent segment. 2.2.1 Kent Base Map Verification A field visit was conducted over two days on October 9th and 10th, 2020 to verify the information on the existing utility base map. Observations in the field that differed from the existing utility base map were recorded such as missing or mislabeled assets and previously unidentified conflicts with proposed facilities. Further review, comparing field notes to the finalized base map completed in November 2020 was completed prior to finalization of this memo. 2.3 Record Drawings within the City of Auburn The City of Auburn provided record drawings for domestic water, sanitary sewer, and storm drain networks. CenturyLink provided schematics for their franchise utility aerial and underground telecommunications network. PSE provided gas and electric field schematics for their network that covers the entire Auburn segment. 2.3.1 Auburn Base Map Verification A field visit was conducted over 3 days on December 8, 14, 15, 2020 to verify the information on the existing utility base map. In January 2021, field notes, finalized base maps, and survey information was compared prior to finalization of this memo. 2.4 Field Survey 1Alliance provided survey services to develop the base map. The 1-800 Locate Center was called to provide painted utility marks that 1Alliance then surveyed. Full site survey is ongoing, to be completed in the next phase of the project. 2.4.1 Potholes Initial potholing was conducted by Allied Professional Services INC (APS) prior to the 60 percent submittal and the transmitted to the design team.. The 60 percent utility plan set displays the pothole locations with the utility depths and sizes or widths Additional potholes will be needed after the 60 percent design; locations to be determined. 5 I Line 60% Draft Utility Memo Potholing was conducted and information field surveyed where civil improvements such as platforms, storm drains, curb revisions, retaining walls, etc., are near existing utility lines. Recommended pothole locations are found in Section 4.0 of this report. The initial potholing results from APS are provided in Appendix A. Plans with additional recommended pothole locations are in Appendix B. 3.0 Potential Utility Conflicts The proposed improvements design, including roadway, drainage, signals, retaining walls, and station foundations, were reviewed to identify potential conflicts with existing utilities. Potential conflicts occur largely where the curb line is being adjusted to accommodate bus platforms, new crosswalks, roadway repaving, and where new storm facilities are proposed. Utilities that are pot entially impacted by project construction are noted in the report. See Table 3-1, 3-2, and 3-3 for the identified conflicts for each jurisdiction (cities of Renton, Kent and Auburn). 3.1 Identified Utility Conflicts Renton: As of the 60 percent design, there is a gas line, telecom lines, and underground electrical lines along S Grady Way that need to be relocated by PSE and the third-party telecom service provider. The relocations are between Lake Ave S and Talbot Rd S along S Grady Way and along Talbot Rd S. There is also a PSE power pole that needs relocating at Talbot Rd S and S 37th St. In addition to the third-party utilities, there are 3 fire hydrant assemblies that need replacing. Kent: As of the 60 percent design there are two water main relocations within the Kent segment. Southwest of SE 216th street the existing 12-inch water main conflicts with proposed storm drainage system improvements. Further south, at the 235th Station, the 8-inch water main underneath the existing planter area on the west side of the roadway conflicts with the proposed station platform. In addition to the water main replacements 6 fire hydrant assemblies are to be replaced due to various conflicts. West of the 256th and 101st Ave SE intersection, a PSE owned pole with a guy wire is anticipated to be replaced with an engineered pole due to the conflict with the proposed retaining wall. Other preliminary pole relocations are shown in the plans in Appendix B. Auburn: As of the 60 percent design, there