HomeMy WebLinkAboutR-4214186I
f_
CO
\4
M
Co
a
w
iA
- - 58+00
_ TALBOT RD SS"°° _ - -
(TAL-2I-LINE) _.. _. __ .. __..._
O
POINT A
LOW SIDE
(STA)
S6
S5
S7
POINT B
o
LOW SIDE
i ro�
N
(STA)
Go
D Z
7 W
00
CID
0
S3
S4
00
(LT) LEFT
Si
(RT) RIGHT
PARALLEL CURB RAMP EXAMPLE
NTS
LEGEND
iiiiiii
eeeeoe
eeaeeee
HMA FULL DEPTH
CEMENT CONCRETE
LANDSCAPING
DETECTABLE WARNING SURFACE
CEMENT CONCRETE CROSSWALK
DOWNTOWN CEMENT CONCRETE SIDEWALK
RIGHT OF WAY (EXISTING)
RIGHT OF WAY (PROPOSED)
CURB RAMP TABLE
GENERALNOTES
1. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS.
2. UNLESS OTHERWISE NOTED, SPOT ELEVATIONS LOCATED AT FACE OF
CURB ARE FLOWLINE ELEVATIONS.
3. FOR MEDIAN DETAILS, SEE CIVIL DETAILS.
INTERSECTION NOTES
iO PARALLEL CURB RAMP PER WSDOT STD PLAN F40.12-03
(D PERPENDICULAR CURB RAMP PER WSDOT STD PLAN F40.15.04
(D SINGLE DIRECTION CURB RAMP PER WSDOT STD PLAN F-40.16.03
0 DETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10-02
LEFT
RIGHT
CURB RAMP
WING
WING
LENGTHAT
RAMPTYPE
RAMP
RAMPWIDTH
POINTA(STA)
POINTB(STA)
Si%
S2%
S3%
S4%
S5%
S6%
S7%
S8%
S9%
WIDTH
WIDTH
CENTER
MI
MI(MIND
PARALLEL B
1
WA
5.00,
6.00,
8.00,
TAL-21 57+36.25
TAL-21 57+31.25
1.44
1.50
WA
7.10
1.15
NA
6.90
NA
1.50
0' 10, 20'
SCALE: 1"=10'
o METRO TRANSIT CAPITAL DIVISION
60 /o SUBMITTAL Jacobs ACVILWILCOX ``�, UR P. ENG RAPIDRIDE I LINE NOVEMBER 2021
DRAM
King County
.
CHECKED. PROUECTNN, RENTON SEGMENT DRAWING NO.
it
S. FORMEW586E18 METRO INTERSECTION GRADING & CURB RAMP PLAN 106.13
no. R-, WKN BY AFRO DATE `"ccxm: ` "O TALBOT RD S & S 32ND ST GHEFRNGOF
METRO PROJECT ENGINEER CXXXXXXXX 186 XXXX
R-4214186