No
WIRING SCHEDULE
RUN NO.
XQ
CONDUIT SIZE
CONDUCTORS
REMARKS
1
AERIAL
1 -48 SMFO
2
3"PVC
1-12SMFO
3
31,PVC
2-48SMFO
60% SUBMITTAL JacobsPN Pp M.PGWERS P. ENG
V O4 WA`SHI � MNWN:
„F °a� L9 King County
� $� x.uu
.WM PaaE6EI METRO
t�concord ^eyEcere°tip SRAHM: E00588E18
9(ONAL @� CHECKED: LIXITMCTNJ'.
RSvlo'i0N BY APPD DATE
E N G I N E E R I N G METRO PROJECT ENGINEER CX%%%%%XX
GENERALNOTES
1. SEE SIGNAL PLANS 1TS1.12A FOR ADDITIONAL WORK AT
THE INTERSECTION.
CONSTRUCTION NOTES
O3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN 140.10-04.
OINSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02.
O TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND
CONDUIT TO AVOID UTILITIES.
OSPLICE FIBERS TO PRE -TERMINATED PIGTAIL IN THE NEW FIBER PATCH
PANEL BY CORRESPONDING COLORINUMBER.
15 INSTALL ONE T PVC CONDUIT RISER ON EXISTING UTILITY POLE. SEE
DETAILS ON DRAWING 112.14. SEE POLE SCHEDULE ON DRAWING 112.15
FOR HEIGHT OF RISER.
16 INSTALL NEW MESSENGER CABLE TO EXISTING UTILITY POLE AT HEIGHT
SPECIFIED ON THE POLE SCHEDULE ON DRAWING 112.15. ATTACH NEW
AERIAL FIBER OPTIC CABLE TO MESSENGER BY LASHING. SEE DETAILS ON
DRAWING 112.14.
17 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS
NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO
PRECONSTRUCTION CONDITION.
22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.07.
COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN
THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02.
r
n
w
T
H
Al'
W
Yr
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
INTERCONNECT PLAN
108TH 28+00 TO 108TH 33+00
0' 20' 40'
SCALE: 1"=20'
NOVEMBER 2021
111.22
1 418 XXXX 1
T-4214118
R-4214418