are telecom lines and underground electrical lines along Auburn Way N that need to be relocated by PSE and the third-party telecom service provider. Additionally, a PSE power pole needs relocating at Auburn Way N and 6 I Line 60% Draft Utility Memo 49th St NE. There is also 1 fire hydrant assembly that needs to be relocated and replaced. Additional utility relocations are anticipated in future phases of design. Table 3-1 Renton Potential Utility Conflicts CL Station Offset Street Utility Conflict Description 30+85 41' LT 108th Ave SE Down guy Proposed underground(?) power distribution passes very close to existing down guy anchor 31+38 15' RT 108th Ave SE Overhead power/telecom lines Check conflict with proposed Crosswalk signal mast arm 54+13 30' LT 108th Ave SE Water valves Revised curb line through valve cluster 54+28 29' LT 108th Ave SE Storm catch basin Revised curb line through existing storm catch basin, no replacement CB shown 16+96 69' LT S 2nd St Water valve In revised sidewalk 20+06 62' LT S 2nd St Storm catch basin In revised sidewalk 11+58 40' LT S Grady Way Underground Power Line Proposed TS line crosses 11+58 40' LT S Grady Way Underground Telcom line Proposed TS line crosses 15+08 56' LT S Grady Way Junction box In revised roadway 16+15 37' LT S Grady Way Fire Hydrant In revised roadway 17+09 31' LT S Grady Way Junction box In revised roadway 17+30 31' LT S Grady Way Junction box In revised roadway 18+28 34' LT S Grady Way Traffic Control Cabinet? In revised roadway 18+51 32' LT S Grady Way Junction box In revised roadway 7 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 20+53 32' LT S Grady Way Junction box In revised roadway 20+58 38' LT S Grady Way Water valve Revised curb line through valve 22+08 50' LT S Grady Way Telecom Cabinet In Sidewalk, low height could be dangerous 22+63 33' LT S Grady Way Junction box In revised roadway 22+74 51' LT S Grady Way Light pole (private) In revised sidewalk 22+85 37' LT S Grady Way Water Valve In revised roadway 23+13 43' RT S Grady Way Junction box In revised roadway 24+19 47' LT S Grady Way Fire Hydrant In middle of sidewalk 24+25 49' RT S Grady Way Junction box In revised roadway 24+31 44' RT S Grady Way Junction box In revised roadway 24+41 55' RT S Grady Way Telecom Manhole In revised roadway 24+52 52' RT S Grady Way Underground Power Line Proposed TS line crosses 10+54 46' LT Talbot Rd S Junction box Revised curb line through box 10+56 19' RT Talbot Rd S Gas Line Proposed TS line crosses 10+57 63' RT Talbot Rd S Underground Power Line Proposed TS line crosses 10+57 40' RT Talbot Rd S Water Line Proposed TS line crosses 10+57 30' RT Talbot Rd S Gas Line Proposed TS line crosses 10+58 58' RT Talbot Rd S Underground Power Line Proposed TS line crosses 10+63 68' RT Talbot Rd S Underground Power Line Proposed stormwater connection crosses 10+71 66' RT Talbot Rd S Junction box In revised roadway 8 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 10+71 49' LT Talbot Rd S Telecom and Power vaults In middle of sidewalk, change in grade? 10+89 59' RT Talbot Rd S Junction box In revised roadway 10+92 58' RT Talbot Rd S Underground Power Line Proposed stormwater connection crosses 10+97 51' RT Talbot Rd S Underground Power Line Proposed stormwater connection crosses 11+03 57' RT Talbot Rd S Junction box In revised roadway 11+07 57' RT Talbot Rd S Streetlight In revised roadway 11+13 54' RT Talbot Rd S Water valve In revised roadway 11+68 43' LT Talbot Rd S Red Light Camera pole Revised curb line through pole 12+16 39' LT Talbot Rd S Junction box In revised roadway 13+32 40' LT Talbot Rd S Junction box In revised roadway 14+55 36' LT Talbot Rd S Junction box In revised roadway 15+18 34' LT Talbot Rd S Telecom Line Proposed stormwater connection crosses 15+18 36' LT Talbot Rd S Underground Power Line Proposed stormwater connection crosses 15+40 33' LT Talbot Rd S Telecom Line Proposed stormwater connection crosses 15+40 35' LT Talbot Rd S Underground Power Line Proposed stormwater connection crosses 15+90 46' RT Talbot Rd S Water Manhole In revised roadway 16+22 32' RT Talbot Rd S Junction box In