HomeMy WebLinkAboutR-4214469n
�/cb
ZT
S GRADY WAY
1n
0
D_
F--
m
H
LOCATION MAP
OB STATION
PANEL: #
VOLTAGE RATING: 120 VOLTS, 1 PHASE, 2 WIRE
BUS RATING: 100 AMPS
MAIN BREAKER: 60 AMPS
FEED: BOTTOM
FAULT CURRENT:AMPS
INTERRUPTING CAPACITY: 22,000 AMPS
CIRCUIT DESCRIPTION
VA
CKT
BRKR
TECH PYLON
84
1
1/20
SHELTER LIGHTS
20
2
1/20
SPACE
3
SPACE
4
SPACE
5
SPACE
6
GFCI
1 180
1 7
1
1/20
CONNECTED LOAD = (84+20+180) = 284 VA = 2.367 AMPS AVERAGE
CONTINUOUS LOAD = ((94+20)*1.25+180) = 310 VA = 2.583 AMPS AVERAGE
#12-3TC, 248,#8G
#8G
#12-3TC
UINULKUKUUINU
TRANSFORMER
VAULT
ELECTRICAL WIRING SCHEMATIC
f3iJ
PER PSE
GENERALNOTES
1.
THE 60% DESIGN REFLECTS THE ASSUMPTION THAT PSE WILL
PROVIDE CONDUIT(S) FROM THE PRIMARY SERVICE POINT TO A
SECONDARY SERVICE JUNCTION BOX FOR STATION SERVICE
CONNECTIONS PRIOR TO I LINE RAPIDRIDE CONSTRUCTION.
2.
HAND DIGGING OR EXCAVATION BY VACTOR MAY BE REQUIRED FOR
CONDUIT INSTALLATION IN AREAS WHERE EXISTING UNDERGROUND
PSESECONDARY
UTILITIES AND/OR TREE ROOTS ARE PRESENT,
JUNCTION BOX
3.
SEE 1S1.10 FOR STATION PLANS AND AMENITIES DETAILS.
PSE UNDERGROUND
CONSTRUCTION NOTES
TRANSFORMER VAULT
OTRENCH
AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
AND CONDUIT TO AVOID UTILITIES.
OBORE
AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES
AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS
BACK TO PRECONSTRUCTION CONDITION.
OPROVIDE
AND INSTALL 60A, 120V METRO NON -METERED ELECTRICAL
SERVICE PEDESTAL, SEE 1E2.01 FOR MOUNTING AND FOUNDATION
DETAIL. THE FRONT DOOR OF THE CABINET SHALL BE ORIENTED AS
SHOWN BY "F" ON THE PLANS.
O4
PROVIDE AND INSTALL WSDOT TYPE 2 JUNCTION BOX PER WSDOT
STANDARD PLAN J40.10-04. LABEL JUNCTION BOX "METRO".
U)
0
O
m
J
WIRING SCHEDULE
RUN NO.
X
CONDUIT SIZE
SHELTER LIGHTS
TECH PYLON
GROUND
SERVICE
PULLTAPE
REMARKS
1
2"RGS METRO SERVICE
244
2"RGSMETROELEC.
#12-3TC
2-#8
48G
2
2" RGS METRO ELEC.
1
SPARE
3
3/4" RGS METRO ELEC.
#12-3TC
LABEL CONDUCTORS WITH "SHELTER
LIGHTS"
4
1' RGS METRO ELEC.
2-#S
48G
LABEL CONDUCTORS WITH "TECH
PYLON"
5
1.5" PVC METRO ITS
1
SPARE
6
2"PVC METRO ITS
1
SPARE
7
PER PSE
PER PSE
LEGEND
Q METRO ELECTRICAL SERVICE PEDESTAL
F
10 JUNCTION BOX TYPE 2
BURIED I CONCEALED CONDUIT
METRO BUS SHELTER
A METRO TECHNOLOGY PYLON
0' 10, 20'
SCALE: 1' =10'
60% SUBMITTAL 7 W n..nv.. METRO TRANSIT CAPITAL DIVISION NovEMBER 2021
Jacobs :��°.�'�°c� DRAM EN PENG RAPIDRIDE 1 LINE
9� g A KING L9 King County
q CHECKED. PROJECT NO: RENTON SEGMENT DMWNGNo:
Aconcord %�19T � MECKED IN CONTYE0056&EI8
TN METRO ELECTRICAL SITE PLAN 1EOF
Nc. REVISION BY ABED DATE orvnu cxecKEo. coNrNncr xo: ID#55936 sxEETxo. or
E N G IN EER ING MFTxn PRniFCT FNAINFFR 469 XXXX
T-4214169
R-4214469