HomeMy WebLinkAboutR-42141651
STATION 60320 (IB',
DESCRIPTION
SHELTER FOUNDATION
LARGE
SHELTER
LARGE
REARWINDSCREEN
LEFTWINDSCREEN
RIGHTWINDSCREEN
REAR WINDSCREEN WITH
LEAN RAIL
FLAG
FLAG POS
ROUTE HOLDER
SCHEDULE HOLDER
TECH PYLON FOUNDATION
TECH PYLON
Av�
NOTES
1. SEE SHEET 1S1.00 FOR GENERAL STATION NOTES.
STATION NOTES
0 EXISTING STATION. MODIFY SIGN TO I LINE STATION.
OSHELTER FOUNDATION PER RAPIDRIDE 2 STD DWG S1.01-S2.22
OTECH PYLON FOUNDATION PER RAPIDRIDE 2 STD DWG 53.01
OPEDESTRIAN GUARDRAIL PER DETAIL D ON SHEET 1S5.01
(D STEM WALL PER RAPIDRIDE 2 STD DWG $2.22, DETAIL 5
(D BOLLARD PER DETAIL C ON SHEET 1S5.01
STATION LEGEND
I LINE STATION AREA BOUNDARY
PEDESTRIAN LUMINAIRE
1
BUS FLAG (WITHIN STATION BOUNDARY)
®
ADA CLEAR LANDING ZONE
MIDDLNBACK DOOR LANDING ZONE
13
TRASH RECEPTACLE
(____1
TECH PYLON
®
BENCH
i�
SHELTER
—
FOUNDATION
0
POWER PEDESTAL
F
0
HANDHOLE
a"I'0
BIKE RACK
RETAINING WALL
PEDESTRIAN GUARDRAIL
•
BOLLARD
DETECTABLE WARNING SURFACE
RIGHT-OF-WAY (EXISTING)
RIGHT-OF-WAY (PROPOSED)
N
51+00 SE_C_ARR RD
(CAR -LINE) — - 0' 1 15' 110,
STATION PLAN SCALE: 1'=5'
DESIGNED'. APPROKE0: DATE:
o METRO TRANSIT CAPITAL DIVISION
60 /o SUBMITTAL vaCObS AVLLAR P.ENG RAPIDRIDE I LINE NOVEMBER2021
King County
C.WILCOXCHECKED: PRWEDTNO: ���RO RENTON SEGMENT K pNWING NOit
S.FORMAN E00566E18 STATION PLAN 1S1.24
ND, R[Vr OV BY APP'D DATE CHECKED_ COMRACTNO'. ID# 60320 SHEETNO OF
METRO PROJECT ENGINEER C)JOGDORX 165 XXXX
R-4214165