revised roadway 16+86 48' RT Talbot Rd S Water Junction Box In revised sidewalk 16+86 45' RT Talbot Rd S Water valve In revised sidewalk 16+86 41' RT Talbot Rd S Water valve In revised sidewalk 9 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 16+89 47' RT Talbot Rd S ICV In revised sidewalk 17+60 31' RT Talbot Rd S Light pole and Junction box In revised roadway 21+78 48' RT Talbot Rd S Telecom Line Proposed TS line crosses existing telecom lines 21+88 49' RT Talbot Rd S Telecom Line Proposed TS line crosses existing telecom lines 22+37 43' RT Talbot Rd S Water Line Parallel to CL. In street concrete repaving area 22+44 49' RT Talbot Rd S Telecom Line In street concrete repaving area 22+44 48' RT Talbot Rd S Telecom Line In street concrete repaving area 22+54 115' RT Talbot Rd S Water Line Revised gutter on top of water line running parallel to Renton Village CL 25+45- 25+85 9-10' RT Talbot Rd S Gas Line Parallel to CL. In street concrete repaving area 25+45- 25+85 17' RT Talbot Rd S Telecom Line Parallel to CL. In street concrete repaving area/under revised curb 25+67 25' RT Talbot Rd S Revised Curb Large rock under existing bush in revised curb area 25+84 17' RT Talbot Rd S Sewer Manhole Revised curb face crosses through manhole 28+17 18' RT Talbot Rd S Telecom Line Crosses under gutter repaving 56+82- 57+43 26' RT Talbot Rd S Drainage ditch Proposed bus stop area will encroach into drainage ditch, need to replace with culvert 71+64- 73+95 12-14' LT Talbot Rd S Water Line Parallel to CL. Near revised curb line or possibly in street repaving area on either side of 37th, in the repaving area at intersection of 37th/Talbot 72+59 17' LT Talbot Rd S Water Valve In street concrete repaving area 73+10 16' LT Talbot Rd S Water Line Relocated catch basin above water line 10 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 73+46- 74+52 15-17' RT Talbot Rd S Gas Lines Parallel to CL. In street concrete repaving area 73+60 19' LT Talbot Rd S Storm catch basin In the middle of revised sidewalk, no replacement shown 73+74 25' RT Talbot Rd S Utility Pole/Street Light In revised street, no replacement shown on roll plot 73+97 15' RT Talbot Rd S Gas Valve In street concrete repaving area 73+98 15' RT Talbot Rd S Gas Valve In street concrete repaving area 88+11- 88+86 30-33' LT Talbot Rd S Underground Power Line In widened bus stop area, which likely needs to be graded lower 88+14- 88+87 11' LT Talbot Rd S Telecom Line Parallel to CL. In street concrete repaving area 88+36- 89+13 12-17' RT Talbot Rd S Gas Lines Parallel to CL. In street concrete repaving area 88+36- 89+31 8' LT Talbot Rd S Water Line Parallel to CL. In street concrete repaving area 89+08 13' RT Talbot Rd S Gas Valve In street concrete repaving area Table 3-2 Kent Potential Utility Conflicts CL Station Offset Street Utility Conflict Description 82+58 28’ RT 108th Ave SE Water Main Proposed storm catch basin above existing water line 83+06 28’ RT 108th Ave SE Water Main Proposed storm catch basin above existing water line 83+19 48’ RT 108th Ave SE Underground Telecom Communication pedestal and underground line under existing back of curb 101+37 32’ RT 108th Ave SE Water valves (3) Revised curb line through valve cluster 101+68 38’ RT 108th Ave SE PSE Power Proposed storm catch basin above underground power 11 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 102+53 43’ RT 108th Ave SE Utility Pole Revised curb line places utility pole in sidewalk 103+00 48’ RT 108th Ave SE Telecom pedestal Revised curb line places telecom pedestal in sidewalk 104+02 49’ RT 108th Ave SE Hydrant Revised curb places hydrant in curb line 104+12 54’ RT 108th Ave SE PSE Power Proposed wall is above PSE power conduit 105+62 49’ LT 108th Ave SE Hydrant Fire hydrant and water meter in proposed driveway 106+10 47’ LT 108th Ave SE Utility Pole Revised curb line is over utility pole 108+16 16’ RT 108th Ave SE Water Valve Revised curb is adjacent to valve 109+64 59’ RT 108th Ave SE Utility Pole Revised sidewalk places utility pole in sidewalk 110+02 52’ LT 108th Ave SE Utility Pole Revised sidewalk places utility pole in