Loading...
HomeMy WebLinkAboutR-42141651 STATION 60320 (IB', DESCRIPTION SHELTER FOUNDATION LARGE SHELTER LARGE REARWINDSCREEN LEFTWINDSCREEN RIGHTWINDSCREEN REAR WINDSCREEN WITH LEAN RAIL FLAG FLAG POS ROUTE HOLDER SCHEDULE HOLDER TECH PYLON FOUNDATION TECH PYLON Av� NOTES 1. SEE SHEET 1S1.00 FOR GENERAL STATION NOTES. STATION NOTES 0 EXISTING STATION. MODIFY SIGN TO I LINE STATION. OSHELTER FOUNDATION PER RAPIDRIDE 2 STD DWG S1.01-S2.22 OTECH PYLON FOUNDATION PER RAPIDRIDE 2 STD DWG 53.01 OPEDESTRIAN GUARDRAIL PER DETAIL D ON SHEET 1S5.01 (D STEM WALL PER RAPIDRIDE 2 STD DWG $2.22, DETAIL 5 (D BOLLARD PER DETAIL C ON SHEET 1S5.01 STATION LEGEND I LINE STATION AREA BOUNDARY PEDESTRIAN LUMINAIRE 1 BUS FLAG (WITHIN STATION BOUNDARY) ® ADA CLEAR LANDING ZONE MIDDLNBACK DOOR LANDING ZONE 13 TRASH RECEPTACLE (____1 TECH PYLON ® BENCH i� SHELTER — FOUNDATION 0 POWER PEDESTAL F 0 HANDHOLE a"I'0 BIKE RACK RETAINING WALL PEDESTRIAN GUARDRAIL • BOLLARD DETECTABLE WARNING SURFACE RIGHT-OF-WAY (EXISTING) RIGHT-OF-WAY (PROPOSED) N 51+00 SE_C_ARR RD (CAR -LINE) — - 0' 1 15' 110, STATION PLAN SCALE: 1'=5' DESIGNED'. APPROKE0: DATE: o METRO TRANSIT CAPITAL DIVISION 60 /o SUBMITTAL vaCObS AVLLAR P.ENG RAPIDRIDE I LINE NOVEMBER2021 King County C.WILCOXCHECKED: PRWEDTNO: ���RO RENTON SEGMENT K pNWING NOit S.FORMAN E00566E18 STATION PLAN 1S1.24 ND, R[Vr OV BY APP'D DATE CHECKED_ COMRACTNO'. ID# 60320 SHEETNO OF METRO PROJECT ENGINEER C)JOGDORX 165 XXXX R-4214165