Loading...
HomeMy WebLinkAboutR-421402N ABBREVIATIONS: ABBREVIATIONS (CONTINUED): GENERAL NOTES: 1 BOT BOTTOM POB POINT OF BEGINNING APPLICABILITY C) CJ CONSTRUCTION JOINT POE POINT OF END THE REQUIREMENTS IN THESE NOTES, AS WELL AS IN THE CONTRACT SPECIFICATIONS, SUPPLEMENT THE REQUIREMENTS OF THE AGENCY OR AGENCIES HAVING JURISDICTION OVER THE WORK IN THIS CONTRACT. IN THE I COA CITY OF AUBURN PRC POINT OF REVERSE CURVE CASE OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY. IN CASE THAT ONE OR MORE ELEMENTS OF Q THE WORK ARE NOT COVERED BY REQUIREMENTS OF AN AGENCY, OR AGENCIES, THE REQUIREMENTS IN THESE COK CITY OF KENT PROP PROPOSED NOTES SHALL APPLY. W CONIC CONCRETE PSE PUGET SOUND ENERGY GENERAL NOTES CDR CITY OF RENTON PT POINT 1. ALL WORK METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE CL CENTERLINE PVC POINT OFVERTICAL CURVE LATEST EDITION OF THE SPECIFICATIONS AND THE APPLICABLE DEVELOPMENT GUIDELINES AND DESIGN AND CONSTRUCTION STANDARDS FROM THE AGENCY HAVING JURISDICTION OVER THE SITES OF WORK. CP CENTER POINT PVI POINT OF VERTICAL INTERSECTION CSBC CRUSHED SURFACING BASE COURSE PVT POINT OF VERTICAL TANGENT 2. CONTACT EACH AGENCY'S PUBLIC WORKS DEPARTMENT AND SCHEDULE AND ATTEND A PRECONSTRUCTION MEETING AT LEAST ONE WEEK BEFORE BEGINNING CONSTRUCTION. ATTENDANTS TO INCLUDE EACH AGENCY'S CSTC CRUSHED SURFACING TOP COURSE RT RIGHT APPOINTED REPRESENTATIVE(S) AND THE PROJECT REPRESENTATIVE. DIA DIAMETER ROW RIGHT OF WAY 3. ASSUME FULL RESPONSIBILITY FOR WORKER SAFETY, AND DAMAGE TO STRUCTURES AND IMPROVEMENTS RESULTING FROM CONSTRUCTION OPERATIONS. DWG DRAWING SF SQUARE FOOT/FEET 4. MAINTAIN THE FOLLOWING THROUGHOUT THE EXECUTION OF THIS PROJECT, AND AT A LOCATION KNOWN AND E EASTING SHLDR SHOULDER ACCEPTABLE TO THE PROJECT REPRESENTATIVE AND THE JURISDICTIONAL REPRESENTATIVES ASSIGNED TO THE PROJECT: EJ EXPANSION JOINT SPA SPACING A ALL APPLICABLE PERMITS, AND CONDITIONING THEREIN. ELEV ELEVATION SR STATE ROUTE B. THE APPROVED PLANS. C. A CURRENT COPY OF THE DEVELOPMENT GUIDELINES AND DESIGN AND CONSTRUCTION STANDARDS FROM EX EXISTING STD STANDARD EACH AGENCY HAVING JURISDICTION OVER THE SITES OF WORK. D. TRAFFIC CONTROL AND STREET MAINTENANCE PLANS APPROVED BY THE AGENCY OR AGENCIES HAVING FL FLOW LINE SYM SYMMETRICAL JURISDICTION OVER THE SITES OF WORK. E. ACURRENT SET OF RECORD (AS CONSTRUCTED) DRAWINGS. HMA HOT MIX ASPHALT TC TOP OF CURB F. COPIES OF THE HEALTH, SAFETY AND ACCIDENT PREVENTION PLANS. IE INVERT ELEVATION TCE TEMPORARY CONSTRUCTION EASEMENT 5. WORK SHALL CONFORM TO THE APPROVED DRAWINGS AND THE CONTRACT SPECIFICATIONS. CHANGES TO KCM KING COUNTY METRO TESC TEMPORARY EROSION AND SEDIMENT CONTROL THESE DOCUMENTS REQUIRE PRE -APPROVAL FROM THE PROJECT REPRESENTATIVE AND THE AGENCY HAVING JURISDICTION OVER THE SITES OF WORK. L LENGTH TSP TRANSIT SIGNAL PRIORITY 6. PROVIDE THE PROJECT REPRESENTATIVE WITH A SET OF RECORD DRAWINGS THAT MEET THE CONTRACT LT LEFT TYP TYPICAL REQUIREMENTS PRIOR TO THE PROJECT FINAL APPROVAL. MAX MAXIMUM UNO UNLESS NOTED OTHERWISE 7. PRIOR TO CONSTRUCTION OF METRO FOOTINGS AND FACILITIES, PLEASE CONTACT METRO INSPECTORS AND MIN MINIMUM UTIL UTILITY CONSTRUCTION AT BUSSTOINSPECTIONS@KINGCOUNTY.GOV OR BY PHONE AT 206-263-2381. PLEASE NOTE THAT METRO REQUIRES NOTICE OF AT LEAST THREE WEEKS IN ADVANCE TO SCHEDULE AN INSPECTION. ALL N NORTHING W/ WITH METRO FOOTINGS MUST BE INSPECTED AND APPROVED BY METRO INSPECTORS BEFORE ANY CONCRETE IS POURED. NO. NUMBER WSDOT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION WORK SCHEDULE NOTES NITS NOT TO SCALE OC ON CENTER 1. DAYS AND HOURS OF WORK SHALL CONFORM TO THE CONDITIONS IN THE PERMITS ISSUED BY THE AGENCY HAVING JURISDICTIONS OVER SITES OF WORK. PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE 5 �o DESIGNED, VPRMD. g�$ 60% SUBMITTAL Jacobs 'Po�T,A C.TOWEIL P. ENG L r of40i, DRnwx. r King County F c m p • �-, CHECKED x rya `""Mm: PR"`U� METRO 2916 ��� �'�g �OMg*68%b�sa S.ECKED E005 TN Y °�oxet LN cNEc�D: coxrRacTxo. w No. REVISICn Nv .F' :a[. ti 0- METRO PROJECT ENGINEER cXX%%%%%X METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE GENERAL NOTES AND ABBREVIATIONS NOVEMBER 2021 MNWING NHxw= G 3HUTNO OF 2 R-42142