sidewalk 111+57 48’ LT 108th Ave SE Utility Pole and guy wire Revised sidewalk places utility pole in sidewalk 111+62 37’ LT 108th Ave SE Underground Telecom Telecom conduit crosses storm drain detention facility 136+94 29’ RT Benson RD SE Hydrant valve Hydrant valve in revised curb line 137+01 29’ RT Benson RD SE Water main Water main conflicts with proposed storm drain manhole 157+75 44’ LT Benson RD SE Cell Tower Cell tower in landscape area 39+17 27’ LT 104th Ave SE Water valves (3) and Main Station platform over water main 49+54 31’ LT 104th Ave SE Water service, meters, standpipe, and hydrant Revised back wall conflicts with water structures 12 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 49+78 36’ LT 104th Ave SE Gas service Revised back wall adjacent to gas valve 51+06 38’ RT 104th Ave SE Water meter Water meter conflicts with proposed curb line 51+33 50’ LT 104th Ave SE Sanitary Sewer Sanitary sewer MH in sidewalk and sewer main crosses proposed storm 51+63 33’ RT 104th Ave SE Water main, and underground power and telecom Multiple underground utilities cross proposed storm 52+76 40’ RT 104th Ave SE Water meter Water meter conflicts with proposed sidewalk 55+80 50’ RT 104th Ave SE PSE Power Power transformer and vault with underground power lines in revised sidewalk 56+35 41’ RT 104th Ave SE Hydrant Fire hydrant in revised driveway and sidewalk 57+24 39’ RT 104th Ave SE Telecom Pedestal Pedestal in revised sidewalk 57+52 40’ RT 104th Ave SE Telecom Pedestal Pedestal in revised sidewalk 57+76 37’ RT 104th Ave SE Telecom Pedestal Pedestal in revised sidewalk 79+78 38’ LT 104th Ave SE Telecom MH TCMH in revised curb ramp 79+86 37’ LT 104th Ave SE Underground Telecom Telecom conduit conflicts with proposed storm drain catch basin 99+56 00’ 104th Ave SE Underground Power Underground power below the proposed crosswalk center curb 101+22 22’ RT 104th Ave SE Underground power and Telecom Power vault and telecom pedestal behind proposed wall 101+26 40’ RT 104th Ave SE Power Pole Proposed wall over PSE Pole 102+49 40’ RT 104th Ave SE Hydrant Fire hydrant in revised roadway 103+92 47’ RT 104th Ave SE Water meter Water meter in adjusted roadway 104+30 48’ RT 104th Ave SE Water Meter Water meter in adjusted roadway 13 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 104+33 44’ RT 104th Ave SE Utility pole Utility pole with transmission, distribution and communications lines in curb line. 105+84 52’ RT 104th Ave SE Hydrant Hydrant in revised curb ramp 17+75 47’ RT SE 256th Sanitary Sewer MH SSMH in revised sidewalk. 17+22 37’ LT SE 256th Power Pole Power pole conflicts with proposed wall 17+04 50’ RT SE 256th Utility Pole Pole and guy in new sidewalk and driveway 15+69 48’ RT SE 256th Utility Pole Guy wire support crosses the revised sidewalk 15+70 49’ RT SE 256th Utility Pole Guy wire support in revised sidewalk 15+46 17’ LT SE 256th Water main Water main conflicts with proposed storm detention facility 15+55 35’ RT SE 256th Sanitary Sewer MH Proposed storm line near SSMH lid. 13+83 54’ RT SE 256th Utility pole Guy wire support crosses the revised sidewalk 28+76 39’ RT E Smith Utility pole Utility pole with power risers in revised bike lane 21+20 19’ LT E Smith Telecomm Maintenance Hole Revised grade at MH 20+96 41’ RT E Smith Water meter Water meter is in revised sidewalk 20+74 5’ LT, 14’ RT E Smith Sanitary Sewer Maintenance holes (2) Revised grade at MH 20+59 14’ LT, 8’ LT E Smith Telecomm Maintenance Holes (2) Revised grade at MH 14 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 20+33 9’ RT E Smith Sanitary Sewer Maintenance hole Revised grade at MH 20+20 34’ RT E Smith Water meter Water meter is in revised traffic lane 19+35 34’ RT E Smith Water Meter Revised curb line is adjacent water meter 18+88 33’ RT E Smith Telecom Vault Telecom vault in revised curb line 18+65 39’ RT E Smith Power Vault, Transformers, and telecom pedestal Revised curb line is adjacent several power and telecom utilities 17+91 21’ RT E Smith Underground power and telecom Underground power and telecom cross proposed storm 17+03 53’ LT E Smith Hydrant Proposed curb