HomeMy WebLinkAboutR-4214401I No CONSTRUCTION NOTES OREMOVE EXISTING JUNCTION BOX OREMOVE EXISTING SMALL CABLE VAULT. O3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J40.10-04. 4O INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02. OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. O6 INSTALL CONDUIT(S) TO EXISTING JUNCTION BOX. O7 INTERCEPT EXISTING CONDUIT AND EXTENDED TO NEW JUNCTION BOX. OSPLICE FIBER TO PRE -TERMINATED PIGTAIL IN THE EXISTING FIBER PATCH PANEL BY CORRESPONDING COLORINUMBER. O SPLICE FIBERS TO PRE -TERMINATED PIGTAIL IN THE NEW FIBER PATCH PANEL BY CORRESPONDING COLORINUMBER. 10 CUT EXISTING 2-12CT FIBER LATERAL CABLES FROM EXISTING FIBER TRUNK AND CUT EXISTING FIBER TRUNK. PULL BACK EXISTING LATERALS INTO SIGNAL CABINET AND PULL BACK EXISTING TRUNK WEST TO NEW TYPE 8 JUNCTION BOX FOR REINSTALLATION. ABANDON EXISTING FIBER EAST TO GRADYRALBOT. 11 INSTALL SMALL OPEN BOTTOM CABLE VAULT PER DETAILS ON DRAWING 112.12. 12 INSTALL ETHERNET SWITCH IN THE SIGNAL CABINET. PATCH FIBERS TO SWITCH PER DETAILS ON DRAWING 112.02. 13 CUT EXISTING 2-12CT FIBER LATERAL CABLES FROM EXISTING FIBER TRUNK. PULL BACK EXISTING LATERALS INTO SIGNAL CABINET FOR REINSTALLATION. 14 INSTALL TYPE 8 JUNCTION BOX PER WSDOT STANDARD PLAN J40.30-04. 15 INSTALL ONE 3" PVC CONDUIT RISER ON EXISTING UTILITY POLE. SEE DETAILS ON DRAWING 112.14. SEE POLE SCHEDULE ON DRAWING 112.15 FOR HEIGHT OF RISER. i6 INSTALL NEW MESSENGER CABLE TO EXISTING UTILITY POLE AT HEIGHT SPECIFIED ON THE POLE SCHEDULE ON DRAWING 112.15. ATTACH NEW AERIAL FIBER OPTIC CABLE TO MESSENGER BY LASHING. SEE DETAILS ON DRAWING 112.14. 17 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO PRECONSTRUCTION CONDITIONS. 18 REPLACE EXISTING JUNCTION BOX LID WITH NON-SKID LID. 19 PULLBACK EXISTING 1-12CT WSDOT FIBER BACK TO EXISTING CABLE VAULT AND REINSTALL TO THE NORTH THROUGH NEW CONDUIT ROUTE. REMOVE EXISTING 1-25PR CUT COPPER CABLE TO THE NORTH. 20 CUT THE EXISTING 1-48CT SMFO LATERAL CABLE FROM THE FIBER TRUNK IN THE EXISTING SPLICE CASE. 21 PULL BACK EXISTING 148CT FIBER FROM 2ND/MORRIS SPLICE POINT AND REINSTALL THROUGH THE NEW INTERCEPTED CONDUIT AT 2NDIMORRIS INTERSECTION. 22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.011. COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. 23 COIL SLACK FIBER IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. 24 INSTALL FIBER SNOWSHOES FOR CABLE SLACK STORAGE AS INDICATED ON THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112,03, SEE DETAILS ON DRAWING 112.14. 25 NOT USED. P6 DISCONNECT EXISTING 1-36CT SMFO FROM EXISTING TRAFFIC SIGNAL AND PULL BACK TO NEW SMALL CABLE VAULT THROUGH NEW CONDUIT FOR SPLICING. 