Loading...
HomeMy WebLinkAboutR-42143450 1 II 1 SD r IWviy �p"Q No P P- T T IUVT 0 47 S4 - SD SD SD SD S S S��S 0 G G N G — 0 — 10 0 (2ND-LINE) 22 o S6 -14*mm 23 SD IN 0 V SS SD SD SD - S — G G — ss WW r o p T 0 I m D m 0 I w 60% SUBMITTAL REvrioN By 14PPD I --TE O I CV L" ® T— T T 48 SD SD s S S G -- ss ss ss -A n1��P� %_• Mmm Irr p SD NOTES: 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. 2. FOR SIGNAL POLE DETAILS SEE 1TS1.01C. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.01 D. 4. FOR CONSTRUCTION NOTES SEE 1TS1.01 B. 5. FOR ILLUMINATION PLANS, SERVICE BREAKER PANEL SCHEDULE AND DETAILS SEE XXXXX. 6. FOR ITS PLANS AND DETAILS SEE XXXXX. 7. FOR TREE PROTECTION PLANS SEE XXXXX. 8. NEW VEHICLE SIGNAL HEAD 23 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M" ON EXISTING MAST ARM PER WSDOT STANDARD PLAN J-75.20. 9. NEW BIKE SIGNAL HEADS 11 AND 12 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "F" ON NEW TYPE I POLE PER WSDOT STANDARD PLAN J-75.10. 10. NEW COUNTDOWN PEDESTRIAN SIGNAL HEAD 25 AND 49 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "A" ON NEW TYPE I POLE PER WSDOT STD. PLAN J-75.10. SIGNS ONE WAY TUR BE] 5 ON RED 6, SIGNAL 83 84 R6-1 (R) (EXISTING) S2 R10-11b (36" W x 36" H) R10-10b (18" W x 24" H) To � To 4� ONLY ® SPECIAL (RELOCATED) 233-51- (30" W x 36" H) S8 SPECIAL (RELOCATED) LOGAN AVES] 0 D3-301(RELOCATED ) SIGNAL HEADS EXISTING NEW V 12' y 12" 8 Y 8" 46, 47, 48 49. 26 O 12" 24, 26, 27 . 12 . g. G 8 21, 22, 41 23 11 12 42,43 PRE-EMPTION SCHEDULE CHANNEL PHASES A 4 B 2 PHASE DIAGRAM 1 5 BIKE NOT USED 2 s i_ NOT F+* USED 3 7 NOT NOT USED USED 4 UNOT SED 1 PROTECTED VEHICLE MOVEMENT t--O-1 PEDESTRIAN MOVEMENT �1 BIKEMOVEMENT Is �FWEr� DROWNS PENOV F H/ Q4R�,0 ,y�Tay�� wuwN: � King County J. GANS CHECKE M.WEG PNaE6ENo METRO CHECKED E00588E18 `isYpNAy E�0 cxmxmcoxrRacTxo. METRO PROJECT ENGINEER CXX%RRRRx N 0' 10, 20' SCALE: V = 20' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNAL PLAN S 2ND ST & LOGAN AVE S NOVEMBER 2021 1TS1.01A SxETNo Of 345 XXXX T-421445 R-4214345