ramps in between existing hydrant 16+82 17’ LT E Smith Water Valve Revised grade at valve 16+80 44’ LT E Smith Telecom Pedestals (2) Revised sidewalk places telecom pedestals in walkway 16+70 48’ RT E Smith Utility pole Revised curb places utility pole with telecom lines in road 16+62 10’ LT E Smith Telecomm Maintenance Hole Revised grade at MH 16+45 22’ RT E Smith Underground power and telecom Underground power and telecom cross proposed storm 16+44 1’ RT E Smith Water Valve Revised grade at valve 16+29 13’ LT E Smith Water Valve Revised grade at valve 16+20 78’ LT E Smith Guy Wire Guy wire in revised curb 16+14 44’ LT, E Smith Hydrant Revised curb line places hydrant in sidewalk 15+63 27’ RT E Smith Water Meter Revised meter at valve 15+31 28’ RT E Smith Water Meter Revised meter at valve 14+96 16’ LT E Smith Gas valve Revised grade at valve 15 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 14+96 17’ RT E Smith Sanitary Sewer Maintenance Hole Revised grade at MH 14+94 29’ RT E Smith Power and Telecomm vault Revised curb line places vaults in roadway 14+81 17’ RT E Smith Sanitary Sewer Maintenance Hole Revised grade at MH 14+81 35’ RT E Smith Sanitary Sewer Maintenance Hole Revised curb line is adjacent to MH lid 14+95 17’ RT E Smith Sanitary Sewer Maintenance Hole Revised grade at MH 14+80 4’ LT E Smith Gas valve Revised grade at valve 14+80 20’ LT E Smith Water valve Revised grade at valve 14+64 48’ LT E Smith Hydrant Proposed hydrant in revised sidewalk 14+15 34’ RT E Smith Water Meter Revised curb line places meter on sidewalk 13+70 43’ LT E Smith Hydrant Revised curb line places hydrant in sidewalk 13+70 13’ LT E Smith Water Valve (2) Revised grade at valve 13+44 13’ LT E Smith Water valve Revised grade at valve 13+03 16’ LT E Smith Water valve Revised grade at valve 13+40 60’ LT E Smith Storm Drain MH Revised grade at MH 13+50 30’ LT E Smith Storm Drain MH Revised grade at MH 12+90 30’ RT E Smith Storm Drain MH Revised grade at MH 11+82 27’ RT E Smith Telecomm Maintenance Hole Revised grade at MH 11+82 37’ RT E Smith Power and Telecomm vault Revised curb line places power and telecom vaults in sidewalk 11+62 15’ RT E Smith Sanitary Sewer Maintenance Hole Revised grade at MH 16 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description 11+62 37’ LT E Smith Sanitary Sewer Maintenance Hole SSMH in revised driveway. 10+56 42’ RT E Smith Utility pole Revised curb places utility pole in pedestrian ramp 10+47 15’ LT E Smith Water valve Revised grade at valve 10+47 45’ RT E Smith Hydrant Revised curb places hydrant between pedestrian ramps 10+31 27’ RT E Smith Power Maintenance hole Revised grade at MH 9+70 30’ LT E Smith Gas valve Revised grade at valve 11+06 26’ RT Railroad Ave N Utility Pole Utility pole in proposed station 11+81 26’ RT Railroad Ave N Utility Pole Utility pole in proposed station 20+75 32’ LT Central Ave N Utility Pole Utility pole in proposed station 37+59 41’ LT Central Ave S Guy Wire Guy wire in proposed station Table 3-3 Auburn Potential Utility Conflicts CL Station Offset Street Utility Conflict Description 19+09 38' RT Auburn Way N Utility Pole Existing Utility pole located in proposed sidewalk 50+81 39' RT Auburn Way N Light pole Light pole located in proposed pavement/driveway 63+16 27' LT Auburn Way N Storm Drain Existing storm drain passes through proposed curb/gutter/pavement. 63+75 29' LT Auburn Way N Utility/Illumination Pole Existing utility/Illumination pole (with risers) conflicts with the light on the proposed illumination pole. 114+00 44' LT Auburn Way N Storm sewer line Storm sewer line seen in CAD file (not on roll plot) 17 I Line 60% Draft Utility Memo CL Station Offset Street Utility Conflict Description runs through asphalt that is being removed for proposed landscaping. 