Loading...
HomeMy WebLinkAboutR-4214404!1 E 1 Comm© WIRING SCHEDULE RUN NO. QCONDUITSIZE CONDUCTORS REMARKS 1 EX. 2" EX. 1 - 48 SMFO 2 3" PVC** 1 - 12 SMFO **SEE SIGNAL PLAN FOR CONDUIT INSTALLATION 3 EX. 1.5" EX 148 SMFO*** ***REMOVE 4 EX. 211** 1 - 12 SMFO **SEE SIGNAL PLAN FOR CONDUIT MODIFICATIONS s s s s s— EX. TYPE 1 S S S S S 2ND ST L 19+00 (2ND-LINE) 18+Do SD SO Sn cn �> JB06 JB❑Lj JBp T --- T N O JB❑ 1 0 r — — — — — t—j WizM see murvHL ruary — 1TS1.03 0 r 2 s = \ NEW TRAFFIC SIGNAL CABINET 8 12 784180-0085 p zi s �S C/' \ _ x z a x 0 U O o 12 mix WPRMD 60% SUBMITTAL DESIGNED P. $ N P M. POWERS P. ENG six jaco s �ep4.,�o P� oDRAM R $ �� X. LIN CHECKED: PROJECT NO: S p boo ^ gEcer2eW°ti'� S. RAHMAH EW588E18 WW x '�+ e`99IONAL gNK` CHECKED: CoNFEKEi IYJ p w < no. R-, IK N BY AFRO DATE concord pX E E N G I N E E R I N G METRO PROJECT ENGINEER CXXXXXXXX 0 LJ s s = N sD s s s LLJ w 1n 1 16 1 FOICV O O CD z — — — N z O J S Q L9 King County METRO GENERAL NOTES 1. SEE SIGNAL PLANS ITS1.03 FOR ADDITIONAL WORK AT THE INTERSECTION. CONSTRUCTION NOTES iO REMOVE EXISTING JUNCTION BOX OS SPLICE FIBERS TO PRE -TERMINATED PIGTAIL IN THE NEW FIBER PATCH PANEL BY CORRESPONDING COLORINUMBER. 11 INSTALL SMALL OPEN BOTTOM CABLE VAULT PER DETAILS ON DRAWING 112.12. 12 INSTALL ETHERNET SWITCH IN THE SIGNAL CABINET. PATCH FIBERS TO SWITCH PER DETAILS ON DRAWING 112.02. 20 CUT THE EXISTING 148CT SMFO LATERAL CABLE FROM THE FIBER TRUNK IN THE EXISTING SPLICE CASE. 22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.07. COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. N 0' 20' 40' SCALE: 1"=20' METRO TRANSIT CAPITAL DIVISION DAMS RAPIDRIDE I LINE NOVEMBER 2021 RENTON SEGMENT OMWING NO. INTERCONNECT PLAN 111.03 2ND 21+00 TO 2ND 16+00 GHEErNDOF 404 XXXX T-4214104 R-4214404