Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR-4214407WIRING SCHEDULE
RUN NO.
QCONDUIT
SIZE
CONDUCTORS
REMARKS
1
3"PVC
1-48SMFO
CONSTRUCTION NOTES
O4 INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02.
OS TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND
CONDUIT TO AVOID UTILITIES.
23 COIL SLACK FIBER IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN
THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02.
1 5
a s 192305-9070
\ 1 s
O
r — — _ _ 0 4 23 k 192305-9070 \
O P ©MWEL
L J P P _- O
P P H
P W LJ
Cn T �� W W W W LaJ
T T T W W W W W T
Li T N
WLJ OIL]OHP W
I OHP OMP \ p �
00 WAY
_ - - _ 24\V23+0 -_ OHP 20v 21.022+00 _ O
oHP HP
HP\ - I (GRA-LINE) OH
- ~ +
OHP
Q �\ OHP —a \\ OHPP� � N
OHP� HFr—
CO OHp OHP \ ❑
LLJ
\
Z SD OHP OHP
\OA?p 0 as as P as as as — as W P
p J
OHP
ohA NA P Q
Q OHP \ P <
oMP
Okyp
OhA HA A \
Oyp
OhA\192305-9023 °N °hA
\ °hA
ohA NA N\\ONA
0' 20' 49
SCALE: 1"=20'
DESIGNED. WPRMD: DAM
60% SUBMITTAL ' METRO TRANSIT CAPITAL DIVISION NOVEMBER 2021
G p4W"po MARS PENS RAPIDRIDE I LINE
Jacobs m" �, X.LIII
`NH, �' DRAWN:
�F`"°a� L9 King County
�
CHECKED: PRQIECTND: DRPWING NO'.
p METRO RENTON SEGMENT
concord "F`9s'ONAL � CHECKM CONCR 18 RA 19+ 0 TO GR PLAN 111.07
n". a=;rr:�N sr aPPo DATE `°""` � `"E`Km: `DNTFADTNO. GRA 19+00 TO GRA 24+00 G"EET"°' °`
E N G I N E E R I N G „lm^ll,.11,.1IlIn,.,«e 407 xxxx
T-4214107
R-4214407