Loading...
HomeMy WebLinkAboutR-4214238a V No STANDARD ESC PLAN NOTES 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT S. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF M OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY SHALL BE DISPOSED OF PROPERLY. CATCH BASINS AND CONVEYANCE LINES SHALL BE REFERRED TO AS THE CITY, THE APPLICANT, AND THE 9, THE ESC BMPS DEPICTED ON THIS DRAWING ARE CLEANED PRIOR TO PAVING. THE CLEANING APPLICANTS CONTRACTOR. INTENDED TO BE MINIMUM REQUIREMENTS TO MEET OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INT(1 THE nC1WNCTRFGM CYCTFM 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION WASHINGTON STATE DEPARTMENT OF ECOLOGY PROGRESSES AND UNEXPECTED OR SEASONAL (ECOLOGY) CONSTRUCTION STORMWATER GENERAL CONDITIONS DICTATE, THE APPLICANT SHALL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE ANTICIPATE THAT MORE ESC BMPS WILL BE APPLICANT SHALL PROVIDE THE CITY'S COPIES OF ALL NECESSARY TO ENSURE COMPLETE SILTATION MONITORING REPORTS PROVIDED TO ECOLOGY CONTROL ON THE PROPOSED SITE. DURING THE ASSOCIATED WITH THE CONSTRUCTION STORMWATER COURSE OF CONSTRUCTION, IT SHALL BE THE GENERAL PERMIT. OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CREATED BY THE ACTIVITIES AND TO PROVIDE CONSTRUCTION SEQUENCE DETAILING THE ORDERED ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM STEPS THAT SHALL BE FOLLOWED FROM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT CONSTRUCTION COMMENCEMENT TO POST -PROJECT ADJACENT PROPERTIES AND WATER QUALITY OF THE CLEANUP IN ORDER TO FULFILL PROJECT ESC RECEIVING DRAINAGE SYSTEM. REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES AREAS AND THEIR BUFFERS, AND AREAS OF NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE VEGETATION PRESERVATION AND TREE RETENTION AS DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY CHANNELS, OR STORMWATER FACILITIES. DELINEATED BY FENCING AND PROTECTED IN THE 11. ANY DEWATERING SYSTEM NECESSARY FOR THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY CONSTRUCTION OF STORMWATER FACILITIES SHALL BE OF RENTON SURFACE WATER DESIGN MANUAL SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY NO DISTURBANCE BEYOND THE CLEARING LIMITS EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE TWO DAYS DURING THE WET SEASON (OCTOBER 1ST MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE THE DURATION OF CONSTRUCTION. DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE SHALL BE IMMEDIATELY STABILIZED WITH THE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND APPROVED ESC COVER METHODS (E.G., SEEDING, MAINTAINED FOR THE DURATION OF THE PROJECT. MULCHING, PLASTIC COVERING, ETC.) IN ADDITIONAL MEASURES, SUCH AS CONSTRUCTED CONFORMANCE WITH APPENDIX D OF THE RENTON WHEEL WASH SYSTEMS OR WASH PADS, MAY BE SWDM. REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL KEPT CLEAN AND TRACK- OUTTO ROAD RIGHT OF WAY CONSTRUCTION SITES BETWEEN OCTOBER IST AND DOES NOT OCCUR FOR THE DURATION OF THE APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC CITY. ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT WEATHER, AS NECESSARY TO PREVENT SEDIMENT REQUIRING IMMEDIATE ATTENTION, SHALL BE FROM ENTERING WATERS OF THE STATE. ADDRESSED WITHIN SEVEN (7) DAYS. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF- SITE OR IN DESIGNATED CONCRETE 15. THE ESC BMPS ON INACTIVE SITES SHALL BE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE INSPECTED AND MAINTAINED AT A MINIMUM OR ONCE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR MONTH OR WITHIN 24 HOURS FOLLOWING A STORM OPEN DITCHES. ON -SITE DUMPING OR EXCESS EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR CONCRETE SHALL ONLY OCCUR IN DESIGNATED MORE FREQUENTLY AS REQUIRED BY THE CITY. CONCRETE WASHOUT AREAS. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED ACTIVITY, CATCH BASIN INSERTS PER THE CITY AND IN OPERATION PRIOR TO LAND CLEARING AND/OR STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL CONSTRUCTION TO PREVENT TRANSPORTATION OF STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS FEET OF A DISTURBED OR CONSTRUCTION AREA, AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS BASIN INSERTS SHALL BE PERIODICALLY INSPECTED COMPLETE AND POTENTIAL FOR ON -SITE EROSION AND REPLACED AS NECESSARY TO ENSURE FULLY HAS PASSED. ALL ESC BMPS SHALL BE REMOVED FUNCTIONING CONDITION. AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON - SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 60% SUBMITTAL Jacobs REVEIov 6v 14PPD I -ATE 18, ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT- LADEN WATER FROM LEAVING PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON- SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1 ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS OF WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS OF WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. SEI. WI((/ XXX P. ENG _ - King County y CHECKED PNG,EGE18 METRO Q pO FSS ONALa Oa�� CHECKED C�ONNUCTNO'. METRO PROJECT ENGINEER CXXXXXXXX METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT TESC GENERALNOTES NOVEMBER 2021 pNWING NO 1 EC.OA SHEETNO: OF 238 XXXX R-4214238