HomeMy WebLinkAboutR-42143450
1 II 1 SD
r
IWviy
�p"Q No
P P-
T T
IUVT
0
47 S4
- SD SD SD SD S
S S��S
0
G G N
G —
0
— 10 0
(2ND-LINE) 22 o
S6
-14*mm 23 SD
IN
0
V
SS
SD
SD SD -
S
— G G
— ss
WW r
o p T
0
I m D
m
0
I w
60% SUBMITTAL
REvrioN
By 14PPD I --TE
O
I CV
L"
®
T—
T
T
48
SD
SD
s
S
S
G --
ss
ss
ss
-A
n1��P�
%_• Mmm
Irr p
SD
NOTES:
1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00.
2. FOR SIGNAL POLE DETAILS SEE 1TS1.01C.
3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.01 D.
4. FOR CONSTRUCTION NOTES SEE 1TS1.01 B.
5. FOR ILLUMINATION PLANS, SERVICE BREAKER PANEL SCHEDULE AND DETAILS SEE
XXXXX.
6. FOR ITS PLANS AND DETAILS SEE XXXXX.
7. FOR TREE PROTECTION PLANS SEE XXXXX.
8. NEW VEHICLE SIGNAL HEAD 23 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M"
ON EXISTING MAST ARM PER WSDOT STANDARD PLAN J-75.20.
9. NEW BIKE SIGNAL HEADS 11 AND 12 SHALL BE INSTALLED WITH NEW MOUNTING TYPE
"F" ON NEW TYPE I POLE PER WSDOT STANDARD PLAN J-75.10.
10. NEW COUNTDOWN PEDESTRIAN SIGNAL HEAD 25 AND 49 SHALL BE INSTALLED WITH
NEW MOUNTING TYPE "A" ON NEW TYPE I POLE PER WSDOT STD. PLAN J-75.10.
SIGNS
ONE WAY TUR
BE] 5 ON RED
6, SIGNAL 83 84
R6-1 (R) (EXISTING) S2 R10-11b (36" W x 36" H)
R10-10b (18" W x 24" H)
To � To
4� ONLY
® SPECIAL (RELOCATED) 233-51- (30" W x 36" H) S8 SPECIAL (RELOCATED)
LOGAN AVES]
0 D3-301(RELOCATED )
SIGNAL HEADS
EXISTING NEW
V 12' y 12" 8 Y 8"
46, 47, 48 49. 26
O 12" 24, 26, 27 . 12 . g. G 8
21, 22, 41 23 11 12
42,43
PRE-EMPTION SCHEDULE
CHANNEL
PHASES
A
4
B
2
PHASE DIAGRAM
1
5
BIKE
NOT
USED
2
s
i_
NOT
F+*
USED
3
7
NOT
NOT
USED
USED
4
UNOT
SED
1 PROTECTED VEHICLE MOVEMENT
t--O-1 PEDESTRIAN MOVEMENT
�1 BIKEMOVEMENT
Is �FWEr� DROWNS PENOV
F H/
Q4R�,0 ,y�Tay�� wuwN: � King County
J. GANS
CHECKE
M.WEG PNaE6ENo METRO
CHECKED E00588E18
`isYpNAy E�0 cxmxmcoxrRacTxo.
METRO PROJECT ENGINEER CXX%RRRRx
N
0' 10, 20'
SCALE: V = 20'
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
SIGNAL PLAN
S 2ND ST & LOGAN AVE S
NOVEMBER 2021
1TS1.01A
SxETNo Of
345 XXXX
T-421445
R-4214345