Loading...
HomeMy WebLinkAboutR-4214415N S S mB �E6 sR€� o A 60% SUBMITTAL JacobsPN Pp DM. RAWN RS P. ENG V O4 WA`SHI � DRAWN „F `"°a� LIU L9 King County CHECKED PaaE6ENo METRO Aconcord ^eyEcere°tip SECKED E00588E18 '9(GNAL @� CHECKED: LIXITMCTNJ'. no. RSvlo'i0N BY APPD DATE E N G IN EERI N G METRO PROJECT ENGINEER CX%%%%%XX n R %/ 14w1 • ■ xmp LLI z J U Q GENERAL NOTES 1. SEE SIGNAL PLANS 1TS1.10A FOR ADDITIONAL WORK AT THE INTERSECTION. CONSTRUCTION NOTES iO REMOVE EXISTING JUNCTION BOX OTRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. O INSTALL CONDUIT(S) TO EXISTING JUNCTION BOX. O8 SPLICE FIBER TO PRE -TERMINATED PIGTAIL IN THE EXISTING FIBER PATCH PANEL BY CORRESPONDING COLORINUMBER. 11 INSTALL SMALL OPEN BOTTOM CABLE VAULT PER DETAILS ON DRAWING 112.12. 15 INSTALL ONE Y PVC CONDUIT RISER ON EXISTING UTILITY POLE. SEE DETAILS ON DRAWING 112.14. SEE POLE SCHEDULE ON DRAWING 112.15 FOR HEIGHT OF RISER. 16 INSTALL NEW MESSENGER CABLE TO EXISTING UTILITY POLE AT HEIGHT SPECIFIED ON THE POLE SCHEDULE ON DRAWING 112.15. ATTACH NEW AERIAL FIBER OPTIC CABLE TO MESSENGER BY LASHING. SEE DETAILS ON DRAWING 112.14. 22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.07. COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. 26 kRKS INTO VAULT 10VE DISCONNECT EXISTING 1-36CT SMFO FROM EXISTING TRAFFIC SIGNAL AND PULL BACK TO NEW SMALL CABLE VAULT THROUGH NEW CONDUIT FOR SPLICING. METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT INTERCONNECT PLAN 108TH 13+00 TO 108TH 18+00 T 0' 20' 40' SCALE: 1"=20' NOVEMBER 2021 111.21 1 415 XXXX T-4214115 R-4214415