27 CUT EXISTING 1-24CT FIBER LATERAL CABLE FROM EXISTING FIBER TRUNK AND CUT EXISTING 48CT FIBER TRUNK IN EXISTING SPLICE CASE. PULL BACK EXISTING 48CT FIBER EAST TO THE SMALL SMALL CABLE VAULT AT LOGAN AVE FOR REINSTALLATION, THROUGH NEW CONDUIT. P8 PULL BACK EXISTING 1-288CT SOOT FIBER TO EXISTING MANHOLE CABLE VAULT AND REINSTALL TO SOUTH THROUGH EXISTING AND NEW CONDUIT ROUTE BY SEATTLE IT. 29 PULL BACK EXISTING 1-48CT FIBER FROM THE EXISTING SPLICE POINT AND REINSTALL THROUGH EXISTING CONDUIT AND NEW INTERCEPTED CONDUIT TO THE EAST TO THE NEW CABLE VAULT AT THE GRADY/LAKE INTERSECTION. 30 REPLACE EXISTING TRAFFIC SIGNAL CONTROLLER WITH NEW SEPAC M60 CONTROLLER. WRIONED 60% SUBMITTAL MEs�xEo P.ENG ON PN PG DRAM S P. V O4 WA`g5't �• MNWN: „F °a�LIU L9 King County � � CHECKED PaaE6ENo METRO Aconcord ^eyEOere°tip CHECKED E00588E18 ,,JOIST @� CHECKED: LIXITMCTNJ'. RSvlo'i0N BY APPD DATE E N G IN EERI N G METRO PROJECT ENGINEER CX%%%%%XX ITS GENERAL NOTES 1. CONTACT THE CITY OF RENTON TRANSPORTATION MAINTENANCE MANAGER ERIC CUTSHALL AT (425) 430-7423 TO COORDINATE ACCESS INTO TRAFFIC SIGNAL CONTROLLER CABINETS. 2. SLACK CABLE FOR FIBER TERMINATIONS SHALL NOT BE STORED IN THE TRAFFIC SIGNAL CONTROLLER CABINET. SLACK CABLE SHALL BE COILED IN THE VAULT INDICATED ON THE PLANS. SEE FIBER ROUTE SCHEMATIC DRAWINGS 112.01-02 FOR QUANTITIES OF CABLE TO BE STORED IN EACH VAULT. 3. AT LEAST TWO LOOPS OF FIBER CABLE SHALL BE STORED IN ALL JUNCTION BOXES WHERE AN EXACT AMOUNT OF SLACK IS NOT IDENTIFIED. 4. ALL CABLES INSTALLED BY THE CONTRACTOR SHALL BE LABELED IN EACH JUNCTION BOX, VAULT, AND TRAFFIC SIGNAL CONTROLLER CABINET. 5. ANY EXISTING PULL ROPE OR PULL TAPE USED FOR THE INSTALLATION OF NEW CABLING SHALL BE REPLACED WITH A NEW PULL TAPE OF THE TYPE DESCRIBED IN THE SPECIFICATIONS. 6. ALL EXISTING UTILITIES SHALL BE LOCATED AND MARKED IN THE FIELD BEFORE PERFORMING ANY UNDERGROUND WORK. CARE SHALL BE EXERCISED WHEN EXCAVATING, TRENCHING OR BORING NEAR EXISTING UTILITIES. 7. ALL CONDUIT ROUTES SHOWN IN THE PLANS ARE TO BE FIELD VERIFIED. CONDUIT ROUTES AND JUNCTION BOX PLACEMENT IS SCHEMATIC. EXISTING LEGEND PROPOSED DESCRIPTION PROPERTY LINE RIGHT-OF-WAY FENCE POWER VAULT UTILITY POLE UTILITY POLE ANCHOR FIRE HYDRANTS TRAFFIC SIGNAL CABINET ELECTRICAL SERVICE CABINET TRAFFIC SIGNAL POLE TRAFFIC SIGNAL POLE WITH LUMINAIRE VEHICLE SIGNAL HEAD PEDESTRIAN SIGNAL HEAD OPTICOM EVP DETECTOR TRAFFIC SIGN LUMINAIRE POLE (TIMBER) gp� JUNCTION BOX - TYPES 1, 214 AND 3/8 PULL BOX © 25-TA CABLE VAULT MANHOLE AFO AERIAL FIBER OPTIC ---- CONDUIT OCONSTRUCTION NOTE QWIRE NOTE METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT INTERCONNECT GENERALNOTES NOVEMBER 2021 111.00 1 401 XXXX F-4214101 R-4214401