Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-4214103
N z x 33+00 aKG I I I I E7 I QR / El 4ij \ 2143 23R 2141 \\ 21U \ 7899 \ p d2 \� p \ � � 22R 24R \ 19N 000 cl 722200.0010 I \\ I Im / �-T BARRIER 1 3' 3 I DO TAL-B 37+01.99, 43.45' LT3 z /� W / o •�':' /TAL-B 37+20.48, 43.35' LT IQ OO , / o TAL-B 37+00.42, 30.44' LT TAL-B 37+20.42, 30.31' LT — 0 / ® © 34+00 0 35+00 BENSON DR S (SR 515)- 36+00 1 CURB&GUTTER o O o (TAL-B-LINE) �O 1 C 0 — TAL-B 35+06.46, 37.04' RT — O TAL-B 34+86.48, 37.96 RT _ ❑ — O O T m rl 60% SUBMITTAL No I R=_msoN BY I AFRO I DATE TFE— m0 m TAL-B 35+04.30. 44.65' RT Jacobs _ 722200-0245 I I I I I I \ \ I I I II I , A. VILLAR P. ENG D24WN, C. WILCOXCHECKE L9 King County it °� S. FOR S.ECKED EN 566EI8: E00588E18CHECKED: METRO LIXITMCTNJ'. METRO PROJECT ENGINEER CXXXXXXXX NOTES 1. SEE SHEET 1C4.00 FOR SITE PREPARATION GENERAL NOTES. SITE PREP NOTES OPRESERVE AND PROTECT FEATURE AS NOTED QREMOVE FEATURE AS NOTED 0PRESERVE AND PROTECT EXISTING TREE 4O REMOVAL OF FEATURE BY OTHERS (METRO) OREMOVE OR RELOCATE FEATURE AS NOTED BASED ON PROPERTY OWNER NEGOTIATIONS SITE PREP LEGEND REMOVE ASPHALT PAVEMENT REMOVE CEMENT CONCRETE PAVEMENT REMOVE CEMENT CONCRETE SIDEWALK CLEARING AND GRUBBING SAW, FULL DEPTH //-//-//-H- REMOVAL ITEM ---- RIGHT-OF-WAY(EXISTING) RIGHT-OF-WAY (PROPOSED) IIIIIIIII .. — TEMPORARY CONSTRUCTION EASEMENT X REMOVETREE I `\ TREE PROTECTION ZONE(TPZ) OTREE PROTECTION FENCE ao99 TREE TAG IDENTIFICATION NUMBER 0' 20' 40' SCALE: 1"=20' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SITE PREPARATION PLAN TAL-B 33+00 TO TAL-B 38+00 NOVEMBER 2021 DMWING NO 1 C4.11 SHEEIN10 OF 03 XXXX R-4214103