115+56 35' RT Auburn Way N Underground Telecom line Proposed illumination/electrical work crosses existing underground telecom line 135+40- 135+70 30-60' RT Auburn Way N Multiple Utilities Relocated signals will probably include relocation of many other associated utilities. Check carefully in this area 136+10 46' RT Auburn Way N Monitoring Well In revised bus shelter footprint/sidewalk 136+27 34' RT Auburn Way N Telecom Manhole In revised roadway 136+32 38' RT Auburn Way N Telecom Cabinet In revised roadway 136+41 38' RT Auburn Way N Unknown Water equipment In revised roadway 150+72 44' RT Auburn Way N Telecom manhole Revised gutter in driveway goes through manhole 151+18 48' RT Auburn Way N Fire hydrant In middle of revised sidewalk 151+61 36' RT Auburn Way N Existing standpipe Revised catch basin appears to overlap or near existing standpipe 151+87 45' RT Auburn Way N Existing standpipe Revised catch basin appears to overlap or near existing standpipe 152+06 53' RT Auburn Way N Power Vault In revised sidewalk, changed grade 152+34 32' LT Auburn Way N Fire Hydrant Proposed power vault overlaps, or will be near fire hydrant 152+75 42' RT Auburn Way N Traffic Junction Box In revised street, changed grade 18 I Line 60% Draft Utility Memo 4.0 Recommended Pothole Locations Following review of the base map and proposed improvements, recommended locations for utility potholes were developed for each jurisdiction. Potholes are recommended at locations that have potential utility conflicts, in order to identify solutions in the next phase of the project. Plans showing the recommended pothole locations are included in the appendix. Table 4-1 Renton Recommended Pothole Locations Pothole Utility Street Centerline Station Offset Pothole Description 1 New Potholes - TBD New pothole Locations will be needed for 90P design. Table 4-2 Kent Recommended Pothole Locations Pothole Utility Street Centerline Station Offset Pothole Description 1 Underground Telecom 108th Ave SE 82+50 40’ RT Verify elevation of telecom lines from pedestal at existing back of curb. APS Pothole 34 was evaluated ~4' west of memo location. Re- pothole in directed location 2 Water main 108th Ave SE 136+95 27’ RT Verify size and elevation 3 Water main 104th Ave SE 38+20 29’ RT Verify size and elevation 4 Water main 104th Ave SE 39+17 12’ RT Verify size and elevation 19 I Line 60% Draft Utility Memo Pothole Utility Street Centerline Station Offset Pothole Description 5 Underground Power and telecom E Smith 17+91 21’ RT Verify size and number of underground power 6 Underground Power E Smith 17+53 62’ RT Verify elevation of underground power crossing proposed storm 7 Power and telecom E Smith 16+45 27’ RT Verify size and location of underground power and telecom crossing proposed storm 8 Underground power E Smith 13+52 63’ RT Verify number and location of underground power lines Table 4-3 Auburn Recommended Pothole Locations Pothole Utility Street Centerline Station Offset Pothole Description 1 New Potholes - TBD New Pothole locations needed for 90P design. 5.0 Utility Contacts Contact information for public and franchise utilities is listed in Table 5-1. Table 5-1 Utility Contact Information 20 I Line 60% Draft Utility Memo Utility Contact City of Renton Renton Map Support RentonMapSupport@Rentonwa.gov City of Kent Brennan Taylor Btaylor@KentWA.gov (253) 856-5591 City of Kent Jamie Warning Simo Jsimo@KentWA.gov (253) 856-5490 City of Auburn Shawn Campbell, City Clerk at scampbell@auburnwa.gov Hannah Scholl, Records Clerk at hscholl@auburnwa.gov Puget Sound Energy (Gas) Glenn Helton Glenn.Helton@pse.com (425) 559-4647 Puget Sound Energy (Power) Hong Nguyen Hong.Nguyen@pse.com (425) 449-6609 Soos Creek Water and Sewer District Ken VanDenBergh KVan@sooscreek.com 14616 SE 192nd St RENTON, WA 98058 (253) 893-7615 (425) 531-4114 Sirena Clark Lead, Development Administration 253.630.9900 ext 107 CenturyLink Kelly Casteel kcasteel@terratechllc.net (206) 353-6847 CenturyLink Phil Stevens pstevens@terratechllc.net (360) 970-4902 21 I Line 60% Draft Utility Memo Utility Contact Comcast Danny Cooley Danny_Cooley@cable.comcast.com 410 Valley Ave NW Puyallup, WA 98371 (253) 686-7592 Zayo Jason Tesdal Jason.Tesdal@zayo.com (253) 221-7585 22 I Line 60% Draft Utility Memo Appendix A: 30% Potholes 23 I Line 60% Draft Utility Memo Appendix B: 60% Utility Plans 24 I Line 60% Draft Utility Memo Appendix C: 60% Drainage Plans 25 I Line 60% Draft Utility Memo