Loading...
HomeMy WebLinkAboutR-4214440e3 0 0 WIRING SCHEDULE CONDUIT WIRE SPAN OR EXISTING STREET PEDESTRIAN CONDUITSIZE CONDUCTORS LIGHTING LIGHTING GROUND NOTES 2" PVC 2/C#10 146 1 STUBOUT V FROM EDGE OF CONCRETE 2" PVC FOUNDATION, CAP FOR FUTURE USE 2" PVC 246 1-46 2 2"PVC SPARE 2" PVC 446 146 3 2"PVC I SPARE 2 U Q 60% SUBMITTAL vaC�bS �.-� �V,HE X. CHEN P. ENG Rof WASHH Gn� MWVMI � a King County q g ING CH CKE X.ZHAN' EM566EPROJECTNo: METRO 0 20100fi25 �4p .ass mfirfi�o ot2 X. ZHANG E00588E18 No. REv612A BY APP'D -ATE Togeu CHECKED CoxmNOTINO METRO PROJECT ENGINEER CXXXXXXXX NOTES 1. SEE SHEET 1L1.N1 FOR STREET LIGHTING GENERAL NOTES. 2. SEE SIGNAL DRAWINGS FOR ADDITIONAL CONDUIT, AND WIRING AT THE INTERSECTIONS. 3. SEE SHEET 11-2.01 FOR WIRING SCHEMATICS. 4. SEE SHEET 11-2.05 FOR POLE SCHEDULES. CONSTRUCTION NOTES iO INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER CITY OF RENTON STANDARD PLAN 117.1. OINSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. OREPLACE EXISTING LUMINAIRE ON EXISTING POLE. O4 REMOVE EXISTING STREET LIGHT POLE, FOUNDATION, BRACKET ARM, LUMINAIRE AND ASSOCIATED WIRING. N 0' 20' 40• SCALE:1"=20' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT LIGHTING PLAN GRA 10+00 TO GRA 14+00 NOVEMBER 2021 1 L1.05 1 440 X)= T-4214140 R-4214440