Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR-4214404!1 E
1 Comm©
WIRING SCHEDULE
RUN NO.
QCONDUITSIZE
CONDUCTORS
REMARKS
1
EX. 2"
EX. 1 - 48 SMFO
2
3" PVC**
1 - 12 SMFO
**SEE SIGNAL PLAN FOR CONDUIT INSTALLATION
3
EX. 1.5"
EX 148 SMFO***
***REMOVE
4
EX. 211**
1 - 12 SMFO
**SEE SIGNAL PLAN FOR CONDUIT MODIFICATIONS
s s s s s—
EX. TYPE 1 S S S S
S 2ND ST L
19+00 (2ND-LINE) 18+Do
SD SO Sn cn �>
JB06 JB❑Lj JBp
T --- T
N
O
JB❑ 1 0 r — — — — — t—j
WizM
see murvHL ruary —
1TS1.03 0
r 2 s =
\ NEW TRAFFIC SIGNAL CABINET 8 12
784180-0085 p
zi
s �S
C/' \ _
x
z
a
x
0
U
O
o
12
mix
WPRMD
60% SUBMITTAL DESIGNED P.
$ N P M. POWERS P. ENG
six jaco s �ep4.,�o
P�
oDRAM
R $ �� X. LIN
CHECKED: PROJECT NO:
S p
boo ^ gEcer2eW°ti'� S. RAHMAH EW588E18
WW x '�+ e`99IONAL gNK` CHECKED: CoNFEKEi IYJ
p w < no. R-, IK N BY AFRO DATE concord
pX E E N G I N E E R I N G METRO PROJECT ENGINEER CXXXXXXXX
0
LJ
s s =
N
sD
s s s LLJ
w
1n
1 16
1
FOICV O O
CD
z
— — — N
z
O J
S
Q
L9 King County
METRO
GENERAL NOTES
1. SEE SIGNAL PLANS ITS1.03 FOR ADDITIONAL WORK AT
THE INTERSECTION.
CONSTRUCTION NOTES
iO REMOVE EXISTING JUNCTION BOX
OS SPLICE FIBERS TO PRE -TERMINATED PIGTAIL IN THE NEW FIBER PATCH
PANEL BY CORRESPONDING COLORINUMBER.
11 INSTALL SMALL OPEN BOTTOM CABLE VAULT PER DETAILS ON DRAWING 112.12.
12 INSTALL ETHERNET SWITCH IN THE SIGNAL CABINET. PATCH FIBERS TO
SWITCH PER DETAILS ON DRAWING 112.02.
20 CUT THE EXISTING 148CT SMFO LATERAL CABLE FROM THE FIBER TRUNK IN
THE EXISTING SPLICE CASE.
22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.07.
COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN THE
FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02.
N
0' 20' 40'
SCALE: 1"=20'
METRO TRANSIT CAPITAL DIVISION DAMS
RAPIDRIDE I LINE NOVEMBER 2021
RENTON SEGMENT OMWING NO.
INTERCONNECT PLAN 111.03
2ND 21+00 TO 2ND 16+00 GHEErNDOF
404 XXXX
T-4214104
R-4214404