Loading...
HomeMy WebLinkAboutR-421437215I DIED r I I N I � p o P D 1A � > I®HP a a 69 A 3 I x / o I 0 81 o I z — M M , I I RENTN a a 3 r p ILLA I 3 z zS 5 3$S 5 SS SS a v u I x 3 � o I o VJ z � O 3 o P T e xP 3 `— T T 91 63 " 62 61— P 0 o m p o SO N Q a_ 2 4A 4 Si w o I J I/ 6 S 0 3�� I 3 O m S E a SD 0 ~g� g�o § E m 60% SUBMITTAL Jacobs >F MW p ¢ No. REVG Ov SY APPD DATE NOTES: 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. 2. FOR SIGNAL POLE DETAILS SEE 1TS1.07D. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.07C AND 1TS1.07E. 4. FOR CONSTRUCTION NOTES SEE 1TS1.07B. 5. FOR ILLUMINATION PLANS AND DETAILS SEE XXXXX. 6. FOR ITS PLANS AND DETAILS SEE XXXXX. 7. NEW VEHICLE SIGNAL HEAD 91 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M" ON EXISTING MAST ARM PER WSDOT STANDARD PLAN J-75.20. 8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 69 AND 88 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "D" ON NEW POLES PER WSDOT STD. PLAN J-75.10. 9. LOOP DETECTORS 911 AND 912 $HALL CALL QUEUE JUMP PHASE 9. PROGRAM THE CONTROLLER SO THAT BOTH LOOPS MUST BE OCCUPIED AT THE SAME TIME TO CALL QUEUE JUMP PHASE 9. SIGNAL HEADS EXISTING O 12m O 12m YY 12 O 12 / OG 12" O 12" / 21, 22, 61, 62, 31, 32, 33, 71 63,11,12 / NEW RELOCATED O12 O 12' 69.88 ® 12" / BUS SIGNAL 91 O 12O 12"5 O 12 O 12 28, 29, 68, 89 O12 O 12 FLASHING 41, 42 O 12" 51 J.DAMS P. ENG H/ Q4R�,o NCT�z�'A JDRAWNDAM King County J. DAMS CHECKE M.WEG PxaE6Exo METRO CHECKED E00588E18 `isYpNAy EEO cxmxmcoxrRACTxo. METRO PROJECT ENGINEER CXX%RRRRX PRE-EMPTION SCHEDULE CHANNEL PHASES A 2&5 B 4&7 C 6 D 3&8 PHASE DIAGRAM 1 5 NOT USED OLA 9, �SB QJ 2 6' 3 � 7 4 B' PROTECTED VEHICLE MOVEMENT *-O—) PEDESTRIAN MOVEMENT QJ = QUEUE JUMP LEADING PEDESTRIAN INTERVAL (LP) SIGNS BUS SIGNAL S1 SPECIAL (XX" W x XX" H) S RENTON VILLAGE PLACE s2 D3'031120^wx24"H) N 0' 10, 20' SCALE: 1"=20' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNAL PLAN TALBOT RD S & 1-405 SB OFF RAMP NOVEMBER 2021 1 TS 1.07A 1 372 XXXX T-421472 R-4214372