1
BOT BOTTOM POB POINT OF BEGINNING APPLICABILITY
C) CJ CONSTRUCTION JOINT POE POINT OF END THE REQUIREMENTS IN THESE NOTES, AS WELL AS IN THE CONTRACT SPECIFICATIONS, SUPPLEMENT THE
REQUIREMENTS OF THE AGENCY OR AGENCIES HAVING JURISDICTION OVER THE WORK IN THIS CONTRACT. IN THE
I COA CITY OF AUBURN PRC POINT OF REVERSE CURVE CASE OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY. IN CASE THAT ONE OR MORE ELEMENTS OF
Q THE WORK ARE NOT COVERED BY REQUIREMENTS OF AN AGENCY, OR AGENCIES, THE REQUIREMENTS IN THESE
COK CITY OF KENT PROP PROPOSED NOTES SHALL APPLY.
W CONIC CONCRETE PSE PUGET SOUND ENERGY GENERAL NOTES
CDR CITY OF RENTON PT POINT
1. ALL WORK METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE
CL CENTERLINE PVC POINT OFVERTICAL CURVE LATEST EDITION OF THE SPECIFICATIONS AND THE APPLICABLE DEVELOPMENT GUIDELINES AND DESIGN AND
CONSTRUCTION STANDARDS FROM THE AGENCY HAVING JURISDICTION OVER THE SITES OF WORK.
CP CENTER POINT PVI POINT OF VERTICAL INTERSECTION
CSBC CRUSHED SURFACING BASE COURSE PVT POINT OF VERTICAL TANGENT 2. CONTACT EACH AGENCY'S PUBLIC WORKS DEPARTMENT AND SCHEDULE AND ATTEND A PRECONSTRUCTION
MEETING AT LEAST ONE WEEK BEFORE BEGINNING CONSTRUCTION. ATTENDANTS TO INCLUDE EACH AGENCY'S
CSTC CRUSHED SURFACING TOP COURSE RT RIGHT APPOINTED REPRESENTATIVE(S) AND THE PROJECT REPRESENTATIVE.
DIA DIAMETER ROW RIGHT OF WAY 3. ASSUME FULL RESPONSIBILITY FOR WORKER SAFETY, AND DAMAGE TO STRUCTURES AND IMPROVEMENTS
RESULTING FROM CONSTRUCTION OPERATIONS.
DWG DRAWING SF SQUARE FOOT/FEET
4. MAINTAIN THE FOLLOWING THROUGHOUT THE EXECUTION OF THIS PROJECT, AND AT A LOCATION KNOWN AND
E EASTING SHLDR SHOULDER ACCEPTABLE TO THE PROJECT REPRESENTATIVE AND THE JURISDICTIONAL REPRESENTATIVES ASSIGNED TO
THE PROJECT:
EJ EXPANSION JOINT SPA SPACING A ALL APPLICABLE PERMITS, AND CONDITIONING THEREIN.
ELEV ELEVATION SR STATE ROUTE B. THE APPROVED PLANS.
C. A CURRENT COPY OF THE DEVELOPMENT GUIDELINES AND DESIGN AND CONSTRUCTION STANDARDS FROM
EX EXISTING STD STANDARD EACH AGENCY HAVING JURISDICTION OVER THE SITES OF WORK.
D. TRAFFIC CONTROL AND STREET MAINTENANCE PLANS APPROVED BY THE AGENCY OR AGENCIES HAVING
FL FLOW LINE SYM SYMMETRICAL JURISDICTION OVER THE SITES OF WORK.
E. ACURRENT SET OF RECORD (AS CONSTRUCTED) DRAWINGS.
HMA HOT MIX ASPHALT TC TOP OF CURB F. COPIES OF THE HEALTH, SAFETY AND ACCIDENT PREVENTION PLANS.
IE INVERT ELEVATION TCE TEMPORARY CONSTRUCTION EASEMENT
5. WORK SHALL CONFORM TO THE APPROVED DRAWINGS AND THE CONTRACT SPECIFICATIONS. CHANGES TO
KCM KING COUNTY METRO TESC TEMPORARY EROSION AND SEDIMENT CONTROL THESE DOCUMENTS REQUIRE PRE -APPROVAL FROM THE PROJECT REPRESENTATIVE AND THE AGENCY HAVING
JURISDICTION OVER THE SITES OF WORK.
L LENGTH TSP TRANSIT SIGNAL PRIORITY
6. PROVIDE THE PROJECT REPRESENTATIVE WITH A SET OF RECORD DRAWINGS THAT MEET THE CONTRACT
LT LEFT TYP TYPICAL REQUIREMENTS PRIOR TO THE PROJECT FINAL APPROVAL.
MAX MAXIMUM UNO UNLESS NOTED OTHERWISE 7. PRIOR TO CONSTRUCTION OF METRO FOOTINGS AND FACILITIES, PLEASE CONTACT METRO INSPECTORS AND
MIN MINIMUM UTIL UTILITY CONSTRUCTION AT BUSSTOINSPECTIONS@KINGCOUNTY.GOV OR BY PHONE AT 206-263-2381. PLEASE NOTE
THAT METRO REQUIRES NOTICE OF AT LEAST THREE WEEKS IN ADVANCE TO SCHEDULE AN INSPECTION. ALL
N NORTHING W/ WITH METRO FOOTINGS MUST BE INSPECTED AND APPROVED BY METRO INSPECTORS BEFORE ANY CONCRETE IS
POURED.
NO. NUMBER WSDOT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
WORK SCHEDULE NOTES
NITS NOT TO SCALE
OC ON CENTER 1. DAYS AND HOURS OF WORK SHALL CONFORM TO THE CONDITIONS IN THE PERMITS ISSUED BY THE AGENCY
HAVING JURISDICTIONS OVER SITES OF WORK.
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
5
�o
DESIGNED, VPRMD.
g�$ 60% SUBMITTAL Jacobs 'Po�T,A C.TOWEIL P. ENG
L r of40i, DRnwx.
r King County
F c m p • �-, CHECKED x
rya `""Mm: PR"`U� METRO
2916 ��� �'�g �OMg*68%b�sa S.ECKED E005 TN
Y °�oxet LN cNEc�D: coxrRacTxo.
w No. REVISICn Nv .F' :a[.
ti 0- METRO PROJECT ENGINEER cXX%%%%%X
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
GENERAL NOTES AND
ABBREVIATIONS
NOVEMBER 2021
MNWING NHxw=
G
3HUTNO OF
2
R-42142